operatorGood day, everyone, and welcome to the Q4 FY '23 earnings conference call for Torrent Power Limited. <<operator_script>> Kindly be aware that this call is being recorded. I'll now turn things over to Mr. Saurabh Mashruwala, Chief Financial Officer of Torrent Power Limited. Thank you, and the floor is yours.
Saurabh Mashruwala
executiveThanks a lot. Good morning, everyone. I appreciate you all joining Torrent Power Limited's earnings call for Q4 FY '23. To begin with, I'll walk you through how we performed during the quarter, and after that we'll open up all the lines for a Q&A session. We present the company's performance at PBT <<inaudible>> and then account for tax expense separately afterward. Reported PBT for the quarter, before exceptional items, came in at INR 668 crores, versus INR 597 crores in the same quarter a year earlier — that's a rise of INR 71 crores, roughly 12% on a reported basis. So that you can grasp the underlying performance of the company, we'll first walk you through the nonrecurring items in the quarter. Now, while no nonrecurring items exist for the current quarter, certain nonrecurring items were present in the prior quarter relative to the quarter last year. There are 5 nonrecurring items in Q4 of FY '22. First, we had a sort of provision for doubtful debt in the franchise and distribution business amounting to INR 16 crores, thanks to better collection efficiency and heightened vigilance activity during this quarter. Second, we had a partial provision of INR 28 crores, out of a total provision of INR 161 crores made for <<inaudible>> projects — wind projects — during FY '20, as a performance <<inaudible>> issued the key — issue as a security for the development of transmission lines has been released by the PGCIL.
Saurabh Mashruwala
executiveThird, there's a reversal of part of a provision — INR 29 crores out of the total INR 51 crores that had been set aside for 115-megawatt 65 projects in FY '20, since project development work has now begun. Fourth, a credit of INR 34 crores was recognized as liquidity damage for the 126-megawatt MSEDCL wind power project, stemming from a settlement with the EPC contractor in the last INR 11 crores, which relates to renewal projects acquired during Q4 of FY '22 that contributed partially during the quarter. Taken all together, net nonrecurring credits came to above INR 118 crores in Q4 of FY '22. So just on a one-off basis, PBT for the quarter stood at INR 668 crores versus INR 479 crores in the same quarter last year — higher by roughly INR 189 crores, about 39%. I'll now walk you through the key highlights on the improvement in PBT of INR 189 crores for the current quarter. The improvement in the operating properties comes from 3 factors — mainly 3 factors. First, better overall contribution from the distribution business, which improved by INR 190 crores, with both the licensed distribution business and the franchised distribution business reporting improvement for the following 2 reasons.
Saurabh Mashruwala
executiveFour factors drove the gain in both the licensed and franchised distribution operations. To start, a reduction in T&D losses within the licensed business relative to the franchise business, by <<inaudible>>, added another INR 48 crores. Greater volume along with tariff in the distribution franchise territory added roughly INR 19 crores. A higher return on equity that lowered <<inaudible>> in the license business also added INR 33 crores. The final piece comes from the new acquisitions — namely Daman and Diu — which delivered an extra INR 100 crores during the correspond— current quarter. Reason two: the distribution business improvement was partly offset by a smaller contribution of INR 19 crores from the gas based power project. Three factors explain that weaker contribution from the gas based power project. First, get prices, which had been elevated through the first 9 months of the year, fell to $10 — $10 per MMBtu — which reduced profitability from LNG trading inside the quarter by INR 30 crores versus the same quarter a year earlier. Second, on top of that, contributions from long-term PPAs came in INR 23 crores lower for the quarter, producing reduced fuel savings, partly offset by lower O&M cost.
Saurabh Mashruwala
executiveThird, the <<inaudible>> charge came in lower by INR 37 crores for the gas based power plant, reflecting onetime impairment charges that were incurred in Q4 of last year, in the <<inaudible>> as well as <<inaudible>> date in SUGEN. The third reason is that the <<inaudible>> business of the company saw an increased contribution of INR 25 crores. So moving on to the after-tax numbers. Conservative profit after tax reported for the quarter is INR 488 crores as compared to loss of INR 484 crores in corresponding quarter last year, which is higher by INR 972 crores. Last year loss numbers increased debit on account of incremental charges in the quarter of INR 1,300 crores and later, we were all in deferred tax liability of INR 372 crores. So net charge to the P&L was INR 928 crores. Just of all this impairment provision <<inaudible>> for the quarter stand at INR 488 crores versus INR 444 crores for corresponding quarter last year, is higher by INR 44 crores, about 10%. Now moving into the operational performance of the company. Distribution business weakness and year-on-year improvement in the demand of <<inaudible>> 6%. <<inaudible>> Losses have also witnessed a marked improvement for FY '23 across all locations, mainly due to continued focus on the low reduction as well as recovery activities.
Saurabh Mashruwala
executiveThat brings the summary of the quarter to a close — both what we finance and how the company performed operationally. Now, shifting to a quick status report on the projects currently in the pipeline. To start, the 115 megahertz SECI-V commissioning has been held up by a delay in building the EHV line, since those sections fell under the company's control. We expect that same item to be commissioned around the end of June '23. The required paperwork seeking an extension of <<inaudible>> has already gone to SECI. <<inaudible>> make solar projects. As we told you on the previous call, we indicated commissioning by the close of this fiscal '24. <<inaudible>> the wind project was carried out in March '23. The development contract for that project went to Suzlon. The SPOD date for the project is anticipated in March '25. Turning now to our Distribution segment. The company has applied for a parallel distribution license <<inaudible>> in Maharashtra, covering Thane and Palghar, Pune and Nagpur. <<inaudible>> MSEDCL is an encumbered licensee and will keep that licensee status. After the license is awarded — which we expect to take 3 to 6 months — consumers in this area will be able to pick either licensee for their power supply.
