Operator

operator
#1

Good day, everyone, and welcome to Techno Electric & Engineering Limited's Q1 FY '23 earnings conference call, brought to you by Asian Market Securities Limited. During this call, we may make forward-looking statements regarding the company, and those are grounded in the beliefs, opinions, and expectations held by the company as of today's date. Such statements do not constitute guarantees of future performance, and they carry risks and uncertainties that are hard to foresee. Actual outcomes could vary from those expectations, projections, and so on, whether expressed or implied. We ask participants to be cautious when referring to these statements and remarks. <<operator_script>> Kindly be aware that this conference is being recorded. I'll now turn the call over to Mr. Kamlesh Kotak of Asian Market Securities Limited. Thank you, and the floor is yours, sir.

Kamlesh Kotak

analyst
#2

Thank you, Michelle. Good afternoon to all of you. We at Asian Markets are pleased to welcome everyone to Techno Electric & Engineering Company Limited's 1Q FY '23 Earnings Conference Call. Joining us today is P.P. Gupta, our Managing Director, here on the company's behalf. I'd now invite Mr. Gupta to walk us through the 1Q financial results along with the business highlights, after which we'll open things up for the Q&A session. Sir, the floor is yours. Thank you.

Padam Gupta

executive
#3

Thanks, Kamlesh. I apologize for running about 5 minutes late. Good afternoon, everyone — gentlemen and ladies — as we come together to go over the financial results for the first quarter that ended 30th June 2022. <<inaudible>> this call, which reflects our outlook and portions of the future, or that might be interpreted as a forward-looking statement regarding <<inaudible>> or industry basics. Allow me to point out our performance, shown on the second slide. Total revenue for Q1 came in at roughly 173 CR; revenue for our <<inaudible>> ... <<inaudible>> Total revenue stands at approximately INR 173 crores, comprising about 142 CR from EPC and roughly 31 CR from the wind segment. EBITDA for completion is about 48 CR, while operating profit in our EPC segment came to roughly INR 21.25 crores, with some pressure on EBITDA margin stemming from the elevated commodity cycle, prices, and also higher overseas trains. Other income is roughly INR 13 CR, profit before tax is roughly INR 50 CR, and PAT is roughly 36, which is nearer to the March quarter just past. EPS stands at 3.27. We currently <<inaudible>> the investment value in cash and cash equivalents at around <<inaudible>>, which works out to about INR 100 per share.

Padam Gupta

executive
#4

The big highlight for this quarter is that we secured a business of almost 199 CR, and as per company records that's the highest in the last 4 years. Our <<inaudible>> order book as of 30th June stands at 3214 CR. As we wrapped up last quarter, on the outlook front, we've managed to navigate the tough period and delivered some growth last year, and we see growth ahead in the years to come, starting <<inaudible>> with the rate. We badly -- in the second half, we expect that growth to keep going in 23, 24 and 25 as well. We expect large builders from the FGD segment, payer by segment, data factors and the transmission business to keep guiding us throughout. Looking ahead, we anticipate strong <<inaudible>> as power and emerging converge. On top of that, there's considerable focus and stress on how available and reliable our supply is. The cost of power and the improvement of the sector's overall financial health <<inaudible>> while renewable power will stay in focus along with related infrastructure, with very significant attention on the distribution segment. The transmission infrastructure for the <<inaudible>> is progressing toward <<inaudible>> by 500 terawatt by 2020, and in addition 25-megawatt of <<inaudible>> is planned for delivery over the next 5 years.

Padam Gupta

executive
#5

On the FGD side, we'll stay focused on <<inaudible>> sulfur <<inaudible>>, and there's been meaningful headway in CPU when it comes to projecting policy-making solutions, but the configuration going forward will involve STBs and the private sector. The order date is April 1, '21 for the <<inaudible>> at the plants; we are <<inaudible>> capital down sell and have to apply by then, while utilities are less by utility <<inaudible>>, though I expect this could take 2 years. The stream court has also declined to expedite the entity within government institutions <<inaudible>> to take a <<inaudible>> that Atlanta stop operation, select technology store mouse. We've received orders of roughly INR 1450 crores, INR 5 crores, or <<inaudible>>, this quarter, and this level of business will carry on for the next 3, 4 years, and <<inaudible>>. We largely anticipate a status on the transmission side, even though we are refusing an upstream in the order of transition infrastructure over the past couple of months, initiating billing for the large lot of 60 gigawatt of renewable power of about 45 megawatts has begun — it started <<inaudible>>. <<inaudible>> in the last project, 22. We're seeing solid interest from large investors responding to participate in above dates by making our company patiently <<inaudible>>.

Padam Gupta

executive
#6

This is going to make a <<inaudible>> more competitive. On the distribution side, <<inaudible>>. What we're looking to do is strengthen our distribution networks — making them smarter, stronger — and delegate the way the government goes about efficiently <<inaudible>> so that <<inaudible>>. Now broadband <<inaudible>> electricity <<inaudible>> event <<inaudible>> when it comes to multiple power supplies <<inaudible>> mobile with internet <<inaudible>>, apart from making <<inaudible>> divisions. The <<inaudible>> facilitate <<inaudible>> distribution platform <<inaudible>> distribution network. It also seeks to be <<inaudible>> to continue users of the solution that was launched by online <<inaudible>> and the provision <<inaudible>> of financial <<inaudible>> with the goal of enabling competition, announcing efficiency of distribution licenses, <<inaudible>> improving and also improving services for consumers and also ensuring sustainability. It also seeks to <<inaudible>> Section 62 of the bank provisions, which created reason <<inaudible>> besides maintain fixing of maximum sealing of the <<inaudible>>. It provides <<inaudible>> minimum pairing by the appropriate office. It provides for a lending section of <<inaudible>> function that will be <<inaudible>> discharged by the respective regulators, that is GRC versus <<inaudible>>. We then also seek Section 126 to convert the rate of punishment from imprisonment or time to file so as stable <<inaudible>> will also Section 152 to facilitate <<inaudible>> that it would be mandated to <<inaudible>>.

