Torrent Power Limited (TORNTPOWER) Earnings Call Transcript & Summary

May 11, 2022

National Stock Exchange of India IN Utilities Electric Utilities earnings 65 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to the Q4 FY22 earnings conference call of Torrent Power Limited, hosted by IIFL Securities Limited. I'd like to remind everyone that all participant lines will remain in listen-only mode, and following the conclusion of the presentation there will be an opportunity for you to ask questions. If you require assistance at any point during this call, please signal an operator by pressing ” ” and then “0” on your touchtone phone. Kindly note that this conference is being recorded. I'll now turn the conference over to Mr. Harshavardhan Dole of IIFL Securities. Thank you, and over to you, sir.

Harshavardhan Dole

analyst
#2

Appreciate that, Neerav. Hello everyone, speaking on behalf of IIFL Securities. I'd like to welcome all of you to this earnings call for Torrent Power's fourth quarter, where we'll go through the results in detail and share how performance is shaping up. Joining us today is the company's senior management team: Saurabh Mashruwala, VP Finance; Rishi Shah, GM Finance; and Jayprakash Khanwani, GM Finance. I'd ask management to share a few brief opening remarks, and after that we'll open the floor for Q&A. Saurabh, over to you.

Saurabh Mashruwala

executive
#3

Thank you, Harsh. Thank you very much. Yes, good morning everyone, and I appreciate you joining the earnings call for Torrent Power for Q4 FY22. To start, I'll walk you through how we performed this quarter, and after that we'll open the phone lines for the Q&A session. I'll begin by explaining the company's performance at the PBT level, and then we'll address tax expenses separately after that. Reported PBT for the quarter, before exceptional items, came in at INR597 crore, versus INR455 crore in the same quarter a year earlier. That works out to a rise of roughly INR142 crore, approximately 31% on a reported basis. So that you can understand the company's underlying performance, we'll first take you through the non-recurring item, both for the current quarter and for the comparable quarter of last year. The first non-recurring item this quarter includes, number 1, a reversal of a doubtful debt provision at the franchisee distribution business of about INR16 crore, reflecting better collection efficiency and heightened vigilance activities during the quarter. Economic activity at our distribution franchise business carried on recovering from the pandemic's effects during Q4 FY22 as well. Over FY22, demand at our distribution business — licenses plus the franchise distribution business — has nearly gotten back to the pre-COVID level.

Saurabh Mashruwala

executive
#4

The second non-recurring item involves reversing part of a provision — INR28 crore out of the INR161 crore set aside for our SECI 3 projects, the wind projects, back in Q2 FY20. So the performance bank guarantee issued as security for developing transmission infrastructure has now been released by Power Grid Corporation Limited. Item three is another partial reversal: INR29 crores out of a total provision of INR651 crore made for SECI 5 projects during Q4 FY20. Since project development work has already begun and is likely to wrap up in FY23, that INR29 crore provision has been reversed, while a balance provision of INR22 crore was created toward land costs incurred initially. Those have not been reversed for the time being. Development activities are now underway at various sites. The fourth non-recurring item is roughly INR34 crore recognized as liquidated damages for the 126-megawatt MSEDCL project, stemming from a settlement with EPC contractors. And the last one is INR11 crore relating to a renewable energy project acquired during Q4 FY22. We made three project acquisitions: one is Surya Vidyut Limited, about 156 megawatt of wind capacity, 50 megawatt of Lightsource bp capacity, which is solar capacity, and 25 megawatt of visual percept.

Saurabh Mashruwala

executive
#5

So, taking everything together, a non-recurring credit of INR118 crore was recorded in Q4 FY22. Now turning to the comparable quarter of the prior year, there are two non-recurring items in Q4 FY21. The first is a reversal of provisions in the franchise distribution business of roughly INR13 crore, thanks to better collections in that comparable quarter of last year. The second is a fuel cost under-recovery of INR38 crore in Q3 of FY21 that was recovered in Q4. So, taken all together, those two items amount to a non-recurring credit of about INR51 crore, which we recorded in Q4 of FY21. After adjusting for these one-off items, PBT for the quarter came in at INR479 crore, versus INR404 crore in the comparable quarter of last year, which is higher by roughly INR75 crore, or about 19%. Now I'll walk you through the key highlights of the performance behind the improvement in adjusted PBT of INR75 crore for the current quarter. First, the improvement comes from the gas-based power project for two reasons: we have a real incremental gain of more than INR25 crore in gas-based power projects, with the first gain stemming from the merchant business of INR40 crore, mainly from the sale of LNG — sale of LNG as was also communicated on the last call.

Saurabh Mashruwala

executive
#6

Higher gas prices make it commercially sensible to keep the LNG for sustained use instead of converting it into electricity. The INR40 crore gain is cut by a lower contribution of INR15 crore stemming from fuel savings tied to reduced PLF, partly offset as well by reduced O&M costs. All told, the gas-based power plant's profitability improved by roughly INR25 crore on about two factors. Turning to how the distribution business performed: because industrial demand was risk-averse, which hurt last year amid the COVID pandemic, overall contribution from distribution — both franchisee and license business — improved by around INR57 crore. So profit from the license and franchise distribution operations rose by INR57 crore. And finally, finance costs came down by about INR13 crore thanks to a lower interest rate and also a lower average debt level over the quarter. The average interest rate for the quarter was about 17 basis points lower than the corresponding quarter of last year. Debt as of March 22 stood higher at INR9115 crore versus INR7808 crore, roughly an increase of about INR1300 crore.

Saurabh Mashruwala

executive
#7

The primary driver here is the acquisitions we completed during the quarter, and that represents a significant debt across both SPVs. So, turning to a fuller account of financial performance, now on operational performance as a company and distribution, since the sector saw normalized demand for this thing with marginal degrowth of only 1% versus pre-COVID levels. Moving on to the after-tax figure, the consolidated loss after-tax reported for the quarter was INR484 crore against a profit of INR408 crore in the same quarter last year. That is lower by roughly INR892 crore, with the loss driven mainly by impairment charges — one-off charges incurred during the quarter of INR1300 crore — and reversal of deferred tax liability of INR370 crore. So the net impact of deferred digital impairment comes to about INR928 crore. Adjusted for impairment provision, the figure for the quarter stood at INR444 crore versus INR408 crore in the corresponding quarter of last year, higher by approximately INR36 crore, roughly about 9%. That completes the overview of the quarterly performance and operating performance of the company. Now let me review the update about the current projects in the pipeline for the 150 megawatt SECI 5 project, which has received an extension from September 22 to February 22.

