Operator

operator
#1

At this point I'll pass the conference to Mr. Saurabh Mashruwala, our CFO and Executive Director. Thanks — the floor is yours, sir.

Saurabh Mashruwala

executive
#2

Thank you very much. Good evening, everyone, and thanks for being on Torrent Power's earnings call for Q3 FY25. To start, I'll walk you through how we performed this quarter, and after that the phone lines will open for the Q&A session. Next, I'll share the company's performance at the PBT level first, and then we will go through the tax expense separately. Reported PBT for the quarter came in at INR 630 crores, versus INR 513 crores in the same quarter a year ago, up roughly INR 117 crores, which works out to growth of more than 23% on a reported basis. PBT for this quarter includes a non-recurring credit of roughly INR 77 crores from the sale of investment in cable businesses. After adjusting for that non-recurring item, adjusted PBT for the quarter was 553 crores, compared with 513 crores in the comparable quarter last year — higher by 40 crores, a rise of more than 8%. The business factors behind this performance are as follows. Four factors are affecting the performance. First, contribution from the thermal generation business rose by roughly 17 crores, mainly because the contribution from sale of merchant power and LNG was higher by 37 crores.

Saurabh Mashruwala

executive
#3

The colder weather this quarter versus the same quarter a year ago had an effect on excess demand, and that excess demand came in roughly 4% higher this quarter. The second item is a non-cash adjustment related to foreign exchange variation, amounting to about 43 crores. Second, the contribution from the distribution business went up by roughly 40 crores, driven mainly by larger volumes, a higher ROE on capitalization of CapEx, and incentives from solar and other O&M. Three, renewable generation contribution rose by around 18 crores because of lower PLF — chiefly at the existing wind power projects, owing to weaker wind speed — along with a smaller contribution from the 300 megawatt renewable plant that was commissioned during the quarter. Fourth, the remaining deviation comes from other income, finance costs, and depreciation. That wraps up the explanation of financial performance for the quarter. Now to project updates. First, the 300 megawatt solar project was fully commissioned in the quarter. As of 31st December 2024, the company's total commissioned generation capacity was 4.7 gigawatt, made up of 2.7 gigawatt of gas-based project, 1.7 gigawatt of renewable capacity, and 62 megawatt of coal-based capacity. The pipeline at quarter end comprises three gigawatts of renewable energy projects, two gigawatts of pumped storage projects, two transmission projects at Kwara, plus solar power.

Saurabh Mashruwala

executive
#4

You can find more specifics about the pipeline project in the investor presentation we just posted on our website. Turning to new ventures: our pilot for blending green hydrogen with CNG in UP — which ranks among India's biggest private-sector blending efforts — has been commissioned and is now running trials. That covers the quarter. At this point I'll ask the operator to open the line for the Q&A session. Please stay safe and healthy. Thank you. And we go to the operator.

Operator

operator
#5

Thanks a lot. At this point we'll move into the Q&A portion. If you'd like to pose a question, you can hit star and one on your touch-tone phone. Should you want to drop out of the queue, just press star and two. We ask that participants use their handsets when asking questions. Ladies and gentlemen, we'll pause briefly while the queue fills up. Once more, to sign up for a question, please press star and one on the touch-tone phone. Our first question is from Gaurav Birmiwal at Axis Mutual Fund. Go ahead, please.

Gaurav Birmiwal

analyst
#6

Appreciate the chance to ask. Could you walk me through that other income jump? I know you touched on part of it during your opening remarks, but I'm looking at the benefits going from INR 53 crores last year to INR 170 crores this year. How should we understand that?

Saurabh Mashruwala

executive
#7

Other income rose from roughly INR 53 crores to INR 172 crores, and there are mainly two reasons for that. First, as we explained, a one-time gain of about INR 77 crores from the sale of the cable division's investment is one of the contributors to that increase in other income. The remainder comes from higher treasury income that we booked during the course of the quarter.

Gaurav Birmiwal

analyst
#8

Got it. Thanks.

Operator

operator
#9

Thank you. The next question is from Swathi Jhunjhunwala at JM Financial PMS. Please proceed.

Swati Jhunjhunwala

analyst
#10

Thanks for the question. Sir, looking at your segmental performance, generation revenues are down 10%, yet EBIT has risen 50%. So what explains both the revenue decline and the revenue decline? I understand it could be due to lower PLF, but what drove the higher EBIT you reported, if you could highlight that?

Saurabh Mashruwala

executive
#11

When you say generation, are you referring to renewable generation or thermal generation?

