operatorGood afternoon, everyone, and welcome to the Torrent Power Limited 2Q FY '22 conference call, brought to you by IIFL Securities Limited. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll turn things over to Mr. Harshavardhan Dole of IIFL Securities. Thank you, and the floor is yours.
Harshavardhan Dole
analystThank you, Zed. Hello, everyone. Speaking for IIFL Securities, I extend a warm welcome to all of you on this call covering Torrent Power's second quarter results. Joining us to walk through the Q2 figures in detail and to share how performance is likely to shape up are the full management team from Torrent Power. I have the privilege of introducing Saurabh Mashruwala, VP, Finance; Rishi Shah, GM, Finance; and Jayprakash Khanwani, AGM, Finance. First, I'd like to ask the management to give their opening remarks, and after that we can open the floor for Q&A. Over to you, Saurabh-bhai.
Saurabh Mashruwala
executiveThank you, Harsh. Good morning, everyone, and thanks for being on Torrent Power's Q2 FY '22 earnings call. To start with, I'll walk you through how we performed this quarter, and then we'll open the phone lines for a Q&A session. Let's begin by looking at the company at the PBT level. PBT as reported for the quarter was INR 485 crores, against INR 230 crores in the same quarter a year earlier. That's a rise of roughly INR 255 crores, or 111% on a reported basis. We had no one-off items at any point during this quarter. However, as you'll remember, the reported PBT for the equivalent quarter, Q2 FY '21, included 3 one-off items. The fourth one was a provision of around INR 100 crores for doubtful debt, largely relating to the subscription business, because collection efficacy was lower owing to COVID. Second, there was an under recovery of fuel cost amounting to INR 42 crores on certain projects, which was reversed in Q2 of FY '21. And lastly, there was an increase of INR 21 crores stemming from the CERC tariff for the control period running from 2019 to '24 for our SUGEN power project. Taken together, net nonrecurring charges came to INR 121 crores in Q2 of FY '21, that is last year.
Saurabh Mashruwala
executiveOnce you factor in that one-off adjustment, PBT for the quarter came in at INR 485 crores, versus INR 351 crores in the same quarter a year earlier — an increase of INR 134 crores, or 38%. Next, I'll walk you through the main points behind the improvement in PBT for this quarter. I'll naturally bring you up to date on the 3 positives that drove this rise in profit. After that, I'll also cover the 2 negatives that pulled the profit down. On the first, we saw a substantial drop in T&D losses, primarily in the distribution franchise business, thanks to industrial demand coming back — it had been hit hard last year by the COVID-19 pandemic. That development gave us a positive impact of INR 70 crores. Second, PLF was higher at renewable projects, largely because wind speeds were abnormally low last year. That added INR 46 crores on the positive side of the profit. Third, finance cost for the quarter fell gross by INR 54 crores. The main reasons are a lower interest rate and a lower average level — a lower level of debt. The interest rate for the quarter was down 90 basis points from the corresponding quarter a year ago.
Saurabh Mashruwala
executiveAlso, the average debt level as of 30 September 2021 stood lower, at INR 7,469 crores versus INR 8,734 crores — a decrease of INR 1,265 crores. So our debt has come down by INR 1,265 crores. Reason four is a rise in contribution from franchised distribution, largely driven by stronger demand. That added roughly INR 13 crores to profitability. Next I'll cover 3 factors that pulled the company's profit down. The first is the annual recovery of fixed costs at the SUGEN plant, stemming from a cut in the long-term PPA with PTC from 75 megawatts to 50 megawatts, which hit profitability by INR 5 crores. The second is higher acquisition costs from increased incremental CapEx versus the prior quarter, which affected profitability by INR 15 crores. And salary and O&M costs went up by INR 10 crores. Those are the factors that have affected the company's profitability. And demand in both the licensed and franchised distribution areas has improved by 19%. We nearly got back to the pre-COVID level, chiefly because of the relaxations the government granted from COVID and the earlier lockdown, along with the reopening of economic activity in the country during the quarter.
Saurabh Mashruwala
executiveWe anticipate that we will probably be below demand, and that demand sits at the pre-COVID level of FY '20. Now to the payout figure. The consolidated payout reported for the quarter came in at INR 367 crores, versus INR 204 crores reported in the same quarter last year, an increase of INR 163 crores, or roughly 80%. That wraps up the overview of the company's quarterly operating performance. I'll now turn to the update. I will go ahead and brief you on the projects currently in the pipeline. In the course of the quarter, the company signed a share purchase agreement with CESC and its associate company to acquire 156-megawatt wind power projects situated in the State of Gujarat, Rajasthan and Madhya Pradesh. The key details of that project were already shared through the stock exchange submission. Onto the other projects. For the 650-megawatt SECI V project, we have obtained an extension of COD from February '22 to September '22. So we were given some extra time to commission the project up to February '22. The EPC contract for this project has already been awarded, and commissioning is likely during FY '23. Second, the SCOD of the 100-megawatt GUVNL project has also been extended to October '22 from July '22.
