Techno Electric & Engineering Company Limited (TECHNOE) Earnings Call Transcript & Summary

February 15, 2021

National Stock Exchange of India IN Industrials Construction and Engineering earnings 70 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to the Q3 FY '21 Earnings Conference Call for Techno Electric & Engineering Company Limited, brought to you by Asian Market Securities Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll turn the conference over to Mr. Amber Singhania of Asian Market Securities. Thank you, and the floor is yours, sir.

Amber Singhania

analyst
#2

Appreciate that, Margarette. Hello, everyone, and good afternoon. Speaking for Asian Market Securities, I'm glad to welcome all of you to the 3Q FY '21 earnings conference call for Techno Electric & Engineering Company Limited. Joining us on this call are Mr. Padam Gupta, our Chairman and Managing Director, and Mr. Ankit Saraiya, Director, together with the management team representing their company. We'll begin with opening remarks from the management, and after that we'll proceed to the Q&A session. Sir, the floor is yours.

Padam Gupta

executive
#3

Yes. Thank you so much, and a very good afternoon to everyone. I welcome all of you to our — to talk through the financial results for the quarter that ended on 31st December, 2020. Any statement made on this call that reflects how we see the future, or that might be considered forward-looking, has to be looked at together with the risks our industry faces and, in turn, the risks the company is exposed to. The nine-month figures can't be compared year on year because of the effect of COVID-19 in the quarter of April, June 2020, when we lost close to about 2 months in that quarter — in the first quarter of this year. And we keep being affected by local lockdown losses and quarantine rules across different states, especially the Northeast, where those rules are the ones we rely on. Let me quickly run through our performance. For Q3 of financial year '21, total revenue for this quarter comes in at around INR 259 crores versus INR 270 crores in the prior year. EPC revenue stands at roughly INR 210 crores. Wind segment revenue is approximately INR 45 crores. The company has recognized the tariff differential payable for this year and last year, in line with the APTEL order dated 28/1/2021, in which they unexpectedly cut our tariff for '18 and '19 by INR 0.975 per unit, which has now been set aside.

Padam Gupta

executive
#4

For the quarter, company EBITDA came in at INR 77.51 crores. The EPC segment's operating profit this quarter is approximately INR 36.5 crores. The operating profit margin in EPC is around 18%, plus or minus, versus 17% a year ago. Operating profit for the wind segment is INR 41 crores. Other income is INR 11 crores, which is nearly at par with last year's figure. Profit before tax for the quarter is INR 75.71 crores, against INR 42.5 crores last year. That means it's up about 77% year-on-year. Profit after tax is INR 56.6 crores versus INR 32 crores last year, marking a rise of 75% year-on-year. EPS is INR 5.15 crores. Turning to the 9-month results, revenue for 9 months is almost around INR 748 crores, compared with around INR 795 crores last year. Similarly, revenue from EPC is around INR 580 crores, approximately. Despite lower revenue in the first quarter due to the challenges faced because of COVID, we've been able to cover most of the ground. Revenue from the wind segment is INR 97 crores, at par with the prior year.

Padam Gupta

executive
#5

EBITDA for the company is INR 197 crores. Operating profit for the EPC comes in at INR 111.5 crores, versus INR 125 crores in the prior year. Operating profit margin is 19.3%, against 18.8% last year. For the wind segment, operating profit is roughly in line with last year, at more or less INR 85 crores. Other income is INR 74 crores, and around INR 75 crore, compared with INR 36 crores a year ago. That's mainly elevated because of profit from the sale of investment of this INR 28 crores from KT Jhajjar to IndiGrid, plus the dividend we received from the JV of about INR 15.8 crores. Profit before tax sits at INR 219 crores. Profit after tax sits at approximately INR 171 crores. EPS is around INR 15.67 crores, or INR 15.7 crores. Current investment values, including cash and cash equivalents, stand at INR 800 crores. Order intake has shown major growth, or improvement, this quarter versus our previous 2 quarters. We have booked almost INR 300 crores of business in this quarter from Power Grid and from Kerala state government, and we are further L1 in another roughly INR 665 crores of business, which majorly includes 1 FGD order from DVC for INR 500 crores and another 1 TBCB package with Power Grid.

Padam Gupta

executive
#6

If Power Grid comes out on top, we will get back-to-back awards. That would bring our total intake for the financial year to roughly INR 1,000 crores, and the unexecuted book as of today stands at about INR 2,000 crores. The outlook for our largest business is shifting more toward — as I mentioned earlier — generating plants for pollution control systems, and also the distribution segment. So the biggest piece is the 1 FGD segment, where, per the Government of India notification, all coal-fired type plants need to limit their sulfur emission, and while SCBs and the private sector have yet to implement the plan, the CPSUs are really advanced in this case. And we expect business of around — of around INR 150 billion in the next 2, 3 years at the industry level. Out of that, we may be eyeing about INR 1,000 crores over the next 2 to 3 years. Good business also for another INR 500 crores, INR 600 crores, so that this segment continues to give us a space of execution at INR 500 crores a year. The Transmission segment continues to be stagnant, and at the moment it is limited only to the evacuation of renewable power.

Padam Gupta

executive
#7

TBCB bidding is currently underway for 66 gigawatt of renewable power, and that's expected to be tendered out by June '21, though the submission dates keep getting extended or revised from time to time. So we don't see that in execution — these orders will happen during this year. We plan to bid for — we also intend to bid for 4 projects, each of small value, under INR 500 crores, in the state of Maharashtra, MP, Karnataka and Rajasthan. And the union budget for '21, '22 has allocated 3 crores — 3 lakh crores to be spent over the next 5 years for the pad solution to be — and the funds will be tied to the financial performance and liability of the — by the distribution companies. We are seeing that the government is keen to implement reforms in past sectors, which are overdue. And they have even gone to the extent of talking about licensing of the distribution segment, which will be a milestone in itself. We are seeing good interest from large investors remitting funds to participate in this TBCB bids along in partnership with us. This will enhance our assets to capital, and we'll be able to participate a bit more aggressively, although the market here is really aggressive and intensive.

