Torrent Power Limited (TORNTPOWER) Earnings Call Transcript & Summary

August 7, 2021

National Stock Exchange of India IN Utilities Electric Utilities earnings 56 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to the Q1 FY '22 earnings conference call for Torrent Power Limited, brought to you by IIFL Securities. <<operator_script>> Kindly be aware that this call is being recorded. I'll now turn the conference over to Mr. Harshavardhan Dole of IIFL Securities. Thank you, and the floor is yours.

Harshavardhan Dole

analyst
#2

Thanks, Zed. Hello, everyone. I'm speaking on behalf of IIFL Securities, and I'd like to welcome all of you to Torrent Power's Q1 FY '22 earnings call. With us today to go through the numbers in detail and to share some performance outlook for the road ahead is the senior management team of Torrent Power. Representing the team will be Mr. Saurabh Mashruwala, VP, Finance; Mr. Rishi Shah, GM Finance; and Mr. Jayprakash Khanwani, AGM, Finance. I'd like to ask Saurabh bhai to give his opening remarks, after which we can open the floor for Q&A. Over to you, Saurabh bhai.

Saurabh Mashruwala

executive
#3

Yes. Thank you, Harsh. Yes, good morning everyone, and thanks for being on Torrent Power's earnings call for Q1 FY '22. To start with, I'll walk you through how we performed during the quarter, and after that we'll open the phone lines for the Q&A session. I'll go over the company's performance at the PBT level, and then we'll take up the tax expenses. Reported PBT for the quarter came in at roughly INR 273 crores, against INR 468 crores in the same quarter a year ago. That works out to a decrease of INR 195 crores, which is about 42% on a reported basis. So that you can understand the core company's underlying performance, we'll take you through the nonrecurring items for the quarter. Nonrecurring items appear in both quarters — this quarter as well as the comparable quarter of last year. Let's begin with the nonrecurring items of the current quarter, which include roughly 21 crores of bad debt provision that we've taken in the franchised distribution businesses. Economic activity at our distribution franchise businesses kept recovering from the pandemic's effects through Q1 FY '22.

Saurabh Mashruwala

executive
#4

But there was some moderation during the second wave — the second COVID wave — relative to the pre-COVID level. That is FY — we're referring to Q1 of FY '19/'20. Comparable demand has fallen 13%. That compares with a degrowth of 27% seen in the same quarter a year earlier. So our demand in franchised distribution remains 13% below the pre-COVID level for Q1. Disruptions from the second wave pushed back recovery of areas in FY '21, and so a provision of 21 crores needed to be made during the quarter. We expect that over the next 2, 3 quarters, we should be able to recover a material amount of these provisions, particularly in the cases of Bhiwandi and Agra. Now turning to the nonrecurring item in the comparable quarter of Q1 FY '21. There are 2 items. As you'll recall, our licensed distribution business received favorable orders from the regulator effective — regarding past regulatory claims of 344 crores. So these are pretax out of 344 crores.

Saurabh Mashruwala

executive
#5

So, there was a one-off income of 344 crores that we had booked in the same quarter a year ago, and that wasn't present in the current quarter. On top of that, a loss of 61 crores was also recognized, stemming from <<inaudible>> fixed costs that the government of Gujarat permitted <<inaudible>> consumers for April 2020. The reason is that, due to the lockdown, the government of Gujarat granted concessions to industry. And we recorded that 61 crore loss in Q1 of last year. So, taken together, the net credit booked in the previous quarter comes to 283 crores. After adjusting for those one-off items in both quarters — Q1 of the current year and the prior year — adjusted PBT for the quarter came in at 294 crores, versus 185 crores in the same quarter last year. That works out to a rise of roughly 109 crores on a normalized basis, an increase of about 59%. So on a normalized basis, profit improved substantially, by 59%, for the comparable quarter of last year. We'll now walk you through the key highlights on the 109 crore improvement in adjusted PBT for the current quarter.

Saurabh Mashruwala

executive
#6

That's a significant boost, and it comes from our franchised distribution operation. We saw a considerable drop in T&D losses, primarily within the distribution franchised business, thanks to industrial demand recovering after being heavily hit last year. The positive effect on profit, I'd say, amounts to 138 crores from lower distribution losses across the franchised areas of Agra, Bhiwandi and SMK. On top of that, finance costs fell on a gross basis by INR 58 crores. In other words, our finance cost was INR 58 crores lower as well. This reflects both a reduced interest rate and a decline in our overall debt level. For the quarter, the average interest rate came in 130 basis points below the equivalent quarter a year earlier. Beyond that, our average debt level was roughly 1,100 crores lower when comparing June 30, 2021 with June 30, 2020. During the previous quarter we didn't take on any fresh borrowing, since internal accruals were quite robust. As a result, we avoided any increase in borrowings last quarter. Looking at our borrowing level — it stood at 8,834 crores as of 30th June 2020, versus a current level of 7,736 crores, a decrease of roughly 1,100 crores.

Saurabh Mashruwala

executive
#7

Look, there are two positive things this quarter — franchised distribution did really well, and we managed to bring down interest costs. But there are negatives as well. Take the first one: we couldn't move enough volume in the merchant market, since demand was somewhat weak and running at a lower level. As a result, merchant sales fell, and the hit comes to roughly 25 crores. Then we have a PPA with the PTC for the Sugen power project, around 75 megawatts, and under that contract they're entitled to cut the PPA by 25 megawatts. So that works out to about 4 crores in fixed costs. Next, the renewable business delivered a lower contribution — down 11 crores — because of a weaker PLF in March, which we booked. That said, over the course of Q1, PLF on a comparable basis came in 2% higher than the FY '21 figures. <<inaudible>> there's an additional 13 crores <<inaudible>> that we charged to the P&L, driven by a higher level of CapEx and — of — over the last 3 years.

