Techno Electric & Engineering Company Limited (TECHNOE) Earnings Call Transcript & Summary
November 15, 2021
Earnings Call Speaker Segments
Operator
operatorGood day, ladies and gentlemen, and welcome to the Q2 FY '22 Earnings Conference Call for Techno Electric & Engineering Company Limited, brought to you by Asian Market Securities Limited. During this call, we may make forward-looking statements regarding the company, and those are grounded in the beliefs, opinions and expectations held by the company as of the date of this call. Such statements do not constitute guarantees of future performance, and they carry risks and uncertainties that are hard to foresee. Actual results could differ from those expectations, projections, et cetera, whether expressed or implied. We ask participants to be cautious when referring to these statements and remarks. <<operator_script>> Kindly be aware that this conference is being recorded. I will now turn the conference over to Mr. Kamlesh Kotak of Asian Market Securities. Thank you. Sir, the floor is yours.
Kamlesh Kotak
analystThanks, Pooja. Hello, everyone. We're glad to have you all here on behalf of the Asian markets for Techno Electrics & Engineering Company Limited's 2Q FY '22 earnings conference call. Joining us today are Mr. P.P. Gupta, Chairman and Managing Director, along with Mr. Ankit Saraiya, Director, representing the company. I'd now invite Mr. Guptaji to walk us through an overview of the quarterly and half year results, after which we'll open the Q&A session. Over to you, sir. Thank you, Guptaji.
Padam Gupta
executiveGood afternoon, everyone, and I wish all of you a very Happy Diwali, Chhath Puja and every festival — Dasara, Ganpati Chaturthi — and I welcome you to discuss our financial results for the quarter ending September 2021 and the half year ending of year 2021. Anything said on this call which reflects our outlook for the future of that would be construed as a forward-looking statement must be reviewed in conjunction with the risks that the company or very industry segment in which we operate faces. Now let me quickly summarize our performance. Total revenue in Q2 stand at INR 273.5 crore, which is almost around 45% higher on Q-on-Q, quarter-on-quarter at 6.5% over year-on-year. Revenue from EPC is at INR 225 crore, similarly which is around 40% higher on quarter-on-quarter and 1% over previous year. In this business, revenue is at INR 48 crores compared to INR 33.75 crore last year, which is up by 42%. The season has been good this year compared to last year. EBITDA for the company stood at INR 85 crores in this quarter compared to INR 75 crore in the same period last year and up by 54.7% quarter-on-quarter at 13.4% year-on-year.
Padam Gupta
executiveFor the EPC segment, operating profit is likewise INR 41.35 crore, essentially in line with the prior year. Other income this quarter stands at INR 10.28 crore versus INR 50 crore a year ago — and last year's figure contained a one-time gain from selling our Haryana transmission assets, made up of INR 28 crore in capital gain plus dividend income of roughly INR 16 crores. Profit before tax for the quarter came to INR 84.35 crore, against INR 70 crore last year once the one-time profit is adjusted out — a rise of 20% — and INR 16.29 crore quarter-on-quarter, up 40%. For the quarter it was INR 63.48 crore, versus INR 52 crore a year earlier after adjusting the one-time profit. That means an increase of 40% quarter-on-quarter and 20% year-on-year. EPS for the quarter is INR 5.7 crore. Now similarly, moving to our half year results: revenue for the first half year is INR 463 crore, up 8.5% year-on-year. Revenue from EPC sales is INR 388 crore, against INR 375 crores last year, which is around 3.5%. Revenue from the wind segment is INR 75 crore, compared with INR 52 crore last year.
Padam Gupta
executiveEBITDA for the company came in at INR 140.62 crore, which is up 17.5% year-on-year. Operating profit in the EPC segment held steady versus last year — more or less flat at roughly INR 75 crores. For this half year, the EPC segment's operating profit margin is 18.9%, versus around 20% a year ago. Operating profit in the wind segment — the wind margin — stands at INR 67 crores, which works out to roughly around 89.55% compared with 84.5% last year. Other income is INR 27 crore versus INR 64 crore last year. Other income also includes the one-time income; strip that out and the figures are very comparable. Profit before tax for the half year was INR 145 crore against INR 116 crore last year, a rise of 24%. Profit after tax stood at INR 9 crore versus INR 27 crore last year — if we take out one-time profit, EPC at around INR 10 crore. Current investment revenues, including cash in hand, for the quarter ending September 2021 are INR 850 crore. We've received new orders, collection has begun in the market — roughly around INR 500 crores this quarter and around INR 575 crores in the first half.
