Talen Energy Corporation (TLN) Earnings Call Transcript & Summary

May 5, 2026

NASDAQ US Utilities Independent Power and Renewable Electricity Producers earnings 60 min

What were the key takeaways from Talen Energy Corporation's May 5, 2026 earnings call?

In the first quarter of 2026, Talen Energy Corporation (TLN:US) reported strong operational and financial results, with adjusted EBITDA of $473 million and adjusted free cash flow of $350 million, both significantly up year-over-year. The company reaffirmed its 2026 guidance of $1.75 billion to $2.05 billion for adjusted EBITDA and $980 million to $1.18 billion for adjusted free cash flow, excluding contributions from the pending Cornerstone acquisition. Management indicated that the Cornerstone acquisition is expected to close by summer 2026, which could enhance future guidance and free cash flow per share growth.

What topics did Talen Energy Corporation cover?

  • Strong Financial Performance: Talen reported $473 million in adjusted EBITDA and $350 million in adjusted free cash flow, with adjusted EBITDA more than doubling and free cash flow quadrupling year-over-year. Management stated, "These results were driven by higher prices and spark spreads, higher capacity and ROR revenues that started in June 2025."
  • Cornerstone Acquisition Update: Management confirmed that they are working diligently to close the Cornerstone acquisition, which is expected to diversify Talen's generation portfolio. They anticipate regulatory approvals by summer 2026, stating, "We expect to provide an update to 2026 guidance after closing the transaction."
  • Market Demand Growth: Talen observed a 3% increase in incremental deliveries on a weather-adjusted basis in PJM compared to the same period in 2025, indicating strong demand growth. Management noted, "This is a clear sign of demand growth and supports our view that energy demand will increase the dispatch of our flexible fleet."
  • Free Cash Flow Yield and Share Repurchase: Management highlighted a projected free cash flow yield of about 11% and discussed plans for share repurchases, indicating potential upside for shareholders. They stated, "We project approximately $41 per share in 2028, a 30% increase to what we showed back in January."
  • Operational Efficiency: The company reported a fleet-wide capacity factor of 55% and achieved strong operational performance during winter cold events. Management emphasized, "Our fleet ran well, and we generated approximately 16 terawatt hours of electricity."

What were Talen Energy Corporation's May 5, 2026 results?

  • Adjusted EBITDA: $473 million (vs $200 million YoY, +136% YoY)
  • Adjusted Free Cash Flow: $350 million (vs $87 million YoY, +303% YoY)
  • 2026 Adjusted EBITDA Guidance: $1.75 billion to $2.05 billion (maintained guidance)
  • 2026 Adjusted Free Cash Flow Guidance: $980 million to $1.18 billion (maintained guidance)
  • Free Cash Flow Yield: 11% (projected yield)
  • Fleet-wide Capacity Factor: 55% (operational performance metric)

Talen Energy's strong first quarter performance and reaffirmed guidance position the company favorably for future growth, especially with the anticipated Cornerstone acquisition. Investors should monitor regulatory developments and the execution of their growth strategy, particularly in relation to data center contracting and market conditions.

Earnings Call Speaker Segments

Sergio Castro

executive
#1

Thanks, Kathy, and welcome everyone to Talen Energy's conference call for the first quarter of 2026. On the line today we have our Chief Executive Officer, Mac McFarland, our President, Terry Nutt, and our Chief Financial Officer, Cole Muller; along with them are additional Talen senior executives who will help field questions during the latter portion of today's call if needed; our earnings release went out this afternoon, together with a presentation, and you can find both in the investor relations area of Talen's website, talenenergy.com. Some forward-looking statements are being made today, based on current expectations and assumptions. Actual results might differ because of risk factors and other considerations laid out in our financial disclosures and other SEC filings. References to certain non-GAAP financial measures are also part of today's discussion. Information reconciling our non-GAAP measures to the most directly comparable GAAP measures appears in our earnings release and the appendix of our presentation; with that, I'll hand the call over to Mac.

Mac McFarland

executive
#2

All right, thanks, Sergio, and good afternoon to everybody. We’re glad you’re interested in Talen, and we’re eager for the conversation in our Q&A. I’ll begin with what we recorded for the first quarter. During Q1, we posted robust operational and financial performance, helped by solid plant performance through the winter cold events, and we’ve gotten off to a good beginning in the outage season. As a matter of fact, we are in startup at Susquehanna, running a bit past the duration we had planned for the outage. Terry and Cole will go into all of that in greater depth later. We also completed a key deal in Q1 that advances the Talen flywheel approach and brings substantial growth in free cash flow per share via acquisitions. Today we are restating our 2026 guidance and offering an early look at 2027 and 2028. The cornerstone assets are not reflected in our 2026 guidance. We anticipate completing the transaction as early as this summer, and after closing we will revise the 2026 guidance. The financing for the cornerstone acquisition was recently finalized, putting us in position to close promptly once every regulatory approval is in hand. Cole will walk through the reasoning behind our timing in greater depth, though the short version is that what we spend to carry the funding right now ought to be outweighed by getting the deal closed at the earliest possible date. On top of that, we've lowered our exposure to swings in the market and swapped out a portion of pricier debt. The preliminary guidance we're giving for 2027 and 2028 factors in the cornerstone assets, along with a handful of other revisions — among them stronger current forward mark-to-market values compared with March 31 of this year, better financing costs, and a number of additional adjustments. Under these outlooks, free cash flow per share grows substantially versus the prior year, and the figures represent considerable upside relative to the outlook we provided earlier, back in January. This shows how solid our business is and how we keep giving cash back to shareholders by buying up a meaningful amount of stock; those projections also suggest we're trading at free cash flow yields in the double digits, and in our view that doesn't capture how our portfolio keeps getting more contracted. On top of that, we've got additional levers for more upside. Cole will take you through those in a bit. As we look forward, our Talen flywheel strategy hasn't shifted at all. We're headed in the same direction. We still have faith in contracting megawatts with data centers, and we're assembling a pipeline that includes both powered land and new build options. Terry is going to take you through those development efforts, along with our outlook on where the market is heading — toward what we refer to as a hybrid model. That approach relies on existing generation to get to market quickly, with new build added on in subsequent years. A few of you might recall my comment that 2025 would be a year of options while 2026 shapes up as one of market rationalization, and that we wouldn't be talking about development activities. We aren't getting into project-by-project specifics, but we will give you a high-level look at our development portfolio as it stands now, and we continue to anticipate rationalization among projects during 2026. Even so, we're assembling a pipeline of genuine chances that can succeed; having said that, I'll hand things over to Terry on this call.