Saurabh Mashruwala

executive
#8

Construction has already begun on our gas project, and the EPC contract for it has already been awarded; commissioning of this project is expected to take place during FY23. For the 100 megawatt GUVNL project, SCOD has been extended up to October ’22, and for the 300 megawatt TPLD project, SCOD has been further extended to February to April ’23. Acquisition transactions were executed with three companies — CESC, Lightsource BP and Visual Percept — and these were consummated during Q4 FY22. In FY23, 2022, the company entered into a share purchase agreement with Sky Power Group to acquire a 50 megawatt solar project, Sunshakti Power Limited, located at Telangana, with an enterprise value of INR417 crores; the company doesn’t have any debt as of now. The PPAs exhibited INR5.35 and balance life is about 20 years. Expected take over of license distribution business of Dadar & Nagar Haveli and Daman & Diu was formally taken over by us from 2022, with 51% stake owned by the Torrent Power Limited. There is a source customer base, about 1.5 lakhs, with annual sales of 9 billion units and annual turnover of about INR4,000 crore. That’s all for the quarter. Now I would request the coordinator to open the lines for the Q&A session.

Saurabh Mashruwala

executive
#9

I hope everyone stays safe and healthy. Thanks very much. Now I'll hand things over to the operator.

Operator

operator
#10

Thanks so much. Operator instructions: our first question comes from Mohit J at DAM Capital Advisors. Please go ahead.

Mohit Jalan

analyst
#11

Good morning, sir. Great to see you there. So despite a range of headwinds, we've managed to keep our profitability. My question, sir, is whether you have secured any tie-up for gas this year. And is it most likely going to be spot purchases until the gas market softens?

Saurabh Mashruwala

executive
#12

So for the current calendar year, FY22, we haven't additionally locked in any cargo — just one cargo, and that one is quite different; we bought it on a spot basis. On a medium-term contract, we have not contracted so far, and the situation remains the same as explained in the last earnings call. So we do have a contract for the further cargo, except one cargo for calendar year ’22.

Mohit Jalan

analyst
#13

Got it. Now that Daman and Diu and Dadar & Nagar Haveli are part of the picture, what kind of capex are you expecting over the next few years for that specific entity? And could you also share the regulated equity figure for that area?

Saurabh Mashruwala

executive
#14

When you look at Daman and Diu, this is a long-term business for us. So we take a long-term perspective on it, and our expectation for capex there would be roughly INR1,000 crore over the next 5 to 7 years — that's what we anticipate spending, and it's about strengthening the network in the Daman and Diu area.

Mohit Jalan

analyst
#15

Could you break out EBITDA for the whole company?

Saurabh Mashruwala

executive
#16

Regarding this quarter, I can provide the quarterly figures. Gas-based projects came in at roughly INR282 crore compared with INR255 crore, while renewable projects were 147 crore against INR157 crore. License distribution stood at approximately INR421 crore versus INR293 crore, franchisee was about INR167 compared to INR184 crore, and total EBITDA before reported reached INR1088 crore versus INR948 crore.

Mohit Jalan

analyst
#17

Got it, sir. Thanks, and good luck to you, sir. Thank you.

Operator

operator
#18

Thanks. <<operator_script>>

Harshavardhan Dole

analyst
#19

Moderator, while the queues are still being put together, I'd like to ask a few questions of my own. Saurabh, could you help us get a handle on the thinking behind this impairment — how often should we expect an exercise like this to happen? And what basis, or what underlying gas price, was used when impairing this asset? Say, hypothetically, gas prices were to drop below $10 — would you then look to reverse the impairment, or do you have any philosophy or comments on that?

Saurabh Mashruwala

executive
#20

Regarding impairment testing, that's a practice we typically perform each quarter. So, on a quarterly basis, we conduct the impairment exercise together with PWC, since they serve as the statutory auditor, and usually in Q4 of the last quarter, we — we also bring in a third party, where the third party is also engaged and performs their valuations and provides their opinion. So that exercise is carried out by us annually, and even last year, we performed a separate third-party valuation exercise in Q4. And this year as well, we conducted a similar exercise. When it comes to fuel prices, we take the fuel price at the market price, whatever is available in the forward market. So, we take that brand price and apply some slope, then arrive at the fuel price and perform the valuations,

Analyst

analyst
#21

To expand a bit on Saurabh's point, Harsh: looking ahead, we shouldn't really anticipate much in the way of impairment, since if you consider the plant's carrying value, it's now quite negligible when it comes to the impairment testing that has to be done. So there's only about INR600 crore still pending for impairment. As a result, going forward, we don't expect much impairment to arise from this plant.

Saurabh Mashruwala

executive
#22

So the thousand feed represented the residual value — I'd call it the current carrying value — and of that, roughly INR600 crore to INR700 crore consists of residual values that won't be provided for. The remainder, still INR600 crore to INR700 crore, is yet to be left out. So that amount will be paid out over time; the buyback will be charged to the P&L, buyback of depreciation, going forward.

Mohit Jalan

analyst
#23

Got it, thanks. Moderator, could we go to the next question? Thank you.

Operator

operator
#24

Absolutely, thanks. Our following question comes from Anuj Upadhyay at HDFC Securities — the line is yours, go right ahead.

Anuj Upadhyay

analyst
#25

Yes, hello, and thanks for the chance to ask. Sir, could you go into more detail about the gas settlement on the tender? You said we've already gone for the 1 cargo. But on the previous call, you said that you had contracted 3 cargos per year for calendar year ’22 through ’27, which would cover roughly 25% of the requirement. And now we've contracted another 1. So with that, what share of our gas requirement has been met in debt, and what's our strategy for the remaining requirement?

Saurabh Mashruwala

executive
#26

Look, we already have a gas purchase arrangement with Reliance that covers roughly 25% above requirement — so a 25% long-term commitment is already in place. Then, during the last calendar year, we floated a tender for Ukraine covering 34 cargos, so we locked in around 34 cargos last year, spanning calendar year ’23 to ’26 — roughly 4 years, with about 6 to 7 cargos contracted each period. Together with this arrangement from calendar year ’23 to ’26, that accounts for approximately 25% of requirement. So in total, 50% of requirement has been tied up from calendar year ’23 to ’26. As for the current year, we still have about 25% of requirement tied up, and we contracted one cargo recently. The remaining requirement for the current calendar year has yet to be tied up. So what we can say is that from calendar ’23 to ’26, we have secured about 50% of our requirements.

