Torrent Power Limited (TORNTPOWER) Q3 FY2026 Earnings Call Transcript & Summary

February 10, 2026

NSEI IN Utilities Electric Utilities Earnings Calls 47 min

Earnings Call Speaker Segments

Operator

Operator
#1

Ladies and gentlemen, good day, and welcome to Torrent Power Limited Q3 and FY '26 Earnings Conference Call. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Saurabh Mashruwala, Executive Director and CFO from Torrent Power Limited. Thank you, and over to you, sir.

Saurabh Mashruwala

Executives
#2

Thank you. Good evening to all of you, and thank you for joining earnings call of Torrent Power Q3 FY '26. First, I will take you through the performance of the quarter, after which phone lines will be open for the Q&A session. We'll explain the performance of the company at PBT levels first, then we'll take you through the tax expenses separately. Reported PBT for the quarter stood at INR 805 crores as compared to INR 630 crores the corresponding quarter of last year, an increase of INR 175 crores, that is above 28% of reported basis. PBT for the corresponding quarter of the last include nonrecurring income of INR 77 crores on account of sale of cable business. Adjusted for this one-off, PBT for the quarter stood at INR 805 crores as compared to INR 553 crores the comparable quarter of last year, an increase of INR 252 crores, 46% on an adjusted basis. Tax expenses were lower during the quarter as favorable orders received during the quarter are eligible for the tax exemption. Business-wise sectors contributing to the performance of the quarter are as follows: First, contribution for thermal generation business reported an increase of INR 163 crores, mainly on account of 3 factors. First, receipt of favorable orders from the regulators. Second, there were contribution from sale of Merchant Power and LNG by INR 75 crores. And foreign currency fluctuation other expenses resulting into the higher expenses to the extent of INR 35 crores. Second, contribution from the distribution business increased by INR 106 crores, mainly on account of 3 factors. First, improvement in T&D losses at distribution franchise units, partially offset by the higher T&D losses in the licensed distribution business. Second, additional, contribution from license distribution business was supported by the increase in ROE and ROCE on account of capitalization of the assets and higher rate of returns on equity as per the new tariff regulations and other incentives. Third, receipt of favorable orders from the regulator by INR 41 crores. For business contribution from renewable generation increased by INR 24 crores, mainly on account of higher PLF from the existing wind power projects due to better wind resources, coupled with the contribution made by the newly commissioned solar capacity of 285 megawatts. Both other factors contributed lower profitability was on account of 2 factors. First, increase in [ miscellaneous ] expenses and depreciation, partially offset by reduction in finance costs on the back of repayment made in Q4 of FY '25. This completes the explanation of the financial performance during the quarter. Moving onto the projects update. First, during the quarter, RE pipeline increased by 500 megawatt. For 1.6 gigawatt thermal project power purchase agreement -- power supply agreement has been executed with the MP Power Management Company Limited. Contract for [indiscernible] machinery has been awarded for the projects. With the progressive commissioning of 360-megawatt MSEDCL project, aggregate installed generation capacity of the company stood at 5 gigawatt as on December 31, '25, comprising of 2.7 gigawatt [ gas-based ] project, close to 2 gigawatt of renewable capacity and 362 megawatt of coal-based capacity. Pipeline projects are at the end of the quarters includes 4 gigawatt renewable capacity, 3 gigawatt of pump storage capacity, 1.6 coal-based capacity and 2 transmission projects at Khavda and Solapur. Further details on the pipeline projects have been summarized in our latest investor presentation available on the website. Thanks all for this quarter. Now I request coordinator to open the Q&A session. We wish everybody to stay safe and healthy. Thank you. Handing over to the operator.

Operator

Operator
#3

[Operator Instructions] Our first question comes from the line of [indiscernible].

Unknown Analyst

Analysts
#4

I have 2 questions. My first question to Mr. Saurabh is, Torrent Power has expanded across the generation, distribution and renewables. Growth often brings some pressure on cost and cash flow. Going forward, how will you balance investing in new renewable projects with keeping debt and margins under control? What clear signals will tell you it's time to slow expansion and focus more on the financial discipline. I want to understand your point of view on this.

Saurabh Mashruwala

Executives
#5

Yes. In terms of financial discipline, if you look at our leverage ratio, we are quite comfortable. For example, our net debt-to-equity ratio is 0.40 as on March '25 and net debt to EBITDA is 1.41. So company is under leverage company right now. And with this investment, we are -- our leverage ratio will remain comfortable, I would say, in terms of our current investment plan. So we are maintaining financial discipline and improving our return on equity and ROCE going forward once we implement all these projects in pipeline right now.