Saurabh Mashruwala
executiveRegarding the Torrent 300-megawatt TPLD project, the SCOD has likewise been pushed out to December '22 from November '22. As you're aware, the AP project remains subsidized. No headway has been made on the AP project. On the matter of the 3 core licensed distribution in the union territory of Dadra and Nagar Haveli, Daman and Diu, we mentioned on the previous call that the Supreme Court has seconded the stay the Bombay High Court placed on the tender process, and we're waiting for the hearing from the Supreme Court. At this point I'd ask the coordinator to open the line for the Q&A session. We want everyone to stay safe and healthy. I'll hand things over to the operator. Thank you.
Operator
operator<<operator_script>> Our first question comes from Aniket Mittal, who is calling in from SBI Mutual Fund.
Aniket Mittal
analystI actually had a question about the fuel arrangement for our gas-based plants and the recent increase we've seen in energy prices. So if you could highlight, first, what the current extent is now for arrangements for these gas-based plants? And second, maybe from a near-term perspective, what measures have you been taking or can you take to cushion yourselves if the current environment persists <<inaudible>>
Saurabh Mashruwala
executiveYes. Yes, Aniket. To start, I'll address the power purchase situation. When you consider the present circumstances in the country regarding action prices — we saw very high prices around mid-October, that sort of thing — that was driven by the coal shortage as well as demand picking up. However, over the past 1 week, we've observed some normalcy in power purchase prices — a correction in power prices. During the last 2, 3 days, it has also eased to roughly 3.5% of this kind of thing. So our expectation is that matters will normalize as far as power purchase prices across the country are concerned and what are expectations here, and we are also heading into winter. So the festival season is upon us, winter is upon us too. Demand is going to be lower compared with September, October kind of thing. So power purchase price has returned to normal. That's what we can say at this moment. Regarding gas, especially where price is concerned, if you look at it, the present situation is unprecedented. To begin with, there are some certain developments on the supply side, then a supply side disruption, and demand has also risen significant way, which has impacted — which has reshifted the demand-supply position of LNG in terms of the market.
Saurabh Mashruwala
executiveSo we’re hopeful this situation will carry on through the winter — it’s likely to be finished by March '22, but by then conditions ought to return to normal. That’s our expectation, since a price of this kind isn’t sustainable; a level of about $30-plus isn’t sustainable. And it has also reached parity with the brand. For instance, if you take $11 low and $80 crude price, LNG should be at roughly $8.8, which isn’t where it stands now. So we expect that parity will decline and will come after winter. So we anticipate things should get better after winter, and we can see LNG prices return to some normal level. That’s what we expect. Regarding our tie-up, as you know, we have a contract running through calendar year December '22. So beyond December '21 — I’d say beyond December '21 — we recently, in the month of August, floated tenders for LNG procurement covering the next 5 years. We have sought the port for 34 cargoes. For those 34 cargoes, we received some offers from previous vendors.
Saurabh Mashruwala
executiveAnd because the price was higher, the offer came in on the higher side. So we contracted around 3 cargoes for the next 4 years — from '20 to '26, I'd say. And in '22, we'll still be able to contract the cargo. But as far as our tie-ups go, we have them with IOCL as well as Reliance, and that covers roughly 25% of what we need for our long-term PPA requirement. So with this tie-up of 2 cargoes, once again, we've contracted 25% of our medium-term requirement for PPA. As for the remaining requirement, we'll wait until April, when things normalize, and then we'll tie up the balance for the year. So that's where things stand with the gas. The current gas situation is unprecedented and not sustainable, and it's likely to come down after winter. That's what we expect.
Analyst
analystAnd only 1 follow-up question on that, if I could. So as you mentioned, we do have a few tie-ups on the domestic side too. But how much of that is actually being supplied? So perhaps on a T&D basis, what's the quantum on a T&D basis that we get domestically, which I believe would be at the APM level?
Saurabh Mashruwala
executiveThat covers roughly 25% of what we need for long-term PPAs, such as our TPLD and PTC requirements.
Analyst
analystAnd so that supply is reaching us.
Saurabh Mashruwala
executiveRight, right. That supply is coming through. So it's handling roughly 25% of the long-term PPA needs we have. We've secured a handful of cargoes quite recently. That contributes another 25% as well.
Analyst
analystRegarding those 3 cargoes you mentioned.
Saurabh Mashruwala
executiveYeah, I'd say we're looking at roughly 4 per year, beginning with calendar '23.
Analyst
analystOne last thing on collection efficiency for your distribution franchise circle. Could you shed some light on how collections are trending in Bhiwandi and Agra at the moment, since in the past I believe we did some excess provisioning of roughly INR 130 crores? And I think none of that has reversed this quarter. So could you give us some color on that and on how we see things moving forward?