Saurabh Mashruwala

executive
#8

Regarding the increase of 14 crores in O&M expenses that we have accounted for, this is primarily due to a higher level of operating activities. So demand in both the licensed as well as franchised distribution area has improved by about 38%, as compared with the comparable quarter of last year, but they are yet to reach the pre-COVID level of FY '19/'20 because demand is still lower in Q1, mainly because of the second wave of COVID. And we expect that the year-end demand will be likely to be pre-COVID level of FY '20 -- of '19/'20. Moving over to the PAT numbers. Consol PAT reported for the quarter is -- was INR 209 crores, as compared with INR 368 crores. This INR 368 crores includes a one-off item of about the -- pretax level of about 283 crores. So profit was lower by about 159 crores. This is about roughly 43%. This is the overview -- this completes the overview of the quarterly performance of the company. Now we'll provide with you the update about the projects in pipeline, renewable projects in the pipeline. So on 30th July, the company entered a security purchase agreement with Lightsource group to acquire 50-megawatt solar project located in Maharashtra, Solapur area.

Saurabh Mashruwala

executive
#9

Now, the important details, the key details — I can, I mean, give you the key details about this acquisition. The project's enterprise value comes to roughly INR 317 crores, and that's subject to adjustments at closing. That enterprise value is made up of INR 196 crores of debt and an equity contribution of approximately INR 121 crores. If we exclude cash and cash equivalents of INR 22 crores, the net equity investment works out to around INR 99 crores. This project's initial cost was roughly 6.25 crores per megawatt on an AC capacity basis. The project has a PPA with SECI running for about 25 years. Roughly 22 years of life remain. The tariff contract stands at INR 4.43 per unit. Looking at the average PLF over the last 3 years, that average is around 20 — 21.6% on an AC capacity basis. We expect — going forward, once we take it over, we expect some savings on O&M costs, which will improve the IRR. And the transaction — we expect the transaction to be completed within the next 60 days. So we'll give you an update on the other 3 projects that are in the pipeline — in the pipeline.

Saurabh Mashruwala

executive
#10

The first one is the SECI V project — we have SECI V <<inaudible>>, which we won in the SECI V bidding. SECI — the — SECI, March '21, has granted an extension for this project — a COD extension for this project to — through February FY 2022. The project size is 115 megawatt. The earlier COD was July 2020. So, taking into account the extension granted by SECI, we are working with <<inaudible>> to revive the project. So this project <<inaudible>> in FY '19/'20, which, because of the extension granted by SECI, we are trying to revive. As you know, we have signed 2 PPAs on — on a solar front, 100 megawatts with GUVNL and 300 megawatts with our own distribution of TPLD. And land acquisition for both projects is in progress, and we expect the order for the models to be placed in a couple of months. As far as the AP project is concerned, AP <<inaudible>> L1 in the AP project, but at present the project is subsidized. With respect to our <<inaudible>> licensed distribution business of union territories Dadra and Nagar Haveli and Daman and Diu, we really have emerged as a successful bidder of 51% stake.

Saurabh Mashruwala

executive
#11

We want to provide a fresh update on the supreme court filings of the same <<inaudible>> Bombay high court regarding the tender process, along with a matter that will be heard by the supreme court very shortly. That will wrap up the update on the upcoming projects which are on the pipeline. I’d now ask our coordinator to begin the Q&A session. Thank you so much. Passing it over to the operator.

Operator

operator
#12

<<operator_script>> Our first question comes from Mohit Kumar at DAM Capital.

Mohit Kumar

analyst
#13

Yes. Sir, for my first question, could you possibly provide the segment-wise breakdown of EBIT or EBITDA, particularly on a Q-o-Q basis?

Saurabh Mashruwala

executive
#14

All right. Looking at EBIT on a comparable basis, Q1 FY '21 to '22 against Q1 FY '22 to '21 — and '22 as well as '21 — key assets generation posted EBITDA of 17 crores, versus 92 crores a year earlier. For renewable, this quarter's figure stands at 106 crores against 115 crores last year; the licensed distribution business came in at roughly 209 crores this quarter, compared with 188 crores in the same quarter a year ago. Franchised businesses have improved considerably, as we discussed, thanks to the lower T&D losses we reported. So the number for this quarter is around 141 crores versus 16 crores last year. And overall, before one-off, it's 447 crores against 391 crores — that's an incremental EBIT of 56 crores for the current quarter.

Mohit Kumar

analyst
#15

Sir, the question really came from us trying to figure out why EBITDA is down quarter over quarter, given that the businesses haven't seen any sharp decline — particularly on a Q-o-Q basis.

Saurabh Mashruwala

executive
#16

Yes. We've covered this. Since in the previous Q1, we booked roughly 283 crores in one-off items...

Mohit Kumar

analyst
#17

No, sir, when you compare that with Q4, it's Q4 as opposed to Q1.

Saurabh Mashruwala

executive
#18

Q4 compared with Q1. <<inaudible>>.

Executive

executive
#19

<<inaudible>>.

Saurabh Mashruwala

executive
#20

Q4 and Q1 can’t really be compared, since our business has quite pronounced seasonal swings. On top of that, volumes tend to be lower in Q4 and higher in Q1 as a result of those seasonal patterns. The effect of T&D losses also differs, so in a business like ours, making an exact comparison between the preceding quarter and the current one isn’t feasible. That’s the reason we always compare against the same quarter of the prior year.

