operatorGood day, ladies and gentlemen, and welcome to the Q4 FY '22 Earnings Conference Call for Techno Electric & Engineering Limited, brought to you by Asian Market Securities Limited. On this call, there may be forward-looking statements regarding the company, and those are based on what the company believes, its opinions and expectations as of the date of this call. Such statements do not guarantee future performance and carry risks and uncertainties that are hard to predict. Actual results could differ from those expectations, projections, et cetera, whether expressed or implied. We ask participants to exercise caution when referring to such statements and remarks. <<operator_script>> Kindly note that this conference is being recorded. I now hand the conference over to Mr. Kamlesh Kotak from Asian Market Securities. Thank you, and over to you, sir.
Kamlesh Kotak
analystThank you, Steven. Good afternoon, everybody. Asian Markets welcomes all of you, on our behalf, to the 4Q and FY '22 earnings conference call for Techno Electrical & Engineering Company Limited. Joining us today is Mr. P.P. Guptaji, our Managing Director, along with the senior management team representing the company. I'd ask Guptaji to walk us through an overview of the quarterly and yearly results for the financial year FY '21-'22, after which we will start the Q&A session. Over to you, Guptaji. Thank you. Hello?
Operator
operatorMr. Gupta, would you be so kind as to go ahead? Mr. Gupta, the floor is yours, sir.
Padam Gupta
executiveGood afternoon, everyone, and thank you for joining us to go over the financial results for the fourth quarter, Q4, which closed on 31st March, along with our results for the full year ended March '22. Any remarks made during this call that express our view of the future, or that might be taken as forward-looking, need to be considered alongside the projections that this industry confronts and that therefore apply to the company as well. Let me move quickly through how we performed in Q4 of financial year '22. Total revenue came in at INR 307.5 crores, a rise of 43% year-on-year. EPC revenue was INR 304 crores, versus INR 212 crores a year earlier, which is 43.32% higher year-on-year. The EPC division's EBITDA margin was 13.13%, against 15.12% in the prior year. Revenue from the wind segment reached INR 3.5 crores. Company EBITDA was INR 29.20 crores, compared with INR 18.96 crore during the equivalent period a year ago. For the quarter, operating profit in the EPC segment totaled INR 39.58 crores, versus INR 31.72 crores last year. We did see some strain on EBITDA margins, driven by building inflation, a high quantity rating cycle, and elevated overseas rates as well.
Padam Gupta
executiveOther income stands at INR 3.08 crores. Profit before tax came in at INR 31 crores — close to another INR 15 crores for the last quarter. PAT for the quarter is INR 37.2 crores versus INR 30 crores a year ago, which works out to roughly a 200% increase. EPS is 3.39%. Looking at the full year, EPC revenue is INR 1,074 crores against INR 889 crores, a rise of 20% -- 21%. EPC revenue comes to about INR 990 crores versus INR 790 crores, up 25%. EBITDA margin is 15.58% against 18% last year. This segment's revenue is INR 85.63 crores versus INR 64.15 crores last year. However, after adjusting for the one-time revenue of INR 36 crores stemming from the tariff order, turnover in the book was approximately INR 100 crores. Company EBITDA stood at INR 222 crores, up 3%. As mentioned earlier, this is also affected by the one-time segment income of INR 35 crores. Operating profit for the EPC segment is INR 153.5 crores versus INR 143 crores last year, up 7%.
Padam Gupta
executiveFor the wind segment, EBITDA comes in at INR 68.96 crores. Other income is INR 150 crores, versus INR 84 crores a year earlier, and that figure includes a gain of INR 110 crores from selling the JV company. In the same way, last year's other income also contained a profit of INR 45 crores from the sale of a transmission asset in Haryana. Profit before tax reached INR 326 crores against INR 250 crores a year ago, a rise of 30%. Profit after tax comes to INR 260 crores, compared with INR 200 crores last year, also up 30%. EPS is roughly 23.7%. Current investment value, including cash and cash equivalents, is around INR 1,200 crores — more than INR 100 per share. So far this year, through March '22, we have booked orders amounting to INR 800 crores. We stood L1 on 2 FGD orders valued at INR 1,600 crores, plus transmission orders worth INR 445 crores, which are confirmed orders at this point. The indicated order book as of 31st March 2022 is INR 1,500 crores. That gives us visibility, as of today, into an order book exceeding INR 3,500 crores.
