Good day, everyone, and welcome to Torrent Power Limited's Q4 FY '24 earnings conference call. <<operator_script>> Kindly be aware that this call is being recorded. At this point, I'll turn the conference over to Mr. Saurabh Mashruwala, CFO of Torrent Power Limited. Thank you, and the floor is yours, sir.

Saurabh Mashruwala

executive
#2

Good evening, everyone, and thanks for being on Torrent Power's earnings call for Q4 FY '24. To start, I'll walk you through how we performed in the quarter and for the full year, and after that we'll open the phone lines for the Q&A session. Let's begin with the company's performance at the PBT level. Reported PBT for the quarter came in at INR 617 crores, versus INR 668 crores in the same quarter a year ago. The main factor behind the lower profit this quarter is lower net gains from the sale of LNG — INR 91 crores, compared with the corresponding quarter last year. To give you a better picture of how the company performed, let me walk you through the nonrecurring items. In the current quarter, there are no nonrecurring items. The nonrecurring items in the corresponding quarter last year, that is Q4 FY '23, include 3 nonrecurring items for that last quarter — the comparable quarter of last year. First, profit of INR 50 crores accounted in the license distribution area of the DNH & DD, which was reported in the first 3 quarters of FY '23. However, it was accounted for during the course of Q4 FY '23.

Saurabh Mashruwala

executive
#3

The reason we deferred accounting for the incentive was that there wasn't clarity on whether it qualified, since FY '23 was DNH & DD's first year of operations. The regulatory approval was in place, and the full incentive amount relating to FY '23 was booked in Q4 so as to comply with the applicable regulations. So I want to make clear here that the whole incentive amount for the first quarter of FY '23 was accounted for in Q4 of last year. As a result, there is no nonrecurring item that needs to be considered for the full-year accounts. Second, INR 35 crores of solar incentive were booked on account of solar rooftop installation in our license distribution area. And the third item: as a policy, we recognize carrying cost as income only once regulatory approvals are in place. That is when the regulator issues a tariff order. Last year, we received the tariff order on 31st March '23. And so INR 21 crores was accounted as revenue in FY '23 itself. In the current year, tariff orders have been deferred because of elections. Therefore, we have not recognized any carrying cost income for Q4 of the current year.

Saurabh Mashruwala

executive
#4

Net nonrecurring credit came to INR 106 crores in Q4 of FY '23. Taking those nonrecurring items together with LNG gains, net PBT for the quarter was INR 617 crores, versus INR 471 crores in the comparable quarter a year earlier — that's higher by INR 146 crores, sorry, a growth of about 31%. The profit improvement came from better performance in the underlying businesses of thermal and renewal generations. The business factors behind the company's performance are as follows: First, thermal generation business overall contribution improved by INR 132 crores, mainly due to 2 factors. First, net gain from higher offtake under the long-term PPA was INR 47 crores, and gain from sale of merchant power was INR 85 crores. During the quarter under consideration, merchant capacity was operational for sale of merchant power for 770 megawatts under the NVVN tender for the sale of power and for sale of power in the exchange as well. The current demand and supply situation in the electricity market is favorable for generators, since no major investment has been made on thermal capacity in the past. The moderation in LNG price globally gives us a good opportunity to run the -- run our <<inaudible>> gas-based power capacity of 1.5 gigawatt.

Saurabh Mashruwala

executive
#5

Thermal generation's overall PLF went up from 18% to 35%, driven by stronger long-term sales as well as merchant sales. Next, beyond that, the renewable segment's profitability rose by INR 26 crores, thanks first to a better PLF at the wind power project and to the contribution from the 1.5 megahertz SECI-V wind project that was commissioned in July '23, and that was partly offset by a lower PLF at the solar power plant. And third, the gains from the generation segment mentioned above were partly offset by a reduction of INR 22 crores in the contribution from the distribution business, mainly because of 2 factors. First, T&D losses were marginally higher, more particularly in Ahmedabad, and carrying cost charges were higher owing to an increased regulatory gap of INR 900 crores. That wraps up the explanation of the financial performance for the quarter. Now I will summarize the key reason for the yearly financial performance as compared with the last year. Reported PBT for the year stood at INR 2,583 crores as compared to INR 3,041 crores in FY '23. The major reason for the lower profit during the year is a lower gain — net gain, I would say — from the sale of LNG amounting to INR 942 crores.

Saurabh Mashruwala

executive
#6

No nonrecurring current items showed up this year. As we explained earlier, the nonrecurring item in FY '23 came from solar incentives of INR 35 crores and carrying cost of INR 21 crores, which totals INR 56 crores. Since that's for the above, 2 items essentially — the LNG gain as well as this — INR 56 crores of nonrecurring items. PBT for the current quarter stood at INR 2,583 crores versus adjusted PBT of INR 2,043 crores in previous years, resulting in a loss of INR 540 crores, which is a growth of 26%. Beyond that, the underlying business across coal generation, gas generation, and renewable generation showed profit improvement during the year. That completes the explanation of financial performance for the year. Moving on, we'll now give a brief update on the project under pipelines. 3 gigawatt capacity on a DC basis of renewable power projects are in pipeline, which includes the following projects. First, a 420 megawatts solar project having PPA capacity of 300 megawatts with our own DISCOM, it is likely to be commissioned by end of this quarter. As mentioned in the last quarter, the project is expected to have an improved return profile considering the recent reduction in solar module prices in interest market.

