Steel Authority of India Limited (SAIL) Earnings Call Transcript & Summary
May 21, 2024
Earnings Call Speaker Segments
Operator
operatorJust a note that this call is being recorded. At this point I'll turn things over to Mr. Ashish Kejriwal of Nomura Institutional Equities. Thanks, and the floor is yours, Mr. Ashish.
Ashish Kejriwal
analystThanks, Manuja. Good afternoon, everybody. Once again, on behalf of Nomura Institutional Equities, we're happy to welcome all of you to this call reviewing Steel Authority of India's Q4 FY24 results. We're pleased to have with us Mr. Praveen Nigam, Executive Director of Finance and Accounts, and joining him are specialists from various departments such as operations, marketing, raw material, and so on. That way, if anyone wants to raise questions touching those areas as well, the picture will be more complete. So I'd now invite Mr. Nigam to give his opening remarks, after which we can begin the question and answer session. Over to you, sir.
Praveen Nigam
executiveYes. Thank you, Mr. Kejriwal. Good afternoon, everyone, and a warm welcome to all our investors and analysts joining this results conference call to discuss SAIL's financial results for Q4 and the annual FY 2024. I believe you have already reviewed the results posted on the company's website as well as on the stock exchanges with BSE and NSE. I will briefly walk you through them before we move to the question and answer session, where we will be glad to address your queries. Let me first update you on the economic scenario under which we have been operating. At the start of the year, the outlook for the global economy appeared gloomy. Supply chain disruptions occurred in the aftermath of the pandemic. The Russia-Ukraine war triggered a global energy and food crisis, a surge in inflation, followed by globally synchronized monetary policy tightening — all of this painted a bleak picture and pointed to a recession. However, the economy demonstrated remarkable resilience as inflation gradually subsides and banks have eased monetary policies. These developments have charted a steady path for the economy, with estimates for CY 2023 at 3.2% and the prediction for the next two year holding at the same level as per the latest IMF World Economic Outlook, published in April 2024.
Praveen Nigam
executiveSimultaneously, downside risks to that outlook come from the highest interest rates, political strife in other regions, elevated debt levels, and the pulling back of physical support. Turning to the Indian economy, it keeps standing out as a bright spot while the world economy remains gloomy. By fighting inflationary forces more effectively than other economies, India has performed better than its peers, and that has preserved fairly steady conditions in the domestic market. Regarding the second estimate released by the Ministry of Statistics and Programme Implementation for financial year 24, the Indian economy expanded 7.6% over that period. According to projections from several major agencies such as RBI, World Bank, IMF, et cetera, growth is set to reach 7% in FY 25 and 6.5 in FY 26, which helps India retain its place among the fastest-growing major economies. Indeed, the World Bank has raised its FY 25 forecast for India considerably, from 6.4% in January 2024 to 6.6% in April 2024. Meanwhile, IMF has lifted its forecast for the economy in CY 2024 from 6.5 to 6.8. As for the world steel scenario, the global steel industry took a hit during 2023 because of several factors, including high inflation, declining household purchasing power, and mounting geopolitical uncertainties.
Praveen Nigam
executiveElevated costs and stricter lending practices have played a part in the deceleration seen across housing and manufacturing. In 2023, overall demand shrank 1.1% versus prior years. China, which consumes more steel than anyone else, is a source of concern, since real estate investment there keeps falling. Steel demand there fell 3.3% in 2023 compared with the year before, and it should stay flat in 2024, then contract 1% in 2025. Meanwhile, the European Union remains the region facing the toughest situation for steel growth. A mix of factors — geopolitical conflicts, elevated energy and commodity prices, and so on — produced a steep 10% year-over-year drop. That region should nonetheless bounce back in the years ahead, expanding 2.9% and 5.3% in 2024 and 2025, respectively. Demand growth overall looks set to swing positive, with the World Steel Association projecting gains of 1.7% and 1.2% in steel demand for 2024 and 2025 respectively, powered by countries such as India, Russia, Germany, Iran, and others. Turning to the Indian steel sector, it has kept expanding steadily on both output and consumption figures throughout the post-COVID period. In financial year 2024, crude steel production and finished steel consumption each rose by more than 13%.
Praveen Nigam
executiveAccording to the World Steel Association, SRO, India was among the strongest drivers of steel demand in 2021. Projections for 2024 and 2025, each at 8.2%, indicate that Indian steel demand will keep charging ahead, supported by continued growth across all steel-using sectors and, in particular, by sustained strong growth in infrastructure and investment. With imported coal prices having declined recently, the industry can also breathe a sigh of relief on the cost side. Meanwhile, steel prices have also been moving within a narrow band, and there are hopes for improvement in the quarters ahead. Now, let me share something about the company's performance for the quarter. Turning to the company's performance, SAIL registered its best ever physical performance during financial year 2024. The company's performance during financial year 2024 is as follows: our crude steel production stood at 19.239 MT, which is an increase of 5% over CPLY. CPLY, it was 18.291 MT. Saleable steel production stood at 18.437 MT, an increase of 7% over CPLY. The CPLY figure was 17.246 MT. Saleable steel SAILs volume stood at 17.024 MT, registering a growth of 5% over CPLY.