Padam Gupta

executive
#7

We’re quite optimistic that <<inaudible>> sector and that something favorable ought to come about as we move forward, with which segment having pursued debt resolution to divest a portion of the assets beyond what is needed for centers. We have 29 megawatts across 3 pockets, 16.9 megawatts, and only 51 megawatts is rather <<inaudible>>, that is not 13- and 18 megawatts in <<inaudible>>. Given the current difficulties prevailing in the power sector stemming from power shortage, we are receiving attractive offers for a bit of power from the local investing <<inaudible>>. In light of this, it is deemed prudent to contract a portion of the capacity and strategic <<inaudible>> situation. The overall power requirement for the data sector is 36 megawatts <<inaudible>> have complementing energy capacity to be transferred to <<inaudible>> to acquire CGPs supply to the power sector by June ’23. COVID-19 has affected our lives in numerous ways, yet one favorable consequence of this is expansion in the digital space. With that expansion in the digital space, that privatization, it is anticipated that the third-party data tractor industry will expand substantially from the present level of 500 megawatts to 2 megawatts over the next 3 years, at least to 5 gigawatts by 2030. Today, most data centers are situated in Mumbai and now, <<inaudible>> or STT are already in the process of establishing that at a <<inaudible>> now shipping, further validating our selection of location.

Padam Gupta

executive
#8

Also, technically speaking, we're at an advanced stage of setting up that 24-megawatt IT sector of <<inaudible>> hyper-density nature. We acquired the project, and we see the approval for smart construction, and we've achieved significant progress on the construction — the building for patients is already down. And we are the first flow and extra for the building super structure to be completed by the end of this year. We're hopeful of commissioning in June '23. In addition, we will consume the payable power from the operational capacity to classify the data sector, which is likely the case with major hyperscale customers like Google, Microsoft or <<inaudible>> because of their ESG commitment. Furthermore, we're seeing aggressive interest from strategic partners from the USA and China and also primary forms. We acted into a joint venture for the data sectors in India. We're evaluating the available options, and shall conclude only <<inaudible>> soon. With CapEx of INR 13, that is around 45 <<inaudible>> per megawatt, 60% to 65% CapEx in the electrotechnical bonds, which is already now expertise as we'll be able to <<inaudible>>. With in-house energy, we will have line EPC capabilities and <<inaudible>> experience of developing infrastructure projects.

Padam Gupta

executive
#9

Our position is stronger than the industry's. With that said, I'll open the floor to questions from our investors. Please go ahead.

Operator

operator
#10

<<operator_script>> Our first question comes from Sandeep Tulsiyan at JM Financial.

Sandeep Tulsiyan

analyst
#11

I've got a couple of things I want to ask about. First, regarding the total order book — I believe we said it now stands at INR 3,200 crores, which is really encouraging, and that you've booked INR 1,900 crores of orders. So I was hoping for a bit more detail. You mentioned there are 2 FGD orders in there worth roughly 40 crores to 50 crores. If you could share more on who those clients are, what each order's size is — in megawatts, if you have that <<inaudible>> — and also on the other big orders you won that form part of this <<inaudible>> flow.

Padam Gupta

executive
#12

P Yes, is that complete or may I participate now?

Sandeep Tulsiyan

analyst
#13

Sir, please. I believe that was the opening question. I’ll come back with the remaining questions after this.

Padam Gupta

executive
#14

Right. We have 2 FGD solutions underway. One is for the <<inaudible>> project in Rajasthan, and the other is at Kalkota. So <<inaudible>> 200 to 600 megawatts at each super critical, and the order is approximately...

Operator

operator
#15

Apologies for cutting in, Guptaji, sir. Sir, the sound on your line isn’t very clear. So I’d ask that you move closer to the speakerphone.

Padam Gupta

executive
#16

Alright, I've now got the handset in my hand. FGD has already received 2 stations. Jalawa is one, and the other is <<inaudible>> from Rajasthan. Kota comes in at 3 to 200 megawatts apiece — or you could say 250 per se. And Jalawa, likely, is 2 to 600-megawatt. The Jalawa order is worth roughly 750 CR, while Kota is around 700 CR. Together, that's 1,450. We've also gotten another order from <<inaudible>> for 300 CR covering their transmission work in the South state for <<inaudible>>, plus another one in Rajasthan. Those are the main order wins this quarter, and one more comes from <<inaudible>>. There we're going to build a 400 kV station for approximately 150 CR. All of this adds up to about 1,900 CR this quarter. So we're seeing solid traction, beginning in the prior quarter and carrying into this one. Most of these are new businesses coming up. Naturally, they need some time before we finish engineering and ordering. They'll land according to their timing. I'd also note that with the commodity cycle cooling off and becoming more affordable, we chose to spend this quarter closing out most of the world obligations that had spilled over from the last quarter.

Padam Gupta

executive
#17

We therefore had to have closed a minimum of 12 projects and achieved final use. Our receivables are at an all-time low right now. Roughly about 130 CR, and creditors too, now just under 300 crores in that sense. So a lot of clean slate as we start moving forward, and we see great growth occurring in Q3 and Q4 this year, and we hold to our top-line target. But the first 2 quarters will be like-for-like with last year, perhaps somewhat better here and there.

Sandeep Tulsiyan

analyst
#18

About the press release you issued — I believe we announced orders worth INR 680 crores, but there's an announcement for the remaining balance, the INR 40 crores and INR 50 crores you mentioned. I just want to clarify: are those orders still at an even page, or are they confirmed?

Padam Gupta

executive
#19

No, no, no. These are all confirmed, as you can see, and the advances are in process — they are not going to be received shortly. I think I don't know what it is — we have filed, and if you go to our exchange side, you may find all the details to buy by — and maybe the exchanges, in their transmission, may not be showing all of it. But if you go to the side of the exchange, you will find the whole detail, sir.

