Torrent Power Limited (TORNTPOWER) Earnings Call Transcript & Summary

August 9, 2022

National Stock Exchange of India IN Utilities Electric Utilities earnings 48 min

Earnings Call Speaker Segments

Operator

operator
#1

Good morning, everyone, and welcome to Torrent Power Limited's Q1 FY '23 earnings conference call. <<operator_script>> Please be aware that this conference is being recorded. I'll now turn the conference over to Mr. Saurabh Mashruwala, Vice President, Finance. Thank you, and over to you, sir.

Saurabh Mashruwala

executive
#2

Yes. Thank you. Good morning, everyone. Thanks for being on Torrent Power's earnings call for Q1 FY '23. To start, I'll walk you through how the quarter went, and after that we'll open the phone lines for the Q&A session. I'll begin by explaining the company's performance at the PBT level, and then tax expenses will be dealt with separately. Reported PBT for the quarter, before exceptional items, came in at INR 671 crores, versus INR 273 crores in the same quarter last year — that's a rise of INR 398 crores, roughly 146% on a reported basis. To help you understand the underlying performance of our company, I'll take you through the nonrecurring item for -- nonrecurring items in the current quarter, which includes 2 items: a profit of INR 16 crores from the sale of land parcels. The second nonrecurring item is the provision of INR 10 crores of performance bank guarantee issued as a GENL as a security for development of <<inaudible>> solar power project. That provision is being considered due to elevated solar module prices in the range of $0.26 to $0.27, compared to much lower levels adjusted at the time of bidding.

Saurabh Mashruwala

executive
#3

Broadly speaking, at the present level this isn’t viable. Taking everything together, the net nonrecurring credit came to INR 6 crores in Q1 of FY ’23. Turning now to the nonrecurring item in Q1 of the prior year, that was a provision — a provision of INR 21 crores for the <<inaudible>> franchise distribution business, owing to weak <<inaudible>> because of the second wave of COVID. So in the comparable quarter of last year there was just 1 nonrecurring item. Once about one-off items are adjusted for, PBT for the quarter came in at INR 665 crores, versus INR 294 crores in the comparable quarter of last year — a difference of INR 371 crores, up by 126%. Let me now walk you through the main highlights — on the improvement in adjusted PBT of INR 371 crores for the current quarter. Four key reasons account for this INR 371 crores increase in PBT for the current quarter. Reason one is better profitability at the gas-based power plant, driven mainly by 2 factors; there was a gain of INR 89 crores from selling LNG, which, as discussed earlier on the call, saw elevated LNG prices make commercial sense for selling LNG rather than converting it into electricity.

Saurabh Mashruwala

executive
#4

Next, there's a gain of INR 41 crores from a lower depreciation charge in the region, which comes from a one-time impairment charge taken in Q4 of FY '22 plus a reduced depreciation rate in future earnings. All told, the gas-based power plant's profitability went up by INR 130 crores. So of that INR 371 crores, the first gas-based power project delivered INR 130 crores. Turning to how the distribution business performed: because industrial and commercial demand was disrupted — hit hard largely by the COVID-19 pandemic — the distribution business's overall contribution improved substantially, by INR 133 crores. A couple of factors drive this INR 133 crore increase in contribution: one is a reduction in <<inaudible>> losses of INR 38 crores, mostly in the franchise distribution business; the second is volume and rate gains from the franchise distribution business of INR 51 crores, plus a higher ROE as well as incentive and license distribution business gains of INR 33 crores. And on solar, we received some solar incentive of INR 21 crores in the license distribution business. Together, all 4 of these contributed INR 133 crores from the distribution business — both franchise and license distribution.

Saurabh Mashruwala

executive
#5

The third factor is the renewable business, where the company recorded a rise in PBT, driven mainly by 2 accounts. First, because of PLS in solar and wind, which went up in the current quarter, delivering an extra profit of INR 33 crores. Second, because of acquisitions made during Q4 and the current quarter, which brought in an additional INR 30 crores of profit. So taken together, the renewal project added roughly INR 63 crores of extra profit in the current quarter versus the comparable quarter of last year. We also have INR 16 crores of profit in the cable business thanks to higher volumes. So all 4 reasons — essentially gas-based power projects, the distribution license and franchise, <<inaudible>>, and cable — combined to contribute INR 371 crores of additional profit in the current quarter. Turning to the tax figure: consolidated profit after tax for the quarter came in at INR 502 crores, against PAT of INR 208 crores in the same quarter a year earlier — that's INR 294 crores higher, an increase of about 151%. That covers the financial performance of the company for the quarter.

