Good day, everyone, and welcome to the Q1 FY '21 earnings conference call for Techno Electric & Engineering Company Limited, hosted by Asian Market Securities Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll turn the conference over to Mr. Amber Singhania of Asian Market Securities. Thank you, and the floor is yours, sir.

Amber Singhania

analyst
#2

Thank you, Ayesha. Good afternoon to all of you. I trust everyone is safe and well given these difficult times. On behalf of Asian Market Securities, I'd like to extend a welcome to all of you to the 1Q FY '21 Earnings Conference Call of Techno Electric & Engineering Company Limited. Joining us today are Mr. P. P. Gupta, Chairman and Managing Director of the company, and Mr. Ankit Saraiya, Director of the company, together with their Finance and Investor Relations team. We'll begin with a few opening remarks from management regarding the quarter, the outlook for the year, and so forth, after which we'll move on to the Q&A session. Over to you, sir.

Padam Gupta

executive
#3

Thanks, Amber. Good afternoon, everyone, and welcome to our discussion of Techno Electric's financial results for the first quarter, which ended on 30th June 2020. Above all, I want each of you to stay safe and well, since that is what matters most right now, as our Prime Minister keeps saying <<foreign_lang>>. So taking care is essential. Any remarks on this call that reflect how we see the future, or that might be read as forward-looking, need to be considered alongside the risks the industry and the company face. Results for this quarter cannot be compared year-on-year, given the very -- the effect of COVID-19. We lost roughly 40 good working days during this quarter, and we are still dealing with local lockdowns and quarantine rules that get followed -- differently by different states. Local transportation and air connectivity remain unavailable, which affects the movement of people. It has hit our vendor and supplier ecosystem as well. A number of vendors are still running at only 25%, 30% capacity, especially in the South and West region. Let me move quickly through our performance, Q1 of the current year.

Padam Gupta

executive
#4

Overall revenue comes in at INR 170 crores. That represents a 49% increase, though much of it is really just making up for the share we lost in the fourth quarter. EPC revenue is INR 151 crore and -- still, I'd say that our execution has picked up somewhat, and we've been running at roughly 50% capacity since last month, with improvement expected over the coming months. The wind segment's revenue is poor at INR 18.7 crores. Wind revenue alone was weaker for a couple of reasons: first, the very got off to a late start. Through June, we had generated about 62 lakh units, and we anticipate recovering that over the remainder of the year. The tariff is lower by INR 1, as you're aware, for the past 2 years. That said, it's under appeal before APTEL, and we're quite hopeful of a favorable order. The company has already taken the GBI benefits in full, as eligible. So that no longer features in the top line. There has also -- consistently been a decline in REC prices, as we explained last quarter, but I expect a recovery on that front in the quarters ahead.

Padam Gupta

executive
#5

EBITDA for the company came in at INR 44.33 crores, versus INR 6.5 crores in the March quarter. For the EPC segment, operating profit is INR 29.42 crores, against INR 14.97 crore in the March quarter. The operating profit margin is 19.5%, compared with 12.6% in the prior quarter and roughly 15% for the full year. Operating profit in the wind segment is INR 40.9 crores. Other income comes to INR 13.31 crores. Profit before tax for this quarter is approximately INR 46 crores. And profit after tax for this quarter is INR 36 crores. EPS is INR 3.28 crores. So the current investment value in cash and cash equivalents as of June end is roughly INR 650 crores, and our outlook is INR 400 crore in mutual funds. Order intake is around INR 300 crores, which includes one order from REC for the Ladakh region. The unexecuted order book as of today is about INR 2,450 crores, and we should be able to talk about order intake for the current year more authentically, perhaps when we discuss Q2 results. Now to outlook. We expect a larger business — basically from the distribution segment and the pollution control segment in generating units.

Padam Gupta

executive
#6

To start, I want to address this topic in 3 parts: the FGD segment, the transmission segment, and the distribution segment. On FGD, per the Government of India's notification, every thermal power plant has to curb sulfur emissions — both NOx and SOx. A range of SEBs and private companies are planning FGD installations for roughly 35-gigawatt capacity, which represents business value of approximately INR 150 billion over the coming 2 to 3 years. The government's broader plan is to finish FGD work on 123-gigawatt by 2024. In the 2021 Budget Speech, the FM stated specifically that older power plants will be asked to shut down when their emissions exceed preset norms. We are bidding on 4 FGD projects totaling more than 6,000 megawatt, and we hope to win at least 2 of them. On transmission, we anticipate a slowdown on that side. It will be lifted largely by evacuation of renewable power. There is ongoing TBCB bidding for 66 gigawatts of renewable power against the 120 -- 175 gigawatt target, of which 50 gigawatt stands already awarded and the balance will be catered by around June '21.

