Ladies and gentlemen, good day, and welcome to Torrent Power Limited Q1 FY '25 Earnings Conference Call. [Operator Instructions] Please note that this conference is being recorded. I now hand the conference over to Mr. Saurabh Mashruwala, CFO, Torrent Power. Thank you, and over to you, sir.

Saurabh Mashruwala

executive
#2

Thank you so much. Good evening to all of you, and thank you for joining Torrent Power's earnings calls for Q1 FY '25. First, I will take you through the performance of the quarter after which phone lines will be open for the Q&A session. Next is the performance of the company at PBT level first, and then we'll take you to tax expenses separately. Reported PBT for the quarter stood at INR 1,315 crores as compared to INR 711 crores in the corresponding quarter last year, an increase of INR 603 crores as a growth of 85% on a reported basis. EBITDA for the current quarter increased nonrecurring [indiscernible] INR 102 crores for carrying costs approved by the regulators. Adjusted for the above nonrecurring item, the adjusted PBT for the quarter stood at INR 1,213 crores as compared to INR 711 crores in comparable quarter of last year, which is higher by INR 502 crores that is a growth of about 71%. Business factors contributing to the performance are as follows: First, gain from sale of merchant power and LNG of INR 517 crores. During the quarter under consideration, merchant capacity were operated for sale in the merchant market, 477 megawatts NVVN tenders, Section 11 as well as sale of power in a merchant and power action as well. Current demand and supply situation in the electrical market is favorable for generator like when -- whoever untied capacity. And due to the no major investment being made on thermal capacity in the recent past. With moderation in LNG price globally, it provides a good opportunity for us to run our untied capacity, and gas-based capacity of 1,500 megawatts. Overall, PLF of thermal generation improved 14% to 16%, due to better long-term as well as merchant sales. Above mentioned gain from the thermal segment were partially offsetted by 2 reasons. First, a reduction in contribution of the renewable energy segment by INR 4 crores. The second, reduction in contribution from the distribution business, mainly on account of 2 reasons, marginally higher T&D losses across all areas except Agra offset by better demand across both the segment, which increased by 7% [ entire ] distribution area and 6% in sensors distribution area. This completes the explanation on financial performance during this quarter. Moving on, we'll now give a brief update on the projects in the pipeline. 3 gigawatt capacity on DC basis of renewable power projects are in pipeline, which includes following projects: First, 87.7 megawatt out of total 420-megawatt solar project having PPA with our own DISCOM as in commission during the quarter. Balance capacity is expected to be progressively commissioned by end of Q2 FY '25. As informed earlier, project is expected to have improved return profile considering reduction in solar module prices in interest market. The project costs is expected to be around 1,800 crores. Second, 300-megawatt SECI XII wind projects, PPA for which was executed in the end of May '23, a turnkey EPC contract for the development of the project has been awarded to Suzlon, in view of the [indiscernible] by [ ERC, ] the SCOD of the project has been extended to January 2026. The project cost is expected to be in about INR 2,500 crores. Third, 200-megawatt merchant hybrid project comprising of 125 megahertz wind as well as 75 megahertz solar is being developed under the Airpower wind farm. The project implementation is on track. And plant is expected to be commissioned progressively by December '25. As the power from the projects to be sold directly in the merchant market, it will start generating revenues right from the first part of commissioning, as evacuation infrastructure is in place. The project cost is expected to be INR 1,400 crores. Fourth, 825 megahertz hybrid projects having PPA capacity of 450 megawatt with our own DISCOM, comprising of 486 megawatt wind and 339 megawatt of solar project was awarded through bidding process, at a fixed tariff of INR 3.65 for 25 years. LOA for the project has been awarded and PPA for the project is likely to be executed by end of Q2 of FY '25. SCOD of the project is 24 months from the PPA date and likely to be implemented with a project cost of INR 5,500 crores. Fifth, 368 megawatt hybrid project comprising of compact 225-megawatt (sic) [ 224-megawatt ] of wind and 144 megawatt solar project was awarded through a bidding process conducted by the Indian Railway at a fixed tariff of INR 4.25 per unit for 25 years. LOA for the project has been awarded and PPA for the project is likely to be executed in the current quarter. SCOD of the project is 24 months from the PPA date and likely to be implemented with the project cost INR 2,600 crores. Sixth, 425 megahertz Solar PV project having [indiscernible] of 306 megawatts was awarded through a bidding process conducted by the MSEDCL at a fix tariff of INR 3.10 for 25 years. LOA for the project has been awarded and PPA for the project has been executed. SCOD project is September '25 and is likely to be implemented with a project cost of INR 1,550 crores. Seven, 100-megawatt wind power project awarded through competitive bidding process conducted by SECI XVI at a fixed tariff INR 3.60 for 25 years. PPA for the project been executed. SCOD of the project is June '26, and is likely to be implemented with a project cost of INR 925 crores. Eighth, under C&I portfolio. Company has 528 megawatts project under development, compassing of 426 megawatts solar, 122 megawatt out of wind project. Out of which, 35-megawatt has been commissioned till the end of the current quarter, taking total C&I capital to 563 megawatt. Balance capacity is likely to be commissioned progressively within next 2 years. The project cost is expected to be INR 2,700 crores. Apart from renewable energy projects, the company has been working on a development of 2 transmission projects, which includes Khavda transmission project in the Torrent Power Grid Limited. It's a JV between Torrent Power as well PGCL which has been awarded because the company on a nomination basis under regular tariff mechanism, post-tax return on equity of 15% plus incentives. The project cost is expected to be above INR 800 crores. Second, Solapur Transmission project under new SPV, which was won on the competitive bidding basis conducted in the Q1 of FY '23 -- '25 at fixed -- annual [ INR 50 crores ] per annum for 35 years. The project cost is expected to be INR 470 crores. The above stated investment in renewable as well as transmission project, the company has investment plan close to odd INR 20,000 crores for next 3 to 4 years. Moving over to the new ventures, companies pilot project on green hydrogen then in the the CNG in UP. One of the largest private sector blending project in Indian sector expected to be commissioned by Q2 of FY '25. Further the company has got allocation of 18 Ktpa of green hydrogen production under SECI PLIs tender. Tthe average PLI of 28.89 per kilo. Technical feasibility has been done and detailed business plan is under preparation. With respect to pump storage hydro project, having good identified project site with a potential of 8.4 gigawatt of pump storage, hydro capacity in the district of Maharashtra and Utar Pradesh entailing total investment of INR 40,000 crores. Technical feasibility study completed and MoEF terms of reference has been granted for the entire capacity of 8.4 gigawatts. It has be appointed for [ EIA ] sudy and environmental clearance for the all sides. Similar opportunities are being explored in other states like Gujarat, MP and Rajasthan. We have initiated the process for obtaining requisite approval. This could be offered either as a storage solution or proving high CUF even or RTC renewal power solutions. That's all for the quarter. Now I request coordinator to open the Q&A session. We wish everybody to stay safe and healthy. Thank you, Handing over to the operator.