Sandeep Tulsiyan

analyst
#20

Got it. So that 40 crores, 50 crores for FGD, plus the INR 650 crores you announced on the transmission side, and adding the INR 221 crores, 231 crores — but what you're booking in the quarter is INR 1,900. So that gap of INR 230 crores, or INR 50 crores, is it after the 30th of June? Or how exactly do you reconcile that difference?

Padam Gupta

executive
#21

No, no, no. What we've stated applies just to this quarter — 1,901 CR, and that comes from 3 clients basically: Power Grid, Rajasthan and <<inaudible>>. The split is 1,450 out of Rajasthan, 300 out of Power Grid, and 145 out of <<inaudible>>. So there may be a bit of confusion regarding the rollover from the business of last quarter, which was, once again, another 500, 600 CR in the prior quarter.

Sandeep Tulsiyan

analyst
#22

That 250 crores would have been recorded during the prior quarter.

Padam Gupta

executive
#23

Yes, yes, 100%.

Sandeep Tulsiyan

analyst
#24

Second, I believe you mentioned that you're keeping the revenue guidance for FY '23 as it stands. So the growth expectation remains 30% for the EPC segment, with margins still in that 12.5% to 13.5% range?

Padam Gupta

executive
#25

That's exactly right. Without factoring in the data center top line, our top line will grow 20%, 25% — let me be clear about that. As you can see up to now, we haven't settled on which year we'll recognize our own development revenue. It might spill over into next year, or we could book it in the final quarter of this year. But excluding data center, for our third customer business we're aiming at roughly 20% growth over last year. That works out to somewhere around 1,250 CR to 1,300 CR.

Sandeep Tulsiyan

analyst
#26

All right. And on the margin, sir, it's the same, because you did better in the first quarter, but...

Padam Gupta

executive
#27

We believe we can do better. In the first quarter, you can see the problem that not a lot of procurement was happening, frankly, since those were basically the tail end of the projects, and then you also pick up some PV revenue in this quarter — as those projects close out. So in essence, I'd call it all hybrid. Honestly, in our business, quarter-on-quarter doesn't mean much, because if you really ask me based on my personal experience in this segment, I'd say return on a specific project matters more than quarter-on-quarter performance. Still, we have to play this role. And sometimes we never know which quarter it is. But deliberately and strategically we also chose to play this role when the high commodity cycle impact is present, so that we avoid making any high-cost commitments and find an opportune moment to move ahead in booking new supplies or new engagements. So I'd say, sir, it's all a blended solution, but — yes.

Sandeep Tulsiyan

analyst
#28

Yes. That's revenue from POC completion — so regarding just the order guidance for this year, on the prior call you had guided to roughly INR 3,500 crores to INR 4,000 crores of inflow that we ought to be able to secure, since the INR 3,000 crores you referenced is already booked or L1, and some additional orders may come through. So what's your guidance or refresh on what you're confident of surely booking in financial year '23, and also all those orders you won worth 99 crores? Naturally, those would have followed some negotiation across the last 2, 3 quarters. So do you expect margins on these orders to be consistent with company-level margins? Or should they be higher, or lower? If you could share some perspective on that?

Padam Gupta

executive
#29

No — staying with the company's guidance of 13%, which we've issued. Still, we'll aim to do better than that. Let me put it that way, first point. And regarding honor, I've kept the guidance that we'll look to book roughly INR 30,000 crores in orders this year, plus — so a further 1,000 crores to 1,500 crores for the order pipeline across the coming 3 quarters where we're L1 or where we plan to strengthen our position in those segments. But the most encouraging thing now is that my dream of the Electricity Act being passed and generating lives in this sector is about to come true. So that will be a long-term driver, which is what happened in 2003, '04 when the Electricity Act was enacted. So precisely 20 years later, we're once again stepping into that opportunity, I'd say.

Sandeep Tulsiyan

analyst
#30

Got it. I have a couple of questions about data center defining. First, on this Chennai Data Center, if you could break out how much CapEx, because this guidance covers the portion you had invested in bringing the technical partner on board and getting the construction kit started. It seems to be a little bit delayed compared with what the initial time frame was, although you're still maintaining that we will commission by June of next year. So how much money will we be spending over there in this financial year? Do you still think you will have the partner in place by, say, the September quarter or the December quarter? What are the time lines, and what should we get set out of this?

Padam Gupta

executive
#31

As you can see, phase 1 of this project — which we plan to commission by June '23 — comes to roughly 550 CR in total, out of the overall project CapEx. To date, we've already spent approximately 100 CR. So you could say another 100 CR will go in each quarter over the next 2 quarters, and the remaining 250 CR will occur in the — 200 CR in the final quarter of January, March. That said, we do have some drum sheets on board where nondisclosure agreements apply, so I'm unable to share those with you. Hopefully, that too will be finalized by September. We've had interest from a number of well-known global entities. That much I can say.

Sandeep Tulsiyan

analyst
#32

Got it. And that revenue booking that you said would begin in fiscal year '24 — what type of revenue should we expect to start coming in during that first year? For the settlement mentioned above?

Padam Gupta

executive
#33

To start, the remaining capacity comes as a four-phase split facility, with each phase carrying 6 megawatts of IT load. After that, one phase will be finished every quarter, meaning the entire station should be commissioned in full no later than March '24, or sooner, depending on how quickly our partner can get it engaged or locate a tenant for it. So outside of the power revenue, which I'd prefer to leave out generally, you could say the rentals falling into this segment run at roughly $100 per month, plus or minus. You can work it out that way, and it will be achieved accordingly.

Sandeep Tulsiyan

analyst
#34

I see. For my final question, on the balance sheet side: you pointed out that cash and investments stand at INR 1,200 crores, but regarding receivables, I'd like to clarify whether anything remains outstanding from the <<inaudible>> and those other slow-moving receivables — was anything still pending, including those real estate companies to which we extended some ICDs? Is any spending happening there? Then, on the wind assets, apart from that 35 crores you plan to liquidate, what should we assume — will it track that INR 5 crores per net, or whatever the deal value is across all the transactions you've completed? Or has it improved, or declined, given where the market sits relative to your expectations? Just some broad guidance — not exactly detailed guidance on that.

