TRX Gold Corporation (TRX) Earnings Call Transcript & Summary

July 16, 2025

Toronto Stock Exchange CA Materials Metals and Mining earnings 60 min

Earnings Call Speaker Segments

Operator

operator
#1

Good day, and welcome to the TRX Gold Corporation presentation of results for the third quarter of 2025. <<operator_script>>. Please note that this meeting is being recorded. <<operator_script>>. At this point I'll hand things over to the Chief Executive Officer, Mr. Stephen Mullowney. Sir, please go ahead.

Stephen Mullowney

executive
#2

Yes. Morning, everyone, and thanks — welcome, shareholders, to the corporate presentation and investor call for Q3 2025. There are quite a few folks with us on the call today, which is really nice to see. With me today is Michael, our CFO. And over in the Tanzanian boardroom, we also have Khalaf Rashid and Richard Boffey. Put your hands up, guys. What's the weather like?

Richard Boffey

executive
#3

The weather's pleasant and sunny <<inaudible>>.

Stephen Mullowney

executive
#4

As always, it's a beautiful sunny day. Things are warm here in Toronto as well today. I believe we hit a 32-degree day. So without further delay, I'll dive into the presentation. And today's presentation will be led by me, with Michael, Khalaf, and Richard all joining in at the relevant section. So let's begin. What I'll do today is simply provide a high-level overview of TRX Gold, just as I always do, and after that we'll move into where we're headed over the short to medium term, along with how our Q3 financial results look. Plus a high-level summary of the PEA road map and how we expect that to unfold, and then wrap things up with the key investment highlights for the company. So TRX Gold, clearly, we're located in Tanzania, and everyone on the line knows that. During fiscal 2024, we generated more than $40 million in revenue and $15 million in EBITDA. We anticipate those figures will be greater this year as we keep progressing and as the strip campaign concludes and we move into the higher-grade sections of the ore body. And we'll cover the results from those operations shortly.

Stephen Mullowney

executive
#5

A key catalyst we released in Q3 was our PEA. As we noted during the previous call, that PEA carries a $1.2 billion net present value at roughly $3,000 gold. On the Buckreef Gold project, it comes to about $750 million after tax. Average output is 62,000 ounces across 18 years, with processing capacity of 3,000 tonnes per day. At present, our processing capacity stands at 2,000 tonnes per day. Over time, our aim is to enhance those metrics and, ideally, end up with a bigger project than the one envisioned there — drawing both on the existing Buckreef Main Zone and on additional resources that the drill bit may uncover as time goes on. Cash costs in that study sit quite low, at $1,000 an ounce, while AISC came in near $1,200 an ounce — comparable, given the same grade profile, to what we are currently seeing. As you'd have noticed in Q3, cash costs ran a bit higher because of the grade profile being processed through the mill. So once the grade profile normalizes, cash cost will decline. In the study, we reset the resources, since our focus was on economics.

Stephen Mullowney

executive
#6

When we put out the previous resource statement, the emphasis was on the raw count of resources rather than the economic ones. Those resources from that prior statement are still there. At this moment, they simply aren't part of the economics. The study showed 900,000 ounces in the M&I category, grading roughly 2.6 grams per tonne. As for the Inferred category, that contained 725,000 ounces at 5 grams a tonne. So our approach was to raise the cutoff grade along with the grade profile fed through the mill. We'll stop there for a moment. Moving to the next slide, we actually have a clear-cut plan that adds value to the business. The slide after this one digs into something closer to a near-term business plan. Over in Tanzania, we hold the special mining license. Our metallurgical flow sheet is straightforward. Richard will cover that shortly. I'm certain questions will come up about recovery rate, and he'll address them, along with how those rates will get better given the local infrastructure—roads and power included—and we have considerable blue-sky potential, which we've noted before and will keep noting. We really do need to return to that drill bit and begin drilling at our Anfield and Stamford Bridge Zone.

Stephen Mullowney

executive
#7

We've got solid availability of human capital in the country. We keep pushing upward on that front. We've completed 3 successful expansions, reaching 2,000 tonnes a day. Another expansion is coming, somewhere between 3,000 and 4,000 tonnes a day. The PEA envisions 3,000 tonnes a day. We'll get there over time. Planning for that is underway right now. It will happen over time. The business plan tied to the PEA is pretty simple: expand the plant, use the cash flow, build out the underground mine, and drill for exploration concurrently. Our operations have ramped up successfully. We run a high-margin, low-cost profile. Costs are down, and Mike will cover that shortly, especially per tonne and, obviously, grade impact <<inaudible>> on costs. We continue to see meaningful chances to keep lowering costs, in both mining and processing. And the PEA lays out a road map for that. You've got a highly experienced management team, both at site and at the corporate level, that has done all of this before, and we're very excited about the significant value potential and value accretion potential over time. So I'll pause here, Mike. Mike, anything to add?

Stephen Mullowney

executive
#8

Richard and Khalaf, is there anything either of you would like to add?

Michael Leonard

executive
#9

No, Stephen, I believe you put that nicely, and there's nothing more I'd add.