Saurabh Mashruwala

executive
#6

Turning now to how the company performed operationally: our distribution business saw a clear uptick in overall demand, which moved past the pre-COVID level recorded in Q1 FY '20. Demand in Q1 rose 22% year-on-year as a mandatory requirement, and it was up 5% against Q1 of FY '20 — the pre-COVID benchmark. The increase came primarily from a recovery in demand on the industrial commercial side bank. That wraps up the overview of the company's quarterly financial and operating performance. I'll now provide a short update on the current projects that are in the pipeline. First, the 115 megawatt SECI 5 project, which has been granted an extension from February '22 to September '22; the EPC contract has already been awarded, and commissioning is expected sometime during FY '23. In the quarter, the company also awarded a 300 megawatt wind power project under the 16-12 tender at a tariff of INR 2.94. The acquisition transaction carried out with Sky Power Group to acquire the 50 megawatt solar power project under Sunshakti Solar Power Private Limited was consummated in Q1 of FY '23. That's all for this quarter. I now ask the coordinator to open the phone line for the Q&A session.

Saurabh Mashruwala

executive
#7

I want everyone to remain safe and well. Thanks. Passing things back to the operator.

Operator

operator
#8

We'll take our first question from Shalini Vasanta at DSP Mutual Fund.

Vivek Ramakrishnan

analyst
#9

Vivek Ramakrishnan here. I’d asked about T&D losses for the quarter.

Operator

operator
#10

My apologies for cutting in. Sir, we can't hear you at all. Would you mind picking up your handset when you ask your question?

Vivek Ramakrishnan

analyst
#11

Ma'am, I've got just the handset here, but I believe something's not working right with it.

Operator

operator
#12

Yes, sir.

Vivek Ramakrishnan

analyst
#13

Has it improved at this point?

Operator

operator
#14

Sir, your audio is actually cutting out.

Vivek Ramakrishnan

analyst
#15

Has it improved at this point?

Operator

operator
#16

Yes, go right ahead.

Vivek Ramakrishnan

analyst
#17

Sir, my question concerned the T&D losses in the quarter. They appear to have risen slightly. Could you tell us how you anticipate T&D losses will trend? And is there any particular reason why that has shifted? That is my only question.

Saurabh Mashruwala

executive
#18

T&D losses have gotten better, especially across the Agra, Bhiwandi and SMK franchise distribution areas, since those were affected in last year's second quarter because of the second COVID wave. So I can update you on how much — what performance we've shown when it comes to T&D losses. For Q1 T&D losses, Bhiwandi stands at about 11.24% versus 11.5% a year ago. In Agra we've seen a solid gain, from 17.43% last year down to 14.25%, which we've reported for Agra. SMK was 14.20% last year and actually came in at close to 38% this quarter. So there's meaningful improvement in T&D losses, particularly in the Agra and SMK areas.

Vivek Ramakrishnan

analyst
#19

So you're figuring those figures will keep getting better as we move ahead? In other words, is there room for more gains from here?

Saurabh Mashruwala

executive
#20

Correct — we anticipate additional gains ahead.

Operator

operator
#21

<<operator_script>> Our following question comes from Swati Jhunjhunwala, who is calling in from VT Capital.

Swati Jhunjhunwala

analyst
#22

My first question also concerns T&D losses. We're observing that T&D losses have risen in the distribution licensee areas, while in the SEZ areas the T&D loss has gone down. So is there some specific reason for that?

Saurabh Mashruwala

executive
#23

Look, the distribution license area has been especially boosted by Surat, so it isn't strictly comparable. You really have to look at the overall yearly figure. So on a quarterly basis, it's not strictly comparable. So if you look at Q1 of the current year, it's about 9.32% versus 7.1% in Q1. And Surat is about 2.99% versus 2.61% last year. So it has — in the license distribution area, it has gone up. But for the year as a whole, if you look at last year, Ahmedabad was 4.17%. So going forward, it may come down, because in the hot summer, generally distribution in the Ahmedabad and Surat area runs a bit higher than the overall average for the year.

Swati Jhunjhunwala

analyst
#24

The second question concerns Dholera — when do we expect operations there to begin?

Saurabh Mashruwala

executive
#25

We anticipate that operations will begin sometime in the current year — that's our expectation. There's — we're waiting for demand to arrive. So we expect operations to get underway at some point during the course of the current year, especially...

Swati Jhunjhunwala

analyst
#26

The third point concerns Dadra and Nagar Haveli and Daman and Diu, so during this quarter, our T&D losses came in at 2.23%. I'd like to get a sense of how low that figure can go. Specifically, what target do we have for T&D losses in this area?