Praveen Nigam
executiveThe CPLY number came in at 16.197 MT. Actually, domestic SAILhas have posted growth of more than 6%, while exports recorded a 22% decline. Turnover, though, at INR 1,04,545 crore, is up 1%, since a 6% drop in price realization weighed on it. Turning to profitability, the company posted an EBITDA of INR 12,280 crore. That marks a 31% gain over CPLY. CPLY EBITDA had been INR 9,379 crore. Profit before tax and profit after tax were INR 3,688 crore and INR 2,733 crore, versus INR 3,263 crore and INR 1,903 crore, respectively, in CPLY. On the sustenance and operation efficiencies side, when it comes to operational efficiency, the company has been steadily progressing on cutting coal, the core cost, raising CDI usage, lowering specific energy consumption, lifting blast furnace productivity, and pressing ahead with efforts to enhance the product mix. Semis accounted for under 15% of saleable steel production. Through conversion services engaged in and around the plant, in the demand sector, the share of semis at SAILs has been low — even lower, at 8%.
Praveen Nigam
executiveLooking ahead, the lift from the different steps the government is taking on infrastructure spending points to good things for steel demand in the country. Since the overall picture is positive for steady growth in domestic consumption, we are hopeful about the realization, and as a result, the company's margin will get better in the quarters ahead. With that, I hand it back to Mr. Kejriwal so we can open the question and answer session. I am sure all of you have plenty of questions about how the company performed. Thank you. Mr. Kejriwal?
Operator
operatorThanks a lot. We’re going to start the question-and-answer portion now. If you’d like to ask something, you can press star and one on your touchtone phone. Should you want to take yourself out of the queue, just press star and two. We ask participants to use their handsets when asking a question. Ladies and gentlemen, we’ll pause briefly while the queue is put together. Our first question comes from Amit Dixit at ICICI Securities. Please go ahead.
Amit Dixit
analystYes, that's me, I believe. Well, good afternoon, everybody, and thank you for the chance to ask. I have two questions. The first concerns — if I look at operating expenditure, pardon me, other expenditure and employee cost, those appear to have declined during this quarter on a YOY basis. On a QOQ basis, looking at other expenditure, it's essentially flat, even though SAILs volume has risen considerably. So I just wanted to get a sense of the main drivers behind both, and what we ought to factor in, and what run rate we should assume going forward, particularly for employee cost? That's my first question.
Praveen Nigam
executiveRegarding employee costs, you know, there’s been a steady decrease when it comes to headcount. At SAIL, on average, the workforce is coming down by roughly 3,000 each year. That’s one of the main reasons employee cost has fallen.
Amit Dixit
analystWhat's the headcount at present, and where do you expect it to land by year end — and how much of a reduction does that represent for this year?
Praveen Nigam
executiveThe presentation we uploaded already has it. If you look at the slide — give me just a minute.
Amit Dixit
analystFifty-five.
Praveen Nigam
executiveThe figure is 55,000 as of 31st March 1989. The slide we uploaded shows this.
Amit Dixit
analystThat said, the 17% year-over-year drop in employee cost is a meaningful decrease that we're seeing, and especially between Q3 and Q4, we always saw a rise because of actuarial provisions and so on. So I just wanted to get a sense from that angle, you know, where is employee cost going?
Praveen Nigam
executiveBeyond that—beyond the headcount coming down—there's been a real gain specifically from leave encashment. That's another factor behind the drop in employee cost.
Amit Dixit
analystHow about the remaining spending? That too has stayed in check.
Praveen Nigam
executiveYes, on the other expenditure side, we've seen a decrease in power and telephone costs, and there are also some provisions that, you could say, we made last year but haven't made this year. That's one of the factors behind the drop in other expenditures.
Amit Dixit
analystWhat might that be, and can you put a number on those provisions, sir?
Praveen Nigam
executiveOn the provision side, the amount we set aside last year came to INR 229 crore. In Q4 of this year, we've recorded a provision of INR 52 crore, which means provisions are down by INR 177 crore.
Amit Dixit
analystAll right, that's fine. Regarding the second question, which concerns CapEx, sir — if you could just provide the specifics on that 31 million ton capacity expansion we're aiming for: where do we currently stand, what main configurations have been settled on, and what's the CapEx plan for this year? That's the second question.
Praveen Nigam
executiveOkay, on the Capex two question, what's the likely spend this year, and what's our overall Capex plan — especially since we've announced that from the current 20 million tons of crude steel, we'll raise capacity to 35 million by the end of 2031. For the current year, planned Capex is in the range of INR 6,300 crore. On the modernization and expansion plan, we've already announced that we'll do a phase-wise expansion. In the first phase, we're expanding our IISCO Steel Plant, where board approval for stage one is already in place. For Bokaro Steel Plant and Durgapur Steel Plant, a pre-feasibility report has already been prepared. The board has also given the go-ahead, and we'll proceed to further forming of the project report for Bokaro and Durgapur, and thereafter move forward.
Amit Dixit
analystSir, regarding that pre-feasibility report, how much would you spend in total, and in which year would that spending reach its peak?
Praveen Nigam
executiveNow regarding IISCO Steel Plant, at IISCO Steel Plant the figure stands at roughly INR 36,000 crore.
Amit Dixit
analystAnd what about the other one?
Praveen Nigam
executiveIn the other case, the consultancy is still working on it. We haven't yet finalized what the other costs will be in those other cases. But roughly, if you look, there's a 15 million ton increase — then if you look at SAIL as a whole, it will fall in the range of INR 100,000 crore to INR 110,000 crore.
Amit Dixit
analystAll right, sir, that's great. Thank you very much. I'll rejoin the queue, and best of luck.
Operator
operatorThanks. Our following question comes from Somaiah at Avendus Spark. You're live.
Analyst
analystThanks for the chance to ask, sir. First, I'd like some clarification regarding the price revision on a provision basis that we've taken for the day. So the INR 17 billion figure we mentioned this quarter—that covers both FY 2023 and 2024, that's one thing, and with this we're largely finished at least through the end of FY 2024; we don't anticipate any additional provisions moving forward. I just wanted to clarify that.
