Operator
operatorGood day, ladies and gentlemen, and welcome to the Q1 FY25 earnings conference call for Torrent Power Limited. Please be aware that every participant line will remain in listen-only mode, and once the presentation wraps up, you won't have a chance to pose questions. If you require help at any point during this call, just signal an operator by pressing star followed by zero on your touchtone phone. Kindly note that this conference is being recorded. At this time, I'll turn the conference over to Mr. Saurabh Mashruwala, CFO of Torrent Power. Thank you, and the floor is yours, sir.
Saurabh Mashruwala
executiveThanks a lot. Good evening, everyone, and I appreciate you being on Torrent Power's earnings call for Q1 FY25. To start, I'll walk you through how the quarter performed, and after that we'll open the phone lines for the Q&A session. We'll first look at the company's performance at the PBT level, and then we'll cover the tax expenses separately. Reported PBT for the quarter came in at INR 1,315 crores, versus INR 711 crores in the same quarter a year ago — that's an increase of INR 603 crores, or growth of 85% on a reported basis. PBT for the current quarter was boosted by a non-recurring credit of INR 102 crores for carrying costs approved by the regulators. After adjusting for that non-recurring item, adjusted PBT for the quarter was INR 1,213 crores, compared with INR 711 crores in the comparable quarter of last year — higher by INR 502 crores, reflecting growth of about 71%. The business sales that drove this performance are as follows. First, a gain of INR 517 crores from the sale of merchant power and LNG. During the quarter under review, merchant capacity was run for sale in the merchant market for 77 MW NVVN tenders, Section 11, as well as for power sales in the merchant power auction.
Saurabh Mashruwala
executiveRight now, the supply-demand balance in the power market works in our favor as a generator with untapped capacity, especially since there hasn't been much major spending on thermal capacity lately. As LNG prices eased worldwide, that gave us a solid chance to run that untapped capacity along with our gas-based capacity of 1,500 MW. On the whole, PLF for thermal generation rose from 40%-60%, helped by stronger long-term and merchant sales. The gain from the thermal segment was partly offset by two factors. First, contribution from the renewable energy segment dropped by INR 4 crore. Second, contribution from the distribution business declined, mainly for two reasons: slightly higher T&D losses across all areas, etc. That was offset by stronger demand in both segments, up 7% in the distribution area and 6% in the central distribution area. That wraps up the explanation of financial performance for the quarter. Next, we'll give a brief update on the projects in the pipeline. We have 3 GW of renewable power projects in the pipeline, including the following. First, 87.7 MW of the total 420 MW solar project that has a PPA with our own discom was commissioned during the quarter.
Saurabh Mashruwala
executiveWe expect the remaining capacity to come online in stages by the close of Q2 FY25. As we mentioned before, the project should deliver a better return profile given the decrease in solar modules within the insurance market. The project cost is projected at roughly INR 1,800 crores. Next, the 300 MW SECI 12 project — a wind project whose PPA was signed at the end of May 2023. Suzlon has been awarded a 20 EPC contract to develop this project. Because of procedural delays in the ERC's adoption of the tariff, the project's SCOD has been pushed out to January 26. Its cost is anticipated to be approximately INR 2,500 crores. Third, a 200 MW merchant hybrid project — made up of 125 MW of wind plus 75 MW of solar — is being developed under the RE Power Wind Farm. Implementation remains on track, and the plant should be commissioned in stages by December 25. Since the power generated will be sold straight into the merchant market, revenue will begin flowing from the very first phase of commissioning, as the evacuation infrastructure is already in place. The cost of this project is expected to be INR 1,400 crores.
Saurabh Mashruwala
executiveFourth, an 825 MW hybrid project — with PPA capacity of 450 MW and including our own distribution, made up of 486 MW of wind plus 339 MW of solar — came to us through a bidding process at a fixed tariff of INR 65 TSA across 25 years. The allotment has been granted, and the PPA for this project will probably be signed by the close of Q2 of FY 2025. Its SCOD stands at 24 months from the PPA date, and implementation is expected at a project cost of INR 5,500 crores. Fifth, a 368 MW hybrid project — 225 MW wind and 144 MW solar — was won via a bidding process run by the Indian Railways, at a fixed tariff of INR 425 per unit over 25 years. The allowance has been awarded, and the PPA should be executed during the current quarter. SCOD for this one is 24 months from the PPA date, with implementation likely at a project cost of INR 2,600 crores. Sixth, a 425 MW solar project with PPA capacity of 306 MW was secured through a bidding process conducted by the MSEDCL at a fixed tariff of INR 310 per 25 years.
Saurabh Mashruwala
executiveThe allowance for the project has been granted, and the PPA for it has been signed. The project's SCOD is September 25, and it is expected to be implemented at a project cost of INR 1,550 crores. Seventh, a 100 megawatt wind power project was awarded via a competitive bidding process run by SECI at a fixed tariff of INR 360 for 25 years. The PPA for this project has been signed. The SCOD is June 26, and implementation is expected at a project cost of INR 925 crores. Eighth, within the C&I portfolio, the company has 528 megawatts of projects under development, made up of 426 MW solar and 122 MW wind. Of that, 35 MW was commissioned by the close of the current quarter, bringing total C&I capacity to 563 MW. The remaining capacity is expected to be commissioned in stages over the coming two years. The project cost is anticipated to be INR 2,700 crores. Beyond renewable energy projects, the company is also developing two transmission projects, including first, the Khavda Transmission Project under Torrent Power Limited. The agreement between Torrent Power and PGCIL, which was awarded to the company on a nomination basis under the Regulated Tariff Mechanism, carries a post-tax return on equity of 15% plus incentive.