Padam Gupta
executiveWe have an unexecuted order book of roughly INR 2,000 crores. The outlook is considerably stronger than the results we have delivered so far. It appears COVID is now behind us, and we can look forward to life being as normal as possible. We anticipate substantial business from the FGD segment. We secured a leading position in one, at more or less around grids valued at INR 20 billion <<inaudible>>, and Rajasthan. FGD will remain a key focus area over the next 5 years. Under the notification from the Government of India, every coal-fired thermal plant must <<inaudible>> as notified by the pollution department by December '24. There is meaningful progress with CPSUs in awarding orders, and implementation of the same will now be taking place by the <<inaudible>> sector. We expect around $15 billion of business this year, and this level of activity should persist for the next 3, 4 years, since 50 gigawatt is still to be ordered out by the <<inaudible>>, the remaining CPSUs, mainly SUVs, in the private sector. On the transmission segment, we anticipate a status quo of sorts from that side. It will be confined largely to evacuation of renewable power. <<inaudible>> is bidding for 66 megawatt of renewable power against the target of 175 megawatts, which is expected to be completed by December '21.
Padam Gupta
executiveOnce more, the deadlines for submitting bids were pushed out during the previous year. Our intention is to bid on no fewer than 5 projects, totaling roughly INR 2,500 crores, across various states, working alongside a number of up-and-coming partners. There's the Union Budget, and on top of that a new QR is now in place, which also benefits us at our construction sites. The Union Budget sets aside INR 300,000 crore for power distribution, to be disbursed across 5 years, with funding tied to viability, demonstration, and the financial performance of the distribution companies. We're observing strong interest from big investors bringing in funds to take part in intimacy, making the company a meaningful partner. If you <<inaudible>> capital and with the aid of additional projects in the wind segment. On the distribution front, we're seeing plenty of activity right now, especially regarding regrade automatic smart meters, as well as reinforcement of the power distribution networks alongside that. The Government's core objective is boosting efficiency and reining in losses, so that <<inaudible>> can be enhanced. And as we said before, we have an interest in the project in the state of J&K covering 6 lakh meters, where we're already carrying out a project for 2 lakh meters.
Padam Gupta
executiveBeyond that, there are leading initiatives in the media — a number of proposal plans now in the market aimed at growing these projects, with part of the funding coming from investors. The Electricity Act amendment is also taking shape, and it will represent a very major reform for the sector, one that has been awaited for many years. Moreover, the Government would certainly want to do away with loss auctioning and payment of — and subsidy will likewise be paid directly to those who deserve it, perhaps for the agriculture sector, et cetera. We hold strong hope that the power sector stands at a very critical juncture and that something ought to move forward. Wind segment. We are glad to report that we have received our major outstanding from the discoms, which is up in Q '20 under the PFC REC funding scheme, amounting to INR 1.2 billion. We are likewise glad to report that following the recent order of <<inaudible>> certified CRC order in June 2020 and now the revised CRC previous order dated March '17, wherein trading on RDCs will be reserved with the floor price of INR 1,000 and price of INR 2,400 as usual. We are hopeful that this loss of 1.5 year will be made good by RPO compliance taking place over the next 4 to 5 months.
Padam Gupta
executiveRegarding any inventory we currently hold, we expect it can be sold off by March 2022. As we promised last quarter, we are going to recover the performance we saw a year ago and will carry out no less than 50% of the planned execution of the backlog over the course of this year. And we will certainly witness growth in the years '22 and '23. Looking ahead, we anticipate stock costs following the reforms, grounded in efficiency, stability and reliability of our supply, the cost of power, and improvements across the overall financial and government sector. That emphasis is going to remain on power along with related infrastructure at every corridor. You may recall that your company has been a frontrunner in building these corridors. The transmission infrastructure needed covers 500 megawatt over the coming year, our first turnover in an overseas market. So it encompasses expanding further business from the markets we serve. Data centers. COVID-19 has touched our lives in many ways, yet one favorable result of it is the expansion in the digital space. With digital data growing and also supported by IT posture and localization of data, the third-party data center industry is expected to expand considerably from the bulk level of 500 megawatts to 2 gigawatts over the next 2 years and roughly 5 gigawatts across the following 5 years.
Padam Gupta
executiveUp to now, the majority of data centers have been situated in Navi Mumbai and Mumbai. However, over the past 1 year, Chennai has emerged as the hub for a traditional mixture of unlisted data work. In the near term, Adani entity is already in the process of establishing its own data centers in Chennai. Techno is largely at an advanced stage of setting up data centers with 5 megawatts to 30 megawatts IP load of <<inaudible>> data vendor, for which the master plan is ready; as already mentioned, we acquired and we are hopeful of starting construction at this point. In addition, we tentatively resumed the operational wind power of itemized megawatts to classify the data center as far as the peripherals, which aligns with the policy of major scale customers because of their ESG commitments. With CapEx of over INR 800 crores, say, 60, 65 caterers is always an electrochemical watch, which is the announced project capital investment of Techno Electric. We'll be able to give you the extra piece after we achieve such works, not only about Techno but also about our projects. With this, I have just covered most of my part of the presentation. Ankit, would you like to add something?