Stephen Mullowney

executive
#10

All right, thanks. So regarding why TRX, and where we stand today, as Q3 shows, revenues are increasing. The gold price is part of that. Ounces will begin to rise now too as we move into a higher grade profile. And we are self-funding this growth, and we will keep self-funding the growth. The PEA sets out a straightforward business plan, or a road map, that we can follow to create value in the Buckreef Main Zone. I covered some of those statistics earlier. So that plan is very scalable. We've done that before, as I mentioned, and we'll keep following that road map. And I always really like the blue-sky potential. So the way that the road map can improve is both by increasing the plant capacity and by finding more higher grade ounces around Stamford Bridge, Anfield and elsewhere on our property. And so we're quite comfortable with that. We do need to get back to the drill bit, and that will be in our budget plans for fiscal 2026. So with that, I'm going to hand it over now to get into the nitty-gritty details. I went through the PEA at a high level.

Stephen Mullowney

executive
#11

Mike will begin walking through the financial profile and the remaining slides here, Mike, and I'll pass it over to you for the next 2 or 3 slides, please.

Michael Leonard

executive
#12

Absolutely, Stephen, no problem at all. Good morning, everyone, and thanks for being with us. You brought up the PEA, and that really is where our attention sits across the coming 12, 18 months — driving that expansion forward so we can unlock the $1 billion valuation we released to the market through that study. That said, as we've mentioned somewhat over the past couple of quarters, we undertook a Stage 1 stripping campaign during the first half of the year, aimed at clearing a great deal of the overburden and waste, which opens the door to higher-grade ore blocks as we move deeper into the pit. Richard and his team have been overseeing that work extremely closely. The good news is that we're substantially past the bulk of that stripping and have started reaching some of those higher-grade blocks. As a result, we're seeing gains in both production and sales. Combined with our leverage to the gold price, we're seeing stronger financial metrics, both quarter-on-quarter and year-on-year. I'll walk through some of the details shortly, but let's move to the next slide, Steve, and touch on a few of the specifics.

Michael Leonard

executive
#13

Here's a quick look, on the following slide, at a financial summary of the results. And once more, as I said, the quarter was a strong one for the company's financial results. We saw gains both quarter over quarter versus Q2 and year over year in nearly every financial line, from revenue through gross profit to net income, operating cash flow and adjusted EBITDA. Output for the quarter came in at just under 4,700 ounces, substantially above what we achieved in Q2. And we keep benefiting from the record gold prices we are seeing once again. We realized over $3,100 an ounce. This morning I sold gold at over $3,300. So we continue to take advantage, in a sense, of these lofty gold price levels. And again, those figures drove revenues of $12.5 million, gross profit of almost $4.5 million, or 35%, in the quarter, and adjusted EBITDA of $4 million, again all improved versus the prior periods, which demonstrates our leverage to gold price. Stephen mentioned it briefly earlier, but gross profit keeps benefiting from an improving cost per tonne profile. And that really stems from a lot of work we did early in the year, laying the foundation for some of these benefits that we are seeing.

Michael Leonard

executive
#14

To give you an illustration, processing cost per tonne came in under $15 and improved substantially, as you can see, versus the same period a year earlier. A major driver there is the economies of scale we're capturing from the expanded plant, since we went from 1,000 tonnes a day last year to 2,000. We told folks this plant was built to scale. And once again, you're seeing those benefits in the cost-per-tonne metrics. In a similar vein, mining cost per tonne has fallen considerably both against last quarter and against last year. It improved significantly. Part of that stems from the fact that we're now running our own fleet, which we procured early in the year, to help supplement our contract mining fleet. As an illustration — and Richard may want to touch on this a bit later in the presentation — we moved roughly 300,000 tonnes of material, ore and waste, with our fleet during the quarter. And we did so at roughly $1.80 a tonne, $1.80 to $1.90 a tonne, which sits well below international contract rates and is certainly a very, very cost-effective way for us to mine both ore and waste while also supporting projects such as our TSF expansion.

Michael Leonard

executive
#15

Richard, would you perhaps like to offer a few sound bites about how our fleet is running and why we're seeing advantages there? I believe we might have a communications problem in Tanzania, but that's fine. Why don't I simply keep going? And if there's an opportunity to hear from you later, Richard, we'll ask you to weigh in at that point. In the meantime, something I'd perhaps like to mention, which people may have noticed in our press release and MD&A, is that during the quarter, we had begun negotiations with the Bank of Tanzania to sell a minimum of 20% of our local gold production to the Central Bank. And that aligned with the newly enacted mining law in Tanzania that applies to every mining company in the country. And under that agreement, the company would gain the benefit of a reduced royalty rate of about 4% on revenue for domestic sales, versus a 7.3% royalty rate for exported sales. And how it works is the company gets paid in Tanzanian shillings at market rates, which we can then use to fund the operating costs we incur in local currency. And one reason I raise it here in the context of the Q3 results is that while those discussions were ongoing during Q3, we were required to set aside a portion of our production in inventory.

Michael Leonard

executive
#16

During Q3, we set aside just under 650 ounces to be sold later to the Bank of Tanzania. So what you'd have noticed in our results is something of a gap between the ounces we produced and the ounces we sold. The good news, though, is that we wound up signing that agreement with the Bank of Tanzania in early June, and we were able to sell this inventory to the BOT, the Bank of Tanzania, which is really paying off now in what we're seeing in Q4 in areas such as revenue, cash flow, EBITDA, and working capital for the final quarter of the year. And as I mentioned, this is genuinely useful to us as a company for several reasons, one being that we take on a lot of local cost and local currency that we're able to use the shilling for. We get the benefit of the royalty rate. But this agreement also helps drive things like local content and local benefication, which has been a key focus area for the government, among other things, to help improve their foreign exchange reserves. So it's a good initiative all around.