Swati Jhunjhunwala

analyst
#12

On the thermal generation side, sir, that comes to INR 1,400 crores of revenue in Q3.

Saurabh Mashruwala

executive
#13

You're saying it came in at 1,400 crores in Q3, right, versus INR 1,590 crores in the prior quarter — is that correct?

Swati Jhunjhunwala

analyst
#14

Correct, correct. Exactly so.

Saurabh Mashruwala

executive
#15

Right. So generation is essentially tied to my fuel prices—the generation that comes will be based on the fuel prices I've contracted. But yes, in terms of MUs, it was lower; however, my generation has two contributors: one is merchant sale and also LNG sale, and that has improved how the thermal generation business performed this quarter compared with the last comparable quarter.

Swati Jhunjhunwala

analyst
#16

Got it. But sir, on merchant sale — wouldn't that come in lower? My assumption is that since DGEN this time stood at a comparable PLF of 4%, which is minimal, wouldn't merchant sale be lower in any case during the quarter?

Saurabh Mashruwala

executive
#17

But at SUGEN, we managed to sell without going through SECI. We're selling merchant power not just from DGEN but from SUGEN as well — we've been able to do that too. So both of them contributed to the higher contribution EBIT, I'd say, relative to the previous quarter. Both the merchant sales and the fact that we could also sell LNG during this quarter played a part.

Swati Jhunjhunwala

analyst
#18

Got it. And could you point out what's behind EBIT coming in at 300 crores rather than 228 crores in Q3 FY24?

Saurabh Mashruwala

executive
#19

That's exactly the point I'm making. It involves a bigger merchant sale, and an LNG sale too. On top of that, we recorded a foreign exchange gain as well over the course of the current quarter. Those are the 3 factors behind the higher EBIT for our thermal generation profit.

Swati Jhunjhunwala

analyst
#20

Got it. And sir, could you break out the CapEx you've spent over nine months across generation, T&D, and renewables, if that's possible?

Saurabh Mashruwala

executive
#21

Okay, so for the nine months of CapEx, am I allowed to use the cumulative nine-month figure, or should I go with the quarter?

Swati Jhunjhunwala

analyst
#22

That's fine. A period of 9 months is acceptable, sir.

Saurabh Mashruwala

executive
#23

Over the nine-month license distribution period, we managed to incur CapEx of roughly INR 915 crores. Franchisee comes to approximately INR 176 crores. Transmission CapEx stands at INR 138 crores. Around INR 1,200 crores of CapEx — INR 1,250 crores of CapEx — has been incurred across the license, franchise, and transmission businesses. That's for nine months.

Gaurav Birmiwal

analyst
#24

Alright.

Saurabh Mashruwala

executive
#25

Nine months have come to an end.

Swati Jhunjhunwala

analyst
#26

What would that figure be for renewables? Is there any CapEx allocated to renewables?

Saurabh Mashruwala

executive
#27

For the nine-month figure, renewable came in at roughly 1,300 crores.

Swati Jhunjhunwala

analyst
#28

Got it. And sir, if you could point to any CapEx guidance for next year — what are your plans across license, franchise, and transmission?

Saurabh Mashruwala

executive
#29

We’re keeping the same CapEx guideline for the following year as well — roughly INR 2,000 crores in total, covering both license and franchisee. Within that, around INR 250 crores is for franchisee, and about INR 1,750 crores goes to the license distribution business. So that’s the same guideline we’re maintaining for the next year too.

Swati Jhunjhunwala

analyst
#30

Okay, and for renewables and transmission, is there any guidance you can give us on those?

Saurabh Mashruwala

executive
#31

Renewable and transmission are tough, but based on the project milestone, CapEx will be spent on both the renewable project and the transmission project.

Swati Jhunjhunwala

analyst
#32

Sure, okay, thanks — I’ll return shortly.

Operator

operator
#33

Thanks. Our next question is from Anuj Upadhyay at Investec. Go ahead, please.

Anuj Upadhyay

analyst
#34

Yes, hi, thanks for taking the question. Could you say — beyond the merchant side, we also did LNG trading — how much income we made from that?

Saurabh Mashruwala

executive
#35

I can’t provide the breakdown, but the contributors are the LNG sale, merchant, and also a certain forex gain. Those are the 3 items that drove the improvement in generation profit, thermal generation profit.

Anuj Upadhyay

analyst
#36

Right, so that wasn’t a major one.

Saurabh Mashruwala

executive
#37

Pardon me?