Padam Gupta
executiveWe've moved further into L1 within the business, to the tune of roughly INR 1,000 crores. For the first time in nearly 5 years, we've managed to reach an order backlog of approximately INR 4,000 crores. That should support doubling the top line over the next 3 years and beyond. As we committed last quarter, we've been able to navigate the tough period — and I'd say we've delivered growth this year. So I'd characterize this as largely a recovery year, and looking ahead to '22-'23, we see it as a year of stabilization combined with growth, though the bigger growth should come in the second half of the coming year. We anticipate substantial business growth in the FGD segment, the AMI segment, and in data sectors. Over the coming years, we foresee strong power sector reforms, with power as energy coverage. On top of that, there's considerable emphasis and pressure around efficiency, stability, reliability, power supply, the cost of power, and improving the financial position of the DISCOMs — though at present that remains a challenge. Attention will stay on variable power as well as on delayed transmission infrastructure and energy storage infrastructure. Renewable power transmission infrastructure needs to reach 500 gigawatt, as our Honorable CM committed at the last co convention, plus 25 to 30 gigawatt of energy storage solutions at grid level RB, which is meant to be developed over the next 5 years.
Padam Gupta
executiveThe FGD segment remains robust and sharply focused, both this year and going forward, since the Government of India has issued a modification covering all coal-fired thermal power stations: those exceeding 200 gigawatts must curb their sulfur emissions, with SOx and NOx both notified by the pollution department as of December '24. We hold considerable providence with CPSUs, and we're now seeing additional progress on the SCB side as well. And over the coming years, we certainly anticipate more business from SCBs, CPSUs, and the private sector. We recently booked 2 orders valued at INR 1,600 crores, which were L1 last year. And we have, once again, secured an order with AVC of INR 700 crores, which turned out better after the first — roughly last year. This volume of business should persist for the next 3 to 40 years — 3 to 4 years, since the gigawatt figure is still being sorted out — on the DotVision digital segment, we observe a status quo on the transmission side, as that sector is being mainly lifted toward power evacuation. The TBCB bidding for 66 gigawatts is underway, and of that, roughly the 175 gigawatts is in progress. We're pleased to report that we have already taken 2 orders within the last month or 2 from Adani for whatever concessions they secured at Khavda as well as at Karur.
Padam Gupta
executiveAdditionally, we intend to submit bids for TBCB packages amounting to as much as INR 1,500 crores through partnerships. In this year's union budget, the allocation aimed at bolstering the power system was increased twofold, reaching INR 29.8 million. We're observing solid interest from major investors, <<inaudible>> to take part in roughly its <<inaudible>> and joint venture. This is going to boost our excess capital and, as a result, will likewise let us stay competitive. Steady progress is being made in the PMDP programs and the metering AMI segment. A great deal more interest is going to be seen in this segment over the years ahead. The government's primary objective is to boost efficiency and sustain losses, which would allow the health of these costs to be improved. Our goal is to operate and remain occupied in this segment in more than just a supporting role, since at present we are roughly in the position of working with these comps as counterparty, which is experience we hold directly as a telco. We have been a leader in the media and firmly hold the view that the amendment to the electricity ad, <<inaudible>> and elimination of gross subsidiary et cetera are in the pipeline, and they could come about soon. It is our belief that this sector sits at a critical juncture, as surely every sector might be in crisis, and good things begin to happen.
Padam Gupta
executiveWe should therefore be looking for some favorable developments on this front as well. Our payback has come through up to June '22, and we've additionally been granted relief by a Madras Highcourt order allowing us to claim our interest dues — every outstanding interest due — by the close of June '22, and we're hopeful these payments will now come in. On the data center side, I'd note that COVID, as has already been said, has touched our lives across many dimensions, yet one silver lining has been expansion in the digital arena. With that digital growth supported by IT policies and full data privatization, the expectation is that the third-party data segment of the industry will likely reach roughly 5 gigawatt by 2030 and 2 megawatt within 3 years, up from the present 500 megawatt of distribution. To date, the majority of data centers sit in Mumbai and Chennai. We too are in Chennai, quite near Airtel, Adani, Equinox, and Sify, all of which are already working on building data centers in close proximity to ours at Siruseri. That essentially confirms the value of our location choice in the first quarter. Our Techno — we are at a sophisticated phase of developing these data centers of 40-gigawatt — 40 megawatts of big load at 24 to 25 megawatt of IT Load, together with the ultra-scalable hyper density, and construction activity has already begun on site.