Operator

operator
#3

[Operator Instructions] First question is from the line of Satyadeep Jain from AMBIT Capital.

Satyadeep Jain

analyst
#4

Sir, a very strong performance. Just I have a couple of questions. On the merchant power sale, I'm not sure if I missed it. Is it possible to share the split between NVVN and Section 11? What was the volume -- and also separately on the profitability for Section 11, last time we discussed that, there is a benchmark and then there's a spread over that benchmark. If you can maybe share some metrics around profitability on the Section 11 that you had in this quarter?

Saurabh Mashruwala

executive
#5

Breakup, we're not able to provide, but we can able to provide the MUs basically. MUs, we have sold is about 1,700 MUs we have sold in the merchant market.

Satyadeep Jain

analyst
#6

So the -- but generally any kind...

Saurabh Mashruwala

executive
#7

It is including the NVVN sale Section 11 as well as well as the sale on the exchange and bilateral revenues.

Satyadeep Jain

analyst
#8

So any profitability directionally can you give on -- maybe Section 11? What was the price at which you sold or maybe some kind of profitability metrics on the Section 11?

Saurabh Mashruwala

executive
#9

This kind of opportunity is available in the summer time and the pre-winter time. So summer time, we -- obviously the demand is very strong and electrifies [ are moderated basically. ] So we got this opportunity to sell significant quantity in the merchant market. We have 1.5 gigawatt untied capacity. So we have utilized this capacity in selling these 3 areas -- the 4 areas, NVVN tenders, Section 11 -- exchange is a bilateral basis. So we expect the similar opportunity will be available in the pre-winter time also, maybe September, October and other things, depending on the season, how the seasons progress.

Satyadeep Jain

analyst
#10

Okay. And can you remind us on your take or pay on LNG, what is the current contracted LNG volumes you have? And I believe you're looking at new tenders. So how does it -- maybe just some details on when these take-or-pay contracts are now written and what kind of renewal you're looking at?

Saurabh Mashruwala

executive
#11

So we are working on the fresh contract, in fact. So it's under discussion by income. So it's working progress kind of [indiscernible] form.

Satyadeep Jain

analyst
#12

Currently, you have, I believe, 3 LNG cargoes contracted under take or pay each year for the next 1 or 2 years?

Saurabh Mashruwala

executive
#13

Yes, up to '26 -- up to '26, we have 3 cargoes we have contracted. And balance cargo for the year, we have taken [indiscernible] is going to be a [ percent ] of spot basis. So we -- now the LNG price is moderated, so we will try and contract more cargoes going forward.

Satyadeep Jain

analyst
#14

Maybe, possibly more than 3 cargos is what you have suggested here.

Saurabh Mashruwala

executive
#15

Absolutely, absolutely. Absolutely.

Satyadeep Jain

analyst
#16

Just 1 more quick question on the distribution and transmission. Just want to understand very strong Y-o-Y growth, the underlying drivers. You discussed it briefly, but if you look at AT&C losses have also -- distribution losses were generally slightly higher Y-o-Y. What drove that profitability in that business?

Saurabh Mashruwala

executive
#17

Sorry, come again?

Satyadeep Jain

analyst
#18

In the distribution and transmission business, when we look at the underlying profit compared to last year, there is a significant growth Y-o-Y. I just want to understand what were the drivers that led to that.

Saurabh Mashruwala

executive
#19

Demand has gone up by about 6%, 7% in the Q1 as compared to the last quarter, comparable to what of last year. The profit is mainly coming from the approval, which we have received from the regulator for the carrying cost of close to about INR 100 crores this quarter.

Satyadeep Jain

analyst
#20

Okay. So that was the big swing in just the approval for that carrying cost?

Saurabh Mashruwala

executive
#21

Yes, exactly.

Operator

operator
#22

[Operator Instructions] Next question is from the line of Mohit Kumar from ICICI Securities.

Mohit Kumar

analyst
#23

Congratulations for the cool set of numbers. My first question is, is it possible to let us know the current arrangement of sales from DGEN and SUGEN? Is it the Section 11 and what is the quantum level of the of the merchant basis? Just some color will be helpful.

Saurabh Mashruwala

executive
#24

So, SUGEN if you look at the Section 11 provision, so whatever is untied up capacity, for example, is we can able to offer in the Section 11. But since we have a NVVN tender, we have some committed capacity from SUGEN and DGEN. So balance capacity can offer on Section 11.

Mohit Kumar

analyst
#25

So is it for the quantum and how long it will continue, this Section 11?

Saurabh Mashruwala

executive
#26

It will be up to 30th June, I would say. So it will keep a limited period of time in the summer month.

Mohit Kumar

analyst
#27

So this is over right?

Saurabh Mashruwala

executive
#28

Yes, yes.

Mohit Kumar

analyst
#29

So now the untied capacity is free to be sold in the budget, right?