Mohit Kumar

analyst
#21

Got it. Second, you mentioned you're working to bring SECI projects back to life. So are we reviving the whole set of projects we bid on? I think SECI IV, V, and VI, which I believe make up a substantial number. Or is it just part of the capacity that we're reviving?

Saurabh Mashruwala

executive
#22

Those are the 1 and 2 project wins we walked away from — roughly 499 megawatts of Gujarat projects that we aren't bringing back. This 115-megawatt project, though, we are reviving right now.

Mohit Kumar

analyst
#23

So it's not about bringing the other ones back? That's the reason. Is the IRR particularly bad? Is that...

Saurabh Mashruwala

executive
#24

No, an extension was granted. Plus, those 499-megawatt projects have land problems as well. So with this project, we've managed to resolve every issue. And we also received the extension from SECI, so we're bringing this project back to life.

Mohit Kumar

analyst
#25

All right, got it, sir. And finally, sir, regarding Dadra and Nagar Haveli — which states are still outstanding? Once that's settled, we'll be in a position to take over the asset.

Saurabh Mashruwala

executive
#26

The case is now going to be heard by the supreme court. Meanwhile, the government is also attempting to address the LOA matter. So as soon as that LOA becomes available, the handover process will get underway.

Operator

operator
#27

<<operator_script>> We now move to a question from Ankit Patel, who is calling in from L&T Mutual Fund.

Ankit Patel

analyst
#28

Yes. My question concerns the solar PPAs at INR 1.99 and INR 2.22. Could you tell us what kind of returns you expect from these projects? Since these tariffs appear to keep declining continuously, and this will rank among the lowest tariffs, what sort of returns, sir, do you expect from these projects?

Saurabh Mashruwala

executive
#29

On the earlier call, we mentioned that these projects are generating an IRR in the low teens. And we keep working on the model prices, which right now are somewhat higher. So we do have some time on our side, and we have some contingency as well. As a result, we anticipate that model prices will come back to a normal level. So for these 2 projects, we're expecting an IRR in the low teens.

Ankit Patel

analyst
#30

Alright.

Operator

operator
#31

Is that what you were asking about?

Ankit Patel

analyst
#32

Yeah, alright.

Operator

operator
#33

The next question comes from Subhadip Mitra with JM Financial.

Subhadip Mitra

analyst
#34

There are a couple of related queries here. I believe these points have come up already, but I think I missed the figures. So you said adjusted PAT for this quarter is 294 crore against 185 crores a year ago. Is that at the PBT level, or PAT ?

Saurabh Mashruwala

executive
#35

Now turning to the PBT figure. We discussed the PBT figures. For the current quarter, adjusted PBT stands at 294 crores, compared with 185 crores in the prior year — that's a rise of 109 crores, or roughly 59%.

Subhadip Mitra

analyst
#36

Also, on that second point, you brought up generation EBIT as well. Could you go over those figures again? I didn't catch them.

Saurabh Mashruwala

executive
#37

Generation, yes, yes. Generation is roughly 17 crores for this quarter, and in the matching quarter a year ago, it was 92 crores.

Subhadip Mitra

analyst
#38

The decline here is mainly attributable to...

Saurabh Mashruwala

executive
#39

Apologies...

Subhadip Mitra

analyst
#40

So what's driving that drop you're seeing this year in generation EBIT — 17 crores down from 92 <<inaudible>> — what's the main reason behind that?

Saurabh Mashruwala

executive
#41

Look, merchant sales took a hit due to the lower price over the course of the quarter. So merchant sales came in lower, and we lost roughly 35 crores in contribution versus the prior quarter — versus the same quarter last year. So the merchant impact — the sales impact was around 35 crores, an essential impact, I'd call it. And there was a PPA, which I explained. The PPA with the PTC was approximately 75 megawatts. The contract had a condition that it would be — they hold a right to reduce as much as 15 megawatts. So roughly fixed cost — a reduced fixed cost is 4 crores per quarter — in this — for this quarter. Plus there are — a higher level of activity has pushed expenses up at the Sugen plant as well as Unosugen too.

Subhadip Mitra

analyst
#42

That's regarding the O&M tied to the 13 crore — I believe you brought up 13 crore.

Saurabh Mashruwala

executive
#43

Yes, those are costs tied to O&M.

Subhadip Mitra

analyst
#44

Understood. Second, sir, regarding those solar projects you brought up and what is expected of <<inaudible>>: for both of them — the 100-megawatt GUVNL project and the 300-megawatt one — the planning orders, the solar module orders, and so forth have not been placed as of yet, is that right?

Saurabh Mashruwala

executive
#45

That hasn't been placed yet.

Subhadip Mitra

analyst
#46

And when would the COD for these projects fall due — and, say, what's the cutoff by which you'd have to place the module orders?

Saurabh Mashruwala

executive
#47

So Subhadip, according to the current COD, the deadline is July '22. We're keeping a close eye on module prices in the market. I think, at the latest, we'll determine when we ought to place the module orders, but we're also anticipating that GUVNL might grant us an extension because of the second COVID wave, and in that case we'd have extra time to order the modules. So we expect that — with both of these factors combined — there should be time available for us to book the modules and salvage these projects.

Subhadip Mitra

analyst
#48

Got it. So normally, you have to place the order for those modules a minimum of 6 months ahead of the planned COD...

Saurabh Mashruwala

executive
#49

Yeah. Normally, that's the window — 4 to 6 months out — when you'd place the module orders. It can be compressed as well, though, depending on the readiness situation with regard to the other items.

