Appreciate everyone holding on, and thanks for joining TRX Gold Corporation's presentation of first quarter 2026 results. <<operator_script>> Please note that this meeting is being recorded. <<operator_script>> Right now, I'll hand things over to Stephen Mullowney, our CEO. Sir, the floor is yours.

Stephen Mullowney

executive
#2

Yes. Thank you, and I appreciate everyone being with us this morning. I think today is Martin Luther King Day in the United States. So you have a holiday. I believe we got somewhat confused about that, but it's — it's great to see quite a few participants here today, and we also had really strong participation on Friday during our virtual NDR with Renmark. So it's an exciting period here at TRX. We're going to review our Q1 2026 results, which were really strong. Those results keep enhancing the company's financial profile, working capital keeps getting better. And Richard and the team on site — Richard is with us from Buckreef today — have been making very good progress on the expansion plans. As I said, and as the team has said previously, really, our business plan is fairly simple. We have a robust asset in Tanzania, 1.5 million ounces, 2.5 grams a tonne. The plan is to expand the plant over the next 18 to 24 months, raise production, which then helps fund the underground. And then we have an 18-year mine life spanning an open pit operation and an underground mine operation, all on the Buckreef main zone that's funded <<inaudible>>.

Stephen Mullowney

executive
#3

After that—we’ve got someone <<inaudible>> probably—there we go. Thanks, operator. And on top of that, we have a few highly promising zones on the property, especially Stamford Bridge and Anfield. Richard will also cover what we’re seeing on the geophysics front, and we’re pretty excited about the exploration side too. Khalaf will then give a quick rundown of our government relations efforts. So I’m going to try to talk less today. I’ve got a very solid team. Mike Leonard, our CFO, is with us today. Mike, there we go. Richard, as I said, is with us from the site—he’s our COO. Put your hand up, Richard. I think everyone can figure out which one Richard is. He’s wearing the orange shirt. And Khalaf is with us from Dar es Salaam this morning. Good morning, Khalaf. So, without further delay. TRX at a glance—I gave a high-level overview. We run the Buckreef Gold project in Tanzania. We’re in production, generating 25,000 ounces to 30,000 ounces in fiscal 2026. That cash flow will let us expand the plant, which will then be online with a PEA for an 18-year mine life, and roughly the final 15 years are underground.

Stephen Mullowney

executive
#4

Richard will address that today. On a few of those items, we might be slightly ahead, but we also won't overpromise. In the M&I resource category, we hold 1.5 million ounces at roughly 2.5 grams per tonne. So my focus really is on our first-quarter results and the financial side. I'll now pass things to Mike to walk through Slide #5 and what Q1 looked like, and Richard will supplement him on certain operational aspects. Go ahead, guys.

Michael Leonard

executive
#5

Great. Thanks, Stephen, and good morning, everyone. Appreciate you joining us, especially those of you in the U.S. on a holiday. As you've probably seen, we released our Q1 2026 results late last week on Thursday — we put out the numbers via press release, and they were record results across the board. Once again, starting right at the top with production. It was a record quarterly production quarter for us. We produced just under 6,600 ounces. That marked a significant increase over the prior comparative period and even versus our Q4 results. We had indicated that during the first half of 2025, we undertook a Stage 1 strip campaign. And the idea was to remove overburden so we could access higher-grade ore blocks toward the back end of last year. What you would have seen is that we put through about 1.9 grams a tonne through the mill at higher throughput levels compared to the prior year. So higher throughput, higher grade and higher recovery — in fact, we recovered around 60 — excuse me, 75% recovery for Q1, which meant record production for the quarter. And in terms of guidance, we'd indicated full year production guidance of between 25,000 ounces and 30,000 ounces.

