Operator

operator
#1

Good day, everyone, and welcome to the Steel Authority of India Q3 FY 2026 Earnings Conference Call, brought to you by Nuvama Institutional Equities. Please note that all participant lines are in listen-only mode, and once the presentation wraps up, you'll have a chance to ask questions. If you require help at any point during the call, just press star followed by zero on your touch-tone phone to signal an operator. I'll now turn the conference over to Mr. Ashish Kejriwal of Nuvama Institutional Equities. Thank you, and the floor is yours, sir.

Ashish Kejriwal

analyst
#2

Thanks, Rahul. Good afternoon, everyone. We're glad to have you all join us once more for the Q3 FY 2026 post-result conference call of Steel Authority of India. It's a pleasure to have Dr. Ashok Panda, Director of Finance, here with us, together with his team. At this point, I'll invite Mr. Panda to give his opening remarks, and after that, we'll open the floor for Q&A. Over to you, sir.

Ashok Kumar Panda

executive
#3

Alright. Thank you, Mr. Ashish Kejriwal ji. Good morning to all of you. I extend a warm welcome to every investor and analyst joining this earnings call, where we are discussing SAIL's financial results for Q3 and the nine months of FY 2025 to 2026. Before we get to the Q&A session, allow me to walk you through the results for this period. On the economic front — the global economic front — to start with the global economic picture, the uncertainties and volatilities appear to be largely settling down at this point. Global inflation, too, has been mostly stable thus far. GDP projections have been revised upward, matching what we see for individual economies as well as regional and global averages. Worldwide growth is expected to hold up resiliently at 3.3% in 2026, with 3.2% anticipated in 2027 — a rate comparable to the estimated 3.3% outturn for 2025. This outlook represents a modest upward revision for 2026 compared with current levels. India's projections have likewise been raised, from 6.4% to 7.3%, by various agencies. It appears the economy will expand at a stronger pace. As for the worldwide steel sector, its landscape is shaped by economic trends, trade policies, and technological advancements.

Ashok Kumar Panda

executive
#4

Recently, we've observed favorable trends in demand as well as cost-driven pressure on prices, mainly stemming from the current rise in coal prices. Turning to the Indian steel sector, domestic steel demand remains strong, since consumption across the nine months of FY 2025 to 2026 rose by nearly 7% compared with CPLY. Crude steel output growth has been even higher, at roughly 9.5% over that same span. As a result, India has once again turned into a net exporter, with exports climbing about 33% to 4.8 million tons, while imports fell roughly 37% to 4.65 million tons this time around. Compared with last year, the picture was entirely different, since this time exports have far exceeded imports, and naturally the cess duty is also contributing to this. We can see a degree of stability in domestic markets, I mean, starting from December onward. We'll now turn to SAIL's performance for Q3 and the nine months of FY 2025 to 2026. On the company's results for the nine months of FY 2025 to 2026, the key points are these: crude steel production rose 2%, from 14.08 million to 14.35 million tons, while saleable steel increased by approximately 4%-5%.

Ashok Kumar Panda

executive
#5

For the company, sales volume rose 16.3%. And we have reached out—we've begun reaching out to retail as well as other consumers. And since this big increase in sales volume across the nine months, it has led to a sizable inventory reduction, along with lower borrowings. Revenue went up 9%, from INR 73,162 crore to INR 79,997 crore, broadly matching the volume growth. And PAT rose 60% in the nine months of this year compared with CPLY last year. That reflects operational efficiency, inventory liquidation driven by sales growth, and cost optimization as well as solid treasury management. So put another way, we can say it comes down to better financial prudence. Debt reduction is near INR 5,000 crore over nine months, and in January alone we again brought it down by roughly INR 2,000 crore, and the momentum carries on through February as well as March. Looking ahead, since the monsoon season and festive seasons have already ended, we expect the market will see an uptick in pricing in quarter four. As coal prices stay range bound—in fact, a little on the higher side—and with market support also present, margins will stay good in quarter four.

Ashok Kumar Panda

executive
#6

That matches our expectations. So for quarter four, SAIL should again deliver stronger growth. With that, I'll turn things back over to Mr. Kejriwal to kick off the Q&A session.

Operator

operator
#7

Thanks a lot. We're moving into the Q&A portion now. To ask a question, press star and 1 on your touchtone phone. Should you want to drop out of the queue, press star and 2. We ask that participants use their handsets when posing questions. Ladies and gentlemen, we'll hold briefly while the queue fills up. To ask questions, please press star and 1. Our first question comes from Amit Lahoti of Emkay. Please go ahead.

Amit Lahoti

analyst
#8

Appreciate the chance to ask. During Q1 of FY 2026, we recorded an inventory write-off of INR 1,000 crore as coking coal prices declined, and given that prices have since risen, did any gain show up in Q3? Also, at today's price levels, how large might that be in Q4? That's my first question.