Executive

executive
#50

<<inaudible>>.

Subhadip Mitra

analyst
#51

Got it, got it, all right. My final question concerns the SECI V bid of 15 megawatts (sic) 115 megawatts. So what you're saying here is that the land, the transmission, and the other related activities are already in place. That's the reason you're looking at salvaging this.

Saurabh Mashruwala

executive
#52

Yes. COD has been extended. On top of that, the required permissions are secured, and the land has been identified as well. So — and we also have <<inaudible>>.

Subhadip Mitra

analyst
#53

Regarding <<inaudible>> acquired <<inaudible>>, has the land actually been acquired and handed over? That <<inaudible>>.

Saurabh Mashruwala

executive
#54

We've identified it, and we're currently in the process of acquiring that land.

Operator

operator
#55

Apoorva Bahadur from Investec has the next question.

Apoorva Bahadur

analyst
#56

Sir, I'd like to get a clearer picture of this Lightsource feed, basically. We came across something saying it carries some VGF benefits too. So could you put a number on that for us, please?

Saurabh Mashruwala

executive
#57

Which one? What kind of benefit? We're talking roughly INR 8 crores, INR 9 crores.

Apoorva Bahadur

analyst
#58

INR 89 crores?

Saurabh Mashruwala

executive
#59

No. No. INR 8 crores, INR 9 crores. From INR 8 crores up to INR 9 crores.

Apoorva Bahadur

analyst
#60

From INR 8 crores up to INR 9 crores. And by what point do we think we'll be able to generate that?

Saurabh Mashruwala

executive
#61

Nope. So for the majority of those established terms from last year, whenever we get it, that's something we'll need to hand over to the seller.

Apoorva Bahadur

analyst
#62

All right, so we're going to keep it then? Understood.

Saurabh Mashruwala

executive
#63

Yes. We won’t be keeping it.

Apoorva Bahadur

analyst
#64

Alright. Alright. Sir, moving on to the second point, regarding that upcoming AMGEN expiry specifically. So, given the government's focus on enhancing the islanding of large cities, should we be expecting an extension there?

Saurabh Mashruwala

executive
#65

At this moment, we can't say for certain. That said, talks with the government are ongoing, and so our hope is that an extension gets granted. Essentially, then, it comes down to islanding for Ahmedabad — that area, the distribution area. As a result, we remain in constant touch with the government. So — we'll have to see — our hope is that the extension is granted, that a further extension is granted for this project.

Apoorva Bahadur

analyst
#66

Correct. So that would apply over the shorter or medium term, which is 3 to 5 years?

Saurabh Mashruwala

executive
#67

Right, yes.

Apoorva Bahadur

analyst
#68

We'll hold for that. All right, sir. So one more question on this — the module procurement for our 2 solar projects. Will those also be affected by the ALMM, given that we can now buy only from the approved list? So does that — is that creating any obstacle for us when it comes to getting modules at the best price?

Saurabh Mashruwala

executive
#69

So at the moment — if you look around the world right now, module prices are elevated because of certain sectors. But specifically, this list isn't holding us back. The main pain point is those elevated prices.

Apoorva Bahadur

analyst
#70

All right, so if you could weigh in right at the start — essentially, the suppliers you'd want to partner with, are they showing up on this list?

Saurabh Mashruwala

executive
#71

Yeah, absolutely, definitely.

Apoorva Bahadur

analyst
#72

All right, that’s great. And if I could just fit in one additional question, it concerns the gas price. And at present, what size of volume do we have committed?

Saurabh Mashruwala

executive
#73

Looking at the current year, FY '22, we're mostly covered — roughly 70% of the requirement is locked in. There are still some quantities we need to tie up, but by and large we're protected. As for the recent rise in the spot price, our thinking is that it isn't sustainable. That gives us time to contract for the following one after that. So we'll focus on contracting for the next one and the one after it. Our view is that the present price can't hold.

Apoorva Bahadur

analyst
#74

So basically, we'll hold off until prices return to normal, and after that we'll move ahead with further tie-up?

Saurabh Mashruwala

executive
#75

Yes.

Operator

operator
#76

The next question comes from Seetharaman of Spark Capital.

Seetharaman R

analyst
#77

Could you share the merchant units sold — in unit counts — for this quarter and for 1Q '21? And what were the average cost and average realization on those merchant sales?

Saurabh Mashruwala

executive
#78

Last year, merchant volume came in at 921 MUs.

Seetharaman R

analyst
#79

921, sir?

Saurabh Mashruwala

executive
#80

Yeah, 921 MUs in the prior quarter — the same quarter a year ago. And for this year, it's roughly 139 MUs.

Seetharaman R

analyst
#81

All right, that's right. All right, so what were the average cost and the average realization on merchant sales?

Saurabh Mashruwala

executive
#82

We can draw the contribution at about — the average contribution last was around 38 paisa, and for the current year it's roughly 2 paisa.

Seetharaman R

analyst
#83

All right, all right. And sir, regarding the shipment, how is EBITDA trending? It would be useful if you could share that, since you've provided it before for comparison purposes. So for both comparison and bookkeeping reasons, that would help. If you can, could you give us that, sir?

Saurabh Mashruwala

executive
#84

Yes, that’s possible. Here’s how EBITDA breaks down for Q1 of the current year, FY ’22, compared with Q1 of FY ’21: for key assets project EBITDA, the current quarter came in at INR 129 crores versus INR 204 crores; renewables stood at INR 175 crores versus INR 185 crores; the license distribution business — Ahmedabad, Surat, Gandhinagar, and Dahej — was INR 322 crores versus INR 292 crores; and our franchise distribution, which has turned around and produced fairly strong numbers this quarter, was INR 168 crores versus INR 39 crores; overall EBITDA before one-off was INR 776 crores versus INR 707 crores, and on a reported basis it was INR 764 crores versus INR 1,004 crores.