Stephen Mullowney

executive
#17

Thanks, Michael. Let me pause for a moment here <<inaudible>>. What you'll see is that this company has been funded via short-term liquidity lines — through Stanbic, through an Auramet facility, and by working with our suppliers on payables. So these are all short-term liquidity lines supporting a long-term asset. What that has produced in our financial statements is a certain profile. We're comfortable with how we finance this. But at quarter end, you'd still see negative working capital. One item that's front and center in our press release, and in our operations over the very near term, is rightsizing that working capital ratio and making sure it goes above 1. It is above 1 today, and it keeps improving. So we believe it's one of the things holding us back in the market on financial metrics versus other comps, and I'll get into that shortly. But that is certainly a very — what we're doing predominantly through the strip campaign and into the higher grades is rightsizing working capital as a near-term goal of ours.

Michael Leonard

executive
#18

Yes. No, you put that nicely, Stephen. I mean, those really are the final 2 points, and Q4 is where the payoff shows up — output has gone up. We've reached roughly 75 ounces per day, a big jump over both Q2 and Q3. And within just 6 short weeks, we managed to rebuild that working capital shortfall we took on during the strip campaign. And like you said, that means cutting items such as accounts payable by close to $6 million and paying off our short-term borrowings. Our liquidity lines are fully available to us. And what we're concentrating on for the remainder of Q4 is making that liquidity stronger and positioning ourselves to execute the PEA you brought up earlier.

Stephen Mullowney

executive
#19

Yes. Apart from a pair of leases on long-term equipment, we don't carry any long-term liabilities. I think our trucks are fully paid off at this point too, correct? So those leased trucks drop away as well as — which leaves us with only the excavator long-term leases.

Michael Leonard

executive
#20

Yes. Let's move on to the following slide, please, which we've discussed, I believe, during the past several quarters. For those who are new to the story, though, as Stephen mentioned earlier, we've successfully completed 3 expansions within 3 years. At full capacity, we're running 2,000 tonnes per day. Throughput in Q3 came in at just under 1,500 tonnes a day, following some planned maintenance and downtime. With that bigger plant, though, I mentioned the economies of scale. You can see that reflected in processing cost per tonne. That throughput, however, is really the driver behind the rising production. The grade profile is somewhat lower given where we sit in the pit and the strip we've seen so far, but we're truly beginning to see the advantages in Q4 now that we're reaching those higher-grade ore blocks and doing roughly 75,000 ounces a day, which we expect to carry on through year-end.

Stephen Mullowney

executive
#21

Yeah, so Mike, one of the things is — Khalaf, is Richard available now? I know the two of you are sitting in the same row.

Richard Boffey

executive
#22

Stephen, are you able to hear me?

Stephen Mullowney

executive
#23

Okay, yes, we can hear you perfectly well. So one item Mike brought up involves 3 mill expansions across 3 years. And I realize I'm going to jump ahead of the questions. One question certain to arise is how we plan to handle the plant expansion down the road relative to the PEA and what I'd describe as our present thinking 5,5,5 regarding the initial plant upgrades you'll be carrying out over the next 4 to 6 months, along with how we picture building out the plant. Would you mind giving the shareholders a brief high-level overview of that?

Richard Boffey

executive
#24

Of course, certainly. So, our plant has undergone several upgrades, and the current target stands at 2,000 tonnes per day. There are plenty of opportunities to optimize the plant in its present state. And once we see some results, we'll find that room for improvement exists. So over the coming 3 or 4 months, our focus is purely on optimizing the existing 2,000 tonne per day plant and layering in enhancements that form part of the longer-term expansion by adjusting the flow sheet in incremental steps. So one modification to the flow sheet involves adding a pre-leach thickener, which is planned for the expanded plant, and bringing it in early. That gives us far better control over our leaching process. It will also let us feed higher grade through the mill. And we believe overall recovery will improve through that process. The next thing we're attempting over the coming 5 or 6 months is installing a new absorption desorption recovery plant, or ADR plant, into the process. That will be capable of delivering considerable enhancements to how we manage carbon. Our present process is quite manual.

Richard Boffey

executive
#25

There's a significant amount of breakage, plus plenty of fines and gold loss, that comes from damaging the carbon. With this new plant, we'll be able to cut down or eliminate much of that, and that probably gives us an extra 3% or 4% gain in recovery. Further gains come from optimizing the mills. We think we've only just started a program aimed at optimizing power draw. We've seen that our mills aren't drawing sufficient power, and we can fix that, and better throughput lets us add more charge to the mills, which means a finer grind and more throughput. So there are some small, easy additions to the plant, and then some bigger items that are still part of a 2,000 tonne per day operation, and those will lift recoveries substantially, from where they sit today up to a much higher level. The expansion work then calls for another flow sheet change, involving a flotation circuit and fine grinding of the sulfide concentrate produced by that flotation plant. And second, a much simpler comminution, or crushing and grinding, circuit that is all rated to 3,000 or more tonnes per day.

Richard Boffey

executive
#26

These are the different actions we'll undertake across the coming 6, 12, and 18 months in order to make that happen.