Praveen Nigam
executiveSo the provision we recorded in Q4 comes to INR 1,714 crore, and that covers financial year 2022, 2023 as well as 2023, 2024. Looking at that, the provision relating to the period before Q4 is INR 8,077 crore for 2022, 2023, while the impact for the nine months is INR 559 crore.
Analyst
analystYeah.
Praveen Nigam
executiveWhen it comes to Q4, that figure stands at INR 278 crore.
Analyst
analystSo moving ahead, we don’t—what I mean is, we aren’t expecting anything, at least through FY 24, when it comes to bookings. Is that the correct way to understand it?
Praveen Nigam
executiveNo, what we're talking about here is really provision prices. The way it works is that, as far as rail pricing goes, there's a department called cost — the CA Cost — which sits under the Department of Expenditure within the Ministry of Finance. They're the ones who determine the cost, meaning the prices that the railway is to be given. So our numbers are with them. They will make the final decision on what those prices will be. We're expecting a price that's better than the provision price the railway has given as of now, whatever that turns out to be.
Analyst
analystUnderstood. Sir, could you provide the booking rate expressed in rupees per ton for FY 2022, FY 2023, and FY 2024, along with what our plan is for FY 2024?
Praveen Nigam
executiveAs far as the exact prices go, I'll provide those to you offline.
Analyst
analystAll right, sir. Moving to the second question, which concerns coking coal. Could you share some detail on what the coking coal draft was during the quarter just ended, along with your expectations for the current quarter? And if you could also shed some light on how coking coal sourcing is mixed, that would be excellent.
Praveen Nigam
executiveRegarding coking coal prices, looking at Q3 — to be precise, they stood at INR 223,693 in Q3 — and in Q4 the cost came to INR 26,424. For the indigenous variety, it was INR 12,000, and in Q4 that figure was INR 13,000.
Ketan Mehta
analystWhat are the expectations for the current quarter?
Praveen Nigam
executiveWhat's the expectation for the current quarter? Yeah. Compared with Q4, it'll be down by roughly $30.
Ketan Mehta
analystUnderstood, and thanks. I’ll hand it back to you. Thank you.
Operator
operatorMuch appreciated. We now move to a question from Vikas Singh of PhillipCapital, who is on the line. Kindly proceed.
Vikas Singh
analystGood afternoon, sir, and thanks for giving me the chance to ask. I'd just like to get a sense of the volume growth target you're aiming for this year, particularly given that we're also carrying a significant amount of inventory?
Praveen Nigam
executiveSo we're aiming for output above 20 million tons, and on the sales side, that figure would come to 19 million tons.
Vikas Singh
analystThat covers some inventory sales as well, since — if I recall correctly — we currently hold more than 1.6 million tons of inventory.
Praveen Nigam
executiveCorrect. Our inventory exceeds 1.6 million tons, and our goal is to bring it down, and that's factored in here as well. The decrease in inventory during these 2 months specifically amounts to 2.09 lakh tons. As things stand right now, our inventory sits at 1.452 million tons.
Vikas Singh
analystGot it, sir. Sir, given that context once more, what's your view on how our net debt will trend? Since a sizable inventory liquidation would also take place. When is our target date for FY25?
Praveen Nigam
executiveAs you can see, our total borrowing came to roughly INR 30,500 crore. During this quarter, borrowings went up, largely due to the elevated inventory, there's no question about that, and also because of lower realization from the railway. Right now, our borrowing stands at about INR 35,000 crore. However, we anticipate that by the close of this financial year, since coal prices are declining, we will also be realizing our rail prices from the railway. And as for NSR, we expect that it won't decline further and will hold its position. Therefore, our borrowing ought to drop below the INR 30,000 crore level, just as it was this year.
Vikas Singh
analystGot it. Sir, I just need one point clarified regarding the railway side: were we also granted the ad hoc price, meaning that from here on all billing will happen at the new prices, or will we still be billing at the FY 2022 prices? I just wanted a bit of explanation on that.
Praveen Nigam
executiveOur policy is that until CA Cost provides the prices and the CRB subsequently grants approval, every bill gets raised using the existing rates alone. Right now, when we bill for 2021 to 22, 2022 to 23, and 2023 to 24, those billings rely solely on the current prices. Where 2021 to 22 is concerned, CA Cost has already issued its recommendation, and we are awaiting the CRB's approval. As soon as that CRB approval comes through, we will raise the final bill. For 2022 to 23 and 2023 to 24, CA Cost has not yet finalized the prices and has offered no recommendation, so we are waiting on CA Cost's recommendation. After that, it will go to the railway for CRB approval.
Vikas Singh
analystGot it, sir. That covers everything I had. Thanks for the chance to ask.
Operator
operatorThanks. Our following question comes from Ketan Mehta at BOB Capital Markets. You're live.
Ketan Mehta
analystThanks, sir, for the chance. My question relates to slide 27, where you showed a quarter-on-quarter benefit of INR 903 crore from raw material usage, partly offset by INR 894 crore of input price and cost. Could you go into detail on the specific items that were included under that INR 903 crore quarter-on-quarter raw material usage benefit?
Praveen Nigam
executiveGive me a second. Give me a second. Wait.
Operator
operatorHello?
Praveen Nigam
executiveHold on one second. I’ll be right back.
Operator
operatorSure.
Praveen Nigam
executiveYeah. So that movement in EBITDA that we've shown, it comes to roughly INR 452 crore because of coal. And it's INR 196 crore from the use of raw iron ore. There are other items too, such as nickel, ferro manganese, and so on. All of that adds up to INR 900 crore, which is what we've shown in our presentation.
Ketan Mehta
analystWhat sort of impact would that have — and this also appears as the next figure, INR 894 crore — which is partially cancelling out part of that gain?