Ankit Saraiya
executiveNo, I think we’ll go ahead and move into the question-and-answer part. If anything needs clarifying, we’ll handle it then.
Operator
operator<<operator_script>> Our first question comes from Sandeep Tulsiyan, who is calling in from JM Financial.
Sandeep Tulsiyan
analystSir, my first question concerns those order inflow figures you gave—INR 500 crore for the current quarter. Could you provide a bit more detail on which of the larger orders you received during this period? Also, I believe I heard during the opening remarks that your expectation for order inflow this year sits at roughly INR 2,000 crores. I'd just like to confirm that figure.
Padam Gupta
executiveCertainly. During this quarter, Parkgate awarded us a highly prestigious order to build a GIS substation at Mohan Ganj in Lucknow City, valued at INR 200 crores. KSEB also gave us an order to set up 2 220 kv GIS stations in the state of Kerala. From Sterlite Power, we received an order for a soft project, one which has been KSEB, worth roughly INR 75 crores. In addition, RDC and PDC have released further orders to us worth about INR 200 crores through augmenting PMDB works. So in total, if you add it all up, that comes to around INR 490 crores.
Sandeep Tulsiyan
analystUnderstood. So what was the value of that KSEB order? Sorry?
Padam Gupta
executiveWhich one?
Sandeep Tulsiyan
analystThat 220 kV GIS station belonging to KSEB that you brought up?
Padam Gupta
executiveThat comes to INR 83.6 crores.
Sandeep Tulsiyan
analystUnderstood. All right. And sir, regarding the estimated annual order inflow figure — is it INR 1,500 crore or INR 2,000 crores? I just got mixed up.
Padam Gupta
executiveINR 2,000, sir. We're already lining up upwards of INR 2,000 crores in FGD orders, and as I've mentioned, that's going to be the biggest stream of orders coming through. Finalization is taking somewhat longer with DVC, the State of West Bengal, and the State of Rajasthan — all places where we're heavily engaged — and in every one of these tenders we stand as L1. My strong hope is that by January next these orders will be in hand.
Sandeep Tulsiyan
analystOkay. Sir, could you give us a bit more detail on the FGD orders — where do they stand right now when it comes to pricing per megawatt? And as you said, DVC, WB and Rajasthan are the main states, so nothing is coming in yet from the private sector.
Padam Gupta
executiveWhen it comes to the private side — they do receive offers from us, and enquiries from us; we don't list that until the orders come in, but the process still gets followed. You have greater confidence in that process, so we're able to talk about it. But private players have also picked up a number of offers from us. And we are serious about working with one or 2 of them. Still, I won't commit — it could happen now, or it could take time. At the same time, sir, we're facing 2 impacts. The first is smaller capacity projects: the bulk megawatt cost goes up proportionately. So there isn't a single set of costs. The cost per megawatt valued at, say, a 660 megawatts set differs from a 500 megawatts set, and it will vary because of <<inaudible>> as well. So that's number one. Number two, the commodity cycle has definitely had an effect on cost per megawatt too, but most of these centers do carry a PV clause, which we generally don't quantify. That PVA cycle, where it is sufficient, gets utilized. In the new tenders, though, there is obviously an impact of almost about 20% because of commodity price hikes such as steel, copper and many other related industrial materials.
Padam Gupta
executiveIf you want my takeaway, with configuration and cost roughly flat at this point—earlier we would have said cost per megawatt sits at around 55 to 70 megawatts—it has certainly risen now to 75 to 90 megawatts.
Sandeep Tulsiyan
analystAll right, understood. And before I rejoin the queue, I have one final question from my end — it concerns the update on those ICDs that you had been anticipating. Is there any status update on it, and when exactly will it be released?
Padam Gupta
executiveYes, there's been a substantial improvement. The pipeline is secured, we've received all the funds — that's first. Beyond that, the DHFL money has also arrived, which is another positive. And with the remaining items still in the pipeline, we're highly confident that these matters will be resolved by the end of the year.
Sandeep Tulsiyan
analystAnd what would the balance figure be, sir, if you're able to share how much has come in versus how much is going out?
Padam Gupta
executiveIf you ask me, the balance right now is no more than INR 100 crores.
Operator
operatorOur following question comes from Deepesh Agarwal, who is on the line from UTI Asset Management.
Deepesh Agarwal
analystI'll start with my first question. Back in October, NHAI ran a tender for a solar project, and you took part in it. So what's the thinking behind that? Is the plan to put your cash to work and hold the solar assets yourselves, or are you viewing solar as an EPC opportunity?
Padam Gupta
executiveLook, first off, right now we're not involved in any of the projects, nor are we taking part in one — that's point one. What we're doing is simply looking to buy solar power for our data centers, or to evacuate — meaning to build a transmission link to evacuate solar power that companies such as Adani Power or other companies in the renewable power space are setting up; I'd put it that we're going to be a renewable power generator in this market at the moment. If we do get it down 3 points, that would be best for our uncap issues, but it's definitely not safe for the grid or for our utilities. Our experience in the past has been very bad.
