Torrent Power Limited (TORNTPOWER) Earnings Call Transcript & Summary

November 11, 2025

National Stock Exchange of India IN Utilities Electric Utilities earnings 22 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, ladies and gentlemen, and welcome to Torrent Power Limited's 2Q FY '26 Earnings Conference Call. <<operator_script>> Kindly be aware that this conference is being recorded. At this point, I hand the conference over to Mr. Saurabh Mashruwala, Executive Director and CFO. Thank you, and over to you, sir.

Saurabh Mashruwala

executive
#2

Thank you, sir. Thank you. Good evening, everyone, and thanks for being on Torrent Power's Q2 FY '26 earnings call. To start, I'll walk you through how the quarter performed, and after that we'll open the phone lines for a Q&A session. We'll begin by explaining the company's performance at PBT level, and then we'll cover the tax expenses separately. Reported PBT for the quarter came in at INR 979 crores, against INR 689 crores in the same quarter a year earlier. That's a rise of roughly INR 290 crores, or about 42% on a reported basis. PBT for this quarter contains a nonrecurring credit of INR 31 crores from receiving favorable orders in the license distribution business, which mainly comprises carrying cost allowances. PBT for the same quarter last year contains a nonrecurring credit of roughly INR 67 crores stemming from 2 factors. The first is accounting of INR 99 crores on receipt of favorable orders in the license distribution area, which mainly comprises carrying cost allowances, partly offset by lower generation from the wind power plant because of forced stoppages of wind turbines caused by heavy rains and Asna cyclone witnessed in Gujarat during the quarter, which led to a reduced contribution of INR 32 crores.

Saurabh Mashruwala

executive
#3

Once you strip out those one-off items, profit before tax for the quarter came in at INR 948 crores, versus INR 622 crores in the same quarter a year earlier — a rise of roughly INR 326 crores, or about 52%. Turning to the sectors, here is how each one contributed. First, thermal generation added around INR 293 crores, driven largely by stronger contributions from merchant power sales as well as LNG, to the tune of about INR 304 crores. Second, those merchant gains were partly offset by higher O&M expenses and a noncash adjustment related to foreign exchange variation of approximately INR 11 crores. Second, the distribution business, adjusted for one-off items, was up about INR 11 crores, mainly because of, first, better T&D losses at the distribution franchise units, partly offset by higher T&E in the licensed distribution area. Second, the licensed distribution business also got support from higher ROE and ROCE, reflecting capitalization of assets and a higher rate of return on equity under the new tariff regulations. And third, demand growth in our distribution business ran in the range of about 4% to 5%. The third item is renewable generation, which adjusted for one-off items fell by INR 20 crores, mainly due to lower PLF from the existing wind power plant on weaker wind resources, partly offset by the contribution from newly commissioned solar capacity of 381 megawatt.

Saurabh Mashruwala

executive
#4

The remaining INR 43 crores of the balance division comes mainly from, first, lower finance costs thanks to repayments made in Q4 of FY '25, partly offset by higher depreciation and other miscellaneous expenses. That wraps up the explanation of the financial performance for the quarter. Now on to the project update. First, in the quarter, on top of our existing renewable pipeline, a subsidiary of the company was awarded an LOA for 250 megawatts of FDRE renewable generation from our licensed distribution unit. The company obtained a Letter of Award from MP Power Management Company Limited for long-term power supply from a new 1.6 gigawatt coal-based power plant at a tariff of INR 5.83 per kilowatt hours. India's largest green hydrogen natural gas blending initiative in the City Gas Distribution sector was successfully commissioned in the quarter. With progressive commissioning of the 367 megawatt MSEDCL project, the company's aggregate installed generation capacity was close to 5 gigawatt as of 30th September 2025, made up of 2.7 gigawatt gas capacity, about 1.9 gigawatt of renewable capacity, and 362 megawatt of coal-based capacity. The pipeline project as of quarter-end includes 3.6 gigawatt renewable capacity, 3 gigawatt of pumped storage capacity, 1.6 gigawatt of coal plant and 2 transmission projects at Khavda and Solapur.

Saurabh Mashruwala

executive
#5

Our newest investor presentation, which you can find on our website, contains a fuller summary of the pipeline project. That wraps up the quarter. At this point, I'd like to ask the coordinator to open the line for the Q&A session. We want everyone to remain safe and healthy. Many thanks. I'll hand things over to the operators.