Padam Gupta

executive
#35

Look, first of all, whenever I mention 36 megawatts, I'm referring to demand load, which is also going to increase in segments as we commission. And that 36 megawatts is needed when the food station is commissioned, just between you and me. Once we have the full 24 IT load on the station, we'll then require 36 to 40 megawatts, which works out to roughly — you could say — 80, 85 megawatts of wind power capacity, and SCUF comparison on a like-to-like basis. So we are — we'll be aiming first to sell out somewhere around 40 to 50 megawatts of the wind-powered assets, bringing our capacity down to about 80 megawatts, 85 megawatts, or a bit more. And that kind of <<inaudible>> we've already entered into, and the price realized will range between 4 crores and 4.5 CR — not 5 crores, I'll say. But definitely, whatever power we're able to put toward our own captive views, that will be more valuable. But going forward, if electricity happens and openers has happened, we do see some kind of greater competitiveness in the power rates in the market.

Sandeep Tulsiyan

analyst
#36

And regarding the receivables piece — on both the ICD side and the SCB side — are there any receivables that are moving slowly coming out of this?

Padam Gupta

executive
#37

No — in Tamil Nadu, construction work is currently underway, and thanks to our high court interventions, we're hoping to receive some payment this month and some the following month. The government is also helping to facilitate payments from DISCOMs. Still, TANGEDCO is definitely somewhat of a concern. That has persisted for a while, but we're now able to make our presence felt, first of all. As for ICD, we've already fully cleaned up our balance sheet, and more or less all the amounts have been realized. So no outstandings remain. That said, you could say certain kinds of claims — P&L interest or legal expenses — are still outstanding with <<inaudible>>, where we hold the post-dated checks. In due course, we may receive that.

Sandeep Tulsiyan

analyst
#38

So what does that come to altogether, all of these?

Operator

operator
#39

My apologies for cutting in, Mr. Tulsiyan. Could I ask you to please get back in the queue, since other parties are waiting for their turn. Our next question comes from Deepesh Agarwal on the line from UTI AMC.

Deepesh Agarwal

analyst
#40

I'll start with my first question. During the quarter, EPC revenues appear to have slowed somewhat. So what has affected execution? I understand seasonality is a factor, but even against the historical trend, there's weakness. Is there any specific reason?

Padam Gupta

executive
#41

First, if you look a bit more closely at our sector, sir, I wouldn't call it a slowdown. The truth is, a project always runs on a 2- to 3-year cycle before it's fully delivered. And any new business takes time — documentation, engineering, approvals, collaboration — before it turns into revenue. Right now that's generally 6 to 8 months. It's always productive between the 8th and 20th month, and then it begins tapering off toward the closing part. So these revenue streams per project always follow a cycle, I'd say. This quarter, I'd say it's the most productive quarter for the company — maybe not in terms of numbers, but in terms of managing working capital and other related risks, commercial risks and all of that, because closing a contract matters more in our business than bagging the order first. That should also be appreciated. So we've significantly brought down our receivables, closed no less than 12 projects to the annualized all their dues, paid off the creditors. So there's a lot of cleaning, which always should happen in our type of ops before you start, again, getting into new commitments. So now we're getting into a new cycle, and Q3, Q4 will catch up whatever we lost in Q1, Q2 in the process, because almost INR 3,000 crores worth is new business with us — or even INR 2,700, you could say — in the last quarter and this quarter.

Padam Gupta

executive
#42

Everything here will generate returns across Q3 and Q4 and from that point forward. So this isn't a downturn — rather, what we're seeing is the finishing off of remaining jobs, works, businesses, payments, bank guarantee realization, <<inaudible>>, views, and whatever term you'd use. It amounts to more strenuous effort. In our line of work, getting a business onto the books is easier than shutting one down, sir, with neither side holding claims. So for us, this quarter has been extremely, extremely productive.

Deepesh Agarwal

analyst
#43

Got it, sir. Sir, just to clarify, this booth transmission line isn't part of that INR 1,900 crores inflow you referred to, correct?

Padam Gupta

executive
#44

Both lines? Sir, we don't handle line work.

Deepesh Agarwal

analyst
#45

In the press release that you put out last week, you shared some work on the <<inaudible>>, which are a line of some 33 crores. That isn't included, correct?

Sandeep Tulsiyan

analyst
#46

That is what we recorded during the previous quarter, sir. That comes from <<inaudible>>.

Deepesh Agarwal

analyst
#47

All right, that's everything, sir.

Padam Gupta

executive
#48

That was already included in the March quarter, sir.

Deepesh Agarwal

analyst
#49

Got it. And sir, how long does our order book take to execute? So, based on the current order book and the interest we expect, do you think the guidance of, say, 20% plus growth this year could also be repeated next year?

Padam Gupta

executive
#50

It has to, sir. I have no choice. I have to complete a project in time. Generally, you can say the thumb norm, year-on-year, we must achieve top line, which is 15% of the order backlog with us. So if order backlog is presently at 3,200 so truly speaking, I should have achieved 1600 CR at this year, where we are targeting only 1,250 CR now this year. So that 350 crores impact will be visible next year and with the growth in further order book. So next year has to be 1,500, 1,600 CR in any way. And as I have already told you at last March quarter results that we are definitely going to double up our top line by the year '25, sir.

Deepesh Agarwal

analyst
#51

Alright, sir. Understood. Sir, since we've secured these orders in the <<inaudible>> within the GT segment, a space where rivals are finding profitability difficult, would you anticipate any dilution of profitability on those new orders?

Padam Gupta

executive
#52

Not in the slightest, sir, since the people who are hurting in FCT — all of that began at the point when they placed their orders 2 or 3 years ago. Every one of them ran into delays, and the commodity cycle hit them as well. Beyond that, the rates at which they committed to the business were extremely low. If you happened to look at the report on this, if you have been following it, at the outset these packages were being priced at 35, 40 CR for each megawatt, and as of today that figure has dropped to nearly 1 CR per megawatt, close to it. Take our Kota Station — it is just 750 megawatts, and the order value comes to roughly 740 CR. So as things progress, you can set the price nearer to what the market actually reflects. And on top of that, PV grosses protect these orders.