Ashok Kumar Panda

executive
#9

Let me address that question. So the answer is that in Q1, as you correctly noted, the impact on the P&L account from the stock valuation rate came to nearly INR 1,000 crore. In Quarter two, there wasn't much. Quarter three gave us a positive, and that was possibly around INR 100 crore at most. For Quarter four, since coal prices are climbing, we anticipate production costs will rise in Quarter four. So we haven't made an estimate as yet, but yes, it will have a solid positive effect on profitability as well as margins, so to speak.

Amit Lahoti

analyst
#10

So at today's prices, what would a rough figure look like for that? Is it something in the range of INR 500 crore —

Ashok Kumar Panda

executive
#11

Honestly, it's hard to give you an exact figure. We can't be precise, mainly because coal prices are going up, though right now they've steadied somewhat at $251. At the same time, output is rising too, so the two will offset one another to a degree. Even so, we think the effect on profitability will be positive, an upward one. Anyone could throw out a guess of roughly INR 200 crore, INR 300 crore, or INR 400 crore, but at this point we can't state that. Still, based on our estimate, it will clearly be positive.

Amit Lahoti

analyst
#12

All right, so my second question concerns the expansion plans. Since we begin with a fairly large cost disadvantage relative to our peers on margin and cost, once we start receiving the additional volumes from expansion projects—especially ISP, which is arriving roughly 2 years from now—how much could that gap narrow? How should we think about it?

Ashok Kumar Panda

executive
#13

Regarding IISCO, we actually have a project there with an estimated cost of around INR 36,000 crore, and most of the major packages have already been ordered out. Ground activities have already begun. They're going to wrap up in three years' time — that's the timeline. And once we get that, we believe the production volume as well as the margin that will come from there will really bolster our profitability to a greater extent. And for that matter, to accommodate those borrowings, we've already cut our working capital borrowing quite a lot. As I've already said, we're keeping a margin to accommodate the expansion CapEx.

Amit Lahoti

analyst
#14

All right, so can we put a number on that — maybe EBITDA per ton or cost per ton? How much of a benefit could there be once it comes in? Any kind of —

Ashok Kumar Panda

executive
#15

Look, those are going to be brand-new facilities. They’ll be brand-new facilities. So at present, our EBITDA per ton is — I believe EBITDA per ton is. So those figures are going to exceed that. At the moment, INR 6,000, hovering around INR 6,000–INR 7,000 as we speak. So quarter four is going to be stronger than that, and we think that once the ISP expansion is finished on schedule, the figures are going to be above INR 10,000 per ton.

Amit Lahoti

analyst
#16

Okay.

Ashok Kumar Panda

executive
#17

Regarding the ISP expansion.

Amit Lahoti

analyst
#18

Following up on that, do you have any updated CapEx guidance for FY 2026 and 2027?

Ashok Kumar Panda

executive
#19

Yes, so for FY 2026 to 2027, our CapEx guidance is INR 15,000 crore.

Amit Lahoti

analyst
#20

Is that INR 15,000 crore for 2027?

Ashok Kumar Panda

executive
#21

Regarding 2026 and 2027 — that's because some of the CapEx payments for the ISP expansion and the IISCO expansion will actually land next year.

Amit Lahoti

analyst
#22

All right, thanks a lot.

Ashok Kumar Panda

executive
#23

I appreciate that.

Operator

operator
#24

Thanks. Our next question comes from Pinakin Parekh at HSBC. Go ahead, please.

Pinakin Parekh

analyst
#25

Thanks a lot for that. First off, I'd like to ask whether you can put a number on the price hikes you've implemented in December and January for both flat and long products.

Ashok Kumar Panda

executive
#26

Let me just say this. And also — are you referring to January or December?

Pinakin Parekh

analyst
#27

For both December and January combined.

Ashok Kumar Panda

executive
#28

Actually, the market began to pick up around mid-December. Up through November, things were fairly subdued — September, October, and November were quite weak. So near the end of December, it started rising, the market began improving, and prices started going up in both long and flat products. When we look at December's actual impact, the price increase showed up in January, not in December — neither for long nor for flat. So the real increase of roughly INR 2000 to INR 2500 came through in January for long, and about INR 3300 to INR 3500 for flat in January, as far as the sales price goes. But the actual hikes took place during June across two or three tranches, so all of that will show up in February. That means in February, the real increase in NSR and sales price will be quite encouraging — it will be larger.

Pinakin Parekh

analyst
#29

Understood.

Ashok Kumar Panda

executive
#30

That's mainly because coal prices are also on the rise. That's why prices will be going up in the domestic market.

Pinakin Parekh

analyst
#31

Okay, so from what we understand, sir, at the trade level in India, the price increases have been considerably larger, but so far the company-level price increases have been lagging behind. So in February and March, do you expect additional price hikes at the company level?

Ashok Kumar Panda

executive
#32

Right, that's exactly my point. During June and January, since the price hike came through in 2 or 3 tranches over the course of the month, not all of it could show up, because it was averaged into January's sales price. So that portion carries over into the following month. Which means in February, you'll actually see a solid jump in the sales price. And I'd also note that coal prices, too, are seeing a solid jump. So in a sense, the two are moving together in tandem.