Saurabh Mashruwala
executiveThat wraps up our discussion for this quarter. At this point, I'll ask the coordinator to open up the lines so we can take your questions. We hope everyone stays safe and in good health. Thanks very much. I'll now turn things over to the operator. Thank you.
Operator
operator<<operator_script>> Our initial question is from Mohit Kumar of ICICI Securities.
Mohit Kumar
analystCongrats on a truly outstanding showing on the distribution side of things. For my first question, sir, could you walk us through how the revenues break down—specifically for Tata and <<inaudible>>—sorry, I mean the demand view revenues, EBITDA and profit for fiscal 4Q?
Saurabh Mashruwala
executiveLooking at the whole year, revenue comes in at roughly INR 6,000 crores, with end users at nearly 10,000 annuals.
Mohit Kumar
analystSir, could you speak to EBITDA and PAT, please?
Saurabh Mashruwala
executiveAs we can see here, profit for the quarter comes to roughly INR 100 crores. That's what we're seeing in the content...
Mohit Kumar
analystAre you asking about the full year — the entire fiscal year?
Saurabh Mashruwala
executivePBT came in at INR 114 crores.
Mohit Kumar
analystGot it, sir. My second question concerns the segment breakdown — the one you normally provide for EBITDA across the 4 segments. Could you give us that for the fiscal year, sir?
Saurabh Mashruwala
executiveWhen it comes to the fiscal year, you could bring it down to <<inaudible>> EBITDA of INR 1,500 crores, versus INR 900 crores the prior year. <<inaudible>> roughly INR 850 crores compared with the previous figure of about INR 650 crores. Tax distribution comes in at nearly INR 1,800 crores, versus INR 1,238 crores a year ago. <<inaudible>> I'm seeing approximately INR 1,030 crores against last year's 760, and total EBITDA stands at INR 5,140 crores compared with INR 33,826 crores.
Mohit Kumar
analystMy third question concerns the fact that gas prices have dropped significantly — how are they thinking about bridging the gas for FY '24 now?
Saurabh Mashruwala
executiveGas prices have dropped a lot compared with what we saw in, say, Q1 — Q1 and Q2 — and now it's available at sub $10 per MMBtu. So — and we expect — if you look at storage capacity in Europe as well, that has also begun rising. We expect the gas price will come down further somewhere around June, July, something like that. So at that point it will be the right time to tie the further cargoes. So we're still waiting — for it to fall further, to decline further. And I think within a couple of months, we'll start tying up the cargoes — that's what we expect.
Mohit Kumar
analystAnd what does the long-term tie stand at right now, sir, for FY '24?
Saurabh Mashruwala
executiveFrom IOCL and RIL reliance <<inaudible>>, we have supply available. So roughly 25% of the requirement we can cover. And then for each of the next 3 years, we have 3 cargoes locked in per year, which comes to about 20%. Somewhere around 45% to 50% is already in place.
Operator
operatorOur next question is from Rahul Modi with Nippon Asset Management.
Rahul Modi
analystCongrats on the strong results. Sir, I was hoping for your medium-term perspective on how the projects currently under construction in renewables are coming along. And regarding strategy for the next 3 to 4 years or so in renewables, are we considering inorganic expansion, or taking part in base, C&I — all of that.
Saurabh Mashruwala
executiveYes. Look, our strategy is quite straightforward. We aim to place greater emphasis on distribution as a renewable segment and as part of the transition too. So with that focus — we're a committed team. On the renewables side, yes, we have roughly 100 megawatts of projects in the pipeline. We're also actively examining inorganic acquisitions as well as greenfield projects. The plan is, as we explained earlier too, the plan is to get to around 5 gigahertz of capacity within the next 3 to 5 years. So we'll keep concentrating on the renewable segment. At the same time, we'll also keep our focus on distribution, since it sits at the core of our business and is an important business for us. And as we explained earlier too on the last call, we have taken part in Maharashtra for a couple of locations, which will take some time because we have to wait roughly — there is some process involved with the regulator. So that will require roughly 3% to 6%. We will therefore focus more on distribution as well as renewable assets too.
Rahul Modi
analystSir, I had one question about the fact that we've apparently been allocated a certain line for green hydrogen in Gujarat. Could you share some thoughts on that, please?
Saurabh Mashruwala
executiveRight. That’s land we’ve set aside — a sizable parcel has been allocated. So our plan is to build renewable projects there as well. That way it will — and we beat the various picky projects and the state discount project for the renewable segment.
Rahul Modi
analystSo the reason isn't green hydrogen itself—it's really about RE projects as such.
Saurabh Mashruwala
executiveYeah — both renewable energy and green hydrogen.
Rahul Modi
analystAll right, so how will this be set up — will it happen in tandem, or will you go first? Since this is just land, you'll only begin adding capacity once you secure PPAs or win bids and so on.
Saurabh Mashruwala
executiveYes, of course.
Rahul Modi
analystAnd regarding megawattage, how much land do we actually have, and what could be built there?
Saurabh Mashruwala
executiveIn Gujarat, we acquired roughly 6,000 hectares — around 600 — so that's quite a substantial parcel of land we have there. As soon as we secure the PPAs, we'll go ahead and develop the projects.