Anuj Upadhyay

analyst
#38

That wasn't a big one, and the total came to roughly INR 17 crores for the merchant, and when you add LNG and everything else together, what would that come to, sir?

Saurabh Mashruwala

executive
#39

So look, last quarter it was roughly INR 228 crores, and this quarter it's around INR 300 crores — that's an increase of about 75%, a 75% rise is there. The main drivers behind this are those three factors: merchant and LNG, plus a bit of forex gain.

Anuj Upadhyay

analyst
#40

And is there any news on Section 11 as it applies to gas-based stations, sir? Or on the exemption — how is that likely to unfold during the current fiscal?

Saurabh Mashruwala

executive
#41

Work has begun on the government side. They've begun addressing how to satisfy demand during the summer months. Hopefully they'll issue the guidelines covering crunch-period demand along with Section 11. It's too early to discuss that, since we're in February, just at the start of February. Talks have kicked off with the various generators regarding crunch-period demand as well as Section 11. Both of those rest on the fuel costs that are available at that particular time. Our hope is that a similar kind of scheme will be in place for the summer period too.

Anuj Upadhyay

analyst
#42

All right. It would be useful for us to hear about any project commissioning pipeline for 2026 and 2027.

Saurabh Mashruwala

executive
#43

Anuj, if you take a look at our investor presentation, you'll see we've laid out, in broad terms, the commissioning schedules for every one of the renewable generation projects.

Anuj Upadhyay

analyst
#44

All right, that's fine. And finally, regarding PSP, we noted during the presentation that 8 gigawatts of what we've signed — so all of these are pump projects, and we've allowed everything to be completed.

Saurabh Mashruwala

executive
#45

Eight gigawatts isn't signed yet. Two gigawatts is signed. The 8-gigawatt site is available to us. We've identified the project. But out of that, 2 gigawatts of PPA we have signed in the market.

Anuj Upadhyay

analyst
#46

Is it PSP that you mean?

Saurabh Mashruwala

executive
#47

Yeah, PSP is the one we mean.

Anuj Upadhyay

analyst
#48

Understood. Understood. Has LoA been completed on that side?

Saurabh Mashruwala

executive
#49

On the LoA side, another facility agreement has come in for us. In addition, we've put pen to paper on the 2 gigawatt deal with MSEDCL.

Anuj Upadhyay

analyst
#50

Thank you, sir. And finally, regarding a small RE power project that we plan to proceed with on a merchant basis, I just want to understand how financial closure could be achieved on a merchant basis. Would it be entirely through internal funding, or are we also looking for some debt funding from external sources?

Saurabh Mashruwala

executive
#51

No, no — we'll aim for a funding mix of 70 to 30 between debt and equity. That said, it's a merchant project and the market — the merchant market is really strong. But even when it comes to the renewable project as well, since we'll be using a blend of debt and equity for this merchant project.

Anuj Upadhyay

analyst
#52

All right. Yet does the banking financial institution give no consent or restriction of that kind regarding lending, even when the project is handled on a merchant basis?

Saurabh Mashruwala

executive
#53

I don’t think so. Anuj, I believe that if you look at the consolidated balance sheet, our consolidated balance sheet is very strong. Lenders usually consider different forms of comfort that a corporate can offer in order to lend for a particular project. So there are different ways and means to fund this. We can borrow at the Torrent Power level and use it for this project, or we can borrow in the subsidiary itself by giving some comfort from the parent. So basically, bankers will look for some sort of security. You are right that since it’s a merchant power, PPA is not there, bankers will have some apprehensions. But that can be mitigated through these avenues. We’ll provide the comfort from Torrent Power, and either we borrow directly in Torrent Power or we’ll provide some comfort and do the funding. It’s not a big challenge, I would say. It’s not a challenge, I would say. It can be, and the project profile is good. Merchant tariff is also good, so it should not be a problem in funding the project.

Anuj Upadhyay

analyst
#54

That's useful, sir. And finally, could you give us an update on the parallel licensing or the opportunity coming up in UP — any perspective from your end would be helpful, sir.

Saurabh Mashruwala

executive
#55

The UP government has begun the process. Since we're located in Agra, we're clearly a major player in UP, so we're very eager to take part in that process. We're waiting for the UP government to launch the formal process. So we've started the process.

Anuj Upadhyay

analyst
#56

All right, that’s it, sir. Thank you, and good luck to you.

Saurabh Mashruwala

executive
#57

Thanks.

Operator

operator
#58

Thanks. Our following question is from Mohit Kumar with ICICI Securities. Kindly proceed.