Saurabh Mashruwala

executive
#30

Yes, exactly. Exactly.

Unknown Executive

executive
#31

So Mohit, just to add, typically, what happens is that if you are untied capacity, when you say untied capacity, it includes a long-term contract, and it includes even bilateral contracts also. Over and above there, if you have any untied capacity, then you have to sell it under Section 11. So typically, what we do is we also do bilateral contracts with short-term for 1 month, 2 months, 3 months. Those capacities are not available for Section 11.

Saurabh Mashruwala

executive
#32

And [indiscernible] Section 11 capacity, government is asking the user schedules during the peak time. We provide a schedule as well as schedule requirement, we have supply the power under Section 11. It will not be throughout consistently being provided. The government is providing the schedule when they need the power. And accordingly, we have to supply power to under Section 11.

Mohit Kumar

analyst
#33

Is it right to say that the terrific Section 11 is over now -- and what will the capacity is free, right?

Saurabh Mashruwala

executive
#34

Yes, it is up to the scheme was available up to 30th June. So now it is not no longer Section 11 is applicable at this moment.

Mohit Kumar

analyst
#35

Second question is on the T&D losses. Of course, generally, you see improvement every year. This particular quarter, you have seen the T&D losses. Is there a particular reason which affected our T&D losses?

Saurabh Mashruwala

executive
#36

See, if you look at the Ahmedabad and Surat distribution area, we -- there was a growth about 6%, 7%. So -- and there will be more retail share -- selling to more retail [indiscernible] area, I would say. Where the loss will be bit higher compared with the industrial commercial consumer. So sale to those residential consumers are higher and where the losses are higher, I would say. That is why it's gone up by a bit -- for a few basis points.

Mohit Kumar

analyst
#37

My last question on the other expenses that has gone up, I think, by INR 60 crores Q-o-Q and Y-o-Y INR 100 crores. What explains this?

Saurabh Mashruwala

executive
#38

If you can repeat your question?

Mohit Kumar

analyst
#39

This other expenses, just as a line item -- other expenses.

Saurabh Mashruwala

executive
#40

Other expenses, see the plant operation is higher. We have -- if you look at generation PLF was 40%, it has gone up to 60%. So obviously, the plant O&M expenses will be higher. So because of the plant higher operation, my other expenses is also higher which will be booked in the other expenses.

Operator

operator
#41

[Operator Instructions] Next question is from the line of Jiten Rushi from Axis Capital.

Jiten Rushi

analyst
#42

My first question is on the gain on sale of gas on merchant business as well as NVVN. Sir, you said in the opening remarks that it is incremental, it is higher by INR 917 crores, right?

Saurabh Mashruwala

executive
#43

Sorry?

Jiten Rushi

analyst
#44

It is incrementally higher by INR 917 crores, your revenue.

Unknown Executive

executive
#45

INR 517 crore.

Saurabh Mashruwala

executive
#46

INR 517 crores.

Jiten Rushi

analyst
#47

INR 517 crores, sorry, my bad. So sir, last year same period, I think the gain was almost INR 140-odd crores, right, sir, incremental?

Unknown Executive

executive
#48

There's INR 130 crores gain from merchant and INR 10 crores from LNG.

Saurabh Mashruwala

executive
#49

Yes, yes. INR 140 -- about INR 145 crores were the gain for the last year.

Jiten Rushi

analyst
#50

Okay. So this year, it is like.

Saurabh Mashruwala

executive
#51

This is the incremental profit of INR 517 crores we are talking about.

Jiten Rushi

analyst
#52

Incremental -- yes. Okay. And sir, the carrying cost, which has got approved by the regulator is for the distribution you said, right, which is still -- this...

Saurabh Mashruwala

executive
#53

License distribution area.

Jiten Rushi

analyst
#54

Ahmedabad and Surat, right, sir?

Saurabh Mashruwala

executive
#55

Yes.

Jiten Rushi

analyst
#56

And sir, 1 more question on the booking side. You have seen a sharp increase in the employee cost. So what was the reason for that, sir?

Saurabh Mashruwala

executive
#57

I don't think there is a sharp increase in the employee cost. General...

Jiten Rushi

analyst
#58

You If you see Q4 '24, it was INR 147 crores. And this is INR 173 crores in Q1. So obviously there is a sharp increase.

Unknown Executive

executive
#59

But you are comparing Q4, but rather, I think quarter 2, quarter 1 as to compare.

Jiten Rushi

analyst
#60

Quarter 1 also is INR 146 crores.

Saurabh Mashruwala

executive
#61

Generally, the Q4 -- if you look at the Q4 -- Q4 by capitalization was highest in Q4. So -- in Q4, our capitalization is highest in Q4 because the highest capitalization, some of the cost of employees also get capitalized because of the accounting, the capitalization and expenses. So -- and Q1, capitalization is lower, I would say.

Jiten Rushi

analyst
#62

But this is not a trend. So this is a different trend we saw. Okay. And sir, on the CapEx guidance, can you throw some light for this year?

Saurabh Mashruwala

executive
#63

Capital guidance, is the same guidance, about INR 2,000 crores we plan to spend of our license and franchise distribution business. INR 1,750 crores is for license distribution business and about INR 200 crores, INR 250 crores for the franchise distribution area.

Jiten Rushi

analyst
#64

And in the renewable part, sir?

Saurabh Mashruwala

executive
#65

So renewal progressively, we have INR 18,000 to INR 20,000 crores investment plan for next 3 years -- 3, 4 years, I would say. So every year, we'll spend about INR 5,000 crores -- close to INR 5,000 crores. But it will be progressively spend based on the commissioning of the projects.

Jiten Rushi

analyst
#66

And sir, in your opening remarks, I think you said something on the green hydrogen and the PLI which is not part of the presentation. Can you repeat or I can take it separately after the call also. It is fine for me.

Saurabh Mashruwala

executive
#67

Yes, you can take it separately after the call.