Saurabh Mashruwala
executiveAt Bhiwandi, there are minor reversals, though I wouldn't call them significant. Even so, collections at Bhiwandi for the quarter came in above 100% overall. When it comes to Bhiwandi and Agra — Bhiwandi and SMK, I should say. At Agra we've reached efficiency of roughly 98%. On the T&D side, though, we made substantial headway with T&D losses. To give an example, our T&D loss stood at around 14.4% this quarter. In the same quarter a year earlier, it was roughly 22%. For Agra, we achieved a T&D figure of 9.36%, versus about 10.83% in the comparable quarter last year. So on T&D losses we've delivered meaningful improvement, and the biggest driver, I'd say, behind profitability this quarter is <<inaudible>> T&D losses across both the franchised and the licensed distribution areas.
Operator
operatorMohit Kumar from DAM Capital has the next question.
Mohit Kumar
analystCongrats on the strong results. My first question is really a bookkeeping one. Do we have — could you provide a breakdown of profit at the EBITDA level by business, the way you do each quarter?
Saurabh Mashruwala
executiveSure. I can break out the EBITDA for Q2. Gas, for instance, is INR 809 crores versus INR 821 crores a year ago. And the renewable project has improved quite a bit — one moment. Right, the Q2 EBITDA for the gas project is INR 189 crores. To repeat, INR 189 crores against INR 175 crores. The renewable project is INR 226 crores against INR 180 crores. Licensed distribution comes in at roughly INR 341 crores against INR 352 crores. And franchised distribution is around INR 220 crores against INR 153 crores. Total EBITDA before one-off, I'd say, is INR 974 crores against INR 870 crores. There was a one-off, essentially. So a one-off of INR 121 crores existed last year, which makes reported EBITDA INR 974 crores for the quarter and INR 748 crores for the comparable quarter last year.
Mohit Kumar
analystYes, sir. Second, sir, you have completed many acquisitions and launched several for renewable power plants. So, once all the enhancements needed to boost efficiency are factored in, what sort of equity returns could be achieved? And the third question, secondly, is what the long-term plan is for the renewable portfolio. Are you considering some form of listing or invite or something different? And any kind of target — any gigawatt figure you are aiming for, say, over the next few years?
Saurabh Mashruwala
executiveRight. During the last quarter, we mentioned that we have roughly 5,000 megawatts of planned renewable capacity lined up over the coming 4 to 5 years, I'd say. That's basically what we're targeting. And what we're shooting for is a 13% IRR — equity IRR — on the renewable projects. And we are, yes...
Mohit Kumar
analystRegarding that acquisition, we can see the figure as well, right?
Saurabh Mashruwala
executiveCould you repeat that?
Mohit Kumar
analystWhen it comes to the acquisition pipeline, should we expect a similar number?
Saurabh Mashruwala
executiveSo Mohit, here's what we're trying to get across: as a target at this point, if you take a look at the capacity we already have, plus the projects sitting in the pipeline, that comes to roughly 2 gigawatts, and we expect to announce taking it to 5 gigawatts over some period of time — let's say the coming 3 to 4 years. Those are the expectations. Now, that could come either through greenfield or through acquisitions. We haven't closed off our options. We're looking at both of those. But the goal is to grow our portfolio to 5 gigawatts across the coming 3 to 4 years.
Mohit Kumar
analystSir, one last thing — where do things stand with the Daman and Diu bid? Is there anything new you can tell us?
Saurabh Mashruwala
executiveRight. On Daman and Diu, we laid out that this sits with the Supreme Court. We're expecting a hearing there, and after that the government will be looking to issue the LOA for Daman and Diu. Once we receive that LOA, we can take over Daman and Diu. So at this point we're waiting on the Supreme Court hearing.
Operator
operatorOur next question comes from Rahul Modi with ICICI Securities.
Rahul Modi
analystSir, I have a couple of quick questions. Sir, is there any news regarding SECI III 500 megawatts, or is there no possibility of it returning? And second, sir, a bit more on gas sourcing. You said we booked 3 cargoes. So just to clarify, what rates are we currently receiving under the medium term that you had opted for? And second, sir, what happens to plant availability for SUGEN and UNOSUGEN if gas prices, beyond December, stay above $10 to $12? If you could just highlight that?
Saurabh Mashruwala
executiveOn the SECI III project, there's nothing new to report. As things stand right now, we are not moving forward with that project. That's the latest on it. And regarding — yes, on that point, yes, we have 3 cargoes contracted for the next 4 years, '22 to '26, at what I'd call a very reasonable, good scope. So we can't give you an exact update on the scope we've contracted. It's a very good scope — 3 cargoes per year is what we've locked in. That's where things currently stand, and — what was the last question?
Rahul Modi
analystSir, I was really asking more about plant availability for both SUGEN and UNOSUGEN after December — how are we planning to handle that?
Saurabh Mashruwala
executiveOn plant availability, readiness for generation is generally at 1000% for both the SUGEN and UNOSUGEN projects. So where availability is concerned, we don't see any issue. On fuel — yes, we have roughly 25% of fuel available. The balance we'll tie up according to the requirement. So plant availability is ensured.
Rahul Modi
analystNo. What I'm saying is that availability has more to do with including fuel. So after December, sir, that 25% domestic figure you mentioned — will you split it between UNOSUGEN and SUGEN? Or how will you go about it?