Padam Gupta

executive
#7

With the bid submission date for the 66 gigawatts being pushed out repeatedly, the final date now looks like October. So we don't expect those orders to be executed during this year. We intend to bid on 4 projects worth roughly INR 2,000 crores in total. A package of INR 220 billion was announced by the Finance Minister, to be allocated to the power and renewable sector for 2021. We're seeing strong interest from large investors and InvIT funds in taking part in the above bids, with our company positioned as a significant partner. That will improve our access to capital, and it will help us bid for more projects aggressively, the way other bidders do. In the metering segment, we see implementation picking up more strongly, and many new opportunities will come up. A month ago, smart metering under the Smart Meter National Program, which is aimed at replacing conventional meters with prepaid ones — the government scheme is to install around 200 million meters by '24. In the current budget, these smart meters over the next 3 years, which will not only help improve the health of DISCOMs by containing T&D but also give consumers the freedom to choose their suppliers. We should mention the specific projects that we'll be investing in in the near future.

Padam Gupta

executive
#8

It's worth noting — and this is really a question — that we'll be giving particular attention to the 9 lakh meter project in the state of J&K as well as a project in the Northeast. Beyond those, clearly, there is media reporting indicating the government is also using this chance to reform the sector — changes that have long been pending — under the guise of Atmanirbhar Bharat, which has been a longstanding demand. What's being held up includes the amendment to the Electricity Act, the amendment to the tariff policy, and elimination of gross subsidy, plus payment of subsidy directly to power consumers, along with a great deal of planning by CA to provide visibility into the programs over the next 5 years. Ultimately, we — once it gets rolled out — what actually gets rolled out will matter more to all of us. We are quite hopeful that the power sector stands at a crucial juncture and that something good ought to happen going forward. Which segment? We are once again facing the question of which one, because the DISCOM is poorer with every passing day and lacks money to pay. This has affected not only the tariff but also the regular payments as per PPAs. We hope to realize our pending payments for the last 2 years by end of September out of the INR 90,000 crore package announced by the Finance Minister through REC and PFC to DISCOMs, to be paid directly toward the generators' overdues up to March 2020.

Padam Gupta

executive
#9

The dues in question are already listed on the CA website known as PRAAPTI, and TANGEDCO has already acknowledged them. Also, the Cabinet has already loosened the eligibility rules for DISCOMs so they can access this money as quickly as possible. We are equally hopeful now about receiving our delayed payment interest claims under the PPAs, for which the required affirmative regulatory orders came through after nearly 7 years. In addition, CRC has revised the REC policy, and the floor price along with the forbiddance price no longer exist. We are challenging this policy legally, since its very foundation rests on a fixed and assured return, which has been violated. And it is contested not only by Techno but also by numerous associations and major renewable power generators. APTEL has put a stay on REC trading, and we are hopeful that a stay will be granted on the order or that it may be set aside. As some of you are aware, the very bench at CRC was also set aside by the Supreme Court owing to the lack of legal members and because orders were not legally compliant. During the last quarter, REC prices saw a correction mainly due to a huge issuance of RECs to the AP DISCOMs, which, I am pleased to share with you, has been nullified following our appeal at APTEL.

Padam Gupta

executive
#10

And this 44 lakh REC that's floating around is canceled or nullified. So no more than 10 lakhs of floating RECs remain available in the market now. So we're quite hopeful that REC prices will get corrected in the days ahead. And at least if the CRC policy isn't reversed, even then they'll be sold at no less than INR 1,000 per REC. That's our forbearance price. As we committed last quarter, we will be recovering our last performance of last year's -- we've recovered almost 50% this quarter, or more than 50%, and the balance shall be recovered in the coming quarter. But we're very hopeful of executing at least 50% of the unexecuted order backlog during this year. And we see the year being a very normal year like '18-'19. So all these damages due to the lockdown and COVID will be a matter of the past. And we see not much happening over the next 2 to 3 months. In the years to come, we see strong power sector reforms with focus on efficiency, stable and reliable power supply, cost of power, improvement of the sector's overall financial health. The focus, however, will continue to be on renewable power, with related transmission infrastructure as green corridors.

Padam Gupta

executive
#11

By 2030, 500 gigawatts will need transmission infrastructure. Our push into overseas markets is paying off as well. We're hopeful about winning additional business from the markets in Africa and Afghanistan. I can tell you that in Kenya our project was moving rather slowly, mainly because the customer had not yet received Parliament approval in Kenya to fund the local portion of 15%, which has now been granted. So the approval process should pick up speed. With that, I'll open things up for questions, or for more specific details if any of you would like to know more.

Operator

operator
#12

<<operator_script>> Our initial question comes from Bhavin Vithlani at SBI Mutual Fund.

Bhavin Vithlani

analyst
#13

Guptaji, a news piece said Techno's smart meter project was actually scrapped owing to sourcing from a Chinese vendor. It would help if you could add some color on that. And alongside that, it would help if you could share the tie-ups we hold with foreign companies for SVC, STATCOMs, FGD and the GIS application. So how would those be affected given the government's current Atmanirbhar initiative?