Michael Leonard

executive
#6

We had anticipated that Q1 would rank among the weaker quarters this year. We're still reaching higher-grade ore blocks, and we remain on schedule to hit that production guidance of, once more, 25,000 to 30,000 ounces at a cash cost ranging from $1,400 to $1,600 per ounce. And in Q1, we landed at roughly $1,500 an ounce, squarely in the middle of that range. Combine that record output with the record gold price setting we're seeing. During Q1, we realized $3,860 an ounce, a record at the time. And naturally, a few weeks later, here we sit above $4,600 an ounce. So gold remains extremely, extremely robust. We keep showing our leverage to that gold price. And when you combine a record gold price with record output, inevitably you get record quarterly revenue — in our case exceeding $25 million for Q1 — along with items such as adjusted EBITDA above $13 million. So we're showing very, very strong cash flow and strong margins. And what we've managed to accomplish — we've discussed this over the past couple of quarters — is essentially take that free cash we're producing, and we've reversed what was a negative working capital ratio early last year, while we were in the midst of that strip campaign, and have effectively recapitalized our balance sheet.

Michael Leonard

executive
#7

So even when you compare it with our year-ended August 31, when the working capital ratio stood at roughly 1.3x, we have now reached 1.7x — that's about $15 million of positive working capital at Q1 — and it keeps getting better. Among other things, we've managed to show our cash position rising to more than $9 million, an increase compared with Q4, while we also keep investing in the business. So we have grown our ROM pad stockpile considerably, and Richard can speak to that a little in his remarks. But we've got more than 22,000 ounces sitting on that ROM pad stockpile, which currently averages roughly 1.2, 1.3 grams a tonne and is split between oxide and sulfide rock, which basically lets us optimize what goes through the mill and also acts as a very, very good insurance policy for us to make sure that mill feed stays consistent and strong. And material coming out of the pit is kind of prioritized against what's on the stockpile to make sure the highest-grade material is going through the mill. I guess the last comment I'll maybe make on the quarter: we do keep investing in what Stephen talked about, the plant upgrade followed by the expansion, which once complete will effectively pay for the underground development.

Michael Leonard

executive
#8

In Q1, a significant portion of that available cash went toward down payments on items such as thickeners, elution plants, gold rooms, and enhanced oxygenation — all intended to boost throughput and recovery, which should drive greater output over time. So it was a very, very robust quarter, with records across every metric, and we definitely expect that momentum to carry into Q2 and beyond. Next slide, please. This essentially summarizes some of the key statistics that I believe we've already covered. We've discussed revenue. We've discussed EBITDA. Gross profit is a crucial metric to mention. We've shown that this is a high-margin, low-cost operation with, once again, exposure to the gold price. Gross profits currently exceed 50%. So we're producing a tremendous amount of free cash and are positioned in what we'd describe as the lowest quartile of the cash cost curve, at approximately $1,500 per ounce. And once more, the plan is to deploy that free cash flow to execute on the PEA — both upgrading our current mill and expanding it — and then to use that cash flow to finance the underground development Stephen mentioned.

Michael Leonard

executive
#9

We've also had the ability to put money into areas such as exploration. Our exploration program's initial phase was essentially this geophysics study, which I believe we'll discuss a bit later, but we keep pushing forward on that front and hope to be able to release some assay and drill results later this year as that work continues to develop, along with finalizing metallurgical test work that, again, I think Richard will address when he gets to it, but which effectively shows that we can achieve high, high recoveries with some of the mill enhancements we're making, which will help drive future production. And the last piece, I think I've mentioned, but we do still expect production to come in between 25,000 ounces and 30,000 ounces at between $1,400 and $1,600 an ounce. On capital, we had guided at between $15 million and $20 million. We continue at this point to expect to spend at that level. But of course, at these gold price levels, if we generate additional free cash, we may shift some of those capital expenditures around the plant expansion forward into the back end of this year, but we'll certainly update the market as and when we make that determination.

Michael Leonard

executive
#10

And lastly, there's exploration spending. Our expectation is to invest somewhere from $3 million up to $5 million. We've secured a pair of RC rigs along with one diamond drill rig — we'll get into that — and we believe these will support our drilling work throughout this year. That covers what I wanted to address on the results side, so Stephen, I'll hand it back to you.