Operator

operator
#85

The next question comes from Aniket Mittal of Motilal Oswal Financial Services.

Aniket Mittal

analyst
#86

Right, so my first question concerns distribution, mainly at Dahej. I just want to get a sense of how overall demand looks and how collections are shaping up for this cycle. And looking at it from an FY '22 standpoint, how do you expect full-year demand to play out on AT&C losses there?

Saurabh Mashruwala

executive
#87

Yes. We mentioned that demand in the current quarter, owing to the second wave, was 13% lower than in the comparable quarter of FY '19/'20. During the quarter, it improved by roughly 38% versus the similar quarter of last year. So even now, in Q1 at least, we are not getting back to pre-COVID demand levels. Did we expect that for the year overall — we anticipated stronger recovery across the next 3 quarters. And in all likelihood, we will be reporting figures at pre-COVID levels where demand is concerned.

Rishi Shah

executive
#88

Okay Aniket, building on Saurabh's point: when you look month over month, May stood out as an especially rough month in this quarter, owing to the lockdowns tied to the second wave. If you check June and July, the figures are getting better. That's the reason we expect that by the end of this year, we will have made up for the degrowth, or we will have halted the degrowth relative to FY '19/'20 when it comes to volume per concern.

Aniket Mittal

analyst
#89

All right, so on the AT&C loss trajectory — would that again be comparable to pre-COVID levels by the end of this year?

Saurabh Mashruwala

executive
#90

I'd say we were looking for something stronger than where we stood before COVID. So, as you can see again in this quarter, AT&C losses are right in line. And that's the reason I think there ought to be some improvement in AT&C losses as we move ahead.

Aniket Mittal

analyst
#91

Sure. Okay, and turning to the provision piece. If I look back across recent months, I believe we've now built roughly INR 130 crores in excess provisions, which includes the INR 21 crores from this quarter. So on recovering that excess provision, how do we expect that to play out? I mean, given the situation, is your recoup — or could we actually get that INR 130 crores back within this year itself?

Saurabh Mashruwala

executive
#92

We anticipate roughly 130%, or 50%, of the provision being confirmed for the SMK area. So for Bhiwandi and Agra, we expect — we believe we can recover that over the coming 3 quarters. In the SMK area, we're developing some new areas where we're focused on SMK. So with SMK, it will take some time before we can recover this amount. But for Bhiwandi and Agra, I think we're hopeful that within the next 3 quarters we'll be able to recover a fairly material amount, I'd say.

Aniket Mittal

analyst
#93

Yes. So it isn't affected. Actually, just one question, to dig into the growth we're seeing in this business. You said EBITDA came in at roughly INR 168 crores compared with INR 39 crores in the prior year. Could you break down that rise in EBITDA? Specifically, how much of it stems from higher demand, and how much comes from reduced T&D losses?

Saurabh Mashruwala

executive
#94

So you're referring to Bhiwandi and Agra, correct?

Aniket Mittal

analyst
#95

Right, looking at it broadly. So broadly speaking, EBITDA arrived at INR 168 compared with INR 39 crores a year earlier. That works out to an increase of roughly INR 130 crores. Could you break that down between how much stems from reduced T&D loss and how much comes from greater demand?

Saurabh Mashruwala

executive
#96

Regarding T&D loss, we saw an improvement of roughly INR 133 crores compared with last year.

Aniket Mittal

analyst
#97

So the big gain comes just from the lower T&D loss?

Saurabh Mashruwala

executive
#98

Correct, that’s exactly right.

Aniket Mittal

analyst
#99

But at the same time, demand is up 38% year over year, correct?

Rishi Shah

executive
#100

Demand has risen as well. So at the same time on volume, the overall tariff was also lower in Bhiwandi and Agra. So the lower tariff has also had an effect on contributions. It is coming out of the T&D losses.

Aniket Mittal

analyst
#101

All right, all right. And perhaps just one question before I get back in the queue. Look, regarding the SECI V projects and the SECI III projects, we had those particular provisions too. Now that we're taking on the SECI V projects, is it possible that we're looking at bringing the SECI V projects back on as that provision reversed? And could you also repeat, in terms of the timeline, when do we — what extension have we been given for SECI V?

Saurabh Mashruwala

executive
#102

Regarding SECI V, an extension has been secured through February '22. On the matter of the provision write-back, my view is that the decision to reverse those provisions will be made at the time we finalize the commercial agreements.

Operator

operator
#103

<<operator_script>> Our following question comes from Noel with Ashika Group.

Noel Vaz

analyst
#104

Actually, one quick point. I'd like some clarity on the gas linkage for this financial year. I believe, sir, you said that 70% of the requirement is already tied up — is that right?

Saurabh Mashruwala

executive
#105

Yes.

Noel Vaz

analyst
#106

So at roughly what rate would that be, developed or?

Saurabh Mashruwala

executive
#107

Cargo, we’ve got both. That comes to roughly $4.36 per MMBtu.

Noel Vaz

analyst
#108

All right. And on that point — the situation is that future bookings haven’t been made, since the rates right now are on the higher side. And we get that this can’t be sustained, so we expect them to come down.

Saurabh Mashruwala

executive
#109

Yeah, our take is that this price can’t hold, and we think prices are going to come down.

Noel Vaz

analyst
#110

Alright.