Mohit Kumar

analyst
#59

Yes, thank you for giving me the chance, sir. My first question is this: could you help us understand the revenues booked for Torrent Green Energy Limited across the nine months?

Saurabh Mashruwala

executive
#60

Torrent?

Mohit Kumar

analyst
#61

Green Energy? That's a new entity you've set up, isn't it, if I'm not mistaken?

Saurabh Mashruwala

executive
#62

Right now, Mohit, Torrent Green Energy has no operations at all. We're working on moving the businesses over from Torrent Power to Torrent Green, and that hasn't taken effect yet. So at this point, there's nothing operating there.

Mohit Kumar

analyst
#63

Got it. Got it.

Saurabh Mashruwala

executive
#64

However, when you take a look at the overall picture — the consolidated figures, the numbers broken out by segment — those are the ones we've provided.

Mohit Kumar

analyst
#65

Got it.

Saurabh Mashruwala

executive
#66

Regarding generation and renewables as well, then — so on a consolidated basis, no figures will change, whether it sits inside Torrent Power or Torrent Green.

Mohit Kumar

analyst
#67

Got it. Regarding the second question about the Bhiwandi franchisee, you said the V&D franchisee agreement can be extended by as much as five years. Does Agra have an option like that as well?

Saurabh Mashruwala

executive
#68

Agra, there isn’t an option like that, since it runs through 2030. Right now, it is available. So we will start the discussion at the right time, because if you look at the newest developments in UP, the government is very eager to privatize the discom. So taking those factors into account and given our strong presence in Agra, we’ll talk around 2030 about extending it further.

Mohit Kumar

analyst
#69

Got it. One final question about the PSP. Naturally, you've secured the PSP — I believe it's been 5 or 6 months now. The PPA has been signed. Has construction begun? If it hasn't, when do you expect to kick off construction under the EPC contract?

Saurabh Mashruwala

executive
#70

For the PSP project, approval typically takes about 1.5 years. You prepare your DPR and all of that. You mobilize the sites and everything. So construction work will begin after 1.5 years. As things stand, we are currently in the stage of securing approvals, having the DPR prepared, and getting it vetted by the Ministry of Environment and Forest. So those processes are underway at the moment.

Mohit Kumar

analyst
#71

Under the PPA, what's the timeline for beginning power supply?

Saurabh Mashruwala

executive
#72

The window spans 4 years. Once 4 years have passed since the PPA was signed, we're required to begin delivering the power.

Mohit Kumar

analyst
#73

Got it, sir.

Saurabh Mashruwala

executive
#74

Appreciate it.

Mohit Kumar

analyst
#75

I appreciate that.

Operator

operator
#76

Thanks. Our following question is from Satyadeep Jain at Ambit Capital. The line is yours.

Satyadeep Jain

analyst
#77

Hello, and thanks. I'd just like to get clarity on what the QIP proceeds will be used for. When I consider the REF CapEx figure you laid out of roughly INR 19,000 crores, and also the distribution CapEx you referenced in transmission, the yearly CapEx — taking into account the equity contribution, which usually runs 25%-30% — it appears there's sufficient internal cash available to fund this project. So what is the planned use of the QIP funds? That's my first question.

Saurabh Mashruwala

executive
#78

Pardon me?

Satyadeep Jain

analyst
#79

What do you plan to do with the money raised through the QIP?

Saurabh Mashruwala

executive
#80

According to the document we filed — the QIP document that we submitted — there's an INR 3,500 crores QIP, with 25% allocated to general corporate purpose and 75% going toward debt prepayment. Right now, we're in the process of prepaying that debt. And once — the internal approvals are in place — once we require the funds to finance this upcoming RE and PSP project, we'll raise the debt as well at that time. At present, we've applied the QIP proceeds, that 75%, to prepay the debt, and we've brought the debt down.

Satyadeep Jain

analyst
#81

I’d just like to get a sense of how you’re thinking about capital allocation. Torrent already stands favorably against plenty of peers, and the balance sheet has been handled well. Then when you consider equity contributions for upcoming projects, putting in more equity reduces the IRR. Are you planning to use less debt in future projects so there’s a bigger safety cushion? Or is the whole amount you mentioned—75%—going toward paying down the existing debt you had?