Deepesh Agarwal

analyst
#53

Got it. Sir, how much of the data center revenue booked this year would come from the EPC portion? Since you're doing a lot of data center CapEx this year, wouldn't there be a corresponding case where 60%, 70% of EPC revenue also picks up, right?

Padam Gupta

executive
#54

No, sir, we don’t plan to book it this year. We’ll essentially keep it as work in progress only, and we may be taking care — we’ll make a decision in the last quarter or next year, in addition. The figures I’m giving you right now are mostly third-party PC business.

Deepesh Agarwal

analyst
#55

Got it. But sir, what does our cash balance stand at at this moment, and what is the investment figure currently?

Padam Gupta

executive
#56

1,200 CR, 1,200 CR.

Deepesh Agarwal

analyst
#57

All right, 1,200 crores. And what's the outstanding amount on a win?

Padam Gupta

executive
#58

Sorry, could you repeat that?

Deepesh Agarwal

analyst
#59

What's the status of outstanding receivables on win?

Padam Gupta

executive
#60

Roughly 130 crores of that consists of running account builds, with a further 200 crores sitting as retention money that hasn't come due yet.

Deepesh Agarwal

analyst
#61

Okay. And sir, are there any other receivables that are moving slowly?

Padam Gupta

executive
#62

On wind power, we're set to receive somewhere between 150 crores and 170 crores, and we expect that to be liquidated this year.

Operator

operator
#63

Our following question comes from Charanjit Singh at DSP Mutual Fund.

Charanjit Singh

analyst
#64

Let me start with the first question, which is about these new FGD orders. Could you help us get a clearer picture of the payment terms? Do they compare favorably with what we saw on earlier orders? Or what exactly do the payment terms look like for these orders?

Padam Gupta

executive
#65

They’re somewhat stronger, though still below what we saw in transmission projects. Take Bokaro: when we took it up, retention was nearly 30%, and here it now stands at 15%. So you could describe it as an 85-15 split. Still, with proper planning, we’ll ensure it ends up at 90-10, just as we’ve actually seen in the normal business, since staggered commissioning is also workable on these projects — some facilities, that is. That way you’re entitled to receive certain payments progressively, along those lines.

Charanjit Singh

analyst
#66

And sir, when do you expect those 2 projects to be finished?

Padam Gupta

executive
#67

Every one of these projects has a 30-month timeline according to the order, though our aim is to complete them ahead of schedule.

Charanjit Singh

analyst
#68

You mentioned there have been some delays with FGD and implementation overall, and that the ministry side might push out the timelines. So does that also apply to these customers? And might they look to delay execution, which sometimes also leads to higher costs?

Padam Gupta

executive
#69

No — look, whichever station receives the order, they're just as eager to finish it ahead of schedule, since that lets them take credit for the compliance side. I'm confident the Rajasthan government will back getting it done before '24 April, May, because by and large that's also their election year. So they'd want to look pro climate change and hand compliance over to the — all the regulators. So the customer is backing these projects well, and we don't see any sort of delay occurring on that front.

Charanjit Singh

analyst
#70

Alright. Sir, you also brought up that electricity amendment bill and the many positives it could deliver. And since we're also concentrating on the distribution side of the business, could you speak to what sort of opportunity that might open up for us? And which segments within it would you want to target?

Padam Gupta

executive
#71

Look, essentially it comes down to swift implementation of the AMI solutions. On top of that, they've launched a scheme known as RDSS — that's the reform and system strengthening scheme for distribution systems. So all of this adds up to an investment of INR 3 lakh, 3 trillion — they refer to it as crores — across the coming 5 years. That's a program the government has announced. It's available on the MoP website. And states have already begun issuing tenders in this segment, much like what happened in 0.4 to 0.8 when APDRP solutions first came along, followed by rural electrification programs, all of which were rolled out across the country. In the same way, in the next phase we see that a great deal of distribution system strengthening and reform is going to be an integral part of it. And we are regularly involved in it, this business. We carried out a lot of jobs in Bihar, Assam, in J&K, and many other parts of India. Right now as well, we're doing similar works for the city of Jammu and <<inaudible>>. So I'd say there are great opportunities nationwide. We don't intend to do much in this segment. We'll be happy to pitch in bar, only 1% of the bar market, which may be around 3 project crores out of 3 this year budget of the government, spread over the next 4, 5 years.

Padam Gupta

executive
#72

Transmission is still going to bring in 500 crores to 650 crores annually for us, not counting FGD and Meeting Solutions. So, once the data center business starts showing up in your top line in '23, '24 and '24, '25, we're confident we'll double that top line.

Charanjit Singh

analyst
#73

Alright. Sir, the other point you mentioned was about 1,000 crores to 1,500 crores of additional order inflow. Could you shed some light on what kind of orders these are, and what you plan to secure during the rest of this financial year?

Padam Gupta

executive
#74

Yes. Essentially, we’re aiming for one additional FGD order downstream, roughly 500 crores, give or take. Plus, we’re also looking at another transmission business worth another 300 crores, 400 crores. And another 500 crores, 600 crores we’ll be targeting from the distribution business, including AMI, I’d say, quite readily. The mix might shift somewhat here and there. But broadly, that’s how the segmentation will look in this. And we may also take the opportunity to have one TBCB project for ourselves as well, around 400 crores, 500 crores, to be implemented over the next 2 years.

Charanjit Singh

analyst
#75

Alright, sir. Sir, finally, regarding power transmission, could you speak to how large the opportunity is—whether we might witness additional growth or whether it will likely stay at steady levels? How do you view that outlook ahead for power transmission, essentially? That was my final question.