Saurabh Mashruwala

executive
#7

The expected cost for this project is INR 1,800 crores. Next, the 300-megawatt SECI XII projects — the SECI XII wind power project — had its PPA executed at the end of March '23, and a turnkey EPC contract for developing the project has been awarded to Suzlon. The project's SCOD is expected to be December '25. Its expected cost is INR 2,500 crores. A 200-megawatt merchant hybrid project — made up of 120 megawatts of wind and 75 megahertz of solar — is being developed under the Airpower wind farm. Implementation is on track. The plant should be commissioned progressively by December '25. Since power from this project will be sold directly into the merchant market, revenue will begin right from the first part of commissioning, as evacuation infrastructure is already in place. The expected cost of the project is INR 1,400 crores. Fourth, an 825-megawatt hybrid project, with PPA capacity of 450 megawatts with our own DISCOM, comprising 486 megawatts of wind power projects and a 339-megawatt solar project, was awarded through the bidding process at a fixed tariff of INR 3.65 for 25 years. The LOA for the project has been awarded, and the PPA for the project is actually likely to be executed in the current quarter.

Saurabh Mashruwala

executive
#8

For this project, SCOD is 24 months from the PPA date, and implementation is expected at a project cost of INR 5,500 crores. Fifth, a 368 MW hybrid power project — consisting of 224 megawatts of wind plus 144 megawatts of solar — was awarded via a bidding process run by the Indian Railway, at a fixed tariff of INR 4.25 for 25 years. The LOA has been awarded for this project, and the PPA is expected to be executed during the current quarter. That project's SCOD is 24 months from the PPA date, and implementation is likely at a project cost of INR 2,600 crores. Sixth, 425 megawatt solar projects with <<inaudible>> capacity of 306 megawatts were awarded through a bidding process conducted by MSEDCL, at a fixed tariff of INR 3.10 for a period of 25 years. The LOA for this project has been awarded, and the PPA has been executed. SCOD for the project is September '25, and implementation is likely at a project cost of INR 1,550 crores. Seven, a 100 megawatts wind power project awarded through competitive bidding conducted by SECI XVI at a fixed tariff of INR 3.60 for a period of 25 years.

Saurabh Mashruwala

executive
#9

The LOA for this project has been awarded, and we expect the PPA to be signed during the current quarter. The project's SCOD will be 24 months from the PPA date, and it is expected to be commissioned—implemented at a project cost of INR 925 crores. The most recent one, number 8, within the C&I portfolio company, has 435 megawatts of projects under development, made up of 395 megawatts of solar and 40 megawatts of wind capacity. Of that 435-megawatt capacity, 34 megawatts was already commissioned as of the end of the year, and the remaining capacity is expected to be commissioned in stages over the next 2 years. The project cost is anticipated to be roughly INR 1,900 crores. Beyond renewable energy projects, the company has been developing 2 transmission projects, as follows: first, the Khavda transmission project under Torrent Power Grid, a joint venture between Torrent Power and Power Grid Corporation Limited, which was awarded to the company on a nomination basis under the regular tariff mechanism, with post-tax ROE equal to 15% plus incentives. The project cost is expected to be INR 800 crores. Second, the Solapur Transmission project under a new SPV, which the company won through a tariff-based competitive bidding process conducted in Q4 FY '24, at an annual fixed cost of INR 50 crores per annum for 35 years.

Saurabh Mashruwala

executive
#10

We expect the project to cost INR 470 crores. That's along with the investment just mentioned in renewable and transmission projects. The company's investment plan is roughly INR 20,000 crores over the next 2 to 3 years, per year. Now turning to the new venture. First, the company's pilot project on green hydrogen with CNG in UP — 1 of the largest private sector blending projects in India — which had been expected to be commissioned by end of March '24, has been delayed and will now be commissioned very soon. In addition, the company has received an allocation of 18 Ktpa of green hydrogen project under the SECI PLI scheme, the PLI tender, at an average PLI of 28.89 per Kg. Technical feasibility has been completed, and a detailed business plan is being prepared for this project. Regarding the pump storage hydro project in Maharashtra, as previously informed, at present we are — at present, we have signed an MOU with Maharashtra for 3 pump storage hydro projects with a total capacity of 5.7 gigawatts, expected to be commissioned in 5 years, per year, for an investment of INR 27,000 crores. Also, MoEF has granted terms of reference for 2 sites of 4.2 gigawatts, and a DPR is under preparation for these 2 projects; depending on central and state government policy, we plan to develop the PS — this pump storage hydro project.

Saurabh Mashruwala

executive
#11

We're also looking at comparable possibilities in other states such as UP, Gujarat, MP and Rajasthan. The process of securing the necessary approval has been started by us. It might be provided either as a storage solution or by delivering renewable power solutions with high CUF and high RTC. That covers everything for this quarter. I'll now ask the coordinator to open the line for the Q&A session. During the Q&A session, we want everyone to stay safe and healthy. Thank you. I'm handing things over to the operator.

Operator

operator
#12

<<operator_script>> Satyadeep Jain from AMBIT Capital has the first question on the line.

Satyadeep Jain

analyst
#13

I have a couple of questions. First, regarding the agreement you have with NVVN, how many units were sold under that agreement during this quarter?

Saurabh Mashruwala

executive
#14

Thus, we’ve begun delivering, and the minimum guaranteed quantity has already been fulfilled with NVVN.

Satyadeep Jain

analyst
#15

Is it possible to say how many units that would be?

Saurabh Mashruwala

executive
#16

No. But the guaranteed volume — the minimum guaranteed offtake amount — has already been fulfilled. They've taken every minimum guaranteed quantity up to now. So the minimum commitment is done.

Satyadeep Jain

analyst
#17

The whole—I think—I believe it was 38 crore units, or something like that.

Saurabh Mashruwala

executive
#18

The minimum amount they must purchase is 388, and we've provided that to them.

Satyadeep Jain

analyst
#19

Alright. The second one falls under merchant power sales, and I just want to get a handle on Section 11. On the earlier call, if I recall correctly, you mentioned a variable cost of INR 6 back then, given LNG prices at the time — so how should we think about how Section 11 would operate when it comes to benchmark cost? And what level of margin might you be able to earn from that?