Unknown Analyst

Analysts
#6

My second question to Mr. Shah is, again, along the similar lines, I just want to understand your plan of action basically in this. Fuel costs and regulatory changes can impact -- can have some impact on the profits, I believe. What financial disciplines do you use to protect the returns? Like, for example, do you have a minimum margin requirement, a debt ratio that you won't cross or cash cycle targets in mind? How do you -- how do these rules shape your investment and decision-making process? I want to understand that.

Saurabh Mashruwala

Executives
#7

Generally, the new projects being financed at 70-30 or maybe 75-25 debt equity ratio. So that is what typically we do the financing. In terms of -- if you look at the sector per se, there are lots of investment opportunity going up because of going up by the sectors. And yes, we do have investment plan, but we are mindful of our financial metrics, I would say, in terms of debt equity ratio and net debt to EBITDA ratio. And which is very comfortable and we will -- if you look at the peers also going aggressively. So definitely, our ratios will be the lower as the peers and we'll be comfortable with those kind of ratios, leverage ratios.

Operator

Operator
#8

Our next question comes from the line of Sumit Kishore from Axis Capital.

Sumit Kishore

Analysts
#9

First, I think it's been a fairly strong P&L performance in the quarter. I just want to understand a few numbers here. You mentioned that there is increased contribution from gas-based power plants because of some regulatory benefit as well as a higher merchant and LNG sale contribution in the quarter. So what is the size of the regulatory benefit? And we hadn't seen much merchant generation in Q3 based on the PLF numbers. So is that INR 75 crore number that you mentioned mainly coming from LNG gains. That's the first question.

Saurabh Mashruwala

Executives
#10

So the contribution from the merchant is lower in this quarter. It's not higher, I would say. That is what we would like to clarify. So it's lower basically by INR 75 crores as compared with the comparable quarter of last year. We got some favorable orders from the regulator, which has, I would say, added the bottom line of the company by about close to about INR 270 crores.

Sumit Kishore

Analysts
#11

Okay. So that basically explains the extent of positive surprise, INR 270 crores.

Saurabh Mashruwala

Executives
#12

Yes.

Sumit Kishore

Analysts
#13

Why -- what was the regulatory item about?

Saurabh Mashruwala

Executives
#14

It is one of the generation projects.

Sumit Kishore

Analysts
#15

Which one SUGEN, UNOSUGEN, DGEN is not -- I mean...

Saurabh Mashruwala

Executives
#16

It's a gas-based generation project. We've got it...

Sumit Kishore

Analysts
#17

Which gas-based generation project SUGEN OR UNOSUGEN?

Saurabh Mashruwala

Executives
#18

UNOSUGEN project.

Sumit Kishore

Analysts
#19

And why did this regulatory benefit crop up? What is the background? This is explaining the entire profit beat in the quarter.

Saurabh Mashruwala

Executives
#20

We'll extend off the call. We will explain it.

Sumit Kishore

Analysts
#21

Okay. The second question is related to CapEx. So basically, in renewable, so far this financial year, in 9-month period, what is the CapEx that you have incurred? And what is your CWIP in renewable as of December end? And has there been any pickup in pace of CapEx in renewable in third quarter?

Saurabh Mashruwala

Executives
#22

Yes, there has been pickup in the CapEx also in the third quarter because we have to implement many projects together. So there has been pickup in the CapEx in last 1 or 2 quarters. And this pace will continue going forward also because we have pipeline of renewable projects and there's a renewable project, pump project and coal project is going to be implemented. So there is a pickup in CapEx also.

Rishi Shah

Executives
#23

So Sumit, just to add, Q3 renewable projects, we had incurred CapEx of INR 1,750 crores. If I look at the YTD number, it was around INR 3,100 crores. So you can understand the increase in the renewal projects CapEx. So INR 3,100 crores YTD, which means 6 months, we would be around INR 1,500 crores of CapEx. In this quarter itself, we have done INR 1,700 crores of CapEx.

Sumit Kishore

Analysts
#24

Excellent. That is what I was looking for, yes. Perfect. So there is a pickup in CapEx. And given the transmission constraints and everything else put together of the 4.3 gigawatt odd RE pipeline under construction, what should be the phaseout in terms of commissioning, say, fourth quarter and next financial year and the year after that? I mean if you can give us a broad sense that will be useful.

Saurabh Mashruwala

Executives
#25

So we can give a sense of about -- for the next year, we expect to commission about 1.2 to 1.5 gigawatt next year. I think in a similar pace, we can expect in next year also the year thereafter also.

Sumit Kishore

Analysts
#26

Okay. So this financial year FY '26 will be a fairly weak year in terms of renewable capacity addition relatively?

Saurabh Mashruwala

Executives
#27

Yes.