Saurabh Mashruwala
executiveWe expect the project to cost roughly INR 800 crore. Second, the Solapur Transmission Project, which sits under a new SPV and was secured through competitive bidding held in Q1 of FY 2025, carries an annual fixed cost of INR 50 crore per annum across 35 years. That project's cost is anticipated to be INR 470 crore. Beyond the renewable transmission project described above, the company has plans to invest close to about INR 20,000 crore over the coming three to four years. Turning to new ventures, the company's pilot on blending green hydrogen with CNG is located in UP. It is one of India's largest blending pilots and should be commissioned by Q2 of FY25. In addition, the company received an allocation of 18 KTPAs of green hydrogen production under the SECI PLI scheme, with an average PLI of 28.89 per kilo. Technical efficiency work has been completed, and a detailed business plan is being prepared. As for the pumped storage hydro project, the company has identified a site with potential for 8.4 GW of pumped storage hydro capacity across Maharashtra and Uttar Pradesh, involving total investment of INR 40,000 crores. Three feasibility studies are done, and MoEFCC terms of reference have been granted for the full 8.4 GW of capacity.
Saurabh Mashruwala
executiveWe've brought on an agency to handle the EIA study and environmental clearance across every site. We're also looking into comparable offices in additional states such as Gujarat, MP, and Rajasthan. The process for securing ESZ approval has been started. This might be presented either as a storage option or by delivering a high-cost CUF or RTC renewable power solution. That covers the quarter. At this point, I'd ask the coordinator to begin the Q&A session. We want everyone to remain safe and well. Thank you — and we'll turn things over to the operators.
Operator
operatorMany thanks, sir. We’re now starting the question-and-answer portion. If you’d like to pose a question, you can press star and one on your touch-tone phone. Should you want to remove yourself from the question queue, press star and two. We ask participants to use a handset when asking a question. Ladies and gentlemen, we’ll pause briefly while the question queue is put together. Our first question comes from the line of Satyadeep Jain from Ambit Capital. Please go ahead.
Satyadeep Jain
analystHello, and thanks. That was a really solid quarter. I have a few questions. Regarding the merchant power sale, I may have missed it — could you share how it splits between NVVN and Section 11? What volume was sold? And separately, on Section 11 profitability, last time we talked about a benchmark plus a spread over it. Could you perhaps give some metrics on the profitability you saw under Section 11 this quarter?
Saurabh Mashruwala
executiveRegarding the breakup, we weren't able to provide that, but we can provide the MUs essentially. In the merchant market, we've sold roughly 1,700 MUs.
Satyadeep Jain
analystWas it typically any specific type?
Saurabh Mashruwala
executiveThat figure covers the NVVN sale, Section 11, along with what was sold on the exchange and through bilateral venues.
Satyadeep Jain
analystOn Section 11, can you give us any directional sense of profitability? What price did you sell at, or perhaps some kind of profitability metrics under Section 11?
Saurabh Mashruwala
executiveAn opportunity like this comes up during summer and in the period before winter. In summer, then, demand is quite strong and LNG prices are basically moderated. So we had this chance to sell a significant quantity in the merchant market. We have 1.5 GW of untapped capacity. So we used that capacity for selling across these three areas, three-four areas, NVVN tenders, Section 11, or the exchange as well as bilateral venues. So we had this opportunity over the summer. We expect a similar opportunity to be available in the pre-winter period as well, maybe September, October or so, depending on how the season progresses.
Satyadeep Jain
analystAlright. Could you remind us about your take-or-pay arrangements on LNG? What contracted LNG volumes do you currently have? From what I understand, you're considering new tenders. Could you give us some details on when those take-or-pay contracts expire and what sort of renewal you're considering?
Saurabh Mashruwala
executiveWe're actually in the process of working on the fresh contract. It's being discussed at this very moment. It's the sort of thing that's still in progress.
Satyadeep Jain
analystRight now, as I understand it, you've got 3 LNG cargoes locked in under take-or-pay annually, and that holds for the coming 1 or 2 years?
Saurabh Mashruwala
executiveRight, as many as 26 years — 3 cargoes are under contract for us. The remaining cargoes for this year, we've pulled those out and bought them on a spot basis. With LNG prices having eased now, we'll look to lock in additional cargoes moving forward.
Satyadeep Jain
analystYou might be saying it could be even more than 3 cargoes, right?
Saurabh Mashruwala
executiveYes. Yes. Yes.
Satyadeep Jain
analystLet me just ask one more quick thing about distribution and transmission. I’d like to get a handle on where that really strong YOY growth is coming from, what’s driving it underneath. You touched on it briefly, but when we look at AT&C losses and distribution losses, both were generally a bit higher YOY, so what was behind the profitability in that business?
Saurabh Mashruwala
executiveCould you repeat that, please?
Satyadeep Jain
analystOn the distribution and transmission side, if we compare underlying profit with the prior year, we're seeing substantial growth there. So I just want to get a handle on which factors drove that improvement.
Saurabh Mashruwala
executiveIn Q1, demand rose roughly 6%-7% versus the prior quarter and versus the same period a year earlier. The profit largely stems from the regulator's approval of the carrying cost, amounting to approximately INR 100 crore in this quarter.
Satyadeep Jain
analystSo the approval for that carrying cost was the big swing, then?
Saurabh Mashruwala
executiveCorrect — that's exactly right.
Satyadeep Jain
analystThanks a lot. All the best to you.
Saurabh Mashruwala
executiveI really appreciate it.
Operator
operatorThank you. Ladies and gentlemen, if you'd like to pose a question, you can press star and one. Those who want to ask something may hit star and one on your touch-tone phone. Our next question comes from Mohit Kumar of ICICI Securities. Please go ahead.
Mohit Kumar
analystHello, sir. Congratulations on a very close set of numbers. My first question is, could you let us know how sales from DGEN and SUGEN are currently arranged? Is it under Section 11, and what is the quantum available on the merchant basis? Because some quantum would be helpful, yeah.
Saurabh Mashruwala
executiveRegarding SUGEN, if you look at what Section 11 provides, then whatever capacity remains untapped, for instance, we would be able to offer it under Section 11. However, because we have the NVVN tender, we haven't committed any capacity from SUGEN and DGEN. So the remaining capacity is what we can offer under Section 11.
Mohit Kumar
analystRegarding Section 11, what’s the amount involved, and for how long will it keep going?
Saurabh Mashruwala
executiveI’d say it’ll run through 30th June. That’s a short window over the summer month.
Mohit Kumar
analystSo that's done with, correct?
Saurabh Mashruwala
executiveYes. Yes.
Mohit Kumar
analystSo at this point, all of that capacity can be sold on the merchant side, correct?