Padam Gupta

executive
#76

The power sector is in <<inaudible>>, and no one can provide you with very perfect answers. If you take whatever we went through during the last 2 years and project it forward, then I would say the transmission business will be a status quo for us. However, if this Electricity Act stands -- approved by September also, then from '23, '24 onwards, I see a lot more activities happening in transmission, because the pockets of demand and the pockets of generation have to be married more efficiently than is presently done by the distributing players like CPSU or, let's see, private players or state governments. So a lot of hard money will happen as a supply chain amendment and achieving economics of the supply chain by strengthening those transmission links with generation closer to the demand pockets and generating pockets, which is not the cause presently. A lot of power is being cycled in a gross billing manner mainly to meet quotas or allocations or prior PPAs, whatever you call it. So it is still not a free market per se. It is still a market based on bondages, historically, as we have evolved in power sector. So all those attempt will be to minimize the inefficiencies, improve the quality of the networks, more efficient and strengthen networks, so the technical losses are brought to the bare minimum.

Padam Gupta

executive
#77

And networks that are able to guarantee the fewest thefts — or none at all — along the highways, too. So I'm seeing growth on several technology fronts and in the network itself. If that comes to pass, I'm very upbeat. That's really all I can say.

Operator

operator
#78

Our next question comes from Vinod at Bank of Baroda.

Analyst

analyst
#79

My question was actually along the same lines as what Charanjit just asked regarding the particular areas where a large CapEx is visible under the new build. So, since you gave a comprehensive answer to that, what I'd like to get your thoughts on is this. There's a lot of protest against this Electricity Act bill. So how do you see the bill's final shape? Do you see a more diluted version possibly coming in? Or do you think they'll be able to push the bill through the way it is today?

Padam Gupta

executive
#80

Sir, I am neither the power minister nor the finance minister of this country. The way I see it, what is happening today ought to have taken place 10 years back, if you ask me. We would rather go for the 1, 2, 3, 4, but each time we witnessed a sunset on the -- look, the issue is that you must introduce market reforms into a sector such as telecom, aviation, ports, highways, and that never happened in power, sir. That is the central question. Whether the consumer will benefit and when, whether I generate and supply power at INR 2.5 or INR 4. In my house or in yours, power arrives largely mainly at INR 9, 10 only. So no cities have ever raised this question in this country. Where is the INR 6 going, sir? Who steals the INR 6 along the way -- on the highway? So that is the central question, which any sector has to answer. Like telecom, I can talk with you for hours, sir. In '95, maybe you -- how old you are, I don't know. In my <<inaudible>> days, I remember, sir, we used to pay INR 30 a minute. We used to have lightning call, <<inaudible>> call, wait for ours for a call to happen, for a connection to be given in my house and whatnot.

Padam Gupta

executive
#81

So — and at this point, it's clear why that comes at no cost. What you pay for now is data. The smartphone is extremely capable. It's extremely efficient. That sort of technological shift only shows up in a market when competition exists and market reforms exist. Everyone wants to serve consumers smartly, better than rivals do. That has never occurred in the power sector. Broadly speaking, it stayed a form of pseudo competition. So if genuine competition arrives at the last-mile delivery of power to consumers, and the B2C segment grows stronger than B2B, as has been the experience so far, then you'll watch it expand the way telecom did, sir, or the way aviation did. You'll have a multitude of choices. And a multitude of — if someone wants renewable power, why must I purchase conventional power here. I ought to enjoy that. There should be segmentation tomorrow. I want solar power only, sir. I want just hydropower in my house. Why not? Every one of those solutions is feasible, and your smart meters will also be able to tell you how you consume power, what your pattern of consumption is. How you — where the power is coming from. And what the cycle is — the hourly cycle of consumption in your house.

Padam Gupta

executive
#82

There's still a great deal that hasn't happened yet in the power sector, sir. We continue to assume that, well, power will simply be there. It arrives and no one worries about anything beyond whether it's available. Telecom and aviation, then, are likely managed centrally. Power, since I believe it's a concurrent subject, is, I think, the place where obstruction always occurs. Because we observe countless reforms that would begin with noble intentions, yet they never actually materialize. Sir, my conclusion is that these amount to foolish pretexts. In the end, power is now turning into energy, and the entire world understands how to handle energy. Energy can never be a matter for a state. Let's be clear on this, sir, first of all. It lies beyond what they can do. They lack the ability to handle energy, let me put it that way. In the past, yes, they played a part. They have formed part of this segment. But now, with technological interventions, as all of us are exiting the coal combustion cycles, shifting increasingly toward renewables, climate change and additional new sources of energy and power, more electric vehicles, electric engines, drives, sir, you must recognize that unless it <<inaudible>> administratively, politically influenced DISCOMs are unable to be technology-based solutions in the country at the end of the day.

Padam Gupta

executive
#83

Those approaches are obsolete. They’re finished. The sooner governments come to this understanding, the better off the people and the country will be, sir. That’s what I’ll say. So the central government must have the political will to drive this transformation. And there are plenty of ways available to them to get it done, sir. But in the end, you’re right. I’ll say this: today this sector has come to be more a part of <<inaudible>> than a part of progressive development. So let’s hope for the best.

Operator

operator
#84

Sarvesh Gupta from Maximal Capital is on the line with our next question.

Sarvesh Gupta

analyst
#85

Sir, my first question concerns those current FGD orders that you mentioned were booked at 1 crore per megawatt. Earlier players may have lost money since they would have entered at a lower price. On the other side, they had to bear the impact of elevated commodity prices. Now that commodity prices are cooling off, do you foresee some kind of super profitability on the orders we have secured so far, or will it have to be passed on? And to that extent, 13% seems on the lower side given the relationship between raw material and price that we have. So that is my first question, sir.