Padam Gupta

executive
#8

When it comes to distribution, we're seeing quite a bit more activity ahead — especially in smart metering and power distribution. As a backup to the metering, the networks will correspondingly become smarter and more intelligent. The government's primary objective is boosting efficiency and reining in losses. That way, the health of DISCOMs could be enhanced, and the benefit could be passed along to consumers in the form of power supply, which, again, I'd call already a major breakthrough. We'll note that the project that will interest us in the near future is a 9 lakh meter project in the state of J&K, where we are already executing a project without issue of 2 lakh meters. Beyond that, they are reading in the media that the government will be using this opportunity to reform the sector, matters which are pending under the name of Atmanirbhar Bharat — which is actually a long-standing demand of the stakeholders. This is holding up the amendment to the Electricity Act, to the tariff policy and estimation of gross subsidy, payment of subsidy directly to power consumers, and a lot of planning is being done through CA to provide visibility over the next 5 years on improving efficiency and stability in power of supply.

Padam Gupta

executive
#9

As usual, let me repeat that the power sector right now sits at a very critical juncture, and something ought to happen quite soon as we move ahead. It will also be a game changer. Turning to wind: once again we face headwinds, caused by the weak financial condition of the DISCOMs and payment delays, and there is pressure on tariffs as well, which we must continually fight at regulatory regimes. We hope to shortly collect our outstanding payment for the last 2 years from the INR 1.2 crores package that the Finance Ministry announced through RDC, PFC to DISCOMs, so that generator dues up to June 2020 get cleared. INR 38 crores has already come in, and INR 28 crores is expected this week, which brings it to INR 66 crores against total dues of roughly INR 122 crores — 50% as the first tranche. In addition, we have discussed the RDC price issue over the last few quarters. No trading is taking place in this because, following the APTEL stay, RDC trading stopped, in line with CRC revising the floor and forbiddance prices, and in the — we are hopeful that the reorder issued in the month of October will be delivered shortly and see that the order will be — will be satisfied.

Padam Gupta

executive
#10

So, normal trading picks back up. That's what we expect. Over the next few years, I'll again — the sales retreat where we're clearly witnessing cost sector reforms taking hold, with emphasis on efficiency, stability and dependable power supply, the cost of any improvement in the financial health of the DISCOMs and this sector. Our focus, though, will stay on renewable power along with electric transmission, where infrastructure has green corridors and your company has been the first mover there. Transmission construction is needed for 500 gigawatt over the next 10 years. Our push into overseas markets is also paying off. We're hopeful of winning more business in the markets of Africa and Afghanistan. I want to talk about another interesting opportunity ahead. Techno has always done well — or excelled — in these power-based solutions, especially in power-guzzling industries like aluminum previously. Now we see that opportunity emerging in data centers. We are — the pandemic has put a lot of stress on digitization as well as online systems. And given the huge population in our country and the growing penetration of more Internet and mobile telephones, that has led to significant data proliferation. Among consumers, we are the — the total, though — to handle this data, to present this data and also the privacy of the data as per the requirement of IND Ministry, India will need to add a lot more data center capacity, which right now stands at no more than 550-megawatt plus/minus.

Padam Gupta

executive
#11

We expect this to expand to a minimum of 2 megawatts over the coming 3 years, and reach 5 gigawatts within the next 10 years. Given that growth and the investment tied to it, our plan is to build an ultra-scale, hyper-density data center rated at 25 megawatts — 25 to 30.0 megawatts, I should say — located in Chennai. The wind capacity we hold in that state will be consumed captively, and our data center will be carbon neutral. That also fits the needs of — and we will satisfy the requirements of hyperscale customers such as Microsoft, Amazon, Google, Facebook, et cetera, given their ESG commitments. Total CapEx for this facility comes to INR 750 crores, and we intend to finish it within no more than 1.5 years. And 60% to 65% of CapEx, though this sits within the electromechanical works, which are the core competency of your company. So we will gain not only from using the renewable energy we produce in Tamil Nadu captively, but also from leveraging in-house expertise in carrying out these works. And in the future, we will likewise be able to take these up as EPC once we have demonstrated our capability in this area.

Padam Gupta

executive
#12

That brings us to the Q&A portion, so I'll open the floor now for your questions, and I'm glad to go deeper on anything I covered in my presentation.

Operator

operator
#13

<<operator_script>> Renjith Sivaram from ICICI Securities has the first question.

Renjith Sivaram

analyst
#14

Congratulations on a solid set of numbers, and my hope is that growth prospects will rise following the budget.

Padam Gupta

executive
#15

Right. Let's give the quarantine rules a bit more time to settle down as a country. Today, we've become a 28-country nation, a normal 28-state nation. That's a huge challenge to handle.

Renjith Sivaram

analyst
#16

Yeah, so regarding the remaining outlook for this year and next, could you provide a bit more clarity there? Do you still see things getting delayed? When do you expect those Green Energy Corridor orders to come through, and for our order intake to improve after that? That's my second question. And third is partly about the distribution reforms. Are we also planning to come out with some products, since that would be a huge opportunity — 3 lakh crore from these distribution reforms? So is there any thinking on our side about participating in that?