Operator

operator
#68

Next question is from the line of Bharani from Avendus Spark.

Bharanidhar Vijayakumar

analyst
#69

Am I audible?

Saurabh Mashruwala

executive
#70

Yes.

Bharanidhar Vijayakumar

analyst
#71

Yes. So I just want to clarify the split of the Section 11 and the contracted capacity to either PPA or bilateral plant wise, like SUGEN has about 80% contracted to own DISCOM. So should I consider the remaining was offered in Seciton 11 in the quarter?

Saurabh Mashruwala

executive
#72

So about 75% is tied up with the long-term PPA for SUGEN as well as UNOSUGEN. And yes, balances are available -- part of it is available for Section 11.

Unknown Executive

executive
#73

So Bharani, you are right. For long-term PPAs, it is 75%. But as I said earlier that we also do short-term contracts. Now if we already have some contracts in place, that will not get counted under Section 11.

Bharanidhar Vijayakumar

analyst
#74

Sir, that's what so -- 25% of SUGEN and UNOSUGEN, whatever is remaining, that would be given to bilateral or merchant or [indiscernible] sorry. So what would have been that bilateral portion from SUGEN and UNOSUGEN in 1Q?

Saurabh Mashruwala

executive
#75

We are not sharing those numbers. I think you should look at merchant on a holistic basis rather than dissecting it in 2 different sections.

Bharanidhar Vijayakumar

analyst
#76

Okay. So of the overall capacity of SUGEN, UNOSUGEN and DGEN, which is [ 2,750 ] megawatts have been given to merchant in megawatts in 1Q?

Saurabh Mashruwala

executive
#77

So merchant, total MU which we have sold, which will comprise of Section 11, NVVN and bilateral all on exchange is around 1,700 MUs for the quarter.

Bharanidhar Vijayakumar

analyst
#78

Okay. Okay. That comes to what percentage, I mean, I can calculate, but just for discussion purposes.

Saurabh Mashruwala

executive
#79

Sorry, come again?

Bharanidhar Vijayakumar

analyst
#80

That will come to what percentage of overall sold by these 3 plants?

Saurabh Mashruwala

executive
#81

I'll give it you offline. I don't have the numbers as of now.

Bharanidhar Vijayakumar

analyst
#82

Okay. Got it. And pre-winter like in September and October, again, there will be probably increased sales in merchant or bilateral. But do you foresee Section 11 in those months?

Saurabh Mashruwala

executive
#83

It depends on the weather condition I would say, so how the weather condition will be there. It depend on the weather condition. And though the weather will not be so severe like summer. So, as of now it's too early to estimate whether Section 11 will come or not.

Bharanidhar Vijayakumar

analyst
#84

Okay. So in the -- for the remaining part of the year, we can assume that it would be PPA of capacity plus some merchant sales that can happen from the -- untied capacity.

Saurabh Mashruwala

executive
#85

Yes.

Bharanidhar Vijayakumar

analyst
#86

Okay. And final question. So I think in the last quarter call, some number around average tariff and average cost of generation for NVVN was said, I think it was -- costs at the INR 8 per unit, tarrif at INR 10 per unit, so EBITDA contribution of INR 2 per unit. So was this materially different? Or was it same for NVVN in [indiscernible]?

Saurabh Mashruwala

executive
#87

The average contribution is higher in the summer months. We can't give the exact number of amount of contribution, but it's higher than the summer -- during the summer month.

Bharanidhar Vijayakumar

analyst
#88

And what would be like the average cost of generation at present or for the remaining, say, 9-month period for this gas- based power plant in rupees per unit?

Saurabh Mashruwala

executive
#89

See if you -- it depends on your material cost the cargo cost, basically. So average, so far, what we have acquired is about $9.5 per Mbbtu -- fuel costs.

Bharanidhar Vijayakumar

analyst
#90

That will roughly translate to INR 7, INR 8 per unit landed cost.

Saurabh Mashruwala

executive
#91

It is about INR 6.5 kind of a thing, variable cost.

Operator

operator
#92

Next question is from the line of Vishal Periwal from [indiscernible].

Unknown Analyst

analyst
#93

Yes, congratulations on a good set of results. I joined the call a little late, so pardon if there is a repetition. In terms of our quarterly PAT of roughly INR 996-odd crores. Can you share if one has to like -- one-offs in this, what could be a recurring PAT for us.

Saurabh Mashruwala

executive
#94

So out of PAT of -- it will be above INR 1,315 crores after Q1 of the current quarter, the one-off is hardly INR 102 crores, which is a carrying cost we got approval of INR 102 crores carrying cost. That is the one-off items.

Unknown Analyst

analyst
#95

Okay. But sir, I think Section 11, again, probably if it is not continuing at least for the next coming quarter, will it be possible maybe like to subtract that and to provide some numbers?

Saurabh Mashruwala

executive
#96

No, we see it as a section as a part of the merchant set. So we don't distinguish section alone differently. So all our NVVN tender, merchant sales, our exchange and bilateral business, Section 11, we all see it as a part of the merchant sales.

Unknown Executive

executive
#97

So Vishal, I think on a normalized basis, which you're talking, I think you'll have to see on a Y-o-Y basis rather on a quarter-on-quarter basis. So if you look at last year, if you -- or any year, Q1 has always been better compared to any other 3 quarters because of inherent demand in the country, which is very high, and that's why having higher merchant sales. So if you want to normalize, actually you'll have to look at Q2 versus Q2 rather than Q1, Q2, Q3.

Unknown Analyst

analyst
#98

Okay. So is that fair to say in the quarter 1 of last year, there were Section 11 at that time also.

Unknown Executive

executive
#99

No. Section 11 was the first time, which was imposed on gas-based power plants in this Q1. What we are trying to say is that merchant sales on a holistic basis, there was profit in the last year Q1 also, there are profits in this year, Q1 also, which typically goes down as we progress towards the year. In Q2, Q3 and Q4 typically, it tapers down because of lower demand.