Saurabh Mashruwala

executive
#20

Right now, under Section 11, the government initially set a timetable running through 31st of May. So we began supplying under Section 11 over the last 10 days — 10 days. The government has started drawing that power. And they've provided a schedule extending to the end of this month. So we are supplying — we've begun supplying merchant power under Section 11.

Satyadeep Jain

analyst
#21

Since you're already providing that, is it possible for you to quantify the benchmark cost at which you're supplying?

Saurabh Mashruwala

executive
#22

Right now it's roughly INR 10. We're providing something in the neighborhood of INR 10 — approximately INR 10.

Satyadeep Jain

analyst
#23

Alright, so…

Saurabh Mashruwala

executive
#24

They used GAIL LNG costs as their benchmark. GAIL LNG costs served as their benchmark.

Satyadeep Jain

analyst
#25

And on your own costs — the variable costs — you mentioned last quarter it was around INR 6. Is it reasonable to think there's basically an INR 4 spread at the moment from that merchant power sale?

Saurabh Mashruwala

executive
#26

Essentially, that represents a 20% markup. When you examine the scheme, you'll see a 20% markup is offered relative to the — so I'd say it isn't all that significant.

Satyadeep Jain

analyst
#27

All right, and just very briefly regarding the DISCOM — I saw that demand growth at a few of the distribution entities, franchise and license, came in somewhat weaker, with even a negative trend Y-o-Y. What was behind that?

Saurabh Mashruwala

executive
#28

Demand is actually still robust. In fact, we're observing growth of roughly 4% to 5% in our demand, and the merchant market is going to stay strong as well — it remains strong. That's what we expect.

Satyadeep Jain

analyst
#29

I wanted to get a clearer picture of those entities — Bhiwandi, Agra, Dadar and Nagar Haveli — and looking at them year over year, demand appears quite weak, and in some areas it's even negative. Is there a specific reason for that?

Saurabh Mashruwala

executive
#30

When we look at Q4, overall demand looks fine. But since Q1 falls in the summer, we expect — yes, Q4 should stay strong, and then Q1.

Satyadeep Jain

analyst
#31

All right. So even though year-over-year demand growth in Q4 was flat to down, Q1 ought to accelerate?

Saurabh Mashruwala

executive
#32

I'd say the decline was limited to Bhiwandi. When you look at Agra or at SMK, both of those actually rose. Bhiwandi tends to be more of an industrial zone. So quarter to quarter, you'll see some swings. Still, looking at the overall trajectory, we don't see any reason demand should soften.

Operator

operator
#33

Our following question comes from Ketan Jain at Avendus.

Ketan Jain

analyst
#34

I'll start with my first question.

Operator

operator
#35

Apologies for cutting in. Mr. Jain, we’re having trouble hearing you — the connection isn’t clear.

Ketan Jain

analyst
#36

Has it improved at this point?

Operator

operator
#37

That's a lot better. Yes, sir, go right ahead.

Ketan Jain

analyst
#38

I'd like to ask, sir, how much EBITDA came from merchant sales and from LNG sales in FY '24 versus FY '23?

Saurabh Mashruwala

executive
#39

We don't usually provide a specific EBITDA figure. At present, we do report EBITDA numbers in our segment reporting. So, for Q4, if you check the EBITDA for the generation business, we basically reported roughly INR 324 crores of EBITDA for generation. Renewables come in at around INR 228 crores, while transmission and distribution is approximately INR 673 crores. For Q4, total EBITDA stands at about INR 1,200 crores.

Ketan Jain

analyst
#40

Sir, could you give us a breakdown of generation? What portion comes from merchant, and what portion from LNG?

Saurabh Mashruwala

executive
#41

So we’re able to report total EBITDA for the generation projects. So no separate figures are available for the merchant.

Ketan Jain

analyst
#42

All right, sir, moving on to my next question: for FY '25, what PLF is expected for DGEN? And at present, what does the variable cost for DGEN stand at?

Saurabh Mashruwala

executive
#43

Regarding guidance for '25 for DGEN, we aren't in a position to give that. But everything hinges on the merchant market, and demand there is set to be very strong. So we anticipate greater utilization of DGEN power as we move ahead.

Ketan Jain

analyst
#44

So, essentially, would that be anything above 20%, sir?

Executive

executive
#45

To be clear, we aren’t providing formal guidance as such. Still, when you review the past 2 years or 3 years, the PLF at our gas-based power plants has kept improving, largely because of the long-term PPAs we hold and also because of the merchant market. And looking ahead at the demand-supply situation, we believe demand ought to stay robust relative to the supply that is available within the country. So we expect every power plant in the country to post a higher PLF. As for precise guidance as such, we aren’t giving any at this point.

Ketan Jain

analyst
#46

All right, all right, got it, sir. And if we assume roughly INR 7 to INR 8 of variable cost for DGEN, would that be correct, sir?

Executive

executive
#47

Everything hinges on the pricing for gas and LNG.

Ketan Jain

analyst
#48

If gas prices are holding steady at the moment, in line with what they are today.

Saurabh Mashruwala

executive
#49

When it comes to the variable cost, that's typically $10 to $11 per se — INR 660.5. So look, for merchant EBITDA, you can assume roughly INR 85 crores for Q4.

Ketan Jain

analyst
#50

Alright. Alright, sir, are there any further agreements we're aiming to sign, similar to the one we signed with NTPC? Are there any additional deals we're looking to sign, short term?

Saurabh Mashruwala

executive
#51

We serve the merchant market, and we regularly handle the short-term contract work.

Operator

operator
#52

Swati Jhunjhunwala from JM Financial has the next question on the line.

Swati Jhunjhunwala

analyst
#53

I just wanted to ask, first, was there any specific reason that the T&D loss in Ahmedabad came in higher?