Terry Nutt

executive
#3

Thanks, Mac, and good afternoon to all of you. We'll now walk through the financial and operating results for our first quarter. During the first three months of 2026, adjusted EBITDA came in at $473 million, while adjusted free cash flow was $350 million. When you set these figures against the same quarter a year ago, it's obvious how much accretion Talen has delivered via acquisitions as well as organic growth within the business. Safety and reliability across our fleet held up strongly this quarter, and that deserves extra recognition considering how bitterly cold the temperatures were and how much ice was around in late January and early February. Right now, we're in the midst of spring outage season fleet-wide. Work at Susquehanna Unit 1's refueling outage has gone smoothly, and it included tasks comparable to those we performed at Unit 2 during last spring. Thanks to what we learned a year ago, this outage has run more efficiently, and as a result the unit was synchronized back to the grid yesterday. I want to express my appreciation to the men and women of Talen, who keep showing strong operational and safety performance. None of this would be achievable without what they do. I'd also like to extend a welcome to the employees from Freedom and Guernsey who joined Talen in April, and to congratulate them on their impressive safety records since startup. Across the fleet, safety continues to be our number one priority, and our team stayed safe through a busy quarter. Our recordable incident rate came in at 0.37, still better than the industry average. The fleet performed well, producing roughly 16 TWh of electricity and reaching a 55% capacity factor fleet-wide, as our intermediate and peaking assets keep trending toward higher runtimes in support of the grid. Turning to slide four, markets continue to tighten on the back of rising demand; during Q1, on a weather-adjusted basis, we observed roughly 3% of incremental deliveries in PJM versus the same period in 2025; that's a clear indicator of demand growth and reinforces our belief that growing energy demand will lead to more dispatch of our flexible fleet. To give another illustration of this demand growth trend, the lower left of this slide shows our first quarter generation spanning 2023 through 2026, rising each year. Over that span, our intermediate and peaking assets — Montour and Martins Creek especially — ran considerably more than they did in the same quarter the year before, extending the pattern we've observed for the past several years. On spark spreads, we've continued to see appreciation in the forward curves for the rest of 2026 through 2028, with spark spread growth throughout PJM, including the zones where our generation sits. PPL Zone spark spreads have appreciated since July of last year, though not to the degree seen in PJM West Hub. We think a portion of the price movement causing the term basis between West Hub and PPL Zone to widen comes from recency bias tied to transmission work affecting that zone, rather than from fundamental factors. It's our expectation that this basis will narrow as the transmission network and load develop. Moving to slide five. The graph on the left shows summer spark spreads continuing to climb, pushed by fundamentally tight conditions in PJM. That's even clearer given we've observed more frequent demand-driven volatility, with cash market spark spreads widening, which is in turn helping push term sparks up. This is starting to confirm our earlier view that the market response would arrive once fundamental drivers show up in the cash market. As I said before, demand keeps rising while supply isn't increasing in any meaningful way. That shows the value of steel in the ground. Moving to slide six. We're working hard to complete the Cornerstone Acquisition announced earlier this year, which will further diversify Talen's generation portfolio and boost our large load contracting opportunities. On the regulatory side, we filed our 203 application with FERC in January and expect approval by this summer. The HSR waiting period lapsed in March, so we have finished the DOJ approval process. Finally, a hearing took place with the Indiana Utility Regulatory Commission in April, and the unopposed final order was submitted. We expect approval in Indiana by this summer. Moving to slide seven. I want to give you some detail on the land development and contracting growth options Mac mentioned earlier; near term, we have multiple 1+ GW opportunities for long-term PPAs at our existing sites plus other sites in Pennsylvania, and we're advancing potential opportunities across the rest of our footprint; regarding specific site development opportunities on land we're currently working on, we're making progress on several fronts. Those opportunities involve land of up to 3,000 acres in total capable of supporting 3 GW-4 GW of data center capacity at current compute density. Zoning on the property runs from fully zoned acreage to zoning activity still in process, like at our Montour site. In addition, at several of these sites we can install new generation of 500 MW — 1 GW. As part of our strategy, we're advancing a mix of gas and storage generation projects totaling over 2 GW at our sites to support data center contracting and reliability needs. Last week, we put several new projects into PJM's Cycle 1 Interconnection Study Cluster. These projects are a mix of generation solutions, including CTs, batteries, and CCGTs. These new generation sources, together with our existing assets, give us the ability to offer customers a solution that is a hybrid approach of receiving power from existing generation now and new generation down the road. Just like we've mentioned previously and will say again now, bringing new generation online has to happen either by way of long-term offtake agreements or via the PJM RBP, and we're concentrating on financial discipline when it comes to returns on investment. This first phase of generation development is capital light, meaning no material capital is needed during those early stages. As things move forward, our spending will be linked to customer contracts and underwriting. Project financing structures tied to these projects will likely be something we use. With that said, I'll hand things over to Cole, who will walk through our financial results.