Saurabh Mashruwala
executiveRight, precisely. Precisely. So Mohit, let me just add to that — usually what happens is this: if you have untapped capacity, and when we say untapped capacity, that covers a long-term contract, and it covers your bilateral contracts as well. Beyond that, if any untapped capacity remains, then it has to be sold by you under Section 11. So usually what we do is we also enter into bilateral contracts for the short term — for one month, two months, three months. Such capacities are not available for Section 11. And generally, on Section 11 capacity, the government asks that we give the schedules during peak time. We provide the schedule, and according to what the schedule requires, we have to supply the power under Section 11. It won't be provided consistently. The government provides the schedule when they need the power. And accordingly, we have to supply power under Section 11.
Mohit Kumar
analystSo would it be fair to say that Section 11 has wrapped up at this point, and the bulk of that capacity is now available — is that correct?
Saurabh Mashruwala
executiveRight, that ran through 30th June. So Section 11 no longer applies as things stand.
Mohit Kumar
analystThe second question concerns those T&D losses. Naturally, you typically observe an improvement annually. In this specific quarter, though, we've seen T&D losses go up. Is there some specific reason that impacted our AT&C losses?
Saurabh Mashruwala
executiveLook, in the Ahmedabad and Surat distribution area, growth is roughly 6% to 7%. And as more retail selling goes into more retail residential areas, I'd say losses there will run somewhat higher than for industrial and commercial consumers. So sales to those residential customers are larger, and that's where losses are greater, I would say. That's the reason it has risen by a few basis points.
Mohit Kumar
analystFor my final question, on the other expenses line — those rose, I believe, by INR 60 crore quarter over quarter and by INR 100 crore year over year. Which expenses are driving that?
Saurabh Mashruwala
executivePardon me — could you say that question again?
Mohit Kumar
analystOther expenses. Now, on other expenses: if you look at that line item, the increase you're seeing is coming from other expenses.
Saurabh Mashruwala
executiveOn other expenses — look, plant operation is running higher. If you look at generation PL, it was around 40%, and now it's up to 60%. So naturally, my plant O&M costs are going to be higher. And since the plant is operating more, my other expenses are higher as well, and that's what's being booked under other expenses.
Mohit Kumar
analystGot it. Got it, sir. Thanks, Mr. Luther. Thanks.
Saurabh Mashruwala
executiveAppreciate it.
Operator
operatorThank you. Before we take the next question, I'd like to remind everyone on the call to ask a question — you can do that by pressing star and one. Our next question comes from Jiten Rushi at Axis Capital. Please go ahead.
Jiten Rushi
analystGood evening, sir. Thanks for taking my question about the Q3 numbers. My first question concerns the gain on sale of gas on a merchant basis as well as NVVN. In your opening remarks, you said it was incrementally higher by INR 917 crore, correct? Sorry? It's higher on an incremental basis by INR 917 crore year-on-year? 517. 517 crore. Sorry. My mistake. So sir, in the same period last year, I believe the gain came to roughly INR 140 crore, right? Incremental? I think there's an INR 130 crore gain from merchant and INR 10 crore from LNG.
Saurabh Mashruwala
executiveRight, right. For the prior year, the gain came to roughly INR 145 crore.
Jiten Rushi
analystAll right, so the way things stand this year is as follows.
Saurabh Mashruwala
executiveThe incremental profit we're referring to here amounts to INR 517 crore.
Jiten Rushi
analystIncremental. Yeah, yeah, I’ve got it. Okay. And sir, this is the carrying cost that the regulator has approved, and that’s for the distribution you mentioned, correct? Which is still this.
Saurabh Mashruwala
executiveThe area where we hold distribution rights.
Jiten Rushi
analystDL license distribution. All right, Ahmedabad and Surat — is that correct, sir?
Saurabh Mashruwala
executiveCorrect.
Jiten Rushi
analystSir, I have one more question about the bookkeeping side of things. We've noticed a sharp rise in employee cost. What caused that, sir?
Saurabh Mashruwala
executiveEmployee costs are going to rise sharply. If you look at Q4 2024 in general terms, that figure stood at INR 147 crore. In Q1, it comes to INR 173 crore. So clearly, that's a steep jump. When comparing with Q4 — though actually, I think the comparison should really be quarter on quarter. Q1 last year was also INR 146 crores. Broadly speaking, on the Q4 side — if you examine Q4, my capitalization peaks in Q4. Sorry, could you repeat that? Capitalization reaches its highest point in Q4. So as a result of that peak in capitalization, a portion of employee cost also ends up capitalized, owing to the accounting treatment — the capitalization of expenses. And in Q1, capitalization is lower, I'd say.
Jiten Rushi
analystThat isn't the pattern. So what we observed here is a separate pattern. Okay. Okay. Okay. And sir, regarding the capital guidance, could you shed some light on this year?
Saurabh Mashruwala
executiveOn capital guidance, nothing has changed. Around 2012, we intended to separate our license as a franchise distribution business. The figure of INR 1,750 crores covers EMR for the license distribution business, while roughly INR 200-INR 250 crores is the EMR for the franchise distribution area.
Jiten Rushi
analystOn the renewable side, sir?
Saurabh Mashruwala
executiveOn the renewables side, we've got an investment plan of INR 18,000 crore to INR 20,000 crore lined up for the coming 2 to 3 years — I'd say 3 to 4 years. On an annual basis, that works out to roughly INR 5,000 crore each year. The spending, though, will ramp up progressively as projects get commissioned.
Jiten Rushi
analystSir, just as an opening comment — I believe you mentioned something about green hydrogen and the PLI, and that isn’t part of the presentation. Could you repeat that, or would it be fine for me to take it separately after the call as well? That works for me.
Saurabh Mashruwala
executiveSure, we can handle that on its own once the call is over.
Jiten Rushi
analystAlright. That's everything from me, sir. I'll rejoin the queue. Thanks for all the questions.
Saurabh Mashruwala
executiveThanks.
Operator
operatorThanks. Our next question comes from Bharanidhar at Avendus Spark. You have the floor.
Bharanidhar Vijayakumar
analystGood evening, everyone. Can you hear me okay?