Stephen Mullowney

executive
#11

Yes. No, thanks, Mike. We're going to move into what I'd describe as operational growth now. I'll pass things to Richard, who will give a quick rundown of where we stand with our expansion plans and what investors should expect over the coming 12 to 24 months regarding that expansion and the throughput level we intend to reach. Clearly, we're aligned with what the PEA contained, and since we do intend to run at a higher throughput than the PEA assumed, our aim is to surpass it. But where do we stand exactly on all our items? I know there's plenty of exciting work around the Aachen reactors, the ADR plants, confirming and finalizing metallurgy, and then moving into the SAGD (sic) SAG ball mill along with the flotation cells and thickeners — all sorts of things underway. So you have a lot on your plate. You're on mute, Richard. There you go.

Richard Boffey

executive
#12

Can you hear me okay? Hopefully, that's — how does that sound?

Stephen Mullowney

executive
#13

Your audio is coming through clearly. The signal quality is solid <<inaudible>> today. Maybe some thunderstorm activity.

Richard Boffey

executive
#14

No, we're actually in the middle of one right now — that's the reason I posed the question. In any case, regarding the work underway at present, our attention remains largely on upgrades at the 2,000 tonne per day plant. At this moment, we're in the middle of a significant upgrade and enhancement to the crushing circuit. Additional work is scheduled immediately following that, moving on to the mills, the power draw for those mills, and the CIL circuits as well. A super oxidation system is being installed, which should hopefully deliver an extra couple of percent in recovery. We also achieved some substantial gains in the recovery areas during the last quarter — something Mike alluded to — and that is going well and continues to progress through this quarter. As for the expansion effort, all of our metallurgical test work is more or less finalized. We've completed full modeling in spec of the SAG circuit. And for those who may have read the PEA, the plan was to pair our existing 600-kilowatt ball mill with a SAG mill. Our modeling indicates we're probably better off simply investing in a larger SAG mill and turning it into a simpler circuit.

Richard Boffey

executive
#15

So we're currently going out on price inquiry and will be going to full tender very shortly. And the indications are that the lead time for that equipment is probably on the order of 7 to 9 months. The float plant and fine grind parts of the expansion, along with the change in the process flow sheet, have gone well. The met testwork was really centered on that, generally producing some excellent results in the lab and pilot plant with recoveries and mass pull, both better than expected. And with our fine grind, it looks like we're going to optimize at about 20 microns instead of 15 microns, which again is a big improvement in energy expenditure and capital expenditure. So those aspects are going well. On the water at the moment, we've got oxygen plants coming to site. So we've got ADR plant orders just finalized and under construction. So they'll be in towards the end of this financial -- they'll be in by the end of the financial year. I won't say we'll see much benefit from some of those aspects until financial year 2027. So generally, things are working pretty well. And as I discussed, this change to a straight SAG circuit for our new expanded plant allows us to effectively fully utilize the existing plant we've got, which is why we're confident that we can probably improve on PEA metrics in terms of throughput and ultimate gold production.

Richard Boffey

executive
#16

Alongside that, we're re-optimizing the pits given this stronger gold price setting, and we feel quite confident that additional reserves will emerge from our known reserves as a result of a lower cutoff grade. So overall, the outlook for us is quite favorable.

Stephen Mullowney

executive
#17

Yes. Richard, thanks for that. Quite a bit of information to take in there, and it gives investors a sense of where we're heading and some of the news that'll come out once plans are finalized. As Richard mentioned, we may not use the 1,000 tonne per day ball mill at present in the SAGD (sic) SAG circuit. So according to the earlier press release, we stated that the 3 smaller ball mills wouldn't be utilized. That means the existing circuit stays intact, along with the new SAGD (sic) SAG circuit. So essentially that's higher throughput than what we previously announced, but we still need to finalize it. The -- also regarding operating cost, recovery rates have risen. And the reason they're -- one reason they're up is oxygenation, and we've been using hydrogen peroxide at present, and the Aachen reactor will come in. And Richard, I assume we'll get the oxygen rates even higher than what we have right now with hydrogen peroxide. So that should, as you said, bring down cost as well as boost recovery rates going forward, along with the upgrades to the crushing circuit, I believe the apron feeders we installed today, which is critical for that.