Padam Gupta

executive
#86

Well, I'd describe these as speculative, I have to say. Right now, the only thing I'll state is that we're shielded when it comes to upcoming commodity cycles — and, based on what we've seen across 30 years in this business, sir, whenever commodity prices ease, CPC gains in one way or another, even though I'm passing along that decline to buyers via a PV formulae. So what I'll say is that we certainly won't get worse than what we've described. If anything, it will only improve. But the commodity cycle will actually soften far more aggressively. So there are all kinds of global calls out there. If Taiwan and China go to war tomorrow, or Russia grows more aggressive in seizing parts of the hived-off countries around it, the global situation is extremely, extremely delicate right now. So I'd rather not hedge on it. And second, you see, most electrical commodities are also turning into components of new-generation solutions. Take transformers — we used to use CRGO, if you follow the industry. Now we tend to produce more CRNO, not GO, since NO is more valuable there and forms part of the batteries used in EV vehicles.

Padam Gupta

executive
#87

So in certain segments, a better price than the traditional one is always available, sir. So we'll just have to keep our fingers crossed. Hopefully...

Sarvesh Gupta

analyst
#88

Sir, do we have any forward contracts on the raw material side that would either protect us or let us enjoy better margins?

Padam Gupta

executive
#89

Sir, by and large our needs aren’t that big, first of all, since those materials arrive by way of the equipment itself. We’re largely not a commodity business. Even so, as between you and me, forward markets don’t exist even at this point. But when it comes to non-tariff matters, yes, forward contracts do exist, yet most of what gets consumed with us comes in the shape of equipment, such as transformers, switch gears or cables. So those manufacturers each handle that themselves. It comes down to merit.

Sarvesh Gupta

analyst
#90

Got it. Second point, sir: orders worth INR 1,900 crores have now been booked, but during these 45 days following 30th June, no order booking has taken place. Would that be a correct assumption?

Padam Gupta

executive
#91

I’ll say this: we are certainly bidding, and we are L1 in 1 or 2 tenders. We can only claim, and we have orders in hand with us, because generally we have not claimed in that way. But tendering is happening. All I can share with you is that tendering is happening. A lot of business has come back — business is back.

Sarvesh Gupta

analyst
#92

For those 2 orders, that's L1, correct? So in the same way, what would the L1 amount be at this point?

Padam Gupta

executive
#93

Roughly 700 to 750 crores.

Sarvesh Gupta

analyst
#94

So that will probably land with us?

Padam Gupta

executive
#95

So ultimately, if customers can accept price levels of this kind. And a lot of customers are seeing commodity prices cycle — as things improve, they might rather do some form of snap bidding. With the power grid today, that's also turning into a way of life, where they go for snap bidding in between.

Sarvesh Gupta

analyst
#96

Sir, regarding the DC side, why is there so much discretion about when revenue gets recognized? Ideally, if the EPC work is underway right now and the contract has been awarded to the parent, then the parent ought to book DC revenues according to the construction schedule.

Padam Gupta

executive
#97

Honestly, there isn’t a perfect reply to what you’re asking, sir. With a third-party contract, you handle the whole co-servicing arrangement and oversee it from start to finish. In the DC model, by contrast, you operate more as developers, sir, and a lot of the services get outsourced by you. Plenty of firms have done this before, but we tend to be cautious here, I would say. We don’t want to present performance in an overly favorable light when we haven’t yet put strong effort behind it, or when revenue isn’t yet visible. We prefer to record that revenue closer to the point where the CapEx aligns with the revenue actually materializing between us. That’s the only thing to take away.

Sarvesh Gupta

analyst
#98

All right, sir. On the cash front — right now you're basically swimming in it. You've got INR 1,200 crores sitting there. On top of that, you're going to divest a <<inaudible>> portion of the wind power assets, and that will bring in another INR 300 crores, INR 400 crores, or thereabouts — perhaps INR 200 crores, INR 250 crores. Beyond that, we're earning a meaningful amount of interest income as well. So, sir, what's the answer when it comes to all this cash? Because even in the DC business — first, there's debt-to-equity; second, we're seeking a partner. That means, again, our equity contribution would be fairly small; and third, we're quite conservative about how we're constructing it, so that the company's overall performance isn't affected. So with all of that in mind, where is the cash going to get deployed, given that this INR 1,000 crore odd of cash will always stay with the company? So what's the answer for this surplus cash we're holding? Shouldn't we return some of it? Or is there some other thinking on this subject? Because there's simply too much cash that's going to sit with you for the foreseeable future.

Padam Gupta

executive
#99

As we discussed at the previous meeting — you probably weren't present for it — we laid out very clearly that roughly 500 crores will go back to investors across the coming 3 years. A buyback is underway right now in which we're paying out close to 160 crores, tax included. On top of that, we're distributing about 25 crores as dividend. So across 3 years, the plan is to return 500 crores to investors — that's point one, sir. We've set aside another 500 crores to 700 crores for the data center business, plus another INR 250 for growth in EPC. It's a fairly balanced approach. And should this Electricity Act be approved, more and more of the EPC business will shift into CapEx-based work, where the only ask of you is to deliver a solution. As in Europe — commissioned, performing — and only then does the asset owner purchase it. So a substantial cash need will simply be a way of life. And we had that, sir, since there's no room to carry debt in our business — at least in EPC. Our focus is exactly this: I must close my contracts, I must collect my last-mile payments, so that our fees and expenses are fully covered by contract closure — which is what we did this quarter and the last, realizing a lot of cash, closing many contracts, and now we're back into new EPC business with a clean slate.

Padam Gupta

executive
#100

That's the place where Techno has kept the cycle running throughout the past 10 years. And sure, I'm not the biggest, but I can promise you that technologically and in working capital management, we'll be among the most efficient.

Operator

operator
#101

Our next question comes from Amber Singhania at Nippon India AMC.

Amber Singhania

analyst
#102

Sir, just a couple of points of clarification. I wanted to check on the revenue side — you said a lot of projects were under completion, and that's why the supply content was less, and that's why the revenue number is looking slightly lower. Is that — am I correct, sir?

Padam Gupta

executive
#103

Yeah. You're not far off at all, I'd say. The services piece is bigger because, whatever figure we assign it, it's a composite of supply chain services. So on the cost side, services make up nearly 50% of that.