Saurabh Mashruwala
executiveYeah.
Bharanidhar Vijayakumar
analystYes, let me clear up how the Section 11 split works alongside contracted capacity—whether that's through a PPA or bilaterally, plant by plant. At SUGEN, roughly 80% is contracted to its own discom. So should I treat the remainder as having been offered under Section 11 during the quarter?
Saurabh Mashruwala
executiveRoughly 75% is committed under the long-term PPA for SUGEN and UNOSUGEN as well. Yes, the rest is available — a portion of it can be used for Section 11. So Bharanidhar, that's correct. Under the long-term PPA, it's 75%. But as I mentioned before, we also enter into short-term contracts. Now, if you already have a short-term contract in place, that won't be counted under Section 11.
Bharanidhar Vijayakumar
analystSo that's the situation. So 25% on SUGEN and UNOSUGEN — whatever's left over — that would go to bilateral or merchant or Section 11, sorry. So what would that bilateral portion from SUGEN and UNOSUGEN in one queue have been?
Saurabh Mashruwala
executiveThose figures aren't something we're disclosing. What matters is viewing merchant as a whole instead of breaking it apart into separate pieces.
Bharanidhar Vijayakumar
analystSo out of the total capacity across SUGEN, UNOSUGEN, and DGEN — which comes to 2,730 MW — how many MW in one queue would have gone to merchant?
Saurabh Mashruwala
executiveRegarding merchant total MUs — those we've sold through comparison Section 11, NVVN, and either bilaterally or on the exchange — the figure comes to roughly 1,700 MUs for the quarter.
Bharanidhar Vijayakumar
analystAll right, all right. What percentage does that work out to? I realize I could work it out myself, but I'm asking just so we can talk it through.
Saurabh Mashruwala
executiveCould you repeat that, please?
Bharanidhar Vijayakumar
analystWhat share of total sales will those three plants account for?
Saurabh Mashruwala
executiveI’ll share that with you separately. Right now, I don’t have those figures available.
Bharanidhar Vijayakumar
analystAll right. Understood. And before winter arrives — say in September and October — there would likely be more merchant or bilateral sales once again. But in those months, do you expect Section 11 to come into play?
Saurabh Mashruwala
executiveI'd say that hinges on what the weather does. So whatever the weather turns out to be, that's what it hinges on. That said, it won't be as harsh as in summer. Right now, it's simply too soon to judge whether Section 11 will come into play or not.
Bharanidhar Vijayakumar
analystAll right, so for the rest of the year, we can figure it'll be PPA capacity along with a few merchant sales that may come out of the capacity that hasn't been tapped yet.
Saurabh Mashruwala
executiveYes.
Bharanidhar Vijayakumar
analystAlright, so this is the final question. On the prior quarter's call, I believe a figure was mentioned regarding the average tariff and the average cost of generation for NVVN. If I recall correctly, that was a cost of INR 8 per unit and a tariff of INR 10 per unit. That gives you a contribution of INR 2 per unit. For NVVN, was this materially different, or was it the same?
Saurabh Mashruwala
executiveBroadly speaking, summer months bring a bigger contribution. An exact figure or dollar amount for that contribution isn’t something we can provide. During the summer months, it is larger.
Bharanidhar Vijayakumar
analystAnd what’s the typical generation cost right now, or for the rest of the period — let’s say the nine-month stretch — for those gas-based power plants, in rupees per unit?
Saurabh Mashruwala
executiveIt really hinges on what you're paying for materials and freight, essentially. So on average, up to now, what we've brought in comes to roughly $9.5 per MMBtu in fuel cost.
Bharanidhar Vijayakumar
analystSo that works out to about INR 7 to INR 8 per unit in landed cost?
Saurabh Mashruwala
executiveThe figure I have in mind is roughly between INR 6 and INR 6.5, referring to variable cost.
Bharanidhar Vijayakumar
analystAlright, that's great. Okay, okay, thanks a lot. I'll rejoin the queue later.
Saurabh Mashruwala
executiveYeah.
Operator
operatorThanks. Our next question comes from Vishal Periwal at Antique Stock Broking. The line is yours — go ahead.
Vishal Periwal
analystYes, sir. Thank you for the chance, and congratulations on a solid set of results. I joined the call somewhat late, so forgive me if this repeats something. Regarding our quarterly PAT of roughly INR 996 crore, could you say whether any one-offs need to be adjusted within that? What would a recurring PAT look like for us?
Saurabh Mashruwala
executiveRegarding the PAT figure of TBD for the current quarter's Q1, which stands at INR 1,315 crore, a one-off component of INR 102 crore is already included, and that represents a carrying cost. Approval was received for that INR 102 crore carrying cost. Those are the one-off items.
Vishal Periwal
analystAll right. But sir, regarding Section 11 again — if it doesn't continue, at minimum through the upcoming quarter, could you perhaps strip that out and give us some figure?
Saurabh Mashruwala
executiveNo, we consider it a Section 11 component of the merchant sale. So we don't treat Section 11 any differently. So all of our NVVN tenders, merchant sales over the exchange and on a bilateral basis, and Section 11 — we treat all of these as part of the merchant sale. So Vishal, I think when it comes to normalization, if you're talking about that, I think you'll need to look at it on a YOY basis rather than quarter-on-quarter. So if you look at last year or any year, Q1 has always been stronger compared to any of the other three quarters, because of the inherent demand in the country, which is very high. And that's why there are higher merchant sales. So if you want to normalize, I think you'll have to compare Q2 versus Q2 rather than Q1, Q2, Q3.
Vishal Periwal
analystSo is it fair to say that in Q1 of last year, Section 11 was also in place at that time?
Saurabh Mashruwala
executiveNo — Section 11 was applied to gas-based power plants for the first time in this Q1. What we're trying to say is that, on a holistic basis, merchant sales were profitable in Q1 of last year as well. There are profits in this year's Q1 too, and those typically go down as we move through the year. In Q2, Q3, and Q4, they usually taper off because demand is lower.