Saurabh Mashruwala

executive
#54

It's seasonal variation, so I'd say there isn't any particular reason. Sometimes this happens -- because of seasonal variation, it has occurred. There's no specific reason.

Swati Jhunjhunwala

analyst
#55

Got it. And then secondly, on CapEx. Could you point out what the CapEx figure is for FY'24? And would you be able to split that out by segment?

Saurabh Mashruwala

executive
#56

On CapEx for the whole year, I can provide the full-year figures: for the license distribution business across Ahmedabad, Surat, Dahej and Dholera, we've spent roughly INR 1,666. Our franchisee distribution side came to INR 243 crores of CapEx. The remaining CapEx stands at INR 106 crores. So total CapEx — excluding renewal, I'd say — comes to around INR 2,000 crores.

Swati Jhunjhunwala

analyst
#57

Got it. So that INR 106 crores balance — what would it be for?

Saurabh Mashruwala

executive
#58

So for other similar areas like MJ and coal-based projects, plus other areas, we've incurred CapEx in the license and franchisee distribution area. Sugen also has some gas projects, and some CapEx has been incurred there; on the coal-based project, some CapEx has been incurred.

Swati Jhunjhunwala

analyst
#59

Got it. And sir, could you provide the net generation figure for FY '24? I believe that one isn't included in PBT this time.

Saurabh Mashruwala

executive
#60

Which figure are you referring to?

Swati Jhunjhunwala

analyst
#61

The net generation figure for every plant.

Saurabh Mashruwala

executive
#62

We’ll provide that figure separately, after the call. We’ll share it offline.

Operator

operator
#63

Our following question comes from Sumit Kishore with Axis Capital.

Sumit Kishore

analyst
#64

I'd like to start with the capital expenditure target for FY '25 and FY '26. Could you break that down across renewables, the transmission projects you're working on, and the regulated and franchisee distribution business?

Saurabh Mashruwala

executive
#65

Sumit, regarding CapEx for our distribution license and franchisees, we're providing guidance of INR 2,000 crores. That guidance remains roughly INR 1,450 crores allocated to the license and INR 250 crores for the franchisee distribution area. Turning to renewables and transmission, the guidance is around INR 20,000 crores of CapEx plan that we have, so at least for the coming 2, 3 years. So the bulk of CapEx will be occurring over the next 2 years, I'd say, out of that INR 20,000 crores CapEx.

Sumit Kishore

analyst
#66

Okay. So it would also hinge on when the 0 date begins and the PPA is signed for a portion of the pipeline...

Saurabh Mashruwala

executive
#67

Right. Right. So that road map of ours is there for at least 2, 3 years. Right now we can see 3 gigawatt projects in the pipeline quite clearly. So the CapEx involved comes to roughly INR 20,000 crores, and that will be spent over the next 2, 3 years, each year.

Sumit Kishore

analyst
#68

And that comes on top of the CapEx you'd ordinarily have for...

Executive

executive
#69

That comes on top of the INR 2,000 crores of routine CapEx that we spend annually in our distribution area.

Sumit Kishore

analyst
#70

Understood. One thing in your presentation today: you referred to installed capacity, and that figure counts solar on a DC basis. I'm just curious—we previously discussed a target of 5 gigawatts for RE over the medium term. I mean, when you considered solar, did you look at it in DC terms or in AC terms, because...

Saurabh Mashruwala

executive
#71

We've got quite a few projects running on a hybrid basis now, essentially high CUF, and we're aiming for high CUF supply. So on supply — we're oversizing capacity given that high CUF requirement. Things are shifting, then. These aren't just plain vanilla solar and wind projects anymore. So — and that means we have to put in larger capacity. Which is why, starting this quarter, we're talking about DC capacity. DC capacity is going to come in much higher than the contractor capacity.

Sumit Kishore

analyst
#72

DC would stem from the AC-to-DC conversion ratio, though if you oversize, you'd still need to build out additional capacity measured in AC terms too, compared with, say, the 100-megawatt nameplate for a round-the-clock project — that's how I understand it. So what's the right way for us to think about this? I mean, these — there's an asterisk you put on the slide, which lists renewable energy projects in the pipeline at AC for wind and DC for solar.

Executive

executive
#73

Okay, Sumit, you're essentially correct. The AC-DC gap comes from two things. First, conversion losses mean you need more DC capacity in order to deliver the contracted AC capacity. And the second factor is the larger DC capacity required so the project can hit its CUF requirements. So in practice, whenever we take on a hybrid project, we examine how the PLF is shaping up and then settle on the overloading, which also takes the AC-DC conversion losses into account. So when you refer to 5 gigawatt of our target, that figure was our aspiration to reach 5 gigawatt. You can now call it AC capacity or call it DC capacity. It all hinges on how many projects we can win while meeting our returns. So on a DC capacity basis, that number could also end up higher.

Sumit Kishore

analyst
#74

Looking at the balance sheet, how do you view the net debt to EBITDA metrics? Or, in terms of taking on new projects beyond the CapEx aspiration you have, what bandwidth does the balance sheet offer? On the earnings side, regarding projects in hand — that's for pump storage hydro, I'm assuming — when do you break ground, since you're looking at substantial CapEx across the 5-year time frame? Some color on that would also be helpful.

Saurabh Mashruwala

executive
#75

Right now, the emphasis is on that INR 20,000 crores being put into renewable projects — both renewables and transmission. So as for our present balance sheet size — the ratios, I'd say the debt equity ratios and net debt-to-EBITDA ratios, are properly in place, I would say, and those will cover this INR 20,000 crores of investment. So in the end, considering the pump storage hydro project, it is 3, 4 years off from today — at least 3 years away from the current date. By then, we will be ready with our renewable investment, and we will be finished with this current investment.

Sumit Kishore

analyst
#76

So you're saying it's 3 years out before financial close and a groundbreaking?