Pinakin Parekh

analyst
#33

Sure. And what sort of rise in coking coal costs are you expecting for the fourth quarter? Spot prices have jumped to $250, and they averaged $184 in 3Q. So how much of a cost increase should we be seeing?

Ashok Kumar Panda

executive
#34

Hold on, hold on. So regarding the price of imported coal, there's one thing to note. In January, the average imported coal price stands at INR 18,500, and we expect that to rise by INR 1,200 in February, bringing it to INR 19,700. That's driven by weighted average arrivals, stock quantities, and so on. That said, as you rightly pointed out, the index has climbed to $251 per ton. Previously it was hovering around $190, $185, $190. So in February, we anticipate an increase of roughly INR 1,200 in the consumption rate. Then in March, there could be a further rise of another INR 1,000 on top of that.

Pinakin Parekh

analyst
#35

Understood.

Ashok Kumar Panda

executive
#36

Whether it will climb past $251 or taper off afterward is uncertain to us. My own view is that it really shouldn't rise much more. It should level out, and then—once conditions in Australia get better—it will likely taper down.

Pinakin Parekh

analyst
#37

Got it. Sir, my final question relates to the sales volume you reported — the steel sales volume. How much of that came from NMDC volumes, and what would the margins be on that?

Ashok Kumar Panda

executive
#38

And turning to NMDC volume — hold on, just a moment, just a moment. So, our total sales for the nine months.

Pinakin Parekh

analyst
#39

Alright.

Ashok Kumar Panda

executive
#40

Total sales volume came in at 14.6 million tons. And NSL? Just about 1 million tons.

Pinakin Parekh

analyst
#41

Of that total, NMDC accounts for 1 million ton.

Ashok Kumar Panda

executive
#42

And yes, NSL is 1 million tons as well.

Pinakin Parekh

analyst
#43

And, sir, on those steel sales, would the margins be roughly in line with what you're seeing at your operating company? Higher, lower? I mean, how — how much longer is this arrangement going to last?

Ashok Kumar Panda

executive
#44

Look, this pricing follows exactly what SAIL, Steel Authority of India Limited, has set, so we're aiming at their products, mainly in the south market, and that lines up precisely with our own products. So their pricing shows no difference when compared with SAIL's pricing from SAIL, as far as the quantities we handle go. There are certain quantities they handle, and on those we can't comment. So in whichever market it goes, this sits at par with SAIL, SAIL products.

Pinakin Parekh

analyst
#45

You mentioned pricing stays unchanged—could you speak to the cost side as well?

Ashok Kumar Panda

executive
#46

I mean, that's sort of a setup involving NSL and SAIL. So the difference, we can't really put a number on it at this moment. I'll say this much: look into it. But —

Pinakin Parekh

analyst
#47

Understood.

Ashok Kumar Panda

executive
#48

For the most part, we’re keeping price parity in the market, and neither SAIL nor NSL is put at a disadvantage. So this benefits SAIL, NSL, and the marketplace alike.

Pinakin Parekh

analyst
#49

Understood. Thanks a lot, sir.

Ashok Kumar Panda

executive
#50

Thanks.

Operator

operator
#51

Thanks. Our next question comes from Vikash Singh with ICICI Securities. Go ahead, please.

Vikash Singh

analyst
#52

Hello, sir, and thanks for letting me ask. Sir, my first question is about our employee costs, which, to my surprise, have declined on a sequential basis. So, first, what's the primary cause? And second, how should we think about employee cost going forward in the next year, given that a mandatory wage revision will be coming in?

Ashok Kumar Panda

executive
#53

Actually, let me get to that. On salary and wages, that figure sits at roughly 11.5% at the moment. So measured against last year, measured against this month, it's pretty much at the same level, if you look at last year. Are you referring to quarter three, or what?

Vikash Singh

analyst
#54

Sequential, sir. Sequential was a decline.

Ashok Kumar Panda

executive
#55

No, it's pretty much at the same level, because what I'm seeing is that whether you compare quarter three with quarter three, or even quarter two with quarter three, there's a reduction there that's really just an adjustment from the actuary and all of that, so that's a separate matter. But broadly speaking, if you look at nine M versus nine M, both are sitting at nearly the same level of INR 6,100 crore. Last year as well, nine M came in at INR 5,943 crore, and now it stands at INR 6,080 crore. Broadly, the same level.

Vikash Singh

analyst
#56

I was looking at Q3. If you look at the last quarter, it was INR 2,900 crore and almost INR 39 crore. So basically, on a sequential basis, it has come down by almost INR 100 crore. So what was the actuarial valuation difference that had not come this quarter, or was there a reversal of provision? If you could give me that number?

Ashok Kumar Panda

executive
#57

Two factors explain this. First, there's the actuarial side, which depends on the discounting factor — that's a separate matter — and that factor keeps rising. Second, there's essentially the guarantee piece. As you can see, in H1 we took a hit on account of that, INR 25 lakh. Once we hit 50% in IDA, it then went up to INR 25 lakh. That's why Q2 actually looked higher. And the discounting rate is also climbing, so taking everything together, in Q3 we're finding it looks a bit lower than that. The same pattern will carry into quarter four as well. Now, on your other question about salary revision, from 2026 — that will actually happen from 2027, 2028 onward. It's not from 2026, 2027, just to be clear. Since it applies from January 1, 2027, most of the impact will land in 2027, 2028. And at the same time, as you're seeing, we currently have around 50,000 employees on our rolls who are legacy people. So there's a substantial decrease in manpower each year. Overall, the manpower reduction — because of that reduction, costs will come down, and because of the pay reduction, whose size we don't yet know, it will be worked out according to the guidelines.