Operator

operator
#6

<<operator_script>> Mohit Kumar of ICICI Securities has our first question.

Mohit Kumar

analyst
#7

To start with my first question, sir: naturally, we delivered a robust performance this quarter. Part of that, I believe, stems from merchant sales under the short-term power purchase agreement signed in March. In the third quarter, are we still selling some portion under that agreement, or has it now ended?

Saurabh Mashruwala

executive
#8

So the bulk of that portion has already been delivered in Q2. That lets us say that most of it was supplied under the contract during Q2.

Mohit Kumar

analyst
#9

Got it. So there’s almost nothing remaining for Q3, correct?

Saurabh Mashruwala

executive
#10

Yeah, I'd say possibly a piece of it — not material, though.

Mohit Kumar

analyst
#11

Got it. Could you give us the split between merchant sales and LNG sales for the quarter — maybe some kind of broad indication?

Saurabh Mashruwala

executive
#12

I'd say LNG sales aren't material. The bulk of the revenue contribution comes from merchant sales.

Mohit Kumar

analyst
#13

Alright, sir, my final question concerns the coal-based power plant that you secured during this quarter. The capital cost appears to be somewhat on the higher side. Is that the maximum, or do you believe you can execute it at a considerably lower cost — perhaps nearer to INR 11 crores or INR 12 crores per megawatt instead of INR 13 crore per megawatt? Is that a possibility? And a related question: what is the fixed cost, the fixed tariff, that you bid for this particular power plant? Could you possibly provide a breakdown between the variable cost and the fixed cost quoted in the bid?

Saurabh Mashruwala

executive
#14

Right, so that kind of rate is what we're seeing, and in fact equipment costs have basically risen now. So that's the cost we've budgeted as of today. Once we — so essentially this sort of cost is what's happening. And regarding your second question about variable cost and fixed cost, fixed cost comes to roughly INR 4.22, while variable cost is pass-through. That's the way the PPA — I'd call it the LOA — is configured.

Operator

operator
#15

The next person to ask a question is Sumit Kishore with Axis Capital.

Sumit Kishore

analyst
#16

You said you've taken a 500-megawatt FDRE project from TPL-D. What terms apply to it? How much of it is solar and how much is wind? Is there any other detail about the specifications that you're able to share with us?

Saurabh Mashruwala

executive
#17

It's really a mix of solar, wind and the battery. So roughly — solar comes to around 350, wind around 150 megawatts, and the tariff sits at about 4.87.

Sumit Kishore

analyst
#18

So, wind is at 150?

Saurabh Mashruwala

executive
#19

Yes, sorry?

Sumit Kishore

analyst
#20

You mentioned wind at 150, is that right?

Saurabh Mashruwala

executive
#21

Yeah, yeah. Wind comes in at 150, and solar is roughly 350 megawatts.

Sumit Kishore

analyst
#22

What's the battery size?

Saurabh Mashruwala

executive
#23

Battery storage would be another item there — roughly 100-megawatt-class batteries.

Sumit Kishore

analyst
#24

A 100 megawatt system with 4 hours of storage, or...

Saurabh Mashruwala

executive
#25

So we're talking about 450 megawatt hours.

Sumit Kishore

analyst
#26

4.5 hours of storage?

Saurabh Mashruwala

executive
#27

Right, so 112 megawatts of battery capacity works out to 450 megawatt hours.

Sumit Kishore

analyst
#28

All right, 4 hours. For my second question, your presentation noted that BTG was awarded for the coal plant. To whom was it awarded, at which project, and at what value?

Saurabh Mashruwala

executive
#29

We can't disclose that, but as for the project, a turbine contract has been awarded.

Sumit Kishore

analyst
#30

So TG has been awarded, but the boiler hasn't been awarded yet?

Saurabh Mashruwala

executive
#31

No, no — the whole of BTG is awarded.

Executive

executive
#32

Yeah, BTG and balance of plant are both being discussed — and BTG has already been awarded.

Sumit Kishore

analyst
#33

So does that go to one of the two domestic players?

Saurabh Mashruwala

executive
#34

Yes, you could put it that way — 1 of the 2 domestic players.

Sumit Kishore

analyst
#35

All right, so the next question is: what's the CapEx for the first half of the fiscal? And last time you mentioned that a significant portion of the CapEx you plan to incur for RE — almost INR 8,000 crores — will be incurred this year. So specifically, what progress has been made on RE CapEx as well?