Rahul Modi
analystSo would it be fair to think that's mostly for solar, and that'll be roughly what—2,000 megawatts, 3,000 megawatts?
Saurabh Mashruwala
executiveYeah, roughly 3,000 megawatts.
Rahul Modi
analystOkay, and that's going to be in solar.
Saurabh Mashruwala
executiveIt's solar and wind, a hybrid of both, basically <<inaudible>>.
Operator
operatorOur next question is from Mohit Kumar at ICICI Securities.
Mohit Kumar
analystThe question I had was this: regarding the land you acquired from Gujarat, what is the consideration for it?
Saurabh Mashruwala
executiveSix thousand hectares.
Mohit Kumar
analystNo, sir. As for the land consideration, is that an amount you pay annually, or was it a one-time upfront figure?
Saurabh Mashruwala
executiveI don’t have those figures in front of me at the moment. We can take that up offline.
Operator
operator<<operator_script>> Our following question is from Amit Bhinde with Morgan Stanley.
Amit Bhinde
analystI just want to get a handle on what's going on with gas EBITDA. In the same quarter a year ago, gas EBITDA stood at roughly INR 462 crore. As you mentioned, right now it's 15,000 for the year. Then when we move to RLNG gains, it barely amounts to INR 213 crores for the quarter. So what exactly explains the gap between INR 462 crore last year and INR 213 crore this year on the gas base plants -- thermal plants, totally <<inaudible>>? So did you earn lower incentives? What has changed Y-o-Y?
Saurabh Mashruwala
executiveSo for the full year, gas EBITDA came in at INR 1,500 crores last year, versus INR 900 crores this year. Looking at the Q4 figures, we posted EBIT of roughly INR 200 crores in the gas base power project, against INR 282 crores a year earlier. Yes, gas EBITDA is down in the current quarter — in the current quarter.
Amit Bhinde
analystSo what's driving that change? Could you just point to it for us?
Saurabh Mashruwala
executivePLF is low, and gas profits are down as well versus the same quarter a year ago.
Amit Bhinde
analystThen I suppose you noted there's only a small gain on RLNG this time — I think that's because last time it came to INR 50 crores. And this time, as you said, there's a deferral of INR 30 crores.
Saurabh Mashruwala
executiveFor this quarter, we came in INR 30 crores lower. In the current quarter, the figure is down by INR 30 crores.
Amit Bhinde
analystIn Q4 of last year, I believe that figure was INR 50 crores, which is INR 30 crores less. So this time around, it's just INR 20 crores. So I'm not — so that's what explains it...
Saurabh Mashruwala
executiveIn the prior quarter, that figure stood at INR 120 crores, while for this one it comes in at roughly INR 90 crores.
Amit Bhinde
analystAll right. So we still have INR 282 crores against INR 200 crores, a gap of INR 82 crores. Of that, INR 30 crores has been accounted for — what about the remaining INR 52 crores?
Saurabh Mashruwala
executiveThe rest is INR 52 crores of EBITDA, with fuel gain lower by roughly INR 25 crores, which came from reduced generation.
Operator
operatorBharani Vijaykumar from Spark Capital has the next question.
Bharanidhar Vijayakumar
analystCan everyone hear me?
Saurabh Mashruwala
executiveYes, could you speak up a bit?
Bharanidhar Vijayakumar
analystI just want to get a sense of how much EBITDA the RLNG sale contributed for the full year FY '23.
Saurabh Mashruwala
executiveFor the entire year, that figure came to roughly close to INR 200 crores.
Bharanidhar Vijayakumar
analystAnd just to double-check the full-year EBITDA figure. For renewables, you mentioned INR 850 crores this year compared with INR 650 crores last year, is that right? EBITDA from renewables, INR 850 crores this year against INR 650 crores last year, correct?
Saurabh Mashruwala
executiveYes, INR 850 crores compared with INR 650 crores in the prior year.
Bharanidhar Vijayakumar
analystAnd on the license distribution, INR 1,800 crores compared with INR 1,238 crore a year ago. Did I get that right?
Saurabh Mashruwala
executiveEither INR 1,800 crores or INR 1,400 crores — INR 1,438 crores came in last year.
Bharanidhar Vijayakumar
analystNow, regarding the gas — sorry, the gas power we're providing through this summer peak — which plants are actually supplying that? And obviously the tariff is publicly available, but on a per-unit basis, how much would the contribution be?
Saurabh Mashruwala
executiveWe're providing that to our <<inaudible>>. On the contribution matter, we'll reconnect later offline. At this moment, we don't have those figures.
Bharanidhar Vijayakumar
analystThat's fine. But this is only going to apply during the 3-month period, correct?
Saurabh Mashruwala
executiveI’d say through June 15.
Bharanidhar Vijayakumar
analystIs there any chance it gets extended?
Saurabh Mashruwala
executiveEverything hinges on the summer—on how the summer unfolds. As for how demand plays out moving forward, that too hinges entirely on demand, along with the supply-demand situation.
Operator
operatorOur next question is from Nikhil with Alliance.
Analyst
analystI’ll start with the distribution opportunities that are being left out in Maharashtra. Could you give us a bit more detail on that? Is the infrastructure owned by the incumbent, and as for the PPAs, do they get transferred or do they stay put? What’s the mechanism?
Saurabh Mashruwala
executiveThe distribution figures for Maharashtra are unchanged.
Analyst
analystMaharashtra distribution is where the opportunity lies.