Saurabh Mashruwala

executive
#82

If you look at the projects we have in the pipeline, we've got roughly 19,000 crores of RE projects under pipeline, and that CapEx will be incurred over the coming two to three years. On top of that, we have distribution CapEx each year. Typically we spend around 2,000 crores there, which adds another 6,000 crores. But then there are small transmission projects as well. There's also a pumped storage project. We signed the PPA for that too, and it carries about 12,000 to 13,000 of CapEx. So our CapEx going out over the next four to five years, taking everything together, I'd say, will come to roughly 35,000 to 40,000 crores. Each year, as a rule, we generate around 2,000 crores of free cash flows, and that money is available to fund the equity — the 30% equity — of the projects. Beyond this QIP money, plus internal outgoing, we're in a position to fund this roughly 40,000 crores of CapEx across the next four to five years. The QIP money will be invested in those upcoming projects.

Satyadeep Jain

analyst
#83

You've brought in the cash at this point, and the PSP will arrive (apologies, but that's not right) since you have to go through DPR and all of that. So most likely the spending on PSP won't begin within the coming one and a half to two years. So the QIP funds have already been raised by you. Will you put that money to work somewhere over the next one and a half to two years, before PSP starts? Because your internal cash flows appear adequate to cover your CapEx for at least the next two years.

Saurabh Mashruwala

executive
#84

So the debt has been prepaid using the QIP funds. That means our debt has come down. Once this project gets going, once we put the money into this renewable project and the pumped storage project, we'll begin raising funds to finance this project. As things stand right now, we've prepaid the debt with this QIP money.

Satyadeep Jain

analyst
#85

With the whole QIP, is 75% of it being used to pay down the debt that's already on the balance sheet?

Saurabh Mashruwala

executive
#86

Correct.

Satyadeep Jain

analyst
#87

All right. Sir, I just want to get some clarity on the long-term take-or-pay LNG contract you hold. I believe last year, at some point, you were considering possibly signing up for additional cargoes compared with what you currently have. What are some of those take-or-pay contracts that you signed? Do any of them expire at some point? And are you looking to — I think last time you mentioned that you're looking to raise the quantum of those contracts. Does that remain the thinking?

Saurabh Mashruwala

executive
#88

Yes. Starting now and running through 2027, we've got three cargoes contracted annually. We're also looking at locking in additional cargoes at present. When the timing is right, we'll secure those. Actually, we launched a tender during August for the additional cargo tie-up. That process is underway right now.

Satyadeep Jain

analyst
#89

You're not considering raising the take-or-pay quantity at all, correct? The cargo count you have now is the same cargo count you'll have going forward, right?

Speaker

unknown
#90

Satyadeep, I believe Saurabh's point was that we're working on securing more cargoes. As you may recall, we secured cargoes for 3 years in the international market, and that arrangement wraps up this year. That means starting next year, we won't have a firm tie-up in place. We're now aiming to lock in cargoes for a longer period and in greater quantity. So whenever an opportunity comes along to secure cargoes, we would certainly want to do so.

Satyadeep Jain

analyst
#91

All right, just a quick one from me. Regarding that hydro power merchant project, it feels like every quarter it gets pushed out, and that's been happening for several quarters now. What's behind the delay? Is there something particular to this project — because it appears to rely on internal cash flows — and also, what's driving the holdup here?

Saurabh Mashruwala

executive
#92

I wouldn’t call it a delay at all. As far as putting the project into practice goes, we’re on schedule.

Satyadeep Jain

analyst
#93

When you look at how things have been trending, each quarter it slips another quarter down the line. Is there anything particular about this project?

Saurabh Mashruwala

executive
#94

So I think what we're working on — last time around, what we said was that it would likely be done by September 25. Now we're saying by December 25. Typically, in these kinds of projects, what we put out there is the full commissioning date for the whole project. It happens progressively, and because this one doesn't have a PPA, any windmill or solar module that gets commissioned will start selling power. So it's been pushed out by one quarter owing to certain reasons around connectivity and land-related matters, but that would apply to a smaller portion of it. When we issued that remark, it covers the project in its entirety, so it doesn't mean we won't do the project. The project will begin getting commissioned — not all of it by September 25. It gets commissioned progressively.

Satyadeep Jain

analyst
#95

All right, thanks. And best of luck to everyone.

Saurabh Mashruwala

executive
#96

Thanks.

Operator

operator
#97

Thanks. Our next question is from Nikhil Abhyankar at UTIMF. Go ahead, please. Nikhil, sir, your line isn't muted. Please ask your question. Nikhil sir, if you've muted your own line, please unmute it and go ahead with your question. Since there's no response from the current participant's line, we'll move on to the next question. Our next question is from Barani at Avendus Spark. Please go ahead.