Ashok Kumar Panda

executive
#58

Guidelines isn't in place at the moment. So we'll see — there will be both pluses and minuses on either side. There may be some net effect, but that won't arrive until 2027 and 2028, not right now.

Vikash Singh

analyst
#59

Got it. For my second question, I want to ask about our product mix. Given that we've already hit the production volume peak — at least that peak has now occurred — is there room for us to improve the mix, reduce semis next year, and lift the EBITDA pattern? Or is demand for these products such that doing so would be difficult? So if you could share some of the company's thinking on this.

Ashok Kumar Panda

executive
#60

Okay, let me just explain this to you. Before I give you the number, let me set the context: we've been making every effort to cut back on semis as much as we can. One way is by raising our own output. As of now, the semis percentage stands at 10%. Compared with earlier years, that's lower, since our emphasis is on having more finished products rather than semis, through taking action on three or four fronts. First, at the mills, we're trying to boost production as much as we can by securing greater availability, improved availability of the mills, better attention to the equipment, and so on. Second, we also have conversion contracts in place, and we're maximizing those. So through these two things — through these two things — we're actually working to get more finished products into the market relative to semis. As a result, the semis percentage has been declining steadily. And second, at Durgapur Steel Plant, we've launched one project, which is a 1 million ton TMT bar mill. That should be up in perhaps two years from now. Work has already begun, ground activity has started. Once it's up, you'll see that semis will be very nearly 0% at that point.

Ashok Kumar Panda

executive
#61

So it’s just a question of when, and we’ll get to the point where semis are zero.

Vikash Singh

analyst
#62

What's the timeline on that?

Ashok Kumar Panda

executive
#63

I mean, it'll be roughly 2 years from now. It'll take 18 months. 18 months, yeah. So, 18 months. Groundwork has already begun. So if we're at end of 2025, 2026 as of now, the timeline is 18 to 24 months. You could say an 18-month timeline for that, for finishing the project activities. And following that, stabilization and commissioning, those things should be there.

Vikash Singh

analyst
#64

Got it. So just last —

Ashok Kumar Panda

executive
#65

It's sometime in 2028.

Vikash Singh

analyst
#66

Right, so one final question regarding the report of the accident at the plant in 3Q. I just want to get a sense of whether any of that carried over into 1Q as well, or if there was no loss at all when it comes to overall production for the sector?

Ashok Kumar Panda

executive
#67

If we’re discussing that accident of —

Vikash Singh

analyst
#68

Since this kind of incident happens every year for us, is there any plan in place to get it under control?

Ashok Kumar Panda

executive
#69

Right. So when you mention the incident at Bhilai Steel Plant SMS — since you haven't been specific about it — are you asking about that particular question? If that's what you mean, then—

Vikash Singh

analyst
#70

We had one incident take place in Bokaro, and then more recently there was one in Bhilai. So two incidents occurred across a four-month period.

Ashok Kumar Panda

executive
#71

That's right.

Vikash Singh

analyst
#72

I’d like to hear more about the recent Bhilai situation, since it could have had an effect on the 1Q — sorry, on the 4Q performance.

Ashok Kumar Panda

executive
#73

Okay, let me take up these two questions. The first one is Bokaro, which we talked about during H1 as well, and the second is Bhilai, which just happened now. As far as Bokaro goes, that's actually already resolved. It hit us hard in quarter one and in quarter two. And at this point, both converters in the SMS, the Steel Melting Shop, are running at full tilt, producing at nearly 100% of target levels. So their SMS is fine, and because of that the blast furnace had no issues, so the blast furnace has come back up, hot metal has come back up, crude steel has come back up. Right now they're running at almost 98%-100% capacity. That's the situation with Bokaro, and they'll continue this way in quarter four and going forward as well, since we've taken certain measures so that such tube leakages in the converter can be avoided in future, because we have the spare parts and all of that. Now, as far as Bhilai is concerned, Bhilai SMS, again, it's back on track. In Bhilai SMS, the converter had its vessel replaced. So after that, there was actually a bit of a problem, which caused a spillover of metal, and it burned the electrical cables.

Ashok Kumar Panda

executive
#74

So that's that. It was down for roughly 15 to 20 days. It's back up now. At Bhilai Steel Plant, production has returned to its usual level—about 18,000 to 18,500 tons of hot metal a day. For around 15 days, it did affect us somewhat. In physical terms, the hit was about 2,000 tons per day for roughly 15 to 16 days. At this point, everything is fine, and going forward, in quarter four, there won't be any issue. All five of our ISPs are running at full blast right now. They're producing at their maximum levels, and that trend should carry through quarter four.