Sumit Kishore

Analysts
#28

Yes. Okay. Okay. And just one more question. Power demand growth in the last 15 days has been quite bad. I mean after 22nd of January, it's once again become flattish kind of power demand growth for almost 15-plus days that we last checked. I mean, is that something you all have been noticing is there any specific reason? And is there any probability of Section 11 getting implemented as we enter into a higher demand period this year as well? I mean what is your sense?

Saurabh Mashruwala

Executives
#29

So one can say that it's an exception kind of a thing, aberration kind of thing, I would say, because if GDP has to grow at 6.5% to 7%, power demand has to grow in a similar line. Otherwise, GDP won't be growing at that particular rate. Two things basically, one is last year, the demand was very, very strong. The base was very strong last year. And the second is the extended monsoon in the current year has impacted the power demand. But this cannot the scenario every year, I would say. So it has to grow in line with the GDP growth, I would say. That is what we can say. So once you ignore the current year, one should see it as an aberration kind of things. And one should not look at the current demand scenario, I would say.

Sumit Kishore

Analysts
#30

Completely agree. Again, it started happening last 15 days, power demand growth is not there. I hope this does not continue.

Operator

Operator
#31

Our next question comes from the line of Satyadeep Jain from Ambit Capital.

Satyadeep Jain

Analysts
#32

Just first, I wanted to understand DISCOM performance a little bit. First on the sale of units within DISCOM. So overall, we understand power demand will relatively flattish Y-o-Y in the quarter. When I look at Ahmedabad, Surat and all, most regions you're witnessing decline. Is that -- what is, in your view, driving that decline? Is it behind the meter? Is there something else that's driving this decline Y-o-Y? And then maybe can you talk a little bit more about the ROE increase that you've seen historically, if I'm not mistaken, it was 14% saying that this year, there is an increase in ROE for DISCOM that in addition to some one-off of INR 41 crores has driven this almost 20% Y-o-Y increase in EBITDA in DISCOM despite a decrease in the purchase of units. Can you explain this power with DISCOM performance?

Saurabh Mashruwala

Executives
#33

In terms of demand, yes, definitely demand is lower this quarter. But as I explained earlier in the call that it's an aberration kind of a thing because of the extended monsoon last year, base was very high. So both the combined impact one can see in the demand. But this is treated as aberration because GDP and the power demand has to go in line and hand-in-hand with the in line with the GDP. So it has to be there, demand will definitely come and at least 5%, 6% demand when one can see next year. In terms of...

Satyadeep Jain

Analysts
#34

I was trying to understand the Torrent Ahmedabad, Surat, we understand the power demand has been muted, but Gujarat has still reported positive Y-o-Y demand growth in third quarter. So what is driving this decline in specific pockets? Is it more residential rooftop or something? Just trying to understand Y-o-Y decline in certain of your...

Rishi Shah

Executives
#35

Satyadeep, if you really look at it, dissect it, Ahmedabad is more of residential, less of commercial because of extended monsoons and winters also pretty good. Typically, this quarter, demand goes down. And this year, particularly because of good winter demand in Ahmedabad has gone down. If you look at Surat. Surat is more of an industrial area. But again, that has been impacted because of the diamond industry, not being in shape. Textiles also not being going good because of which Surat also has been impacted. If you look at D&H, it has shown some growth. But again, because of the industrial activity, it has not shown the growth which it used to report around 3% to 4%. So I think there are mixed factors involved in each area, you'll have to look at from how the mix is there between industrial, commercial and residential.

Satyadeep Jain

Analysts
#36

Okay. And in terms of increase in regulated return and one-offs, can you maybe...

Rishi Shah

Executives
#37

Just going back to your earlier question, you said that demand has gone down, but your ROEs have increased. So first of all, I just want to clarify that our profitability is not actually dependent on the unit growth for license distribution businesses. It is more dependent on the capitalization, which we do as we get ROEs.

Saurabh Mashruwala

Executives
#38

So there is no correlation between the demand and our return -- profitability, I would say. And second thing, regarding the carrying cost order, if you look at our regulatory asset, yes, on regulatory asset we do earn some carrying costs, but we account for the carrying cost, when it is approved by the regulators. So this kind of order we keep on coming, I would say. That is what we can say right now.

Operator

Operator
#39

Sir, participant has left the queue. Our next question comes from the line of Dhruv Muchhal from HDFC AMC.

Dhruv Muchhal

Analysts
#40

Sir, most of my questions are asked by Sumit and Satya, but just probably some follow-ups. Sir, in the opening remarks, you mentioned distribution profitability has also improved because of higher capitalization and higher ROE. So is there some change in ROE rates in any of these circles?

Saurabh Mashruwala

Executives
#41

Yes, it's 14% to 15.5%, 15% to 15.5%.