Deepesh Agarwal
analystGot it, got it. Then, regarding the wind assets, how much is still owed to us in receivables at this point? And when do you expect those to be monetized?
Padam Gupta
executiveSo, look — right now we've received roughly INR 120 crores from PFC REC under the <<inaudible>> scheme, that INR 1.2 trillion program the Government of India announced <<inaudible>>. That means current outstanding balances, again as of today, come to around INR 100 crores. On top of that, there's about INR 50 crores from liquidating our RDC certificate, which had been on hold because of the July trading ban; that's now been resolved in our favor, since the CRC order setting floor drive zero stats aside at the old floor price of <<inaudible>> takes effect this month — starting 24th of November, with the first trade taking place <<inaudible>>.
Deepesh Agarwal
analystWhen do you think that INR 100 crores still owed by the customer will actually come in?
Padam Gupta
executiveThat's the million-dollar question, sir. Financially, all of these are challenged. I'm sure, so to speak — <<inaudible>> tariff — every RDC ought to come forward. Yet with the government change in Tamil Nadu, we're also hearing they'd want it cleared ahead of March '22. In our view, it's hurting as well. That government <<inaudible>> terminated, and we paid on time.
Deepesh Agarwal
analystGot it. Got it. And third, where do things stand with the strategic partnership for data center?
Padam Gupta
executiveThat's all still being discussed. Ankit, would you like to give an update?
Ankit Saraiya
executiveYeah, we're currently in talks with several data center operators headquartered in Singapore and the U.S. Those conversations are still going on. They're becoming more in-depth. And we're hopeful that by March '22 we'll have some kind of strategic tie-up in place.
Deepesh Agarwal
analystAlright. Alright. And finally, if I could fit in one more. Regarding smart meters — on the smart meter front, there's considerable CapEx that's likely to take place. So how far away would we be from witnessing a sizable order ring occurring out there?
Padam Gupta
executiveLook, we’re going to be very selective and choosy here, and between you and me, at any given point we wouldn’t want to commit more than INR 500 crores to this additional segment. Right now, for example, we’re doing 2 lakh meters, and that’s purely an EPC contract. For the next 6 lakh meters, 40% of the component will come from the supplier side, and that should be paid over 5 years. So what we’re looking at is top-line contribution from this segment of roughly INR 200 crore to INR 250 crore a year, with financial exposure capped at no more than INR 500 crores.
Operator
operatorOur following question comes from <<inaudible>>, who is an individual investor. Since Mr. <<inaudible>>'s line isn't responding, we'll proceed to the next question, coming from Sandeep Tulsiyan of JM Financial.
Sandeep Tulsiyan
analystI just wanted to get one thing clear regarding the INR 48 crores in wind segment revenues for the quarter. Did we factor in any one-time receipts there, or is that purely the wind power generation revenue we've booked?
Padam Gupta
executiveThe balance sheet is always driven by revenue rather than by collections. That said, during this quarter we did also collect roughly INR 62 crores from REC PFC, though that is clearly tied to revenue booking APAC RDS generation.
Sandeep Tulsiyan
analystIf you work backwards from the numbers, in the second quarter we historically haven't reported a PLF that high. That's why I wanted to ask about it.
Padam Gupta
executiveThe second quarter is the — the rich season is always the second quarter on a year-over-year basis, if you look at it. And this year as well, it's been a robust year because of the cyclonic weather and a lot of depressions along the East Coast. So we have benefited from that. And we — just this year, we will be generating power as good as 13, 14 — around 250 million. As of today, we have already generated 210 million, sir. It is almost about 7%, 8% higher than last year's, you can say, in mid-terms.
Sandeep Tulsiyan
analystThe second part concerned the EPC segment. Sir, raw material prices have risen, as we see it. From a margin standpoint, how should we view this? I know our guidance has consistently been in that 16%, 17% range, yet over the last 2 years we have been delivering higher margins of 17% to 18%. So going forward, given this pressure from raw material costs, do we return to that 16%, 17% range, or do we still continue to deliver the current margins that we have been doing?
Padam Gupta
executiveSir, our guidance has consistently been 15%, and that will remain the case — though because of GST, the base line comes down, so honestly the percentage shifts a little. Put differently, broadly speaking, you can take it as 15%. And on this commodity price line, most of our contracts are protected by PV volumes within them. So generally they offset things — they don't give you a benefit, but they do offset you as a matter of course. Still, we have to keep watching across our LTE networks, since the government has now submitted 6 months on account of COVID. So every LTE network became really cost strained. As always, Techno is very hands-on operationally, and management had cost for maintenance. So we are able to hedge this at — you can safely take 15% as the overall market for the year.