Operator

operator
#75

Thanks. Before we take the next question, I’d ask everyone to keep it to two questions per participant, so management can get to questions from all participants in the conference. The next question comes from Pallav Agarwal at Antique Stock Broking. Please go ahead.

Pallav Agarwal

analyst
#76

Good afternoon, sir. So, for the first question, it was about the bridge, the EBITDA bridge, in your presentation, from 2Q to 3Q. There, one of the negative items is shown as the volume impact. But I thought, sir, that we had an increase in volumes on a sequential basis, sir. Is there any reason for that negative impact due to volume?

Ashok Kumar Panda

executive
#77

Yeah. Just a second. That's from quarter two to quarter three, right?

Pallav Agarwal

analyst
#78

Yes, sir.

Ashok Kumar Panda

executive
#79

That's mainly due to saleable steel production being lower. Although there's some improvement in hot metal and crude steel, saleable steel declined because in earlier quarters at RSP, the new Austenite mill — the new Austenite mill — has greater capacity. So they were making more by drawing slabs from Bokaro Steel Plant, by drawing slabs from Bokaro Steel Plant's excess stock. So at present, since at Bokaro Austenite has ramped up and everywhere it has ramped up, in-process stock at Bokaro Steel Plant has fallen. That's why at RSP the saleable steel level stayed low. So that was the main cause of the drop in saleable steel volume in quarter three versus quarter two, quarter two. In quarter four, all five plants have already raised output since all the capital delivery, everything, is finished. So every mill is running full blast. All, blast furnace as well as SMS, they are at the 100% level or above the 100% level. So slabs will be available for Rourkela Steel Plant to satisfy the greater need, the higher requirement of HSM-2.

Ashok Kumar Panda

executive
#80

We'll also be getting slabs from Bokaro and from Bhilai over to Rourkela, so that we can achieve that additional output at HSM-2, at Rourkela Steel Plant. That's the reason behind it.

Pallav Agarwal

analyst
#81

All right, so the main reason is that we had less saleable steel production — it's not about the sales volume. And that's what led to the —

Ashok Kumar Panda

executive
#82

So, as you can see, our sales volumes have really taken off. Even with the market being tough, we're looking at roughly 16% growth across nine months versus the prior year.

Pallav Agarwal

analyst
#83

And then the other item — same situation with input price cost — that figure is positive. So I was thinking coking coal costs would have risen quarter over quarter, so could you clear that up too?

Ashok Kumar Panda

executive
#84

Actually, the price of coking coal rose following December.

Pallav Agarwal

analyst
#85

What's the cost?

Ashok Kumar Panda

executive
#86

Beyond December, that also delivers a reduction in power expense. This comes partly from coking coal and mainly from electricity costs, since we are working to cut our power spending by obtaining it through renewable energy sources. So we have implemented certain measures across various plant units, and those have produced some savings.

Pallav Agarwal

analyst
#87

So this should be structural, with the saving going in?

Ashok Kumar Panda

executive
#88

Right, that's the structure. It forms part of that, and we'll make further improvements. We're working on it. It's also a requirement. RE power is a requirement for us. And by pursuing RE power, we're also securing a price advantage in certain cases.

Pallav Agarwal

analyst
#89

Absolutely, sir. And one more thing — for the NSL volumes you cited covering the nine months, would you mind sharing the third quarter volumes as well?

Ashok Kumar Panda

executive
#90

For the third quarter, let me verify those volumes. Give me just a moment. It came to 0.37 million tons in quarter three.

Pallav Agarwal

analyst
#91

Of course, sir. All right, thanks.

Ashok Kumar Panda

executive
#92

I appreciate it.

Operator

operator
#93

Thanks. Our next question comes from Raashi Chopra at Citigroup. Go ahead, please.

Raashi Chopra

analyst
#94

Thanks. Regarding your realization question, what was the exact sequential change in realization, NSR?

Ashok Kumar Panda

executive
#95

Which one?

Raashi Chopra

analyst
#96

NSR — how did that figure move between Q2 and Q3?

Ashok Kumar Panda

executive
#97

Regarding the move from Q2 to Q3: if you look at average NSR in Q2, there's a decline. Q2 came in at INR 48,836, whereas Q3 was INR 47,735. When you set long against flat, though, long rose from INR 48,885 to INR 49,021. Flat fell from INR 48,790 to INR 46,580. So flat saw a decrease in NSR relative to long. That means average NSR likewise showed a slight decline.

Raashi Chopra

analyst
#98

And then regarding the coking coal cost, you said the January cost was INR 18,500. I take it that's your blended coking cost, correct? Not in —

Ashok Kumar Panda

executive
#99

Yeah, that actually is the average. Yeah, you've got it right.

Raashi Chopra

analyst
#100

What number did you say that was for Q3?

Ashok Kumar Panda

executive
#101

The figure for the third quarter came in at INR 18,351.

Raashi Chopra

analyst
#102

Did you say INR 18,350?

Ashok Kumar Panda

executive
#103

Yes. For the third quarter, the figure comes in at INR 18,350.