Stephen Mullowney

executive
#27

Thanks, Richard. That's a solid summary, and I believe it gives investors some reassurance that this is being managed properly. Efficiency has to be our focus. So a few things will follow from what Richard just outlined — a higher head grade, as you all are hearing, translates into a lower cash cost per tonne and lower processing costs per ounce, sorry. And beyond that, it lets us — the power draw will likely let us run more tonnes through the plant, which translates into a lower cost per tonne and a lower cost per ounce. Those are among the metrics set to improve as we upgrade the plant here over the next 5 to 6 months. Thank you, Richard. Mike, back to you.

Michael Leonard

executive
#28

All right. Steve, let's spend a moment on the upcoming slide. What this slide does is basically underscore the strategy I mentioned before for how this business is run and operated. Growth continues to be funded through operating cash flow we generate ourselves. During this quarter, we reinvested an additional $5 million of cash flow back into the business. And as of today, you can see in the box on the far right that we've contributed more than $50 million after an early capital raise in 2021, combined with nearly $40 million of operating cash flow reinvested into this business. So the aim would be to keep deploying cash flow to help finance some of the enhancements and growth Richard just mentioned. But as you can see, it is producing increases in items such as revenue and EBITDA. And we keep doing this in a very, very cost-effective manner. Our management team is very, very lean, and we maintain a sharp focus on areas like G&A to ensure overhead costs stay in check. Still, our approach involves being very, very prudent with capital in order to drive higher profitability.

Stephen Mullowney

executive
#29

Yes, Mike, I'll just jump in briefly on G&A here, since I do receive a fair number of questions about that noncontrolling interest figure in the financial statements tied to the JV. As everyone knows, we have a joint venture with STAMICO, 55-45. And one factor is that G&A costs, especially corporate costs, come in below Buckreef. So that's part of why we're very focused on making sure we hold G&A steady and stay very disciplined on G&A costs, so that in the future we can hopefully push net profit per share higher, along with other financial metrics the market watches and that people use in screens. Okay. Next slide. And Richard isn't with us. So obviously, we have a comms issue in Tanzania. So I showed this slide in the last presentation and a lot of people liked it. So because it was fairly easy to understand. A couple of things on this slide are relevant. One is we like purples. We particularly like deep purples on this slide, and here it is that. And so Buckreef gets better grades as we get deeper. And so what this slide shows here now is where mining has occurred up to May 31 and where mining is going to occur the rest of the year.

Stephen Mullowney

executive
#30

So Richard, this gives everyone a quick picture of where you'll be mining for the remainder of the year and how that will lift the grade profile heading to the mill. And one more item we did highlight in our press release is a substantial boost in the ROM pad — in terms of tonnes, ounces, and grade — and how that will shift as time goes on.

Richard Boffey

executive
#31

Absolutely, Stephen, thank you. So, if you look at the color coding, the warmer shades indicate the higher grades. At the start of FY '25, we concentrated on the right side of that page, where grades were much lower. Over the past 2 quarters, as we indicated during these meetings, we shifted our strategy toward returning to the central and southern sections of the main pit, and we accomplished that in the last quarter, and we have now reached those high grades. So we have not only better grades, but also abundant ore that we are now accessing. We are signing — we have realized the advantages of that strip. Another advantage of this is that our strip ratio going forward will be considerably lower for a period of time, and that lets us really build our stockpiles ahead of the processing plant to the point where I would say we already have roughly 2 months of supply of high grade and feed grade ore ready for processing. And that will keep going. We will be in a very strong position now until we complete Stage 1 of the pit, which is another 6 or 7 months away.

Richard Boffey

executive
#32

We've gotten ourselves into a solid, strong position with feed — good feed for the plant. And we've also now begun the second phase of stripping for Stage 2 of the pit. And we've built up a nice, healthy stockpile to carry us through a gap in mined ore that will hit us in roughly 7 or 8 months.

Stephen Mullowney

executive
#33

Great. Thanks, Richard. Moving on to the following slide, here's a quick summary of the PEA. As Richard just explained, the grade profile is getting better. Stockpiles are healthy. We're progressing through the pit in a very favorable sequence, which forms part of the PEA. And so within that PEA, that sequence carries on for 3 to 4 years of open pit mining across various stages. I believe there are 3 stages for the open pit, Richard.

Richard Boffey

executive
#34

So at this point, there are two stages in this pit. We took it down from three stages to two, and that third stage is really underground. So, yeah.

Stephen Mullowney

executive
#35

Yes. So we're working our way through that sequence. The reason that matters is that this sequence, and the way it has been engineered, runs through the plant expansion, runs through mining those higher-grade ore blocks in the open pit section, and generates cash flow for the underground expansion and the underground workings roughly 3 to 4 years from now. So I won't walk through the PEA metrics again. They appear on the slide here. They're pretty clear. Obviously, it came out quite healthy. The key point — in talking with investors over the last couple of months since we released this study — is that in mining, one thing everybody asks is, what's your upfront CapEx? How much do you need to fund to execute your business plan? And our comment has always been that we have a bit of a queue in the IRR, and we probably should have stepped back a little, because we get asked that question. So what's your IRR? And we say, well, given how the study was put together and that it was predominantly self-funding, you don't have an initial CapEx upfront, so you don't have an IRR. To a certain degree, it's infinite.