Saurabh Mashruwala
executiveRahul, the problem here is really availability. There's plenty of gas out there in the market, so availability shouldn't be a concern. What we're dealing with is pricing. As for availability itself, there shouldn't be any problem stating that both plants are available.
Rahul Modi
analystRight, so since UNOSUGEN came with some conditions attached, that was the understanding at the time.
Saurabh Mashruwala
executiveRight. The UNOSUGEN condition concerned the price — both the variable portion of the total price and the fixed cost ought not to reach the midterm price. The medium-term price, I'd call it. That was the nature of the condition. However, when you consider — since the — if we are securing liability and making sure fuel is on hand, the plant is on hand, then the PPA falls under Section 62; these are cost per tariff, a 2-part tariff. And every PPA approved throughout the country under Section 62 — once we demonstrate the plant's availability with respect to fuel availability and with respect to plant viability — has the fixed cost passed through. So we don't anticipate any problem arising with regard to pass-through of the fixed cost with regard to the SUGEN as well as UNOSUGEN projects.
Operator
operatorOur next question comes from Apoorva Bahadur, who is on the line from Investec.
Apoorva Bahadur
analystNice work on those results. Sir, I'll go back to the gas tie-up once more. I just want to get a sense, for this FY '23, what's the latest point by which that gas tie-up has to be in place for the plants to run? Physically, is there a lag between signing the tie-up and the gas actually reaching the plant?
Saurabh Mashruwala
executiveOn gas, this is an ongoing effort. As a matter of fact, we're out in the market helping to support where the gas gets sourced. So — and for the FY — for the current calendar year '22, 25% of gas is available to us. So our expectation is that pricing settles down after winter. And at that point, we'll be able to move more — we will secure the market and secure additional gas.
Apoorva Bahadur
analystAnd sir, is UNOSUGEN usable for domestic gas as well, or is it only for SUGEN's PPA?
Saurabh Mashruwala
executiveNo. Domestic gas is an option for us as well. Actually, in the UNOSUGEN project, we're receiving domestic gas from Reliance. So Reliance is supplying us that gas through the UNOSUGEN project.
Apoorva Bahadur
analystAll right, that's fair. Sir, my second question concerns this AMGEN retirement. Given the recent price surge—which is tied to the extend—and with gas being so expensive, is there any expectation of an extension there?
Saurabh Mashruwala
executiveRight now, we don’t have any such news. But yes, if the country faces a power shortage, the government might consider it. But we — as of now, there’s no such clarity.
Apoorva Bahadur
analystAll right, that's fair. Sir, one final question on this, if I may: regarding the loss reduction at SMK, it hasn't been as pronounced as at some of our other distribution franchisees, even though the losses there have been quite substantial. So from a loss-reduction standpoint, what kind of trajectory should we expect over there?
Saurabh Mashruwala
executiveWhen you compare the loss to the prior Q2, over the past 1 year we've brought it down by roughly 2%, I'd say. And so — we've now been in SMK for 1 year, and on top of that — with COVID, we weren't in a position to put meaningful investment into SMK the way we had planned. So at this point we've begun investing, we're putting this network in — we're moving a network underground. We're stepping up — our efforts when it comes to centering that network. So going forward, we anticipate a solid decrease in SMK T&D losses.
Apoorva Bahadur
analystAlright, and finally, sir, regarding the government's smart building scheme — do we see any CapEx opportunity for our distribution license business coming out of that?
Saurabh Mashruwala
executiveWhich plan was that?
Apoorva Bahadur
analystAnd what about the smart building initiative?
Saurabh Mashruwala
executiveThat's not my view. That isn't how I see it.
Operator
operatorMoving on, our next question comes from Devam Modi at ARDEKO Capital.
Devam Modi
analystI just want to get a better understanding of the current environment—obviously, we also talked on the call about the power shortages. Our expectation is that whenever these abrupt shortages occur, gas-based power tends to be the area people turn to for meeting their short-term needs. Yet, on a year-on-year basis, if you actually look, utilization of gas-based power has dipped. So if you could just spell out the various nitty-gritty details involved here, and what it would take for us to achieve a higher, let's say, merchant volume—a shorter-term volume on the gas-based side—in terms of the overall environment.
Saurabh Mashruwala
executiveOn the plant operation side, I’d say the gas-based plant is very well positioned to begin operating compared with the coal-based portion of this. So that’s one advantage we have when it comes to running the plant—yes, just to put that out there. So in terms of—but importantly, fuel availability and the price at which fuel is available, because this is the current opportunity, a very fitting opportunity for a gas-based power project to run the power project. But at the same time, the gas price has risen so much that it’s not comparable, I’d say, competitive with respect to the current domestic power price. So yes, this is ideally placed to run the gas-based plant in the current situation, when there is a huge coal shortage and the power price has gone up effectively to this kind of level.