Saurabh Mashruwala

executive
#77

It's a minimum of 2 to 2.5 years, since the approval process for pumped storage hydro projects takes roughly 2 years.

Sumit Kishore

analyst
#78

Okay, that's reasonable. One final thing from me about the 20% cap on returns for the ECR on your gas-based projects. From what I understand, the variable cost of the ECR comes to roughly INR 6.5, which would mean that 20% on that works out to INR 1.2 to INR 1.5 per kilowatt hour at the EBITDA level. Have I got that right?

Saurabh Mashruwala

executive
#79

Sumit, I believe there are additional charges that must be loaded onto this as well — things like the transmission cost of gas, the losses on the SHR, and all of those would need to be added to it. Now, one point is that this Section 11 will benchmark gas prices against the GAIL benchmark, which means our cost could be lower than what GAIL would sell at. We buy directly from international markets. So there will be some difference, or some additional benefit, that ought to come in from that account.

Sumit Kishore

analyst
#80

All right. So the spread has the potential to come in above our usual calculation, which assumes the variable cost — the reason being that it's benchmarked to GAIL. How does the GAIL benchmark rate compare with your procurement cost?

Executive

executive
#81

I’ll let you know. I mean, it’s not available as of — on hand, but let me give you one more pointer on this. If you look at CERC norms for SHR and O&M expenses and all, we are much below that at our existing plants, where we have a 2-part PPA. So I think that’s a key pointer for everybody to understand that our cost would be lower than what a normative 120% would calculate. So apart from 120%, there are 2 things we are able to gain. Our gas cost is lower. Plus, we are also going to get fuel efficiency.

Sumit Kishore

analyst
#82

I genuinely want to commend you on the momentum you've built in locking down a pipeline for renewable projects and transmission projects as well.

Operator

operator
#83

<<operator_script>> Our following question comes from Mohit Kumar at ICICI Securities Limited.

Mohit Kumar

analyst
#84

Sir, I have a few questions. First, regarding the approval you've obtained for the QIP to raise INR 5,000 crores — what's the reason behind raising this money? Are you planning a very high CapEx in the medium term that goes over and above what we just discussed right now?

Saurabh Mashruwala

executive
#85

What we're obtaining is enabling approval. So at this moment there isn't any actual intention. It's an enabling approval that we're securing, just as other companies are securing. So the present balance sheet size and our debt equity ratio are well and safe right now, and that can take care of this INR 20,000 crores investment, which we're going to invest over the next 2, 3 years' time. So the only thing is, it's an enabling approval we're taking. There's no such real concern at this moment.

Executive

executive
#86

So Mohit, looking at it at this moment, that INR 20,000 crores would be spread across 2 to 3 years, meaning my cumulative EBITDA — if I also take this year's run rate, which is INR 5,000 crores — that's a INR 15,000 crore EBITDA we're discussing, versus INR 20,000 crores of investments over 2 to 3 years. And with net debt-to-EBITDA currently at 2.25, we have enough balance sheet strength to handle the CapEx needs for these projects that are in the pipeline.

Mohit Kumar

analyst
#87

Got it. For that second question, can you put a number on the EBITDA from the renewables capacity you have coming online?

Executive

executive
#88

I believe the capital expenditure figures are there, and the tariff number is there as well. So I think that's a pretty straightforward bit of arithmetic right there.

Mohit Kumar

analyst
#89

So what's your ambition for the C&I renewables portfolio? Do you see an opportunity—a sufficiently big one—to grow it to 1 gigawatt, or 1 to 2 gigawatts, in, say, 2 to 3 years? Is that achievable?

Saurabh Mashruwala

executive
#90

There isn't a set figure, honestly. We've got what I'd call a decent beginning, and that's the 320-megawatt C&I portfolio we've built in. So going forward, we intend to grow that portfolio. But a specific number isn't something we can give. On the overall figures, though, yes — 5 gigawatts is the target we're currently working toward. So at this moment, no particular target exists for the C&I capacity.

Mohit Kumar

analyst
#91

Got it. So my final question relates to this — I think you're bidding on a couple of coal projects, such as SKS Power. If I'm not mistaken, NCLT has lifted a stay and directed the NCLT to reach a decision within 60 days. I believe the ruling didn't go your way, and I think we can file a fresh appeal, correct? Have you appealed, or do you think it's not?

Saurabh Mashruwala

executive
#92

No. As a matter of fact, what we're examining is a brownfield project. We aren't — we have never been considering a greenfield project or a coal-based project. If solid opportunities come along, then yes, we're keen to take a look.

Mohit Kumar

analyst
#93

Sir, my question concerned SKS Power. They were seeking to acquire from <<inaudible>>.

Saurabh Mashruwala

executive
#94

SKS Power is currently in litigation with the NCLT. I think that litigation will continue for at least another 2 months. We'll see how the litigations play out.

Operator

operator
#95

<<operator_script>> Our following question comes from Aniket Mittal at SBI Mutual Fund.

Aniket Mittal

analyst
#96

I want to go back to that INR 5,000 crores enabling resolution. Could you speak to it from, say, a 3- to 5-year view — which areas are you seeing growth in that might call for extra equity?

Saurabh Mashruwala

executive
#97

When it comes to the current investment, we're in good shape, I'd say, and there's still balance available to handle this requirement. So for the upcoming RE project, or any further project — these pump storage hydro projects — additional funding may be needed. So we'll see at that point what kind of — and this INR 20,000 crores investment will also begin generating EBITDA as well. So it depends on — I'd say, at what point we have to — it's an enabling resolution. Nothing is fixed right now, I'd say, on the QIP side. What we're taking is an enabling resolution.