Padam Gupta

executive
#14

Look, your question is quite involved, and the reality is that it’s both, in practice. First off, I want to tell you that our smart meter order has not been canceled. What has been removed is the approval for a Chinese company handling the communication portion of the project — that’s point one. So at this stage — even though that company has had a base in India for the last 10 years, and we were sourcing from the Indian entity only, which was established under the Make in India initiative — nonetheless, given the higher sensitivity, we have now proposed a South Korean company, essentially LG Electronics. They have a company in Korea that performs the same work. We are awaiting the approvals. We ought to receive them shortly. Apart from that, there is no impact. The order remains intact. And the customer understood that removing this approval would definitely mean a delay of 4 to 6 months, which they have already acknowledged and approved. But in the meantime, we have already finished the work on the data centers and data recovery rules, both in Srinagar and Jammu. So that is now operational on Oracle’s side, and we have taken care of it.

Padam Gupta

executive
#15

We remain hopeful that we can complete 50% of this metering work during this year, with the other 50% falling to next year. That is the way it appears at present. Still, let me say that plenty of things occur in life, though at times they occur for the better. The Korean partner is considerably stronger, more agile, more cooperative, and more economical — even compared with the Chinese partner. They also have more advanced technologies available than the Chinese counterpart, contrary to what is generally believed. In FGD, our only partner is Korean, namely KC Cottrell, and they assisted us in locating this partner, as well as in our meter work. So we are quite hopeful that matters should improve. Turning now to the STATCOM side, this Chinese company basically operates from a U.K. office and collaborates with us. Under the Make in India initiative, they have established a factory in India. Yet, taking every precaution, the company has already submitted an application for approval to the DPIIT Department according to the format issued last week. We are hopeful of receiving that approval. Even Power Grid is pressing for it, since having more choices certainly makes projects more competitive. So disturbances of this kind will arise along the way, such as COVID and Chinese aggression.

Padam Gupta

executive
#16

At the end of the day, though, we need to stand on our own when it comes to maritime capacity. That means we can absorb these difficulties without breaking stride and keep pushing ahead with an optimistic outlook.

Bhavin Vithlani

analyst
#17

Absolutely. On the wind side, for your second question: what are the new tariff levels? And is this something we should view as a more lasting level from here on out? You noted that tariffs also came down last quarter, but at this point it looks more like a structural shift in how the tariff structure is set up.

Padam Gupta

executive
#18

Look, this has turned into a somewhat complicated matter once more. The reason is that the states — the DISCOMs — are running short of funds, and they're constantly coming up with new tricks to push tariffs down, even when that isn't grounded in sound tariff-determination principles. And when it comes to APTEL, matters don't get resolved all that easily. Especially during COVID, the courts are hearing only urgent cases. Still, let me share 2 wins with you: one was in Andhra, where we managed to get their RECs nullified; and second, our legal status name change was pending in APTEL as of today. And just this morning, we received a favorable order that the name change — no new process is needed under the CRC order, and the existing registration is healthy and valid. So some things have begun moving via the court's remote operations through videoconferencing. And on this tariff issue too, we're hopeful of moving quickly. Because the very tariff SECI sets through competitive bidding rests on a very different platform and can't be compared with the all-inclusive tariffs the CRC determines, since central government tariffs don't include any transmission cost, any losses, or any availability issues.

Padam Gupta

executive
#19

So in effect, that works out to something like a built-in subsidy of INR 1.15 to INR 1.25 within the process itself. That being the case, the two aren't really comparable. And frankly speaking, when it comes to the state-level tariff, it ought never to fall below INR 3 if the projects are to remain viable. We remain hopeful that justice will be done. So whenever that comes through, it will also mean a topping up for the past period, just as we've received favorable orders on APPC and similar matters in the recent past as well. Now, the regulator in Tamil Nadu is an improvement on the previous one, which was constituted 6 months ago, and it has begun to make progress. As an example, I can share with you 1 success story of a similar kind. On the matter of delayed payments, we hadn't been receiving them for the last 10 years, and the amount owed to us comes to almost INR 50 crores in this part. So earlier TANGEDCO was negotiating on a 50:50 basis, which we also went along with, but they were unable to honor it. With that failing, the regulator has now issued orders in line with the Supreme Court directive that all PPAs must be honored by the state DISCOMs. So we have received approval for the payment of INR 50 crore, which may also form part of the payment by REC PFC under this INR 90,000 crore package.

Padam Gupta

executive
#20

So things are improving, though gradually — and you keep pressing for it — but there's a saying in government: sir, no money is ever lost. One day you receive it, once you qualify and have the capability to collect it. So over the last 30, 40 years, we haven't lost any money. We've pursued this vigorously by understanding our processes and adhering to them, and we're quite hopeful that we'll recover the last outstanding amount in this case as well.

Operator

operator
#21

Our following question comes from Renjith Sivaram, who is on the line from ICICI Securities.

Renjith Sivaram

analyst
#22

Yes, am I coming through okay?