Anuj Upadhyay

analyst
#27

For the ’23 and ’26 calendar years?

Saurabh Mashruwala

executive
#28

Yes, for the calendar year. Four years.

Anuj Upadhyay

analyst
#29

All right, sir, fair enough. And could you just touch on the capex plan — are we still going with roughly INR15 billion of capex for FY23–FY24, or has anything changed there?

Saurabh Mashruwala

executive
#30

No, the capex plan is unchanged. So INR1,200 crore is for our license distribution business. The figure of INR250 crore is for our franchise distribution business over the next 3 years. I can update you on the current year, capex, which we have incurred in FY22. For license distribution, we are proceeding according to the projections of INR1,200 crore — INR1,254 crore capex we have incurred for FY22 — and franchisee incurred about INR316 crores capex. So we are moving along the plan that we shared during the last couple of calls. Thus, INR1,500 crore capex we have incurred in the course of FY22, and we expect to incur the same over the next 3 years as well.

Anuj Upadhyay

analyst
#31

Understood, sir. And finally, regarding that 100 megawatt GUVNL tender, sir, is there any update on that?

Saurabh Mashruwala

executive
#32

We do have time until October, so we're waiting for module prices to come down. I think we'll make a decision during the next quarter.

Anuj Upadhyay

analyst
#33

Okay, so up to October — meaning no penalty would apply before then, right?

Saurabh Mashruwala

executive
#34

For solar projects, generally, once you begin the implementation and contracting of modules, the increase won't resemble what you see with a wind power plant — solar projects get implemented quickly.

Anuj Upadhyay

analyst
#35

Fair enough, sir. That’s all I have.

Operator

operator
#36

Thanks. <<operator_script>> We now have a question coming from Bhavin Vithlani at SBI Mutual Fund, who is on the line. Go right ahead.

Bhavin Vithlani

analyst
#37

Appreciate the chance to ask, sir. I’ve got 3 questions. The first concerns SUGEN and UNOSUGEN, both of which are cost-plus projects. With the gas tie-ups we currently have in place, could you help us understand whether we’d be in a position to recover our fixed charges as well as return on equity?

Saurabh Mashruwala

executive
#38

Regarding SUGEN and UNOSUGEN, because we have TP under section 62 and gas availability—gas is available, though at a higher price. So gas is available. Therefore, we need to establish that the gas is available. Once we establish gas availability according to the PPA terms and we're able to—we will recover the fixed cost for both the SUGEN and UNOSUGEN projects as well.

Bhavin Vithlani

analyst
#39

Yes. And when it comes to fiscal ’23 too, with the gas situation as it is, are we assuming those fixed charges come back?

Saurabh Mashruwala

executive
#40

Yes.

Bhavin Vithlani

analyst
#41

Picking up on that same point with a second follow-up: both SUGEN and UNOSUGEN carry an incentive and efficiency component. Could you give us some help on that? What did that figure come to in fiscal ’22, and how do you expect it to look given that our utilization levels are low right now?

Saurabh Mashruwala

executive
#42

Because volumes were lower on the SUGEN and UNOSUGEN project in Q4, we saw some reduction — around INR15 crore — in the fuel gain loss tied to SUGEN and UNOSUGEN. That’s what I’m able to share with you at this moment for Q4.

Rishi Shah

executive
#43

Bhavin, I’ll just build on what Saurabh mentioned. As I see it, two components are at play here. One is SSR savings, and the other piece is O&M savings. When it comes to O&M savings, we’re entitled to receive every saving available under that PPA. With respect to SSR savings, that hinges on the PLF at which the plant runs. So because both of these plants have seen a drop in PLF, SSR savings would be smaller, yet we will still be entitled to obtain the full O&M savings. Taking everything together, this quarter carries a net charge on the P&L of roughly INR15 crore.

Bhavin Vithlani

analyst
#44

Thanks a lot. That's quite useful. My second question concerns the franchisee side. In Shil, Mumbra & Kalwa, AT&C losses have stayed stubborn at roughly 40-odd percent. Could you give us a sense, perhaps looking over 3 years, of how much improvement in AT&C losses one might reasonably expect?

Saurabh Mashruwala

executive
#45

Regarding the SMK area, let me just give you the figures. If you look at the FY21 AT&C loss figure for Shil, Mumbra & Kalwa, it came in at roughly 52% AT&C losses across the whole year. In FY22, we reached 39%. So that's a meaningful gain we've posted when it comes to AT&C in Shil, Mumbra & Kalwa. On the T&D losses side, we've locked in a reduction of about 5%, and of that 12% cut in AT&C losses, 5% comes from T&D losses, so we can look for this type of reduction going forward for at least a couple of years, I'd say.

Bhavin Vithlani

analyst
#46

Sure. Our final question concerns the Agra and Bhiwandi franchises. Looking at a three-year horizon, would it be reasonable to state that we could get to the same loss level we are currently observing in our Ahmedabad and Surat license areas?

Saurabh Mashruwala

executive
#47

Take Bhiwandi as an example: at the close of FY22, T&D losses there came to roughly 11.64%. So when it comes to reduction, we expect some improvement each year — somewhere around 1% to 1.5% improvement is what we can expect in Bhiwandi as well as in Agra. But incrementally, because the base itself is coming down, the pace of incremental reduction would slow for a period of time.

Bhavin Vithlani

analyst
#48

Absolutely, glad that was useful. Thanks a lot for asking your questions.

Operator

operator
#49

Thanks. Our next question comes from Subhadip Mitra at JM Financial. Go ahead, please.

Subhadip Mitra

analyst
#50

Good morning, and thanks for the chance to speak. So, could you please assist us with the regulated equity figure for Dadra & Nagar Haveli, and also provide the regulated equity number for the license business?

Saurabh Mashruwala

executive
#51

Alright, for the license distribution business, regulated equity as of March ’22 for that business across Ahmedabad, Surat, and Dahej comes to roughly INR3,000 crore. Then AMGEN sits at around INR434 crore, SUGEN is about INR916 crore, and UNOSUGEN is INR533 crore.

Subhadip Mitra

analyst
#52

Apologies — I didn’t catch that final item.

Saurabh Mashruwala

executive
#53

UNOSUGEN stands at INR533 crore.