Stephen Mullowney

executive
#18

This lets us keep running our 2,000 tonne per day plant at good efficiency, both ahead of and following the expansion. So I'd say the picture is very encouraging, and this year we ought to see throughput rates higher than before, plus the grade profile will rise. We'll come to that shortly, compared with last year, given where we sit in the pit. And as Richard said, in any study and with any resource profile, you select a gold price in order to determine your optimal pit design and your underground mining plan design. In our PEA, I believe we used $1,900 an ounce, Richard, that's what it was, to carry out that work. And that in turn sets a cutoff grade. So Richard and the team are now going to revisit that, given we're at $4,600 an ounce today. So we'll pick a higher price there. And really, the aim is that what you'll begin to see is, when you do that mine plan, you'll have a bottleneck in your plant, and your stockpile will keep growing as you take the lower grade material and simply place it on the stockpile for the end of mine life.

Stephen Mullowney

executive
#19

And that's generally what you'd expect when it comes to mine planning. But without question, the reserves and resources are going to increase because of it. So overall, there are a lot of very, very positive things happening on the throughput front. In that regard, when you look at the figures showing up in the financials, we have not built a $4,000 gold price into our budgets. The gold price we use is below that. So since we're confident about our throughputs, our recovery rates, and our gold production metrics, that clearly ought to carry through into the financial metrics, and we're quite hopeful we'll be above where we were, certainly, in fiscal 2025. If you look at the run rate we have at present, it's definitely higher — substantially higher — than what fiscal 2025 delivered, and we're performing pretty well. On a net basis, the first quarter saw EBITDA rise by roughly $10 million compared with the first quarter of last year. So overall, we're doing very well. And clearly, working capital keeps growing. Our view is that companies which have done exceptionally well carry a working capital ratio somewhere between 1.75 and above 2.

Stephen Mullowney

executive
#20

We should reach that point pretty quickly, and we're well capitalized to carry out our plans. Mike, anything you'd like to add on that?

Michael Leonard

executive
#21

No, Stephen, I think you put that well. As we said, we're making good progress — Q1 came in at a positive $15 million, and with that improving profile it will fit squarely into the working capital metric you just laid out.

Stephen Mullowney

executive
#22

Right, exactly. On that slide, a lot of folks have reached out to me about it, and they like it because a picture is worth a thousand words — and that's definitely true here — and it shows why we needed to do the stripping campaign last year and now we're into the pinks and reds, those nice colors. There are still some blue colors left to get through, but blue colors are unavoidable. You have to strip so you can open up the nice colors. And Richard, could you give a quick overview of our mine plan for this year — what should we expect from a mining standpoint as the grade profile comes through? And obviously the thickener is a big item, because we won't have to mix oxides in our plant anymore, and that will raise the head grade, which raises production too. So just give us a quick overview of what people are seeing here. Obviously, Buckreef gets nicer colors as we go deeper.

Richard Boffey

executive
#23

Okay, so generally speaking, during the latter part of FY '25 our attention was directed at that southern zone on the left side of the slide, where grades were better, and that move came about because of certain delays in reaching that area. In the current year, the main pit's progression is descending much more consistently, and we'll be applying what is probably close to a 30-meter vertical rise overall across the entire site — across the whole pit. That gives us a reasonably uniform grade profile, particularly through the first 3 quarters. Then in the fourth quarter we actually encounter some really favourable material, which will bring a modest lift in grade across the mine. My reason for emphasising a steady profile of roughly 2.1 grams, 2.2 grams is that...

Stephen Mullowney

executive
#24

Richard, your audio is breaking up a bit. Yeah, muted once more. Oh, you've dropped off. <<inaudible>> So we lost you right at the point where I was emphasizing why an even profile of 2.1 grams matters.

Richard Boffey

executive
#25

Alright. So having a good, consistent grade profile is a huge help to the plant. As Stephen said, in roughly 2.5 to 3 months — definitely at some point in April — the pre-leach thickener will be in place, and that should let us see around a 5% increase in the mill head grade. So we'll begin seeing some production gains tied to that too. Another thing we're doing in the third quarter of this year is opening a new pit — the strip for this new pit, which goes by the name Eastern Porphyry. And by the time our financial year wraps up, we'll have faced off so that all faces in the ore blocks are accessible to us. So in that regard, I suppose we'll be derisking our production profile as well.