Saurabh Mashruwala

executive
#27

When you look at Dadra and Nagar Haveli and Daman and Diu, the majority of those areas are commercial — nearly more than 90, roughly 90% <<inaudible>>. So that makes it comparable to our Dahej area, where distribution loss sits at around 0.5%. We're not claiming it will definitely reach that level, but there is room for further improvement in Dadra and Nagar Haveli and Daman and Diu. The industrial base — it's industrial, and estimated customers are not a very small percentage.

Swati Jhunjhunwala

analyst
#28

And just one final question. Could you break out for me how much revenue came from the distribution license areas versus the distribution franchise areas?

Saurabh Mashruwala

executive
#29

No — right now we don't have that reference available. We can provide it offline.

Operator

operator
#30

Our following question comes from Rahul Modi at ICICI Securities Limited.

Rahul Modi

analyst
#31

Strong numbers once more. Sir, I have a few questions. Could you shed some light on gas sourcing—specifically, how much is already booked and where things stand following the recent LNG sale we're doing? And help us understand the spreads we've earned on those recent LNG sales, on average, for the quarter. So yes, that's where I'll begin.

Saurabh Mashruwala

executive
#32

On LNG sales, those are essentially merchant sales. As I recall, we've consistently maintained that whenever merchant gas is available—and we do have gas available—it's better to pursue the opportunity we see in the market. Right now, we identified an opportunity to sell the gas by converting it into electricity. That's the reason we sold gas and booked a net profit from the LNG sale. Regarding tie-ups, as we reported last quarter, roughly 50% of gas is tied up for our beneficiary from FY '23—calendar '23 to '26. There's nothing further—we contracted one cargo from merchant power for the merchant gas. Other than that, for the current year, <<inaudible>> gas.

Rahul Modi

analyst
#33

I just want to ask about this—some newspaper articles we read said that domestic gas supplies to the power sector will be curtailed because of high LNG prices globally. So, any view on that, if you've heard anything on that front? It's just news?

Saurabh Mashruwala

executive
#34

We aren't doing — the sole domestic gas we have access to is Reliance Gas, KG-D6.

Rishi Shah

executive
#35

I think, Rahul — this is Rishi here — that the usage is essentially for the subsidized gas that has been provided to the power companies. In any case, the portion we get from that subsidized gas is extremely small. So it won't make any difference.

Rahul Modi

analyst
#36

To add a bit more clarity on that — sir, could you expand a little on the couple of acquisitions we've recently completed in the renewables space, since some of them were quite small as well? So, any update on those, and on your thinking regarding how we should view, on an annual basis, the additions we're targeting over the next 4 to 5 years in renewables, across both organic and inorganic routes?

Saurabh Mashruwala

executive
#37

Lately, we’ve completed 4 acquisitions, mainly in renewables. The first is the 156 megawatt deal with CESC, a wind asset, plus 50 megawatt with Lightsource bp and 25 megawatt with Visual. And during this quarter, 50 megawatt with Sunshakti and Sky Power. So that’s 4 acquisitions we closed in the prior quarter and in the present quarter. As for what we plan going forward, we assess things — it hinges on what opportunities come up and at what value, what reasonable value can be secured. So everything really hinges on the opportunity that’s available. So we don’t have any target in mind when it comes to making acquisitions.

Rahul Modi

analyst
#38

And sir, sir, the — we had bid for a project at INR 1.99. So, are we moving ahead with that? Or this INR 10 crore is for that project that we provided for?

Saurabh Mashruwala

executive
#39

That INR 10 crores applies solely to that particular project.

Rahul Modi

analyst
#40

So we're not moving forward with that?

Saurabh Mashruwala

executive
#41

At this point, that's our plan.

Operator

operator
#42

Aniket Mittal from SBI Mutual Fund is on the line with our next question.

Aniket Mittal

analyst
#43

I have a few questions of my own. First, regarding the distribution franchise business, just so I understand — could you specifically shed some light on how demand is trending in Agra and Bhiwandi? Have those 2 circles surpassed where they stood before COVID? And with that in mind, how should we think about AT&C losses across the full year for these 2 franchises?

Saurabh Mashruwala

executive
#44

Franchise distribution area demand has now gone beyond where it stood before COVID. To illustrate, take Q1 demand: it rose roughly 24% versus the same quarter a year earlier. And measured against pre-COVID FY '20 demand, it's 7% higher. So in terms of these center areas, we've already moved past the pre-COVID demand level.

Aniket Mittal

analyst
#45

Now, regarding the AT&C loss matter—if I recall correctly, before COVID, for Agra and Bhiwandi, we were nearer to 12%. So how do you see it for FY '23, then?

Saurabh Mashruwala

executive
#46

Regarding AT&C loss levels, let me provide an update on collection efficiency. In Q1, it's nearly at 100%. Agra stands at roughly 94% to 95%. SMK is also around 97% to 98%.