Padam Gupta

executive
#17

Regarding the order book, as I mentioned to you, we have already secured orders worth INR 300 crores. That figure includes one Sikar package from Power Grid, which we won recently through this TBCB bidding. We are also L1 with Power Grid on another set of packages worth roughly 300 crores, which still need to go through the TBCB bidding, and those should mostly wrap up by 15th of March. From my perspective, they are coming through one at a time. So we should — Power Grid is being fairly aggressive. As we have seen historically, their success rate comes to almost 80%. So we are quite hopeful about winning this business. On top of that, some business is happening selectively across different states as well, where we will pick up work — like Kerala, where we recently received an INR 85 crore order to build 220 kV 2 GIS stations. So in a similar way, we expect additional business from MP as well as from the state of Ghana and Karnataka going forward. But on the whole, if you ask me, I would say growth will come more from the FGD business, where we expect to book close to INR 500 crores. We are certain to — we will get tomorrow's towards Board meeting in DVC, it should be approved.

Padam Gupta

executive
#18

That gives us an additional INR 500 crore where we hold the L1 position. We're also in close discussions with a private entity for an order worth roughly INR 400 crores that should mature soon. So FGD ought to provide solid strength. The starch mission is going to stay flat at INR 500 crores annually. However, this data center addition will bring us another line of business — out of our CapEx, we'll carry EPC of approximately INR 500 crores on our books, to be executed across the coming 12 to 18 months. And beyond that, we're seeing business traction from other entities in data centers as well, much like the interest we're finding from investors in the U.S. and Singapore in this business. So on the whole, I'd say business prospects look good. Now turning to distribution sector reforms — look, manufacturing products has never been Techno's forte. We've always been a technology-driven, high-end, complex-solution company. With DISCOM or distribution power being delicensed, I'm quite certain this sector will see through... <<inaudible>>

Operator

operator
#19

<<operator_script>> Mr. Gupta is back on the line.

Padam Gupta

executive
#20

Yes. Sorry about that — I got logged out. So, what I was getting at is that where Techno is concerned, we're in a fairly solid position and we keep climbing the ladder in solutions. But turning to distribution reforms and the INR 3 lakh crore piece of this, we will certainly be focusing more on reforms rather than simply injecting funds into the DISCOMs — instead, on concrete steps that deliver efficiency, lift performance, and curb T&D losses. That ought to be the government's central agenda, so that these reforms are sustainable and the money gets used wisely, rather than throwing good money after bad money. A portion of distribution needs privatization — if not the whole thing, then all of it — so that new technologies can be rolled out and modern-day solutions become a way of life. Consumers could have a choice, like in telecom, with competition present in every market, in every — to the extent possible, in every market. So it will definitely be good for everyone — a product manufacturer, a solution provider, or even a power distributor, power aggregator or power distributor — all will benefit. So delicensing is a very sensible idea from the government, but we need to see the political will to carry it through.

Padam Gupta

executive
#21

Looking back at history, plenty of positive ideas have been discussed, yet putting them into practice has taken a great deal of time or come late.

Renjith Sivaram

analyst
#22

Sir, just as a quick follow-up — energy meters are one area where we already offer some solutions. So in that respect, wouldn't this distribution reform also drive a lot more of the energy meters kind of product?

Padam Gupta

executive
#23

Sir, it isn’t just energy metering — I’m confident the networks themselves will be rethought. There’s a great deal of scope here. The whole of the networks will be reconfigured, in technology and in other ways too. And you’ll see that, much like telecom today, voice is no longer a product; it’s value-added services. So the same future I foresee, 10, 20 years out, in power as well: if you’re able to generate power from renewables at INR 2 a unit, and it can be that distributed — power on every rooftop and across every countryside — it will be a revolutionary change. Once an energy storage solution is in place for us, once we have renewable power, with the next corridor being produced at competitive prices, this will be an entirely different world. That is what I see over the next 10, 20 years. For young people, it will be a completely new lifestyle.

Operator

operator
#24

Our next question comes from Sandeep Tulsiyan, who is on the line from JM Financial.

Sandeep Tulsiyan

analyst
#25

Sir, I have a...

Padam Gupta

executive
#26

Could you turn that up a little?

Sandeep Tulsiyan

analyst
#27

Yes. Sir, does that come through more clearly?

Padam Gupta

executive
#28

Yeah, that's an improvement. If you're able to give a bit more, that would be good.

Sandeep Tulsiyan

analyst
#29

Sure. Sir, first, I just want to get these order book and order inflow figures straight, because I wasn't able to reconcile them. So the INR 300 crore inflow you mentioned — that's the 9-month figure, correct, and not the third quarter number?

Padam Gupta

executive
#30

Yes, that figure covers the third quarter, sir — it isn't the 9-month number.

Sandeep Tulsiyan

analyst
#31

Sir, at the close of 2Q we shared an order book of INR 2,100 crores. EPC revenue of roughly INR 200 crores has been delivered. So logically, booking INR 300 crore of orders ought to have lifted it by INR 100 crores, correct? Yet sequentially it has fallen by INR 100 crores.

Padam Gupta

executive
#32

The thing is, certain business also turns unexecutable as time passes because of some of the orders we hold. So here and there we do make small adjustments. So you could say the executable value comes to roughly INR 2,000 crores, give or take.

Sandeep Tulsiyan

analyst
#33

Sir, could you give us some details on those INR 200 crores of orders that we've left out of the order book? For instance, what kind of orders were they, just so we can get a bit of an understanding there?

Padam Gupta

executive
#34

Do you want me to specify which order you mean?

Sandeep Tulsiyan

analyst
#35

To break down those orders or customers by area or transmission — would it be PGCIL, or the state — what would that order be?