Saurabh Mashruwala

executive
#36

Regarding the H1 figure, license costs came to roughly INR 780 crores. Franchisee was on the order of INR 100 crores. For transmission, we incurred approximately INR 275 crores. And on RE, renewable CapEx will be INR 2,500 crores that we incurred during H1.

Sumit Kishore

analyst
#37

Regarding the INR 2,500 crores we incurred in H1, RE?

Saurabh Mashruwala

executive
#38

Yeah, RE.

Sumit Kishore

analyst
#39

What was the total CapEx you incurred at the consolidated level in H1?

Saurabh Mashruwala

executive
#40

That comes to roughly INR 2,700 crores.

Executive

executive
#41

We're looking at INR 3,700 crores.

Saurabh Mashruwala

executive
#42

We recorded INR 3,700 crores.

Sumit Kishore

analyst
#43

All right, so that's INR 3,700 crores in total, and INR 2,500 crores of it is RE. Okay, understood.

Saurabh Mashruwala

executive
#44

That's exactly right.

Sumit Kishore

analyst
#45

And lastly, in what you said at the start, I want to check whether I caught the figure correctly. You said the overall rise in merchant contribution for thermal came to INR 324 crores, is that right?

Saurabh Mashruwala

executive
#46

Approximately INR 300 crores, give or take.

Sumit Kishore

analyst
#47

Is it INR 300 crores?

Saurabh Mashruwala

executive
#48

Yes.

Sumit Kishore

analyst
#49

So that figure is the change compared with the same period a year earlier?

Saurabh Mashruwala

executive
#50

Right, and yes — the change versus a year ago, measured against the prior quarter.

Sumit Kishore

analyst
#51

All right, all right, all right. So how many merchant units in total did you sell in the quarter?

Saurabh Mashruwala

executive
#52

Roughly 650 MUs.

Operator

operator
#53

The next person to ask a question is Satyadeep Jain of AMBIT Capital.

Satyadeep Jain

analyst
#54

Starting with the NVVN tender question. Since the tender has now concluded, can you tell us how much volume was actually lifted under it? And for whatever portion wasn't lifted, do you recover the full fixed cost in 3Q, or have you already recognized part of that fixed cost recovery in 2Q?

Saurabh Mashruwala

executive
#55

As we mentioned before, we have supplied materially, which is what we said in response to the first question.

Satyadeep Jain

analyst
#56

Apologies, sir, but I didn’t catch that. Whatever...

Saurabh Mashruwala

executive
#57

As we said in our earlier response — to the first question — we have materially supply under that contract.

Satyadeep Jain

analyst
#58

Got it. So you met the whole—there wasn’t any volume, which was guaranteed under the minimum contract and wasn’t raised by the consumer? My understanding was that actual offtake came in below the minimum offtake, correct, and that’s the reason you have a fixed cost guarantee you recover if the customer doesn’t take the full volume.

Saurabh Mashruwala

executive
#59

So the bulk of the contract has been fulfilled — that's what we're able to tell you at this point.

Satyadeep Jain

analyst
#60

So you're not expecting any meaningful fixed cost recovery from this contract in Q3, correct?

Saurabh Mashruwala

executive
#61

Yes.

Satyadeep Jain

analyst
#62

And second, I wanted to ask about the PSP project. The CapEx there also looks a bit high, at INR 7 crores per megawatt. If you consider INR 14,000 crore of CapEx against INR 1,680 crores of revenue under the contract, what sort of IRR would you expect on a project like this?

Saurabh Mashruwala

executive
#63

How can you claim that's the cost? What number of megawatts are you factoring in?

Satyadeep Jain

analyst
#64

That 2,000 megawatt project at INR 14,000 crores, correct? Works out to roughly INR 7 crores for each megawatt.

Saurabh Mashruwala

executive
#65

The overall project cost comes to INR 14,000 crores. And the capacity we're building out is 3 gigawatts. And 2,000 gigawatt -- 2 gigawatts is a -- we've signed off on a PPA. So -- but the capacity we're putting up stands at 3 gigawatts, and the project cost is INR 14,000 crores.

Satyadeep Jain

analyst
#66

So the INR 14,000 crores — that covers 3 gigawatts?

Saurabh Mashruwala

executive
#67

That's right. Precisely.