Rishi Shah
executiveAnd Devam, to build on what he said — yes, you can get this power plant going on very short notice, but the catch is that the ecosystem needs to be in place for a gas-based plant to start up. So as things stand right now, a lot of the country's power plants are stranded. That means you can't bring those plants online quickly. A plant can only be started if it's already running and you've got fuel available. So next to every other power plant, ours are running and in a state of readiness. But since prices were extremely high, usage of the plants wasn't all that great, or the PLFs for gas-based plants weren't all that great. So if a plant is stranded, it takes a couple of months of preparation to get it started. And the spike we saw in the current merchant markets was very sporadic and very fast — nobody had anticipated it. That's why, as you've seen, the gas-based power plants weren't able to contribute to it.
Devam Modi
analystRight. So essentially, that one obvious signal — the elevated prices everyone observed, the ones all of us could see on the energy exchange — well, those prices pointed to levels that were far higher. So would that serve as a rough proxy for the sort of pricing that was in force at the time? Or would you say that when the SEBs come to do the sourcing in bulk, or perhaps when your plants sell the power, the real power price ends up being considerably lower?
Saurabh Mashruwala
executiveNo, no — those exchange prices you saw, they're really short-term sorts of prices, and they've gone back to where they were before, INR 3 to INR 3.5. So short-term spikes like that can't be solved by gas-based power plants alone if the fuel isn't there.
Devam Modi
analystAll right, and just roughly converting — say, as a very rough rule of thumb, if fuel is available at $10, I mean your variable costs would land at approximately INR 5 per unit. At USD-INR 75, would that be a reasonable rough figure to use?
Saurabh Mashruwala
executiveRegarding INR, that's something you can take into account.
Devam Modi
analystSo the conversion ratio from USD would be 0.55%.
Saurabh Mashruwala
executiveCorrect.
Devam Modi
analystAnd based on what we remember from before, that figure was around 0.45, and it has depreciated only about 10% from those levels. So would the heat rates differ, or is something else the change?
Saurabh Mashruwala
executiveHeat rate won't make — no, 0.45 was never the figure <<inaudible>>. The range was consistently 0.5 to 0.6.
Devam Modi
analystRight, right, right. And regarding gas-based plants as well, something else we should keep in mind is that they'd serve as ideal complements to renewable power, given the round-the-clock challenges that renewables run into. So do you have any thoughts, or is there any progress on that front when it comes to government policy on this — for renewable power or for teaching — because we've been hearing for a couple of years now that something is in the works, yet we aren't seeing anything in the way of a draft paper or the like. So any views on those fronts?
Saurabh Mashruwala
executiveThe government is working on that, but as of right now, nothing is actually in place.
Devam Modi
analystAlright, and one more thing...
Saurabh Mashruwala
executiveThe government has discussed this concern, but up to now nothing has materialized, and nothing is actually in place to address this particular concern.
Devam Modi
analystRight. We do hear about these kinds of things from various power manufacturers such as ABB or Cummins, or those types of companies where they're also discussing such matters. But even so, it isn't happening through government policy. So I mean, what you're saying is that there's no such discussion — nothing of that sort is coming from the government as of now.
Saurabh Mashruwala
executiveAnd yet, having fuel at a fair price matters, since that would let the gas-based plants get it. The way I see it, the government is working on the question of how fuel can be made available to the gas-based portion of it at a reasonable cost.
Devam Modi
analystAll right, and last thing — there's this split involving kerosene content, which is likely fairly far along or at some particular stage. So what impact does that have on us? And for us specifically, given that plenty of zones sit next to the license area we hold today, which we could access if a separation of kerosene content comes through — do you view that as a chance for Torrent, or how would that play out?
Saurabh Mashruwala
executiveTake licensing — that gives Torrent a solid opening <<inaudible>>, since our grip on distribution is really strong. Because nobody is going to come into Ahmedabad, say — the <<inaudible>> would be tough for a newcomer. But we're able to go tie up some fresh territories, urban ones and new rural ones, sort of near our existing areas too. That hands us a real chance to move out and grow our distribution footprint — the business.
Devam Modi
analystAbsolutely. And what kind of timelines are we looking at here, since there's been a lot of discussion on this front? What timeline would you expect?
Saurabh Mashruwala
executiveThe bill was meant to be introduced by parliament, or rather by the government, but I don't believe that has taken place. So on this particular front, we are still waiting on the government.
Operator
operator<<operator_script>> Our following question comes from Subhadip Mitra of JM Financial.
Subhadip Mitra
analystOkay, returning to what we discussed regarding fuel cost and tariffs. Our understanding is that the UNOSUGEN PPA carries a price cap of roughly INR 4.4, and that works out to a gas price of perhaps nearer to around $7-odd. Based on our calculations, what we observe is that as you approach something like $9, you will likely begin to see variable cost and other recoveries as well, and not only fixed costs. So I just wanted to hear from you: if gas prices have settled even at around $9 or $10, what sort of impact would UNOSUGEN be facing? Would we start to see fixed cost under recovery occurring there?
Saurabh Mashruwala
executiveWhen you consider the UNOSUGEN PPA, it received approval under Section 62, which operates as a cost-plus tariff — so I'd describe it as a two-part tariff. Across all the PPAs approved in the country under Section 62, there's a fixed cost component, and we're required to make sure the plant is available and fuel is available. In our case, we don't see any problem — both are available for us. Both ought to be available in our situation. Fuel too should be available, even though it's somewhat expensive. So we really don't anticipate much of an issue when it comes to recovering that fixed cost.