Amber Singhania

analyst
#104

And then, second, of the total order book of roughly 3,200-odd crores that we currently hold, about what proportion has yet to begin, or is only at a very early stage of starting?

Padam Gupta

executive
#105

Yeah, yeah.

Amber Singhania

analyst
#106

Where will revenues land in the quarters that follow?

Padam Gupta

executive
#107

Got it.

Amber Singhania

analyst
#108

Sir, what might that proportion be?

Padam Gupta

executive
#109

Sir, nearly 80% of the business is new to us, and we've booked that in the last quarter plus this quarter. Revenue growth, you can count on it, will begin in Q3 of this year and run for the next 6 quarters. Broadly speaking, those peak quarters will run from Q3 of '22 and '23 through Q4 of '24, coming out of this business. After that, it will begin tapering again in '24 and '25. That is, unless we bring in new business once more near the close of '23, which is what we hope to do.

Amber Singhania

analyst
#110

And regarding all of the FGD orders, approximately what sort of booking might we have already completed, sir, from those older FGD projects?

Padam Gupta

executive
#111

Right now, our unexecuted FGD business stands at roughly — aside from the 1,455 as new business — the unexecuted portion of DVC is about 68 crores, sir. So if you add that 68 crores in, it comes to roughly 15 crores, 20 crores.

Amber Singhania

analyst
#112

Understood. And finally, sir, regarding wind, you said the capacity equal to 85 megawatts will be moved over to separate companies, <<inaudible>> data center. So what timeline do we see for completing that transfer? And have you all already begun the process of canceling the PPA on that account? Or until when will Tamil Nadu keep on taking in the surprise from our side in that case?

Padam Gupta

executive
#113

Sir, we'll begin that transfer in October, since we don't want to miss out on the peak season that's happening at present. It goes on — wind season — wind is a seasonal industry, which runs almost until mid-October. And after that, until March, there's a lag period. So we'll kick it off around the middle of October and wrap it up by the end of March. That way, this peak season gets fully built out to the government only.

Amber Singhania

analyst
#114

All right, so this year it's essentially government billing, and then next year...

Padam Gupta

executive
#115

However, we're currently in the process of selling roughly 40 megawatts to third parties at this point, and those agreements are close to being finalized, so we anticipate being clear of that CapEx.

Amber Singhania

analyst
#116

And what would the price be at which this separate <<inaudible>> sells power to data centers? Do you have any rough figures for that line of business? How is that agreement going to be rounded off?

Padam Gupta

executive
#117

Sir, it will be based on the market tariff, obviously—only the determined tariff, only the dynamic tariff—which is itself changing quite dynamically. If this Electricity Act goes through and open access and renewable power become a way of life, then the tariff is likely to be lower than the tariffs generally determined by the DISCOM. And if all tariffs are alike, there may be consumption. Otherwise, we would like to transfer power to the data center at the market determined range or at the DISCOM regulatory approved tariff, whichever is high.

Amber Singhania

analyst
#118

Techno is going to hold 100% ownership of this, or they'll be, say, arriving by way of data center or something else...

Padam Gupta

executive
#119

This will be done together with Europe. Right now, in our rural areas, we are required to grant group captive status. Under group captive status, the buying entity has to own 26% of the equity. What that means is the data center company must purchase 26% of the equity in the power company. Techno alone will retain the remaining 74%. However, the capital contribution will be kept very low, so the data center company does not have a bigger involvement on the capital side. Generally speaking, the arrangements work as a kind of deposit — any electricity board takes a security deposit covering 1 month to 2 months of power supply. That deposit will therefore be taken in the form of equity.

Amber Singhania

analyst
#120

So there wouldn't really be any money coming in, mainly to Techno, if you're moving 26% of capacity through the joint venture? Or is it going to be...

Padam Gupta

executive
#121

Right. There won’t be any inflow, sir, but at least we won’t get any future power juice from the state discounts. On the revenue side, things will improve month-on-month.

Amber Singhania

analyst
#122

And then one last thing, sir: for this 24-megawatt Chennai data center taken as a whole, how much total equity are you planning to put in from the Techno side? Is there some cap or ballpark figure that we've set beyond which we won't go, and we'll just wait for the <<inaudible>> to come in?

Padam Gupta

executive
#123

No. Look, this project is being rolled out in 4 phases. Each phase comes to 6 megawatts. For phase one, the CapEx sits at INR 550 crores. And we definitely aren't planning to put in more than 150 crores to 200 crores as capital here. Once a partner comes in, the SPV's total capital will land somewhere around 450 crores to 500 crores. So usually, these foreign investors want a slight majority. That means it'll either be roughly 51-49 or perhaps 55-45. Which means Techno's involvement will never go past 200 crores in 1 data center such as Chennai. But we'll also be launching data centers in other locations, where development costs will keep getting incurred as well. So we have certainly set aside about 500 crores for this business, spread across the next 3 to 4 years.

Operator

operator
#124

Since that was the final question for today, I'll now pass the conference to Mr. Guptaji for closing remarks.

Padam Gupta

executive
#125

Correct.

Operator

operator
#126

Sir, do you have any final remarks you'd like to make?

Padam Gupta

executive
#127

Yes, yes, yes. Thank you all. I want to express my gratitude once more for being on this conference call with us. We've done our utmost to satisfy as many of you as possible. Anyone who still has further questions about our performance or about any piece of information is more than welcome to email us, and we'll be quick to respond — such messages can be directed to Mr. Vishal Jain, who handles IR for us. And should you find yourself on this side of the country, you're very welcome to come see for yourself how our work is done up close. Taking you around our office would be our pleasure. Or if there's any project site you'd like to visit, simply write to us. We'll gladly make those arrangements. With that, I'd like to wrap up the conference and thank everyone, once again, for participating this year.

Operator

operator
#128

Thank you. That brings this conference to a close on behalf of Asian Market Securities Limited. We appreciate your participation, and you’re welcome to disconnect your lines at this time.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Techno Electric & Engineering Company Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Techno Electric & Engineering Company Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Techno Electric & Engineering Company Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.