Operator

operator
#23

Yes, sir.

Padam Gupta

executive
#24

Yeah, Sivaram, we’ve got you loud and clear.

Renjith Sivaram

analyst
#25

Yes. Congratulations on a solid set of numbers despite the tough environment. The margins in the EPC segment have been genuinely surprising. So is there any one-off element in there?

Padam Gupta

executive
#26

No, essentially, this is about controlling costs, sir. You could describe it as managing overheads and staff salaries—we've realized savings of roughly 3% overall. And that saving might be short-lived, given the incentive offered to employees: if they hit a top line of INR 1,100 crores or INR 1,150 crores, which is close to 50% of the unexecuted business, it gets paid back to them as a bonus.

Renjith Sivaram

analyst
#27

Right, so the kind of margins you're expecting for the full year, 15%, that stays, correct?

Padam Gupta

executive
#28

Yes, it definitely stays, sir, since that's baked into the order value.

Renjith Sivaram

analyst
#29

All right. And what sort of EPC revenues are we aiming for across the full year?

Padam Gupta

executive
#30

More than INR 1,100 crore, sir.

Renjith Sivaram

analyst
#31

All right, so do you have any figures for the order book and order intake in Q1 at this point?

Padam Gupta

executive
#32

During Q1, we booked business worth roughly INR 300 crore, and that figure includes one L1, for which we anticipate receiving the order any day now. Also, as of the end of June, our unexecuted order stands at approximately INR 2,450 crores, and from that we plan to execute between INR 1,100 crore and INR 1,150 crore during the current year.

Renjith Sivaram

analyst
#33

All right, on that INR 300 crore — what does L1 come to?

Padam Gupta

executive
#34

L1 is just INR 70 crores, sir. We already have INR 230 crores in hand — one from Power Grid and one from Sterlite.

Renjith Sivaram

analyst
#35

All right. And looking at the whole year, what guidance do we have for order intake?

Padam Gupta

executive
#36

Right now, sir, it's really hard to provide guidance since COVID has caused many tenders to be extended. By October, I believe we'll be in a better position. Once we talk through the Q2 results, we'll have guidance that's more firmed up. That said, we definitely expect order intake of no less than INR 1,500 crores this year, and it may go -- it may even cross INR 2,000 crores, depending on the government's push on infrastructure -- on power infrastructure. This will mainly comprise -- we're targeting 2 FGD orders worth about INR 750 crores. And we're looking for, at least, as usual, roughly INR 500 crores from the transmission business, plus another metering business of no less than INR 250 crores to INR 500 crores in the distribution segment. So that's largely the outlook for this year.

Renjith Sivaram

analyst
#37

And, sir, how much money is still owed by TANGEDCO that hasn't been paid yet? What's the total outstanding amount?

Padam Gupta

executive
#38

We expect to collect INR 150 crores from REC now. We haven't been paid for the last 2 years—from April '18 to March '20—plus the interest owed. So it'll be around INR 150 crore plus.

Renjith Sivaram

analyst
#39

Are we planning for this — have any provisions been made on our side?

Padam Gupta

executive
#40

Provision—what does that mean? It's a component of our debtors, sir.

Renjith Sivaram

analyst
#41

Right, since you mentioned that this has remained unpaid for over 1 year, has any provision been recorded against that unpaid amount?

Padam Gupta

executive
#42

No, sir, no. We haven't set aside any provision, since the practice in the past has generally been that with this type of backlog, payments have been coming through from TANGEDCO. But no money is lost, sir. In the end, it does get paid. That said, we also intend, down this season, to move into some form of third-party share agreements, or merchant power status, for our project, and for that we have already applied to them.

Renjith Sivaram

analyst
#43

Alright, and sir, on the previous call you brought up 3 STATCOM packages — 2 of them with Power Grid and 1 with TBCB. So where does that stand at the moment?

Padam Gupta

executive
#44

That's still pending, sir. At this point it's been pushed out to October. So it ought to take place — Power Grid should be issuing those bids around September, with the TBCB due date falling in October '22, according to...

Renjith Sivaram

analyst
#45

All right, so what's the typical size of those packages?

Padam Gupta

executive
#46

Each of those is INR 200 crore. In terms of value, sir, they aren't large. Each one comes to INR 200 crore.

Renjith Sivaram

analyst
#47

All right, and on STATCOM — we don't have a Chinese partner there, correct? Or is that one also a Chinese partner?

Padam Gupta

executive
#48

Strictly speaking, sir, that partner is Chinese, though its operations are run from the U.K. Its operating base has been Manchester in the U.K., yet there's no question that the factory itself sits in China. And as things stand, they now have a plant in Kolkata under the Make in India initiative. So a registration application has been filed with the DPIIT, and we're hopeful of securing it within a month or 2, since Power Grid is likewise pressing for the approvals so that a better choice becomes available.

Operator

operator
#49

Renjith, please return to the question queue if you have any follow-up questions, since quite a few participants are waiting for their turn. Our next question comes from Rohit Balakrishnan of VRDDHI Capital.