Aniket Mittal

analyst
#98

All right. But in terms of how you're thinking about it, would you say it's mostly going to fall within renewables and pumped hydro — those 2 areas being where you might potentially <<inaudible>>

Executive

executive
#99

With the renewable pipeline we have at present, I believe we're well capitalized to fund those projects. Also, when it comes to pump storage or green hydrogen, if further opportunities arise and we choose to put financial investment into them, then at that moment, given the balance sheet and the cash flow, we'll need to seriously examine whether raising equity at that time makes sense first. On the second part, we're also reviewing a lot of acquisition opportunities. If a good opportunity is available, and whether it's a larger one, then at that point it becomes operationally very difficult for you to go and secure approvals. That's why these enabling resolutions are being taken. So if you look at our group companies as well, we have been taking enabling resolutions for a long time, and not a single rupee of equity has been raised. Unless there is a need and a justification for raising equity, I think we would — as a group, we will not be doing an equity raise.

Aniket Mittal

analyst
#100

All right, that's useful. Just 2 smaller questions, and these relate to the opening remarks you made. In one of those opening remarks, you talked about incentives worth INR 50 crores that the DNH & DD had earned last year. What exactly are those incentives for, if you could shed some light on that?

Saurabh Mashruwala

executive
#101

Essentially, last year marked DNH & DD's fourth year of operation. And we weren't certain regarding the incentive — basically the one stemming from T&D losses and O&M expenses — since during the first 3 quarters we didn't know whether it would accrue to us. Clarity came in the fourth quarter, when it became available that this incentive does belong to us. That's what we recognized in Q4 last year.

Aniket Mittal

analyst
#102

All right. But on which line item or which loans are these incentives actually being earned?

Saurabh Mashruwala

executive
#103

Operations and maintenance plus transmission and distribution loss.

Executive

executive
#104

Aniket, just to make things clear, every one of these incentives is available — we weren't certain which portion would flow through to us and which portion we'd have to retain. That's the reason those incentives weren't booked in Q1, Q2 and Q3. As soon as we had that clarity, we booked them in Q4 itself, and INR 50 crores of that related to Q1, Q2 and Q3. So when you look at the full year, there's no normalization. But for last year's Q4, it was a onetime INR 50 crore gain that got booked.

Aniket Mittal

analyst
#105

Understood. One final question, then. If we look at Q4 versus Q4 on a Y-o-Y basis, what is the difference in, say, the profit you made from LNG and merchant for the delta — could you just provide that figure?

Saurabh Mashruwala

executive
#106

Regarding LNG, as we mentioned — on the merchant side, we stated that we generated a profit of roughly INR 85 crores in Q4.

Aniket Mittal

analyst
#107

And what would that figure have been in Q4 of last year?

Saurabh Mashruwala

executive
#108

Regarding Q4 of last year — that isn't significant, I would...

Aniket Mittal

analyst
#109

And what sort of difference would we see on LNG sales?

Saurabh Mashruwala

executive
#110

Delta items account for INR 85 crores.

Aniket Mittal

analyst
#111

Regarding delta — and where LNG sales are concerned, what is that delta compared with the same period a year earlier?

Saurabh Mashruwala

executive
#112

For the entire year, that comes to INR 942 crores.

Aniket Mittal

analyst
#113

This falls under the...

Saurabh Mashruwala

executive
#114

On the LNG side.

Aniket Mittal

analyst
#115

Regarding EBITDA measured on a 4Q basis, what would that figure come to year over year?

Saurabh Mashruwala

executive
#116

Correct — we’re talking about it on an EBITDA basis.

Aniket Mittal

analyst
#117

All right, so for the full year, that comes to INR 942 crore.

Saurabh Mashruwala

executive
#118

Correct.

Operator

operator
#119

Up next, we have a follow-up question from Mohit Kumar, who is on the line from ICICI Securities.

Mohit Kumar

analyst
#120

My question is this: can you share with us the revenue and profit figures for the Daman and Diu distribution business in FY '24?

Saurabh Mashruwala

executive
#121

So we’re giving the distribution figure to <<inaudible>> — just 1 second. Then for Daman and Diu PBT, what I’d say is that we can provide the subsidiary companies’ numbers separately. So PBT comes to roughly INR 184 crores for the current year.

Mohit Kumar

analyst
#122

Alright, got it, sir. For my second question, it's about Shil and Kalwa. I believe we've reached 30% there. But I think you also mentioned during the presentation that 12% is achievable — is that right — and in your view, how long would it take us to get to 12%? Would that be 3 years, 4 years, just some rough sense of it, sir.

Saurabh Mashruwala

executive
#123

Each year, based on what we've delivered historically, we manage to achieve a 3%, 4% gain. That run rate is something you can apply to the coming couple of years as well.

Mohit Kumar

analyst
#124

My final question concerns the parallel licenses. If I'm not mistaken, you had submitted applications for several of those licenses in Maharashtra. Sir, is there any update, or any timeline you think the regulator might follow in deciding on this?

Saurabh Mashruwala

executive
#125

At this point, nothing new to report. In fact, every question and query raised by the regulator, MERC, has been answered by us. So our hope is that after the election, they might take a call on this particular item. Perhaps they are waiting for the Maharashtra election to finish.

Operator

operator
#126

Our following question comes from Dhruv Muchhal, who is on the line from HDFC Asset Management Company.

Dhruv Muchhal

analyst
#127

The renewable specifics in the presentation are quite useful. So the single question I had concerns project cost — if I look at the costs for particular projects, say a few of our wind projects, they come to roughly INR 8 crores to INR 9 crores per megawatt. That looks like it's on the higher side. So what am I missing, sir? Is there a lot of conservatism built in, or is the cost really this high?

Saurabh Mashruwala

executive
#128

That's a fair cost. We attempt to — once we take on those costs, we'll find out. This is the fair cost that we've calculated.

Executive

executive
#129

As of right now, Dhruv, there are certain contingencies included. Still, from what our estimates show, I think we'll land near this cost. Some savings might come out of the contingencies that have been built in. That said, at this point, we can treat this as the cost.