Vishal Periwal
analystAll right, all right, got it. Thank you, sir. Perhaps, sir, regarding this Section 11 — for any figure that's already out there publicly about the electric share when it comes to realization, how does that actually compare with the contracted quantity we have? If you could give even a rough directional percentage, higher or otherwise, or simply share it, that would help.
Saurabh Mashruwala
executiveYeah. We clarify that we don’t break out Section 11 separately. It’s the PAT from the merchant sale. So under the formula, it comes to 120% of your variable cost. Variable cost here is defined as your gas price — the price set by GSPL or the GAIL-defined price — and our sourcing cost sits below that. The other piece is O&M cost, which is variable. There are certain normative parameters, and our O&M costs come in under those. So taking a holistic view, my margins would be above 20%, which is the level given under Section 11.
Vishal Periwal
analystAll right, all right, all right. Understood, understood. Yes. That covers everything I had to say, sir. Thanks.
Saurabh Mashruwala
executiveThanks.
Operator
operatorThanks. Our next question comes from Swati Jhunjhunwala at JM Financial. Go right ahead.
Swati Jhunjhunwala
analystYeah, thanks for taking my question, and congratulations on a good set of numbers. Sir, I might have missed it. So the C&I capacity of 525 MW — when is that expected to be commissioned?
Saurabh Mashruwala
executiveLooking ahead, over the next 2 to 3 years — that's a 2 to 3 year window.
Swati Jhunjhunwala
analystFor the next 2 to 3 years — okay. So could you give me a rough number for what you plan to commission this year, then next year, then in FY27? Is it just the 8 projects you mentioned, or could there be additional ones?
Saurabh Mashruwala
executiveAll right. So we currently have 8 projects in development, and as of March 2025, one of them — 420 MW — will be commissioned.
Swati Jhunjhunwala
analystUnderstood.
Saurabh Mashruwala
executiveCommissioning of the remainder of the project begins next year and beyond. A portion of that capacity will also come online within the C&I portfolio.
Swati Jhunjhunwala
analystGot it.
Saurabh Mashruwala
executiveOn the renewable energy side, capacity is being brought online in stages, since the commissioning deadline lands around December 25, though a portion of that capacity is also coming online ahead of March 25.
Swati Jhunjhunwala
analystGot it. About the hydro PSP — that 8.4 GW — since it's still going through approvals, is it fair to figure a timeline of roughly 4 to 5 years before it comes up?
Saurabh Mashruwala
executiveI’d put it at a minimum of 5 years.
Swati Jhunjhunwala
analystAlright, just one question about this PSP. Are we looking at something near a river, or is it not close to a body of water? Because I think the water requirements would be very different.
Saurabh Mashruwala
executiveMy view is that these are entirely run-of-the-river projects. All of them are pumped storage hydro projects. Such projects are generally located in regions with favorable rainfall. So when rainfall is plentiful, you're able to capture the water and put it to use. There will be a reservoir for the upper as well as the lower reservoir. It will be developed in that area.
Swati Jhunjhunwala
analystGot it. So what you're saying is that it's not run of the river?
Saurabh Mashruwala
executiveThat's not right at all.
Swati Jhunjhunwala
analystAll right, all right. Thanks a lot, sir. Yeah.
Operator
operatorThanks. The next question comes from Aniket Mittal at SBI Mutual Fund. Go ahead. Thanks for the chance to ask. Just one clarification: during the quarter, what were our LNG sales, or the gains we made on LNG?
Saurabh Mashruwala
executiveLNG sales were extremely small — truly tiny, just tiny. And as for the chances to produce power and sell it into the merchant market: the volume we sold into LNG was an extremely small amount.
Aniket Mittal
analystSo of that total gain of, let's say, INR 660 crore that we achieved, close to INR 650 crore would be merchant-related. Is that a fair way to put it?
Saurabh Mashruwala
executiveI'm sorry — could you repeat that, Aniket?
Aniket Mittal
analystSo if I look at total profit, the overall gain on merchant-plus LNG sales this quarter comes to roughly INR 660 crore, right?
Saurabh Mashruwala
executiveCorrect.
Aniket Mittal
analystSo from this, you're saying roughly INR 650 crore relates purely to merchant business. For LNG sales, it would be INR 10 crore or higher. Is that accurate?
Saurabh Mashruwala
executiveLNG sales account for roughly INR 40 crore. Merchant makes up the remainder.
Aniket Mittal
analystSo 40 crore works out to roughly 620. That means on the 1,700 MUs we sold, we made a little over INR 620 crore. Is that correct?
Saurabh Mashruwala
executiveYes.
Aniket Mittal
analystAll right, thank you. And sir, would Section 11 end up being more profitable for us compared with the actual bilateral contract — let's say the one the two of us have done between us?
Saurabh Mashruwala
executiveI think, Aniket, that's a tough way to look at it. As Saurabh correctly mentioned before, Section 11 doesn't assure you of RTC power. To take part in Section 11, your base load must be running, and only then can you participate in Section 11. I think we need to consider this holistically, where you sign some short-term contract that provides you with RTC power, and your generators can then run on base load. Once that's in place, even at lower profitability, that opportunity lets you ramp up more quickly and capitalize on Section 11 or peak power demand and whatever other opportunities exist in the market. I think it's a mix of all these things that delivers better profitability.
Aniket Mittal
analystAlright, so I’ll ask just one more question for the notes. What merchant volumes did we do in Q1 of last year, and what were they for FY24 overall?
Saurabh Mashruwala
executiveWhen it comes to MUs, it was roughly 400 to 500 MUs in the prior year.
Aniket Mittal
analystRegarding Q1? Can anyone hear me?
Saurabh Mashruwala
executive400 million units. 400 million units. 400 million units.
Aniket Mittal
analystWas it 400 MUs in Q1 of last year?
Saurabh Mashruwala
executiveThe first quarter of last year. The same quarter a year earlier.
Aniket Mittal
analystRegarding the entire FY24 period?
Saurabh Mashruwala
executiveThat figure comes to 1400.
Aniket Mittal
analystWhat would the total merchant gain have amounted to for last year?
Saurabh Mashruwala
executiveThe merchant gain should come in at approximately INR 325 crores.
Aniket Mittal
analystUnderstood, understood. Yeah, those are the questions I have. Thanks.