Dhruv Muchhal

Analysts
#42

Okay. In Gujarat, it has moved from 14% to 15.5%.

Saurabh Mashruwala

Executives
#43

Yes, ROCE basically.

Dhruv Muchhal

Analysts
#44

Okay. And this will be applicable for the next tariff period or 3 to 5 years? Or is it only for a single?

Saurabh Mashruwala

Executives
#45

MYT regulation, as per MYT regulation.

Dhruv Muchhal

Analysts
#46

MYT regulation, okay. Perfect. Got it. And sir, does it also apply to your thermal asset AMGEN or only for distribution?

Saurabh Mashruwala

Executives
#47

No.

Dhruv Muchhal

Analysts
#48

It's only for distribution, okay. And sir, second is on the renewable.

Rishi Shah

Executives
#49

Dhruv, just to correct, it would also apply for AMGEN because it's part of distribution.

Dhruv Muchhal

Analysts
#50

It's part of distribution. Okay. Perfect. And the next question is on the renewable execution. Now you have a decent pipeline of wind assets and hybrid assets to be executed based on your PPT to be executed in FY '27. So you have, I think SECI XV then TPL-L project and REMCL project. So we are hearing a lot of challenges in the sector because both a mix of transmission issues and mix of wind execution issues. And your near-term visibility is primarily driven by wind and hybrid. So if you can help us a bit more in terms of probably, I don't know, the proportion of land that you have acquired, the quantum of transmission, which is available with you already, which gives you visibility that this 1.2, 1.5 gigawatt can actually happen?

Saurabh Mashruwala

Executives
#51

In terms of land, we are reasonably okay. Land is not the issue. Only thing -- maybe the ROW issue everybody is facing, we may face, but we have to enter those issues, and we have to implement our execution plan.

Dhruv Muchhal

Analysts
#52

Okay. So because it's a mix of wind and transmission where it seems the challenge is generally even higher than solar and transmission. So I just wanted to understand the comfort on the commissioning targets?

Saurabh Mashruwala

Executives
#53

We are comfortable, I would say, in terms of implementing 1.2 to 1.5 gigawatt projects next year at this moment.

Dhruv Muchhal

Analysts
#54

Okay. So probably the equipment would get available, the wind equipments. But on transmission, do you have the transmission access already or it's in the applied stage and it is pending commissioning?

Saurabh Mashruwala

Executives
#55

Connectivity is all available for most of the projects, I would say.

Dhruv Muchhal

Analysts
#56

Okay. The physical substation probably is already commissioned?

Saurabh Mashruwala

Executives
#57

That is to be...

Rishi Shah

Executives
#58

So I think, Dhruv, there are 2 parts to it. One is that you have the connectivity, which is yet to be commissioned. So some of our projects will have connectivity to those substations, which are already commissioned. Some of our projects are having connectivity where augmentation or a new substation is getting commissioned. So it will be a mix of both.

Dhruv Muchhal

Analysts
#59

Okay. But based on your assessment on individual substation wise and project wise, you are reasonably certain of 1.2, 1.5 gigawatt?

Saurabh Mashruwala

Executives
#60

Yes, yes.

Dhruv Muchhal

Analysts
#61

Okay. And sir, generally, we have seen -- I mean, generally, in the industry, the bidding activity is low, if you commission 1.2 this year or 1.2 next year, you're already done through your contracted pipeline, including the C&I projects, of course. You've already done through and even the merchant capacity. So how do we see -- how are you looking at the visibility beyond that, given it's -- I mean, we consider this as a platform business. So how about visibility beyond, say, next 2 years?

Saurabh Mashruwala

Executives
#62

So we are bidding for most of the projects, I would say, but we restrict ourselves with our threshold IRR. If you look at the last Q3, we added about 100-megawatt additional incremental capacity. So we keep on bidding and we keep on aiming for the higher capacities also going forward.

Dhruv Muchhal

Analysts
#63

Sir, I was wondering, can you probably get more aggressive in the C&I project side until the utility building happens or that's a limited market and probably...

Rishi Shah

Executives
#64

Dhruv, we are already aggressive. So effectively, we are there in all the bids or majority of the C&I consumers. It's all about the commercial aspect of it. If commercials are feasible, we will definitely want to lock in capacity. As we have stated earlier also, I think our aspiration is to reach a 10 gigawatts of renewable capacities, which we look at it. If commercials are favorable, we will definitely want to lock in those. In past also, we have seen that 1, 1.5 years, the capacities were not growing, suddenly in 6 months, we would have -- we had built up 3 gigawatts of capacity. So those opportunities are available in the market as and when available, we'll be able to catch that.

Dhruv Muchhal

Analysts
#65

Sure. And just one clarification. The 1.2, 1.4 is at the AC level, or is it the BC level? Is it megawatt peak or megawatt?