Praveen Nigam
executiveINR 894 crore. Hold on one second. Yes, so this concerns the prices we pay for inputs. That's NSR. In other words, that represents a decrease in NSR.
Ketan Mehta
analystGot it, sir, thank you. For the second question — it concerned how much the structural mills are being utilized at the two plants, both the Universal Section Mill and the Medium Structural Mill. Could you give more detail on what their utilization stands at right now?
Praveen Nigam
executiveWhat about the structural mill at Burnpur and Durgapur in particular?
Pratim Roy
analystYeah.
Praveen Nigam
executiveMr. Puri is here from the Operations Directorate, and he'll take your question.
Pratim Roy
analystI appreciate that.
Praveen Nigam
executiveThis year, at Durgapur, the structural mills—that's MSM—along with USM at ISP, Burnpur, have done everything they could to make full use of our capacity. Next year, looking ahead, the targets in ABP remain modest for them, and they are ramping up quickly toward those. Many enablers have been provided to these two mills, simply because a great deal of foreign technology was involved, which took considerable time during their ramp-up. But at this point the spares and all positions have been frozen, and we intend to grow substantially at these two mills. Considerable growth is also planned within ABP at these two mills.
Pratim Roy
analystCould you give us the actual utilization level as a number? Did it come in above 70%, or can you offer some quantitative indication?
Praveen Nigam
executiveKiritani, please give me just a moment.
Pratim Roy
analystSure.
Praveen Nigam
executiveRight. Regarding what Mr. Puri said about Burnpur's USM, utilization there stands at 70% of capacity, while MSM is running in the 55%-60% range.
Pratim Roy
analystThanks very much, sir.
Operator
operatorThanks. Our next question comes from Ritesh Shah at Investec — go ahead. That caller is still on hold. We'll take the next question from Nalin Shah at NVS Brokerage. Please go ahead.
Nalin Shah
analystThanks for giving me the chance to ask. On one side, India is in the middle of an infrastructure boom, and on the other side, we also have the China factor. So given these contrasting forces, how do you see FY 25 playing out for steel companies?
Praveen Nigam
executiveRight, so if you look at that, from FY 2023 to 24, like I mentioned in my opening remarks, crude steel production and finished steel consumption both went up 13%. We expect positive growth in 2024 to 25 as well. And yes, on the China factor you're raising — the Chinese economy isn't in great shape. Especially with the U.S. imposing certain restrictions, steel included, there's every likelihood Chinese steel will flow into India and could put pressure on Indian steel too. But given the growth we're seeing in Indian steel consumption, we're still hopeful that whatever we produce gets consumed within the country. Government impetus for infrastructure development is already there. We expect this year's growth to be at least 12%-13%, for both production and consumption. Whatever imports come from China might have some impact, but it won't be severe. Even so, we're keeping a close watch, keeping an eye on imports from China.
Praveen Nigam
executiveActually, you can see it in this quarter specifically — long product prices have already gone up 12%-13%. That demonstrates there's a positive sentiment in the market.
Nalin Shah
analystYes, sir. Thank you, sir. Sir, and one more thing. I believe we now have permission to sell the low-grade fines. So what kind of impact would that have, sir?
Praveen Nigam
executiveWe do have the ability to sell the low-grade fines. As you can see, there's a heap located in Jharkhand, and those fines are also obtainable across the Odisha group of mines. For Jharkhand, permission has been granted to us for internal consumption of those fines. Selling those fines is not something we're in a position to do. We have a certain plan through which these fines can be pelletized, and following the pelletization, our own plants will consume them. That pelletization process is underway; it remains under construction under the comm method. That's what I can tell you.
Nalin Shah
analystYes. Thanks so much, sir. Yeah.
Operator
operatorThanks. Our next question comes from Pratim Roy at Batlivala & Karani Securities. Go ahead, please.
Pratim Roy
analystYeah. Hi, thanks for the chance to ask. I’ve got a couple of questions. First, what will the NSR be for Q4, for both long and flat? And what sort of NSR improvement can we expect for Q1, given that you just mentioned long steel prices have moved up by 12%-13%? So what kind of price increase can we expect by the end of this quarter? That’s the first question, sir.
Praveen Nigam
executiveDuring Q4, the long product was bringing in an NSR of INR 55,400, while the flat product was bringing in an NSR of INR 53,700.
Pratim Roy
analystMm-hmm.
Praveen Nigam
executiveRegarding Q1 of financial year 2024 to 25, the long figure we achieved comes to roughly 54,600, while the flat number stands at 53,500.
Pratim Roy
analystSir, you just brought up a 12%-13% rise in long steel prices. However, you said the 1Q long price was INR 54,600, if I'm not mistaken, and 4Q at INR 56,400.
Praveen Nigam
executiveLook, in April—if you look at what I mentioned—during April, long product prices sat around INR 51,700. What I stated in Q4 was the Q4 average, but looking at April, long prices were INR 51,700, and that has risen to INR 54,600 in May. So that's my point: there's a chance prices during the month have gone up where long product is concerned, and likewise the flat position as well.
Pratim Roy
analystAlright, sir. The second item: what's the capex guidance for FY 2025? It's INR 6,300 crore, correct?
Praveen Nigam
executiveYeah, yeah.
Pratim Roy
analystAnd yeah, if you could share some material output — when should we expect the proper CapEx guideline, and when can we expect that, how much capacity will arrive by FY 2026 or 2027 around May, or will it all come in FY 2031?