Unknown Analyst

analyst
#100

Okay. Sure sir. Maybe. Sir, on this Section 11, any number that is there in public domain that you like to share in terms of the realization, how exactly it differs maybe with our contracted quantity, if there's any directionally ballpark percentage higher? Or if you can just share?

Saurabh Mashruwala

executive
#101

Yes. So we explained, we don't differentiate the Section 11. It's a part of the merchant set.

Unknown Executive

executive
#102

So as far as the formalized concern, it is 120% of your variable cost. Now variable cost is defined as your gas price, which is defined by GSPL or the defined price by the [ new ] -- price against which our sourcing cost is lower. Another one is on the wind and costs, which are variable, there is some normative parameters against which our O&M costs are lower. So if you look at -- from a holistic basis, my margins would be higher than 20%, which is [indiscernible] under the Section 11.

Operator

operator
#103

Next question is from the line of Swati Jhunjhunwala from JM Financial.

Swati Jhunjhunwala

analyst
#104

Congratulations on a good set of numbers. Sir, I might have missed it. So the C&I capacity of 525 megawatts, when is that expected to be commissioned?

Saurabh Mashruwala

executive
#105

Next 2, 3 years, 2 to 3 years.

Swati Jhunjhunwala

analyst
#106

Next 2 to 3 years, okay. And so can you give me a broad sort of a number as to what you are planning the commission this year versus next year versus FY '27. Is it -- like are the 8 projects that you highlighted? Is that it? Or there might be more?

Saurabh Mashruwala

executive
#107

So as of now 8 projects under development right now. If you look at the -- by March '25, 1 project of 420-megawatt is getting commissioned. And the rest of the project is getting commissioned from next year onwards. Some capacity will get commissions of C&I portfolio also. Airpower capacity progress fully gets commissioned because it is both commissioning date line is somewhere around December '25, but some part of the capacity is getting commissioned before March '25 also.

Swati Jhunjhunwala

analyst
#108

Understood. And on the Hydro PSP, 8.4 gigawatts, can you assume a sort of a 4 to 5 years timeline for this one to come up since it's still in the approval phase.

Saurabh Mashruwala

executive
#109

Yes, at least 5 years, I would say.

Swati Jhunjhunwala

analyst
#110

Okay. And sir, just 1 question on this PSP. So are we looking at it at a -- is it a near a river or is it not near the water body. Because I think the water requirement is very different.

Saurabh Mashruwala

executive
#111

I think it is not one of the river projects. They are all pump storage -- storage hydro projects. And the projects are typically in those areas where rainfalls are good. So once you have good rainfalls, you can collect the water and use it for store.

Unknown Executive

executive
#112

There will be a reservoir for upper and for lower reservoir -- and so -- and that area it will be developed.

Swati Jhunjhunwala

analyst
#113

Understood. So it's not run off the rivers is what you're saying.

Unknown Executive

executive
#114

No, no, no.

Operator

operator
#115

Next question is from the line of Aniket Mittal from SBI Mutual Fund.

Aniket Mittal

analyst
#116

Sir, a clarification. For the quarter, what were our LNG sales or the deals that you made on LNG?

Unknown Executive

executive
#117

LNG sales are very, very municipal.

Saurabh Mashruwala

executive
#118

So now they have opportunities to generate the power and sell in the merchant market. So very municipal amount we sold in the LNG.

Aniket Mittal

analyst
#119

Sir, this overall number of, let's say, INR 660 crores worth of gain that we met. Like almost INR 650 crores will be merchant related. Is that fair?

Unknown Executive

executive
#120

Sorry, come again, Aniket?

Aniket Mittal

analyst
#121

Sir, the overall profit, if I look the overall gain on merchant plus LNG sales for this quarter is roughly INR 660 crores, right?

Saurabh Mashruwala

executive
#122

Correct.

Unknown Executive

executive
#123

Yes.

Aniket Mittal

analyst
#124

So out of this about like -- you're saying INR 650 crores is just merchant-related only. LNG sales would be INR 10 crores or [indiscernible].

Unknown Executive

executive
#125

About INR 40 crores is LNG sale, the rest is the merchant.

Aniket Mittal

analyst
#126

INR 40 crores, then it's about INR 620 crores. So on the 1,700 MUs that we sold, we earned INR 620 crores EBITDA. Is that right?

Saurabh Mashruwala

executive
#127

Yes.

Aniket Mittal

analyst
#128

Okay. And sir, is Section 11 for us being more profitable than the actual, let's say, bilateral contract that you have done between the two?

Unknown Executive

executive
#129

I think, Aniket, it is very difficult to look at it in that [ session. ] As Saurabh has rightly said earlier, Section 11 does not guarantee you RTC power. So if you want to participate in Section 11, you'll have to have your base loads running and then you can participate in Section 11. So I think we'll have to see on a holistic basis, wherein you enter into some short-term contracts, which will give you an RTC power and you can use your generators on a base load. And then once that is there, even though at a lower profitability, then that opportunity is available for you to ramp up faster, and take utilization of Section 11 or peak power demand and what other opportunities are available in the market. So I think it's a combination of all of them, which gives you better profitability.

Aniket Mittal

analyst
#130

Just 1 more bookkeeping question. What were the merchant volumes that we did in 1Q of last year and for FY '24 as a whole?

Saurabh Mashruwala

executive
#131

So in terms of annual about 4 -- about close to 500 MUs last year.

Aniket Mittal

analyst
#132

For 1Q.

Saurabh Mashruwala

executive
#133

400 MUs.

Unknown Executive

executive
#134

400 MUs.

Aniket Mittal

analyst
#135

400 MUs for 1Q of last year?

Saurabh Mashruwala

executive
#136

Q1 of last year comparable quarter of last year.

Aniket Mittal

analyst
#137

And for FY '24 as a whole?