Rohit Balakrishnan

analyst
#50

Hello? Can you hear me, sir?

Padam Gupta

executive
#51

Yes, we’re able to hear you, sir.

Rohit Balakrishnan

analyst
#52

Sir, my first question is also this: regarding the STATCOM order you mentioned—when you talk about order book intake guidance of roughly INR 300 crores, and transmission at about INR 500 crores—are you counting that STATCOM order within those figures? Or is it not included there either, so that it would come on top of them?

Padam Gupta

executive
#53

It's going to be on top of that, sir. On top of that.

Rohit Balakrishnan

analyst
#54

Alright. Alright. So — sir, regarding those FGD orders you brought up, the ones worth about INR 750 crores, when would that happen? I mean, have the bids already been submitted, or is that still to come? In other words, you won't get ahead of yourself on that?

Padam Gupta

executive
#55

As a result, two technical bids came in for this, and we're still waiting on the price bid. However, the technical bid has already been submitted, sir.

Rohit Balakrishnan

analyst
#56

And sir, when do you think that order will be finalized? And again, sir — sorry — this is in West Bengal that you're expecting?

Padam Gupta

executive
#57

No, Bihar, sir. Bihar is the one we're aiming at. Among these NTPC projects — Muzaffarnagar and Barauni — we're targeting one of them, and the other will be in Chhattisgarh alongside NTPC.

Rohit Balakrishnan

analyst
#58

Alright. Alright. And you're expecting those to be...

Padam Gupta

executive
#59

We've also filed a proposal with DVC for Jharkhand — that project sits in Chandrapura, Jharkhand, near Bokaro.

Rohit Balakrishnan

analyst
#60

Okay, okay. Sir, during your previous call, you said you'd also secured an order worth roughly INR 50 crores — if I recall correctly — to make Northern Power Grid toll free. Was that counted in Q1? Or has it not yet been reflected in revenue?

Padam Gupta

executive
#61

No, sir, that falls under Q1. We already have the order from Power Grid for — it isn't INR 50 crore. It's roughly INR 72 crore, you could say, for the 0 grid fault package in Uttar Pradesh.

Rohit Balakrishnan

analyst
#62

Alright, alright, alright. Sir, there's one more thing I wanted to mention. So sir, you said recently — in that whole CNBC interview — that you were expecting Q1 to be pretty much in line with what we had in Q1 of last year. But the results were still subdued when compared with, obviously, last Q1. Obviously, I understand, sir, this COVID and it's not simply comparable, as you mentioned. But sir, from your comments in that interview and also in your previous interactions, one thing is that recovery is picking up, sir. So I just want to understand 2 things. One, in terms of recovery, are you still quite confident about that in the next Q2, Q3 onwards? And two, sir, in terms of the specific comment you made in that interview for Q1, was there anything that would not be included? And hence, that there were — because you had mentioned that Q1 of last year we would be able to come very close to that. So I just wanted to get very specific on that. That's it, sir.

Padam Gupta

executive
#63

Okay, so look — the feel-good factor in Q1, as I mentioned to you, is that we lost 40 days, and local transport still isn't in place. What I was really getting at is closer to the bottom line of the EPC business. Any decline you're seeing between Q1 of last year and this year is essentially the wind segment. We've lost roughly INR 15 crore there. That's the gap between this year and last year — INR 50 crore versus INR 35 crore by March. Beyond that, we've made up ground here and there. Still, when it comes to the top line, I was always talking about the full year — that we'll be able to get back to healthier stocking. Obviously, last year wasn't the best one for the EPC business. That's really our '18-'19 level. So we'll return to that level this year, and then growth comes from next year onward. Aside from that, I trust — just between you and me — that the COVID angle shouldn't stretch past the end of Q2, and we should have far more freehand in Q3 and Q4. I think that's how the government will play it, unless things truly deteriorate again, which to my mind is very, very unlikely.

Padam Gupta

executive
#64

We're confident that once the post-rainy season arrives — that's Q3 and Q4, which are consistently our more productive quarters regardless — we'll be in good shape. Those 2 quarters account for 60%, 65% of our top line. So despite the restrictions, we ought to be able to make up that ground, since Techno has certainly not been hit as hard as others might be, given that a lot of departmental labor is available to us. We have no migrant labor. That's what helped us get back quickly on these projects. The remaining factor is simply how fast execution moves. You can see that in any project, the customer's requirements also have to be in place. So if they push, we'll be ready to go. That's what I shared with you. So everything looks good for the quarters ahead. And certainly in competition as well, the better of the best are getting more favor from the asset owner, because he wants certainty that the project will be delivered on time and with quality, since that ultimately determines their returns. So we do expect somewhat more business from the private sector in the coming quarters this year, at least in transmission.