Stephen Mullowney

executive
#36

Of course, everyone wants to know what you plan to spend across the coming 3 to 4 years. In truth, that figure comes to roughly $90 million. Plant expansions make up most of the spending during the first 2 years, and Richard has already walked you through how that works. Then, in years three and four, the focus shifts mainly to developing the underground workings that will supply the plant for the rest of the mine's life. All of this sits inside the Buckreef Main zone. It leaves out Anfield — where, as I said earlier, we have our best drill hole results, along with Stamford Bridge — and Anfield also has truly strong drill hole results. So that's the CapEx profile, divided first into the plant expansion and afterward into the underground workings. Everyone therefore asks how much, in theory, you need to raise while running this business. People keep asking us, fine, when will you raise money for this? Our response is that we are self-funding at present. As Mike said, we've put substantial money into self-funding. At this moment, the plan is for that to keep being self-funding.

Stephen Mullowney

executive
#37

Also, when you consider the forecasted EBITDA along with projected operating cash flow, plus the multiples on CapEx across those first 4 years, it indicates that going forward we ought to be able to handle this mostly through self-funding. So I simply wanted to ensure that’s clear to everyone, along with how the study was structured. Mike, is there anything you’d like to add, since we receive quite a few questions about this?

Michael Leonard

executive
#38

There are also some issues up in Canada. Sorry about that. No, I believe you put that well. And once more, I think it clears up a great deal of what people have been asking us during the past few weeks ever since the PEA came out. Appreciate it.

Stephen Mullowney

executive
#39

Regarding the comparable company analysis we performed: one point I raised earlier that we're concentrating on is that when you examine those who have advanced along this curve, they've delivered on both ounces and expansions. And crucially, they possess what I'd describe as normalized working capital ratios. Therefore, our near- to medium-term priority is ensuring we aren't penalized due to our working capital ratios. So we'll keep working steadily to pay down a portion of our payables and to capitalize the business suitably, ensuring our working capital ratios align with market comps that have performed. And additionally, when I consider the others who have also moved up along this curve, ensuring we maintain capital discipline in carrying out our expansion plans while continuing to grow that business is likewise extremely important for advancing along this curve. So the focus — though we lag today — is that hopefully we can begin to catch up when we recapitalize through the — through gains in production and cost management along with our expansionary plans. On the capital structure, we didn't issue any capital raises during the last quarter or over the last couple of years.

Stephen Mullowney

executive
#40

The stock keeps swinging around. As I said, I believe a significant chunk of that comes from the $1 billion study sitting out there in the market. The market wants to see you reach that point. And to reach it, you need to be confident you've got the right capital in place. When we recapitalize over the coming couple of quarters, I think we ought to see -- hopefully begin to see some share price movement. We've also ramped up our marketing efforts now that the PEA is out, both through various parties and ourselves, and we're holding far more meetings, especially institutional ones -- Mike, I'd say over the last 2 to 3 months, more than we typically do. Some institutions have begun entering the stock on 12 Fs. So that's been encouraging too, though modest so far. Executing this does take some time, but it's definitely a sharp focus for us. So let me restate the key investment highlights before Q&A. We're experiencing robust growth along with sustained profitability, plus other methods to reduce costs and hold them down. We do have a demonstrated operational track record.

Stephen Mullowney

executive
#41

A solid business plan sits in the PEA that everyone can see. The jurisdiction where we operate is a favorable mining one. Our relationship with the Tanzanians is quite strong, and as I noted on previous calls, we are engaging with the government's negotiating team and others regarding efforts to revise the joint venture agreement. That revision ought to take place; it's politics. An election is coming in October. So we'll find out whether anything can be accomplished before that, though it will more probably slip into the new year. Both on the ground and at the corporate level, we possess the technical experience needed to carry out our business plans. I'll stop at that point and hand things to the moderator for Q&A.

Operator

operator
#42

<<operator_script>>. Our initial question comes from Jake Sekelsky at Alliance Global Partners.

Jacob Sekelsky

analyst
#43

To begin with throughput for the quarter, the mix came in at 25% oxide and 75% sulfide. Do you have any visibility into how that split is likely to trend over the next several quarters?

Stephen Mullowney

executive
#44

Yeah, so I’ll take that one, and then I’ll have Richard wrap it up for me. When he mentioned a pre-leach thickener, the point of that is reaching 100% sulfides so we can get a better head grade. Right now, the oxides are lower grade, but you need them so the carbon floats properly and you get gold recovery. That’s one of the things near the top of Richard’s list. Richard, you’re far more technical than I am, so would you pick up the answer from here?

Richard Boffey

executive
#45

I'd say that covers it well enough. On the timing side, though, our aim is to have the thickener in place before this calendar year wraps up. What that means is we likely won't be feeding oxides to any real degree, or at such an elevated percentage, starting in calendar year 2026 and beyond. And yes, that should lift our head grade by roughly 0.3 of a gram, 0.4 of a gram.

Stephen Mullowney

executive
#46

Also, Jacob, truly, if you consider how this is being carried out, what we mainly have at present is an oxide plant that's in the process of being converted to a sulfide operation. That forms part of the <<inaudible>> count, and it's also part of the flotation and regrind circuit modifications that Richard has been describing.

Jacob Sekelsky

analyst
#47

All right, that helps. And to expand on that point a little, regarding recoveries: you mentioned the more detailed grind work that is underway. Could you share any extra detail on how that timeline is shaping up? In other words, are those benefits something we could see within the next few quarters, or is this a program that could take somewhat longer?