Saurabh Mashruwala
executiveYeah, it's too early to discuss that. We've applied for a couple of areas. So the regulator is evaluating our applications, and there's some process required on the regulator's end. So it takes about 3 to 6 months' time. Once we have some visibility on these applications, so we'll update once it processes — basically the regulatory is undertaking a process. So it requires about 3 to 6 months' time.
Rahul Shah
executiveTo build on what Saurabh said, this will be a parallel license. So we're expected to develop our own network and procure our own power. There won't be any PPA sharing or use of any network; even if we do need to use it, that will have to be in line with the billing charges we'd have to pay. In effect, it's a parallel license — a second license.
Analyst
analystOn that same subject—the competitive distribution model—the government has been at work on it for quite a while. Have you seen any additional progress from the government's side? I mean, they've been attempting to modernize it, but is there anything you've heard about beyond that?
Rahul Shah
executiveMy understanding is that the government would introduce it during the upcoming parliamentary session. Beyond that, I can't offer any further detail on it.
Analyst
analystGot it. And one final question. Regarding the renewable opportunities, there was a press report, I believe earlier this year, about Torrent looking into acquiring assets from ReNew Power. Are those talks still continuing? Could you share any thoughts on that?
Saurabh Mashruwala
executiveThese are still being evaluated — there's no, there's no firm answer on this yet, but as of right now it remains under evaluation.
Operator
operatorOur next question is from Harsh Dole at IIFL.
Harshavardhan Dole
analystI have several questions. The first one concerns our Ahmedabad and Surat circle. My understanding is that no tariff increase has taken place. If that's the case, how do we plan to generate the incremental ROE on the CapEx we've already carried out or intend to carry out? That's my first point. Second, I heard that we've earned close to INR 140 crores of PBT in the DNH circle. On a full year basis, that works out to roughly 14% ROE. Were there any one-offs in that circle? Third, we heard in the news that you may bid for SKS's coal-based plant, in terms of acquiring it at <<inaudible>>, given our strategy of not committing additional capital for generation?
Saurabh Mashruwala
executiveOn the first question regarding Ahmedabad and Surat distribution — yes, on tariff: if it isn't given, there's always a regulator pass-through of the tariff between the power purchase cost and the fuel costs, and power <<inaudible>> went up by our <<inaudible>>. Regularly, we keep receiving the increase in the — in terms of our <<inaudible>> PPAs. So that comes to us regularly, on a quarterly basis, I'd say. The second question concerns Daman and Diu, where we mentioned INR 140 crores PBT. There's nothing one-off in it — it comes entirely from distribution activities. And it mainly arises from — arising out of savings in O&M as well as T&D losses, and the return on equity as well. Then the third question is SKS. Yes, we are <<inaudible>> for SKS. We have taken part in the bidding. So 4 players are in the race at present: one, our Torrent Power, Jindal Power, Vantage Point and the <<inaudible>> — 4 pillars are there. We are — from what we understand, our <<inaudible>> are very close at the moment. And according to our information, the lenders are — there are 2 lenders.
Saurabh Mashruwala
executiveRight, so <<inaudible>> serves as the lead lender, with FCI as the second lender. And at present, under the reservation <<inaudible>> plan, everyone — all of the bidders — gets a time resolution plan. And as things stand right now, the <<inaudible>> on the part of the lenders. That's the <<inaudible>>.
Rahul Shah
executiveTo build on what Saurabh mentioned regarding the first question, I believe your focus was primarily on the capital cost. What essentially occurs is that although the tariff has not gone up, the regulator has permitted a specific capitalization of expenses—or of the capital we've invested. In fact, it also works out that your volume rises year-on-year. So given the CapEx you've carried out and what they've approved, there's no need to raise the fixed charge. That's due to capitalization, since the units are going up as well. So effectively, we are receiving a pass-through of the fixed cost tied to the CapEx we've completed. So the regulator has no reason to increase the tariff on that account.
Harshavardhan Dole
analystYes, that’s very clear. I’m really pleased that in the very first year after taking over DNH, we’ve been able to turn it around and reach an ROE of almost 14%. Now, how sustainable is that? And what kind of growth in this figure should we model going forward? Because when we began, the perception was that the base was significantly low, and so concerns emerged that we had overpaid for the asset. So how have you managed to turn this around and swing this kind of profitability?
Saurabh Mashruwala
executiveWe've therefore operated within a distribution network. In the fourth, distribution loss reached as high as 1.59%, and that's notably below the typical figure. Our view is that this number — a number of this kind — can also be sustained moving forward, given the distribution, our management, and the work we've done on cutting distribution losses in this restriction. And O&M expense is likewise kept well in check.
Rahul Shah
executiveTo add to that, Harsh — this is essentially an industrial zone. So if I use our industrial zone as the benchmark, which is the hedge you mentioned, we're running at 0.5% T&D losses. That means there's still room for us to bring those T&D losses down. But on the other hand, the regulator may keep revising the normative norm as well. Taking both of those together, we believe these are sustainable numbers. And going forward, we'll also be putting in some amount of CapEx, which will earn us incremental ROE on that CapEx. So where the current numbers stand, we believe they can be sustained over a period of time.
Operator
operatorOur next question is from Nikhil Abhyankar with ICICI Securities.
Nikhil Abhyankar
analystI have 2 questions. You were just discussing the SKS facility that you're attempting to acquire. So, does this facility have any power types? And if it doesn't, how do you plan to use this power plant?