Saurabh Mashruwala

executive
#111

So at this point we're exploring other alternatives to handle the situation that has come up as a result of higher gas prices. But we still have some time on our side to work through this. So once we've settled on the strategy for which we want to book gas for the years ahead, we'll update everyone.

Operator

operator
#112

Dhruv from HDFC Asset Management has the next question.

Dhruv Muchhal

analyst
#113

Right, so about this SECI V project — you mentioned the extension runs until Feb '22, and that's roughly 6 or 7 months away from now. Given such a brief window, do you believe the project can actually be finished?

Saurabh Mashruwala

executive
#114

To give you an example, Dhruv, we had a few projects in Karnataka, Jodhpur and Latur. We completed those within 4 months — a span of 3 to 4 months. So 6 months, I think, gives enough time, and we're already engaged on multiple facets of that. We're therefore confident that we can get it done within 6 to 8 months.

Dhruv Muchhal

analyst
#115

All right, so the machinery and all of that — you've already wrapped that up, would you say?

Saurabh Mashruwala

executive
#116

We're nearly there.

Dhruv Muchhal

analyst
#117

All right, understood. And sir, is the tariff staying the same? I believe it's 2.76. Does that stay unchanged?

Saurabh Mashruwala

executive
#118

Yes, that's still the case.

Rishi Shah

executive
#119

All other things are unchanged.

Dhruv Muchhal

analyst
#120

All right, understood. The point is that when you originally bid on this project, the assumption was that equipment costs would be coming down. But at this stage, from what I can see, with the way prices have shifted — even within the U.S. — cost escalation would now be pretty substantial.

Saurabh Mashruwala

executive
#121

There are additional sectors, then, that have worked to our advantage when it comes to, say, interest cost. Back at that moment, interest cost stood higher. Now, as you can see, interest costs have dropped considerably. There is also some land, and we're working out the strategy for how to handle that land. So overall, I think we can anticipate that we'll be getting the loading IRRs from this project, and we can channel this a bit.

Dhruv Muchhal

analyst
#122

Understood, understood, understood. And sir, roughly what would the capital cost be here?

Saurabh Mashruwala

executive
#123

INR 800 crores.

Dhruv Muchhal

analyst
#124

Sir, the second question concerned capital expenditure for the regulated business this year. What is your target for this year in regulated distribution?

Saurabh Mashruwala

executive
#125

Yeah, so Dhruv, I’d say the outlook hasn’t changed — INR 1,500 crores for the full year, with our DL and DF combined. Distribution license ought to come in at INR 1,200 crores. That said, there should be a bit of upside to that INR 1,200 crores thanks to the lower CapEx we carried out last year. Some of it could spill over.

Dhruv Muchhal

analyst
#126

So you're saying it's more than INR 1,200 crores?

Saurabh Mashruwala

executive
#127

Correct.

Rishi Shah

executive
#128

Yes.

Dhruv Muchhal

analyst
#129

Do we have a distribution license?

Rishi Shah

executive
#130

Yes.

Dhruv Muchhal

analyst
#131

And sir, one last small item on O&M. So O&M has gone up by INR 13 crore. So has a base reset taken place? Or is this just something that came through in this quarter? I mean, have these service contracts been restated so that it's locked in for the full year?

Rishi Shah

executive
#132

No—it comes down to a higher volume of activity.

Dhruv Muchhal

analyst
#133

All right, so there isn’t any base reset? In other words, this applies only to the current quarter.

Saurabh Mashruwala

executive
#134

Yes. Absolutely.

Rishi Shah

executive
#135

Higher activity has brought operations and maintenance costs down.

Operator

operator
#136

The next question comes from Anuj Upadhyay with HDFC Securities.

Anuj Upadhyay

analyst
#137

Yes. Most of the questions have already been addressed. I have two of my own. The first concerns your SMK losses, which remain at roughly 43 odd. So, sir, is there any roadmap for what we are aiming at over the coming 1 or 2 years? And what level of CapEx is incorporated into the plan so that you can furnish for the SMK area in order to bring it down?

Saurabh Mashruwala

executive
#138

Yes. SMK is a new territory for us, and we took it over on 1st of March 2021. At the start of the tariff — when the tariff came in, when COVID hit — that's when we acquired this territory. So over the last 1 year, we haven't been able to get much done in the SMK area. But going forward — in fact, we've already begun altering the network in SMK — so over the next 5 years, I'd say it will be — we will get to a very different level of AT&C losses in the SMK area.

Rishi Shah

executive
#139

Anuj, to build on what Saurabh said, it was unfortunate that we received a handover of a new area right when COVID hit, when everything was locked down. As a result, I think we waited 1 year to put in place the necessary things we wanted to do in that area. So effective last year, we have been able to do -- there is the needful amount of what we would have done. And that is why you are seeing the higher pains coming out of that region. But going forward, I think it should follow what we have done in Bhiwandi and Agra. That is the expectation.

Saurabh Mashruwala

executive
#140

Sure, here's an illustration. Take Q1 of FY '21, when AT&C -- T&D loss stood at roughly 53%. This Q1, it's around 43%. That means we've brought T&D losses down by 10% in the SMK area. A reduction of this kind is what we've assumed over the last 1 year, and we did it without heavy spending on CapEx and network building. So over the next 4, 5 years, as we focus on building the network, these T&D losses should drop substantially -- that's what we expect.

Anuj Upadhyay

analyst
#141

Okay, sir. Is there any figure you can put a number on, sir, regarding what the SMK product lost?

Saurabh Mashruwala

executive
#142

No. We won’t be in a position to use a segment unit-wise numbers.