Padam Gupta

executive
#65

All things considered, though, I'd say we're sitting in a really strong spot — in really strong shape — thanks to the genuine merit of the company. We're able to soak up every one of these setbacks and shocks without doing any greater damage to the bottom line. We will definitely deliver a bottom line that beats last year. And second, this one asset is sold out — definitely, if not both — to IndiGrid, whose inflow we expect by October. That too will mean no less than INR 90 crore for us, along with a capital gain of almost about INR 45 crore. So that ought to give the bottom line a further boost, plus an EPS boost of at least INR 3 to INR 4, which will be repeated next year as well, post COVID-19. So on the whole, I think both — top line and bottom line — will be growing and staying healthy.

Operator

operator
#66

Rohit, we’d ask that you please rejoin the question queue if you have any follow-up questions, since quite a few participants are waiting their turn. <<operator_script>> We’ll now take the next question from Keshav Garg at Counter Cyclical Investments.

Keshav Garg

analyst
#67

Sir, I'd like to get some clarity on the smart meter topic. The government has recently been discussing an ADITYA scheme under which smart meters would be installed, with INR 2.3 trillion involved. On top of that, there's a smart meter national program that talks about replacing conventional meters — 28 crore of them — with smart meters. Sir, all of this discussion continues, but given that you're an insider in the power sector, sir, you would know whether in the near term — over the next 1 to 2 years — you actually expect some business to come out of this, or whether it's just talk?

Padam Gupta

executive
#68

Look, this is bound to happen. But in India, as is typical, the timeline is what suffers. What the government plans for 3 years ends up taking 7 years. Take FGD as an example. What we once discussed as a 3 to 4 year effort has now stretched all the way to 2024 — a scheme that began in '16, '17. So our implementation certainly doesn't match the policy announcements. Still, the direction that was announced remains unchanged. Smart meter, then, is a necessity. It will happen. The real question is the finances. When will the government make them available — the finance. So even entities such as EESL, REC, state governments — many are being brought in to carry out this growth. And the national infrastructure fund will also be funding this program. So I'm sure this program will happen. If not 250 million meters, at least you can count on 200 million happening. If not across 4 years, it will take 7 years, but it is going to happen.

Keshav Garg

analyst
#69

Alright, sir, and one more thing on the dividend, sir — I just want to put this forward, sir: any time you feel ready to distribute, sir, please go with a share buyback instead, sir, since, sir, a 43% tax versus a 23% tax rate is basically double, so share buyback. And sir, a share buyback has a lasting effect in that the share count will come down. So on the same profits, earnings per share goes up permanently. Sir, with a dividend, once it's paid out, that cash leaves the company, and that's the end of it. Sir, so please give this some thought.

Padam Gupta

executive
#70

Oh, you're welcome. We'll take care, sir.

Operator

operator
#71

Our next question comes from Bhavin Vithlani, who is on the line from SBI Mutual Fund.

Bhavin Vithlani

analyst
#72

Could you give us some detail on cash equivalents? Specifically, what did the corporate bond portfolio stand at when June ended? And what holdings sit within the liquid mutual fund schemes?

Padam Gupta

executive
#73

We hold about INR 400 crores in liquid mutual funds, plus roughly INR 250 crore put into our transmission assets business, and something under INR 200 crore sits in bonds, from which we're recovering somewhere around INR 30 crore to INR 40 crore each quarter. So the decision we've made is that any cash that comes out of the bonds stays in liquid funds only. We aren't redeploying any of it at all. As a result, we expect to be clear of this bond liquidity perhaps by September '21 at the latest, or June '21 at the earliest, I'd say. That's where things stand right now. Then, on top of that, the wind money we got from REC by the end of September will likewise go entirely into the mutual fund money, since we have no outstanding liabilities against us.

Bhavin Vithlani

analyst
#74

That's right, sir. And sir, regarding the divestment of the BOO transmission assets — since we have a contract with the CLP, and given the ongoing issues with our neighbor, do you see any possibility of hiccups? And do we have a plan B on that side, sir?

Padam Gupta

executive
#75

Absolutely. Look, we aren’t — I shouldn’t say we — I’m not especially optimistic that CLP will get through an approval process, even though they keep asserting it will happen. That asset is due to be commissioned in roughly another week. It’s more or less ready. So if CLP doesn’t come through, we’re seeing strong interest from other buyers, including Adani and L&T Finance, as well as from IndiGrid. Interest is very strong and substantial — even CDPQ is interested. So I don’t think replacing CLP would be difficult if they don’t proceed or couldn’t proceed for any reason. Interest in transmission is soft and healthy right now.

Bhavin Vithlani

analyst
#76

Okay, but — yeah, is it possible that because of this problem, monetization could get pushed back to fiscal year '22?

Padam Gupta

executive
#77

No, no. If it goes past that point, it will — the total comes together inside the first quarter of '21-'22, not past June '21, so to speak. If you haven't gotten there before March '21, then it will — at most it will extend to June '21.

Operator

operator
#78

Our next question comes from Jaineel Jhaveri, who is on the line from JNJ Holdings.