Padam Gupta
executiveEvery statutory claimant for the project has now been received. We hope to have the first phase ready by June '23. We'll also consume energy captively for this data center, so that it's a strong data center aligned with the policy of major hyperscale customers, given their ESG commitments. With CapEx of INR 1,200 crores to INR 40 crores per megawatt of IT load, 65% is almost within the domain of Techno Electric, which is largely electromechanical works, energy source works, state by solutions, which is the in-house capability of the company, as we believe this could be used as experts. We have further been favored by the allocation of land investment at Kolkata, in a place called Silicon Valley, alongside TCS and Reliance, to set up a data center. We'd also like to have 250 megawatt capacity by 2030, as already committed. With that, I'll say I now open the forum for any further details or clarifications — you're welcome.
Operator
operator<<operator_script>> Our first question comes from Sandeep Tulsiyan at JM Financial.
Sandeep Tulsiyan
analystSir, my first question concerns order inflows, and I'd appreciate a bit more detail if you could. Our order inflows came to roughly INR 500 crores during the first 9 months, and our order book has fallen year-on-year from INR 1,950 crores down to INR 1,500 crores. We can't square that with this INR 800 crore order inflow figure. So is it the case that this INR 800 crore takes in some L1 orders you've referred to?
Padam Gupta
executiveNo, no, no. By now, as of 31st March '22, all of these are orders that have been received in hand. And after that, we've received additional orders amounting to INR 2,045 crores over the last 2 months. So the year's opening order position stood at INR 1,600 crores. We brought in new business valued at INR 800 crores and carried out roughly INR 1,000 crores. And the closing figure as of the end of March is almost INR 1,400 crores.
Sandeep Tulsiyan
analystIs it INR 1,400 crores, or would that be INR 1,500 crores, sir?
Padam Gupta
executiveWhether you look at INR 1,400 crores or INR 1,500 crores, take INR 1,400 crores, INR 1,500, or something in the middle — INR 1,450 crores to INR 1,500 crores. After that, though, we've picked up additional business valued at more than INR 2,000 crores. That puts our total order backlog as of today at INR 3,500 crores.
Sandeep Tulsiyan
analystGot it. Sir, to dig a bit deeper on that from a pipeline standpoint — let's say we've booked INR 2,500 crores of orders on top of the INR 800 crores we've bid. So looking ahead, how should we think about the additional orders sitting in the pipeline that could be booked over the remainder of FY '23 and '24? And if you could shed more light on what the split should look like across T&D, FGD and smart metering, some broad guidance along those lines would be helpful, please.
Padam Gupta
executiveAs I've already mentioned at the border, I made a statement that transmission status will keep going, and this will keep contributing roughly INR 600 crores to our top line annually. Another INR 300 crores to INR 400 crores, we should see from our AMI and PMDP — that's the system strengthening solutions — year-on-year. And on top of that, we should see another INR 1,000 crores of top line from the GT segment now. So over the next 3 years, we definitely see our top line doubling, and our aim is to — should we say wish or play the mark — whatever 3 years we lost, I think we've lost them, and now we have to make up. So over the next 3 years, we see our top line definitely doubling. Order intake will keep being no less than INR 3,000 crores a year. And I just — by the time we close this year, the order backlog may be INR 4,000 crores, and next year it should be INR 5,000 crores plus. So the major growth in business will have to be in FGD. It will happen in data centers as well as on the metering side.
Sandeep Tulsiyan
analystRight, got it. Now for my second question, which concerns the data center side. Earlier we pointed out that CapEx will come to INR 1,200 crores for the data center, and on top of that there will be a standalone battery storage setup, which in all likelihood would call for some extra CapEx. So could you shed light on just how much more the company will be putting in toward these battery storage systems?
Padam Gupta
executiveLook, let's not mix things up. What's needed is a battery storage solution deployed inside the data center, and that's different from a grid backup solution. On top of that, there's transmission on a favorable route basis across the country. So where our data sector is concerned, CapEx won't go up, because it will mostly be replacing part of the UPS side and part of the captive power side, since this adds a power layer between those 2 to stabilize the power supply to the data management — the data load, basically. So we'd like to squeeze these in with no additional CapEx as well as the data center coming. The counter solutions are broader, and we have that we're hedged by a margin. That's what we — to get what it does, if affordability improves over time in the next 6 to 9 months, then maybe we can consider going even a little bigger versus those decisions, in addition. So we'll do some technology balancing as we go along. But I can assure you, it will be a data sector — a futuristic data sector for tomorrow — and technology that stays relevant 5 years from now.
Padam Gupta
executiveThat’s going to be a predicate data center.