Rishi Shah

executive
#47

Regarding FY '23, Aniket, we don't provide guidance as such for future periods. On the directional front, though, AT&C loss will continue to come down, as we've mentioned before — Ahmedabad and Surat are running at roughly 5% to 6% AT&C losses. Our goal is to reach those same levels across all these areas in franchise distribution as well. So overall, on a year-on-year basis, an improvement should be seen. That process was delayed because of COVID. But at this point, I think we're on track to bring AT&C losses down.

Aniket Mittal

analyst
#48

The second question concerned renewables. At the Group level, we currently hold roughly 1,070 megawatts of renewable assets. A fair amount of that came through acquisitions. So looking at this portfolio, what would steady-state revenue and EBITDA be for these assets on an annual basis?

Saurabh Mashruwala

executive
#49

We don’t have the annual figure right now, but we can give you the prior-year number — although it doesn’t really convey the picture. Last year, EBITDA for renewable was roughly — as we have reported — so this year it will definitely be much higher than INR 662 crores EBITDA.

Aniket Mittal

analyst
#50

I was simply attempting to examine...

Saurabh Mashruwala

executive
#51

When it comes to acquisitions, PLS does better in Q1. So...

Aniket Mittal

analyst
#52

The other thing I wanted to ask about was just to get a sense of Dadra and Nagar Haveli — what did it contribute to profit for the quarter?

Saurabh Mashruwala

executive
#53

We began during April. So stabilizing will require some time, and stabilizing will require some time. So yes, we have started during Q1. But I would say that isn't significant when set against the business's overall size. So we are looking ahead—going forward, we will improve efficacy, and we will also bring down the <<inaudible>> past. So it is too early to comment on Dadra and Nagar Haveli considering the 1 year—1 quarter performance.

Aniket Mittal

analyst
#54

And then only one more question, if I may. It concerns where we source fuel, which breaks into 2 pieces. First, could you say how much cash we're receiving from domestic sources at present, and at what price we're receiving it? And second, regarding the 1 cargo you've contracted, what price applies to that contract?

Saurabh Mashruwala

executive
#55

When it comes to gas, as you're aware, we source it from 2 places. The first is that we obtain gas from IOC and from Reliance KG-D6. Those are very good volumes, covering roughly 25% of what we need. Then there's the cargo we've contracted for our merchant deployment. We have contracted at about $21.

Rishi Shah

executive
#56

On pricing, both are tied to the rated brand. So this domestic gas we’re purchasing from IOC and Reliance doesn’t carry a fixed price.

Aniket Mittal

analyst
#57

But the 25% requirement is coming from IOC and centralized.

Saurabh Mashruwala

executive
#58

Yeah, yeah, we're getting there.

Operator

operator
#59

Mohit Kumar from DAM Capital has the next question.

Mohit Kumar

analyst
#60

I wasn't able to catch the whole call clearly. Perhaps something slipped past me. But when it comes to gas sales for the quarter, what exactly was the one-off item?

Operator

operator
#61

Apologies for cutting in, Mr. Kumar. We can't hear you clearly. Your voice keeps breaking up — I mean, the words aren't coming through properly.

Mohit Kumar

analyst
#62

Yes, actually—can you hear me at this point?

Rishi Shah

executive
#63

Yeah, Mohit, we did hear you there. Essentially, the profit we booked from gas sales in the quarter came to roughly INR 89 crores.

Mohit Kumar

analyst
#64

Sir, since fuel and power costs came in very high this quarter, what receivables do we currently have on our books?

Rishi Shah

executive
#65

I think looking at receivables quarter over quarter would be tough — or rather, that isn't the right way to view them. I mean, across the full year, we'd expect some growth in the regulatory asset, for the distribution business for instance. But quarter over quarter, we may not focus on regulatory assets or other receivables, since typically all of those receivables would be settled within the following 2 to 3 quarters.

Mohit Kumar

analyst
#66

With that high price, your thinking is you can't pass it through right away—you'd do so across the coming 12 to 18 months. Is that the right assumption?

Rishi Shah

executive
#67

The timeline is hard to pin down, but it wouldn't occur right away.

Saurabh Mashruwala

executive
#68

Across a stretch of time.

Mohit Kumar

analyst
#69

Finally, sir, regarding the renewables part. Could you just verify that portfolio figure for me? Is it 1.8 gigawatts? Of that 1.8 gigawatts, 1 gigawatt is currently operating, and 0.8 gigawatts is in development. Is that correct, sir — that number?

Saurabh Mashruwala

executive
#70

Yeah. Broadly speaking, that's right.

Mohit Kumar

analyst
#71

Regarding that 300 megawatt wind power you announced on the <<inaudible>>, it's going to cost INR 2,600 crores, correct? That figure looks quite high — over INR 8 crore per megawatt. What PLI do you get from this wind power plant?