Cole Muller

executive
#4

Appreciate it, Terry, and hello everybody this afternoon. If you turn to slide eight, where we go over the numbers for Q1: adjusted EBITDA came in at $473 million, and adjusted free cash flow was $350 million. Compared with the same period a year ago, adjusted EBITDA grew by more than two times, while adjusted free cash flow was four times as large, which reflects what the Freedom and Guernsey deals we completed in Q4 of last year brought us. Additional drivers behind these results included stronger pricing and spark spreads, greater capacity and ROR revenues that kicked in starting June 2025, plus the continuing ramp of the AWS PPA. Another boost to our adjusted free cash flow came from lower cash tax payments, mostly tied to the effects of the Freedom and Guernsey acquisitions. Now on slide nine, we're standing behind the 2026 guidance ranges we put out earlier. Q1 was solid, but adjusting things this early in the year isn't something we typically do. For adjusted EBITDA, the range sits at $1.75 billion-$2.05 billion, while adjusted free cash flow is guided to $980 million-$1.18 billion. Neither range factors in anything from the Cornerstone acquisition that's still pending, and once that deal closes, we intend to update the 2026 guidance. Our commitment stands to hold adequate liquidity and to keep our long-term net leverage ratio under the 3.5 x target we've stated. Our forecasted 2026 net leverage ratio stood at 3.1x as of March 31st. Keep in mind, that figure leaves out any effects of the Cornerstone acquisition and the related debt we raised in April. Once the Cornerstone transaction is done, we anticipate retaining the capacity to get below 3.5 x net leverage by the close of 2026. Moving to slide 11, we just obtained appealing acquisition financing for the Cornerstone assets, which gave us a chance to improve the balance sheet as well; through a private placement we issued $4 billion in senior unsecured notes, split across five and seven year tranches, with a blended rate a touch above 6.25%, which takes risk out of the Cornerstone acquisition financing at appealing pricing and positions us to close as soon as regulatory approvals come through. In addition, we retired our $1.2 billion of senior secured notes carrying an 8.625% coupon, which cuts interest expense by more than $40 million annually, adding close to $1 to our free cash flow per share. Let me take a moment to explain in more detail why we chose to raise the financing before regulatory approvals arrived. By acting now, we sidestepped possible threats to market availability, including fallout from geopolitical events and the midterm elections coming up, and locked in appealing long-term rates along the way. We also eliminated any headaches had we needed to raise funds while possibly holding MNPI in the months ahead. And second, with financing already arranged before regulatory approvals, the time to close gets shorter, which means we can take ownership of the asset earlier and capture more of the peak summer season. We figure that having one extra month is worth roughly $30 million more in cash flow, and that easily exceeds the net negative carry, which is just a few million dollars a month. Keep in mind that part of the proceeds let us retire the pricier senior secured notes last week and capture interest savings right away. Given where the regulatory approval processes stand, we believe this was the appropriate moment to secure the financing. By getting rid of the senior secured notes, we've brought our secured debt composition down substantially, from about 60% of total debt to 30%, which has resulted in better credit ratings from multiple agencies. In connection with this funding, we're also strengthening our liquidity position by agreeing to increase our current revolver to $1.35 billion, as well as our separate letter of credit facility to $1.5 billion. Beyond that, we're pushing the LCF's maturity date out to December 2029. Once the Cornerstone deal is completed, these changes to the credit facilities will go into effect. Turning to slide 12, we're giving a preliminary refresh on our 2027 and 2028 guidance, which folds in the Cornerstone assets along with developments throughout the business since Investor Day last September — among them spark spread growth through March 31st and the effects of the financing I just walked through. Separately, we're also including what we expect from carrying out our share buyback program, based on the assumption that we use 70% of the free cash flow available to us. For our base case, we're keeping the number of shares unchanged and expect free cash flow to come in around $34 per share during 2027, then roughly $36 per share in 2028. That works out to a 15% gain over the figures we gave in January, which had the Cornerstone acquisition baked in. Once we include our buyback program, we're looking at about $41 per share in 2028 — that's a 30% jump compared with what we presented in January. At those forecasted levels, our free cash flow yield lands near 11%. Keep in mind this is based on the assumption that 70% of free cash flow gets used, which leaves roughly $1 billion in extra cash over 2027 and 2028 that could give shareholders more upside; we still expect additional upside from the flywheel by way of accretive M&A — something we've shown with Freedom, Guernsey, and now Cornerstone — plus faster progress on the Amazon ramp set up under our current PPA, fresh chances to sign data center contracts, and more spark spread growth as markets keep getting tighter. In the appendix, you'll notice that spark spreads have improved considerably since the 3/31 pricing date — roughly $5 a megawatt-hour above what these figures reflect — and if we marked that today, it would mean several additional dollars per share. We also anticipate that the recent widening of the West Hub to PPL zonal basis will return to levels closer to the recent average. Keep in mind that this outlook incorporates the most visible mark tied to that elevated zonal basis. That said, as Terry said earlier, we view this recent shift as not fundamentally driven. An impact of $5 per megawatt-hour over more than 30 TWh in the PPL Zone creates a strong upside opportunity, especially as load growth takes place inside that zone. Every one of these opportunities might deliver 10%+ in extra free cash flow per share growth on top of what is presented here, giving us an attractive set of additional growth possibilities. I should point out that further upside may also exist in 2026 that isn't captured here, driven by completing the Cornerstone acquisition this summer and/or carrying out our share repurchase program over the rest of the year. I'd like to emphasize that our commitment to capital discipline will not waver, and we'll remain squarely concentrated on value-enhancing levers that drive a meaningful increase in the free cash flow per share our investors can access via the Talen flywheel. Turning to slide 13, we lay out the total contracted shape of our operations at the point when our current PPA of close to 2 GW has completely ramped, covering both the megawatts and the cash flows tied to the Cornerstone assets. Since 35% of our gross margin is locked in through long-term agreements, those contracted cash flows from a counterparty rated AA will represent our largest source of revenue, which lowers our long-term exposure to PJM capacity and energy markets. Every additional 1 GW PPA we sign increases our long-term contracted gross margin by 15%, so the next 1 GW PPA we land could bring that long-term contracted gross margin up to 50%. We view this as a differentiated position, with cash flows that keep growing and are becoming more durable. I'll now hand it back to Mac.

Mac McFarland

executive
#5

Okay, we appreciate everyone being here. That brings our prepared comments to a close. At this point, I'll hand things back over to the operator so we can take your questions.

Executive

executive
#6

Hello everyone, good afternoon. This is actually Constantine speaking instead of Shar. Nice work on such a strong quarter, and thanks for the news on development.

Cole Muller

executive
#7

Thanks, Constantine.

Executive

executive
#8

Perhaps to begin with the PJM context and how sites get developed for data centers: is there any preliminary outline regarding matters such as matching new capacity against capacity that already exists, say at a ratio of one to one? Looking ahead, how much flexibility would you expect there to be, particularly given that the reserve auction is attempting to sort of push all this capacity matter to its limit?