Subhadip Mitra

analyst
#54

533?

Saurabh Mashruwala

executive
#55

Yes.

Subhadip Mitra

analyst
#56

Thanks. So right now, the regulated equity for Dadra & Nagar Haveli isn't available?

Saurabh Mashruwala

executive
#57

Roughly INR150 crore of regulated equity — around INR149 crore.

Subhadip Mitra

analyst
#58

Is it INR150 crore?

Saurabh Mashruwala

executive
#59

Yes.

Subhadip Mitra

analyst
#60

Alright, that's great. And then, on the second point, about the gas price threshold we use for running the plants. From your perspective, is that figure roughly $10 — and at that point do these plants become economical?

Saurabh Mashruwala

executive
#61

Look, it hinges on the comparative cost as well—coal has risen too, so when you look at the situation in real time, since coal is also higher, the coal cost has climbed as well. So the numbers keep shifting. In fact, it isn't all at one particular level, I'd say.

Subhadip Mitra

analyst
#62

All right. I was really just attempting to get my head around it starting from the UNOSUGEN PPA, if my memory serves me right, the ceiling on the tariff in that case sat at roughly 4.2. So I'm simply working backwards from that figure. Would that then add up to something in the neighborhood of $10, is that the correct figure?

Saurabh Mashruwala

executive
#63

Should get 4.5 about gas cost about $9 kind of things.

Subhadip Mitra

analyst
#64

Roughly $9. Got it, got it. All right. And finally, on those write-offs we're taking related to DGEN — you said they're being made using present LNG spot prices, and that's the basis for these write-offs. So is it fair to think a write-back could come at some point down the road, if gas prices decline?

Saurabh Mashruwala

executive
#65

In the impairment assessment, you have to look at fuel price assumptions, and also at assumptions around selling and power selling arrangements. So, for power selling arrangements, we assume roughly 5 years of average merchant spot price as well — exchange price, I would say — and that has also risen for the current quarter. If costs are up, selling prices are up too, but higher, so you shouldn't focus only on fuel cost; you also need to consider the price at which we will sell. So it's really a combination of all these factors that comes together and determines the impairment assessment, I would say — not just one factor.

Subhadip Mitra

analyst
#66

Got it. So even in the event that gas prices drop, you don’t really expect any sizable write-backs, since those costs were already removed at a higher exchange price?

Saurabh Mashruwala

executive
#67

So each year—in fact, each quarter—we go back over the assumptions, and annually we also bring in a third party to provide value for these assessments. So on a continuing basis, we'll run the impairment testing annually, and every quarter as well, we'll revisit those assumptions.

Subhadip Mitra

analyst
#68

Got it — my last question concerns the UNOSUGEN PPAs. The PPA, as I recall, referred to a tariff cap of roughly 4.2 or 4.3, yet today even imported coal waste prices carry a tariff cap of INR12. In your view, does that PPA allow the discount to effectively purchase at a higher tariff, even though the cap stated in the PPA is low?

Saurabh Mashruwala

executive
#69

So essentially, we need to make sure both the plant and the gas will be available going forward for the UNOSUGEN project. As soon as we've settled the fixed cost tied to that availability, we can then record those fixed costs.

Subhadip Mitra

analyst
#70

Yeah, I get that — the way I'm actually approaching it is more from a P&L angle. That assumes you're able to recover UNOSUGEN's fixed cost, and the PPA carries a tariff cap of roughly 4.2, whereas, say, the discount wants it far off, and today the next best alternative comes in at maybe INR12. So would that at some point let you kind of run the plant — assuming at INR12 you're able to operate it profitably and the discount is ready to purchase at that price? I'm just trying to look at that scenario.

Saurabh Mashruwala

executive
#71

On this specific point, we really need to bring the regulators further along. As soon as the regulator gives the green light, then yes, without question, we're able to produce the power and push the discounts higher even at this price.

Subhadip Mitra

analyst
#72

Got it, got it. Appreciate you taking the questions. That's all from me.

Saurabh Mashruwala

executive
#73

Thanks. Our next question comes from Rahul Modi at ICICI Securities — please go ahead. Thank you for the chance, sir. Sir, my first question is about the one cargo we've locked in so far this year: what's the average rate we would have done on that, for the gas? And so, what rates are we getting — are we seeing any discounts? And can we buy gas from Russia? You see, the whole contract is a contract of about $20.

Rahul Modi

analyst
#74

All right, $20. And what about pricing at present, sir, as we enter the market?

Saurabh Mashruwala

executive
#75

Prices are at the same level, I think, so we've contracted quite decently, and pricing right now is around $20, $21 or so.

Rahul Modi

analyst
#76

Alright. Sir, is there anything regarding the Russian side? Are we able to secure some discounts this year?

Saurabh Mashruwala

executive
#77

Not up to this point, no.

Rahul Modi

analyst
#78

Alright, my next question concerns the 400 megawatt GUVNL project and our own distribution renewal bid. Sir, does that come under ALM procurement, or is it outside that scope, meaning you can proceed and import? And when you mention that we'll be watching module prices — if the BCD applies, is it a pass-through in our tariff? If so, how does that work?

Saurabh Mashruwala

executive
#79

Right, so it’s essentially a change in the legal condition. That means BCD will be passed through.

Rahul Modi

analyst
#80

So the 40% in BCD is the pass-through, but as far as your strategy goes, sir, are you looking at procuring modules locally, or will you keep importing?

Saurabh Mashruwala

executive
#81

We're keeping an eye on module pricing both in the local market and from overseas as well, and based on what I think the cost will be, we'll take a cost-based approach over the next couple of months.

Rishi Shah

executive
#82

Okay, Rahul, the situation is this: at the time we bid for that contract, module prices were sitting at certain levels. They've since climbed to a very high level. As a result, we haven't yet decided whether to go ahead with implementation of the project. At this point, it's very hard to predict where those prices will land over time. So giving any color right now on implementing the project would be very difficult.

Rahul Modi

analyst
#83

Thank you, sir — that's quite useful. Sir, one additional point: clearly, as a strategy, we have bought a number of assets across the past 12 months. So inorganic expansion in renewables is plainly one element of the strategy. The other piece is bidding. So how do you view it — are we active or not active, given what we have experienced in the large Q3 bids, as the strategy, you probably consider that?