Saurabh Mashruwala

Executives
#66

[indiscernible] level.

Dhruv Muchhal

Analysts
#67

[indiscernible] level, okay.

Operator

Operator
#68

Our next question comes from the line of Satyadeep Jain from Ambit Capital.

Satyadeep Jain

Analysts
#69

Sorry, I got disconnected. One question on the PSP. In the presentation, you mentioned [ October '28 ] is the SCOD. Just wanted to understand that it looks aggressive given it's 2.5 years from now. How do you look at this time line versus typically what we are hearing in the -- was seeing and hearing in the industry from others? And where are you in terms of preparedness to get this executed in 2.5 years?

Saurabh Mashruwala

Executives
#70

See, we are preparing ourselves for the execution contract, major contract, I would say, has been given for the PSP project. So maybe delay may happen. But as of now, all contracts, key contracts have been given.

Satyadeep Jain

Analysts
#71

So [ October '28 ], is the decline as per the agreement with MSEDCL, right?

Saurabh Mashruwala

Executives
#72

Yes.

Satyadeep Jain

Analysts
#73

And there can be extension to this based, so they can be...

Saurabh Mashruwala

Executives
#74

There can be an extension.

Satyadeep Jain

Analysts
#75

For how long, what is the agreement typically say about extension? Does it have to be because of some particular reasons or?

Saurabh Mashruwala

Executives
#76

Transmission capacity is not available kind of a thing, where substation may not be ready. So those kind of thing will get the extension.

Satyadeep Jain

Analysts
#77

Okay. DISCOM, again, so ROE, you mentioned this, I also want to understand, is there -- there's a one-off that you talked about in DISCOM. So is that INR 41 crores at the PAT level and the INR 270 crores you mentioned in generation is also at the PAT level. Can you explain?

Saurabh Mashruwala

Executives
#78

These are all PBT level. PBT level.

Satyadeep Jain

Analysts
#79

So INR 270 crores in generation, SUGEN is PBT and this INR 41 crores in DISCOM is also PBT.

Saurabh Mashruwala

Executives
#80

Yes, yes.

Satyadeep Jain

Analysts
#81

And just on this 1 or 2 RE projects where you're seeking SCOD extension. Is that mainly because of lack of transmission for these projects. Everything is installed on ground, you're just waiting for transmission or something else?

Saurabh Mashruwala

Executives
#82

No, no. Certainly, if...

Rishi Shah

Executives
#83

So if you are seeing the transmission project is getting delayed, if you put up everything on ground, effectively, you're incurring indirect cost, which nobody will reimburse you to. So you will always calibrate your implementation based on your expectation of transmission being commissioned.

Saurabh Mashruwala

Executives
#84

So for execution of all the project is in line with the transmission is coming basically with the transmission line.

Satyadeep Jain

Analysts
#85

So these 2 projects where you're seeking extension, the SECI XII and the MSEDCL one, maybe how much delay are you looking at here? And this is all transmission in which location is this?

Rishi Shah

Executives
#86

No, no. So I think project by project, there are different issues. If you look at MSEDCL, we have already commissioned part of it. It is only some part of it, which is pending, which is not because of transmission. It is because of some other factors, okay. As far as SECI XII is concerned, it's because of transmission not being ready, the evacuation part of it not being ready. So every project will have its own nuances because of which there are certain pluses and minuses.

Satyadeep Jain

Analysts
#87

Okay. So -- but as of now, you don't -- you must have some visibility on SECI XII or this you expect in FY '27, correct?

Rishi Shah

Executives
#88

Yes. Yes, absolutely.

Saurabh Mashruwala

Executives
#89

FY '27, yes.

Operator

Operator
#90

Our next question comes from the line of Atul Tiwari from JPMorgan.

Atul Tiwari

Analysts
#91

So first, I wanted to check whether in this quarter, you booked any income from the NVVN contract. Because I suppose there was some take and pay and the contract was supposed have finished by October.

Saurabh Mashruwala

Executives
#92

So no, the contract was over by September Q2. So we have not booked any income in Q3.

Atul Tiwari

Analysts
#93

And sir, this INR 270 crores to what period does it relate to the slips only this year or past few years? And what part of this will be recurring going ahead?

Saurabh Mashruwala

Executives
#94

Past year, basically.

Rishi Shah

Executives
#95

It is not recurring, it is one time.

Operator

Operator
#96

Our next question comes from the line of Ketan Jain from Avendus Spark.

Ketan Jain

Analysts
#97

Sir, just on the clarification on the previous question. Even the INR 41 crores favorable order in distribution is also onetime or is it recurring?