Praveen Nigam
executiveNot everything is going to arrive on a thirty-thirty-one schedule, exactly. Look, as I mentioned, where the IISCO Steel Plant is concerned, board approval has already been secured. We're now in the middle of finalizing the party. The tendering process is underway, and we expect that by the end of October, we'll probably be in a position to firm up the party, and then we'll obtain the approval — that's the second-stage approval from the board. After that, the expansion at the East Coast will begin. In the initial phase, as you can understand, only the drawing and design, et cetera, are shared. So this year, we aren't expecting much expenditure as far as CapEx is concerned, where modernization goes. As for our expectation, from 26, 27, and in particular 27, 28, and 28, 29 — the major CapEx will come, and as far as the facilities are concerned, where Burnpur goes, we're expecting by 2029. FY 2027, 28. In late 2027 or 2028, we'll be in a position to start commissioning of the facility at the East Coast plant. And after that, gradually, all the facility will get commissioned by 2030, 31.
Pratim Roy
analystAnd finally, just one more question to add. What’s the debt guidance you mentioned for FY 25? It’ll be around less than INR 30,000 crore. So will it stay in that same range for FY 26, or could it rise or something like that, or is there any leverage ratio we’re maintaining for the years ahead?
Praveen Nigam
executiveAs you know, we’ve consistently stated that we’ll maintain a 1:1 ratio when it comes to debt equity. As of 31st March, our current borrowing stands at around INR 30,000 crore. That figure has risen to INR 35,000 crore — because, as I mentioned, of the lower realization from the railway, and also due to inventory build-up. What we do expect, though, is that this inventory will be brought under control during this year, and the railway prices will also come through to us. Second, coal prices have dropped considerably — if they stay within that same range, our borrowing will decline further and will be below INR 30,000 crore by the end of March 2025.
Pratim Roy
analystAlright, sir. Understood — thanks for clearing that up.
Operator
operatorThanks. Our next question comes from Rashi Chopra at Citigroup. Go ahead, please.
Raashi Chopra
analystThanks. On NSR again, just to be clear, you mentioned that the long realization came to INR 55,400 for the quarter, correct?
Praveen Nigam
executiveYes.
Raashi Chopra
analystRegarding the INR 54,600 figure you mentioned, is that an average across April and May, or does it reflect just May's realization?
Praveen Nigam
executiveWe're at the midpoint of May.
Raashi Chopra
analystApril was 51,000?
Praveen Nigam
executiveFifty-one, correct.
Raashi Chopra
analystAll right, so when you blend it together, that figure remains below what we saw in both the first quarter and the fourth quarter.
Praveen Nigam
executiveThe figure remains below where it was, but looking at today's prices—specifically for the long product—at mid-month it stood at INR 54,000, while right now, based on the feedback we're getting from the market, it's sitting in the range of INR 58,000. That's exactly the point we're making: there's positivity in the market. Long prices have moved up compared with April, and we expect this positive sentiment to hold through the remaining months of this financial year as well.
Raashi Chopra
analystAll right, and where do flats stand in this? So what was April, mid-month and—
Praveen Nigam
executiveIf you look at mid-month in April, it was around INR 51,500, and by mid-month in May it had reached INR 53,500 — so from April to May, it was flat, flat, flat. And flat, more or less, is holding its position; it isn't rising the way long product has risen.
Raashi Chopra
analystAnd I apologize — what was the average NSR for the quarter, blended across flats and long?
Praveen Nigam
executiveQuarter means, quarter means, quarter four?
Raashi Chopra
analystCorrect.
Praveen Nigam
executiveIn quarter four, the average NSR — counting both long and flat together — came in around INR 54,500.
Raashi Chopra
analystAlright, thanks. Turning to costs — you said imported blending coking coal came in at INR 26,500, and,
Praveen Nigam
executiveThat's right.
Raashi Chopra
analystThat's compared with 23,700 in quarter three, correct?
Praveen Nigam
executiveYes.
Raashi Chopra
analystSo coking coal costs did go up, but on that slide, the bridge you presented, you mentioned an INR 450 crore improvement on the coking coal side. So did the blending ratio change, or, I mean, how did that decline come about, how was that decline explained by an increase?
Praveen Nigam
executiveNo, no. If you look at the slide, it's INR 453 because of usage. By usage I mean we've enhanced our blend and also bettered our techno-economic parameters. That's where this improvement comes from. Am I able to make that clear?
Raashi Chopra
analystRight. Got it. Okay, one more thing about CapEx. What was the target you mentioned for this year? I didn't catch it.
Praveen Nigam
executive8,300.
Raashi Chopra
analystWhat is this mainly about?
Praveen Nigam
executiveYou could mostly describe it as sustainable CapEx, and some payment will be involved — as I mentioned, we expect the IISCO Steel Plant matter to be finalized with this party, and the expansion to get underway perhaps from October or November. So at the outset, at the early stage, there may be certain payments made, but for the most part it's sustainable CapEx.
Raashi Chopra
analystSo IISCO can produce 4 million tons, is that correct?
Praveen Nigam
executiveYes.
Raashi Chopra
analystSo other than IISCO, Bokaro, and Durgapur, are you also looking to sweat capacities the way you do?
Praveen Nigam
executiveYeah, we're also working on sweating capacity, because whatever we've planned for this year is higher than what we achieved in the current year. So there are certain facilities we're trying to sweat, yes.
Raashi Chopra
analystApologies — what amount is that going to contribute, that sweating of capacity?
Praveen Nigam
executiveIn terms of sweating capacity, how much will it add? Hold on a moment. Hold on a moment. Yeah. As you can see, a new caster is coming at our Rourkela Steel Plant, and that will contribute 1.4 MT. We're also carrying out an upgrade of Blast Furnace 3 at Durgapur Steel Plant, which will contribute around 0.9 MT. In addition, a new coke oven battery is being built at IISCO Steel Plant, and it will contribute 0.4 MT. That, then, is the capacity increase we're going to achieve.