Saurabh Mashruwala

executive
#84

Right, so in both of those areas — whether we're talking inorganic or organic — we're examining both. On top of that, we're taking part in a few biddings for the new projects, and at the same time, we're also considering M&A activity fees by acquiring the operating projects.

Rahul Modi

analyst
#85

Sure, sir. And this is my final question. Sir, considering the customer mix across both the license operations and the franchise operations, in percentage terms, what AT&C loss figure are you targeting there, or what is the most favorable AT&C loss level we could bring things down to from the present 10%, 11% we currently have. So, how much savings over the years can happen in the distribution area?

Saurabh Mashruwala

executive
#86

When you look at the licensed distribution area alone, we don’t have much there — recovery is nearly 100%. And on the franchisee side, in terms of our collection efficiency last year, for Bhiwandi and SMK it was above 100% collection efficiency, while Agra came in at roughly 99% collection achieved last year. So regarding reduction of AT&C losses in franchisee distribution, as we explained earlier, we can export about 1% to 1.5% reduction at certain levels — though I’d say not every year on a perpetual basis can we expect that reduction.

Rahul Modi

analyst
#87

Just so I understand, that 1% to 1.5% at certain levels you brought up — what might that be roughly?

Rishi Shah

executive
#88

Rahul, when you examine the license distribution businesses we already have, those sit around 5% to 6%, or I'd put it at 4% to 6%, so there's a lot of room for the franchise distribution business as well to reach those kinds of levels over time, and that would come through a steady decline in AT&C losses. Therefore, over the long term, we might expect them to be roughly in line with the license distribution businesses too. However, the speed of that decline will keep slowing down as your base keeps falling.

Rahul Modi

analyst
#89

Right. Sir, finally, how is the interest rate market doing now that we're about to go in for financing, or once we've taken fresh loans — this is more of a macro question. How is that doing for us and for the market? Are we seeing refinancing take place at somewhat higher levels as interest rates rise? That guidance would be very helpful. Thank you.

Saurabh Mashruwala

executive
#90

If you look at the interest rate, it has shifted quite recently. Our rate is tied to what we borrow, which is tied to the base rate — call it the lender's base rate. So right now, the lender's rate is the base rate, yes, and our costs have also gone up, moving in a similar direction instead.

Saurabh Mashruwala

executive
#91

To build on that, if you examine how our debt is structured, part of it is floating and part is fixed. On fixed-rate borrowings, then, we don't anticipate any rise in cost. With variable-rate loans, however, there would be an uptick. As MCLR begins climbing over time, a share of that will also be assigned to the license distribution businesses, and that will carry a pass-through effect. Regarding the P&L impact, the effect would be smaller where existing loans are concerned; for new loans, given the recent RBI increase in Repo and CRR, there would be an effect on incremental borrowings, which will play out over a period of time.

Rahul Modi

analyst
#92

Absolutely, sir — thank you, and best of luck to you.

Saurabh Mashruwala

executive
#93

Thanks.

Operator

operator
#94

Thanks. Our next question comes from Puneet at HSBC Global Asset Management. Your line is open.

Puneet Chaddha

analyst
#95

Yeah, hi, thanks. My one question is this: you mentioned module prices are elevated and that the project might not be included. Is there — what kind of penalty would apply if the project isn't executed, and what other consequences could there be at this point?

Saurabh Mashruwala

executive
#96

For a 100 megawatt project, there's a penalty of roughly INR10 crore.

Puneet Chaddha

analyst
#97

So that's it, and there's nothing more to it.

Saurabh Mashruwala

executive
#98

Yeah.

Puneet Chaddha

analyst
#99

Alright, that covers everything on my end.

Operator

operator
#100

Thanks. Our following question comes from Apoorva Bahadur at Investec. Your line is open.

Apoorva Bahadur

analyst
#101

Hello, sir. Thanks for giving me the chance. So, to pick up on that question about variable cost debt: could you share how much, or what proportion, is already due for refinancing during this year?

Saurabh Mashruwala

executive
#102

Could you say that question again?

Apoorva Bahadur

analyst
#103

So, with the variable cost essentially, if it gets repriced in, how much of our debt comes up for refinancing this year?

Saurabh Mashruwala

executive
#104

Apoorva, to address what you asked, the majority of the loans on our books carry long tenors and come with amortizing schedules — so annually we'll be making repayments in the range of INR800 crore to INR1000 crore. That said, as I mentioned earlier, a portion of these facilities is variable-rate, tied to the MCLR of the banks we've partnered with. As a result, refinancing may not really arise, but given that the rates float, they will rise down the line once MCLR begins moving up, reflecting the Central Bank's recent hikes.

Apoorva Bahadur

analyst
#105

All right, that's fair. One more thing I'd like to get clarity on — the gas profits, meaning the profit from gas sales that we've been guiding to over the last 2 to 3 quarters. Is any portion of that required to be passed along through the discount, particularly within the distribution license areas?

Analyst

analyst
#106

Nope, that isn’t necessary. Essentially, it operates as a distinct business line.

Apoorva Bahadur

analyst
#107

Alright, finally, I believe you pointed out that taking on new debt has become more expensive at present, since we have a couple of renewable projects that haven’t been carried out yet. Could you share your thoughts on whether the higher cost of debt still works economically, and up to what point do you plan to keep proceeding or intend to move forward? Especially considering that solar module prices are already rather elevated.

Saurabh Mashruwala

executive
#108

Apoorva, so the key factor here is really how module prices move. If they stay inside that range, then the next thing to look at would be interest cost, since as you said, we recognize these are all 25 year long-term projects, and right now rates are in an upward cycle. That said, looking ahead, we think after a couple of years they should come down as well, so at this point everything really rests on module prices. Interest rates might not play a major role in what UNO decides.

Apoorva Bahadur

analyst
#109

All right, thanks a lot.

Operator

operator
#110

Thanks. Our next question comes from Deepesh Agarwal at UTI, on the line. Please go ahead.

Deepesh Agarwal

analyst
#111

Yes, good morning, sir. First question from my side: would we be permitted to trade gas that's sourced domestically — meaning from IOCL or SLI? Or does the restriction on trading apply just to imported gas?

Saurabh Mashruwala

executive
#112

Pardon me?

Deepesh Agarwal

analyst
#113

Hello there.

Saurabh Mashruwala

executive
#114

Could you say that question again, please?

Deepesh Agarwal

analyst
#115

My question was this: with LNG trading, is it only imported gas that can be traded, or can domestic gas be traded as well? Hello?