Saurabh Mashruwala
executiveThanks.
Operator
operatorThanks. The next question comes from Ishan Minda at IIFL Securities Limited. Please go ahead.
Ishan Minda
analystThanks for taking the question, sir. I simply wanted to check whether anything has moved forward regarding discom privatization or parallel licensing?
Saurabh Mashruwala
executiveAt this point, nothing more has progressed on the parallel licensing front. Every question the regulators raised has been answered by us. So now we're waiting for the regulators to take their next step. As for privatization, the election has concluded. So we'll have to see what the state government does from here on. Still, we're quite eager to take part in whatever opportunity arises in privatization.
Ishan Minda
analystOf course, sir. Given that Section 11 applies only through Q1 of FY25, how have your gas IPPs performed? Could you share some qualitative comments?
Saurabh Mashruwala
executiveWe don't have visibility on the other piece, but our gas-fired power project is prepared to serve any demand — whether that's the merchant market, Section 11, all of it. So really, every one of our projects sits in a state of readiness, and that includes the DGEN project as well.
Ishan Minda
analystAbsolutely, sir. That said, when it comes to merchant trade as it stands today, can we keep margins at a solid level across our merchant operations with DGEN and?
Saurabh Mashruwala
executiveWhen you look at Q1, the merchant market has delivered a substantial amount of profit for us.
Ishan Minda
analystYeah, absolutely. Appreciate it. That covers everything on my side.
Saurabh Mashruwala
executiveAppreciate it.
Operator
operatorThanks. Our next question comes from Nikhil Abhyankar at ICICI Securities. Please go ahead.
Nikhil Abhyankar
analystHello, sir. So through July of this year, roughly 6.5 GW of renewable capacity has been awarded.
Operator
operatorApologies for cutting in, sir. Your voice is coming through very quietly.
Nikhil Abhyankar
analystCan you hear me? Hi there?
Operator
operatorYes, please, go right ahead.
Nikhil Abhyankar
analystYeah. Yeah. So up through July of this year, nearly 6.5 GW of renewable capacity has been awarded, but as of yet we haven't won any project. So are we planning—or is it a decision we've taken—to execute this portfolio first and then return to the bidding process?
Saurabh Mashruwala
executiveOver the past six months — and I'd include last Q1 in that as well as the last six months — we've captured capacity exceeding 1.5 GW during the last year.
Nikhil Abhyankar
analystWe'll also be putting in bids during FY25 for new projects.
Saurabh Mashruwala
executiveDefinitely, definitely. Yeah, Nikhil — so the goal is to reach at least 5 GW over the coming two or three years. At the moment we have roughly 4 GW that's under construction. So we'll continue to look at projects. The one caveat is that our parameters have to be met. If they are met, then we'd want to take on additional projects.
Nikhil Abhyankar
analystGot it. And sir, we're also handling merchant RE projects. So are we going to take on more projects like that, or?
Saurabh Mashruwala
executiveRight now, we have 1 project that’s under construction. Once we commission that 1 project, then we’ll see. At this point, there isn’t any additional plan for a merchant project.
Nikhil Abhyankar
analystAll right. And is that going to be entirely from sold-on exchanges, or will bilateral contracts play a part too?
Saurabh Mashruwala
executiveWherever a base price can be obtained — whether via stock exchanges or through bilateral bidding — that's what we'll do.
Nikhil Abhyankar
analystWould a virtual PPA be another option, maybe?
Saurabh Mashruwala
executiveThat really hinges on what opportunities are out there for a project like this.
Nikhil Abhyankar
analystOf course. Of course. Thanks, and best of luck.
Operator
operatorThanks. Our next question comes from Amit Bhinde at Morgan Stanley. You have the floor.
Amit Bhinde
analystHi there — congrats on those strong results. I was hoping you could give us an update on note number 3, the one you've been issuing lately where you break down the revenue from merchant and RLNG. So what does that come to this year? A year ago it was INR 72 crore.
Saurabh Mashruwala
executiveApologies. What was the merchant revenue figure?
Amit Bhinde
analystRegarding Merchant and RLNG, which you'd recently been including in note 3 of the account. This time around, that note isn't there.
Saurabh Mashruwala
executiveThat figure wasn't especially meaningful. It depends on whether the auditors are dropped or not.
Amit Bhinde
analystSo that applies just to the RLNG sale — is that what you mean?
Saurabh Mashruwala
executiveThat’s right — precisely.
Amit Bhinde
analystAll right, all right. So on the merchant side, I mean, would that have come in at roughly INR 1,700 crore for this year? Or sorry — for this quarter?
Saurabh Mashruwala
executiveWe said that 700 MUs is available.
Amit Bhinde
analystOkay. 1700 MUs are there. So I'm just guessing a price of about INR 10. Is that the right number to assume?
Saurabh Mashruwala
executiveThat's a fair assumption to make.
Amit Bhinde
analystSo that figure is only an approximation. Right. There's one more point I wanted clarified — the RLNG and merchant gains, is the INR 517 crore for this year an increase, or is it the absolute amount? Because last year, I believe.
Saurabh Mashruwala
executiveStep by step. This is step-by-step. Step-by-step.
Amit Bhinde
analystRegarding the earlier question, your figure was INR 145 crores for Q1 F24?
Saurabh Mashruwala
executiveYes, precisely.
Amit Bhinde
analystAll right, that covers what I wanted to ask. Appreciate it.
Saurabh Mashruwala
executiveI really appreciate it.
Operator
operatorThanks. Our next question comes from Satyadeep Jain at Ambit Capital. The line is yours — go ahead.
Satyadeep Jain
analystHi, thanks. Just a couple of quick follow-ups. I'd like to get some clarity on Section 11 — with any untied capacity you have, you're able to sell it through the power exchange, or via bilateral support by getting there. Is that right? As a generator, do you have the option to sell in whichever market segment offers you better prices?
Saurabh Mashruwala
executiveNo, no. I believe that prior to invoking Section 11, if you had already committed your merchant capacities through bilateral arrangements, those cannot be offered under Section 11. Every other capacity must be offered under Section 11. Should the regulator or the SLDC be handling scheduling, and if they aren't scheduling, then you're free to sell into the merchant market.