Sandeep Tulsiyan
analystAlright, so how much CapEx are we looking to put into data centers during FY '23 and '24? And then, on the battery storage side separately — the grid backup battery storage — what's the business model going to be there? And what CapEx might we deploy in that area?
Padam Gupta
executiveBroadly speaking, on the data center front, we've already spent roughly INR 50 crores to date on land acquisition, the detected approvals, consultancy design, specialty approvals, and whatever construction has taken place so far. For '22-'23, our plan is to spend as much as INR 500 crores, and a further INR 500 crores during the year '23-'24. That could, however, be brought forward, depending on the industry and the occupancy levels at the data centers, and as far as grid backup is concerned, I'd say this business remains in the evolving stage, and where grid backup is concerned as well, but we foresee a great future ahead in this business. Right now, these grid large-scale solutions are still not very affordable, I'd say, compared with public solutions or hydro solutions or even gas-based power genetic solutions, for creating some kind of big load stabilization solutions. So at the moment we will wait and watch; over the next 1 year, we are not advertising any CapEx or grid to back the battery storage resolutions. Our focus will therefore be mostly on data centers. In '23-'24, we may have one more data sector under construction, in addition to the one already being built.
Padam Gupta
executiveThat means extra CapEx. In '23-'24, for the data center we already have running, CapEx comes to INR 500 crores plus — and if we launch a new data center, that could carry its own CapEx of another INR 300 crores, INR 400 crores, INR 250 crores to INR 300 crores.
Sandeep Tulsiyan
analystAlright, so how much is the equity commitment exactly? Because the way we understood it, the plan was likely to hold off until a partner is brought in, and only after that would this money start being deployed — since the equity commitment, which you mentioned on earlier calls, is going to be capped at INR 250 crores or INR 300 crores, somewhere in that ballpark?
Padam Gupta
executiveThat's exactly right. That's how it's going to work. We already have strong interest from the few ready entities around this partnership, and we're very hopeful we can crystallize it by September. If not, we'll have to fund it from our own resources, which will be up to INR 500 crores this year — comprising INR 250 crores of equity, with the balance through short-term loans that the partner will replace where they want.
Sandeep Tulsiyan
analystI see — and my final question concerns the cash balance and how the company allocates capital. You said earlier that INR 1,200 crores now represents the company's total free cash, and that it can produce at least INR 100 crores of other income annually. So how much of that cash do you intend to put into the existing business, which is mainly data centers? And how much will go to investors, whether through a dividend or a buyback?
Padam Gupta
executiveYou could split it up along these lines: INR 500 crores going to data centers, INR 500 crores for investors across the coming 2 to 3 years, and a further INR 200 crores toward the EPC business.
Operator
operatorOur next question comes from Rishab Garg at BP IBL.
Rishab Garg
analystSir, I'd like to get a sense of this — in FY '23, in the EPC division, what sort of top line should we be expecting?
Padam Gupta
executiveSetting aside the data center, EPC work, which that may perform. On the conventional side, you can expect about INR 1,300 crores, a growth of INR 300 crores over last year.
Analyst
analystAnd sir, you also said on the previous call that we'd be hearing something about the share buyback very soon. So is that still being considered?
Padam Gupta
executiveShare, was that what you said?
Analyst
analystSir, buyback of shares — the share repurchase.
Padam Gupta
executiveYou'll be hearing from us very soon, sir. I just told Mr. Tulsiyan a moment ago that INR 500 crores has been set aside for the investors. Most of that will be delivered through buyback alone. On a year-on-year basis, we plan to keep carrying out buybacks over the next 2, 3 years.
Analyst
analystOkay, sir. And sir, despite the fact that our EPC income rose last year from INR 790 crores to nearly INR 1,000 crores, sir, operating profit in this segment came in roughly flat, at about INR 152 crores against INR 145 crores the year prior. So looking ahead to FY '23, sir, might we see some margin improvement, or will margins stay under pressure?
Padam Gupta
executiveI'd expect you to achieve that. Even with the current inflation level, commodities and all-time highs, we're still beating the industry. Those factors are hitting our costs too. And of course, we're looking for some form of relief with our customers by passing part of the cost along to them, as PV or the reveal ending prices. So this remains an ongoing challenge between you and me; steel prices have already eased a bit after the government, a week ago, cut them by INR 10 a kg. We anticipate further softening. But as for global inflation slowing down, I don't believe that will happen going forward, at least not for another year. So this year, in my view, we shouldn't anticipate a very large EBITDA increase, which will likely be around 13% to 13.5% by and large, or perhaps 12.5% to 13.5%. I think we're in a position to pass more cost on to the customers.