Operator

operator
#116

Alright, just a second.

Saurabh Mashruwala

executive
#117

Honestly, that’s a question we’d rather not respond to.

Deepesh Agarwal

analyst
#118

Alright. Alright, and then the second thing — could you give us the gross block for the renewable portfolio that's operational at present?

Saurabh Mashruwala

executive
#119

The renewable portfolio's gross block — could that be offline? We don't have those numbers available at the moment.

Deepesh Agarwal

analyst
#120

And finally, could you say whether any circles are due to be privatized within the coming 12 to 18 months?

Saurabh Mashruwala

executive
#121

The government has announced union territories such as Lakshadweep and Pondicherry, you know. So those are the circles that are going to come up for bidding.

Operator

operator
#122

Sir, that caller's line dropped. We'll go to the next participant. Our next question comes from Sumit Kishore of Axis Capital Ltd. Please go ahead.

Sumit Kishore

analyst
#123

Morning, Saurabh and Rahul. My first question concerns Dadra and Nagar Haveli and D&D: although the acquisition is effective for people, could you possibly share the revenue, EBITDA PAT for FY22?

Saurabh Mashruwala

executive
#124

Right. But before we can obtain the fiscal year 2022 figures from the legacy company, I'd put it that way.

Sumit Kishore

analyst
#125

Alright. The second question relates to renewables — and in the last financial year, the country managed to add close to about 15 gigawatt of renewable capacity, with the bulk of it coming from solar. Hello?

Operator

operator
#126

Sir, give me just a moment.

Sumit Kishore

analyst
#127

Hi there. Can you hear me?

Operator

operator
#128

Yes, sir, we can hear you clearly.

Sumit Kishore

analyst
#129

What I was mentioning is that nearly roughly 15-odd gigawatts of renewable capacity was added during the previous financial year, mostly through solar, but at this point, with module prices elevated, duties levied on imported modules, and sells ALM also under consideration in the background — do you foresee the execution pace, not just for Torrent organically but for the entire country, experiencing a bit of a slowdown over the coming couple of quarters? And if you could also share your thoughts on the bid pipeline you are currently observing for solar, perhaps looking out 6 months to 12 months?

Saurabh Mashruwala

executive
#130

So, Sumeet, when you consider where module prices stand right now, along with the bid label or the tariffs that have been quoted based on what we understand, it would be extremely hard for anyone to move forward and actually implement a project at those quoted tariffs with today's model prices. The expectation is that module prices will begin declining again over some period, and at that point certain projects will turn viable and get implemented. But that's a very tough question to answer, in the sense of how module prices would behave, how ALM would function, and how domestic module prices would come about going forward. So at present, our understanding is that it would be difficult for anyone to implement projects given the tariffs quoted at current module prices.

Sumit Kishore

analyst
#131

I mean, logically I get the strategy, but does it look like FY23 could very well end up being a year where — if things stay the way they are right now — solar capacity addition actually comes in below FY22?

Rishi Shah

executive
#132

This is an area where a lot shifts very quickly, so as Saurabh said earlier on the call, setting up a solar plant doesn't take that long, provided the rest of the infrastructure is in place. So if module prices begin to fall, you'll see more implementation, but at these elevated levels it looks difficult.

Sumit Kishore

analyst
#133

So you’re saying the discounts aren’t prepared to move at all, and there aren’t any parallel talks taking place about, say, tweaking tariffs and moving forward with the project given the new developments?

Analyst

analyst
#134

All of those are projects that have gone through bidding. So in any case, once the bidding process is complete, there isn't much you can do beyond trimming it further where possible — and it doesn't appear that there's room for that. And we aren't privy to any discussions of that kind.

Sumit Kishore

analyst
#135

Sure. Thanks, and best of luck to everyone.

Saurabh Mashruwala

executive
#136

Appreciate it.

Operator

operator
#137

Much appreciated. Our following question comes from Ankit Mittal at SBI Mutual Fund, who is on the line. Kindly proceed.

Ankit Mittal

analyst
#138

Yeah, thanks a lot for giving me the chance. My first question was really about the AMGEN recollect — I believe the initial retirement timeline was set for December ’22, and there were a fair number of discussions you were having with the regulator on that. If you could just give some update, how would you view the retirement AMGEN at this point in time?

Saurabh Mashruwala

executive
#139

We're still waiting on the clarification from MOEF, so no decision has been made at this point. As things stand, our expectation is that December ’22 will be extended. So it won't be completed by December ’22.

Ankit Mittal

analyst
#140

All right. And what do you — I'm hearing here — my understanding is that AMGEN still has a solid 4 to 5 years of useful life left, and please correct me if I've got that wrong over there.

Saurabh Mashruwala

executive
#141

Turning to the country's present power circumstances, we anticipate that the MOEF will look at extending the life of the majority of our generating stations, which I would describe as efficient, so AMGEN ranks among the most efficient facilities. Although it still has four, five years of operating life remaining, that station is more efficient when set against the older plants. We therefore anticipate that the government will weigh the expansion of those stations that are run efficiently.

Ankit Mittal

analyst
#142

Right, that makes sense—appreciate it. My other question was really just to get a handle on the regulatory assets, sir. If you could, what's the regulatory asset figure at present? And second, I don't believe there's been a particularly big traffic, I think that's occurred this year, considering that the average purchase cost is rising. So how do you view the regulatory gap as it develops for the current year?

Saurabh Mashruwala

executive
#143

Right now, regulatory assets stand at roughly INR1,900 crore. Of that, we've already recorded approximately 1,300 crore in the books of accounts, and the rest is tied up in a dispute with the regulator. As for tariff hikes, none have been granted over the last three quarters, but essentially whatever incremental cost arises gets passed through via the SMK mechanism. In fact, quite recently we received a tariff increase of about 20 basis points in the rate as well, so the regulator keeps considering raising the pay rates on a regular basis — it's basically an ongoing process.

Ankit Mittal

analyst
#144

All right. Broadly speaking, how large would the regulatory gap be for this year? As I mentioned earlier, the tariff hike isn't in line with the rise in power purchase cost that we're seeing this year.

Saurabh Mashruwala

executive
#145

Which year are you referring to, ’22 or ’23?

Ankit Mittal

analyst
#146

Regarding 2023.

Saurabh Mashruwala

executive
#147

It's hard to pin down, since it really hinges on the kind of — the level at which we'll be buying power, and what the fuel costs will come to. So predicting what that level will be as of March ’23 is very difficult.