Raashi Chopra
analystAlright, thanks — that covers everything I wanted to ask.
Operator
operatorThanks. Our next question comes from Riddhi Panchal at Chanakya Capital. Go right ahead.
Riddhi Panchal
analystGood afternoon. For my first question, roughly how much energy does it take to make 1 ton of liquid steel that’s meant for sale?
Praveen Nigam
executiveWhat amount of energy does making a single ton of liquid steel take? 6.3. 6, 6.3? 6.31 gigacalorie.
Riddhi Panchal
analystGigacalorie — right, that's 6.31 gigacalorie.
Praveen Nigam
executiveLast year, that represented the best performance globally that we managed to reach. Mm-hmm.
Riddhi Panchal
analystWe posted 6.31.
Praveen Nigam
executiveYes.
Riddhi Panchal
analystThe second thing I'd like to ask is this: what is SAIL's cost per ton for iron ore, considering that SAIL operates its own iron ore mine?
Praveen Nigam
executiveThe cost for iron ore.
Riddhi Panchal
analystMm-hmm.
Praveen Nigam
executiveYes, that would land somewhere around INR 1,300 to INR 1,400 for each ton, with royalty added on top of that.
Riddhi Panchal
analystCould you repeat that, please?
Praveen Nigam
executiveThe price is INR 1,300 to INR 1,400 a ton, and on top of that there's royalty.
Riddhi Panchal
analystOkay. If it’s provided, what is that royalty percentage?
Praveen Nigam
executiveRight, so we do have mines across different states — Jharkhand, Odisha, and Chhattisgarh. Jharkhand's royalty runs higher since those mines were renewed after 2015. Over in Rourkela it remains lower, as the older leases are still in effect, while Bhilai also carries a high royalty. So, for the average figure across total royalty, we'll get that to you offline.
Riddhi Panchal
analystAlright, thanks. And just one final question: so with electric arc furnaces, they likewise use scrap — the same thing, industrial scrap, correct? So I just wanted to check whether that scrap is comparable to mild steel scrap, or whether it's a different material that we use, and what does it cost per ton for SAIL?
Praveen Nigam
executiveSo because of that, its steel isn't made using arc furnaces. Steel production there is essentially just the BF route. So which part exactly are you asking about?
Riddhi Panchal
analystSo, according to the website, one of the sources is industrial scrap — excess steel trimmed by the auto and appliance stampers. And that gets purchased through an auction run by SAIL.
Praveen Nigam
executiveIn our alloy steel facilities and our ferroalloy facility, production relies on arc furnaces.
Riddhi Panchal
analystMm-hmm. That's right.
Praveen Nigam
executiveRegarding the alloy steel plant we operate at Durgapur, it primarily uses steel scrap — mainly scrap generated by the plant itself. As for the cost, we'll share that offline. We won't be sharing cost on this call.
Riddhi Panchal
analystAll right, thanks.
Operator
operatorThanks. Our next question comes from Tushar Chaudhary, who is calling in from Prabhudas Lilladher. Go right ahead.
Tushar Chaudhari
analystGood afternoon, sir, and many thanks for the chance to speak. Sir, we were also in the process of adding 1 million tons of casters at both Bhilai and Rourkela. I believe we've touched on this over the last few quarters. Is there any update you can share on that? And on top of that, there was one TMT at DSP as well.
Praveen Nigam
executiveYes. Yes, Samir. Yeah, regarding Bhilai, that 0.8 MT is currently in trial, and when it comes to Rourkela, we expect this caster to arrive by 2025. The Bhilai unit can produce both beams and blooms. So the beam portion has already been commissioned, while the bloom portion is in trials. It has been tested with normal steel, but trials are still ongoing for rail steel.
Tushar Chaudhari
analystAnd what about TMT and DSP?
Praveen Nigam
executiveOn DSP and TMT, we have two proposals. One, I believe, sits on a COM basis, and the other we'd build ourselves, which is MEP. Both are still being worked through and aren't finalized yet. Rajeev? 1 million on site, 1.4 on COM. Right — 1 million tons is MEP, done on our own, and 0.4 is on a COM basis. But it's going to take time. It will take time.
Tushar Chaudhari
analystOkay. And sir, I missed the breakdown of that INR 1,700 crore figure we provided. Within that railway price revision, how much related to the FY 2023 portion?
Praveen Nigam
executiveOut of that INR 1,700 crore railway price, you can break it into three portions. If you look at how much relates to Q4 of 2023 to 2024, that came to INR 278 crore. The remainder related to periods before Q4, where the 9-month figure for 2023 to 2024 was roughly INR 550 crore, and the impact from 2022 to 2023 was approximately INR 877 crore.
Tushar Chaudhari
analystINR 827 crore.
Praveen Nigam
executive77.
Tushar Chaudhari
analystThank you very much, sir. I appreciate it.
Operator
operatorThanks. Our following question comes from Kamlesh Jain with Lotus Asset Managers, who is on the line. Go ahead, please.
Kamlesh Jain
analystThanks for giving me the chance. Sir, I have one question regarding CapEx. We, and SAIL as well, finished CapEx after roughly 10 years, and right now we're seeing those volumes come through in real time. So with the government placing such strong focus on divestment — as an example, RIN was also up for sale a while back, and the NMDC Nagarnar plant is also being sold — how confident should we be about these particular projects, meaning this capacity expansion? And if you could, shed some light on when this might come on stream or when ordering will take place, because frankly, across the last 5 years we've done only maintenance CapEx, roughly INR 4,800 crore of CapEx annually. And even with that, our debt has climbed to FY 2022 levels. There are reasons — coking coal prices also rose — but if you look at the other players, their CapEx, their debt levels, are at a multi-year low, even with heavy CapEx. Everyone is spending on CapEx and expanding capacity, and they have far more visibility on their capacity expansion. Yet in our situation, where the primary shareholder is on the divestment path, how confident should we be in this CapEx guidance that we're highlighting?