Padam Gupta

executive
#36

One order, clearly, is FGD for Bokaro, worth INR 300 crores. Then there's an order we're executing for Adani at Lakadia. And we're now executing an order for Sterlite in Karnataka.

Sandeep Tulsiyan

analyst
#37

Apologies — what I was trying to get at is which orders are these that you’ve taken out, the ones you referred to, since that shortfall comes to nearly INR 200 crores. I’d like to understand which orders these are that you now…

Padam Gupta

executive
#38

Shoot me an email — I'll respond, since I'm currently in Delhi, all right? I'm not at my office, so giving you that will be tough. It may be spread across 15, 20 orders.

Sandeep Tulsiyan

analyst
#39

Got it — I’ll follow up on that separately. And second, sir, I just want to make sure I understand: on order inflows, you previously guided that annually — what you’re referring to is roughly INR 500 crores. On the transmission side, we should view it as annual. Then perhaps, say, INR 400 crores to INR 500 crores for FGD, and maybe INR 200 crores to INR 250 crores for smart meters. So that should be — largely the opportunity of about INR 1,200 crores to INR 1,250 crores or so annually is how we should assume it?

Padam Gupta

executive
#40

And then there's another INR 400 crores — INR 500 crores coming from the data center, which is what we're beginning with now.

Sandeep Tulsiyan

analyst
#41

Right, right, my apologies. So adding that together brings us to INR 1,700 crores.

Padam Gupta

executive
#42

Yes.

Sandeep Tulsiyan

analyst
#43

We'll handle the first order ourselves, and after that we'll present it to the external customers.

Padam Gupta

executive
#44

Right. 100%.

Sandeep Tulsiyan

analyst
#45

And sir, regarding those 2 areas you brought up — the first being data centers — will that entire INR 750 crore be financed by Techno out of its own cash, or does it sit as a project under the JV?

Padam Gupta

executive
#46

So first off, we've taken on this project. Foreign investors from the U.S. and Singapore have shown a lot of interest. However, since we're under NDA, we can't share more details with you right now. But in the end, there will be a JV partner at the SPV level.

Sandeep Tulsiyan

analyst
#47

Right. And sir, the other item you raised concerned those INR 500 crore bids in Maharashtra, MP, Karnataka and Rajasthan — each one of them. So is it essentially the case that these are BOOT projects we would be bidding on?

Padam Gupta

executive
#48

Yeah, BOOT — these fall under the TBCB BOOT category. Four of those projects will have us involved, and each one comes in at roughly INR 500 crores, give or take, so altogether that's INR 2,000 crores. If we can, we'd like to secure one of them.

Sandeep Tulsiyan

analyst
#49

One in four is the goal we're aiming for. Understood. And sir, if I may, one final question, please. Regarding the mutual fund side, could you just tell us what those bonds' exposure has been brought down to, given that you've consistently shared the progress on that front.

Padam Gupta

executive
#50

At this point that exposure stands at INR 150 crores, and we're hopeful we can get it under INR 100 crores by March. That's where it is. Then next year, we'll have a full exit. And I'll note that this is a bond exposure, not a mutual fund.

Sandeep Tulsiyan

analyst
#51

Apologies — the bond. The bond.

Padam Gupta

executive
#52

What we've taken away from this is that any money you receive, you now keep in a mutual fund, which is both safe and healthy. So apart from that, the balance held in mutual funds comes to roughly INR 500 crores in cash as well.

Sandeep Tulsiyan

analyst
#53

Alright, understood.

Padam Gupta

executive
#54

Also, there’s a further INR 150 crore being invested on an ongoing basis through our JV — the SPVs with Patran in transmission.

Operator

operator
#55

Our following question comes from Deepesh Agarwal, who is on the line from UTI AMC.

Deepesh Agarwal

analyst
#56

Sir, my question concerns the data center side. So, do you have in-house expertise when it comes to setting up a data center, or are you depending on some other party for this?

Padam Gupta

executive
#57

Look, I can't say we have the in-house ability to devote time to data centers. That part is definite — but when it comes to building the elements of a data center, we do have plenty of capabilities, to put it that way. Because a data center is largely a multilayer power solution, and it has to be ensured that power is available under any circumstances, so that availability and reliability is no less than 99.9. On top of that, you need to deliver quality power to the racks. So definitely, for only the first project, we will work with a global consultant who handles these jobs day in, day out. They will be hand-holding us, so that the first project and the customization happen together in partnership with them. By partnership, I mean under their consultancy and detail. And once we have gained experience, definitely, we can stand on our own legs.

Deepesh Agarwal

analyst
#58

All right. And sir, you brought up the INR 750 crores of CapEx. So with INR 750 crores in CapEx, what power requirement would this data center have? And could we fully tie up our vendors for this data center?

Padam Gupta

executive
#59

Yes, that's exactly what we're aiming for, sir. We have 112 megawatts of capacity in the State of Tamil Nadu, and at a given PLF of 25%, if you translate like-to-like to a stable powerhouse, that comes out equivalent to 25 to 30 megawatts, depending on how much power is produced. More precisely, we generate roughly 200 million to 220 million units annually. That's the power availability we'll have on hand. And a data center of this size will require that kind of power within plus/minus 10%.

Deepesh Agarwal

analyst
#60

All right, all right. So in essence, this is going to resolve the problem we have when it comes to working capital, and it will also provide us a chance to get a better rate than the one we presently reach on the vendor side?