Raashi Chopra

analyst
#104

All right. And regarding CapEx, you noted that for FY 2027, it will be INR 15,000 crore. For the full year FY 2026, what does the CapEx figure come to?

Ashok Kumar Panda

executive
#105

At the start of the year, our guidance was INR 7,500 crore for the full year, and the final guidance now stands at INR 10,000 crore. The actual figure will land somewhere between those two.

Raashi Chopra

analyst
#106

What's the total amount that's been spent across the nine months?

Ashok Kumar Panda

executive
#107

The nine-month figure, yeah, so that nine-month figure came to INR 5,427.28 crores. INR 5,428 crores.

Raashi Chopra

analyst
#108

Understood. Appreciate it. My final question concerns volumes — what targets are you setting for this year and for next year?

Ashok Kumar Panda

executive
#109

Okay, hold on a moment. So for this year, covering April through December, hot metal volume comes to 15.14 million tons. And by the time the year ends, what we expect is — just a moment.

Raashi Chopra

analyst
#110

Oh, sales — just the sales volume works fine for me.

Ashok Kumar Panda

executive
#111

Yeah, let me finish that thought. The hot metal figure for the year ending could land around 20.5 million, something in that neighborhood — close to 21 million tons. So for next year, our target is 22.5 million tons of hot metal.

Raashi Chopra

analyst
#112

Regarding the sales side?

Ashok Kumar Panda

executive
#113

On the sales side, let me tell you this: sales volumes are running on the higher side. So if my saleable steel over nine months is 14.2 million tons — 14.6 million.

Raashi Chopra

analyst
#114

14.6 million.

Ashok Kumar Panda

executive
#115

Over nine months, total sales volume stands at 14.6 million, which means it's running ahead of production levels, and we're bringing our inventory down. Our inventory levels have declined. Across those nine months, if you look, our inventories are lower by roughly 0.3 million tons relative to the start of the year, counting both in-process and sales together. So there will be further reductions. On that basis, we should be able to reach a sales volume of about 19.5 by year end, which will exceed production.

Operator

operator
#116

Thanks. Our next question comes from Sumangal Nevatia at Kotak Securities. Please go ahead.

Sumangal Nevatia

analyst
#117

Good afternoon, and thanks for the opportunity. So, for my first question, I'd like to get a sense of whether there's any contribution at the EBITDA level coming from this arrangement — specifically the NMDC volumes, NSL?

Ashok Kumar Panda

executive
#118

Let me explain, as I mentioned before, that with NSL products, selling is advantageous both for NSL and for the market participants. That depends entirely on the arrangements we have put in place. But mainly, as I said, it's simply about maintaining consistency in the pricing approach for sales across different regions. Our primary focus is on the south. We are focused primarily on the south. As for the nine-month figure, the volumes were already stated. So margins are positive. They are small, though. It isn't very high, but it provides market stability. It has provided market stability. So on all three fronts, people have gained from this.

Sumangal Nevatia

analyst
#119

So this year, with growth running at roughly 16% or so — I mean, if you take out NSL, it comes in at about 7% to 8%.

Ashok Kumar Panda

executive
#120

Yeah.

Sumangal Nevatia

analyst
#121

So for guidance, excluding NSL, that would be about 18.5 million tons in volume for this year, right?

Ashok Kumar Panda

executive
#122

For this year?

Sumangal Nevatia

analyst
#123

Right.

Ashok Kumar Panda

executive
#124

Negative 19.5 million. Yeah, that's right.

Sumangal Nevatia

analyst
#125

But 1 million ton has already been achieved across the nine months, correct? So —

Ashok Kumar Panda

executive
#126

We've already hit 1 million tons, and a good chunk of the volume may not arrive in quarter four. So in a sense, if we land — we're aiming to land at 19.5 million, no, that's the sales figure — so it might come in somewhere, our own number might land somewhere near 18.5 million to 18 million, somewhere around 18.5 million or thereabouts.

Sumangal Nevatia

analyst
#127

Understood. Understood. Where are we able to go with that?

Ashok Kumar Panda

executive
#128

Yeah.

Sumangal Nevatia

analyst
#129

If no new capacity comes online, where could that 18.5 million go over the next two years — 2027 and 2028, say?

Ashok Kumar Panda

executive
#130

For 2026 to 2027 — let me take that question about 2026 to 2027 first. During this year, in 2025 to 2026, our effort is to complete hot metal at 20.5 million to 21 million tons. Our target is 22.5 million. 22.5 million for 2026 to 2027. That means you could put it at roughly 21 million tons of saleable steel in 2026 to 2027. And then further growth can come in 2027 to 2028. Once this particular growth is achieved, we'll have additional growth in 2027 to 2028. So you could say that in 2027 to 2028, it might be 23 million tons of hot metal along with 21.5 million tons of saleable steel. And following that, we will see ISP modernization taking place.

Sumangal Nevatia

analyst
#131

Okay, and does that figure, sir, exclude NSL, or does it include NSL's 1 million ton?

Ashok Kumar Panda

executive
#132

This is an example from NSL.