Anuj Upadhyay

analyst
#143

Alright, sir. The next question concerns the distribution opportunity. What we're seeing — or what we believe the figure we're now seeing is — sits below the Supreme Court level. But are there any other states where we're seeing an opportunity with a distribution licensee or a franchisee?

Saurabh Mashruwala

executive
#144

Right. We believe the government is going to put that new union territory up for bid. So the bidding will come from elsewhere — the demand within the union territory. And state governments too, such as UP, are also considering moving toward privatization. So our hope is that a new area will open up for bidding.

Operator

operator
#145

Our next question comes from Aniket Mittal at Motilal Oswal Financial Services.

Aniket Mittal

analyst
#146

So I just want to make sure I understand this 25-megawatt reduction in the PPA — I believe that's what took place. I was hoping for a bit of color on the PPA terms. You also said there's a possibility of a further backdown of another 25 megawatts. So could you give some color on what method is used for that, and how you see it playing out going forward?

Saurabh Mashruwala

executive
#147

Under the contract, they hold the right to cut 25 megawatts from the 75 megawatts of PPA. That's exactly what took place this year. And then — 5 years down the line — once more, they can reduce it by 25 megawatts.

Aniket Mittal

analyst
#148

So once those 5 years are up, they’re able to lower it at that point. And how much usable life might still be left in this?

Saurabh Mashruwala

executive
#149

A 25-year PPA.

Aniket Mittal

analyst
#150

Okay. Okay. All right. And sir, just one question, really, about the gas tie-up. You said roughly 70% of your FY '22 volumes are tied up. But just to understand, what inherent PLF assumption are you making for SUGEN and UNOSUGEN when you say that 70% has been tied up?

Saurabh Mashruwala

executive
#151

Roughly 65% for the PLF assumptions, give or take.

Aniket Mittal

analyst
#152

And that applies to both SUGEN and UNOSUGEN?

Saurabh Mashruwala

executive
#153

Yes.

Aniket Mittal

analyst
#154

Alright, and perhaps one final question regarding SMK.

Rishi Shah

executive
#155

My view is that the benefit from PLF splits 35% and 65% between Ahmedabad distribution and Surat distribution.

Saurabh Mashruwala

executive
#156

That's going to be 65% PLF for the whole plant.

Aniket Mittal

analyst
#157

So regarding — all right, as for that capacity which is tied up, that's what you mean?

Saurabh Mashruwala

executive
#158

No, no — I mean the whole plant.

Rishi Shah

executive
#159

The whole facility. The whole facility.

Aniket Mittal

analyst
#160

For the whole facility, right? The whole facility for SUGEN and UNOSUGEN. Okay, understood. And regarding SMK, just so I can grasp the effect that's headed for the DF, what's the profitability effect for each 1% cut in T&D there?

Saurabh Mashruwala

executive
#161

So Anuj, I'd say at this point it's hard to put an exact figure on it. But as a ballpark, the improvement ought to be somewhere between INR 5 crores and INR 6 crores—though it's too soon to say anything for certain right now.

Harshavardhan Dole

analyst
#162

Zed, I’ve got a couple of questions I’d like to ask. May I go ahead?

Operator

operator
#163

Absolutely, sir. <<operator_script>> Harsh, go right ahead with your questions, please.

Harshavardhan Dole

analyst
#164

So Saurabh bhai, we expect changes to the Electricity Act, and that should open up plenty of growth avenues. Combined with the new 3 lakh crore CapEx scheme the central government has announced, it's quite likely that areas like smart metering, providing ancillary services, or even running smart meters on behalf of many of these distribution companies become available for private participation. Do you see this as a growth area for us? And if so, how are we preparing for it? Have you pinpointed where you'd want to go and execute these smart metering projects? That's the first part. The second part concerns offering ancillary services, such as EV charging, at least within the license area. If you could just update us on the progress we've made and what revenue model we should adopt there?

Saurabh Mashruwala

executive
#165

Yes. On that deal licensing matter, we see a really strong opportunity for players such as us. We have a solid grip on distribution, so this is a very good chance for us, since we can grow within our current territory of Ahmedabad, Surat and the areas we already serve. On top of that, we can move into new regions as well, places where we believe we are efficient. There is a lot of inefficiency in the distribution sector right now, so we can capture these areas, and we can expand into other regions too. So for Torrent Power, we view this as a great opportunity to go beyond our own territory.

Harshavardhan Dole

analyst
#166

All right. Do you have anything to say about the smart metering initiative — would you want to serve as a vendor for some of these reforms? Or should we just move past that topic?

Saurabh Mashruwala

executive
#167

Correct. Up to this point, we haven’t done any work on it. However, whenever the right opportunity arises, we’ll take it on at that time.

Harshavardhan Dole

analyst
#168

And what about any news on the EV charging infrastructure and so on, at least within the license area? Do you have any thoughts there?

Saurabh Mashruwala

executive
#169

No. As of now, we haven't done any work on that.

Harshavardhan Dole

analyst
#170

Alright, great. Zed, I believe we have a handful of questions lined up. Go ahead and take them.

Operator

operator
#171

Moving on, we have a follow-up question coming from Mohit Kumar at DAM Capital.

Mohit Kumar

analyst
#172

My question has to do with gas prices, which are elevated right now. So when do you expect — since it also looks like we lock in our gas contract for the coming year — how do you view that? And a second question on the same topic: do higher gas prices hurt our capacity to recover fixed charges, particularly at UNOSUGEN, given that I believe some capping was in place?