Saurabh Mashruwala

executive
#72

We're assuming 40% PLI.

Mohit Kumar

analyst
#73

40%.

Operator

operator
#74

Our following question comes from Harsh Dole at IIFL Securities Limited.

Harshavardhan Dole

analyst
#75

I had 3 questions. First, regarding treasury income, we recognize that a one-off component exists. Yet even once you strip out that one-off piece, treasury income still looks fairly elevated. Could you help us understand why that is? That's #1. #2, on CapEx, where do we stand relative to our annualized target? Or, given the revival in power demand, are there any thoughts about revising it upwards or downwards?

Rishi Shah

executive
#76

Regarding treasury income, a one-time item of roughly INR 16 crores sits within other income. Beyond that, looking at power purchase cost, the bulk of the power purchased this quarter came either from merchant power or through bilateral arrangements. Usually, under those contracts, paying inside 7 days lets you take discounts on the power purchase cost, and that benefit is now showing up in other income. That explains why the figure is higher than in the same quarter a year earlier.

Saurabh Mashruwala

executive
#77

We did take advantage of that discount, and it gave us a reduction on power purchase.

Harshavardhan Dole

analyst
#78

So does that mean the purchase cost and our PBT aren't affected?

Saurabh Mashruwala

executive
#79

That cost will be handed through. There won’t be any P&L impact from it; it gets handed through.

Harshavardhan Dole

analyst
#80

So rather than appearing in the power purchase cost, it shows up in treasury income. Is that how it works?

Saurabh Mashruwala

executive
#81

Yeah. Yep.

Rishi Shah

executive
#82

That comes in <<inaudible>>.

Harshavardhan Dole

analyst
#83

And regarding the second item, capital expenditures, if there's any increase to that figure...

Rishi Shah

executive
#84

No, I'd say the expectation of INR 1,500 crores that we've provided looks feasible, and given the current situation, that seems appropriate.

Harshavardhan Dole

analyst
#85

And if I could just fit in one final question here.

Rishi Shah

executive
#86

Yes, of course.

Harshavardhan Dole

analyst
#87

There's been talk about the amendment to the Electricity Act, and it has actually gone to the Standing Committee. But in theory, if the bill were accepted in its entirety — which, of course, seems like a less probable event, but hypothetically speaking — what kinds of risks as well as opportunities do you foresee from the bill being passed?

Rishi Shah

executive
#88

Regarding Bill, I'd say we're viewing the situation positively, since it will give us chances to enter new distribution areas. So for us, I think we see it as an opportunity rather than a risk.

Operator

operator
#89

Moving on, our next question comes from Jiten Rushi at Axis Capital.

Jiten Rushi

analyst
#90

Sir, could you break down EBITDA for us?

Saurabh Mashruwala

executive
#91

EBITDA?

Jiten Rushi

analyst
#92

Right, the EBITDA breakdown — thermal, renewable, licensees, and franchisees.

Saurabh Mashruwala

executive
#93

Regarding EBITDA, the gas-based project contributed roughly INR 238 crores during this quarter.

Jiten Rushi

analyst
#94

Which project are you referring to, sir?

Saurabh Mashruwala

executive
#95

My apologies — INR 238 crores. For the gas-based project, INR 238 crores against INR 129 crores a year earlier. The renewable project then comes in at INR 260 crores, compared with INR 175 crores last year. License distribution was roughly INR 421 crores versus INR 322 crores the prior year. Franchise stood at INR 250 crores against INR 168 crores last year. And overall EBITDA reached INR 1,169 crores, up from INR 764 crores a year ago.

Jiten Rushi

analyst
#96

That's prior to the one-off item, correct — this INR 1,169 crores?

Saurabh Mashruwala

executive
#97

No, that's once you factor in the one-off. Prior to that one-off, the figure stands at INR 1,151 crores. The current quarter does include a few quite minor one-offs.

Rishi Shah

executive
#98

So every segment EBITDA figure you see is shown before one-off items, while the total figure is after one-off items. So whatever remains, you can put that down to one-off and other items.

Jiten Rushi

analyst
#99

And sir, about the wind PLI, you mentioned that for this 300 megawatt, 40% PLI you were expecting 30%. Could you clarify that, please?

Rishi Shah

executive
#100

40%. 4-0.

Jiten Rushi

analyst
#101

4-0. And sir, regarding the gas tie-up, just to go over it again. So, for this year we have 25% of gas tied up. And from CY '23 to CY '26, we have 50%, because last time we said up to CY '27. So, has there been any change in that?

Rishi Shah

executive
#102

For CY '26 — covering the stretch from '23 through '26 — we've got 50% tied up.