Subhadip Mitra
analystRegarding that figure of roughly 4.4, is the fixed cost included in that cap? That's how we understood it.
Saurabh Mashruwala
executiveYes, that 4.4% covers just the variable cost. On top of it, there's a fixed cost of INR 1.1, which works out to roughly INR 228 crores.
Subhadip Mitra
analystGot it. So does that mean I should potentially be looking at something like INR 6.2 as the cap, with the fixed cost included in that?
Saurabh Mashruwala
executiveNope. Roughly INR 4.28 plus INR 1.10 — that's the total cost.
Subhadip Mitra
analystThat's right.
Saurabh Mashruwala
executiveINR 5.5 is sort of a thing.
Subhadip Mitra
analystRegarding INR 5.4 — yes, INR 5.38 is the figure. So INR 5.38 is the effective cap, correct, when both are combined. So if your variable costs come in higher, would you be considering a situation where you'd choose on your own to shut the plant down? Or are you telling me that I'll always see — even in a case where I'm purchasing gas at $15 and my plant is able to produce, you'd still see fixed cost recovery, because this is something of a dilemma, right, since suppose you're indicating gas availability at, say, what is it, $14 or $15, and you're operating the plant while the price cap sits at, say, INR 5.4 — then you'd actually begin incurring under recovery. That's precisely why I'm posing this question.
Rishi Shah
executiveSo, Subhadip, what we're essentially saying is this: suppose the gas price is uneconomical, and that cost shouldn't be pushed onto consumers — even then, we'll still declare the plant's availability, and that lets us recover the fixed cost. As Saurabh explained, it's a Section 62 PPA, which means recovery of your fixed cost depends on you declaring the plant's availability. So if you declare our plant availability but it doesn't get scheduled because your gas price is very high, and because of that the variable price is very high, you'll still get the fixed cost. That's what we expect.
Subhadip Mitra
analystRight. So this isn’t a situation where the DISCOM would instruct you to generate, since you’re already demonstrating availability anyway — it’s not a case in which that DISCOM would tell you to produce the power and sell it to them at this life cap of INR 5.4 no matter where gas is available. So that’s not the contention?
Rishi Shah
executiveNo, no. That's not right. Section 63 PPA is the one that scenario applies to — not Section 62 PPA.
Subhadip Mitra
analystAll right, that's helpful — that clears this up nicely. And then, on that same topic with SUGEN, should I be thinking of a situation where, as I understand it, this is an ROE-based PPA and you'll be showing availability? But right now you do earn quite a lot of those SHR and other efficiency-linked benefits. So my read is that if that plant isn't getting any withdrawal from us because of higher gas prices, you might actually begin to see, say, the profit figure there coming in closer to just about INR 100-odd crores — which is the normalized regulated ROE — rather than the bigger number you have today? Are those numbers more or less right?
Saurabh Mashruwala
executiveIf we're not generating, then yes, that block will see less of a fuel efficiency gain. So the only effect would be the SHR saving, which you get if the plant is running. If the plant isn't running, those SHR savings wouldn't come to us. That's what the impact on profitability would be. There's no other impact as far as the SUGEN PPA goes.
Subhadip Mitra
analystAll right, so the baseline ROE that SUGEN would generate would come to roughly INR 100 crores — around INR 120-odd crores — if we assume just the ROE and no efficiency gains?
Saurabh Mashruwala
executiveWe aren’t giving out those figures plant by plant to everyone.
Operator
operatorThe next question comes from Noel with Ashika Group.
Noel Vaz
analystI actually just have 1 question about that — CapEx for the current quarter, and for the full year and forward, meaning the next 2 years: have there been any changes?
Saurabh Mashruwala
executiveRegarding capital expenditure for the half year, I'd say we're roughly on track — we've spent around INR 400 crores on CapEx in the licensed distribution area and franchising, and in the franchised distribution area we're sitting at about INR 113 of CapEx. On guidance, for the next 3 years, the current year included, it's INR 1,200 crores for the licensed distribution area and roughly INR 250 crores for our franchised distribution area. That guidance still stands.
Noel Vaz
analystRight. Yeah, that’s one item. Just one more item, then. I wanted to ask about the RE plan—just to confirm. You mentioned that we need to add roughly 5 gigawatts of RE under the plan. Does that include both organic and inorganic?
Saurabh Mashruwala
executiveCorrect, sir. Both organic and inorganic as well.
Operator
operatorThe next question comes from Aman Madrecha at Augmenta Research Pvt. Ltd.
Aman Madrecha
analystYes, sir. Sir, I just wanted to ask: of the total distribution generation, what share is regulated equity and what share is merchant power plant? And the second one is, can you just give an outlook on the region power plant? Do we expect demand to come back from the region power plant, or is the scenario going to remain the same over the next 3 years?