Sandeep Tulsiyan
analystSo 15% before the GST benefit. Then after the benefit, should it be that same 18% that we've been doing? Right?
Padam Gupta
executiveNo. I’d put it this way: you’re taking 15% on <<inaudible>>, with GST subtracted since it isn’t part of a book. That was the case earlier, though it might not be going forward. So on the whole, we should pick up roughly 15% as an EBITDA, operating margin, however you want to put it.
Sandeep Tulsiyan
analystTurning to EBITDA, okay. And finally, sir, regarding order inflows for the year — where we're providing guidance, sir, that INR 2,000 crores — if you could roughly break that down, I mean smart meters, FGDs and the base T&D, how much are you factoring in? And have you included anything for the data center in this, or not?
Padam Gupta
executiveNo, data center orders aren't part of that, since that's our in-house business, first of all. When we say INR 2,000, we've been referring only to the utilities business, which mainly consists of INR 200 crores for smart meters, roughly INR 500 crores for transmission, and another INR 15 crore for GDP. That's the breakdown we hold between us. The data center business will come on top of that.
Sandeep Tulsiyan
analystAnd basically, what we're looking at is 2 out of 3 FGDS, so INR 1,200, INR 1,250 out of...
Padam Gupta
executiveAt this point it's 2 out of 5 — <<inaudible>> we ought to be at 2 out of 5. It isn't 3 out of 5.
Operator
operatorThe operator has now given the instructions.
Kamlesh Kotak
analystKamlesh here. Guptaji, I was hoping to get some clarity — you mentioned the bidding pipeline for projects under the joint venture route. Could you share a bit more on that? How does the pipeline look, and what sort of biddings are we seeing when it comes to newer projects?
Padam Gupta
executiveEssentially, this is TBCB taking part through a JV route. However, with the amendment that came in just a week ago, we now qualify on our own. Since construction experience in these systems has also been made eligible. If you have completed INR 500 crores of construction over the last 5 years, then you too are eligible to bid in these practices. But just so you know, the market is extremely competitive; it's basically like solar is a <<inaudible>>, where I personally doubt Techno will win. They are going to -- add significant competition unless it's a very strategically located pocket where others may not have interest, like we did Kohima, Northeast package, which we are now handing over to CRP in a month's time. So those kinds of strategies are coming up now on the balance sheet side as well as for the main renewable evacuation packages. So we have good performance in that Sterlite or Adani, we have EPC because now they need a project to be done in 15 months as against 2 years or 3 years earlier, which is the industry norm. So all put together, I will say that we will be able to -- rather we may or may not, we need a bid.
Padam Gupta
executiveBut we will certainly secure EPC business from whichever developer comes out on top in that bid. For them at EPC, we will without a doubt stay a preferred supplier.
Kamlesh Kotak
analystBut are we also considering putting our own capital to work and bidding on a project of our own, sir?
Padam Gupta
executiveYes, we'll be taking a chance, as I've mentioned at various points, and we believe this will be a tough pocket where others might not go. So those sorts of opportunities keep coming along — one or 2 in 10. If there are 10 bids, there are always 1 or 2 bids we can opt for. Like with Sterlite, we achieved a breakthrough at Nangalbibra in Assam, which crosses the Brahmaputra — though I'm only doing it, Satellite will be handling that crossing. So we do provide support at the time of bidding itself so that they succeed, and it becomes a back-to-back comfort watch. Like we were a back-to-back partner of Power Grid when it came <<inaudible>> and we succeeded with that. We've already completed Nagpur Sambal for that. So it became a very mirror-image project in the state on an ongoing basis. So those kinds of relationships of Techno are very strong in the market, and we adjusted for our time and had quality performance.
Operator
operatorWe’ll now take the next question from Bhavin Vithlani, who is on the line from SBI Mutual Fund.
Bhavin Vithlani
analystSir, I just want to get a clearer picture of the Kohima project — you said you're selling it to CLP. So at this point, what milestones are still outstanding?
Padam Gupta
executiveIf you're not asking me anything specific, that's fine—but the big one is that we need to get that officially <<inaudible>>.
Bhavin Vithlani
analystSir, excuse my lack of knowledge here. So if you could help us out, what does 281 mean?
Padam Gupta
executiveGenerally speaking, there's a procedural rule: whenever you remove a fixed asset from your books, you have to get a consent audit from the income tax department.
Bhavin Vithlani
analystThe Central Government — the Union Government — has now given its approval.
Padam Gupta
executiveEverything has been secured. All of it has been secured. The lenders' approval has now also come through. So we're hopeful of closing this month, or at the latest in December.
Bhavin Vithlani
analystGot it. On your second question, you pointed out that transmission TBCB has gotten very competitive. Now, when developers secure a project at tariffs that competitive, they typically attempt to shift the pressure downstream to the next link in the value chain — EPC or equipment. So if you could just speak to the margins, or the profitability, on the EPC side: can these developers pass it on, and can companies like yours hold on to their profitability?