Cole Muller

executive
#9

Appreciate it, Constantine. Cole here. So, look, like we've discussed before, and our view hasn't changed, there's a chance to sign contracts off the generation we already have. Clearly, new generation matters a great deal, and the question of how to motivate it, well, that's something a lot of people are debating right now. Terry said it in his remarks — we do expect that adding new generation on the back of a PPA with existing generation, this hybrid approach we've been discussing and developing, will drive contracting in the near term as load rises across the next 3 to 5 years, while also delivering new generation in the 2030 and later period. Definitely not one for one, but we think some percentage, as you've seen in certain other deals over recent months, a percentage of new build, fits into the answer.

Mac McFarland

executive
#10

Hi Constantine, Mac here. I just wanted to add something after what Cole mentioned. When you take a step back, there's an issue with reserves that's already been pinpointed — a resource adequacy concern. Like Cole, Terry, and I, along with the rest of our team, have been saying for several years: this is essentially a 50-hour challenge. We're exploring ways to address it. As Cole pointed out, it doesn't have to be a one-to-one match for the base load generation, since there are many hours when energy is abundantly available. What addresses those 50 hours? That's the reason — and we can dig into this, and Terry brought it up — we're considering a combination that includes batteries, which can be brought to market fastest, CTs, which are the most cost-effective option after that, and CCGTs for the longer term; we're evaluating everything within the framework, but I don't believe it begins, as Cole noted, as a one-to-one situation where having a 1,000 MW PPA would mean you'd definitely require 1,000 MW of additionality to fix the issue, because you can accomplish that through various means to boost the reserve margin for that load.

Executive

executive
#11

All right. Perhaps I could put the question in a slightly different way — for some of the site development you're pursuing, the solution doesn't necessarily have to be based on a CCGT, correct?

Mac McFarland

executive
#12

No—let me just cut in here, folks. What we genuinely believe is this: when you consider what the RBP will probably produce, upgrades are coming, and you'll also see CTs turned into CCGTs, which amounts to upgrading a unit that already exists. Batteries and peakers, in my view, will end up being the cheapest answer. In the coalition we've assembled—a broad one—that we proposed for the RBP and that we've backed, the design is pay-as-bid, and the reason is to make unmistakably clear the affordability problem we're facing. That, we believe, is the lowest-cost route to achieve it. CCGTs, as it happens, sit toward the steeper portion of that curve and higher up on cost. Our view is that other approaches would do a better job of addressing the reserve margin.

Cole Muller

executive
#13

Right. Constantine, building on what Mac said, if you look at the capacity factor across our whole fleet, apart from those 50 hours each year when you've got genuine constraints and genuine capacity requirements, it's clear the grid has surplus generation available to handle additional megawatts during times other than those peaks, correct? If you return to that slide we showed, and you observe that gradual, consistent upward drift in demand, surplus capacity still exists. In our view, that explains why a one-for-one type of approach isn't necessary, you know, when you consider the big picture; what we're actually addressing is the peak hours within each day, during very narrow windows, which, as Mac noted, comes down to capacity, not energy overall.

Executive

executive
#14

Great. Perhaps I could just ask a quick follow-up regarding a matter of regulation. As the PJM co-location rules continue to move forward at FERC, how at ease are your customers when it comes to advancing certain data center development and site development even though the rules have yet to be finalized? Are there any thresholds to watch for that you might be keeping an eye on?

Cole Muller

executive
#15

Honestly, I wouldn't characterize anything as a threshold. There's clearly plenty of discussion about the direction things are heading. You brought up the co-location docket. Obviously, the RBP is in play. And a few other related matters are floating around that PJM and other parties are working through. No threshold, for sure. We continue to observe considerable appetite for hooking up to the grid and getting power as quickly as possible, and that will be accomplished using generation that already exists. Our view is that hyperscalers and others will surely recognize the need to provide incentives and add new generation over five-plus years. We aren't seeing any threshold they're aiming for.

Terry Nutt

executive
#16

Constantine, I might just toss in a bit of extra shading on top of what Cole said. At data center locations throughout PA, the development and construction already underway — and clearly, the site close to our Susquehanna facility makes for an excellent illustration — that work keeps rolling along at a consistent clip. They're pressing ahead, filling up data halls, getting equipment powered; we see no deceleration whatsoever. Naturally, the hyperscalers held their earnings calls — several of them — during the past week. Across every one of them, you notice the same ongoing pattern in what they're up to, whether that's their hosting operations or elsewhere in their business. Those revenue streams exist. They're advancing rapidly, and capital continues to flow into physical infrastructure.

Executive

executive
#17

Excellent. Sounds good. Thank you. Thanks for taking the time.

Cole Muller

executive
#18

Thanks, Constantine.

Rinny Singh

analyst
#19

Hey, everyone. My first question is about power prices. You mentioned that PPL trades somewhat differently from PJM West due to recency bias. When do you expect a correction might occur, and is there a particular catalyst we should be watching for?

Terry Nutt

executive
#20

Sure, Rinny, I'll take that one first, and then I'll pass it to Chris, who is here with us today. Over the past several months, quite a bit of transmission work has been done in and around PPL Zone and other areas of PJM. As a result, we're seeing considerable short-term congestion of a temporal nature across the board. Our main view, which we brought up in the prepared remarks, is that as load changes and new load pockets emerge in PPL Zone and the other places you're seeing form, we believe that would clearly trend back and align. Chris, anything you'd like to add?

Chris Morice

executive
#21

You see, because the auction mechanism itself faced certain liquidity constraints and timing challenges, what those marks capture is the way those auction clearings end up diverging from the projections we're putting together. The near-term tightness and basis stemming from the transmission work still underway is spilling over into that longer-dated price. Choosing a moment when that shifts back or returns to a more typical level will, once again, occur gradually as that load shows up, rather than as an all-at-once, single-instant event.