Saurabh Mashruwala
executiveIt has a PPA of roughly 200 megawatts. So our position in the <<inaudible>> market is quite strong — we're able to leverage our own distribution, and we can also sell into the merchant market.
Nikhil Abhyankar
analystSo we're not planning to lock it in with PPAs, then?
Saurabh Mashruwala
executiveNo, we're going to go ahead with it. Once we <<inaudible>> on a long-term basis.
Nikhil Abhyankar
analystAlright. Sir, could you break down the capital expenditure for FY '24 for us? And also give guidance for FY '24?
Saurabh Mashruwala
executiveFor the full year, distraction CapEx came in at roughly INR 1,800 crores, while franchise estimation stands at around INR 250 crores. So when you put distribution together, that's essentially all CapEx, totaling close to INR 2,000 crores. We've kept the same guidance for the coming years as well — we are maintaining INR 2,000 crores of CapEx. Of that, about INR 1,700 crores is license distribution, and roughly INR 250 crores to INR 300 crores falls in the franchise distribution area.
Nikhil Abhyankar
analystAnd sir, regarding the Daman and Diu license area — is there any long-term tax arrangement for a power plant there? And would we also procure any short-term plant?
Saurabh Mashruwala
executiveWhat about the Daman and Diu area?
Nikhil Abhyankar
analystYes.
Saurabh Mashruwala
executiveYeah, we do have some tires with our NTPC, so long-term time, and balance power. They are securing from the open -- on a bilateral basis <<inaudible>>.
Rahul Shah
executiveBilateral exchange too, as well as <<inaudible>>.
Nikhil Abhyankar
analystDoes that also put a number on the long-term partnerships?
Rahul Shah
executiveThere are also certain short-term arrangements, and those essentially originate from central utilities — a nuclear power corporation, say, along with the other central utilities — under which they sell to DD and DNH on a short-term basis. So in DD and DNH, that would make up the entire mix of the power purchase arrangement.
Nikhil Abhyankar
analystSir, could you break that down for us between long-term and short-term? How much are we procuring?
Rahul Shah
executiveAs of right now, we don't have those numbers. We'll give it a...
Nikhil Abhyankar
analystWhen it comes to a rough percentage estimate, that's not an issue at all.
Rahul Shah
executiveWe’ll get that to you after the call.
Operator
operatorOur next question is from Jiten Rushi at Axis Capital.
Jiten Rushi
analystI'd like to start with a question about EBITDA. Could you break down EBITDA for us for the fourth quarter?
Saurabh Mashruwala
executiveFor the fourth quarter, EBITDA <<inaudible>> in the current quarter stands at INR 207 crores, compared with INR 282 crores. Of that, renewable accounts for roughly INR 200 crores, against INR 150 crores a year earlier. License distribution comes in at approximately INR 535 crores versus INR 421 crores last year. <<inaudible>> is around INR 230 crores — INR 235 crores, that is, compared with INR 167 crores the prior year. And total EBITDA is roughly INR 1,200 crores, up from INR 1,088 crores last year.
Jiten Rushi
analystSir, what EBITDA would the new distribution center contribute in Q4? And you mentioned PBT of INR 144 for the full year, correct?
Saurabh Mashruwala
executiveRight, the figure is a combined one. So what I’m doing is simply reviewing the breakdown.
Rahul Shah
executiveWe will provide that to you outside this call. At present, we do not have a takeup figure for EBITDA, and we have a considered number of licenses in the business.
Jiten Rushi
analystSo essentially, sir, regarding the gas business, you mentioned that INR 90 crore comes from trading gains in this quarter?
Saurabh Mashruwala
executiveTrading came in at roughly INR 30 crores.
Jiten Rushi
analystWhat’s the actual trading volume in Q4?
Saurabh Mashruwala
executive90 crore rupees.
Jiten Rushi
analystSo that's INR 90 crores. Whereas a year ago, it came in at INR 120 crores — same period last year. My apologies — in Q3, wasn't it roughly INR 397 crores, sir? The prior quarter, Q3, stood at INR 397 crores, while this quarter sits at INR 90 crores. Then over 2 years, you cited INR 780 crores, INR 700 crores, INR 700 crores.
Saurabh Mashruwala
executiveNow, regarding the Q4 EBITDA figure for Daman and Diu — that comes to roughly INR 107 crores for the quarter, and for the full year it's approximately INR 173 crores.
Jiten Rushi
analystSir, interest cost has fallen this quarter as well. Is there any reason for that, given the change in debt holders...
Saurabh Mashruwala
executiveIt has risen. It has risen.
Jiten Rushi
analystRegarding the interest cost, it came in at INR 189 crores, compared with INR 220 crores in Q3. My question is about why that interest cost declined on a sequential basis.
Saurabh Mashruwala
executiveThe figure for Daman and Diu has risen by nearly INR 1,700 crores. That's a sequential number, not the early — it's an amount.
Operator
operatorOur following question is from Aniket Mittal with SBI Mutual Funds.
Aniket Mittal
analystJust a few questions, sir. First, regarding the distribution franchise, I believe at Bhiwandi and Agra we have witnessed quite steep declines, with your T&D losses there sitting at levels below 10%. So looking ahead, how do you view these figures with respect to loss reduction year over year? And where do you think they could settle down?
Saurabh Mashruwala
executiveLook, each year the figures are declining, as you can see. So <<inaudible>> not observed moving the same way, at the same rate, I'd say, and we'll keep at it. So it's getting to sub-10% figures. And when you look at areas like Bhiwandi, Ahmedabad and Surat, it's sub-5%. So we expect that loss reduction will continue going forward as well, perhaps not at the same rate we've achieved up to now. But 1.5 of a point, 75% reduction, we can assume for the next couple of years.