Padam Gupta
executiveSure. For any EPC company, I've always viewed profitability as a highly dynamic journey. It ties back to sourcing quality, engineering that's optimal, execution within set timelines, managing wastage, and managing productivity, you see. Markets are competitive, no question, and everything has flattened out. Developers, equipment suppliers, EPC — none of them get special margins anymore; they all sit on the same line. Even so, experience is a help. Your maturity in business is a help. You earn somewhat more than the competitor. That's what experience is really about. If I'm unable to earn 5% more than my competitor, that's my big challenge in adding <<inaudible>>. Can I qualify myself as an experienced company over others?
Bhavin Vithlani
analystGot it, and thanks. One final question along those same lines, since a few of the transformer manufacturers did point to longer lead times resulting from demand conditions surging — where previously a transformer might have been supplied within a 3 to 4-month window, today the lead time has stretched to as much as 14, 15 months, and the value chain underneath has grown really tight. As a result, we're discussing improved profitability. So where the value chain and the equipment side are concerned, what are we seeing at present? And following the quasi-ban imposed on the Chinese regarding the border areas and neighboring areas, are we observing tightness in EPC or in the equipment chain that could have some effect on our profitability?
Padam Gupta
executiveNo, not at all — that's the short answer, first of all. The reason is that we now have enough capacity in India, which we've built up over the last 5 years for GIS site work and reshaped across roughly the past one decade in this country, more or less. At present we hold capacity for close to 500,000 annually, by and large. What the transformer folks are warning you about is simply another way of saying the same thing — that all of us are growing more careful about IDC cost when these packages are being set up. Our aim is to get equipment to site that can be put to work right away once it's on the seat at site. Take a transformer: it's one big-value shipment, and earlier, as we showed, the top line used to bring it at least 6 to 9 months ahead of requirement. These days we bring it just one month ahead of requirement, since it's the final piece of equipment at site to be integrated into the value chain. That's how everyone is rearranging their finance, cash flows, cost of finance, and the productivity gains tied to it. Once all the rest is ready — your control room is ready, ablations are ready, all enabling works are ready — you bring the transformers, set them on the foundation, and have them ready for charging within 2 months.
Padam Gupta
executiveWhen you have to audit date one, as we did previously. You see, so many things get innovated—I wouldn't call it some sort of compulsion around you. It's a natural process of improvement. Take automobile: they have only family shops. Every supplier—warehousing is handled by the supplier itself. Each week, he receives the component in his <<inaudible>>. He doesn't hold more—any inventory in auto shops. So in the same way, we too are learning and innovating how to rearrange our supply sequence, the readiness of the seat of supply in the field, related works in the field, an optimized way of creating facilities in that field. So let me keep on challenging growth in any business. As you mainly felt, we will survive, sir.
Operator
operatorAmber Singhania from Nippon India Asset Management has the next question.
Amber Singhania
analystSir, only two items. Nearly everything has been covered already. Just a couple of small points. Could you give us some color on the total CapEx needed for the data center on an annual basis — FY '22, '23 and '24 — and would that cover only Chennai, or are other locations also going to be counted in that?
Padam Gupta
executiveAnkit, do you want to handle this one?
Ankit Saraiya
executiveSure, absolutely. The overall capital expenditure needed for the Chennai data center comes to roughly INR 1,000 crores. And I think it's fair to assume that by the time we commission it in March '23, the CapEx will be around INR 500 crores. After that, it probably splits into something like INR 200 crore to INR 225 crore annually over the following 2 to 3 years.
Amber Singhania
analystOkay. And of this INR 500 crores, most of it is going into FY '23 only, correct?
Ankit Saraiya
executiveYes. And the rest of that INR 500 crores is going to be split across the following...
Padam Gupta
executiveThe period in question runs from '20 through '23 — not through '23 — and it wraps up in March '23.
Amber Singhania
analystAnd Ankit, do you have any color on that other site we were planning — will that also be headed toward construction starting in FY '23, or before that?
Ankit Saraiya
executiveWe're optimistic about getting one more site underway by December '22. It hinges on the state government allocating land, and we're waiting for a favorable allotment from them in the coming quarter. Then, as soon as that allotment is settled, we hope to have another data center starting construction by December '22, or possibly the first quarter of calendar '23.
Amber Singhania
analystI just want to clarify one thing about the current order book of roughly INR 2,000 crore. The second FGD order from DVC isn't part of that, correct?
Padam Gupta
executiveNo, that's not the case at all.
Operator
operatorOur following question comes from an individual investor, <<inaudible>>.
Speaker
unknownI have 2 questions. The first concerns the investment policy we follow as a company, since in the current annual report I can clearly see that we have put money into shares, and beyond that we have put money into those top 2 companies such as <<inaudible>>. To me it appears we are taking on a bit of risk in that area. So my first question is about the investment quality of power? And -- yes, that's the first question, if you could answer it, and then I'll ask the next one.