Jiten Rushi

analyst
#103

So that's 25% domestic and 25% imported, correct, sir?

Rishi Shah

executive
#104

Understood.

Jiten Rushi

analyst
#105

And sir, regarding CapEx — how much did we spend on CapEx in Q1? Could you break that out between the distribution licensee and the distribution franchisee?

Saurabh Mashruwala

executive
#106

Sure, we can break that out for you. The distribution license business comes to roughly INR 438 crores.

Jiten Rushi

analyst
#107

INR 438 crores.

Saurabh Mashruwala

executive
#108

The franchise amount comes to INR 55 crores. So that puts combined CapEx on the license plus franchise at roughly INR 500 crores, and in the prior quarter that figure stood at about INR 150 crores, measured against the same quarter a year earlier. So a substantial chunk of CapEx has gone out in Q1 of FY -- the present year.

Jiten Rushi

analyst
#109

So for the whole year, combined, that's going to be INR 1,500 crore — is that right?

Saurabh Mashruwala

executive
#110

Yeah. That's exactly the goal.

Operator

operator
#111

Our following question comes from Apoorva Bahadur, who is on the line from Investec.

Apoorva Bahadur

analyst
#112

Sir, I'd like to hear your thoughts on the Electricity Amendment Act, since now, rather than de-licensing, we'll have multiple licensees. So how do you view this opportunity — would the size here be more along the lines of a franchise business?

Saurabh Mashruwala

executive
#113

As Rishi explained, this is a chance — we view it as a chance for us, since we can go out and secure additional distribution. So we see it as an opportunity rather than any stakes over the existing distribution area.

Apoorva Bahadur

analyst
#114

Second, sir, I also wanted to get some clarity on the billing for UNOSUGEN. My understanding is that the regulator has permitted cost pass-through in the tariff order. Sir, but will it — so does UNOSUGEN work on a 2-part billing basis, where we bill for all of the fixed cost and only the variable cost for generation? Or is it instead that the full annual amount the regulator approved is what's being billed?

Saurabh Mashruwala

executive
#115

It's the same <<inaudible>> type — every fixed cost gets passed along. It'll be billed into the entity. And the consumer will be able to recover it.

Apoorva Bahadur

analyst
#116

Okay, so that makes it 2 parts, and that's fine, sir. Sir, another thing — MOP recently floated a proposal concerning this high-cost dam market, which sits above the INR 12 ceiling. So, given that our gas-based power bill would come in above INR 12, do we plan to take part in it?

Saurabh Mashruwala

executive
#117

No, look — it really comes down to what it costs you to produce that electricity, and on that basis we'll determine if it makes sense to take part in the...

Rishi Shah

executive
#118

Basically, Apoorva, it comes down to a trade-off: are you generating greater profit from selling gas, or are you generating greater profit from selling electricity? So it would be more of a dynamic situation, playing out period by period. And at any given moment, we have to examine which option makes more sense at that point in time.

Apoorva Bahadur

analyst
#119

Sir, last point from me — again on the gas availability side, could you just shed some light on this for me: the gas we're selling, is that the merchant cargo? Or are we selling our portion of the IOCL and RIL gas? And also, if it's domestic gas we're selling, then how are we declaring the availability for the SUGEN plant?

Saurabh Mashruwala

executive
#120

On the availability side, it is available. So availability stands at 100% for both plants, SUGEN and UNOSUGEN. When it comes to where the gas comes from, we aren't able to comment on that right now.

Operator

operator
#121

Our next question comes from Aniket Mittal, who is on the line from SBI Mutual Fund.

Aniket Mittal

analyst
#122

I have just a couple of questions. First, for those 2 renewable projects you have underway, how much CapEx is still pending? I mean the 300 megawatt PLD and the 115 megawatt SECI project.

Saurabh Mashruwala

executive
#123

The 115-megawatt SECI project...

Rishi Shah

executive
#124

The 115-megawatt SECI project comes to roughly INR 800 crores in CapEx, while PPLD's 300 megawatts runs about INR 1,250 crores to INR 1,300 crores.

Aniket Mittal

analyst
#125

What portion of that CapEx is actual spending?

Rishi Shah

executive
#126

For PPLD, the bulk of it is spending. 115 megawatts — I believe roughly 30% of the CapEx is complete, and another portion is in the pipeline. The EPC contract, though, has already been awarded. So whenever the EPC contractor carries out the work, we'll need to make the payment.

Saurabh Mashruwala

executive
#127

Regarding that INR 500 crores of CapEx, which we've spent on 115 megawatt crore out of INR 800 crores.

Aniket Mittal

analyst
#128

The other thing I wanted to ask about — I believe in your opening comments, regarding the distribution business, you referred to a solar incentive gain of roughly INR 21 crores. Could you walk me through that? What exactly is driving this gain?