Dhruv Muchhal

analyst
#130

Alright. So from what you're saying, these figures represent the expenses involved — what I mean is, when it comes to executing on the ground, these costs are going to show up. In other words, once actual execution happens, the expense should land at roughly these amounts.

Saurabh Mashruwala

executive
#131

Correct.

Dhruv Muchhal

analyst
#132

But even when it comes to solar — take TPLD solar as an example — the cost runs roughly INR 6 crores for each megawatt. So it does look like your costs are on the higher side even in solar. I'm just trying to get a sense of what might be behind that.

Executive

executive
#133

Regarding solar, what you're doing is based on contracted capacity. So when I look at things on a 420-megawatt basis, it isn't that high.

Dhruv Muchhal

analyst
#134

Alright. We previously assumed the costs would be — I mean, even taking the duty into account, I mean, the Chinese duty of <<inaudible>>, the cost wouldn't exceed INR 4.5 crores per megawatt at the AC level, but ours comes to roughly INR 6 crores. So just trying to...

Executive

executive
#135

So, what I believe we're doing here is -- no, I'd say this is a reasonable estimate of the cost as we understand it.

Dhruv Muchhal

analyst
#136

Right. And since those are under PPA, you'd have them contracted. Take wind as an example — that would already be locked in. So these cost estimates are pretty reasonable — in effect, you've secured your supplies.

Saurabh Mashruwala

executive
#137

Regarding the TPLD solar project of <<inaudible>>, I'd describe it as being in commissioning.

Operator

operator
#138

Moving on, our following question comes from Sumit Kishore at Axis Capital.

Sumit Kishore

analyst
#139

Can you give us the regulatory assets for FY '24 in your distribution areas? And what change has that number seen compared with FY '23?

Saurabh Mashruwala

executive
#140

Therefore, the regulatory asset for this year has increased by roughly INR 900 crores. And the figure I can give — it's around INR 2,670 crores, versus the ideal figure of INR 1,724 crores.

Sumit Kishore

analyst
#141

I'd call that a fairly meaningful jump in regulatory assets, even when you look at it as a percentage — so where is it concentrated, and can you give us some color?

Saurabh Mashruwala

executive
#142

The primary source is DNH & DD, and that figure will decrease over the course of this year.

Sumit Kishore

analyst
#143

So the remaining <<inaudible>> weren't permitted a certain tariff increase, which was the correct call.

Saurabh Mashruwala

executive
#144

Yeah, I'd say it's going to arrive very soon.

Sumit Kishore

analyst
#145

All right. And on this 26, are you recording a carrying cost against the regulatory assets?

Saurabh Mashruwala

executive
#146

The way we book carry cost is tied to when the order is received, rather than on an accrual basis.

Sumit Kishore

analyst
#147

Understood.

Executive

executive
#148

So in practice, Sumit, the interest cost has already been incurred, but that carrying cost isn't recorded as income — and that's precisely why there's conservatism in the figures as well.

Sumit Kishore

analyst
#149

Therefore, it isn’t recorded using accrual accounting—it gets recorded based on actual cash.

Saurabh Mashruwala

executive
#150

When it comes to carrying costs, here's what I'd say about that.

Sumit Kishore

analyst
#151

Right. It isn't recorded using accrual accounting?

Executive

executive
#152

Yes.

Sumit Kishore

analyst
#153

All right, that's helpful to know. Okay. So essentially, nothing is rising in Ahmedabad or Surat — I mean, those places are continuing as they normally do.

Executive

executive
#154

No, no — there is a rise. Ahmedabad also shows a rise, and there is — so essentially, volumes, since volume share volumes in Ahmedabad, that city is seeing a rise too; the bulk of it comes from DNH & DD. Still, Ahmedabad likewise has an increase.

Sumit Kishore

analyst
#155

Alright. Then for my second question — what's the overall CapEx you're anticipating, broadly speaking, for the CapEx that has to be undertaken as part of the PLI — sorry, not the PLI, I mean the SECI PLI scheme — right, the SECI site scheme.

Saurabh Mashruwala

executive
#156

The way we see it, preparation is really where the plan comes together. So we aren't — at this point we're not providing any numbers.

Sumit Kishore

analyst
#157

All right, so this covers green nitrogen production at a rate of 18,000 tonnes per annum, correct.

Saurabh Mashruwala

executive
#158

Yes.

Sumit Kishore

analyst
#159

Right. And just to understand this conceptually, when you think about pumped storage hydro — the CapEx is some time off before it starts. But that doesn't include the CapEx you'd need for, sort of, charging the water battery. Meaning the renewable capacity that would be needed to pump the water up isn't included in your...

Saurabh Mashruwala

executive
#160

That's right. Without a doubt.

Sumit Kishore

analyst
#161

So conceptually, you'd be weighing whether to handle that CapEx on your own or purchase it from the grid — what's the thinking there, since that's also going to involve substantial CapEx?

Executive

executive
#162

So what I mean is, we haven't settled yet on which model we'll end up using. Once we can see approvals coming through, I think that's when we'll begin to examine how we want to lock things in for ourselves — whether we go with a lease model, or whether we want to lower RTC supply, which would happen through this storage solution. That will depend — I mean, that will also give us CapEx estimates, because if you do an RTC power, then renewable will also have to be put up.

Operator

operator
#163

We’ll take the next question from Bhavin Vithlani, who is on the line from SBI Mutual Fund.

Bhavin Vithlani

analyst
#164

I missed the beginning there. Could you help me — let's say you reported EBIT of INR 5,140 crores last year and INR 4,900 crores this year. If you could help me with this: what was LNG in your EBITDA last year, and what is it this year? And similarly, what was merchant income last year and what is it in the current year? So basically I want to know the <<inaudible>>, if you can help me with that.