Richard Boffey

executive
#48

Maybe I'll take this one. There are 2 aspects of grindability we're addressing. Right now, our process needs a PAD of roughly 75 microns. We've hit that, but not consistently. So as we keep working on it, recoveries should improve somewhat. The flotation plant, together with the Fine Grind, HIG or IsaMill, is about 12 to 15 months out. But my intent is to try to have it installed and operating by financial year 2027. And at that point we'll see a substantial rise in recoveries tied to it.

Stephen Mullowney

executive
#49

Yeah, Richard, so I think the timelines we use models this sort of works out is for recovery rates into the low 80s, those are kind of where we're going to do, what we're doing into the current plant upgrades with the thickeners and the ADR plant. That's the goal there. And then the high 80s, low 90s in sulfides, that's with the flotation and regrind circuits as well as the upfront crushing circuit.

Richard Boffey

executive
#50

Yes, I’m with you on that. So we’ll see improvements in recovery — stepwise gains — by roughly the end of the calendar year, and hopefully a few other smaller improvements from operational optimizations before then as well.

Jacob Sekelsky

analyst
#51

All right, so the goal is to move up into the low 80s during the coming two quarters or so, and after that take another step up to the high low 90s across the following 18 months — is that fair?

Stephen Mullowney

executive
#52

Yes, and the PEA models it that way too. What I'd add to that, Richard, is that as we gain more experience at Buckreef, we're seeing different geometric zones with differing recovery rates. The lower-grade zones we were in earlier this year have both lower grades and lower recoveries compared with the zone we're in now. Richard, would you give a quick overview, a snapshot of that, since it's important <<inaudible>> at Buckreef.

Richard Boffey

executive
#53

Yes, absolutely. So, yeah, look, we’ve got a lot of metallurgical test work underway. Some of it involves the ore we currently have, and some involves the ore that will be there for underground, and we’re examining things from a geometallurgical angle, a flotation angle, and a grindability angle. So all of that work is continuing. We’ve already identified some quite interesting characteristics of the ore body, and we’ve essentially divided the ore body into 2 geometallurgical domains, and we know we need to take somewhat different approaches when processing those 2. But check. It’s — we have to mine all of it. It’s all economic. We just need to optimize our plant to suit that.

Michael Leonard

executive
#54

Yes. And I was about to add, Richard, perhaps you might give a quick comment that the geometallurgic study results are in, and they've sort of handed us a road map to follow for handling some of these more complex geometallurgic zones, combined with a comminution study that has handed us a road map for the improved flow sheet, correct?

Richard Boffey

executive
#55

Exactly. And like I mentioned, there are minor optimizations we can make on top of what's happening in the flotation circuit. Simply adding some pure oxygen, plus some over the first tank of the CIL tank, will likely provide us with another modest boost in these areas. So — and it works better in one geometallurgical domain compared to the other. So yes, plenty of fine-tuning remains for us to do. It's a young plant, and we're working our way through it to achieve the best results.

Operator

operator
#56

Our next question is from Mike Niehuser at ROTH Capital Partners.

Richard Niehuser

analyst
#57

Stephen, is my voice coming through clearly?

Stephen Mullowney

executive
#58

Yeah, Mike, you're coming through loud and clear.

Richard Niehuser

analyst
#59

I find Richard's remarks on getting the plant optimized encouraging, and doing so in multiple respects. And the timing appears just right as we move from oxide toward the sulfides. So my question is this: it sounds as though you're essentially fully underway with pushing back this pit in order to move ahead on the PEA path by keeping production going, generating cash flow, and finishing the steps needed to build a flotation circuit and get underground. So really, it seems you're simply going to transition smoothly into that. Is that how I should be seeing it?

Stephen Mullowney

executive
#60

That's right.

Richard Niehuser

analyst
#61

Straightforward response — that works. No need for much fanfare on my end. On the second question: quite a bit of surface material near the project is available for oxidation. How do you view that — will it end up taking a backseat to the underground sulfides? Or could you make use of it through the plant you already have, in a way that lets you capitalize on the market and so forth?

Stephen Mullowney

executive
#62

Yes. So you noticed Richard grinning when that question came up. Look, we keep evaluating oxides across the property on an ongoing basis. And part of that involves raising exploration spending, which I did say would need to go into the fiscal 2026 budget. And whenever you've got more oxides, there's a trade-off here, and the way we see it is this: if you're dealing with below 1 gram a tonne oxides and you also have 2.5 gram a tonne sulfides, well, after those plant optimizations are finished, you're going to run 2.5 gram a tonne sulfides through, right? So there's a trade-off between the 2. But certainly, if you can get some really good high-grade oxides, you're going to put them through because they help. And they'll go through any plant. They'll go through the expanded plant too, as long as there isn't too much clay in it. Prominent oxide material at Buckreef is something that just has clay in it. Did I get that right, Richard?

Richard Boffey

executive
#63

Well, yes and no. I believe what Mike is really asking is whether we intend to squeeze out an additional 10,000 or 20,000 ounces simply by running a small oxide plant. And while we don't have that in place, that potential certainly exists. We even have legacy tailings that could be reprocessed economically at $3,000 an ounce. So plenty of opportunities are available to us. Our attention is very much on the PEA side of things, but other chances to improve the business exist throughout this project.