Padam Gupta

executive
#61

Sure. The electricity that data centers purchase from the state runs at INR 8. That makes your power more valuable. Your power asset is valued higher, and you sit in a sunrise sector known as data center. And once we complete one of these, we will likewise be acknowledged as an EPC, which the country requires in order to build out these capacities. So it will be — and our goal resembles transmission. We began as an EPC, then entered TBCB. We have no desire to experience the life cycle of TBCB projects. So we park with IndiGrid and InvIT. In the same way, these data centers ultimately end up in a REIT or InvIT — that happens in this line of business across the world too. So the business model stays the same: you develop it, you operate it alongside a global partner, and you rent it out to one of the digital data companies such as Facebook, Google or Microsoft. And they are partly in REIT or InvIT, like in Singapore, where there is a company named CapitaLand, funded by the Government of Singapore itself. So they handle that themselves. In the end, it is a simple business model.

Deepesh Agarwal

analyst
#62

Alright. Alright. And sir, out of that INR 750 crores of CapEx, how much will be carried out by Techno's, let's say, EPC arm? And would you be making an EPC margin on that?

Padam Gupta

executive
#63

Basically, what we'll be handling is the power receiving side rather than power conversion—taking power from EHV down to HV, and from medium voltage down to LV. On top of that, captive power forms another layer, and then there's yet another layer consisting of energy storage solutions, or something like a UPS setup around it, with battery backup as is commonly done. So multilayer power solutions fall within our forte, aside from cooling systems, firefighting systems, and safety and security systems, all of which are integrally part of these stations. So we've already acquired land in the State of Tamil Nadu, at Chennai. The land was provided by their industrial estate at SIPCOT. And we're now at a very advanced stage to launch the project.

Deepesh Agarwal

analyst
#64

So is it fair to say that, at a minimum, we'll handle 50% of the value internally and earn a company-level margin on that?

Padam Gupta

executive
#65

Roughly two-thirds of it, sir — close to two-thirds.

Deepesh Agarwal

analyst
#66

And are you also factoring in company-level margins on the EPC side?

Padam Gupta

executive
#67

Regarding the margin level, it could be 1 or 2 notches above or below, but over the long term that's what the margin will be, sir. Eventually we're going to use margin to our advantage, but it will end up being worth more to you.

Operator

operator
#68

Next up, we have a question from Rohit Balakrishnan at VRDDHI Capital.

Rohit Balakrishnan

analyst
#69

Sir, can you hear me?

Padam Gupta

executive
#70

Yeah, yeah, I can hear you loud and clear.

Rohit Balakrishnan

analyst
#71

Sir, regarding your FY '21 business, based on the guidance you gave earlier for this quarter, we should see execution of INR 500-odd crores in Q4, since you mentioned something like INR 1,100-odd crores in probable revenue. So is that assessment correct, or has there been a change to it?

Padam Gupta

executive
#72

Correct, that's the target we aim for. What we're seeing right now, though, is that DISCOMs simply don't have cash, sir. So unless we can see money sitting with the customer, we're not willing to sink additional working capital into the business. That's why in Q3 we could have booked another INR 50 crores and didn't, largely because payments from DISCOMs haven't been coming for the last 2 months. They're starved of money — funds, whatever term you prefer — because of the pandemic. So if their financial position picks up and government money arrives, we're certainly hopeful of INR 500 crores. If not, INR 400 crores is a fair number to achieve. You could say that if we fall short on INR 1,100 crores of EPC, we will certainly get there with the wind top line — wind power — apart from other income. So it's really just a matter of realigning progress with the funds available. We don't want to build more debt or book debts by pushing up our top line.

Rohit Balakrishnan

analyst
#73

Okay, okay. So then for next year, I mean, is it fair to think, based on what you just said — leaving out this data center — that we're looking at something like 10% or 12% growth, just on the overall EPC side? Or am I again talking about excluding data centers?

Padam Gupta

executive
#74

Do you mean this year or next year? '21, '22?

Rohit Balakrishnan

analyst
#75

I'm referring to 2021 and 2022, sir.

Padam Gupta

executive
#76

As far as I can tell, '21 and '22 are definitely going to be stronger years. Vaccinations have begun, and the government is taking economic growth seriously. The budget offers a lot of support. So I'm confident liquidity shouldn't be a problem from April onward. This issue is only a temporary one, limited to this year. But then FGD will become another growth center rather than data center — for this year, we wanted to do INR 100 crores but couldn't even manage INR 40 crores, INR 50 crores. So next year, FGD will contribute no less than INR 500 crores. So another INR 750 crore we can easily expect from transmission and distribution. And obviously, data center will also be adding to the top line. So we are very confident that '21, '22 will achieve a top line of INR 1,500 crores.

Rohit Balakrishnan

analyst
#77

Okay. And regarding this data center business you just mentioned, the total investment is INR 750 crores. So I mean, how should someone view it from a company standpoint, because we'll be doing some — there will also be some EPC revenue, and then some wind business will also come through this since we'll be using it captively. So on a total investment basis, how do you — I mean, from an ROI perspective, what kind of ROI are you looking at for this business?

Padam Gupta

executive
#78

Look, when you examine this particular business segment right now, it's a really healthy and rewarding sector as things stand today. EBITDA in this market comes in at no less than 50% at full power cost, since power represents the largest raw material after the data centers are commissioned, apart from manpower cost. So power is available to us in-house, and that will contribute at least INR 150 crore operationally, separate from another INR 100 crore that comes in as rental value. As a result, Techno's delta will come largely from the power side, and our EPC capability to execute in-house covers almost 2/3 of the project cost. You can compare that with another TBCB project where you build a project and do the EPC in-house, and in the end you park it with a REIT or InvIT at a price driven by the market. But we will remain the power supplier to this facility, and that will keep giving us at least about INR 150 crores of top line as a power supplier in the process.

Rohit Balakrishnan

analyst
#79

Sure. And in the end, you’d kind of, as you do with TBCB, sell it to...