Rishi Shah

executive
#148

And just to add, profitability wouldn't be affected, since carrying cost is also available on the regulatory gap. So if there is any increase in the regulatory gap, it would be a matter of cash flow rather than an impact on the P&L.

Ankit Mittal

analyst
#149

I was actually just trying to get a handle on that, because the dividend this year is a bit lower as well. And what we're seeing in ’21. Do you see any cash flow coming in for next year, and where would that be?

Saurabh Mashruwala

executive
#150

The dividend for the current year isn’t the result of any issues tied to cash flow. As you’re aware, we’re also in a growth phase, and our stated policy calls for a 40% dividend — any additional dividend will hinge on how management views growth going forward. Because we’re in a growth phase, the dividend has been above 40%, and there was also a one-off item in the P&L that placed certain limits on paying additional dividends. This has nothing to do with the company’s cash flow or cash as such.

Ankit Mittal

analyst
#151

All right, all right, understood. And then a final question regarding Dholera — what's the situation there, what kind of capex do we plan to undertake, and is there any uptick in the investments we see in that region over the coming, say, 5 years or so?

Saurabh Mashruwala

executive
#152

We're also noticing some activity over in the Dholera area, where a number of industries are arriving and launching new projects. So, as we said before, we're expecting roughly INR1,000 crore of capex in the Dholera area over the coming seven, eight years.

Ankit Mittal

analyst
#153

Alright, fair enough. That covers what I had. Appreciate you taking my questions.

Operator

operator
#154

Thanks. We’ll take the next question from Dhruv Muchhal at HDFC Asset Management. Please go ahead.

Dhruv Muchhal

analyst
#155

Yes, sir. Thank you. Sir, just one point to clarify. That INR15 crore hit in the gas generation business on a Y-o-Y basis is mainly down to fuel savings. So if I annualize it — assuming, hypothetically, the plant runs at a similar rate for the rest of the year — the maximum impact comes to roughly INR60 crore from the fuel saving. Is that broadly right, sir?

Saurabh Mashruwala

executive
#156

Yes. That assumption is reasonable, since what we're seeing right now reflects Q1. What I mean is, it's the prior quarter, Q4.

Dhruv Muchhal

analyst
#157

Right. If the plants stay where they are, given gas prices as they stand, that's the largest effect — nothing beyond that?

Saurabh Mashruwala

executive
#158

Yes, that’s a fair assumption to make.

Dhruv Muchhal

analyst
#159

Second thing, sir — when we look at the tariff orders for Ahmedabad and Surat, the tariffs and the capex we’ve put in for this year, if I’m not mistaken, sir, Ahmedabad is roughly INR1500 odd crore, and Surat is another, I think, INR100 crore and INR200 odd crore. So that adds up to around INR1700 odd crore, versus your guidance of about INR1200 crore. So, last year — I mean FY21 was COVID, I understand there was a difference. So should we assume there could be some upside to your capex for distribution licenses compared with what you’ve guided, at least based on the tariff orders?

Saurabh Mashruwala

executive
#160

The guidance we've provided so far is roughly INR1,200 crore for our license distribution business, along with about INR200 crore and INR250 crore for the franchise distribution business. I'd say that's a fair assumption for anyone to keep in mind.

Dhruv Muchhal

analyst
#161

And sir, for the next 2 or 3 years, should we assume a similar rate for the license distribution of around INR1200?

Saurabh Mashruwala

executive
#162

We expect to spend a comparable amount of capital expenditure for roughly 2 to 3 years.

Dhruv Muchhal

analyst
#163

All right, that's enough. Yes, sir. Sir, one final item — a little macro perspective here. We're observing this shortage of demand — or rather, leaving aside the supply crunch driven by imported coal and various other factors. Sir, in our case too, there's a certain shortfall when it comes to our Ahmedabad and Surat needs, and part of that we purchase from exchanges and elsewhere. So, considering how things are unfolding, do you think — since if one must rely on merchant power, there's an expectation that prices will run higher, as we are witnessing right now. So, are there any discussions or expectations that you might likely proceed with a medium-term or long-term PPA in order to cover your medium-term requirement as we go forward and as the power situation keeps getting tighter? And tied to that is, does this also — if feasible, does this also open up an opportunity for us to perhaps satisfy that need via a power plant, or I'm not certain, through some alternative power plants, if that's doable?

Saurabh Mashruwala

executive
#164

Regarding our distribution territory, licenses, and franchisee, as of yesterday, I would say we haven’t had any problem with power cuts. We supply power across our entire distribution area 24/7. Where our licensed distribution area is concerned, before the power cuts began, we secured some short-term power purchase agreements with a couple of suppliers. So for our area, we’re fairly comfortable when it comes to supplying power 24/7.

Dhruv Muchhal

analyst
#165

Right, sir. Sir, I get that you're meeting the requirement, but as we see it, the cost of merchant power keeps rising. So looking at it from a cost perspective, is there a thought that we ought to go for a medium-term or long-term PPA — and probably the regulators are also inching toward that, some sense of it there?

Saurabh Mashruwala

executive
#166

Prior to the onset of this crisis and before rates climbed to INR12, we had signed some short-term contracts covering our license distribution area. As a result, we have a fairly solid power supply in place for that license distribution area.

Dhruv Muchhal

analyst
#167

Understood, sir. Yes, sir, thank you very much. That’s everything. Thank you.

Mohit Jalan

analyst
#168

Thanks. Our next question comes from Mohit J at DAM Capital Advisors. Please go ahead. Hi, sir. Thanks again for the chance. Sir, a couple of clarifications. Are they still running under the 2016 regulations? Is there any discussion of a 2021 regulation being drafted soon?

Saurabh Mashruwala

executive
#169

Right now, the earlier regulation—MYT 2016—is what applies, since the regulator has not yet announced the new embodied regulation. That has been pushed back by roughly one year or so, which means the 2016 rules remain in force at present.

Mohit Jalan

analyst
#170

Got it. And sir, regarding those ancillary markets, do you believe that once they come in, they'll benefit our gas-fired plants — the DGEN in particular — over the medium term?

Operator

operator
#171

Everyone, please remain on the line while we get management back on. <<operator_script>>. Ladies and gentlemen, we appreciate your patience. Management's line is now reconnected. Sir, please proceed.

Saurabh Mashruwala

executive
#172

Yes. So, the line dropped, and I sincerely apologize for that.