Richard Niehuser

analyst
#64

Honestly, both of those replies were really solid, and I'm grateful for each of them. One piece of advice: since we're now in Q4 and publishing year-end figures takes a while, I believe investors will be pretty eager to see recurring operating results presented on a standalone basis. So I'd urge you to go ahead with that. In my view, now's the moment to shake things up a bit and celebrate the win if you're able to. That's everything from me.

Stephen Mullowney

executive
#65

Mike, you really need to speak with the members of our Board, but that....

Richard Niehuser

analyst
#66

No, no — I'm just pointing out what's plain to see, Stephen.

Operator

operator
#67

Heiko Ihle from H.C. Wainwright has our next question.

Heiko Ihle

analyst
#68

Am I coming through clearly on your end?

Stephen Mullowney

executive
#69

Your audio is coming through clearly. Heiko, I received your message about your questions too.

Heiko Ihle

analyst
#70

Great. Regarding your PEA — I suppose I was warned about what's coming. Your PEA projects 62,000 ounces of gold annually. Clearly, today's gold price backdrop is extraordinarily robust, and with all the inflation underway, we might even witness further gains. Let's imagine for a moment that financing truly wasn't a major worry. Over the next couple of years, what would chiefly limit pushing that number even higher?

Stephen Mullowney

executive
#71

So I'm going to have Richard handle that question in a bit more technical detail shortly, but first I'll give you a sense of how we approached this. When we initially set out to assemble the study, the constraint at present is plant capacity within the study — the principal constraint being 3,000 tonnes per day, which is capable of going larger. But once you do that, you then have to carry out all your underground development and engineer all of it. And there are so many ramps and that kind of thing that feed into it. And completing that kind of work consumes a great deal of time. So when we examined the study, we made the same observation you did: an 18-year mine life is too long, and 62,000 ounces could be higher. The majority of studies you come across fall within the range of 8 to 12 years of mine life. How do we reach that? And when we then talked with the engineers about it, properly engineering that would have required a couple more months. And we concluded these numbers are strong regardless. So let's bring this to the market to demonstrate to investors how good the Buckreef Main Zone alone can be.

Stephen Mullowney

executive
#72

Richard, feel free to go into a bit more technical detail about why engineering work below ground takes as long as it does.

Richard Boffey

executive
#73

There's no need for me to get into that level of detail. The constraint, really, is the same as at any well-run plant at the mill. To raise throughput, our crushing circuit would also require a substantial upgrade. Under the new flow sheet, a SAG mill is specified, and my plan would be to ensure that this SAG mill carries additional capacity, allowing us to achieve a throughput greater than 3,000 tonnes a day. So we shouldn't let that become the constraint — at minimum, push it to its maximum capacity and get more out of it than expected. Once we're underground, extracting 3,000 tonnes a day from essentially 2 declines isn't impossible. With 3 declines, though, it's fairly straightforward to achieve and easy to scale up. So we see potential to sink one more decline. Our studies assume 50-tonne trucks. We could examine 60-tonne trucks, for instance. We have other — we carried out a haulage and hoisting trade-off study, and the results were all so close you could toss a blanket over them. That means even a small shaft might be viewed as a workable option, and at that point you can genuinely begin discussing 4,000 tonnes a day. So there's lots of upside potential in that, though optimization studies would be needed.

Richard Boffey

executive
#74

And as Stephen mentioned, our goal was to reach the market with what I'd call a plain-vanilla technical approach, and I believe that serves as a solid base case.

Heiko Ihle

analyst
#75

Okay, that makes sense. Let me ask a follow-up, and perhaps there's something I'm missing. With your arrangement involving the Bank of Tanzania, the royalty drops from 7.3% down to 4%. That shifts 3.3% of what you receive—roughly $100 per ounce, which is quite significant. The terms also say you sell to BOT at market rates. So if you could scale this up—and it certainly sounds that way, since you described 20% as a minimum—why not go all the way to the maximum, or 100%? Is there credit risk involved? What downside does this agreement present for you? I suppose I just don't....

Stephen Mullowney

executive
#76

That's a great question. So we've only just entered into this agreement, Heiko. And I'll let Mike dig into the finer details, because there's another question already queued up on this topic, which is: look, when we took this on, we had certain factors in play. And the way the agreement is structured is basically that we sell assay Doré to the Bank of Tanzania out of the gold room and receive payment immediately, though payment comes to us in shillings at market exchange rates. And we have a — our cost base is mostly in shillings too. So yes, no, it really is a solid transaction. We worked quite extensively with the Tanzanian government to bring it to this point. The Tanzanian, Bank of Tanzania, much like many central banks around the world, wants to build up their gold reserves. And this is a good way for them to do that. We sell 20%, Barrick sells 20%, Geita sells 20%, Shanta sells 20%. I'd say right now, the biggest bottleneck is refining capacity in country. So Mike, do you want to get into that a little bit?

Michael Leonard

executive
#77

Yes. No, you put that nicely, and your interpretation is correct, Heiko, absolutely. What I mean is that figure represents a floor. So there's room for us to sell however much beyond that amount as we consider suitable. That said, we get paid in shillings, and as Stephen pointed out, we do carry items such as overhead costs and other expenses that are denominated in U.S. dollars. So we do have some U.S. dollar exposure, and we would keep getting paid and needing that. Still, there's a chance to send additional gold to the local refiner and sell it to the Bank of Tanzania so we can benefit from that royalty. Since they are only now sort of becoming operational in terms of their refining capability, there's a capacity limitation, Heiko, that Stephen brought up. They're working out how to refine our gold, Barrick's Gold, Anglo's Gold, Shanta's Gold, and to do so efficiently and effectively. And at the moment, I've requested that we be somewhat patient with them regarding what we ship to them. As they become more efficient in their process, we could definitely consider raising the amount we send them and sell to them, and capitalize on that lower royalty rate.