Padam Gupta

executive
#80

So in 2 years, we’ll exit through a REIT or an InvIT as appropriate.

Rohit Balakrishnan

analyst
#81

Understood.

Padam Gupta

executive
#82

Also, second, sir, these facilities are going to be developed by us through a JV as well. For this business we set up a separate holdco, and that holdco will be held jointly by a foreign investor together with Techno Electric. Taking the entire risk onto our own books isn't something we'd prefer. That's what we want at this point.

Rohit Balakrishnan

analyst
#83

Okay, one more question, and this follows on from what we were just discussing. We already hold roughly INR 800 crores on the books, and we expect another INR 100-odd crores from TANGEDCO, with similar amounts from Kohima — perhaps even more than that. And then, of course, we are generating cash flow. Last time you mentioned that we would be distributing a healthy amount, but in terms of — we have done an interim dividend, though it is certainly not very high relative to the cash we have. So I just want to understand your thinking. What is your thought process? Because in the past as well, we have been generous with cash outlay through buyback and everything. So I just want to understand where your thinking stands at this point on this.

Padam Gupta

executive
#84

As you can see, we've already paid INR 3 in the last quarter and INR 3 in this one. Then the final dividend, when it comes due, will fall within the March quarter. So all told, we will definitely be distributing around 40% of the bottom line in line with our policy. If the government had imposed tax on the buyback, we would have gone with the buyback option instead. But as things stand, dividend is tax-free, and it's taxable in the hands of the recipient. And our major investments are in mutual funds, which are largely tax-free, you see. And if they sit in a growth scheme, even investors are tax-free in those funds. So in that sense, the market response leaned more toward dividend. So we are very — trust me, you will be handsomely rewarded going forward. It will be no less than buyback, and it will continue like that.

Operator

operator
#85

<<operator_script>> Our following question comes from Nishith Shah with Aequitas Investment.

Nishith Shah

analyst
#86

Sir, I'd like to get a sense of the smart meter opportunity around the 9 lakh meters in Jammu and Kashmir. In terms of revenue, how large could that end up being?

Padam Gupta

executive
#87

Sir, as a rule of thumb, a smart meter project runs about $100 for each meter installed.

Nishith Shah

analyst
#88

My apologies, sir. I didn't catch that.

Padam Gupta

executive
#89

One hundred dollars. What I mentioned is that a smart meter, once it’s installed, runs $100 to $120 for each meter.

Nishith Shah

analyst
#90

Alright.

Padam Gupta

executive
#91

That means, for each meter, the price comes to roughly INR 8,000 before taxes.

Nishith Shah

analyst
#92

That's right. Got it.

Padam Gupta

executive
#93

At the installed level, you can take 9 lakh and multiply it by INR 8,000.

Nishith Shah

analyst
#94

Yes, sir. And on the bidding side — I mean, where does this project stand at the moment?

Padam Gupta

executive
#95

Which one?

Nishith Shah

analyst
#96

These 9 lakh meters?

Padam Gupta

executive
#97

This is going to cover the entire state, sir. Right now we're handling 2 lakh meters — 1 lakh in Jammu City and 1 lakh in Srinagar City. That leaves 9 lakh meters for the remaining areas of the state.

Nishith Shah

analyst
#98

Is there any kind of timeline for when it would be finished — within 2 years, 3 years — and for the bidding and all of that to be out?

Padam Gupta

executive
#99

Look, the way things stand right now in the power sector and with how DISCOMs and the government operate, you could easily see that stretch to about 3 years, maybe even 4.

Nishith Shah

analyst
#100

Alright. And sir, I was hoping you could clarify something. In your opening remarks, you mentioned a reduced tariff of INR 0.975 under some order from 2021. So what exactly is that...

Padam Gupta

executive
#101

That's not 21, sir.

Nishith Shah

analyst
#102

Could you clarify what that is, sir?

Padam Gupta

executive
#103

It's enhanced. What happened was that in '18 and '19, the regulator issued an order cutting the tariff to INR 0.97 from the earlier tariff of INR 2.18 that was paid from '15 to '18. So we challenged that action by the regulator — the state regulator, I mean — at APTEL, which is a regulatory body akin to a high court. So they have set aside that order. So the tariff reduction they made 2 years back is now billable and payable to us under the current mandate. So that's what we're referring to when we say we are presently accounting our billing at INR 2.14 as against INR 3.12 2 years back.

Operator

operator
#104

<<operator_script>> Our following question comes from V. P. Rajesh at Banyan Capital.

V.P Rajesh

analyst
#105

I hopped on a bit late. I just wanted to confirm that I...

Operator

operator
#106

Mr. Rajesh, my apologies — I can't hear you clearly.

Padam Gupta

executive
#107

We can barely hear you. Could you speak up a bit?

V.P Rajesh

analyst
#108

Is it in a better spot at this point, sir?

Padam Gupta

executive
#109

Yeah, slightly better. If you're able to push it a bit further, we'll be in good shape.

V.P Rajesh

analyst
#110

All right, okay, I'll give it a shot. My apologies — I was a bit late joining.

Padam Gupta

executive
#111

At this point, things look solid. Things look solid now.

V.P Rajesh

analyst
#112

Right. So regarding the data center piece, my takeaway was that you're setting up a JV in which CapEx of INR 700 crores will be spent over roughly the coming year. So what I'd like to ask is, what share will we be putting into that JV, and what kind of timeline is involved for it to come up — the plant, or the data center, how long until it's actually put up?