Praveen Nigam
executiveOn this modernization expansion plan, what we've announced going from 20 million to 35 million tons, as I said before, will happen in phases. As I've already explained, where Rourkela is concerned, stage one approval has already been obtained. We're in the tendering process and we expect that process to finish and the party to be finalized by maybe October. For Bokaro and Durgapur, the pre-feasibility report is already done, and we're in the process of seeking stage one approval from the board. Rajeev? Yes. Stage one approval from the board, and after that, we'll move further on Rourkela and the Bhilai Steel Plant. We've learned from our past experience that delays occurred in the expansion. There was time overrun. Taking that learning, we're pretty confident that this year, whatever we've planned, we'll be in a position to commission all our facilities as per the plan, and by June 30, 31, our facility will increase from the present 20 million ton to 35 million. As far as debt is concerned, what you referred to, that debt has increased — yes, we've seen debt has increased.
Praveen Nigam
executiveWe do have concerns about that, but the main driver behind the debt increase this year specifically — as I mentioned, our debtors have risen, as you can see in our results, to roughly INR 3,000 crore to INR 3,500 crore — is that the realization from the railway wasn't available, and we expect it to come through during this financial year. Also, inventory planning, especially in Q3, was affected by low demand. Since demand is now picking up, we expect that inventory to be liquidated as well. So realization from these two sources will also help bring our debt down. Second, coal prices during 2023 to 24 were quite high. NSR kept declining, and we're seeing a better picture, a better position in 2025, 2024 to 2025. Coal prices have dropped substantially and are holding in the range of around 239 to 240, which we expect will continue this year. So there won't be much stress as far as imported coal prices go. That will further help us bring our debt down. We expect that by the end of this particular year, our debt will be substantially lower by INR 2,000 crore, 2023 to 24, that is INR 30,000 crore.
Kamlesh Jain
analystOkay, and then second, regarding what the capital expenditure per ton would be — since these are largely brownfield projects, and even previously SAIL only committed to expanding its green brownfield capacity. So if I look at today's EBITDA pattern, it's roughly about $60, and if I assume we spend roughly about $900, then on the ROE front or any return parameters, it doesn't really justify expanding capacity; instead the focus should be on bringing costs down, even though we do have our captive ore mine. So even in that scenario, we're making $50-$55 per ton. So how does it justify expanding capacity rather than working more on the cost side?
Praveen Nigam
executiveWhen it comes to expanding capacity, our greater emphasis is on value addition and added products, since those will deliver a better NSR for us. On cost, we keep monitoring continuously and strive to boost our efficiency, and that in turn assists us in bringing our cost down. Regarding the expansion, you asked how much it comes to per ton. As I said, for the 15 million ton expansion, we expect something to the tune of INR 100,000 crore-INR 110,000 crore, which works out roughly in the range of 7,000 to 7,500 per ton, per million ton.
Kamlesh Jain
analystSo what further gains are we seeing in our product mix? Because we're already at one of the strongest product mixes in the last 7, 8 years. For instance, semis have dropped to 8%, whereas previously that was roughly around 18%-19%. And even a major portion of the semis is, say, conversion in the open market. So there are also the semis that really aren't semis. They're getting converted by the resellers. So what additional improvement are we seeing on the product mix once the expansion comes online?
Praveen Nigam
executiveLike I mentioned, our emphasis is shifting more toward value-added output. Looking at 2023 to 24, value-added production came in at roughly 9, 9.5 million tons, though we expect that figure to climb to 11 million ton going forward. So the greater emphasis is on the value-added product. Beyond that, we're working on bringing costs down and strengthening our capital economic metrics. All of these things should help us improve our bottom line.
Kamlesh Jain
analystExcellent, sir. Many thanks. Thank you very much, sir.
Operator
operatorThanks. Our next follow-up comes from Somaiah at Avendus Spark. You have the floor.
Analyst
analystAppreciate the chance to speak again, sir. Sir, my first question concerns employee cost. You mentioned a reduction of close to 3,000 headcount per year. So what level of annual savings does that generate?
Praveen Nigam
executiveWhat's the yearly savings from lowering employee costs and cutting headcount?
Analyst
analystUh, yeah.
Praveen Nigam
executiveGiving you an exact figure is really hard, because it's a mixed picture — in the sense that dearness allowance for existing employees keeps rising, while headcount is also coming down. So stating precisely what the per-employee impact will be is difficult to do at this moment, sir.
Analyst
analystSure, no problem. Generally speaking, for FY 2024, as for our employee cost—is that the run rate you're looking toward, going forward, such that it would be more or less around that figure, allowing for usual wage revisions offset by a decrease in headcount?
Praveen Nigam
executiveRight now, looking ahead, the current financial picture would come to roughly 11,000 to 11,500 employees, taking every aspect into account.
Analyst
analystSo that's also what you're anticipating moving forward. I just wanted to confirm that.
Praveen Nigam
executiveYeah. Definitely, definitely, definitely.
Analyst
analystUnderstood. So the next question concerns domestic demand. You mentioned that prices on the long side are improving. So what change are you actually seeing on the ground from April to May? Is it driven purely by demand, or is some restocking demand also providing support, or has there been a supply constraint on the secondary side, or is a cost pass-through occurring? Which of these factors is driving — this sharp uptick over roughly the last month?