Sumangal Nevatia

analyst
#133

Got it. And sir, next year CapEx is going to go up a lot. I believe it was roughly INR 10,000 before, and now we're discussing INR 15,000. So could you break that down, and within it, how much are we spending on ISP expansion, and over what time frame does that spending happen for the coming two-three years?

Ashok Kumar Panda

executive
#134

For the next two, three — you see, the total CapEx for ISP expansion is going to be roughly INR 36,000 crore. So between 2026 and 2027, a major chunk of that will come from ISP expansion. The ISP expansion figure could be more than — could land somewhere around, maybe about INR 7,000 crore to INR 8,000 crore for ISP expansion, as far as 2026 to 2027 goes, and then it will pick up again after that. That means the peak will hit in 2027 to 2028, and also in 2028 to 2029, for ISP expansion.

Sumangal Nevatia

analyst
#135

So the completion could land near the end of 2029, or possibly FY 2030 as well, correct?

Ashok Kumar Panda

executive
#136

Fiscal 2030, yes. Roughly fiscal 2030.

Sumangal Nevatia

analyst
#137

Got it.

Ashok Kumar Panda

executive
#138

Toward the close of 2029, or perhaps 2030 — roughly along those lines.

Sumangal Nevatia

analyst
#139

Okay. And sir, regarding the coking coal cost you mentioned — the rise in Feb compared with the 3Q average comes to only about 7%-8%. Is that the correct comparison? Because if you look at the dollar price, it has increased by over 20%. So have we got those numbers right? It's INR 19,700 against roughly INR 18,000.

Ashok Kumar Panda

executive
#140

Which one are you referring to?

Sumangal Nevatia

analyst
#141

Regarding the coal cost, sir.

Ashok Kumar Panda

executive
#142

On the coal cost side, yeah.

Sumangal Nevatia

analyst
#143

On the third quarter compared with spot, could you walk us through what the increase is?

Ashok Kumar Panda

executive
#144

For the third quarter, the average was INR 18,351 — and that's really a result of averaging out the stock situation here plus the supplies that arrive from time to time. Spot prices, though, have risen. The spot price stands at $251, that's the index price, and on that basis we actually see 98%, 97%, and so on, coming from various different sources. So these prices are flowing through gradually, partly in February and partly in March, and the impact will also show up in April. As you're aware, there's a lag of roughly 1.5 months to 2 months before these prices feed into consumption.

Sumangal Nevatia

analyst
#145

Alright.

Ashok Kumar Panda

executive
#146

On top of that, the dollar-rupee parity is having an impact here as well.

Sumangal Nevatia

analyst
#147

Alright, turning to consum —

Ashok Kumar Panda

executive
#148

Each of those factors is having an effect here.

Sumangal Nevatia

analyst
#149

Regarding the consumption basis, what’s the quarter-on-quarter increase? Since this is—yes, could you explain that, sir? On a consumption basis.

Ashok Kumar Panda

executive
#150

Since Q2 came in at INR 18,158 and Q3 at INR 18,351, the rise in Q3 was pretty small. In Q4, though, I figure you'll see roughly INR 1,500 more than in Q3 — that's my guess.

Sumangal Nevatia

analyst
#151

Got it, sir. Got it. All right, thank you, sir, and best of luck.

Ashok Kumar Panda

executive
#152

I appreciate it.

Operator

operator
#153

Thanks.

Ashok Kumar Panda

executive
#154

Is that going to be the final question, please?

Operator

operator
#155

There's one more question. Tushar Chaudhari from Prabhudas Lilladher is next in line. Go ahead, please.

Tushar Chaudhari

analyst
#156

Good afternoon, sir. Thank you very much for the chance to ask. Sir, during the previous quarter, we sold roughly INR 1,140 crores or so of scrap. What was the figure for this quarter — scrap and byproducts?

Ashok Kumar Panda

executive
#157

Let me just pull up that number. Give me one second. Could you go ahead with the following question before we get to this one?

Tushar Chaudhari

analyst
#158

All right, so on CapEx — you're putting it at INR 7,000 crore to INR 7,500 crore, going up to INR 10,000 crore for FY 2026 and 2027, and then it comes in at INR 15,000 crore-odd. Have I got that right? Okay.

Ashok Kumar Panda

executive
#159

Okay.

Tushar Chaudhari

analyst
#160

Earlier we mentioned debottlenecking efforts at DSP, RSP, and BSP. Could you shed some light on how much CapEx those projects will require?

Ashok Kumar Panda

executive
#161

Regarding RSP, task number 4 has already been finished by them, and production will begin at this point. It has already gotten underway over there, so that portion is done. As for DSP, the debottlenecking brownfield project has already commenced, and roughly 18 to 20 months will be needed for it.

Tushar Chaudhari

analyst
#162

That one goes into TMT, the TMT mill.

Ashok Kumar Panda

executive
#163

The TMT mill, yes.

Tushar Chaudhari

analyst
#164

Alright.