Operator
operatorOur following question comes from Akhilesh Bhandari, who is calling in from ICICI Prudential AMC.
Akhilesh Bhandari
analystYou said that on the smart metering side, you're now focusing more on the EPC route instead of investing yourselves. So could you share some sense of what the tender pipeline looks like? Or what kinds of bids should we expect to see come out in this space?
Padam Gupta
executiveSo we're looking at roughly 15 million meters' worth of tenders coming up over the next 2 years in the EPC space, from Power Grid and REC. Broadly speaking, Power Grid will be putting out 8 million to 10 million, and RDC ought to start floating tenders itself for 8 million to 11 million through EPC routes. So out of that pipeline we'll be aiming to win at least 0.5 billion meter of work, since Power Grid is a customer we've had for a long time — well, not for us through processes. So we're hopeful we'll see more success. And should the government mandate that more CPSUs carry out metering work, that would be a really exciting opportunity for Techno.
Akhilesh Bhandari
analystAnd after that — since you're carrying out the JMK order, you've got all the required prequalifications in place, correct?
Padam Gupta
executiveDefinitely. We meet all the qualifications. Beyond that, because of our history in the power sector, every customer is ready to adopt whatever Techno means by QR. QR no longer poses a challenge in any part of the power business.
Akhilesh Bhandari
analystSir, one more question on the competition side, which is coming. Since there may be several companies that would want to partner with PowerGrid and REC on this metering piece, given that you won't really be dealing with the states directly and the payment risk will be lower — do you think you can hit your usual margin range of around 14%, 15% in this business?
Padam Gupta
executiveThat's the million-dollar question, so I'll give you a straight answer. It hinges on what the program's mix looks like — if metering is combined with certain power-strengthening solutions as a core part of the package, then the answer is yes. If it's metering alone, I'd say most of the non-metering players are already fully booked today, with states on the DT FOT model as things stand. That leaves room for us to engage with lesser-known retail manufacturers or solution providers in this arena, and that market ought to be open to us. We should have room to add value there. In the EPC space, you have to understand, margins don't really come from the pricing you bid. They come more from your efficiency and from avoiding wastage. Once we take the order, for us it turns into more of a loss-management exercise than a profit-management one. The smaller the loss you take, the bigger the profit at the end of the day. That's the way this business expands, and that's what we've done successfully across the past 20 years. So I'd say, why shouldn't we be able to look into metering as well?
Akhilesh Bhandari
analystAlright. And sir, just one final question regarding the FGD orders that you recently got. So those would be at today’s commodity price levels, correct? There won’t be anything where you’d have — a loss, that we would need to take for the price increase that has already occurred?
Padam Gupta
executiveYes, sir, you're absolutely right. The market, and most of our investors, haven't grasped our approach of avoiding taking on business last year. It was purely the fear of watts uncertainty, challenging conditions, and so many economic issues prevailing all around — the EPC business is a very, very difficult business amid any uncertainties. So yes, you're absolutely right, sir, our new business sees quality prices. And there's no hangover from the past, and it's almost based on no less than INR 1 crore per megawatt now. That's the cost of executing the solutions — not INR 60 lakhs, INR 70 lakhs anymore.
Operator
operatorOur next question comes from Deepak Poddar, who is calling on behalf of Sapphire Capital.
Deepak Poddar
analystI just want to get a clearer picture regarding the revenue mix. Looking ahead over the next 2 to 3 years, how do you expect that mix to shift, particularly where data center is concerned? Could you give some sense of the trajectory for data center revenue scaling up across the coming 3 to 4 years? That would be quite helpful.
Padam Gupta
executiveYes. As you can see, data centers represent a fairly small portion of the business, I would say. You need to build out capacity. It functions more along the lines of a rental arrangement, similar to year-on-year unitary charges for transmission assets. The going rate stands at $90 to $100 per kilowatt, or alternatively it can be a charging business. So what I would say is that this top line will only begin to be affected starting in '23-'24, but it should become far more pronounced from '25 and '26 onward, when that income could come in at nearly 20% of the bottom line — or top line, sorry. And perhaps close to, let's say, 30% of the bottom line, as you are seeing in our wind segment or transmission assets.
Deepak Poddar
analystFor fiscal year '26, that's 20% of the top line, and also a bit over INR 500 crores by FY '26. Data center...
Padam Gupta
executiveFor '25-'26, we can expect INR 500 crores.
Deepak Poddar
analystBy FY '26. Okay. Yes.