Saurabh Mashruwala

executive
#173

Our initial take is that this elevated gas price can't last. And like we mentioned—as we told you earlier this year, we're basically shielded since roughly 75—70% of the requirement is already covered. Around 30% remains to be covered, but that's fine. On average, we believe we're well protected for the current year. And there's time for us to contract it for next year and beyond. So—and we sense that gas prices will ease, and we'll have the chance to cover gas for the remaining—for future years. And RIL is also coming forward with bidding, and domestic gas has been becoming available too. So mostly—nearly 20% of gas is—we are utilizing domestic gas. So where UNOSUGEN is concerned, given that domestic gas is available at a reasonable rate, we expect to stay competitive when it comes to capping.

Mohit Kumar

analyst
#174

Sir, what sort of opportunity does gas being made available through the other gas fields present in the near future? Do you have any figures, particularly for FY '22?

Saurabh Mashruwala

executive
#175

Nope. As of right now, I’d say we don’t have those figures.

Operator

operator
#176

Aniket Mittal from Motilal Oswal Financial Services has a follow-up question, which comes next.

Aniket Mittal

analyst
#177

Yes. Sir, my question was actually about that Lightsource acquisition, and I just wanted to get a sense of your thinking there. I mean, is there now some kind of internal target that we're building toward on renewables? Or is it that the existing bids coming in from SECI are extremely competitive, and that's why we're looking at this as well? Just a bit of color, maybe, on what led you to look at this acquisition, and our plans for growing the renewable portfolio would be helpful.

Rishi Shah

executive
#178

So, Aniket, I don't think we really provide any guidance as such when it comes to growth in renewables, but we're always watching for opportunities that fit with our overall plan. Regarding this acquisition — this specific one — if you look at it, I think it delivers a solid equity IRR given the capacity and the tariffs we've secured. So moving ahead, we'll continue to look at opportunities that are available, and we'll also keep watching new biddings as they come up. But when it comes to guidance, we wouldn't be offering any guidance as such on additions in the renewable space.

Saurabh Mashruwala

executive
#179

Growth is going to come from inorganic sources along with organic ones too, in renewables.

Aniket Mittal

analyst
#180

That's useful. And sir, regarding Lightsource, I believe you noted that the O&M costs are quite elevated. Since, if I check the FY '20 financials, the EBITDA margin sits at just 83%. So I simply wanted to get a sense of what the scope really is for enhancing the O&M? And to what kind of margins could we raise this?

Rishi Shah

executive
#181

So at this point, I don’t think we can say anything about that. Once the deal is consummated, we’ll be in a better position to give you a clearer picture of what we’re looking at regarding those O&M expenses.

Aniket Mittal

analyst
#182

Alright, and maybe just one final question about Dholera. I get that there’s a really long-term plan there of roughly INR 1,200 crores across the year. But how is that emphasis kind of playing out at the moment? And looking at the next 2- to 3-year view, what CapEx are you looking at there?

Saurabh Mashruwala

executive
#183

Regarding Dholera, inquiries have begun coming in from people. What I mean is, we've been informed that the land for the Metro project has been acquired by them. ReNew also intends to establish its facilities there. So our expectation is that demand will emerge in Dholera, and numerous units will be set up across the Dholera area.

Aniket Mittal

analyst
#184

On the CapEx side — since I believe you have that INR 1,200 crore plan spread across 10 years — how might that end up being phased out?

Rishi Shah

executive
#185

I think it'll also hinge on which industries are coming in. We'd prefer to put money in once we can see some clarity or visibility around the demand that's showing up. So I think it comes down to how demand plays out, and at that point we'll begin our CapEx. So that INR 1,200 crores or INR 1,000 crores across 10 to 12 years — it's hard to attach a figure to that right now. But demand — if we get visibility on demand, we'll start building the necessary infrastructure.

Saurabh Mashruwala

executive
#186

And part of the basic network is already in place that we've built, so we do expect that demand to show up. And then we go further — we're putting additional investment into Dholera.

Aniket Mittal

analyst
#187

At this point, is there any investment or CapEx in Dholera?

Rishi Shah

executive
#188

We're spending CapEx, but that covers the core network.

Saurabh Mashruwala

executive
#189

That's the modest CapEx we're undertaking in order to establish a basic network — a basic network that will supply construction power to whichever industries are coming up.

Aniket Mittal

analyst
#190

Sure. And regarding capital expenditures, could you share what total CapEx came to for this quarter?

Saurabh Mashruwala

executive
#191

The amount we spent came to roughly INR 250 crores.

Harshavardhan Dole

analyst
#192

I believe, Zed, that our time is entirely up. So I'd like to ask Saurabh bhai to offer closing remarks, if there are any at all, and then if you could hand the line over to me.

Saurabh Mashruwala

executive
#193

Yes. Thanks a lot for — for being on this call. We want everyone to remain safe and well. Harsh, many thanks for the chance to present our company, Torrent Power. Thank you very much.

Harshavardhan Dole

analyst
#194

Well, thank you, ladies and gentlemen, for joining us on the call. And I want to express our thanks to Torrent Power for the chance to host this call. If any of your questions are still unanswered, feel free to send a note to me or Rishi bhai or to the IR team, and we'll make sure it gets answered. Thank you very much, and enjoy a lovely weekend.

Saurabh Mashruwala

executive
#195

Thanks a lot. I really appreciate it.

Rishi Shah

executive
#196

Thanks.

Operator

operator
#197

Many thanks to the management team. Everyone, IIFL Securities has now wrapped up today’s conference call. We appreciate all of you being with us, and at this point you’re free to hang up.

Saurabh Mashruwala

executive
#198

Appreciate it.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.