Rishi Shah
executiveRegarding the region power plant, we anticipate that demand within the country is going to stay robust, driven by pure GDP growth as well as lesser demand. That said, at present the fuel situation is somewhat challenging, since we believe that on 1st April '22 the fuel price will cool down and reach a sustainable level. So everything hinges on what kind of fuel — what fuel is available for the region plant.
Aman Madrecha
analystAnd then, sir, going back to my first question, what share is regulated equity? And within our thermal land distribution, what share comes from merchant power plants?
Rishi Shah
executiveTo give you an example on the gas-based side, we have 114 megawatts of capacity, of which 835 megawatts belongs to our TPLD distribution and 150 megawatts to PTC. There isn't much capacity left beyond that. As for UNOSUGEN, of the 382 megawatts, 278 megawatts is allocated to our TPLD, and the remainder is merchant capacity.
Aman Madrecha
analystAll right. And regarding the regulatory side of things, there isn't any regulated equity, correct?
Rishi Shah
executiveEverything there has been fully retired, and every PPA is in place. So, where renewables are concerned, there really isn't any merchant-type arrangement.
Aman Madrecha
analystAll right, and sir, moving ahead, when it comes to the renewable capacity that we're expanding, should we expect that to fall once again under the merchant side or the regulatory equity — whichever capacities are coming down the line?
Rishi Shah
executiveThis will be under a PPA, likely with the city or the state DISCOM. So I'd say it'll be fully tied up. So that means — we don't do anything for the merchant. So it'll be the state DISCOM or a city-type organization.
Operator
operatorOur next question comes from Sumit Kishore at Axis Capital.
Sumit Kishore
analystTo start off, I'd like to ask about those two PPAs you signed with GUVNL and TPLD at 1.99 and 2.22 — given that prices are broadly similar in kind, at what point will the contracts be awarded? And do you expect the company to hit the 2022 timeline of October and December for these 2 projects?
Saurabh Mashruwala
executiveTherefore, provided module prices stay where they are at present, we will proceed with these projects.
Rishi Shah
executiveSo we're waiting for things to settle down. We know prices have risen compared with what we budgeted. This is—we have time. So we haven't yet made the decision to place the order for the module. So we're waiting for the price to stabilize, and then we'll move that—this thing forward.
Sumit Kishore
analystWhen it comes to completion in October, you need to place your contract over what time frame for delivery of the projects.
Rishi Shah
executiveSo we can either award modules or procure them 3 months ahead of that as well, provided everything else is in place. So we're figuring out how to go about this project, how to construct it. Right now, there's still no clarity on when module prices will come down. But to address your question, we can get it done in 3 months' time too, if the other elements — land, evacuation, and transmission — are in place. So we're working on those aspects to keep ourselves in a ready-state condition. That way, if the module price is right, we may be able to order those modules. But as of now, there's no clarity on when module prices are going to correct.
Sumit Kishore
analystMy next question concerns Bhiwandi's loss trajectory. It looks like there's a quarter-on-quarter rise, going from 11.6% to 15.1%. So — since COVID disruption has faded, this ought to have come down.
Rishi Shah
executiveRegarding Bhiwandi,
Sumit Kishore
analystLooking at the T&D loss number you provided in the presentations, comparing the September quarter with the June quarter: it stands at 13.1% as of September, versus 11.6% in Q2.
Rishi Shah
executiveNo. So I think looking at T&D losses quarter-on-quarter may not be so relevant. You'll need to look at it on a YTD basis, because there are certain changes or certain estimates that we make where T&D losses are concerned. So the ideal way to look at it is on a YTD basis rather than quarter-on-quarter. The expectation is that for my franchised distribution business, we would be more or less in line with what we have seen at pre-COVID levels of T&D losses or below that. So we are in that line. So if you look from an H1-to-H1 perspective, H1 of FY '22, Bhiwandi is at 13.07% of T&D losses, whereas H1 FY '21 was 23%. So we have made up quite a progress where T&D losses are concerned. Quarter-on-quarter, there could be some aberrations, which we would like to avoid. So I think the ideal way to look at it is on a YTD basis.
Sumit Kishore
analystUnderstood. And I just want to get a handle on that 5-gigawatt renewable portfolio goal you have for a 3- to 4-year horizon — is it something like — has senior leadership actually put this out there? And have you worked through how solar fits into the mix across the whole company? Or is it more of an aspiration you're moving toward?
Rishi Shah
executiveSo honestly, whether it's solar or wind doesn't really matter to us. We'd evaluate each project individually, on a very standalone basis — if it clears our internal hurdle rate criteria, then we absolutely want to pursue that project, whether it's wind or solar. But all of that will hinge on the kind of IRRs they're offering us.
Sumit Kishore
analystSo it would depend on the project itself. There isn't really any formal target, as such.
Rishi Shah
executiveNo. So the goal is to expand — to reach 5,000 gigawatts — sorry, 5,000 megawatts, or 5 gigawatts, within 2, 3 or 4 years from now. But whether we get there hinges entirely on whether that delivers our hurdle rates.
Sumit Kishore
analystOkay. And the 156-megawatt purchase from CESC — does that clear the hurdle rate of mid to high teen IRR?