Cole Muller

executive
#22

Right, Rinny — so, like I mentioned during my prepared comments, the marks we rely on are the ones everybody can see, and that means the PPL Zone mark. If you flip to the appendix, there's a slide laying out the basis, the West Hub PPL basis, across time; for quite a few years it moved in an extremely tight band, and then during the past 2 months or so it has broken away from that, since, as you're aware, Terry and Chris have pointed out, there are, well, reasons behind it. From the standpoint of just a mark, we remain faithful to whatever is visible, and that's the reason we describe this as an upside opportunity.

Mac McFarland

executive
#23

Hi Rinny, Mac here. There's one more point I want to tack on, and let's keep it in view. The basis has widened, yes, but the whole market has climbed, and it's now clear Chris had it right — you know, the market was going to get tighter, or at least the term market is beginning to side with Chris. Even with that wider basis, the market sat above the 3/31 marks. As Cole said in his prepared remarks, if you look at yesterday, they're up even more. In our view, the markets are at last rationalizing supply-demand; and as for this basis, we see it as a temporary matter.

Rinny Singh

analyst
#24

All right. Yeah, that seems logical to me. So then, regarding this load growth you mentioned and the capacity involved, what sort of new pricing are you observing, whether for a CT or a CCGT, and how are you approaching risk management — clearly the RBP side, to cover that capacity price, but especially the energy risk? Does that just mean concentrating on long-term data center agreements and elevated pricing?

Terry Nutt

executive
#25

Yes. Appreciate it, Rinny. That's a solid question. Clearly, there's been considerable appreciation in the turnkey expense for a CCGT, and honestly, a comparable shift for combustion turbines generally. In what we proposed for the RBP — and I believe this aligns closely with what PJM has discussed — our view is that it ought to be a capacity product, correct? That's the area to concentrate on, presuming you'll construct a CT supported by a reliability backstop award, so to speak. The capacity portion of it, or the capacity revenue stream, is genuinely what ought to underwrite or incentivize it. Energy plus any ancillaries derived from it rank as second tier. Beyond that, securing that award across multiple years — and clearly our proposal allows for as much as 15 years. PJM's present proposal even references procurement extending to 15 years. There are evidently some parallels there. Our view is that, in the end, this is what supports the underwriting. As I think we've mentioned previously, the main difficulty isn't whether you can bring additional resources online. It's actually the financing of those resources and what foundation exists for someone to underwrite and obtain the financing tied to this. In our view, the proposal from PJM satisfies those requirements. We believe there are a few modifications we'd prefer to see, but we think it reaches that point.

Rinny Singh

analyst
#26

Okay. Perfect. Thanks so much, guys.

Terry Nutt

executive
#27

Thanks, Rinny.

Moses Sutton

analyst
#28

I appreciate you fielding this. It's genuinely <<inaudible>>. In the prior quarter it stood at $31.40, and with Cornerstone included that figure now climbs past $41, while you're counting on favorable items such as M&A and PPA within that. Of that roughly $10 gain, what portion comes specifically from the spark spread widening as opposed to offsetting effects elsewhere? I noticed you mentioned the basis piece isn't factored in. And lastly, does any higher capacity factor expectation for the fleet sit inside those assumptions?

Cole Muller

executive
#29

Yes. Thank you, Moses. Well, in the final analysis, we won't be overly granular about each individual element, but we've included the whole picture, so to speak. You could parse it somewhat, and naturally we disclosed the effect of the share repurchase program on its own. As for the remaining variables — basically the Cornerstone figures plus the spark spreads and similar items — you can reach an approximate sense of direction from those, yet we won't provide a detailed item-by-item accounting.

Moses Sutton

analyst
#30

Understood. Understood. Regarding the backstop option, not directed at you two specifically, but more generally, do you hold a perspective on whether they will even reach 15 GW, whether that includes battery CT, a few CCGTs among them, can they construct that quantity by 2031 given queue reform? Do you believe a portion of it will enter that 2nd stage of the clearing process? Would you anticipate, you know, the bilateral process handles the bulk of the work? I realize it's difficult to judge from this point, but I'm just interested in your market perspectives.

Terry Nutt

executive
#31

Yes. Moses, plenty there to unpack. Let me perhaps address a few of those. I believe when you examine the cost and you examine, you know, affordability ultimately, I believe there are some clear-cut options regarding technology. You know, PJM relies on the cost of new entrants. That cost of new entrants rests on a benchmark of a CT, which is the most economical ultimately. We likewise believe you can get specific kinds of CTs and batteries constructed more promptly. That's additionally something that frankly the, you know, reliability backstop must factor in. You somewhat hinted at it in your remark, CCGTs and entering the queue for a turbine or for a CCGT involves a somewhat longer wait period. You must account for that ultimately. Yes, I mean, we believe there are some positive elements in the proposal. I will say the single item that we believe might be beneficial though is the interconnection queue requires some clearing and requires some prioritization. That's one domain where we're actively involved in the stakeholder process and will remain involved in the stakeholder process, since ultimately that interconnection queue counts quite a bit toward bringing these new resources online. Hopefully, that provides you a bit of color and, you know, we believe it's solid progress. It's solid progress, and we'll watch it advance here.

Moses Sutton

analyst
#32

That's quite useful. Thank you. Congratulations on the guidance you've given.

Terry Nutt

executive
#33

Appreciate it, Moses.

Michael Sullivan

analyst
#34

Hey. Hey, guys. How's it going?

Terry Nutt

executive
#35

Hey, Michael.

Michael Sullivan

analyst
#36

Hey, hey. This might be a dumb question, but I realize you don't want to discuss particular opportunities, yet when you presented, sort of, what your development team can do, why not simply focus on those that already have full zoning instead of the ones that lack it, the ones we tend to hear more about publicly that keep running into resistance? For those with full zoning, what's the obstacle there?