Ashok Kumar Panda

executive
#165

That's what we referred to as the TMT mill. And in addition, once the TMT mill is in place, we're also commissioning a blast furnace at that site. One ageing blast furnace will be shut down, and a new one will be brought online. So together with the blast furnace, there's an additional converter, and so on. Beyond the TMT mill, we've also cleared another package for them. That too will lift Durgapur Steel Plant's total capacity by 1 million ton. So the TMT mill accounts for 1 million ton, and work on it has already begun. Completion is expected in 18 months' time — a further 18 months — and it will bring semis down to zero. Following that, though, hot metal and crude steel capacity overall will go up by 1 million ton via other debottlenecking activities, under which we'll install one blast furnace, one converter and a caster, while the old unit gets knocked out. To return to your first question, Q2 stood at INR 1,140 crores, and it now stands at INR 1,279 crores.

Tushar Chaudhari

analyst
#166

1,279 crores of Indian rupees.

Ashok Kumar Panda

executive
#167

During quarter 3.

Tushar Chaudhari

analyst
#168

And at this point, what's the level of finished steel inventory — how much do we have?

Ashok Kumar Panda

executive
#169

Let me come down to the numbers. So finished steel inventory sale overall is roughly 1.5 million tons, and in-process inventory stands at 0.9 million tons. Combined, that's 2.4 million tons. As of 31st March, the figure was 2.7 million tons.

Tushar Chaudhari

analyst
#170

Alright, thank you very much, sir. Many thanks.

Operator

operator
#171

Thanks a lot. We’ll treat that as the final question. At this point, I’d like to pass the conference to Mr. Ashish Kejriwal for his closing remarks.

Ashish Kejriwal

analyst
#172

Thank you, sir. Sir, right before we wrap up, I have one question as well. We’re discussing the 19.5 million ton sales volume guidance for FY 2026, which means that, and across nine months, we’ve already achieved 14.6 million. So, are you suggesting that, you know, our fourth-quarter volume will be more or less below the third quarter? Or, since we’ve already hit 14.6 million now, and we did 5.15 million in the third quarter, so how do you view volume in the fourth quarter?

Ashok Kumar Panda

executive
#173

Right, 14.5 million has already been completed across the 9M period.

Ashish Kejriwal

analyst
#174

That's correct.

Ashok Kumar Panda

executive
#175

Q4 volumes are going to exceed Q3's. The one caveat is that with NSL, we probably won't pull much volume from it. That's the sole issue. We'll —

Ashish Kejriwal

analyst
#176

Alright.

Ashok Kumar Panda

executive
#177

Our goal is to sell in comparison with the others, so NSL figures in quarter four might come in lower than what we saw in 9M. That's why.

Ashish Kejriwal

analyst
#178

But taking everything into account, do you believe we're capable of hitting 5.5 million tons? Since if that comes to pass, our total volume would then go past 20 million tons.

Ashok Kumar Panda

executive
#179

Let me think about this. We're making a big effort here, because as you can see, in January we also saw inventories come down by roughly 0.3 million tons, and for February and March, if I'm being optimistic, I expect another 0.3 million tons. That's why we're going to push hard toward that.

Ashish Kejriwal

analyst
#180

Okay, one last thing, sir — regarding that roughly INR 3,000 average price hike you mentioned happening in tranches during January, is that saying we'll raise prices again in February, or is it just that the January average price will come in below the spot price?

Ashok Kumar Panda

executive
#181

Right, so there's upward movement in the market at the moment, driven by coal prices. So, as you correctly said, the guidance is for it to move upward.

Ashish Kejriwal

analyst
#182

Alright, thank you very much.

Ashok Kumar Panda

executive
#183

March as well.

Ashish Kejriwal

analyst
#184

Sir, do you have any final comments before we wrap up? Then we'll close the call. Thanks.

Ashok Kumar Panda

executive
#185

Thanks so much for the whole Q&A session and everything. For the steel industry, the second half of the financial year is always the strongest. The situation has already begun to improve, and we're hoping that trend and momentum carry on. At the same time, demand for steel is rising considerably, and together with better efficiency and our cost control steps, that should—so it will lift margins over the rest of the year, meaning quarter four, even though coal prices stay high. Inventory comes down a lot in this quarter four, and borrowings will fall sharply. That's because borrowings are being reduced, because interest cost is coming down. As you know, across the nine months, our interest cost has dropped by INR 500 crore. We expect a further INR 500 crore of inventory reduction to take place in quarter four. So for the year as a whole, the interest reduction could be roughly—interest cost reduction could be roughly INR 1,000 crore. The company also stays committed to sustainable performance, including a focus on decarbonization, improving capacity, utilization, value addition, cutting semis, and achieving cost competitiveness. We're also working to lower cost as well as lift the top line.

Ashok Kumar Panda

executive
#186

So what you'll see is that in this particular year, your top line, which had been holding at nearly INR 100,000 crore before, is now headed for a big number this year. My thanks go to all our investors for placing their faith in Steel Authority of India Limited, and I hope the same will carry forward in the future as well. Thank you very much.

Operator

operator
#187

Thanks a lot. That wraps up this conference on behalf of Nuvama Institutional Equities. Ladies and gentlemen, we appreciate your participation. You can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Steel Authority of India Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Steel Authority of India Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Steel Authority of India Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.