Satyadeep Jain
analystSo with Section 11, the requirement is that scheduling has to come from the SLDC. Is that what you're saying?
Saurabh Mashruwala
executiveRight. So with Section 11, when it's scheduled, you're obligated to provide power. When it isn't scheduled, you're free to sell into the merchant market or any other place you see fit.
Satyadeep Jain
analystAll right, so I was just trying to get my head around this. If we take that INR 6.5 variable cost you referred to, is that figure tied to the LNG price? Obviously there will also be some incremental O&M on top. And then, going by the number you gave, it appears to work out to an EBITDA spread of INR 4 per unit. On the whole, that comes to roughly INR 12 per unit. So we're simply trying to grasp, when you sell this power, it would be in a high-priced DAM market. So when SLDC schedules these, I just wanted to understand what the clearing mechanism is for this.
Saurabh Mashruwala
executiveNo, no. So there isn’t any clearing. When you mention a clearing mechanism, could you explain a bit more about what exactly you’re looking for in that clearing mechanism?
Satyadeep Jain
analystSo I was just trying to get a handle on those prices landing at roughly INR 12 per unit there. How are you going about scheduling that power sale?
Saurabh Mashruwala
executiveLet me explain. Scheduling isn’t handled by us. It’s handled by — let’s say, under Section 11, the SLDC would handle the scheduling, correct? Under bilateral, the other party who has entered into a contract will handle the scheduling. Under the NVVN tender, again, NVVN will handle the scheduling. So scheduling isn’t in our hands. The only thing we have is that if scheduling hasn’t happened, and if there’s untied capacity, if you’re able to sell in the merchant market, we will sell.
Satyadeep Jain
analystAlright, one more thing I wanted to ask about regarding the LNG cargoes you're aiming to secure. Could you remind us about the 3 cargoes you had under take and pay? What share of your total generation would those 3 cargoes represent? As for the reasoning behind potentially securing additional cargoes, are you feeling more confident about employing that in the merchant market over a longer-term basis?
Saurabh Mashruwala
executiveSo I think, looking at my cargo requirement, or the LNG I've procured, as of right now, under my PPA obligations, I've procured roughly 50% of what my PPA obligation is. The remaining 50% is open. So I think I'd want to handle that first as far as my PPA obligations go. On the merchant side, we keep looking at opportunities year on year. We don't want to lock ourselves in, because these are all take-or-pay contracts. So if merchant prices fall tomorrow and you can't sell into the merchant market, you'll have to pay for that cargo. So that's something we don't want to do on a longer-term basis. A year, a year and a half — we keep watching it and keep procuring cargoes for the merchant market. And in any case, all these long-term contracts are variable-rate contracts. They aren't fixed-rate contracts. So you're only tying up the quantity, not the prices.
Bharanidhar Vijayakumar
analystThat, I get — it's about locking in the volume. It's just that, clearly, demand isn't there. I was attempting to figure out whether these are take-or-pay contracts. But you're saying that regardless, with the higher LNG cargoes, you'd still need that for the PPA too, correct? So.
Saurabh Mashruwala
executiveExactly.
Satyadeep Jain
analystAlright, thanks a lot.
Saurabh Mashruwala
executiveThanks.
Operator
operatorThanks. Our next follow-up comes from Jitin Rushi at Axis Capital, who's on the line. Please go ahead.
Jiten Rushi
analystYeah. Thanks for taking my question. So just to stay on the LNG tie-up. So now, as you mentioned, only 3 cargo tie-ups are pending, which is, and this is for 50% of the PPA capacity. And the remaining 50% we will be procuring from the domestic market.
Saurabh Mashruwala
executiveRegarding those 3 cargoes, I believe that's actually incorrect. What we stated was that we have 3 cargoes secured through December 26 as things stand. There are certain contracts relating to domestic market procurement. When both are combined, that provides a 50% tie-up as far as my PPA capacities go.
Jiten Rushi
analystSo essentially, when you combine the three cargoes through December with the domestic contract, that comes to about 50% by December 2026.
Saurabh Mashruwala
executiveCorrect. Correct. Under my PPA commitments, 50% of the balance is open. And anything I choose, I expect to sell in the merchant market — that part is open.
Jiten Rushi
analystSo this tie-up sits at roughly $9.5 MMBtu, correct, sir?
Saurabh Mashruwala
executiveRight. No. So the $9.5 is entirely those fixed contracts that we've executed on a spot basis. That 50% cargo I mentioned under the PPA — those are all variable-rate contracts. They aren't fixed-rate contracts. Since under the PPA there's Section 62 PPA, where the LNG cost gets passed through.
Jiten Rushi
analystAll right, so the expense tied to this cargo arrangement is likewise a pass-through. It’s an open contract tied to the delivery.
Saurabh Mashruwala
executiveWith the PPA in place, that gets passed through.
Jiten Rushi
analystRight, so essentially this comes down to the delivery date — whatever the cost happens to be at that point, it gets passed straight through, from what I understand. Is that right?
Saurabh Mashruwala
executiveYeah. Yeah.
Jiten Rushi
analystAll right. Sir, are there any additional tie-ups you're aiming for at this point, now that the tenders have been submitted, as you mentioned? So in terms of further tie-ups beyond 26, or for the remaining 50%, or the open capacity, when do you expect those tenders to be awarded?
Saurabh Mashruwala
executiveWe're still in talks on this. So we'll keep track of it as soon as we can.
Jiten Rushi
analystAlright, sir. Thanks, sir. Thanks.
Operator
operatorThanks. Our next follow-up comes from Bharanidhar at Avendus Spark. The line is yours — go ahead.
Bharanidhar Vijayakumar
analystYeah. So, are we placing bids on any thermal projects that might be up for sale or listed on the NCLT? So yeah, when we look at it, if good assets can be had at a reasonable price, then yes, we're keen to acquire those assets on the thermal side. Okay. So any target we have, we'll want to add so much in thermal over the next 2 to 3 years?
Saurabh Mashruwala
executiveNo such goal exists. No set goal of that kind exists. So it comes down to the asset's quality as well as the price.