Praveen Nigam
executiveMr. R.R. Singh is here with me, and he's on the marketing side. He'll answer your question.
R. R. Singh
executiveMorning, everyone. Starting in April, long product prices have risen, and there's been a notable shift in how long product prices are trending. And we're hopeful that, given the healthy consumption trend, consumption is up 13% over CPLY. We expect that consumption to keep going. There's plenty of visibility on infrastructure growth in this financial year, with the government stable and a lot of infrastructure push. And the main thing is that secondary prices have moved higher. Secondary market, secondary players, they control about 70% of total long product, correct? So secondary prices have moved higher mainly on a cost push. Because domestic coking coal prices are up by roughly INR 2,000 per ton, from INR 9,000, say, to INR 11,000 per ton. So that's the key driver of prices in the long product segment. And demand from infrastructure is likely to be very robust. Going forward, I see long products holding up, demand holding up, and prices holding up at current levels as well. How much more of an increase there might be is a matter of speculation. But looking ahead, we see good demand in the long product segment. Flat products will stay in a similar position, because flat products are primarily determined, prices are determined to a great extent by imports from China and other countries.
R. R. Singh
executiveHowever, when it comes to long product, the main drivers are domestic factors — the infrastructure push and cost push. We expect to see prices stay at similar levels. Thank you.
Analyst
analystUnderstood. Then one final question regarding cash taxes. It has been fairly minimal, so what should we expect? How much longer will that gap persist, in terms of cash and so on?
Praveen Nigam
executiveCould you say that one more time?
Analyst
analystThe cash taxes we pay right now are very minimal. So how long can this benefit keep going?
Praveen Nigam
executiveI'll have to give you that answer outside this call, since I don't currently have that figure on hand.
Analyst
analystAlright. Thanks. That's everything from me.
Operator
operatorThank you. Because of time constraint, that will be the last question for the day. I now hand the conference over to Mr. Ashish Kejriwal from Nomura Institutional Equities for closing comment. Over to you, sir.
Ashish Kejriwal
analystYes, thanks, everybody. Many thanks. And once more, on Nomura's behalf, we appreciate SAIL's management letting us host this call. And thank you, sir, for the thorough responses. On my end, sir, just 2 questions, and after that we can offer a closing remark. By the close of FY24, what might our finished steel capacity stand at, and how do you expect that to grow annually until the point when our ISP Burnpur capacity arrives? That is question one. And the second one: regarding inventory days, ours appear to rank, you know, among the highest on the street when measured against our peer groups. So is there anything we could do there to bring the count of inventory days down?
Praveen Nigam
executiveLet me start with your second question about inventory. Yes, the inventory we're holding is elevated beyond whatever our usual level happens to be. That worries us, and we're working to reduce it—if we can't bring it all the way down, then at least substantially. Right now, yeah, it sits at a very high level.
Ashish Kejriwal
analystSo, sir, not just at present — when we look back across the last five to seven years as well — this appears quite elevated relative to what the industry considers standard. It comes across as averaging beyond, you know, 3 months. In fact, at times it even reaches 4 months.
Praveen Nigam
executiveRegarding inventory, what we mean is solely finished steel inventory. As you can see, during financial 2021 to 2022 and 2022 to 2023, our inventory holding came to roughly 18 to 20 days, and in this financial year that has risen considerably. Our focus there is on reducing it further.
Ashish Kejriwal
analystYes, yes. And then the second item — capacity for finished steel?
Praveen Nigam
executiveYes. On finished steel capacity — what we actually refer to as saleable steel. The saleable—
Ashish Kejriwal
analystYeah.
Praveen Nigam
executiveWhen it comes to our five integrated steel plants, the steel capacity, as we see it, will be around 19.04.
Ashish Kejriwal
analystMm.
Praveen Nigam
executiveThe operating capacity would come to around 18.57 million tons. And if we include the smaller plant, which is also a special steel plant, then our operating capacity would come in at about 19.09 million tons. And as for the growth percentage, if you look at it, the growth percentage that was available would be around 9%.
Ashish Kejriwal
analystAnd this capacity of 19.09 million tons — how does it progress over the coming two years?
Praveen Nigam
executiveFor the upcoming financial year, our plan—as far as the annual business proposition in question goes—is 20.09 million tons. And with this caster RSP added, we expect a further 0.4 million tons to come on. And if you look at it year by year, year by year... Could we handle that separately offline?
Ashish Kejriwal
analystYeah, yeah, absolutely, of course. That's not a problem at all. Thanks a lot, sir — and would you like to add any closing remark?
Praveen Nigam
executiveThank you, Mr. Kejriwal. As we've noted, forecasts for the Indian economy from various agencies have been quite encouraging. The upgrades to those projections reinforce confidence that the economy will keep performing well. In fact, these forecasts aren't just favorable for a handful of years. Some reports project that India will become the world's third largest economy in the near future. Steel demand projections look promising too, at 7.7% in FY 2024, and the government's emphasis on infrastructure spending provides a major boost to the economy overall and to the steel industry specifically. The residential sector should also expand, supported by affordable housing projects and urban demand. Private investment is picking up as well, helped by the Production Linked Incentive schemes. India's capital goods sector is likewise poised to gain from momentum in infrastructure and investment in renewable energy. Automotive and consumer durable segments should sustain healthy growth, fueled by continued growth in private consumption. The company stays committed to sustainable performance, including... capacity utilization, value addition, and attaining cost competitiveness. I thank all our investors for the faith they have placed in us, and I hope that will continue going forward as well.
Praveen Nigam
executiveThanks, Mr. Kejriwal.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Steel Authority of India Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Steel Authority of India Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Steel Authority of India Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.