Padam Gupta

executive
#113

As you know, the industry norm for this kind of thing is generally a 2-year project. But since it's our own in-house facility, we definitely want to complete it in a shorter timeframe — no more than 18 months, and if you ask me, 15 months would be preferable. And second, obviously, even at a 1:2 ratio, you'd have INR 250 crores of capital and INR 500 crores of loan sitting at the SPV level. So that INR 250 crore equity will be shared with the foreign investor based on his appetite. From what we're told in this business, they generally look for majority. But we have to experience it, and we'll be clearer when we talk with you around the March results, sometime in May. We'll have full clarity on this issue then.

V.P Rajesh

analyst
#114

Alright. For my second question, I'm looking ahead to next year, fiscal year '22. It looks like your growth share is mainly coming from FGDs and the smart meters. Is that accurate, or is there another growth piece I'm overlooking?

Padam Gupta

executive
#115

Okay. So FGD, smart metering, and on top of that, data centers — those are all going to become standard practice over the coming 4 or 5 years, once we've built our own captive data center.

V.P Rajesh

analyst
#116

Okay, so looking ahead over the next 4 to 5 years, what sort of market opportunity do you see for data centers?

Padam Gupta

executive
#117

During my presentation, sir, I noted that right now our capacity in the country stands at just 550 megawatts, and that ought to rise to 2 gigawatts over the coming 2 to 3 years. The growth will be quite swift, reaching 5 gigawatts within the next 7 to 10 years.

V.P Rajesh

analyst
#118

My apologies.

Padam Gupta

executive
#119

This is going to grow dramatically—at minimum 10x over the coming 7 years. That much I'm sure of. In other nations, roughly 10%, 12% of electricity is used by data centers themselves. If you consider what's happened in Singapore, the U.S., or Hong Kong, and likewise, India was left out previously since this sector sat with big foreign players and aggregators. Now, thanks to pandemic-era digitization and data expansion, the enormous rise in online services, education and all of that, e-commerce, plus not many foreign players and the privatization of the Government of India's data policy—so all these firms now view India as a hub. So whichever cities currently have global undersea cable links—before, that was just Mumbai. So of all data centers, 80% sit in Mumbai. Now Chennai got connected over the last 2, 1.5 years to Singapore via undersea cable, so Singapore—Chennai has turned into a contender. Now a Calcutta cable link is underway through Jio at Digha as the first step, and then 2 further stages will follow. So that's how this sector will keep growing along with global connectivity. Anywhere fiber connectivity on a global scale exists, these sorts of hubs turn out to be viable and practical.

Operator

operator
#120

We’ll take our next question from Keshav Garg at CCIPL.

Keshav Garg

analyst
#121

Sir, I just wanted to get a handle on this — so for next year, FY '22, what sort of — do you figure we can reach roughly INR 1,500 crores in top line?

Padam Gupta

executive
#122

Absolutely. Without question.

Keshav Garg

analyst
#123

All right, sir. And sir, as you were saying, sir, so on the subject of this data center — sir, is it your view, then, that by FY '23 we can look for revenues to begin in the second half of FY '23?

Padam Gupta

executive
#124

You're right about that, absolutely.

Keshav Garg

analyst
#125

Alright.

Padam Gupta

executive
#126

By June or September, our facility should be ready.

Operator

operator
#127

Renjith Sivaram from ICICI Securities has the next question.

Renjith Sivaram

analyst
#128

Sir, regarding this data center, will that INR 750 crores be fully invested next year, or will it be spread out — what amount are we planning to put in next year?

Padam Gupta

executive
#129

Right now, giving you an exact figure is a bit tough, sir. Still, you can assume roughly 75% in '21 and '22, with the remaining 25% coming in '22 and '23.

Renjith Sivaram

analyst
#130

And, sir, what sort of ROE — return on equity — are we at least projecting from this investment, based on our internal workings?

Padam Gupta

executive
#131

Assuming the market stays in the same condition it’s in today, then we could expect a ROE of at least 20%.

Renjith Sivaram

analyst
#132

And is there a specific site that we've purchased, or one that we have in mind?

Padam Gupta

executive
#133

No — as I mentioned during my presentation earlier, the city is Chennai, and there's a SIPCOT industrial area located in a place called Siruseri along OMR Road. The land has already been purchased by us from the Government of Tamil Nadu, and it sits directly across from the Airtel data center and right beside the Adani data center. This is an IT park, an IT hub, and we will be part of it. So the land is now already in place.

Operator

operator
#134

Our next question comes from Rohit Balakrishnan, who is calling in from VRDDHI Capital.

Rohit Balakrishnan

analyst
#135

Sir, just 2 questions on TANGEDCO — we had roughly INR 160-odd crores that was owed to us. And of that amount, how many crores did you say we've actually collected — about INR 30 crores?

Padam Gupta

executive
#136

Of the INR 132 crores due through the RDC PFC scheme up to June 2020, INR 66 crore has come in. We've received the first tranche, which is 50%, sir.

Rohit Balakrishnan

analyst
#137

So, sir, we're looking at somewhere between INR 60 crores and INR 66 crores.

Padam Gupta

executive
#138

Of the INR 132 crores billed for the 2 RDC, INR 66 crore came from that.

Rohit Balakrishnan

analyst
#139

Sir, what's still pending at this point? And the overall payment too — I mean the total.

Padam Gupta

executive
#140

We generated more than INR 66 crore between July and December, and on top of that came a further INR 20 crore. That puts us on track to receive an additional INR 86 crore.

Rohit Balakrishnan

analyst
#141

All right, all right. And sir, regarding the Kohima project, is there any update? What I mean is, we had said earlier that in January we would know. So is CLP still expected to be the buyer, or is it somebody else? And when do you think that will close, sir?

Padam Gupta

executive
#142

As my update is with me, sir, we have achieved COD successfully. We have to give CLP 3 months to get their approvals in place, which will wrap up by the end of March or mid-March. So I'm told they're working hard at it. If they succeed, that's good. If they don't, then even so, we have alternate buyers ready who would purchase this asset at a better value than CLP as well.