Stephen Mullowney

executive
#26

That's excellent. So we've covered the production side and what underpins the payment structure. I'll move around our presentation a bit here. Let's go directly into what we envision for our exploration programs. I know we have one drill rig, an RC rig, on site, and Richard, I believe it's currently handling some condemnation drilling tied to certain expansion plans. But we intend to put some exploration holes in with it fairly soon, and our diamond drill rig should be on the water shortly and arrive at site, and we'll likely bring in some subcontract drilling too during 2026. Of course, everything we've outlined on the production side sits within the Buckreef main zone. A solid geophysics study has been finished, and we'll bring that to the market soon. But here's an overview of our exploration plans.

Richard Boffey

executive
#27

Absolutely. So, Stephen, as you said, we have finished our initial geophysical survey, and it's essentially bringing out some interesting structures, and it was carried out at a very high level of detail that hadn't been achieved previously in this project area. So that has brought out some truly interesting targets for us. And we are going to hit a number of those right away with our drills. And for the others, we intend to conduct what's known as an induced polarization or electrode resistivity survey on them to see whether we can try to pinpoint some deeper pyritic anomalies, and as a result, we'll place drills on those too. So over the course of the year, we're planning to drill probably around 40,000 meters in total, perhaps even 50,000 to 60,000 if things go well for us.

Stephen Mullowney

executive
#28

Yes. And clearly, Stamford Bridge is going to be included. Anfield will be included as well. And as others just heard, additional areas are looking very promising based on the geophysics survey being conducted on the site — areas that aren't Anfield or Stamford Bridge. Is that right?

Richard Boffey

executive
#29

You're right, that's exactly right. There are also a few other rather intriguing small structural features we've spotted that we intend to pursue further.

Stephen Mullowney

executive
#30

Right, and thanks. So to sum things up, our PEA is now online. As everyone knows, the production profile under that PEA turns out to be quite strong. We're hopeful that we can beat it. And with gold prices where they are today, profitability is looking quite solid too. Then the next item — part of the overall business plan, and we've been upfront about this — is that negotiations with the government are underway. Of course, that's moving a bit more slowly than anyone would want, but that's just how it works when you deal internationally. Things have to work their way through the political process. So, Khalaf, could you give us a high-level rundown of where things stand on that front? Please unmute yourself.

Khalaf Rashid

executive
#31

Absolutely. Thanks, Stephen, and good morning, everyone. Good evening, Richard, who is at the site in Tanzania with me. Right, okay. So, as we're all aware, Tanzania has gone through a tough stretch. We're emerging from that tough stretch, the election period. So it really does feel as though things are returning to normal. Business is coming back to the way it ought to be. Naturally, there is some fallout that politicians are working through, attempting to reconcile differences and so on. They've had — Tanzania has taken somewhat of a hit when it comes to international development funding. From our standpoint, that's likely a good thing, since it puts mining at the front of the queue, correct? So there's an emphasis on trying to get projects — new projects launched, and existing projects of ours scaled up as quickly as we can. So clearly, that government receives more revenue. We've — as we said during earlier meetings we've held; we've been actively negotiating with the government. There is — as everyone knows, state participation regulations, with the amendment brought in during 2022, right, basically framework agreements and state participation. We have a joint venture agreement already in place since 2011. So what we're hoping for is reaching a point where we can settle on improved agreements with the government, all parties, right, far more transparent, simpler to operate within Tanzania, and I suppose, steering clear of disputes and lowering risks for investment in the country.

Khalaf Rashid

executive
#32

We're eager for that to happen. The talks are still in progress. As Stephen mentioned, though it's moving somewhat slowly. Yet in Tanzania, from what we understand, things are progressing rapidly. In any case, we do anticipate that I believe 2026 will be the year when, hopefully, matters pick up speed. At the very least, the foundation has been laid, correct? The foundational work and early conversations have been completed. So we ought to proceed fairly fast. I think over the past month, we've already had two meetings. We met in December, at the end of December. We met again last week with our partners. So we're making progress. And the expectation, as I said, is that perhaps before this year concludes, we should have fresh agreements that are improved and more attractive for investment. So -- yes, in essence, that sums it up, Stephen. Would you like me to include anything further?