Rishi Shah
executiveRight. As we laid out regarding the CESC acquisition, the PLF we're currently seeing is subdued on account of some issues in that area. Our expectation is that we can bring the IRRs up, and on that basis it ought to land within our low-teen to mid-teen IRR expectations.
Operator
operatorWe move now to Bharani Vijayakumar from Spark Capital, who has the next question.
Bharanidhar Vijayakumar
analystRegarding this CESC acquisition, at what point will it be consolidated?
Saurabh Mashruwala
executiveOur expectation is that we’ll wrap things up over the course of this quarter.
Bharanidhar Vijayakumar
analystRight. So starting with the third quarter's results, it'll be consolidated?
Saurabh Mashruwala
executiveThat's our hope. Some PPAs need to be finalized ahead of the acquisition closing, so we're working through that now. We're hoping to wrap up — CESC to control cities by before the end of this quarter.
Bharanidhar Vijayakumar
analystRight, right. And turning to the renewables additions. So 2 is what we've got operating and under construction — 2 gigawatts. So we'll probably bring on 3 more gigawatts across the coming 3 to 4 years, and at the end of that we'd be at 5 gigawatts. Is that correct?
Saurabh Mashruwala
executiveYes. Yes.
Bharanidhar Vijayakumar
analystAll right, so on the renewables side — and given that most of it will be on a PPA basis — I'm just trying to get your view as a generator on how appealing all these green products that have been launched in the exchange markets are. So would you have interest in using those products to sell your power? And if not, why not? Things like your green term-ahead market, green dam products on the exchanges?
Rishi Shah
executiveIt's too soon to say anything about that. This only began a short while ago. So as of right now, we haven't examined it very thoroughly. It's too early to comment on that.
Bharanidhar Vijayakumar
analystSure. So at this point, we aren’t using the green term-ahead market at all, right?
Rishi Shah
executiveThat's not right.
Saurabh Mashruwala
executiveThere isn't any capacity that's untied that we have.
Rishi Shah
executiveThere isn't any capacity that's untied on our side. Every bit of capacity is committed under a long-term PPA.
Bharanidhar Vijayakumar
analystUnderstood. Even so, some generators continue to rely on it, so I’m just trying to see whether you have any plans of that kind. All right. Then my last question concerns the gas arrangement. Would the yearly need for SUGEN and UNOSUGEN combined come to roughly 5 MMSCMD — about 4 for SUGEN and around 1 for UNOSUGEN?
Rishi Shah
executiveRoughly 3.2, I'd put it. 3.2...
Saurabh Mashruwala
executiveThose volumes run 5 to 6 MMSCMD, and it hinges on the PLF levels at both plants.
Bharanidhar Vijayakumar
analystAll right, what I'm trying to get from Rishi is to figure out what's been happening on this side — call it the outside figure. So you're saying that for UNOSUGEN, we've secured arrangements with IOCL and Reliance. So that part is fully taken care of.
Rishi Shah
executiveBharani, just to set the record straight, what we've actually said is that where our long-term PPA liabilities are involved, we've secured roughly 25% for both plants — that's through IOCL and Reliance. Beyond that, as Saurabh-bhai mentioned earlier on this call, we've launched a long-term current tender to bring in international LNG from the market, and under that we've locked in 3 cargoes per year beginning with calendar year '23, which comes to about 25% of our additional requirement. So that brings us to 50% of what we need for both these plants as far as the PPA liabilities go. The remaining 50% stays open, and calendar year '22 is open as well, apart from domestic. So domestic is available for '22 and going forward. International kicks in from calendar year '23 and going forward.
Bharanidhar Vijayakumar
analystAll right, so of that requirement of roughly 5 MMSCMD, how much is coming from domestic sources for us at this moment?
Rishi Shah
executive25%.
Bharanidhar Vijayakumar
analystSo 25% plus 25% plus 25% — that's 75%, right? Is that covered?
Rishi Shah
executiveMy view is that the domestic market can supply 25%.
Bharanidhar Vijayakumar
analystRight. So 25% is committed to IOCL and Reliance, and a further 25% starting in calendar '23 comes from — I mean, from international? Just 25% — or is it 50% open in calendar year '22 and 25% open in calendar year '23.
Rishi Shah
executiveDefinitely not. For calendar year '22, 75% remains open, and from '23 onward, 50% stays open.
Operator
operatorThat brings us to the end of the session, everyone, since we've run short on time. I'll now pass the conference over to Mr. Harshavardhan Dole for his closing remarks. The floor is yours, sir.
Harshavardhan Dole
analystThank you. I want to express gratitude on behalf of IIFL Securities, and I thank all of you for joining this call. My sincere thanks also go to the management for the chance to host it. Saurabh-bhai, Rishi-bhai, is there anything final you'd like to say before we wrap up this con call?
Saurabh Mashruwala
executiveThanks a lot to all of you, and Happy Diwali to everyone. Many thanks.
Rishi Shah
executiveI appreciate that.
Operator
operatorThanks so much, management team. Everyone, IIFL Securities has now wrapped up today's conference call. We appreciate all of you being with us, and at this point you're free to hang up your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.