Saurabh Mashruwala

executive
#138

1,400.

Aniket Mittal

analyst
#139

1,400. And sir, what would have been the overall merchant gains for last year?

Saurabh Mashruwala

executive
#140

Merchant gains would be around INR 300 crores -- INR 325 crores.

Operator

operator
#141

Next question is from the line of Ishan Minda from IIFL Securities Limited.

Ishan Minda

analyst
#142

I just wanted to understand if there has been any development on the part of DISCOM privatization or parallel licensing.

Saurabh Mashruwala

executive
#143

No. As of now, there is so further development because parallel licensing, we have replied all queries of the regulators. So we are awaiting the further action from the regulators. And privatization now the election is over. So let's see -- what the state government action going forward. But we are very keen to participate in any opportunity available in the private -- privatization.

Ishan Minda

analyst
#144

Sure sir. And with Section 11 only up til 1Q of FY '25, how was the performance of your gas IPPs -- I mean if you could provide any qualitative comments?

Saurabh Mashruwala

executive
#145

So we don't know the other, but we have -- our guess is our project is ready to meet any demand, I would say, either merchant market, Section 11, everything. So we are -- it's a state of readiness submission for all our projects, including the DGEN project also.

Operator

operator
#146

Sure, sir. But at current merchant rate, are we able to maintain a good level of margins on your merchant operations with 3...

Saurabh Mashruwala

executive
#147

If you look at the Q1, the significant profit we have, it could be a 1,000 merchant market Yes.

Operator

operator
#148

Next question is from the line of Nikhil Abhyankar from ICICI Securities.

Nikhil Abhyankar

analyst
#149

Sir, in the -- till July this year, almost around 6, 6.5 gigawatts of renewable capacity has been awarded.

Operator

operator
#150

Sorry to interrupt sir. Your voice is very low.

Nikhil Abhyankar

analyst
#151

Audible? Hello?

Operator

operator
#152

Yes please.

Saurabh Mashruwala

executive
#153

Yes.

Nikhil Abhyankar

analyst
#154

Sir, till July this year, almost 6, 6.5 gigawatts of renewable capacity has been awarded, but we were -- we haven't won any project as of yet. So are we planning or is it a decision that we have taken to execute this portfolio first and then get back in this bidding process.

Saurabh Mashruwala

executive
#155

Last 6 months, I would say, few last Q1 is the -- last six months. We have won about more than 1.5 gigawatt of capacity in the last [indiscernible].

Nikhil Abhyankar

analyst
#156

Okay. So -- but we will be bidding in FY '25 as well?

Saurabh Mashruwala

executive
#157

Absolutely.

Unknown Executive

executive
#158

Yes. Nikhil, the aim is to have at least 5 gigawatts in next 2 or 3 years to reach 5 gigawatts. So we are right now under construction would be around 4 gigawatts. And so we'll keep on looking at projects. The only thing is we have to meet our parameters. If they are meeting, and we'll be wanting to take more projects.

Nikhil Abhyankar

analyst
#159

Understood. And sir, we are also doing merchant RE projects. So will we be taking up more such projects or...

Saurabh Mashruwala

executive
#160

So as of now, 1 project is under construction. So we'll commission that 1 project and then we'll see -- as of now, there is no further plan of merchant project.

Nikhil Abhyankar

analyst
#161

Okay. And this will be purely be sold on exchanges or through bilateral contracts as well?

Saurabh Mashruwala

executive
#162

So we'll see the where ever base price is available either through stock exchanges or through the bilateral business, we will do it.

Nikhil Abhyankar

analyst
#163

Something like a virtual PPA as well?

Saurabh Mashruwala

executive
#164

So it depends on available opportunities for this kind of a project.

Operator

operator
#165

Next question is from the line of Amit Bhinde from Morgan Stanley.

Amit Bhinde

analyst
#166

Congratulations on a great set of numbers. I just wanted to get some update on the note #3 that you had been recently putting out where you quantify the revenue from the merchant and RLNG. So how much it is this year? Last year it was INR 72 crores.

Saurabh Mashruwala

executive
#167

No, as -- sorry, revenue from merchant.

Amit Bhinde

analyst
#168

Merchant and RLNG that you had been putting into the books of account recently. So this time, we haven't put that note #3.

Saurabh Mashruwala

executive
#169

So it was not a very significant number. So that is what the auditor has dropped or not.

Amit Bhinde

analyst
#170

So that is only for the RLNGs really, you mean?

Saurabh Mashruwala

executive
#171

Yes, exactly.

Amit Bhinde

analyst
#172

OkOkay. So for merchant, I mean would it have been around INR 1,700 crores this year -- or sorry, in this quarter?

Saurabh Mashruwala

executive
#173

No, I didn't say. The 1,700 MUs is there.

Amit Bhinde

analyst
#174

Okay. 1,700 MUs is there. So I'm just assuming a price of around 10. Is that a correct number to guess?

Saurabh Mashruwala

executive
#175

You can, you can assume that.

Amit Bhinde

analyst
#176

That is an approximate number. Right. One other clarification that I wanted to get, is that RLNG and merchant gains -- this year is INR 517 crores increase or absolutely because last year, I think.

Saurabh Mashruwala

executive
#177

It's an incremental. It's an incremental. Incremental.

Amit Bhinde

analyst
#178

And to the previous question, you said it is INR 145 crores for Q1 of '24.

Saurabh Mashruwala

executive
#179

Yes, exactly.

Operator

operator
#180

Next question is from the line of Satyadeep Jain from AMBIT Capital.

Satyadeep Jain

analyst
#181

Just a couple of follow-ups. So I wanted to understand on Section 11, whatever untied capacity you have, you have the option to sell it in the power exchange bilateral support by GRID India. Is that -- say you have the option as a generator to sell in any market segment where you find better prices?