Operator
operatorMr. Poddar, do you have any other questions?
Deepak Poddar
analystNo, that’s all.
Operator
operatorThe next question comes from Rahul Modi at ICICI Securities.
Rahul Modi
analystSir, a question I had on how you're viewing the market for transmission ordering picking up for the green energy corridors. Because over the last 2 years, due to various issues such as inflation and commodity, the bidding pipeline, which was already there, almost INR 40,000 crores, we saw that not materializing meaningfully. So how do you see that coming through over FY '23 and '24? And secondly, sir, on the FGD orders, I believe the Power Ministry is again requesting to push the date further in terms of implementation. So do you see any slowdown because of that? Or are you confident that the balance 80,000 megawatts will come in over the next couple of years?
Padam Gupta
executiveAs we anticipated in earlier discussions and across our many calls, locking in a date certainly assists us, since business gets distributed more evenly across a standard period. We anticipated this market would persist through '27 and '28, and '24 won't mark its conclusion, particularly as we can't deliver beyond 3 to 4 solutions at any one time. So that benefits us too. The overall business, as I mentioned before, has been projected — what remains of this 80 gigawatt, which from our perspective comes to roughly INR 80,000 crores. Taking that as INR 15,000 crores annually, Techno would be keen to book no more than around INR 1,500 crores of business each year from this launch. We therefore certainly expect this business to continue over the coming 5 years, per our planning, and it ought to keep delivering a top line of INR 1,000 for the next 5 years. Likewise, across the next 3 to 4 years, data center will begin contributing a further INR 1,000 crores. Transmission distribution, meanwhile, will also keep adding another INR 1,000 crores. So over the next 3 years, we definitely expect our dotnet to grow to double where it stands today.
Padam Gupta
executiveAnd what we’ve put forward is INR 5,000 crores by 2030, if that’s the figure. That will be our opening statement.
Rahul Modi
analystThank you, sir. Sir, this is my final question. Looking at FGD margins — and we've observed margins being quite thin across the board — do you believe that, as a sector, we have reached the bottom for FGD execution when it comes to margin overall?
Padam Gupta
executiveNo, sir. Look, the issue is comparable to your stock market — it matters when you get in and when you get out, as we see it in the market, sir. So with FGD, the entry point carries great importance. And completing work on schedule matters a lot, so that your costs are properly hedged, debt protective, which is relevant in any EPC business, of course. You can't let your value-added be lost to losses or inefficiencies. So we would like to type — generally, Techno has never believed in carrying order backlog beyond double, because generally each of our projects takes about 2 years, 2 years, 2.5 years to complete. So our order backlog will never exceed 2x to 2.5x of the top line. That's how we plan. This 3-year stagnation has definitely set us back, but the order backlog has shrunk to no more than 1x to 1.5x. But on the inside, it looks like it was a blessing that books went because of this inflation and commodity cycles. So going forward, we will restore this 2x to 2.5x, entering at the peak of the commodity already in 26 years to the efficiency players because you are always safe from the future threats.
Operator
operatorOur next question comes from Abhishek Poddar at HDFC Mutual Fund.
Abhishek Poddar
analystAbout data centers, sir — on the EPC side, could you give a bit more clarity on whether you've already begun bidding for work beyond your own data centers? Then, regarding your own data centers, you mentioned work underway on the first one and the possibility of a second coming in. So what's the plan there in terms of how much EPC work we should expect in '23-'24? And past 2, would you also pursue a third or a fourth, or how will capital allocation be decided there? And the last question on your tender is: if you get a profitable exit, would that be the case, or would you want to carry it on your books?
Padam Gupta
executiveLet me lay out where we stand right now. Naturally, this can be validated if it leads to better rewards, and delivering improved rewards to our stakeholders and investors is part of what our business does. First off, we are targeting 250 megawatts as of today, with 2030 as the goal. That is the target we have set and are measuring against. So 250 megawatts will also translate into roughly 5 to 6 stations, by and large. And to begin with, for 1 year, we would certainly want to invest in and refine our concepts and technology inside our own data center before we move on to the park. So through June 23, we will not be remarketing for any basic work. Only after June 23, once we have made progress on data center operation, will we begin pursuing third-party business as well, alongside work on our own — developing our own data centers. By and large, it will be something like a transmission business of ours, acting as a middle image. We have been developing and acting as EPC to state utilities and government utilities, private utilities, and also developing assets of overall and once in every street, we stabilized, taking acetate in it. So that has entered the trajectory, although we have big, but how it will get navigated, I do want to be very, very precise on it, because we will try to do our best as a trustee for what to buy investors.