Stephen Mullowney

executive
#78

Yes. So Mike, I’ll jump in before Heiko asks another question, since it leads into the text question. Please explain the foreign exchange rate between the Tanzanian shilling and the U.S. dollar for gold as it pertains to TRX’s agreement with the BOT. So I want to explain to you how you manage that through the team in Tanzania.

Michael Leonard

executive
#79

Yes. No, that’s a fair question. So, as Heiko, you brought it up, and it’s also a good question about the FX: both the gold price they quote and the foreign exchange rate they quote on each transaction are daily international published rates. So the FX is published every day. It’s at about KES 2,600 to USD 1 — for every USD 1, it’s KES 2,600. And again, what we validate — both the gold price and FX rates that the Mining Commission quotes with each shipment — is against internationally published rates in London and abroad. So all market rates, and again, published on a daily basis on the Mining Commission website that folks can track. And again, Stephen mentioned it, the goal in part by some of this local benefication is to help prop up those foreign currency, exchange reserves. The currency has depreciated candidly in the last number of years. So it’s just an opportunity for them to bolster the currency, and it’s improved from about, I want to say KES 2,750 to $1 to about KES 2,600 to $1 currently, which I think is in part due to the approach they’re taking with local gold sales.

Stephen Mullowney

executive
#80

Okay, Heiko, is there anything else you'd like to ask?

Heiko Ihle

analyst
#81

Nope, that was all from my side.

Stephen Mullowney

executive
#82

So I’ll move on to another question — operator, is anyone else waiting in the queue?

Operator

operator
#83

No, sir, the floor is yours.

Stephen Mullowney

executive
#84

All right, great. So that final question is a fascinating one. Sirs, everything you say is reasonable and valid. But in what way do investors generate a return? We're at an early point in a gold bull market, and I'm noticing quite a few small juniors—ones that aren't even producing yet—that have seen solid price gains, while TRX stock hasn't risen to a comparable extent. Look, I did—so let me cover what I believe is required and what the team believes is required. And I did address this during the presentation. In my view, having a $1 billion study alongside a solid road map is wonderful, but you have to actually reach that point. As you're hearing on this call, we are reaching it. We're taking steps toward beginning to realize that. Yet I believe the market will need to watch us keep moving along that path and also become properly capitalized. As I noted in the comp charts, companies that are better capitalized have delivered superior returns. And I've witnessed that, and we observe it in the analysis we perform. So here's what I'd do: I would tell the gentleman who posed that question to examine those juniors that are—that have gained value and check their working capital ratios along with their cash balances.

Stephen Mullowney

executive
#85

And what I think you'll observe is that companies holding larger cash reserves have seen greater appreciation than those with smaller balances. Businesses free of debt have gained more in value than those carrying substantial debt. So in my view, working capital remains a factor in how this market is valuing things. The second piece of that question concerns the joint venture agreement. I believe some uncertainty persists in the market around it. Our joint venture split is 55%, 45%, and that structure isn't as advantageous as what you'd find in other jurisdictions or with other players, including within the same country. And I think we have to resolve that together with the Tanzanians, helping them see that what benefits us benefits them as well, and then push it forward. So those, I'd say, are the 2 main factors that have affected share price appreciation so far. Let me also mention a third one. When we first arrived — and I've walked people through this many times — the company was severely undercapitalized even at the point I joined, with just $2 million of cash on hand. To accomplish what we've accomplished, we had to raise capital early on. Sources of capital were scarce at that time.

Stephen Mullowney

executive
#86

There is still a warrant book in place, and it begins to expire in the new year. And I think as we work through that warrant book and those warrant expirations, we ought to begin seeing some appreciation in the share price. So anyone who knows trading knows what I'm referring to. I'm glad to take additional questions on that topic. Hopefully that addresses the question. And given how thorough the question was, it's definitely something we're thinking about. Operator?

Operator

operator
#87

Yes, sir. There are no further audio questions from anyone else. So please go ahead and take the floor for your closing remarks, or if you have any additional tech questions.

Stephen Mullowney

executive
#88

Appreciate everyone being on the call today — thank you very much. Thanks for the questions. I hope it comes across clearly that progress is happening. It does take some time, but the right team is in place to advance this asset. We've demonstrated that before, and we're demonstrating it going forward. As I've said a number of times, the near- and medium-term priorities are normalizing working capital, continuing the plant expansion, carrying on with underground mining, the PEA path, getting back to the drill bit in the new year, building that into our budgets to grow resources, and also continuing negotiations and constructive discussions regarding the joint venture agreement with the government team. It's fairly straightforward now — no longer as complex as it was 2 years ago. So it's a clear road map toward value creation. Thank you.

Operator

operator
#89

That wraps up our session for today. You're welcome to leave the call now. We appreciate your taking part, and we hope the rest of your day goes well.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete TRX Gold Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to TRX Gold Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TRX Gold Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.