Saurabh Mashruwala

executive
#182

No, no. I think if you -- before impose of Section 11, if you had already tied up your merchant capacities on a bilateral basis, that you can not offer under Section 11. All the other capacities, you'll have to offer under Section 11, if there is scheduling by the regulator or by the SLBC. If they are not scheduling, you are open to sell in the merchant market.

Satyadeep Jain

analyst
#183

The under Section 11, it has to be based on scheduling by the SLBC.

Saurabh Mashruwala

executive
#184

Yes. So under Section 11, if it is scheduled, you will have to supply power. If it is not scheduled, you're open to sell in the merchant market or wherever you need to sell it.

Satyadeep Jain

analyst
#185

So just because I was trying to understand if we look at the variable cost of INR 6.5 is what you guided mentioned based on the LNG price, there is obviously going to be incremental O&M also and then you have based on the numbers that you mentioned it looks like an EBITDA side of INR 4 per unit. Overall, it looks like about INR 12 per unit. So I was just trying to understand when you sell this, these would be in high-priced end market. And so these are -- will be the schedule by SLBCs? I wanted to understand the clearing mechanism for this?

Saurabh Mashruwala

executive
#186

No, no. So there is a -- I mean when you say clearing mechanism, can you just elaborate on what do you want on the clearing mechanism.

Satyadeep Jain

analyst
#187

I was trying to understand the prices coming to about INR 12 per unit there. How are you scheduling this power sale?

Saurabh Mashruwala

executive
#188

I'll tell you, the scheduling is not done by us. It is done, let's say, under Section 11, the SLBC would do the scheduling, right? Under bilateral, the other person who has entered into a contract will do the scheduling. Under NVVN tender, again, NVVN will do the scheduling. So we don't have scheduling in our hands. Only thing which we have is that if the scheduling is not Happen and if there is an untied capacity if we are able to sell in the merchant market, we will sell.

Satyadeep Jain

analyst
#189

Okay. And 1 more question I wanted to ask on the LNG cargoes that you're looking to tie up. Can you maybe remind us the 3 cargoes that you had for taken pay, how much of your overall generation, the 3 cargoes would account for and the rationale for maybe tying up more cargoes is -- you seem more confident of using that in the merchant market on a longer-term basis?

Unknown Executive

executive
#190

So I think, if I look at my cargo requirement or my LNG procurement. As of now, under my PPA obligation, I have procured around 50% of our PPA obligation. Balance 50% is open. So I think I would want to do that first in terms of my PPA obligations are concerned. Merchants, we keep on looking at opportunity on a year-on-year basis. We don't want to lock ourselves because these are all take-or-pay contracts. So if tomorrow merchant prices go down and you are not able to sell in the merchant market, you'll have to pay for that cargo. So that we don't want to do it on a longer-term basis, a year, 1.5 years, we keep on looking at it and then we keep on procuring cargoes for the merchant market is concerned. And anyways, all these long-term contracts are all variable rate contracts. They are not fixed rate contracts. So you are just tying up the quantity rather than the price volumes.

Satyadeep Jain

analyst
#191

That I understood tying up the volumes -- just that obviously, the demand is not there, I was trying to understand is that these are take-or-pay contracts, but you're suggesting that anyway with the higher LNG cargoes, you would still need that for the PPA as well, right? So.

Saurabh Mashruwala

executive
#192

That's right.

Operator

operator
#193

Next follow-up question is from the line of Jiten Rushi from Axis Capital.

Jiten Rushi

analyst
#194

Just harping on the LNG tie-up. So now as we said, only 3 cargo tie-up is pending. So which is -- and this for of the 50% of the PPA capacity in balance 50%, we'll be procuring from the domestic market?

Unknown Executive

executive
#195

No, no. So I think it is actually wrong. What we said was 3 cargoes we have tied up for -- early December '26 as of now, and there are some contracts for domestic market procurement. Both put together gives you a tie-up of 50% for my PPA capacities are concerned.

Jiten Rushi

analyst
#196

Okay. So basically, 3 cargoes up to December and domestic contract put together 50%, up to December '26 broadly.

Unknown Executive

executive
#197

That right. That's right. Balance 50% under my PPO obligation is open. And whatever I want, I'm anticipating that to be sold in the merchant market that is open.

Jiten Rushi

analyst
#198

So this tie-up is that around $9.5 annuity, right, sir?

Saurabh Mashruwala

executive
#199

No. So $9.5 are all of fixed contracts, which we have done on a spot basis. the 50% cargo, which I told about under the PPA are on variable rate contracts. They're not fixed rate contract because under the PPA, Section 62 PPA wherein the LNG cost is a pass-through.

Jiten Rushi

analyst
#200

Okay. So this cargo type also cost is a pass-through. It's open contract based on the delivery.

Unknown Executive

executive
#201

Under the PPA, it is a pass-through.

Jiten Rushi

analyst
#202

Pass-through. Yes. Okay. So this is on the -- so basically, on the date of delivery, whatever cost would be there, it is a pass-through. What I understand, correct?

Saurabh Mashruwala

executive
#203

Yes, yes.

Jiten Rushi

analyst
#204

And sir, any further tariff which you're targeting now as you have put the tenders, as you said. So when can you expect this tenders to get awarded in terms of further tie-up beyond '26 or for the balance 50% upon capacity open.

Saurabh Mashruwala

executive
#205

We are under discussion. So we keep -- perhaps as soon as possible.

Operator

operator
#206

Next follow-up question is from the line of Bharani from Avendus Spark.

Bharanidhar Vijayakumar

analyst
#207

Yes. So are we bidding for any thermal projects, which might be of course sale or on the NCLT?

Saurabh Mashruwala

executive
#208

We are looking at it. So if assets are available at reasonable price, yes, we are keen to acquire those assets on the thermal side.

Bharanidhar Vijayakumar

analyst
#209

Okay. So any target we have, like we will want to add so much in thermal in the next 2 to 3 years?

Saurabh Mashruwala

executive
#210

There is no such fixed target. So it depends on the quality of assets and price also.