Bharani Vijayakumar

analyst
#98

Yes. Good evening. Can you hear me?

Saurabh Mashruwala

executive
#99

Correct.

Bharani Vijayakumar

analyst
#100

Alright, so here's a conceptual question I have. Agra is already part of DVVNL, and that entity is now being put up for privatization — or at least that's what the government is working toward. So if someone other than Torrent ends up winning this DVVNL bid, how would our operation in Agra function? In other words, would it still stay with us?

Saurabh Mashruwala

executive
#101

So, what about impact? How are we able to have an impact? Since we hold a contract that will ultimately conclude by up to 2030. Therefore, by that point, there won't be any impact. So I think, Barani, we're a franchisee in that location. We aren't a licensee there. What the UP government is considering is awarding the license. So whoever wins that will become a licensee. So rather than DVVNL, whoever wins that will become the licensee. So that contract will be transferred.

Bharani Vijayakumar

analyst
#102

So our client is going to shift for us, is that right?

Saurabh Mashruwala

executive
#103

Right, exactly. Yeah, since it’s a bilateral contract, there won’t be any impact through 2030, until that contract comes to an end.

Bharani Vijayakumar

analyst
#104

Is there any renewal clause in this contract for Agra, so to speak?

Saurabh Mashruwala

executive
#105

We’ll talk about that when the time comes, because Kezabna 2030 is roughly five years off, I’d say. So we’ll have that discussion closer to the contract expiry date in Agra, similar to what we did with Bhiwandi.

Bharani Vijayakumar

analyst
#106

Alright, that's fine. My second question concerns the thermal generation segment's EBITDA. Specifically, how much of the gain in EBITDA from merchant sales came in this quarter?

Saurabh Mashruwala

executive
#107

As we mentioned earlier during this call, giving you the split between merchant and LNG sales isn't something we're able to do. That INR 75 crores of incremental contribution comes from the three segments, the three EBITDAs. The first is greater contributions from merchant sales, the second is greater contributions from LNG sales, and the third is some EBITDA from exchange as well.

Bharani Vijayakumar

analyst
#108

All right, so regarding merchant sales during April, May, and June — that's the first quarter — we got a benefit from Section 11, but at this point we'll be selling on the open market. If I have that right, is that correct?

Saurabh Mashruwala

executive
#109

I'm sorry — could you say that once more, please?

Bharani Vijayakumar

analyst
#110

The merchant power will be sold by us on the open market.

Saurabh Mashruwala

executive
#111

Yeah, yeah. I'd say we're selling into the power exchange.

Bharani Vijayakumar

analyst
#112

Right, that's accurate. Since prices have dropped, we'd clearly be aiming to sell only during the evening peak hours. Is that how it works, or?

Saurabh Mashruwala

executive
#113

Correct — our focus is on driving sales during peak hours, yes.

Bharani Vijayakumar

analyst
#114

The hours of the evening peak. All right.

Saurabh Mashruwala

executive
#115

That's right.

Bharani Vijayakumar

analyst
#116

Got it. Got it. All right, so what does this Forex gain tie back to?

Saurabh Mashruwala

executive
#117

To be specific, when you compare with last year, the euro exchange rate stood at a higher level. During this year, it came in lower. So essentially, that represents a gain we have recorded on certain of our long-term O&M contracts, I'd say.

Bharani Vijayakumar

analyst
#118

Operations and maintenance contracts — on those, some outside vendor handles that work.

Saurabh Mashruwala

executive
#119

Right. So at our plants, we've got O&M contracts signed on a long-term basis. So each quarter, a provision gets made, but the payable is in euros. So when the euro depreciates against the rupee, there's an incremental outflow. And that's where you get a foreign currency loss on a provisional basis, on an accounting basis. That isn't an actual cash outflow or inflow. And then if it depreciates, it turns into a gain. That's the situation.

Bharani Vijayakumar

analyst
#120

Got it. Got it. Okay. That’s all from me, folks.

Saurabh Mashruwala

executive
#121

Thanks.

Operator

operator
#122

Thanks.

Saurabh Mashruwala

executive
#123

Yeah, got it.

Operator

operator
#124

Ladies and gentlemen, since no one else has any questions, I'll now turn the conference over to management for their closing remarks.

Saurabh Mashruwala

executive
#125

Thanks for joining the Torrent Power investor call, everyone. Please stay safe and healthy. Thank you very much.

Operator

operator
#126

Appreciate it. That brings this call to a close on behalf of Torrent Power Limited. Thanks for being with us. You can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.