Bharanidhar Vijayakumar
analystGot it. And on the recent developments with battery prices declining, there have been a number of bids that include battery storage as a component. And have we been participating in those bids? If we haven't, what's our thinking and strategy on that front?
Saurabh Mashruwala
executiveNot yet. Not at this point, but we're looking into it. As we understand it, both the battery and pumped storage are going to coexist in the market.
Bharanidhar Vijayakumar
analystRight. So with a pumped storage pipeline of 8.4 GW, my question is this: when it comes to batteries, why aren't we making the most of that low price?
Saurabh Mashruwala
executiveWe're assessing it, and we'd consider it at an opportunity point in time. But at this moment, we're also looking at battery storage as a solution and bidding for that.
Bharanidhar Vijayakumar
analystSo really, Rishi, what I'm getting at is this: are there any particular challenges you're running into in battery that are causing you to still be in evaluation?
Saurabh Mashruwala
executiveNo, no.
Bharanidhar Vijayakumar
analystSo, what does all of this mean?
Saurabh Mashruwala
executiveAlright.
Bharanidhar Vijayakumar
analystAll right, all right. My final question is again about our Q1 sales in the merchant segment. Now, if I simply ran a calculation on how much we actually generated from SUGEN and DGEN using the sales figures you gave, it comes out to roughly 3,300 million units. So you're saying we sold 1,700 in merchant. That means around 50% is what we sold in PPA plus NVVN.
Saurabh Mashruwala
executiveCorrect.
Bharanidhar Vijayakumar
analystIs NVVN also in the mix as a merchant, or not?
Saurabh Mashruwala
executiveNVVN operates as a merchant. NVVN also functions in a merchant capacity. Our view is that the merchant sale is what we're looking at.
Bharanidhar Vijayakumar
analystSo half — 50% — is being sold under PPA, and that same 50% will also mostly be coming solely from SUGEN and SUGEN.
Saurabh Mashruwala
executiveThat's right.
Bharanidhar Vijayakumar
analystAlright. Regarding that LNG contract where 50% goes to the PPA, those are variable-rate contracts. On average, what would that dollar-per-MMBtu figure have been in Q1?
Saurabh Mashruwala
executiveOn the contracted cargo side, that's roughly $9.5. As for the domestic piece, it will come in somewhat above that $9.5 figure, I'd say.
Bharanidhar Vijayakumar
analystI think with variable rate, regarding what you're saying about the PPA, that would cover not just imported cargo but domestic procurement as well. Correct. So as Saurabh sir mentioned, for the imported cargo it was $9.5. For domestic, he said it's a little higher.
Saurabh Mashruwala
executiveYeah. Yeah.
Bharanidhar Vijayakumar
analystFor merchant, we would have gone to the spot market to procure. In Q1, what would that dollar-per-MMBtu figure have been?
Saurabh Mashruwala
executiveThe 9.5 figure takes spot cargos into account as well.
Jiten Rushi
analystAlright, so those 3 cargoes we've got under contract — we're using them for the PPA market, and they'll also go toward selling in the merchant market.
Saurabh Mashruwala
executiveThe three cargoes we’ve contracted are primarily for our long-term beneficiary.
Bharanidhar Vijayakumar
analystAll right, thanks.
Operator
operatorThanks. Our next follow-up comes from Vishal Periwal of Antique Stock Broking. The line is yours.
Vishal Periwal
analystYes, sir. Thanks for that follow-up. Sir, on your slide covering contracted capacity for renewable PPAs along with installed capacity, could you share from an operational standpoint? I believe you mentioned briefly while answering one of the participants that we're attempting to lock in the PPA. So does that responsibility fall on us, or on the agency that called this bid? In other words, is it up to them to secure the PPA on our behalf.
Saurabh Mashruwala
executiveNo, what they're doing is trying to finalize the PPA. The PPA hasn't been signed yet. So we've got one under the option. The PPA still needs to be signed with the beneficiary.
Vishal Periwal
analystRight. So I believe your comments note on that same slide that SCOD comes 24 months following the PPA. A few of those capacities are already under contract. Say, for instance, in RTC, if there's one — take that as an example — the gap is about 260 MW. So operationally, how does that actually work? Do we commission that capacity? Do we hold off until the PPA gets signed, or do we commission just the 100 MW and then what?
Saurabh Mashruwala
executiveNo, no, no. Commissioning of the project gets underway only after the PPA has been signed. That is the reason SCOD is tied to the signing of the PPA, not to the tender award.
Vishal Periwal
analystRight. No, but at the point when we invite tenders — I mean, coming from the equipment manufacturers, we're putting in a full 368 MW. We'll be putting that up.
Saurabh Mashruwala
executiveYes.
Vishal Periwal
analystAll right. But then with the commissioning — in that sense, we're really only putting up 100 MW. And then.
Saurabh Mashruwala
executiveNo, no, no — 368 is what's installed in terms of capacity. The PPA, though, would cover 100 MW. The thing is, all of these are renewable projects, and a number of these contracts carry a higher CUF. Take REMCL, for instance — that one has a CUF of 85%. So if I'm looking to deliver power at 85%, or on a PLF basis, for this renewable project, I'll have to scale up the capacities at the back end. That's the reason you're seeing 100 MW tied up, while I'm actually putting in 368 MW so those standard conditions get met.
Vishal Periwal
analystRight. Right. Right. So in a sense, that's really due to a higher CUF, which means most of it is essentially tied up. Is that the right way to look at it?
Saurabh Mashruwala
executiveYeah.
Vishal Periwal
analystRight, right, right. OK. OK. Sure. Yeah. Nothing further from me. Thanks.
Saurabh Mashruwala
executiveThanks a lot. Appreciate it.
Operator
operatorThank you. Ladies and gentlemen, that brings us to the final question for today. At this point, I'd like to pass the conference back to Mr. Saurabh Mashruwala for his closing remarks.
Saurabh Mashruwala
executiveThanks a lot, everyone. We want all of you to remain safe and well. Many thanks. Appreciate it.
Operator
operatorMuch appreciated, sir. That brings this conference to a close on behalf of Torrent Power Limited. Thanks to everyone for being with us, and you're free to disconnect your lines at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.