Terry Nutt

executive
#37

Yeah. Michael, our goal with that slide was really to convey a sense of what the team has been working on for, you know, more than a year, in every area. When you look at the various opportunities we've advanced, you know, the ones you're hearing about are okay. Clearly, Montour has appeared in the press. I mean, we keep moving that one along. There are others we have that haven't been covered publicly, and honestly, we want to advance those too. Like we mentioned on the previous call, back in February, there was a great deal of attention on merely one or two of these. We wanted to ensure investors grasped that a wider context existed. I believe the most useful piece, too, is that as we consider this hybrid strategy we're pursuing and attempt to locate some new generation to bring into the mix, we feel that answer truly, sort of, satisfies many requirements for certain hyperscalers. That will, in fact, be a major element of how you'll observe these projects move ahead; ultimately it isn't only zoning, whether that's industrial or, sort of, agricultural use; it's also the additional considerations around, okay, do you have some new gen to pair with it? What's the existing gen you can place behind it? Hopefully that provides you with some color.

Mac McFarland

executive
#38

Michael, this is Mac. Just quickly. When you pose that question and ask what the obstacle is, I don't believe an obstacle necessarily exists. What we're engaged in is exactly what we've discussed previously, namely building out a collection of possibilities. Each carries a distinct status as it progresses through the pipeline. At times a particular site that may not yet have secured zoning — Montour, in other words — could have been moving ahead more quickly since a counterparty favored it more during that initial stage. Correct? Then there are additional ones that already have more zoning in place. They arrive. We also have further sites lacking full zoning that we're actively pursuing. It's about moving all of these various items forward, rather than focusing on just a single one. That's the point we were making when we noted that Montour isn't our sole option — it isn't the only item sitting in our development pipeline.

Michael Sullivan

analyst
#39

All right, that is quite useful. I appreciate the detail. Now, turning back to the pricing activity. I believe you provided some solid explanations regarding what took place in Q1, though clearly matters have truly begun shifting over the past 14 days or so. I'm simply wondering, since we're in something like a shoulder season, what is causing that? And even regarding the basis side, it appears that is in fact still heading the wrong way. What is your thinking on that across the recent, yes, sort of the recent 14 days or so of developments?

Terry Nutt

executive
#40

Yes. Michael, allow me to begin, and afterward I'll have Chris weigh in. This kind of ties back to the prepared remarks. One item you're observing is that when cash market activity in the real-time market becomes very constrained and very tight, the term market truly reacts to it. A few illustrations, clearly more recent, late January and early February, we experienced a genuinely major pricing event lasting 8 or 9 days across the whole market. Clearly the market responded to it. Even lately, there's this group of spring outages that we've had, correct? Typically we have a customary big group of spring outages system-wide. Some generation goes offline, yet even a small bit of weather arriving, we've witnessed price volatility and cash strengthen. The term market draws from that. Chris, would you like to provide a few details on that?

Chris Morice

executive
#41

Right. Once more, when it comes to that rise in prices, it's a thing we have been monitoring — and, in fact, spotting — for a number of quarters at this point, and it would be an oversight on our part not to call attention to where our hedge percentages currently sit in those later years. Once again, they are under the ranges we have historically occupied. To a greater or lesser extent, the confidence we hold for those periods, our confidence regarding that upward price movement, comes through in those hedge percentages that are historically low. As Terry mentioned, many of the underlying forces at work in the cash market are now showing up via the curve. That is, unfolding as time passes, yet across various portions of cash and term.

Michael Sullivan

analyst
#42

Very helpful. Much appreciated.

Terry Nutt

executive
#43

Thanks, Michael.

Angie Storozynski

analyst
#44

Thanks. I'd like to discuss Ohio. I realize we're still waiting on the Cornerstone deal to finish, but Guernsey has been in your portfolio for a good while now. There's been plenty of talk regarding data centers in Ohio, particularly in the area where you already have a plant; this morning we heard AEP mention how unhappy they are with how slowly load interconnection is moving in PJM; it really seemed to concern Ohio. We've seen some behind the meter arrangements from Williams. You've shown us opportunities to contract assets in Pennsylvania. Could you speak to Ohio, especially Guernsey, please?

Terry Nutt

executive
#45

Sure. Angie, let me address that briefly and Mac might add something. Clearly, on the slide we discuss particular activity in Pennsylvania. I'll mention in the prepared remarks, and we also have one small call out box. We have been busy in Ohio. Clearly Guernsey has been part of the portfolio for several months now. It did very well in Q1. Clearly a major contribution to our overall financial results. We've been working in Ohio. We've spoken with customers in and around that location, and across the wider state as well. We're busy there. Again, I think we've been pursuing a number of different options. When we reorganized the leadership team at the end of last year, we placed much more emphasis on various segments of the market and Ohio is certainly one of them; it's a priority for us. We believe it's a truly good market and we believe customers enjoy being there. Many customers are already located there today. It's a well-established market in and around Columbus. There are multiple hubs in the region where you have many data centers. We really want to keep advancing that just as we're advancing in Pennsylvania.

Mac McFarland

executive
#46

Angie, I'll add something on top of what was said. Of course, Ohio is appealing to us. More than 4 GW of gas generation capacity has been built up by us in that region, and that takes in the facility located in Indiana whose output essentially supplies Ohio. There was a rationale behind that move. Number one, when you examine those fundamentals, the uplift in prices and the trading movement we were just discussing are having an impact on them, and the drawback of West Hub basis isn't present. Taking that stance has worked well for us. The second point regarding building out possibilities in Ohio is that we are indeed pursuing development opportunities there; this mirrors what we've gradually been carrying out in Pennsylvania. We simply won't provide the details.

Angie Storozynski

analyst
#47

Another item regarding slide 12 and that Talen flywheel. What I've always gathered is that you pursue M&A, and after that comes turning assets into cash. In the box displaying the upside to free cash flow per share, M&A appears as the leading driver. Would it be reasonable to expect that some asset monetization comes first, ahead of any further M&A deal?

Mac McFarland

executive
#48

Yes. Hi, Angie, this is Mac, and perhaps I can take that one. To start with, the sequence on the right-hand side carries no significance — it was simply kept aligned with our earlier presentation, since that's how we presented it previously. Clearly, and I believe all of us have expressed this, ideally you would bring in assets, get them under contract, redeploy the capital, and then bring in more assets and repeat. Regrettably, we're in a position where we must choose strategic moves that fit the Talen flywheel, and those tend to arrive unevenly over time. Indeed, we're hard at work. Cole brought this up, I believe. We're considering the path to reaching that 50% contracted energy margin. We're reviewing various possibilities out there. Those are taking shape. We're pleased with what we've been accomplishing. Certainly, would investors be satisfied if a deal had been announced by now? Absolutely. Such matters require time. We've stated that; we're progressing through them. We believe we hold a solid pipeline of opportunities to accomplish things.