Stephen Mullowney

executive
#33

No, no. I'd say it's moving forward. And of course, the speed and the politics differ in other regions compared with what we're accustomed to in the United States and Canada. But that comes with the territory when you operate internationally. I've got plenty of experience with this kind of thing, and it has to work its way through the political departments and reach the right point where decisions can actually be taken. I believe we're at that point now, and hopefully we can push it ahead a bit faster than we have been able to before. Our agreements differ somewhat from what you'd see at other companies out there. Those other companies are aiming to bring properties into production, so they head straight for the framework agreement. What we're doing is working with an existing joint venture to convert it to framework agreement terms. And in doing so, obviously, what we want is essentially to get the agreements into better shape than the ones we have at present for both sides — for us and for the government — and that has been communicated clearly. So I think we'll come out the other side, for us and for the government, in a far better win-win situation.

Khalaf Rashid

executive
#34

Yes. No, definitely. Maybe I should also mention that we’re working with our embassies on the ground here. And they are contributing their views, and clearly they’re quite engaged in this process too, cooperating with the government to try to get all of these matters finalized as quickly as possible. So...

Stephen Mullowney

executive
#35

Yeah. That applies to both the US and Canada...

Khalaf Rashid

executive
#36

Yes, from Canada.

Stephen Mullowney

executive
#37

Yes, and that includes both the American and Canadian embassies. During my December trip to Tanzania, I met with both of them. Both are pro-investment — pro-stability, I'd say. All right. So as far as we're concerned, I'll now open the floor in this second and final section, since I'm going to walk through valuation. Obviously, we're beginning to climb our chart a bit as we keep delivering solid financial results, recapitalizing the business internally, and the market starts to grasp where we're headed with our business plan and expansion plan. So I fully expect — hopefully — that as we keep executing and executing successfully, we keep moving up that chart. We've examined many metrics that the market looks for and have oriented our business plan toward those metrics. I do believe we have a very large chunk of warrants expiring on February 11 — the $0.80 warrants — and then 12 months later, the $0.44 warrants. I think we'll reach a point where the overhang from those warrants and the capital structure on the equity side becomes much cleaner. I think that will be a positive for the stock as well.

Stephen Mullowney

executive
#38

Overall, then, we're in a pretty solid spot. TRX is well positioned. Cash flow generation is strong, especially with gold at $4,600, and we're putting that cash back into the business. Our most recent capital raise happened more than 4 years ago, bringing in $20 million net, and we'll likely reach a mining property capable of producing 80,000 ounces to 100,000 ounces plus from that $20 million — something I don't believe has been accomplished anywhere. As of now, gross investment in the asset sits at roughly $70 million on the back of that $20 million. That ratio is now comfortably above 3x and keeps climbing. We're feeling confident — you can hear that confidence in our voice. I think there's considerable upside on the exploration front too. There's even upside in revising our mine plan. So we're a self-funding growth operation across production, cash flow and resources. So, looking ahead — yes, we're quite confident. I'll turn it back to the moderator for questions.

Operator

operator
#39

<<operator_script>> Our first live question today is from Heiko Ihle at H.C. Wainwright.

Heiko Ihle

analyst
#40

With the bigger processing plant, could you take me through where things might get constrained once it really ramps up? And what it means for the workforce too — how many additional staff do you figure you'll require? My assumption is that once it's up and running, that's a fairly limited number. Then, if I could squeeze in one more, the estimate for — your best expectations regarding what you'll spend on labor this year.

Stephen Mullowney

executive
#41

I'll give the floor back to Richard. Let me take the final portion of that question. My assumption is you're viewing labor as a source of inflationary pressure. Is that what you're really asking?

Heiko Ihle

analyst
#42

Right. Well, I mean, presumably that'll involve a larger headcount too. But yes, that's the concept.

Stephen Mullowney

executive
#43

Yeah. So I think Richard is better placed to address that, specifically regarding our expected processing cost per ton compared with labor rates. We haven’t really observed much inflationary pressure when it comes to labor rates in Tanzania. That said, relative to what has been seen in other places, there is a bit, though not to the same degree. So, Richard, would you like to take the first part of that question? I believe you’re on mute once more. There we go. We’re having a bit of trouble hearing you today, Richard. You’re on mute.