Saurabh Mashruwala

Executives
#98

If you look at -- as I explained on my call earlier, we are carrying some regulatory assets and that regulatory asset is carrying the carrying costs. So we keep on getting these kind of orders, favorable orders on carrying costs on a regular basis. That is what we can say right now.

Ketan Jain

Analysts
#99

Pertaining to Ahmedabad and Surat?

Saurabh Mashruwala

Executives
#100

Ahmedabad and Surat, yes.

Ketan Jain

Analysts
#101

Sir, can you give us -- you gave the CapEx for RE, if you could provide us the total CapEx in terms of licensee franchisee and separately?

Saurabh Mashruwala

Executives
#102

You want for this quarter or the cumulative YTD basis?

Ketan Jain

Analysts
#103

Cumulative 9 months.

Saurabh Mashruwala

Executives
#104

Cumulative 9 months about INR 1,100 crores for license and franchise basically, both put together. And transmission about INR 240 crores. Core project is about INR 200 crores. [ PST ] we incurred about INR 300 crores. Renewable, as we explained about INR 3,100 crores, that is what we've incurred basically CapEx in 9 months.

Ketan Jain

Analysts
#105

What did you say after transmission, sir? I couldn't get the number.

Saurabh Mashruwala

Executives
#106

Transmission after Transmission thermal project, coal project basically.

Ketan Jain

Analysts
#107

How much more?

Saurabh Mashruwala

Executives
#108

INR 400 crores.

Ketan Jain

Analysts
#109

INR 400 crores. Okay. So this is INR 4,200, so around INR 4,000 crores. So what's the target for FY '26, sir?

Saurabh Mashruwala

Executives
#110

Sorry?

Ketan Jain

Analysts
#111

What is the target CapEx for FY '26?

Saurabh Mashruwala

Executives
#112

We don't give any target for the FY '26.

Ketan Jain

Analysts
#113

But we will have a similar run rate as in third quarter?

Saurabh Mashruwala

Executives
#114

Yes. Our run rate is -- if you look at the Q3, run rate has increased. So similar pace will be there going forward also.

Operator

Operator
#115

Our next question comes from the line of Bharani V. from Avendus Spark.

Bharanidhar Vijayakumar

Analysts
#116

Yes. So I just want to clarify one thing. The INR 270 crores negative INR 77 crores on the generation side and the INR 41 crores on the distribution side, these are all PBT numbers, right?

Saurabh Mashruwala

Executives
#117

PBT [indiscernible].

Bharanidhar Vijayakumar

Analysts
#118

Can you give a corresponding EBITDA number for these 3, sir, for the third quarter?

Saurabh Mashruwala

Executives
#119

It is given even in the -- we give the segment analysis also where the EBITDA numbers has been given.

Bharanidhar Vijayakumar

Analysts
#120

So the incremental INR 270 crores is PBT. So what would be the incremental specifically on this regulatory onetime impact on the EBITDA side?

Saurabh Mashruwala

Executives
#121

This is the EBITDA...

Rishi Shah

Executives
#122

So EBITDA and PBT, there is no difference between this.

Bharanidhar Vijayakumar

Analysts
#123

Okay. And second question is on -- of course, someone also asked the nature of this favorable regulatory order on UNOSUGEN. Is it possible to explain that?

Saurabh Mashruwala

Executives
#124

We explained the INR 41 crores carrying cost order, which keep on coming because we are carrying regulatory assets. So...

Bharanidhar Vijayakumar

Analysts
#125

Sir, my question is on the INR 270 crores of favorable regulatory income we booked due to UNOSUGEN. So just if you can explain what was this related to?

Saurabh Mashruwala

Executives
#126

We'll explain -- we're not able to expand at this moment right now.

Bharanidhar Vijayakumar

Analysts
#127

Okay. My final question is on this INR 41 crores on the distribution side you mentioned. Somewhere I think you also mentioned that the ROE has increased from 14% to 15.5%. Is that something that I heard right?

Saurabh Mashruwala

Executives
#128

No, that is ROE, the carrying cost all are different.

Bharanidhar Vijayakumar

Analysts
#129

Okay. So ROE having increased from 14% to 15.5%...

Saurabh Mashruwala

Executives
#130

ROCE, it is now or basically, not ROE.

Bharanidhar Vijayakumar

Analysts
#131

So that is neutral, right? Because at the ROE level it will be same, because it's just a different way of compensating, but still the net profitability at the ROE level will still be the same to clarify?

Rishi Shah

Executives
#132

So Bharani, basically ROCE, I mean 14% or 15.5%, there are certain milestones which regulator has defined. If you are meeting those milestones, you can earn up to 15.5%. So there are different parameters which have been defined.

Bharanidhar Vijayakumar

Analysts
#133

So, Rishi, my question is, earlier, we were getting compensated based on ROE, which was 14% regulated...