Aniket Mittal
analystAnd the same goes for SMK, since across the last 2 years we've witnessed a really steep drop, going from 45 down to 33 at this point. What would that path look like going forward?
Saurabh Mashruwala
executiveEach year, we anticipate a reduction of 4% to 5% in SMK T&D losses as well. That trend is expected to keep going forward for SMK too.
Aniket Mittal
analystOne final question. Regarding the 715 megawatts of renewables we have under construction, what's the total CapEx on that, and how much of it have you already incurred?
Rahul Shah
executiveI'd say the overall CapEx for 715 megawatts comes to roughly INR 5,000 crores. Of that, 115 megawatts is expected to be commissioned by the end of June this year, and most of the CapEx for that portion has already been spent. As for the remaining 600 megawatts, the SCODs are 2024 and 2025, so a significant amount of work still needs to be done. So I'd say that of the INR 5,000 crores, somewhere between INR 800 crores and INR 1,000 crores would have been spent by now, and the bulk of the spending will take place over the next 2 years.
Operator
operatorSubhadip Mitra from Nuvama has the next question.
Subhadip Mitra
analystMy questions really center on how you expect future growth to unfold when it comes to new areas. And I apologize if these have already been covered — I joined a bit late. So first, on the renewable side: with more bidding anticipated over this year and beyond, do you have a revised target for how much you intend to win, or are there any goals around new acquisitions and so on?
Saurabh Mashruwala
executiveI’d say there isn’t a revised target we’re trying to win, but our aim is to get to roughly 5 gigawatts within the next 3 to 5 years. We’re looking at a range of opportunities in <<inaudible>> areas and also through inorganic routes. So we don’t have a target for the year. That said, the medium-term target is to get to about 5 gigawatts over the next 3 to 5 years.
Rahul Shah
executiveSubhadip, we also need to keep in mind that the target has a wish list. Whether we can move forward will hinge on our ability to earn decent returns from those projects.
Subhadip Mitra
analystGot it. Second, regarding the commercial and industrial side, or the corporate PPA market that's been developing over the past 12 to 18 months — do you have any plans there?
Saurabh Mashruwala
executiveWe are therefore addressing it, and in fact we are doing so actively right now. At present, we also have some PPAs — roughly 20 megawatts — that we exited. Looking ahead, there is an <<inaudible>> area on which we will work actively.
Subhadip Mitra
analystOkay, so about the region plant and the capacity that's still open there — does anyone have a view on what gas price level would actually make longer-term PPAs feasible?
Saurabh Mashruwala
executiveWhen it comes to longer-term PPAs, that looks tough, since the general trend right now is toward short-term PPAs. We have roughly $6 to $7 gas available, so selling into the short-term market is probably more affordable. And Subhadip, again, if you want a long-term PPA, it would be a fixed-cost or fixed-tariff PPA, and that would be hard for us to enter into, because I won't be able to hedge my gas prices in terms of price. So for a gas-based power plant, doing a long-term PPA would be a bit riskier for us if it's a fixed-tariff PPA.
Subhadip Mitra
analystFinally, regarding the distribution business, are there any near-term opportunities you see there? Or do we need the electricity amendments to come in first before that area opens up?
Saurabh Mashruwala
executiveAs you know, we've submitted an application for the parallel license in Maharashtra. That opportunity remains available at all times. So there's no need for us to wait for the ministers there to be amended. Therefore, the chance for a SECI licensing is always there. We are leaving out those opportunities in Maharashtra and in Gujarat as well.
Subhadip Mitra
analystNow, on that Maharashtra parallel license — has there been any progress there, or do you expect it might be awarded at some point soon?
Saurabh Mashruwala
executiveThe regulatory process means the regulator needs some time as well to review what we've submitted. So over the coming 3 to 6 months, we should have some visibility on that front.
Operator
operatorOur next question is from Sumit Kishore of Axis Capital.
Sumit Kishore
analystSure, my first question would be: what's the total regulatory asset for your distribution license business as of the end of FY '23? And how did that number change compared with FY '22?
Saurabh Mashruwala
executiveBy March '23, the regulatory asset should come in at roughly INR 1,900 crores, near enough, and that's already been accounted for, I'd say. There are also some talks underway with the regulators regarding one particular item — the carrying cost, which stands at approximately INR 650 crores.
Sumit Kishore
analystThat INR 650 crores doesn't fall within the INR 1,900 crores.
Saurabh Mashruwala
executiveNo, that isn't included in the INR 1,900 crores.
Sumit Kishore
analystYou mentioned INR 1,900 crores sitting on your balance sheet. What did that figure come to a year ago?
Saurabh Mashruwala
executiveThe figure came to roughly INR 1,300 crores.
Sumit Kishore
analystSo would you say Ahmedabad is the main driver behind that increase?
Saurabh Mashruwala
executiveAhmedabad as well as Surat.
Sumit Kishore
analystAll right. Given how you think the regulatory orders might play out, do you expect that figure to rise even more in FY '23?
Rahul Shah
executiveMy sense is that it shouldn't go up. When you look at where prices stand today—whether for gas or in merchant markets—we believe that number ought to stay flat, since the main driver of the increase is last year, when merchant prices ran very high, and that's what pushed the figures up. If prices hold around current levels going forward, we'd expect some decrease in the regulatory asset. As a reminder, this will again bear the carrying cost. So in effect, there's no real impact on the P&L, just a cash flow mismatch that arises here.