Satyadeep Jain

analyst
#68

Okay. And finally, regarding wind and solar PLF, I didn’t quite follow, because everyone — including in Gujarat — is seeing greater wind PLF this quarter versus a year earlier, and then reduced solar PLF. What was unusual in Gujarat for you? I’m just trying to get it — was it something specific to the location?

Saurabh Mashruwala

executive
#69

I think that, since the monsoon came faster, the PLF is somewhat weaker where wind is concerned. And for solar, thanks to the newly commissioned capacity, PLF is somewhat stronger than in the same quarter a year earlier.

Satyadeep Jain

analyst
#70

So the wind side—it was only the monsoon that hit, and that likely affected a few wind mills in Gujarat for you, while solar was probably just the new mills and the new plant?

Saurabh Mashruwala

executive
#71

Right, right. Exactly — that's it. In Gujarat, we observed the monsoon arriving sooner than usual. It continued through Diwali as well, I'd say. So that's the reason wind resources took a hit, I would argue.

Operator

operator
#72

<<operator_script>> Atul Tiwari from JPMorgan has our next question.

Atul Tiwari

analyst
#73

Right, thanks. Just a quick one from me. Now that the NVVN tender has wrapped up, is it fair to think that during the third quarter and at least the early portion of the fourth quarter there won't be any merchant sales — or are you still selling something into the merchant market?

Saurabh Mashruwala

executive
#74

Everything hinges on how the market plays out. Should peak demand materialize, then without question there will be merchant sales. So we can’t state anything at this point, but I’d say it all comes down to market dynamics. And if you — you’ve noticed that LNG prices are declining. So it’s a matter of peak demand, sort of. So one needs to watch peak demand closely over the next 6 months, I would say.

Atul Tiwari

analyst
#75

What's the landed cost of LNG right now for generating the power you need?

Saurabh Mashruwala

executive
#76

At $10, if you take that $10 per MMBtu of cost, then variable cost would come to roughly INR 6, something like INR 6, variable cost.

Atul Tiwari

analyst
#77

All right. So if merchant prices happen to exceed that amount, then it would make sense for you to...

Saurabh Mashruwala

executive
#78

Yes.

Operator

operator
#79

<<operator_script>> Ketan Jain from Avendus Spark has our next question.

Ketan Jain

analyst
#80

Sir, my first question concerns NPE per project. When is this thermal plant expected to be commissioned?

Saurabh Mashruwala

executive
#81

The first unit comes in at roughly 66 months starting from the PPA date, while the second unit runs 72 months from that same PPA date.

Ketan Jain

analyst
#82

All right, so that comes to nearly 6 years.

Saurabh Mashruwala

executive
#83

Correct, that's 6 years out from now. And actually, the PPA hasn't been signed yet. We expect it to be executed within the next 2 months. Once that happens, the clock on that timeline begins.

Ketan Jain

analyst
#84

Six months. All right. My next question concerns renewable capacity additions. For the second half of FY '26, what are you targeting, and then progressively in FY '27? What level of renewable capacity addition do you expect?

Saurabh Mashruwala

executive
#85

On total capacity, what we've envisioned for the full year is roughly 500 to 600 megawatts for the current year. Of that, approximately 367 megawatts has already been commissioned, and we expect the remainder to come online in the second half. And most of the capacity from the upcoming project — apart from the newly won project — will be commissioned next year. Next year and the next 1.5 years, I'd say.

Ketan Jain

analyst
#86

So the entire balance portfolio capacity is expected to arrive in '27 and the first half of '28?

Saurabh Mashruwala

executive
#87

Yeah, yeah. The next 2 — 1.5 to 2 years, at most, I'd say.

Ketan Jain

analyst
#88

Got it. Do you have any goal in mind for FY '27, sir?

Saurabh Mashruwala

executive
#89

Not really, though we’ll do our best to speed up the commissioning. And actually, the commissioning date is included in the presentation as well.

Operator

operator
#90

<<operator_script>> Since no one else has questions from the participants, I'll now turn the conference over to Mr. Saurabh Mashruwala for his closing remarks.

Saurabh Mashruwala

executive
#91

We appreciate you all being here for Torrent Power's earnings call. We hope each of you stays safe and well. Many thanks.

Operator

operator
#92

Appreciate it. That brings us to the end of this call for Torrent Power Limited. Thanks for being with us, and you can go ahead and disconnect your lines now.

Saurabh Mashruwala

executive
#93

Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Torrent Power Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Torrent Power Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Torrent Power Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.