Saurabh Mashruwala

executive
#129

So look — in the distribution area we’re licensed for, there’s a solar rooftop program. Under that solar rooftop program, the government runs 1 scheme: if you’re enabling rooftop solar beyond 10 — if, in the area you’re licensed to serve, you enable rooftop solar, then an incentive is on offer, and when capacity growth for any given year exceeds 10%, the government pays you an incentive. So in a few of the distribution areas we’re licensed for, we received some incentive. Through that, we’ve added capacity above 10%.

Aniket Mittal

analyst
#130

How much capacity have we got installed through that scheme?

Saurabh Mashruwala

executive
#131

We’ll provide that figure separately outside this call.

Aniket Mittal

analyst
#132

And just one final question. I believe, in sequence, we've observed a fairly reasonable rise in interest expense for the company. So if you could just shed some light on that with regard to total debt and finance cost, what is driving that increase? And how do you expect this to play out over the next 1 year?

Saurabh Mashruwala

executive
#133

For the overall base number, the average cost comes to roughly 7.25% for the current quarter, and the base should land at around INR 11,000 crores.

Operator

operator
#134

Our next question comes from Rahul Modi with ICICI Securities Limited.

Rahul Modi

analyst
#135

Sir, what does the current asset...

Rishi Shah

executive
#136

Pardon me?

Rahul Modi

analyst
#137

Sir, what is the current amount of outstanding regulatory assets?

Rishi Shah

executive
#138

At year-end, around March '22, the total stood at roughly INR 1,900 crores, covering both disputed and undisputed amounts. The undisputed portion came to approximately INR 1,300 crores, while the disputed part was about INR 600 crores.

Operator

operator
#139

Ladies and gentlemen, Mr. Modi's line has dropped. We'll proceed to the following question, coming from Mohit Kumar at DAM Capital.

Mohit Kumar

analyst
#140

I’d like to ask about the CapEx you’re likely to incur in Dadra and Nagar Haveli over the next 3 to 4 years. Do you have a clearer idea of that right now?

Saurabh Mashruwala

executive
#141

As we said before, our plan is to invest roughly INR 1,000 crores in CapEx over the coming 5 years across the Dadra, Nagar Haveli, Daman and Diu region.

Mohit Kumar

analyst
#142

Second, sir, on that point — since power prices remain really elevated, how are we locked in for our power purchases over the coming 8 months? Are those resources secured on a medium-term basis, or are they coming through the exchanges?

Saurabh Mashruwala

executive
#143

So we do have certain contracts — bilateral ones — that are available within the license area we already hold. As a result, what we're looking at is a combination of bilateral contracts, generation from our own assets, and some volume coming from the exchange as well.

Operator

operator
#144

Our next question comes from Rahul Modi at ICICI Securities Limited.

Rahul Modi

analyst
#145

Apologies, sir — my connection dropped, which is why I fell off the call. So this is just a follow-up question on that same point. What was that regulatory asset you referred to? Was it INR 1,900 crores?

Saurabh Mashruwala

executive
#146

Yes.

Rahul Modi

analyst
#147

And anything that accumulated over the course of Q1?

Rishi Shah

executive
#148

As we discussed, Rahul, certain regulatory assets accumulated during Q1 due to elevated power purchase costs. Over time — and let's say this year as well — there are expectations that some portion will be liquidated. However, for the full year, we anticipate some additional buildup of regulatory assets.

Rahul Modi

analyst
#149

Is there any indicative figure, just so I can get a sense of it?

Rishi Shah

executive
#150

It's hard to say right now — hard to predict how much volume we'll be able to get and at what cost going forward, and that will have an impact on the regulatory asset number.

Rahul Modi

analyst
#151

Sir, on a blended basis, what variable cost are we currently generating for our gas plants?

Rishi Shah

executive
#152

We’ll provide that figure separately. Right now, we don’t have it available to us on hand.

Operator

operator
#153

Devam Modi from ARDEKO has the next question.

Devam Modi

analyst
#154

Sir, first, regarding this Dadra and Nagar Haveli — could you just walk us through exactly how much we've paid them to date, and whether there's any additional amount still to be paid, whether as a license fee or something along those lines? And what would the economics of the transaction look like, let's say, as we understand it, in terms of IRRs and so on ?

Saurabh Mashruwala

executive
#155

We put in INR 565 crores to acquire a 49% stake — a 51% stake, rather. That's how the investment came about. Essentially, we view this as a perpetual opportunity instead of chasing something bigger. Our business is therefore available on a perpetual basis. That's the situation — and over the next couple of years, it should open up many opportunities in nearby areas as well. So we see it as a perpetual opportunity rather than focusing on one particular idea or anything of that sort.