Operator

operator
#173

Mohit, could you please ask your question one more time?

Mohit Jalan

analyst
#174

Yes. Sir, I guess what I was asking is this: do you believe those ancillary markets, whenever they're brought in during this fiscal, will benefit our gas-based power plants at the margin on our open capacity?

Saurabh Mashruwala

executive
#175

Could you say that one more time?

Mohit Jalan

analyst
#176

Since ancillary markets are supposed to come in at some point during this fiscal year, sir, do you see that helping the open capacity in material?

Saurabh Mashruwala

executive
#177

When you say ancillary market, what exactly do you mean? What are you referring to?

Mohit Jalan

analyst
#178

CERC is rolling out ancillary markets for power supply and delivery with a duration of 30 minutes up to 2 hours, sir. So this market is expected to launch this year, and it ought to benefit those power plants that are able to ramp up and ramp down very quickly.

Saurabh Mashruwala

executive
#179

Sure, Mohit — so yes, that market could be quite valuable for us. But for any power plant, ramping up and down — for a gas-based plant, that can happen if it's running at baseload, doing a cold start or a hot cold start, and supplying for 30 minutes or two hours — that would be very difficult. That said, for our untied capacities at SUGEN and UNOSUGEN, introducing this market means we'll have a significant opportunity. As for Dahej, it would be very hard to say, because it operates — it doesn't run at baseload the way SUGEN and UNOSUGEN do.

Mohit Jalan

analyst
#180

Got it, sir. Thanks very much, sir. And best of luck. Thank you.

Operator

operator
#181

Thanks. We’ll take the next question from Bharani Vijay Kumar, who is calling in from Spark Capital Advisors. Please go ahead.

Bharani Vijay Kumar

analyst
#182

Morning, sir. Could you share what the yearly gains from LNG trading are at the EBITDA level, as reflected in the gas generation segment?

Saurabh Mashruwala

executive
#183

For Q4, we mentioned roughly INR40 crore.

Bharani Vijay Kumar

analyst
#184

Right, sir — so I’m just trying to get a handle on it for the full year?

Analyst

analyst
#185

All right, then — could we get that to you outside this call?

Saurabh Mashruwala

executive
#186

I’ve got the Q4 figures, so we can provide those to you offline.

Bharani Vijay Kumar

analyst
#187

Alright, no issue. So the thought is to grasp how EBITDA differs between FY21 and FY22, and that difference will mostly come from the LNG gains — that's what I'm asking. Okay. Then the second question: how much equity would we have put toward acquisitions this year, for both CESC and the other acquisition?

Analyst

analyst
#188

When we look at CESC's equity value of INR300 crore, Lightsource came in at roughly INR100 crore, and Visual Percept stood at about INR165 crore. So those figures are laid out in our presentation, if you take a look at it.

Bharani Vijay Kumar

analyst
#189

Sure. So the thinking here is that, beyond the capex figure you've guided to for franchise — INR1,200 crore to INR1,250 crore — what kind of capex or capital would go toward acquisitions like this over the next one to two years for renewables, in particular?

Analyst

analyst
#190

Bharani, to start with, we don’t provide any estimates, and giving estimates for any acquisitions as such would be very difficult. We continue to look at acquisitions. Now, providing any estimate as such for acquisition-related investments is going to be difficult.

Bharani Vijay Kumar

analyst
#191

Alright, that’s all I have to share.

Operator

operator
#192

Thanks, and our next question comes from Bhavin Vithlani at SBI Mutual Fund. Go right ahead.

Bhavin Vithlani

analyst
#193

Appreciate the chance to follow up once more. Sir, I'm building on what the earlier participant asked. Could you walk us through the thinking that sits behind this acquisition, since what we're seeing is that you're in fact pursuing smaller assets? So what sort of valuation are we getting, and what sort of IRR can we produce at the prices we're able to pay for these assets?

Saurabh Mashruwala

executive
#194

When we look at IRR, our typical target is roughly 13% equity IRR, I'd say. That's the benchmark we usually apply when evaluating any acquisition. And our attention really centers more on the <<inaudible>>.

Bhavin Vithlani

analyst
#195

I have just one question to wrap up. Regarding the purchase of the CESC assets, or the wind assets that have been turning in very weak results, and what was originally anticipated — where exactly can we contribute value so that the shortfall in PLF performance gets closed, and as a result we're able to focus on a better return?

Saurabh Mashruwala

executive
#196

Essentially, we can create added value through improved O&M activities—better plant availability, I would say. So those are the areas we'll focus on, and we'll raise availability and boost the PLF above where it currently stands. The plan involves enhancing O&M practices, having them available for O&M activities on a continuous basis now, and increasing plant availability by resolving the ROW issues. So through this, we'll lift the PLF from existing levels—that's roughly the planning.

Bharani Vijay Kumar

analyst
#197

Could you share what multiple on EBITDA we've been able to acquire at, and are we finding — are smaller assets available at a much deeper discount than what we're hearing for the larger assets on azure platforms?

Saurabh Mashruwala

executive
#198

That doesn't have a straightforward answer—each asset would carry its own valuation metrics, and we'd need to determine how we can bring or add value to that proposition and derive higher IRRs. As for EV per megawatt, that figure is in our presentation; on EV per EBITDA, we don't currently have numbers ready. Again, with all these acquisitions, there's certain scope for improvement on the operational side. So current EV-EBITDA may not truly reflect what we are envisaging. Once it stabilizes, it would be better to look at EV EBITDA on that number.

Bhavin Vithlani

analyst
#199

Thanks for that, and I really appreciate you fitting in my question.

Operator

operator
#200

Thank you very much. Since nobody has any more questions, I'll now turn the conference over to Mr. Harshavardhan Dole for his closing remarks.

Harshavardhan Dole

analyst
#201

Appreciating IIFL Securities, I want to say thanks to everyone for being on this call. A particular thanks goes to Torrent Power’s management for allowing us to hold it. Many thanks. I truly value that. Are there any closing remarks or comments you would care to offer?

Saurabh Mashruwala

executive
#202

Yes. Thanks, Harsh. Thanks for the call, and we thank all of you, and we appreciate the call, and stay safe and healthy. Thank you very much.

Harshavardhan Dole

analyst
#203

Appreciate it, Saurabh.

Saurabh Mashruwala

executive
#204

Thanks.

Operator

operator
#205

<<operator_signoff>>

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.