Jaineel Jhaveri

analyst
#79

I just wanted to ask about the wind assets — I believe there was some discussion earlier about selling those. So is that still on the table? And when would that be expected?

Padam Gupta

executive
#80

Yes. We’ve consistently been eager to get out of this wind investment. But our initial thinking 2 years ago was that any regulatory disputes we had needed to be resolved so we could achieve fair value for these assets, and we succeeded in doing that. However, in the process of getting there, we generated some fresh problems. That’s the way this sector behaves on the regulatory front. So we’re hopeful we will recover those dues of INR 200 crores owed to us — INR 150 crores on the books and INR 50 crores off the books, which will be recognized only when the customer pays and will also establish a sales channel not to the DISCOM but to a third party. So once we accomplish this by December this year, an exit will become feasible within the next 6 months. We will certainly be making a serious effort so that before the start of the next season — wind season — we are out of this business in one way or another. There will be a serious attempt at that.

Jaineel Jhaveri

analyst
#81

And would going rates still land at roughly INR 5 crore for each megawatt?

Padam Gupta

executive
#82

No, I think at this point we ought to bring the expectation down to INR 4 crore per megawatt.

Jaineel Jhaveri

analyst
#83

Alright, and one final question as well. On the revenue side for this year, you're projecting INR 1,150 crores, and right now we're sitting at roughly 50% utilization. So what I don't quite follow is how — is it actually possible for us to exceed 100% utilization, given how would we be able to complete that much revenue over what's left of the year?

Padam Gupta

executive
#84

Look, this business generally isn't spread evenly across quarters. If you look at our track record over the last 5, 7, 10 years, the first 2 quarters typically account for no more than 35% to 40%, while the last 2 quarters have historically always been 60%, 65% in our industry. So we're hopeful that we'll realize that full 60%, 65% once things return to normalcy from October onwards. And in the first 2 quarters, we'll definitely be aiming to hit at least 30% of the targeted 40% — say, around 75% — and to make up this 10% through some extra effort somehow. That's functioning as a plan B in contingency. For instance, this quarter has been INR 150 crore, and the next quarter should be no less than INR 200 crores or plus. And similarly, when we looked at the following 2 quarters, we should achieve at least about INR 700 crores across those 2 quarters. So that's how we'd like to shape it up.

Operator

operator
#85

Ankur Sharma from HDFC Life has the next question.

Ankur Sharma

analyst
#86

I have a couple of things to ask. First, building on what the prior participant asked, could you describe how labor availability looks for you right now compared with, let's say, last year? Has it essentially returned to normal? How much additional time do you think is needed to get there? And what about productivity? The reason I ask is that many other construction firms tell us that even though the labor picture is clearly improving, productivity is suffering due to social distancing and similar factors. So I'm simply trying to get a sense of how things are developing for us?

Padam Gupta

executive
#87

You're absolutely right. The problem isn't whether labor is available to us—it's more about how we utilize that labor. So that challenge is definitely bigger. When I say we're at 50%, I mean we're utilizing 50% of the labor we have available. That's what I'm referring to, and starting in October, we expect that to reach 100%, nearly 100%. That said, our sites are fully mobilized. What we're lacking is local transport, air connectivity, better review meetings with customers, and better customer participation on the ground, because in my classification, project work is a high-touch industry, sir. You handle the very strong interactive portion. Unless both the customer and the agency work together hand-in-glove, you can't complete any project on time or ahead of time. Those are the basics of this business. And the challenges differ across different parts of India when you do it. It's also tied to customer maturity. But even so, we prepare ourselves in advance as much as we can. For instance, in metering, when we were getting delayed because of this China situation when the approval was coming in <<inaudible>>, we had already finished that peripheral part—things like the data center, data recovery, and the MDM portion—so that the end part of the project is in place.

Padam Gupta

executive
#88

At this point, what I need built is just the face-end portion of the project. So you shift the schedule by a minimum of 6 months, which means no time gets wasted on your side. That way, some portion of your time ends up being put to use one way or another. Instead, we begin with the face-end or the back-end. Still, when all is said and done, the project's closing date must stay as it is.

Ankur Sharma

analyst
#89

Right, that's useful. Second thing, sir: we've heard there've been some adjustments to Power Grid's bidding rules since this whole Atmanirbhar push came along, aimed at halting equipment imports from China. So I'm just wondering — for us, things like transformers or switch gear and so on, which we'd be needing — for us, it's mostly from domestic players. Does it come from China? Is it a combination of the two? How does our sourcing change, roughly? Or is it a mix of both domestic, so we won't really — it doesn't really hit us, is what I was trying to get at?