Sumit Kishore
analystAll right. Just so I can get a clearer picture of this, what percentage of the regulatory asset would you put the carrying costs at right now?
Rahul Shah
executiveSo with the launch, that's SBI's 1-year MCLR.
Sumit Kishore
analystOn the SBI 1-year MCLR — and regarding the rise in regulatory assets, what portion came from carrying cost? So as it moves from INR 1,300 crores to INR 1,900, how much of that was due to carrying costs?
Rahul Shah
executiveIf we're talking a ballpark figure, that's roughly INR 100 crores to INR 150 crores — though I'll come back to you with the precise numbers.
Sumit Kishore
analystMoving to my second question, which concerns the distribution business on the other side <<inaudible>>. Regarding that INR 140 crores PBT, what portion of the PBT stems from cost savings and other incentives tied to T&D loss reduction, and what portion comes from ROE?
Rahul Shah
executiveSo look, we won’t be in a position to hand over precise figures. What I can do is try to give you the rough range. Right. So where regulatory equity is concerned, it stands at roughly INR 150 crores right now, and on that, 15% or 15.5% is available. When it comes to T&D, the normative figure is about 4%, 4.5%, while we have recorded 1.6% against it. So those savings are there. And on O&M, there won’t be anything major -- and we’ll need to provide that to you offline. We don’t have that figure at the moment.
Sumit Kishore
analystSo this is — we can make our assumptions.
Operator
operatorAnuj Upadhyay with Investec has the next question.
Anuj Upadhyay
analystSir, just 2 questions. First, a confirmation on the consolidated CapEx — at Slide 24, you said on the distribution side it would come to roughly INR 3,000 crores, and then we have another INR 4,000-odd crores going toward renewables. So is it fair to assume consolidated CapEx of about INR 4,000 crores here for FY '24 and FY '25?
Saurabh Mashruwala
executiveIf that INR 4,000 crores is renewable, it will take place over a 2-year period.
Anuj Upadhyay
analystYou mentioned INR 2,000 crores for distribution and INR 2,000 crores for renewables. So is it fair for us to assume that?
Rahul Shah
executiveSo I’m putting distribution CapEx at INR 2,000 crores for FY ’24 — that figure would be INR 2,000 crores. After that, it’ll come down a bit for FY ’25 and beyond.
Anuj Upadhyay
analystAlright, and then second, do you have any plans to move into new business areas, for example battery storage derived from Pumped Hydro? There was some news going around previously that we're also looking to enter the PSP segment. So is there any confirmation, or anything you'd like to expand on regarding that?
Saurabh Mashruwala
executiveWe're working on it right now, but we're quite interested in discussing all of these new areas.
Rahul Shah
executiveOn the pumped hydro and battery storage side, that work is underway, but it would be too early for us to say anything about it. On new segments being added, I believe we mentioned C&I as a new segment—we've now begun work there, and we've tied up 20 megawatts in it, which we'll build on going forward.
Anuj Upadhyay
analystAll right. Do you have any internal goal for what you're still aiming to reach?
Saurabh Mashruwala
executiveWe definitely don't set targets or provide them, but we do have a target we care about, which is getting to our 5 gigawatt within the next 3 to 5 years.
Anuj Upadhyay
analystIs that C&A you're asking about, sir?
Rahul Shah
executiveTherefore, there isn’t a distinct goal for C&I.
Operator
operatorDevam Modi from ARDEKO has the next question.
Devam Modi
analystI just wanted to ask whether we're looking at any chance to sell renewable power through group captive arrangements. There are a number of small companies that we believe have been established. Subsidies have been established under Torrent Power. So is there any angle around a group captive setup for renewable power, and what's the purpose behind establishing those companies?
Saurabh Mashruwala
executiveAs we talked about, C&I projects are essentially group captive projects. And the subsidiaries that have been established are primarily for C&I projects — or, put another way, group captive projects.
Devam Modi
analystWhat kind of volume are we aiming for in that market?
Saurabh Mashruwala
executiveLike I mentioned, we don’t really provide targets as such. Right now, we have 20 megawatts, and our hope is to build a bigger pool of C&I projects. Still, we won’t be in a position to offer targets as such.
Devam Modi
analystSure. And, I mean, generally speaking, there's been a line of thinking over the past few years that as renewable power grows, you'll need gas-based power to balance it. But so far that hasn't really happened, at least based on what we've seen <<inaudible>>. So if you could just shed some light on when that angle might come into play. And also, what's the possibility of bundling gas-based power together with renewables and delivering, say, more holistic quality power?
Saurabh Mashruwala
executiveI mean, that is a question for the long term, and it needs an answer. I think there are 2 approaches here. One is to bundle a gas based power plant with renewable and provide RTC power, or to have battery storage and give our RTC power. So it is too premature right now to say which technology or which approach would go going forward. But India has 24 gigawatts of gas based power plants, which can be effectively utilized for managing the intermittency of the grid. Now how it will be utilized, right now there is no clarity on that.
Devam Modi
analystAnd lastly, what more is there—I mean, we've announced a few acquisitions. Those relate to solar and wind. They aren't included in the current capacities, the ones being commissioned or already set up. So what amount is going to come in? And what payout will take place toward <<inaudible>>?
Saurabh Mashruwala
executiveOn the new acquisition side, whatever we announced, that was last year. So any new...