Devam Modi

analyst
#156

So you said the one-time licensing payment comes to INR 565 crores.

Saurabh Mashruwala

executive
#157

Yeah. A 51% stake.

Devam Modi

analyst
#158

So essentially, when you look at total debt on a quarter-on-quarter basis, it's risen by roughly INR 2,500 crores, and most of that increase would relate to the renewable acquisitions?

Saurabh Mashruwala

executive
#159

Renewable acquisition, plus some of our built-up regulatory assets as well. So basically it's a mix, along with the acquisition of Dadra and Nagar Haveli too.

Devam Modi

analyst
#160

What would the cash balance be on our side by the close of June?

Saurabh Mashruwala

executive
#161

It's roughly...

Rishi Shah

executive
#162

Roughly INR 1,500 crores.

Devam Modi

analyst
#163

I actually left out 2 figures — could you point out the EBITDA figure for renewables and the EBITDA figure for Dadra and Nagar Haveli?

Rishi Shah

executive
#164

So we’re not breaking out EBITDA figures separately for Dadra and Nagar Haveli. On the renewables side, <<inaudible>> Q1.

Saurabh Mashruwala

executive
#165

The first quarter came in at roughly INR 260 crores, compared with INR 175 crores a year earlier.

Devam Modi

analyst
#166

What about licensing distribution?

Saurabh Mashruwala

executive
#167

On the license distribution side, that came in at INR 421 crores, compared with INR 322 crores a year earlier.

Devam Modi

analyst
#168

So the big difference you could assume is basically Dadra and Nagar Haveli — I mean, in this case, Shil, Mumbra was already there last year, right?

Rishi Shah

executive
#169

No, no. So, as Saurabh covered in his opening comments, there were various other sectors on the AT&C side — I mean, within license distribution, generally, incentives existed, and gains came from a higher ROE. So taking all of that together gives you this delta.

Operator

operator
#170

Rani Vijayakumar from Spark Capital has the next question.

Bharanidhar Vijayakumar

analyst
#171

So regarding gas availability and gas sales — from what I understand, whenever there's a profit opportunity from selling LNG, we purchase power on the short-term market, supply it to our distribution businesses, and then sell the LNG. Is that correct?

Saurabh Mashruwala

executive
#172

Right. But essentially, what we're selling is merchant cargo. So whatever generation the beneficiary has available, SUGEN provides it to our distribution arm.

Bharanidhar Vijayakumar

analyst
#173

You also brought up that at some price level, selling LNG makes more sense than generating. So what would that price level be, in dollars per MMBtu?

Saurabh Mashruwala

executive
#174

There isn’t a set price point—this market moves dynamically. So, day by day, we’ll determine whether we should produce electricity or sell the gas. That also hinges on the merchant prices that are available for electricity and the opportunity that exists at a given point in time. Those are things we have to consider.

Bharanidhar Vijayakumar

analyst
#175

And I didn't get to the cargo you’d contracted on a merchant basis — what’s the price you contracted at?

Saurabh Mashruwala

executive
#176

Turning to your first question, the $21.

Bharanidhar Vijayakumar

analyst
#177

And clearly, selling into the LNG market would earn you more than that.

Saurabh Mashruwala

executive
#178

Yes.

Bharanidhar Vijayakumar

analyst
#179

My next question concerns Dadra and Nagar Haveli. Could you tell me the gross block and the debt tied to those assets? And has that figure been consolidated during this quarter?

Saurabh Mashruwala

executive
#180

Correct — those figures are combined.

Rishi Shah

executive
#181

Right now, the business carries no debt — actual debt is zero as of today. As for gross block, it should come in at roughly INR 250 crores to INR 300 crores; we can share the exit figure with you offline.

Bharanidhar Vijayakumar

analyst
#182

I didn't catch the debt portion. Could you go over that again?

Rishi Shah

executive
#183

At this point, we have no debt.

Bharanidhar Vijayakumar

analyst
#184

There isn't any debt on the books. All right.

Operator

operator
#185

Since no more questions remain, I'll turn the conference over to Mr. Saurabh Mashruwala at this point for his closing remarks. Ladies and gentlemen, the management line has dropped. Kindly remain on the line while we get them reconnected. Ladies and gentlemen, management's line is now connected.

Saurabh Mashruwala

executive
#186

Thank you.

Operator

operator
#187

Now I’ll hand things over to you for your closing remarks.

Saurabh Mashruwala

executive
#188

Yes. Thanks a lot for being on Torrent Power's earnings call. We want everyone to stay safe and well. Many thanks.

Operator

operator
#189

Appreciate it. That brings us to the end of this call for Torrent Power Limited. Thanks for being with us — you can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.