Rishi Shah

Executives
#134

The 14% has moved to 15.5%, but the methodology has changed from ROE to ROCE, but 15.5% also is ROE. But there are certain slabs. So if you achieve this much, you can get 25 basis points incremental. If you achieve this much, you can get 50 basis incremental. So 14% or 15.5% both are effectively ROE numbers, but regulator has shifted from ROE to ROCE.

Bharanidhar Vijayakumar

Analysts
#135

Okay. Rishi, I will pick it up offline. No problem.

Operator

Operator
#136

Our next question comes from the line of Aniket Mittal from SBI Mutual.

Aniket Mittal

Analysts
#137

Just actually, that is non clarification that I wanted. So it's on an all-in basis, given this new MYT order, what's the increase in ROE that we're effectively seeing in Ahmedabad and Surat?

Rishi Shah

Executives
#138

So Aniket, basically, what we're trying to say is that 14% is an ROE, 15.5% also is an ROE. The methodology has been changed from ROE to ROCE, first point. Second is another regulations, regulator has defined a base ROE or ROCE on equity. Then there are certain milestones based on which your return on equity increases if you achieve those milestones. And the highest one which you get is 15.5%.

Aniket Mittal

Analysts
#139

So are we trending at the highest one? I'm just trying to understand, let's say, the incremental delta in ROE, is it 150 itself for us? Or is it somewhere in the middle?

Rishi Shah

Executives
#140

We would aim at incremental delta of 150 basis points. Some years, you may not be able to achieve this if you are not achieving those milestones. So it could be slightly lower.

Aniket Mittal

Analysts
#141

The other question I had was just on Bhiwandi. I think the franchise agreement for Bhiwandi is pilot till Jan '27, which is about a year away. Just trying to understand what's the discussions over there? How does one think about that franchise agreement going forward?

Saurabh Mashruwala

Executives
#142

So we are under discussion right now with the MSEDCL for the extension.

Aniket Mittal

Analysts
#143

Okay. Fair. And just one last question. What would be the overall regulatory assets currently on Ahmedabad and Surat right now?

Saurabh Mashruwala

Executives
#144

Regulatory assets would be, Ahmedabad, Surat would be about around INR 3,000 crores.

Aniket Mittal

Analysts
#145

INR 3,000 crores, okay. Fair.

Operator

Operator
#146

Our next question come from the line of Anuj Upadhyay from Investec.

Anuj Upadhyay

Analysts
#147

Can you elaborate further on the LNG sale agreement, which we have done with the JERA? And with this 0.27 MMTPA, how much of the fuels we have secured across our gas base station and for what period?

Saurabh Mashruwala

Executives
#148

JERA agreement is about 0.27 MMTPA. This is transferred into the [ 4 cargoes ], starting from 2027 to 2037 for 10 years contract we have executed.

Anuj Upadhyay

Analysts
#149

Okay. So this is 0.27 cumulative, you are saying?

Saurabh Mashruwala

Executives
#150

Per annum.

Anuj Upadhyay

Analysts
#151

Per annum, which we are doing it. Okay. And with this, how much of the total requirement?

Saurabh Mashruwala

Executives
#152

So requirement would be about 25% kind of a thing.

Anuj Upadhyay

Analysts
#153

Okay. Okay. And on the pricing front, how exactly these contracts are placed? Are they fixed? Are they flexible?

Saurabh Mashruwala

Executives
#154

It is flexible with the brand.

Anuj Upadhyay

Analysts
#155

Got it. Got it. And second, on the SMK side, any time line by when we can achieve -- we are targeting to achieve a breakeven over there? Or anything on the profitability? So basically, not exactly aware how the profitability have placed over there. It's has been almost like 4 or 5 years we have taken over the circle. So how things are progressing over there in terms of profitability?

Saurabh Mashruwala

Executives
#156

So in terms of [indiscernible], if you look at, we have reached about 20% level. So we are near to the breakeven, I would say.

Anuj Upadhyay

Analysts
#157

So by next year, we can expect breakeven happening, sir? FY '27?

Saurabh Mashruwala

Executives
#158

Yes. Yes.

Anuj Upadhyay

Analysts
#159

Okay. And how much CapEx you would have spent till date on SMK?

Saurabh Mashruwala

Executives
#160

Currently, we get back to you on that number, we have to pull up the numbers on a cumulative basis.

Anuj Upadhyay

Analysts
#161

Okay. And any update on the parallel licensing?

Saurabh Mashruwala

Executives
#162

There is no further update at this moment.

Operator

Operator
#163

Our next question comes from the line of Dhruv Muchhal from HDFC AMC.