Richard Boffey

executive
#44

What about at this point? Were you able to hear it this time?

Stephen Mullowney

executive
#45

Correct.

Richard Boffey

executive
#46

Great. Okay, just a quick point on labor. Labor costs aren’t really rising much at all. Right now, it’s more a matter of exchange rates than anything else. Things have been fairly steady for about 36 months. As we upskill our people, naturally we pay them somewhat more, but that will lead to somewhat smaller workforces. The expansion will raise the total workforce while lowering unit costs and overall labor increases compared with what we’re seeing right now. The underground part of the project isn’t especially labor-intensive relative to what we’re seeing in the open pit at the moment. We’re aiming for a fairly efficient underground mine run by a contractor, probably with no more than 300 operators and perhaps another 50 staff. So it won’t be a large increase, not like some other African mines where thousands of people are employed. I don’t see labor as a major driver of <<inaudible>>.

Stephen Mullowney

executive
#47

Alright. Thanks, Richard. Heiko, does that address what you asked?

Heiko Ihle

analyst
#48

Yes. Thanks. Thank you, Richard and the team. And then figure 8 on Page 7 of the press release as well — I mean, if you simply take a look at it from 20,000 feet, there's plenty of high-grade material in the center, correct? Given — and it appears to be improving further the deeper you go. Just conceptually, when ought we to expect that to be mined? And will it be blended in such a way that the impact gets muted? Or will there be, say, a quarter or 2 with mine fine grades substantially above?

Stephen Mullowney

executive
#49

Yeah. Richard already addressed that point earlier in the presentation — head grade is going to rise once we get the thickener in place. What the thickener does is let us avoid blending lower-grade oxides with the higher-grade sulfide material. And as the pit goes deeper and we move into the underground portions, you'll see the head grade shift in our PEA, and obviously there are peaks in there that come from that increase in head grade.

Operator

operator
#50

While we’re waiting for any additional questions by voice, Steve, I can hand things over to you, since a few written questions have come in.

Stephen Mullowney

executive
#51

Absolutely. There are a few text questions, so I’ll address those now. The first asks whether you could explain what took the plant utilization rate from 88% to 90%, and with that, the person has a related question: are there any plans to put in place a lower strip ratio than 5.8? Thanks for taking my 2 questions, and great results this quarter. On the first one, utilization has risen slightly. Look, a lot of emphasis has been placed on preventative maintenance, and we’ve also brought in significantly more spares from a working capital standpoint. Both of those things have helped plant utilization. Richard, is there anything else you’d add?

Richard Boffey

executive
#52

Look, it's just that we're getting this process plant somewhat better organized. We've brought in some expatriate expertise for consulting and management to enhance our reliability-based maintenance planning.

Stephen Mullowney

executive
#53

Now, about the strip ratio — that figure really comes out of the mine plan. The mine plan incorporates the inputs I referred to earlier: the gold price, the recovery rates, and the mining operating cost. The mine model then works to maximize net present value and cash flow. So as for the strip ratio, it will rise and fall depending on the proportion of ore blocks versus strip blocks, or waste, within your mine plan. Given where we are now — whenever stockpiles are building, that typically means a lower strip ratio. Whenever you are drawing down the stockpile, the strip rate is usually higher. What we miners typically focus on is a life-of-mine strip ratio. That life-of-mine strip ratio will exceed 5x, because that reflects the character of this deposit — especially with gold at $4,600, maximizing cash flow would call for a higher strip ratio at this deposit than that. Then you reach what I would describe as a crossover point, which is where you transition to underground, since stripping costs more than underground development does.

Stephen Mullowney

executive
#54

The strip ratio keeps shifting, as you'd expect. On your second question — TSF3 is scheduled to be built in 1 quarter later in fiscal 2026. What risks are there to hitting that timeline, given the situation? Richard, walk everyone through TSF3. You and I were talking about this earlier this morning, of course. We're raising TSF2 first, and after that comes TSF3. Once TSF3 is in place, nearly all the tailings risk goes away, since it will serve mainly for the life of the mine. So please explain the process to everyone.