Angie Storozynski

analyst
#49

Okay. Understood. Thank you.

Mac McFarland

executive
#50

Thanks, Angie.

Bill Appicelli

analyst
#51

Hello there. Good afternoon to everyone. My question returns to a few points that came up previously. When your team examines the levelized cost of energy required for much of this new construction, how broad is that range, even when considering a CT compared with where market conditions stand at present?

Cole Muller

executive
#52

Hi Bill, this is Cole. I'll kick things off, and then other folks can jump in. So, the difference is significant, isn't it? Purely from a merchant standpoint, to back any type of new construction. That's the reason we, and I believe many others, and this isn't complicated, you know, we'll pursue new builds backed by some form of commitment, be it a bilateral agreement straight with a hyperscaler or via the RBP and consequently through PJM. But that shortfall has to be, you know, closed for us to make that, you know, major pledge, you know, and do it in, you know, a way that benefits our shareholders here. I mean, the present capacity prices, as everybody is aware, aren't enough to encourage new construction, and clearly various technologies come with different LCOE. Combined cycles are the priciest. They clearly offer greater energy margin. There's always a trade-off, but the shortfall isn't merely a couple of dollars. It's quite a substantial spread at the moment.

Bill Appicelli

analyst
#53

Right. Okay. So, is there any worry on your end about a market that's split in two — where, you know, the new megawatts being added are being paid enough, but, you know, generation that's already there isn't? I mean, that strikes me as something people are worried about, you know, across the market generally. Just wondering what you think.

Mac McFarland

executive
#54

Well, Bill, this is Mac here. What I'd say is that, sure, those are worries that exist pretty widely across the market. Whether we feel that same degree of worry, I'm not sure, since, as we've said all along, we backed the RBP, and it was a single instance of action. I do believe that, as you're aware, the cap got extended last week, and we were — you know, the capacity clears 2930 and <<inaudible>>. For another 2 years. We, you know, gave our support to that. It provides an opportunity to build and to work the RBP; that's a worry that will always come up, yet our level of worry isn't the same.

Bill Appicelli

analyst
#55

All right. So maybe as a final point, regarding those next-generation choices, would that cover any repowering of assets you already have, whether through uprates or anything else of that sort?

Cole Muller

executive
#56

It does not.

Bill Appicelli

analyst
#57

Okay. All right. Thank you.

Cole Muller

executive
#58

Thanks, Bill.

Mac McFarland

executive
#59

Thanks, Bill.

Julien Dumoulin-Smith

analyst
#60

Hi there, good afternoon, everyone. Great to speak with you, and I appreciate you making time for this. Perhaps I could just respond to a few points. Hi again, afternoon, folks. Turning back to that ratepayer commitment that was released following your prior call — could we discuss briefly whether it caused the name to shift immediately away from the RBP, and also revisit the protection pledge they introduced in March? Could you address that, and whether it altered your approach at all? I realize you'd rather not say much on this, but is there anything to share? Has it developed in any manner? I'd just like to, you know, address it head-on and plainly here. Then I have one quick follow-up.

Mac McFarland

executive
#61

See, are you referring to the one in Pennsylvania, or are you referring to the one that emerged from the White House industry?

Julien Dumoulin-Smith

analyst
#62

The White House. Right, that White House item from March. Yes.

Mac McFarland

executive
#63

Correct. So, in my view, there's this pledge—you've heard hyperscalers make it—that they're obviously committed to covering their fair share, in effect. What exactly counts as that fair share, though, and the way it gets decided, and how all of it moves through the system, as you're aware—I'd say that debate remains unresolved. That's because we're operating in a reorganized market at PJM, which comes with a particular structure and rule set, plus capabilities, jurisdictions, and authority—whether at PJM, with the states, or at FERC—that must establish those rules. Then there's implementation, which is making its way along. Broadly speaking, where do we think the puck is heading? Our general view is that the ability still exists, thanks to speed to market, to contract using assets already in place. The hybrid model talked about in today's remarks is beginning to appear as the development side of this, meant to address what's called additionality or, you know, delivering incremental generation alongside ratepayer protection. Evolving on that front is going to require time, and I'm not sure it's as straightforward as some would claim—that, you know, hyperscalers have agreed to foot the bill for all of it, since that isn't quite how, you know, reformed markets function.

Julien Dumoulin-Smith

analyst
#64

Understood. To connect this point, when you mention potentially adding between 500 MW and 1 GW of new generation, would you consider that covering about 50% of that requirement regarding additionality, so that, as you mention, those sites of 1+ GW and similar? Are you considering linking the new generation to that? Go ahead.

Mac McFarland

executive
#65

Yes. No, I believe Terry already mentioned it, and I'm reviewing it.

Terry Nutt

executive
#66

Right.

Mac McFarland

executive
#67

To be precise, at one location it's 0.5 GW to 1 GW, and across several locations we're looking at multiple gigawatts of potential. Dale has been handling the development side of this — the asset development side — and he's the person who filed through the queue the 2.3 GW, or slightly above 2 GW, that we submitted. By tethered, I believe what we mean is the hybrid model, where you pair it with a PPA that already exists, and that way you're addressing those 50 hours per year, whether through batteries or peakers. Once energy is what needs solving, then new CCGTs come into play, correct? Those can be attached to what's already there and fix a great deal of the resource adequacy issue at a cheaper cost than adding a CCGT. Because, as you're aware, Julien, much of what's being discussed out there right now is $3,000 to $4,000 for a new CCGT. That's far above $500 per megawatt day.

Julien Dumoulin-Smith

analyst
#68

Sure. And yes, I understand what you're saying about the storage component, definitely. For the time being, combustion turbines plus storage, correct? Certainly — I just want to wrap up that line of thinking completely. Your intention is to get these facilities operating. Essentially, by making use of that RBP, that's when we might witness something significant take shape. When you consider things like schedules, everybody keeps pressing you about the timing. For it to actually happen, assuming you manage to get something approved on the RBP side or whatever the case may be, that becomes the triggering moment that ought to open up this chance. At that moment, it will be conceptually linked to certain contracting efforts that you have been working on.