Padam Gupta

executive
#90

Look, India’s situation is a highly blended, mixed one. The trouble is that over the last 7, 8 years, a great deal of Chinese investment has already come into India, and that happened under the Make in India initiative of this very government. Now those capacities — whether you call them Chinese or Indian, I have no idea, sir. These are political achievements rather than technological or physical ones. So these capacities get used in India, like TBEA. Today they are the single largest transformer manufacturer in India. So can you still call it that, when I say ATV is an Indian company because it has been in India for the last 30, 40 years? Likewise, when a Chinese company is in India, why can’t I call it an Indian company? It falls under the Companies Act of India. It exists within the Constitution of India. It is answerable to every taxation authority of India. So these are mindset issues. I’m sure once it cools down — all this border tension — everybody will begin talking normally and behaving normally. So in excitement, we say many things and create a certain kind of processes which apparently start looking discriminately. But if any of these companies go to High Court tomorrow or Supreme Court, I’m sure they will get a favorable order.

Ankur Sharma

analyst
#91

They put money into India, all right?

Padam Gupta

executive
#92

So it will keep going, sir. There is absolutely — in the power sector, when you don't deliver what's expected of you, otherwise as a whole sector to society, so many vested interests get created, and we handle it differently across different sensitivities. That's what's happening. In the end, instead of pushing the sector itself toward a telecom or aviation model, we're still playing buddy games among ourselves about whose transformer, whose make switchgear, whose make meters. In the end, can you imagine any solar power happening in this country without China, sir? If you don't use panels, you'll need cells. If you don't need cells, you'll need wafers. If you don't need wafers, you'll need the precious metals. But in the end, you cannot ignore globalization, sir. Everything you don't have in India. We don't have an ecosystem in India. Because demand has been very sparse and scarce, which does not justify the economics of having it. So you will always have some interdependency at some stage or the other. So an ecosystem takes its own time to build up. You can't raise the political slogan today and expect that everything except for the power equipment has an ecosystem available in the country, whether it is a meter or a transformer or a technology, whatever we talk like STATCOM.

Padam Gupta

executive
#93

Even the European players don’t offer STATCOM technology in India. So everything is sourced from Europe. So at some point, Europe will also become untouchable — then what do we do?

Ankur Sharma

analyst
#94

Alright. Alright. That's fair. And sir, only one final item. Regarding all these TBCB bids on the RE side, which, again, based on what we hear from Power Grid and a few other players, have been postponed for a range of reasons. So -- and you also mentioned it in your opening remarks that some of these might at least be tendered out to the developers and then, naturally, it reaches us. So how much -- or what amount in terms of the value of such bids do you expect will be placed with the developers and, as a result, arrive at us as an opportunity over the coming, let's say, 2 quarters, let's say, in FY '21 is what I meant?

Padam Gupta

executive
#95

So sir, the tendering business right now stands at about INR 15,000 crore, which had been due in June and has now been pushed to October owing to COVID and isn't in place. And right after that comes another INR 15,000 crore. So last year, by December, January, they finalized bids worth INR 15,000 crore. In each slot they take up 50 gigawatts, and their aim is 175 gigawatt to be ordered out by June '71 -- '21, sorry, so that this connectivity reaches the generators no later than June -- March '24. That's the Government of India's target, 175 gigawatt. So it's being taken up across 3 phases to provide that connectivity. So the first 50 gigawatt has already been ordered out. The current one is 66 gigawatt in process, and the third will be another 50 gigawatt.

Ankur Sharma

analyst
#96

Right. Right. Right. Understood — sir, got it. Sorry, just one final question, and it concerns the debtor position: what would total debtors be for us? I believe you referenced roughly INR 150 crore, and something like INR 200-odd crore coming from TANGEDCO — INR 150 crores — but as of June, what would the overall debtor amount be?

Padam Gupta

executive
#97

We're carrying INR 500 crores in total debtors — INR 350 crores sits on the EPC side, and INR 150 crores is on the wind side.

Operator

operator
#98

Because we’re running short on time, I’d like to pass the conference over to Mr. Amber Singhania now for some closing remarks.

Amber Singhania

analyst
#99

Much appreciated, Ayesha. Speaking for Asian Market Securities, our thanks go out to all of you for joining this call, and we're especially grateful to the management for letting us host it. Once more, we'd ask each of you to stay safe and look after your health and that of your family. That brings us to the end of this call. Sir, is there anything you'd like to add as closing remarks on your end?

Padam Gupta

executive
#100

Yes, yes. Sorry about that. First, if anyone wasn’t able to finish asking us your questions, please email us, and we’ll address your concern properly. I’d also like to thank each of you for joining this conference call. And apart from that, if you happen to be in this region of India once things return to normal, you’re welcome to visit our office for an interactive session with us. We’ll also have a more detailed session when we take up Q2, because by that point a lot of COVID-related issues should be behind us. So for now, I’ll just say please stay safe, look after your family and yourself, <<foreign_lang>>. Thank you very much. Take care.

Operator

operator
#101

Thank you. That brings today’s conference call to a close on behalf of Asian Market Securities. We appreciate your participation, and you’re welcome to disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Techno Electric & Engineering Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Techno Electric & Engineering Company Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Techno Electric & Engineering Company Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.