Padam Gupta
executiveAs you can see, we've been through an enormous learning curve, as I mentioned to you, and so has the company. In the past, it used some ICD in certain areas, along with some debt funding. During the post-trial efforts, we also went through a learning curve. Right now, our policy is quite straightforward. We put our money only into business, or we keep it in mutual funds, or at most we'll use it for buybacks or dividends to shareholders. So you can see that whatever money we recovered from ICD and debt funds is now part of cash. That's how our cash has risen to INR 850 crores at present, compared with below INR 500 crore a year ago. And we will be coming out shortly with the buyback option — that's what we're waiting for, perhaps in the last quarter of this year, if you like part of this batch.
Speaker
unknownCould I also just check whether the funds from Talwalkar have come in yet, since my understanding is that payment was due last year, in 2020?
Padam Gupta
executiveYes, definitely.
Speaker
unknownSo the funds are in our hands?
Padam Gupta
executiveWe received a portion — 40%, not the entire amount. Of that, we were able to obtain 40% from the promoters.
Speaker
unknownBut at this point we aren't writing it off, are we?
Padam Gupta
executiveNo, no, no. That's still sitting in HCLT, and we'll handle it whatever way things turn out. Within the whole corporation, it's a really minor figure. So it isn't something that should set off alarms.
Speaker
unknownSir, my next question relates to the data centers. The first one we're discussing is located in Chennai, and after that comes Hyderabad, then Mumbai. Do we already own the land for these data centers, or do we intend to acquire it?
Padam Gupta
executiveIn Chennai, we've already got that in place. The master plan is finished, and construction begins this month; our target is to have it ready by December '22, with commissioning no later than March '23. That's the first one. For Calcutta, we've already — you could say — allotted it, though registration still has to happen. It's also going through capital approval. Likewise in Hyderabad, we're in talks with the government — both the state government and the wealth fund — about acquiring land in their industrial estate at Chandanwadi. So all of this will be done by March '22. And in both of those additional pockets, we hope to begin construction in the second half of '23-'23.
Speaker
unknownAnd have we tied up with any companies, or will we be looking for clients once we have the plan in execution?
Padam Gupta
executiveAs I’ll continue to emphasize to you, we are in serious discussions with big data center operators—ones that typically look after clients and users, that put money in, and that run the facilities as well. Our part will be solely to keep the infrastructure up and to serve as the power provider.
Speaker
unknownWhat IRR are we looking at from those businesses?
Padam Gupta
executiveSure, Ankit — go ahead and take that question.
Ankit Saraiya
executiveYes, that’s what I’m saying — you could be looking at an IRR of around 23%.
Operator
operatorThe next question comes from Venkat Subramaniam Raman at Organic Capital.
Analyst
analystRoughly about a year back — actually a couple of times — I said that this financial year and the one after would likely rank among our strongest. The pandemic ought to have delayed that by a certain amount. With close to INR 2,000-odd crores in orders arriving over the coming 6 months, do we have the capacity to roll out fairly large-scale execution across the next couple of years? And — yes, I have a couple of further questions. I'll probably come in after you handle this first one.
Padam Gupta
executiveAs I've mentioned before, Techno has consistently demonstrated the ability to carry out projects involving at least 25 to 30 pockets. What's shifting now is the policy landscape, and that's why our pocket output is increasing. It isn't that the number of pockets is going up. At this point it's a highly concentrated, focused business. And by and large, every pocket will be INR 250 crore-plus. So by '25 we have the capacity to deliver these projects to INR 2,000 crore, as we've talked about in execution. But when it comes to order booking as well, generally in FTD you need at least 30 months to deliver a project, since these are electromechanical solutions based on chemical processes. So there are a number of facilities that have to be executed — cement, structural, mechanical, and electrical instrumentation. So it's essentially a process plant. Capacity therefore won't be a problem, and we'll be able to bolster whatever is needed within the process and the timeline.
Analyst
analystCould you tell us what that is, Guptaji? What sort of EPC billings might one actually expect over the next year or 2?
Padam Gupta
executiveAs I mentioned to you, this has been a year of stabilization, and between you and me, for vision alone we are clearly targeting billing of INR 1,000 crore to INR 1,100 crore. Of that, INR 400 crores has been achieved so far. So across the next 2 quarters, we should manage at least about INR 700 crores. For this quarter, INR 350 crores is assured.
Analyst
analystLooking ahead, Guptaji, was that for the single year '22-'23?
Padam Gupta
executiveYeah, so for '22-'23, we'll have the order book in hand, and obviously that turns into rolling out the execution. In '22-'23, we should be aiming for no less than INR 1,300 crores, and then growing at least 25% in '23-'24, which would put us at INR 1,750 by that point.