Rahul Shah
executiveWe haven't made any new acquisitions.
Saurabh Mashruwala
executiveWhen it comes to renewables, there weren't any new acquisitions at all.
Devam Modi
analystDo those acquisitions you've announced already figure into the current pay?
Saurabh Mashruwala
executiveRight, definitely, definitely. That happened <<inaudible>> during the previous year, and 1 acquisition is going to land either in Q1 of this year. So the equity is already included in the current figures.
Operator
operatorOur next question is from Bhavin Vithlani of SBI Mutual Funds.
Bhavin Vithlani
analystNice results — congratulations. I've got a couple of questions, so forgive me if this has already come up. For the distribution license we just acquired in DNH, what CapEx are we now expecting?
Saurabh Mashruwala
executiveRegarding DNH, our plan is to spend roughly a minimum of INR 500 crores in capital expenditure over the coming couple of years — or I'd put it at 3 to 5 years, actually. That's what we're planning for.
Bhavin Vithlani
analystIs that INR 500 crores each year, or INR 500 crores in total?
Saurabh Mashruwala
executiveNo, not at all — I mean cumulative CapEx.
Rahul Shah
executiveThe area isn't all that big, so the CapEx figures for it wouldn't be very large either. On top of that, CapEx would be higher at the start and then come down. As Saurabh mentioned, INR 500 crores would be spent cumulatively across a period of 3 to 5 years. For the near term, though, it will be on the higher side and will steadily decline.
Bhavin Vithlani
analystRight. And what kind of CapEx should we be expecting in Ahmedabad and Surat from '25 onward?
Saurabh Mashruwala
executiveStarting in '25, I think we should look at roughly INR 750 crores to INR 1,000 crores of CapEx in Ahmedabad and Surat.
Bhavin Vithlani
analystOne final question. Regarding the DNH for wind in particular, those figures have been on a downward path. On Slide 22, in the chart at the bottom left, they've dropped from 30% in '19 to 24%. Could you provide a bit more detail on that? And am I right that the assumption underneath is a 35% PLF for assets that are newly constructed?
Saurabh Mashruwala
executiveNo, I think over the last couple of years, wind — wind has shown a reduction in the PLF because the wind resource hasn't been so robust. But I think we're now seeing it improve, and we're hopeful that it should improve over the next couple of years.
Bhavin Vithlani
analystSo at what level do you get a 12% IRR on those newly constructed assets? And what assumption are you using for PLF?
Rahul Shah
executiveAll right. So I believe this will vary from one site to another. When you mention a newly built asset, we're dealing with 115 megawatts, and that's slated to come online in June of this year — so essentially next month. For that, the PLF assumptions would land somewhere around 35% to 40%.
Operator
operatorOur next question is from Shreya Mehta with Equitas Investment.
Analyst
analystLet me start with my first question, which relates to gas prices coming down. What kind of advantage does that give us, and starting at what point?
Saurabh Mashruwala
executiveCheaper gas means we can provide more of it to the power project we run on gas — the one that feeds gas into our own distribution territory. As a result, we won't need to look outside for power purchases, and distribution will — it still benefits our distribution territory by bringing down the overall power — the overall market for purchased power, and that has to be recovered even through regulatory efforts as well.
Analyst
analystSo should we expect to see that effect starting in the next quarter? And how large would the impact be in terms of quantum?
Saurabh Mashruwala
executiveYeah, so on profitability, I’d say the extra profit is going to come from merchant power generated by the gas-based plants. In India, H1 usually sees the biggest volumes—or the strongest demand—for power. This year, though, we probably won’t get much of a lift in merchant sales, since gas prices are high for our gas-based power plant. Looking ahead, we expect gas prices to ease further, and at that point we’d want to lock in contracts on a long-term basis, or at least a medium-term basis, to cover our own distribution needs—that should help us bring down the total cost of supplying power to Ahmedabad, Surat and our own license distribution areas. And that will help us bring down our regulatory assets. So where profitability is concerned, this doesn’t affect it, because variable cost is a pass-through for us—but it will help us lower the cost of power, which in turn should help us recover regulatory assets that got built up last year.
Analyst
analystOkay, regarding merchant power: we won’t see the benefit in H1 of this year, but possibly next year, since the gas-price flow and the potential agreements we’d enter into would help it in FY ’25 H1.
Rahul Shah
executiveMy take is that covering now would be premature, since every one of those long-term deals is a variable-price contract rather than a fixed-price one. So once more, when next year comes around, we'll need to look at where things stand on gas prices and what merchant prices can be secured. It's therefore a highly opportunistic play, and providing guidance on it going forward isn't something you'll be able to do.
Analyst
analystWhat is the reason we wouldn't be able to get lower gas prices for H1 of the current year?
Rahul Shah
executiveThe reason is that prices were higher. So in effect, procuring gas takes you 1 month. Even if you place the order right now, getting that LNG will take 15 days to 30 days, depending on where the cargo is located. And on top of that, you have no idea what merchant prices will be 1 month from now.
Operator
operatorThank you. Ladies and gentlemen, that brings the question-and-answer session to a close. At this point, I'd like to turn the conference back over to management for some closing remarks.
Saurabh Mashruwala
executiveThanks a lot for being on the Torrent Power call. We want everyone to remain safe and well. Many thanks to all of you. We'll get together again in the coming quarter. Thank you very much.
Operator
operatorAppreciate it. That brings us to the end of this call for Torrent Power Limited. Thanks for being with us. You can go ahead and disconnect your lines now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.