Padam Gupta
executiveRight now, we're just examining one investor per individual data center. We're not doing it on a global scale.
Abhishek Poddar
analystGot it, sir. That's very clear. So just that 250 megawatt goal for 2030 — does that mean we'd be building 250 megawatts by 2030, and maybe none of that ends up on our books?
Padam Gupta
executiveSure, sir, we’ll develop that. And perhaps in books, at that point, 150, perhaps 160, something like that. Half of that—100 megawatt—we will definitely have exited out.
Operator
operatorOur next question comes from Tejas Mehta, who is on the line from Omkara Capital.
Tejas Mehta
analystI just wanted to get a handle on the cost economics of the data centers you're building out. Could you help us understand that?
Padam Gupta
executiveYes. What exactly would you like to understand?
Tejas Mehta
analystNo. So is the CapEx cost roughly INR 45 crores for each megawatt, or isn't it?
Padam Gupta
executiveYou can take INR 40 crores to INR 45 crores.
Tejas Mehta
analystOkay, okay. So then, if you can't upload it, how much revenue and EBITDA do you figure you could generate from these data centers, and how would that slot into the business parameters for you?
Padam Gupta
executiveSir, you can figure on approximately INR 10 crores annually for each megawatt.
Tejas Mehta
analystAlright. So that's the revenue figure you're referring to.
Padam Gupta
executiveRevenue — that means our rental charges, or you could call it rental cost.
Tejas Mehta
analystCorrect, that's INR 10 crores for each megawatt hour.
Padam Gupta
executiveFor 25 megawatts, let's say INR 250 crores at the center.
Tejas Mehta
analystAlright. Understood. And roughly what portion of that would EBITDA be? Or does that happen automatically?
Padam Gupta
executiveSir, it's going to account for nearly 80% of that EBITDA.
Tejas Mehta
analystRight. And...
Padam Gupta
executiveIn operations, power is still a cost that gets passed through.
Tejas Mehta
analystRight, understood. And my other question was this: you said you've been watching for EPC work on the data center side beyond June '23. So how much work do you think it could pick up in that segment of the market?
Padam Gupta
executiveSir, if the country’s goal is 5 gigawatt by 2030, then even aiming for 5% of that works well for us — that alone would be no less than 250 megawatts. On the EPC side, even at INR 20 crores per megawatt, that comes to an INR 5,000 crores contract from those parties. Beyond that, our in-house work would be no less than another INR 5,000 crores, with 100 megawatt going at a time over 3 years.
Tejas Mehta
analystRight. So at 250 megawatts and a run rate of INR 40 crore, that comes to roughly INR 10,000 crores. And out of that, somewhere around INR 6,500 crores to INR 7,000 crores is what we're able to handle in-house, correct?
Padam Gupta
executiveWe're an IT sector company, so it's fair to say we work no less than that — though it would be ambitious to claim that, if I had a power sector company, you should expect a return of 20% plus. Still, we definitely would like to have an EPC margin of 15% plus/minus.
Tejas Mehta
analystSir, my other question concerns smart meters, all right? So when you look at international pieces on this topic, a smart meter's lifespan is quite brief. What you come across online is no greater than 5 to 7 years. And the CapEx cost for each meter is fairly big as well. It comes to roughly 9,000 to 10,000, and that covers all the services and infrastructure. Given that replacements will keep occurring after a few years, do you think smart metering is viable in a country such as India? And do you think that because of this, the project could end up very slow and will be stretched beyond 5 or 10 years?
Padam Gupta
executiveSir, do you want my view as someone in the power business or as an EPC firm?
Tejas Mehta
analystA power professional, sir.
Padam Gupta
executiveLook, in my opinion, I've long believed that this isn't a CapEx the Government of India actually wants, because they first need to categorize consumer types. And if a person's monthly bill is under INR 10,000, they don't deserve a smart meter. You could offer a device costing at most INR 1,000, and it can carry every smart-meter feature except remote control. The only thing you need is a communication channel that can't be <<inaudible>>. So it could be WiFi, it could be WhatsApp, it could be email, you can use any other communication mode, perhaps telephony, 5G if it arrives, and then you'd have far more options for communicating. That's what the comment ought to consider. In the end, a smart meter isn't really needed by people who want to track the quality and usage of their power, but many consumers at INR 1,000, INR 2,000 barely grasp power quality or power users or power usage. That's the missing substance they need.
Operator
operatorOur next question comes from Sandeep Tulsiyan, who is on the line from JM Financial.