Analyst
analystMy next question concerns the Electricity Act. That has been in progress for a good while now. In qualitative terms, what can change — in what ways could things shift? And Techno, as we all know, sits in an extremely strong position. What sorts of opportunities could it develop? It likely could even assist us in deploying some of the chairs we're seated on. Would you mind giving us a broad picture?
Padam Gupta
executiveOf course. This Act, along with how it gets implemented, has forever posed difficulties in our nation when it comes to confrontation. The Act itself is quite promising, I would say. When a government reaches toward something that looks like this, it comes across as very reassuring or aspirational. The trouble, though, lies in how long implementation takes. I would much prefer reforms that are simpler and tied more to the market — in telecom, or at airports or ports <<inaudible>>. Hopefully this one, again, looks like a somewhat guarded set of reforms, which ought to deliver a certain amount of political stability while still making the sectors financially healthier and more stable. So let's watch how it — once legislation happens and how the rollout goes. One thing I definitely see, though: no matter who — no matter what — the lower private sector will certainly expand within the private sector. The format content, right now, I am unable to translate. But certainly, as in — you can see today, most schemes run on a 60-40 basis, meaning 60% comes from government funding and 40% from the EPC. So with plenty of escrow accounts and guarantees provided by government, all of that is already in place, and it will definitely produce a bankable model. Still, I wish they had left this sector more to market forces and market reforms.
Padam Gupta
executiveThe consumer would have been served better.
Analyst
analystOn the data center side, Ankit mentioned that discussions are underway. Ankit, when do you expect we'll be able to announce something—whether about a client or about the funding structure, and so on?
Ankit Saraiya
executiveSorry, could you repeat that?
Analyst
analystAnkit, you mentioned that talks are ongoing regarding the Chennai data center. When do you expect to be able to share some announcements—whether about the funding structure, investor participation, or that potential client?
Ankit Saraiya
executiveMy hope is that we will have at least one strategic partner brought on board by March '22.
Analyst
analystThat is the point at which the remaining 2 announcements are able to take place — namely, A, the funding pattern, their participation, and the client as well?
Ankit Saraiya
executiveRight. I mean, once we have a strategic partner on board, we'll gain a lot of clarity around the funding — around the equity involvement from both partners. And client acquisition will be the strategic partner's responsibility, since that's the capability he brings to the table.
Padam Gupta
executiveBut I have to add one thing here, Venkat. Regardless of when the partners crystalizes, we're not stopping. We've brought on the best consultants. Ankit, could you explain what the arrangements are and how you're carrying out this project, independent of the partners?
Ankit Saraiya
executiveNo, absolutely. Since partnership isn’t all that critical for us at this point. It would truly be a pleasure to have them onboard, certainly when it comes to client acquisition. Still, relying on our own capabilities, we’re quite confident that we can deliver the data center. And at the appropriate time, we will bring in customers. As of now, we have the finest consultants working with us—whether on the design consultancy front, we have a design consultant based in New York. We have a peer review consultant from Hong Kong. We have a project management consultant from the U.S. We have business consultants, once again, a U.S.-based firm. So the best people are associated with us. We have our independent data center division team. And we’re confident that we can deliver the project regardless of whether a partner joins or not. To be transparent here, we already hold a term sheet with one of the partners. It is us who have been postponing any further deepening of the relationship with them because we believe that, somewhere, as we get deeper into the relationship, our confidence in delivering the data center on our own is increasing as well. So we want to explore more.
Ankit Saraiya
executiveWe’d like to watch how matters evolve from here and then, hopefully, by March, have a stronger strategic partner in place.
Operator
operatorLadies and gentlemen, since that wrapped up the final question for today, I'll now turn the conference over to Mr. Kamlesh Kotak for his closing remarks.
Kamlesh Kotak
analystThanks, Pooja. On behalf of Asian Markets, we appreciate everyone taking the time to join this call. We're especially grateful to Mr. Guptaji and Ankit for sharing their insights into the company's business and financial performance. Guptaji, would you like to offer any closing remarks, sir?
Padam Gupta
executiveThank you very much, Kamlesh. I want to express my gratitude to every one of you, and to all of you, for being on this call and helping make it such a tremendous success. Once more, should you have any question regarding how we performed, or about the industry, or the business we operate, or if you happen to be located on this side of India, please feel free to send us an email, or visit our office, or whatever you prefer — you are welcome. We would treat you as an honored guest, and your company will keep delivering superior results as it always has, just as in the past. With that, I thank you once more, and I would like to bring the conference to a close, thank everyone for participating, and wish you a very happy festive season and one that has recently passed. So, many thanks to all of you.
Kamlesh Kotak
analystThanks very much, sir.
Operator
operatorThank you. That brings this conference to a close on behalf of Asian Market Securities. We appreciate your participation, and at this point you're welcome to disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Techno Electric & Engineering Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Techno Electric & Engineering Company Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Techno Electric & Engineering Company Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.