Rohit Balakrishnan

analyst
#143

Okay. So, based on your timeline, sir, do you expect this to be closed at some point during the first quarter of FY '22?

Padam Gupta

executive
#144

Definitely. Yes, sir. We’ll have that finished by June.

Rohit Balakrishnan

analyst
#145

All right. And will we have the money with us as well, or is that going to be…

Padam Gupta

executive
#146

Right. Absolutely. Otherwise, there’s no meaning to it. If you don’t receive money, why would you get rid — why would you exit with asset.

Operator

operator
#147

Ladies and gentlemen, because of time constraints, that was our final question. I'll now turn the conference over to Mr. Amber Singhania for closing comments.

Amber Singhania

analyst
#148

Thanks, Margaret. Sir, right before we wrap up, I have 2 questions of my own. First, you brought up the roughly INR 86 crores of pending receivables in Tamil Nadu. Will this INR 36 crore that gets recognized this quarter come on top of that amount?

Padam Gupta

executive
#149

Yes. Clearly, that would come on top of this, sir. This isn’t included — it hasn’t been billed yet. We hold a regulatory offer and entitlement. So, in line with TANGEDCO’s notification, we’ll be in a position to bill it in March. However, that billing will apply retroactively from those dates.

Amber Singhania

analyst
#150

Right, so essentially half of it comes from FY '20, and the other half is...

Padam Gupta

executive
#151

No — hold on, can you hear me? Hello?

Amber Singhania

analyst
#152

Yes, sir, I’m able to hear you.

Padam Gupta

executive
#153

Yes. What I'm saying is that we remain unsure. The funds they received from REC PFC — they've drawn loans up to June 2020. Now the remaining amount has to come from the DISCOM's own resources. So at present, all their resources are strained due to the pandemic. So as soon as they recover, we're being assured that regular payment can be expected, and the government may be assisting them through this INR 3 lakh crore payment that they've mentioned in this budget, spread over the next 5 years. So we're quite hopeful that in '21, '22, not only will old dues be cleared, but we'll also be paid regularly as usual. The backlog issues will be finished, done with, as promises are being shared by the government. But let's see. The reality will lie in eating the pudding rather than talking about it.

Amber Singhania

analyst
#154

Understood, sir. Sir, second point, regarding the pipeline side, when you referred to the TBCB covering 4 states — Maharashtra, MP, Rajasthan and Karnataka — plus the FGD tendering from that private player and a couple of additional ones from NTPC and PGC. For any of these, should we expect any to be tendered during this year itself, or is it potentially heading into the next financial year?

Padam Gupta

executive
#155

Sorry? Your voice is really quiet, sir. Could you speak up?

Amber Singhania

analyst
#156

Is this coming through clearly to you at this point, sir?

Padam Gupta

executive
#157

Yeah, that's improved — definitely better now.

Amber Singhania

analyst
#158

Right, so with that whole TBCB pipeline across 4 states, plus the FGD tenders sitting in the pipeline as well — should we expect any of those projects to be put out for bidding during this financial year, or will most of them potentially slip into the next financial year?

Padam Gupta

executive
#159

My expectation is that those should wrap up within this year, and if not, I'm confident they won't extend past June in any case. Still, we're more optimistic about Power Grid, where we remain L1 with them. We secured one job from them — Sikar, 765 kV — just as we did Bhadla for them, which is now finished and already booked. From Power Grid itself, we ought to be able to bring in business worth INR 250 crores to INR 300 crores by the end of March, or at the latest April, just between you and me. On top of that, we'd like to win at least 1 out of 4 as our own TBCB package together with one of the InvITs in the country, where we're making an effort. So that's the picture behind it. Our one are being pushed back right now, which I think may slip to May or June, if not March or April. As things stand, we're still waiting to receive the final dates from them.

Amber Singhania

analyst
#160

Regarding the order book — yes. Sir, I just need one clarification. Of that INR 2,000 crore order book, is this INR 300 crores that we purchased from PGCIL in Kerala state part of it, or does it sit on top of that as well?

Padam Gupta

executive
#161

That figure sits inside the INR 2,000 crores, sir. And everything we executed during this quarter drops out of it. What we're discussing here is the unexecuted portion. Once the non-executable piece is stripped from that unexecuted book, what remains with us as the executable portion today stands at INR 2,000 crores.

Amber Singhania

analyst
#162

And then there's — the one-off amount is INR 65 crore on top of that, correct?

Padam Gupta

executive
#163

Beyond that as well. That’s exactly right.

Amber Singhania

analyst
#164

Understood, sir. Understood, sir. That wraps things up from my end. I believe we've already gone past the scheduled time, sir. On behalf of Asian Market Securities, I want to express gratitude to every participant, with particular thanks to the management for granting us the chance to host this call. And I'd like to ask the management to share their closing remarks. Sir, the floor is yours for the closing remarks.

Operator

operator
#165

Mr. Gupta, is there anything you'd like to say in closing?

Padam Gupta

executive
#166

Yes. I want to express appreciation to every participant, and to their extremely eager involvement on this call. And if there is still any participant, or anyone else at all, who has a question about how we performed, please don't hesitate to send us an email. And should you find yourself over on this side of the country, you're welcome to stop by our office so you can see how we actually carry out the work, and so forth. With that, I'd like to bring the conference to a close, and I thank all of you once more for joining. Thank you, and I wish you a year free of the pandemic next year — pandemic-free next year — and get vaccinated soon.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Techno Electric & Engineering Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Techno Electric & Engineering Company Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Techno Electric & Engineering Company Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.