Sandeep Tulsiyan
analystSir, I have a couple of quick follow-ups. First, regarding these FGD projects, we've heard from some other players that they bid on first orders. And since finalization of those orders got delayed and these were fixed-price contracts, the final margins may not line up with what they originally bid. So could you shed some light on whether our projects are of that same nature, or is there a price variation gloss?
Padam Gupta
executiveSandeep, first of all, any order we accept with a maturity beyond 1 year is only taken if loss is built in as a way of life. That means every order of ours has to be loss-making, and it fully offsets whatever swings occur in commodity cycles. The existing FGD order, along with the newly backed one, sits between you and me. By and large, fixed price orders of this kind only arise in the private sector, between you and me. So we have consistently discouraged engagement with the private sector by and large, since they carry extra involvements in this price beyond that. As far as we are concerned, we know what we have bidded for, and we will assume no risk more than that, but we are glad to be taken to stay fit in the business.
Sandeep Tulsiyan
analystCould you give us a bit more detail on which state Genco these projects belong to, sir? And what configuration does each of these orders have, plus their specific value?
Padam Gupta
executiveYeah, no problem. Why don't you go ahead and touch on that while we answer, probably, one of those.
Sandeep Tulsiyan
analystJust one quick follow-up: many equipment manufacturers are finding that these FGD projects generate substantial recurring revenue, since the warrant area is quite high owing to the slurry handled, which causes wear and tear on the equipment. From that angle, will we also have a role there, or once that EPC income gets booked, do we have no part at all on the aftermarket side?
Padam Gupta
executiveFirst, Techno is a genco manufacturing company. We're strictly a solutions provider working on an <<inaudible>> basis. So, if you're outsourced by us, that's number one. That said, the FGD project does carry an O&M enrollment covering 3 years from the COD of the projects. We'll be sourcing equipment, and we also hold these commitments back to back from the suppliers to deliver these ONM services free of cost, which covers the inputs, whatever is required. Second, I'd also like to share that our technology ranks among the most proven and best in the world — that's our Korean technology. It began in America and is now in Korea, and they've recently taken over — they are all growing generally as well. So they've become a very strong source of technology; in fact, all our competitors want to pitch in to our technology providers. As a matter of fact, because the world is phasing out. So we are very — having been part of this business for the last 40 years, we know what is what. So we always engage in the booking companies, the best of the best companies, companies of our size at scale, who of course are buying our services with partnership.
Padam Gupta
executiveAnd what's more, at DR, our tech isn't superior to what you'd find in any other major player. So our systems scale linearly. They're robust. They hold steady in terms of performance. So I'd say none of those worries apply. Even in a thriving sector, it comes down to experience — you can engineer a highly brittle solution just as easily as a highly localized one. So how you manage it depends on your experience and expertise, doesn't it?
Sandeep Tulsiyan
analystOkay, and I have one last question from my end regarding the receivables. There was some doubt about whether we would be able to recover that amount, and we were giving an update each quarter. How much of it is still outstanding in our receivable report? So where does that figure stand now within this INR 584 crores debtor? Could you just provide an update on that?
Padam Gupta
executiveWe never had it, sir, but for want of a better <<inaudible>>, what concerned us was certain investments within you and me.
Sandeep Tulsiyan
analystYes, that's right.
Padam Gupta
executiveOn investments, we're pretty much finished there as well, sir. If you were to look at our balance sheet for the current year, it's down to INR 100 crores at most, and it should be cleared within this year. Come March '23, we'll be out of it.
Operator
operator<<operator_script>> Since no more questions remain, I'll now turn the conference back to management for their closing remarks. The floor is yours.
Padam Gupta
executiveYes. I want to express my appreciation to each of you for participating in this conference and for having such a candid and open exchange with us regarding every matter tied to our business and financials. Even so, should you have any question concerning any aspect of the business — we handle everything connected to the power sector, now referred to as the energy sectors — you are welcome to send us an email or come by our office, and we would be very glad to welcome you and walk you through all of our processes for carrying out our responsibilities and assignments in a manner that is more secure, with no greater risk than is normal in any business. With that, I would like to bring the conference to a close and thank everyone for attending it. Welcome, and thank you all once again.
Operator
operatorLadies and gentlemen, that brings our conference to a close on behalf of Asian Market Securities Limited. Thanks to everyone for being with us, and you can go ahead and disconnect your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Techno Electric & Engineering Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Techno Electric & Engineering Company Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Techno Electric & Engineering Company Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.