Bharanidhar Vijayakumar

analyst
#211

And coming to the recent developments where battery prices are coming down, there have been several bids with battery storage as a component. And have we been bidding there? If not, what is our thinking and strategy there.

Saurabh Mashruwala

executive
#212

So far, not but we are evaluating it. Our understanding is the battery and the pump storage will coexist in the Indian market.

Bharanidhar Vijayakumar

analyst
#213

Correct. So if we are having a pipeline of 8.4 gigawatts on pump storage, like -- my question is in battery, why aren't we taking advantage of the low price.

Saurabh Mashruwala

executive
#214

We are evaluating it, and we would look at it, an opportunity fall in time. But right now, we are also evaluating battery storage as a solution and bidding for that.

Bharanidhar Vijayakumar

analyst
#215

So actually, my point is, is there any challenges specifically you're seeing in battery, which is keeping you still evaluating meaning...

Saurabh Mashruwala

executive
#216

No. No. No.

Bharanidhar Vijayakumar

analyst
#217

Okay. Okay. My last question is on again our 1Q sales in the merchant. Now if I did just a calculation on how much we actually generated from SUGEN, UNOSUGEN and DGEN based on the sales you have provided. It comes to about 3,300 million units. So you are telling we sold 1,700 in merchant. So roughly about 50% is what we sold in PPA plus NVVN.

Unknown Executive

executive
#218

Yes.

Bharanidhar Vijayakumar

analyst
#219

Or is it NVVN also you're considering as merchant.

Unknown Executive

executive
#220

NVVN is also merchant.

Saurabh Mashruwala

executive
#221

We can say is a merchant sell.

Bharanidhar Vijayakumar

analyst
#222

Okay. So 15%, we are selling in PPA and that 50% also predominantly will be only coming from SUGEN and DGEN.

Saurabh Mashruwala

executive
#223

Correct.

Bharanidhar Vijayakumar

analyst
#224

Okay. And the LNG contract that we have for 50% to be used for the PPA there, we have variable rate contracts. And what would have been that dollar per MMBtu on 1Q on an average.

Saurabh Mashruwala

executive
#225

Cargo, which we have contracted is about $9.5. And the domestic which is about -- will be little bit higher than the $9.5, I would say.

Unknown Executive

executive
#226

I think few variable rate, what you're saying about is the PPA, it would be not only imported cargoes, it will also be domestic procurement.

Bharanidhar Vijayakumar

analyst
#227

For which Saurabh sir said, for the imported cargo, it was $9.5. For domestic, he said it's a little higher.

Saurabh Mashruwala

executive
#228

Yes, yes.

Bharanidhar Vijayakumar

analyst
#229

And we would have procured in the spot market for merchant, what would have been that dollar per MMBtu in 1Q?

Saurabh Mashruwala

executive
#230

So this $9.5, this is spot cargoes also.

Bharanidhar Vijayakumar

analyst
#231

Okay. So the 3 cargoes that we have contracted, we are using it both for PPA market and also to be used to sell in the merchant.

Saurabh Mashruwala

executive
#232

So 3 cargoes that we have contracted is mainly for our long-term beneficiary.

Operator

operator
#233

Next follow-up question is from the line of Vishal Periwal from [indiscernible].

Unknown Analyst

analyst
#234

Yes. Sir, in your slide of renewable PPA contracted capacity and installed capacity, operationally, can you share -- I think you did mention briefly in one of the participants answer that you are trying to tie up for the PPA. So is it the onus on us? Or is the agency which has called this bid so they have to get the PPA for us?

Saurabh Mashruwala

executive
#235

No. It is a time to -- trying to tie up the PPA. It is -- PPA is yet to be signed. So we have won under the auction PPA is yet to be signed with the beneficiary.

Unknown Analyst

analyst
#236

Okay. So I think your remarks do mention in the same slide that SCOD will be 24 months after PPA. And there are a couple of capacities where -- which is already contracted. And maybe difference running in like, say, [ R&C ] take an example, the difference is roughly 260-odd megawatt. So then operationally, how exactly it works. So we commission the capacity we wait for the PPA signing up or we only commissioned the 100-megawatt and then...

Saurabh Mashruwala

executive
#237

No. No, no. We start commissioning the project once the PPA is signed, and that's why SCOD is linked to the PPA signing rather than on the award of the tender.

Unknown Analyst

analyst
#238

Okay. No. But when you are inviting tenders, we would be -- I mean from the equipment manufacturer, so we are putting 368-megawatt complete, we'll be putting up for...

Unknown Executive

executive
#239

Yes.

Unknown Analyst

analyst
#240

Okay. But then the commissioning in the sense, we are actually putting up only 100 megawatts? And then...

Unknown Executive

executive
#241

No, no. 360 here is the installed capacity. PPA would be for 100 megawatts, but since these are all renewable projects and some of these contracts are with a higher CUF. So let's say, in example, REMCL, it is a CUF, a CUF of 85%. So if I want to supply 85% power on a PLF basis, for this renewable projects, I will need to scale up my back-end capacities. And that's why you're seeing 100 megawatts of tied up, but I am actually installing 368 megawatts to meet those tender conditions.

Unknown Analyst

analyst
#242

Okay. So it's actually, in a way, because of the higher CUF most of it is actually tied up, that's right way to understand. Is it?

Saurabh Mashruwala

executive
#243

Yes, Right, right.

Unknown Executive

executive
#244

Right.

Operator

operator
#245

Ladies and gentlemen, that was the last question for the day. I would now like to hand the conference over to Mr. Saurabh Mashruwala for the closing comments.

Saurabh Mashruwala

executive
#246

Thank you so much, everybody. We wish everybody to stay safe and healthy. Thank you so much.

Operator

operator
#247

Thank you very much, sir. On behalf of Torrent Power Limited, that concludes this conference. Thank you all for joining us, and you may now disconnect your lines.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 248,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 248,000+ others is available through the EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.