Dhruv Muchhal

Analysts
#164

Yes. Sorry, I missed the MYT regulation actually. Just to clarify, I was reading the regulation. The change to the return on capital employed method is only applicable for capitalizations post April '25. Is that understanding correct?

Saurabh Mashruwala

Executives
#165

Yes. Yes.

Dhruv Muchhal

Analysts
#166

So it's basically a prospective change. For the older assets, you continue to earn the ROE as you were earning earlier. Of course, the rate has changed. But for the incremental assets capitalized, it moves to the ROCE model.

Saurabh Mashruwala

Executives
#167

Absolutely, absolutely. You're absolutely right.

Dhruv Muchhal

Analysts
#168

Perfect, sir, that's the only clarification.

Operator

Operator
#169

Our next question comes from the line of [ Arul Selvan ] from Bajaj Life Insurance Limited.

Unknown Analyst

Analysts
#170

This is a follow-up of the previous question that somebody asked. The question is with respect to the incremental milestones that have to be achieved to get that 150 points delta on the ROE. Could you just give us a sense of what is the nature of those milestones that have to be achieved before we can get that 150 basis points delta?

Saurabh Mashruwala

Executives
#171

[ Arul ], these are all milestones are linked to operational efficiencies like your AT&C loss, [indiscernible] your other parameters linked to your operational parameters.

Unknown Analyst

Analysts
#172

Okay. Okay. And is there any time line by which you have to achieve that or is it like you get that...

Saurabh Mashruwala

Executives
#173

It's an yearly, based on yearly performance.

Unknown Analyst

Analysts
#174

Okay. Okay. I was wondering if there's any normative level that we'll have to achieve every particular year before we're eligible for those incentives?

Saurabh Mashruwala

Executives
#175

Yes, those normative levels are there. And if we achieve those normative, we get extra incentives.

Unknown Analyst

Analysts
#176

Okay. Okay. Secondly, one more question was with respect to, again, the Bhiwandi distribution franchise. Does the existing contracts have any clauses for renewal? Or is it going to be like a fresh sort of a bid that the government has to invite for renewal of the current distribution franchise?

Rishi Shah

Executives
#177

So if you look at our investor PPT, we have already said that can be extended 5 years upon mutual agreement.

Saurabh Mashruwala

Executives
#178

Mutual agreement. So it's a mutual discussion going on. But it can be extendable for further of 5 years.

Unknown Analyst

Analysts
#179

Okay. Okay. So hopefully, we should be hearing some news about that before February 2027? I'm just wondering if there's any deemed extension clause, if there's no news on that at all?

Saurabh Mashruwala

Executives
#180

There is no automatic extension clause, but we need to discuss with MSEDCL.

Unknown Analyst

Analysts
#181

Okay. Okay. And lastly, with respect to your parallel licensing, I'm just trying to get a sense of how much could be the amount of capital that you could be investing if the parallel licensing applications are allowed. Any rough sense in terms of...

Saurabh Mashruwala

Executives
#182

I think it's too early to comment on that. Unless it is awarded, I think we should first get the first thing cleared and then we can discuss on that. And it depends on the area also, how large is the area, how small is the area. So it depend all even on the approval, we are going to get on particular area.

Operator

Operator
#183

Our next question comes from the line of Bharani V from Avendus Spark.

Bharanidhar Vijayakumar

Analysts
#184

Are there any short-term gas tenders in the market right now? We've heard something coming up from Tamil Nadu. Can you please elaborate if there is any...

Saurabh Mashruwala

Executives
#185

Very recently, 19 tenders was closed.

Rishi Shah

Executives
#186

No, I think -- so I think Bharani, we'll not be able to comment on that, I mean, for the future part.

Bharanidhar Vijayakumar

Analysts
#187

No, I'm just asking, is there any gas tenders, like the NVVN kind of tender that...

Rishi Shah

Executives
#188

No, not like NVVN tender as of now. But see, as the summer comes in, typically discounts keep on doing short-term contracts for procuring power for their requirements. So that is a normal phenomenon which happens.

Bharanidhar Vijayakumar

Analysts
#189

Sure. And there is a possibility that something like NVVN tender comes up for this year too, right?

Saurabh Mashruwala

Executives
#190

We're not able to comment at this point of time.

Operator

Operator
#191

Ladies and gentlemen, as there are no further questions, I would like to hand the conference over to Mr. Saurabh Mashruwala, for the closing comments. Thank you, and over to you, sir.

Saurabh Mashruwala

Executives
#192

Yes. Thank you for joining Torrent Power's earnings call. We wish everybody to stay safe and healthy. Thank you so much.

Operator

Operator
#193

Thank you, sir. Ladies and gentlemen, thank you so much. Ladies and gentlemen, on behalf of Torrent Power Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines.

This call discussed

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 32,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.