Terry Nutt

executive
#69

Julien, returning to the discussion and inquiries from before. I believe we have a quite defined route for that. Those additional megawatts will reach the grid in one of two manners. Either a hyperscaler will sign a direct offtake agreement, or an RBP award will be granted. Those are the two routes to get there. Naturally, which route arrives first will ultimately determine the outcome.

Julien Dumoulin-Smith

analyst
#70

Correct. Okay. Yes, that's reasonable. <<foreign_lang>> Certainly. Very well, everyone. I'll stop here. Many thanks, folks. I appreciate that.

Terry Nutt

executive
#71

Thank you, Julien.

Nick Amicucci

analyst
#72

Hi folks. Happy <<foreign_lang>>. Just a few quick items from my end. In fact, I'm building off what Julien asked as well. Would it be reasonable to say the new generation might involve a long-term DC offtake agreement, or perhaps the RBP? How would you characterize the capital deployment? Would it be reasonable to say the RBP functions more as a fallback, or are you observing economics that could go head-to-head with a hyperscaler PPA?

Mac McFarland

executive
#73

It isn't a binary selection between those two, in my view. This is Mac speaking, by the way. I don't see it as a binary selection between those two. My expectation is that we'll take part in the RBP, and through the hybrid model, as we've consistently stated, we'll also take part in the bilateral markets with these. One is, I believe, a more centralized mechanism that, in our view, delivers a one-time backstop — which is why it carries that name — to the market for resource adequacy. Meanwhile, a bilateral market also exists that can deliver the additionality via the hybrid model we're talking about. I don't believe it's as binary as that. What people are observing regarding cost, I think, will be intriguing, since bidding will be required. There's a construct we have in place where, in its original form, it was 1.25 x, I believe, the approved cost with it, net CONE with it, so that approval of your capacity bids wasn't necessary. Regarding the RBP, some argue it probably ought to increase, and I can see some rationale for that. People must determine what they're prepared to bid, what they're prepared to contribute toward that demand or capacity payment, and then what they're prepared to do on the energy side. Clearly, the CCGTs need both a larger capacity component and a larger energy margin expectation. In our view, there are actually some least cost solutions that can bring things in below those costs.

Nick Amicucci

analyst
#74

Great. That's logical. And if we look at that as well, I mean, you all mentioned it previously on this call, essentially a free cash flow yield in the double digits. You know, $100 million of share buybacks isn't something to, you know, dismiss lightly. There's still $1.9 billion left through 2028. We'd anticipate some kind of acceleration toward the Q1 pace, especially, as we consider, you know, Cornerstone closing and then leverage coming back down under the target.

Mac McFarland

executive
#75

You're allowed to say dismiss lightly because it's $100 million out of a $2 billion allocation. Like, when we get the chance, you know, and are able to exercise, we always prefer to step in and repurchase the shares when we can.

Cole Muller

executive
#76

Right. Nick, if you turn to slide 12, we've laid out how the share repurchase program affects things. Reaching that point will require executing at scale as time goes on. As you know, we're dedicated to making that happen.

Nick Amicucci

analyst
#77

That's reasonable. Okay, thank you. I simply wanted to be courteous there, Mac.

Cole Muller

executive
#78

Appreciate it, Nick.

Terry Nutt

executive
#79

thank you, Nick.

Mac McFarland

executive
#80

I'm grateful that you're nudging Cole along with Terry.

Terry Nutt

executive
#81

Hope you enjoy those tacos.

David Arcaro

analyst
#82

Hi there, I really appreciate you letting me ask a couple of things. I was curious whether you might share whatever insight you can about what you're picking up from possible counterparties at this point. Are they holding off until there's greater certainty regarding the Backstop Procurement? For instance, are there certain points along that path that in your view might speed things up and open the door to some contracting? Is it when PJM finalizes its rules, or might we need to sit tight, perhaps until the procurement itself has actually been conducted, before we observe additional activity?

Terry Nutt

executive
#83

Yeah. Hi, Dave, appreciate that question. Broadly speaking, I'd say it comes down to a mix of factors. There's now fairly solid agreement around the reliability backstop; what we're really discussing is the specifics of how it will be structured. As I mentioned, I believe many stakeholders, customers among them, have grown at ease with it. As we, clearly, as we've hinted at during this call, a portion of our conversations has shifted toward more of this hybrid strategy, in which we're discussing introducing new generation and folding that into the set of solutions. Our view is that this isn't really something that's blocking or preventing people from doing deals. Would they prefer, say, complete certainty? Absolutely. I think ultimately, they also have demand they must ensure they can serve for their customer base; on that particular question, it's somewhat both yes and no when all is said and done.

Mac McFarland

executive
#84

David, I'd add that we believe it's beneficial that we've been offering feedback on the RBP, and one point we made was not to stretch that program out into next year. During the open sessions and stakeholder sessions over the past couple of days, they've begun to shift, and PJM has started reworking its view of the timeline, moving it to this fall. We consider that a positive. Anything along those lines that delivers a bit more clarity certainly helps. Are people still setting down those capital plans that just keep reaching escape velocity at the hyperscalers? It isn't slowing. Sure, clarity is helpful, but is it essential? No. Sadly, we have to stop here. I can see a few additional questions waiting in the queue. I apologize to everyone we couldn't reach. We've simply run out of time, and we're up against our limit. We truly appreciate your joining us today and your ongoing support of Talen. In summary, what I'd like to say is that we hold a strong 2027, 2028 outlook, with multiple levers available to us and additional upside from spark expansion. I think we're also, hopefully, giving you a bit of a look behind the curtain to show that we're positioned to deliver on some of this growth through our development pipeline and the opportunities we've been pursuing for quite a while; we're enthusiastic about that; we look forward to powering the future. Have a great day.

Operator

operator
#85

We appreciate everyone joining us on this call. That brings the session to a close. You're welcome to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Talen Energy Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Talen Energy Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Talen Energy Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.