Richard Boffey

executive
#55

Okay, so we are fully engaged right now in designing and evaluating our main TSF3 — the life-of-mine facility built around containing all the PEA material we intend to mine. On the risk side, we've decided to add a third and final lift to the existing TSF2.2. That gains us roughly another quarter, or 1.5 quarters. And that effectively carries us until probably the first, or possibly the second, quarter of FY '27, which ought to leave us ample time to construct this full facility. So essentially we're committing to spending on a full life-of-mine tailings project in a single construction effort. And the reason, basically, is economy of scale in the sense that essentially everything we dig out goes into walls, and it's a very even match. So we aren't bringing in a lot of material. Construction will probably take us about 5 months to finish, and we've likely got another month of permitting and final design to go.

Stephen Mullowney

executive
#56

Great, thanks. So the answer to that question is that it's well under control. Moving to the next one, Stephen, could you share your outlook on the initiatives for 2026 aimed at further promoting TRX and its stock? We'd like more high and ultra-high-net-worth investors to grasp the value and put money into the company, especially in light of the strong operational performance. Please advise. On the marketing side, we do have a couple of marketing firms that have been engaged on our behalf, out in the market, reaching out to a lot of what I'll call retail brokers, high-net-worth individuals as well as institutional investors. And that has generated a lot of meetings. Also, when it comes to the company's performance, that has caught the attention of a lot of investment banks who have likewise brought forward a lot of institutional investors. The challenge, I would say that we predominantly have is most people in the mining industry are used to getting discounts through private placements. And we're not offering that. We're offering if you want exposure to our stock and our growth story, you can purchase in the market. And so a lot of the institutional investors have the option of going in -- there's a lot of capital raises happening, going into other stocks on the capital raise or purchasing ours in the market without a discount.

Stephen Mullowney

executive
#57

And we're going to stick with that approach, since we believe that keeping the share count from rising by our own choice pays off more over the medium to long term. So because of that philosophy, you might not see the shareholder base shift as fast as you'd prefer, but we're going to stick with that approach. On the marketing side as well, we do a fair amount of marketing at what I'd describe as small to mid-cap conferences in the United States right now, plus a couple of mining conferences. So at those small to mid-cap conferences, in tandem with the 2 marketing firms we have -- actually, we have 3 marketing firms on board. We do come across plenty of shareholders who match what you're describing, around high-net-worth individuals. And that's been a successful path for us to bring in new shareholders. So those are the initiatives. It's definitely a top-of-mind initiative. Anything to add to what I just described, Mike?

Michael Leonard

executive
#58

No, I think you put that well, Stephen. As you said, we're moving into conference season, and I've got 3 conferences over the next 4 weeks, and our schedules are already packed with quite a large slate of high-net-worth and institutional investors who have — to help address the question, shown interest in the results we're beginning to produce. So there is genuine interest in the market. And in the coming weeks, expect us to meet with some prospective shareholders. So stay tuned.

Stephen Mullowney

executive
#59

Yes, let's keep going. Operator, I believe we've reached the end of the questions.

Operator

operator
#60

Right, that's accurate. At this point there are no more questions from the voice line.

Stephen Mullowney

executive
#61

Thanks. Well, I appreciate all of you for being on the Q2 -- sorry, Q1 conference call. The results are good. They keep improving. We're sticking with our expansion business plans, making use of free cash flow. Exploration results will be coming further along later in the year. As Richard said, we're aiming to complete well over around 40,000 meters of drill holes. We also have additional prospective targets beyond just Anfield and Stamford Bridge to pursue. And we're all excited about what the future holds at Buckreef in Tanzania. Thank you. Asante sana.

Operator

operator
#62

That wraps up the meeting for today. You're free to disconnect at this point. Thanks for joining us, and enjoy the rest of your day.

Stephen Mullowney

executive
#63

Yes, thank you, Richard, and Khalaf, for being with us from Tanzania.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete TRX Gold Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to TRX Gold Corporation earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in TRX Gold Corporation or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.