Executive

executive
#165

The LNG delta comes to INR 942 crores.

Bhavin Vithlani

analyst
#166

Alright. Could you give me the exact figure for last year? And it would be helpful to know what it was this year.

Executive

executive
#167

Bhavin, we won’t be sharing that figure. But what we can say is that on a delta basis, it comes to INR 942 crores, since for the past 2 years we have been providing delta numbers.

Bhavin Vithlani

analyst
#168

Therefore, we see a decline amounting to INR 900 crores...

Executive

executive
#169

You've got it. That is correct.

Bhavin Vithlani

analyst
#170

All right, so that's a drop of INR 900 — and what about the merchant side, could you walk me through that?

Executive

executive
#171

The merchant figure would come to roughly INR 400 crores.

Bhavin Vithlani

analyst
#172

All right, and that represents a rise.

Executive

executive
#173

Yes.

Bhavin Vithlani

analyst
#174

All right, so on the second question — I was just going through your presentation. In earlier discussions, as you'll remember, someone brought up a different circle where you hold the parallel licenses. Has the regulator also signed off on that one, the one nearer to Ahmedabad, or is it still being worked through with GERC?

Saurabh Mashruwala

executive
#175

This will be MBSIR. It's close to Mehsana, Becharaji. So that — so we've begun work there.

Executive

executive
#176

This is still at a really early stage right now, which is the reason it wasn't included in the presentation. Work there has only just gotten underway.

Bhavin Vithlani

analyst
#177

Okay, any hint — say, could you give us some sense of how large that consumption is, either in megawatts or in terms of end use, just so we get the order of magnitude regarding how important that circle is?

Executive

executive
#178

This is a special investment region, and right now we don’t have the specifics on exact consumption. Once we’ve got enough details available, we’ll let you know.

Bhavin Vithlani

analyst
#179

Sure. And then, second, you hold the license in Dholera, and we've seen a few semiconductor plants announced in Dholera. If you could — I mean, have they come to you regarding what kind of power requirement they would need? What kind of — as a result, what kind of investment do we need to put into Dholera.

Saurabh Mashruwala

executive
#180

At first, you’re going to have that construction power need. So the precise amount of power required will be figured out as we move ahead. At the outset, it’s just the construction power requirement.

Executive

executive
#181

They’re also finalizing their plans at the moment — and that’s why it’s hard to say what the estimate would be or what their plans would be for drawing power from the grid.

Operator

operator
#182

Thank you. <<operator_script>> Sir, Mr. Bharanidhar Vijay Kumar has just sent in a question at the last minute. Shall we go ahead and take it?

Bharanidhar Vijayakumar

analyst
#183

Is my voice coming through?

Operator

operator
#184

Sir, you're coming through quite faint. So if you're on speakerphone, could we ask you to switch over to the handset, please.

Bharanidhar Vijayakumar

analyst
#185

Yes, I'm on my handset. So my first question is just to get clarity on this delta regarding merchant sale EBITDA in FY '24 — you mentioned a delta increase of INR 400 crores, correct?

Saurabh Mashruwala

executive
#186

Yeah.

Bharanidhar Vijayakumar

analyst
#187

Alright, INR 400 crores, got it. Then regarding the second question about Section 11 and the PPA with NVVNL — could you give me a sense of the capacities contracted there with NVVNL? You also brought up some minimum guaranteed figure, 388. Is that crore units or million units? How exactly does that work?

Saurabh Mashruwala

executive
#188

Yes, 388 million units have already been supplied by us. The offtake has been completed already. We began 10 days ago, and the schedule was approved by the government on 31st of May.

Bharanidhar Vijayakumar

analyst
#189

So that's 388 million units — is that per quarter or per month? Or how did that work?

Saurabh Mashruwala

executive
#190

The total <<inaudible>> we're required to provide — the minimum guaranteed units that we've delivered.

Bharanidhar Vijayakumar

analyst
#191

And what time frame would that be for?

Executive

executive
#192

The agreement covers 770 megawatts. There's a guaranteed minimum offtake of 20%, and the contract runs until, I believe, the 15th of June, with an option to extend it by a further 3 months.

Bharanidhar Vijayakumar

analyst
#193

Right, so 388 million units, and that's pro rata for whatever period applied — for the fourth quarter, we've supplied what you're referring to.

Executive

executive
#194

Yes.

Bharanidhar Vijayakumar

analyst
#195

For the entire contract term through 15 June, 388 is the guaranteed minimum.

Saurabh Mashruwala

executive
#196

For this quarter, we essentially need to deliver 388 million units.

Executive

executive
#197

I believe this contract began on March 15th—the 15th of March. And up to now, we've delivered the minimum contracted capacity. So a portion of the supplies took place during those 15 days in March, and another portion occurred later, in April and May.

Bharanidhar Vijayakumar

analyst
#198

That comes to 20% of 770 megawatts.

Saurabh Mashruwala

executive
#199

Correct.

Bharanidhar Vijayakumar

analyst
#200

Beyond the 770 megawatts, what quantity are we providing under Section 11, in quantum terms?

Saurabh Mashruwala

executive
#201

That's hard to say. It's too soon to talk about that — it only began 10 days ago. We have a schedule in place. So I think it's better for us to address that after the Q1 results come out.

Operator

operator
#202

Since no one else has questions from the participants, I'd now like to turn the conference over to Mr. Saurabh Mashruwala for his closing comments.

Saurabh Mashruwala

executive
#203

Thanks to all of you for being on this Torrent Power earnings call. We want everyone to remain safe and well. Many thanks.

Operator

operator
#204

Appreciate it. That brings us to the end of this call for Torrent Power Limited. Thanks for being with us. You can go ahead and disconnect your lines now.

Saurabh Mashruwala

executive
#205

I really appreciate it. Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.