Good day, everyone, and welcome to the UltraTech Cement Limited Q3 FY20 Earnings Conference Call. We need to remind everyone that what we discuss today may contain certain forward-looking statements, and those must therefore be considered alongside the risks the company faces. The company takes on no responsibility to publicly amend, modify, or revise any forward-looking statements based on any subsequent development, information, or events, or otherwise. As a reminder, every participant line will be in listen-only mode. You will have a chance to ask questions once the presentation concludes. If you require assistance during the conference call, please signal an operator by pressing star then zero on your touchtone phone. Please note that this conference is being recorded. I now hand the conference over to Mr. Atul Daga, Executive Director and CFO of the company. Thank you, and over to you, sir.

Atul Daga

executive
#2

Thanks a lot. Good evening, everyone, and welcome to the call where we'll go over UltraTech's results for Q3 FY20. Better late than never. I wish each of you a very successful and eventful 2020. I think far too much is going on in the country and across the globe. Amid all this turmoil, India's growth story has really suffered a setback. Let me begin with some positive news. Demand has begun improving in a handful of regions across the country, with states such as Odisha, West Bengal, Jharkhand, Bihar, Tamil Nadu, Kerala, Telangana, Maharashtra, Rajasthan and MP showing a turnaround. That's a lot of territory covered. The finest development is that work has restarted on the Polavaram Dam, the country's biggest irrigation project, and the AP government has re-awarded several other irrigation projects. It's clear the government is worried about how depressed the economy is, and I'm certain that where there's a will, there is a way. The honorable Prime Minister has pinpointed and laid out a detailed program for driving growth, and with a push on infrastructure, the cement sector stands to gain entirely. You all must have read about the task force on National Infrastructure, where a pipeline has been identified across different segments for spending roughly $1.5 trillion through 2025.

Atul Daga

executive
#3

Naturally, that pipeline contains work that’s already been identified, but it still needs to be awarded and then begin execution. In the real estate segment as well, launches of housing units in the top eight cities saw 25% growth during the second half of 2019, in the smaller and lower ticket sizes. Unsold inventories fell roughly 13% in calendar 2019 compared with the prior year. As I said, we are seeing new launches. That ought to support an overall recovery in real estate demand across urban areas. Now let’s discuss cement prices. Average prices fell about 4% during the quarter relative to Q2. Even so, they remain above last year’s level. The corrections were concentrated in the East, South, and Western markets. In certain markets, prices have begun to recover, as we speak, during the current month, helped by better demand sentiment. What about costs? Please don’t be alarmed when you see a larger amount of other expenses in UltraTech’s P&L. First, let me explain the exceptional items charged in the P&L this quarter. INR 133 crores has been provided against disputed liabilities offered under the amnesty scheme known as Sabka Vishwas, which the central government introduced.

Atul Daga

executive
#4

You're probably aware that this amnesty scheme covers service tax along with the other indirect taxes through June 2019. We went through the pending cases we have and the gross liabilities tied to the settlement we've opted for come to INR 832 crores. Every one of these liabilities falls under contingent liabilities, show-cause notices, and matters that have been running for some time. Our thinking was that management's efforts are better directed toward productive work rather than being spent running between courts and legal authorities. In my view, this brings us considerable peace of mind and lets us get more productive work done. As I said, contingent and disputed liabilities valued at INR 832 crores have been settled through payment of INR 133 crores. Sorry — that payment happens by 31st March 2020. A provision for it was taken in this quarter. There's another one-time expense of 31 crores, incurred on the acquired Century plants as a one-time exceptional cost, forming part of how we integrate and align them with our company's accounting policies. Both of these items affect operating EBITDA by close to INR 82 a ton.

Atul Daga

executive
#5

On the transition or upgradation costs at the Century plants, we'll have roughly another 30 crores of spending in the current quarter as part of the integration program. To go a bit deeper on energy costs, those came down by about 6%, tied to the decline in fuel prices. In the quarter, our petcoke consumption was at roughly $80 a ton, versus $91 a ton in the prior quarter. Petcoke spot prices are hovering near USD 70, and US coal stands at about USD 80 on a landed basis. Those price benefits will definitely show up in Q1 FY 2021. That said, we're all aware of the IMO's ban on bunker oil as a shipping fuel. From what we know, most of the chartered ships are moving to low sulfur fuel oil, and that will push up their costs and therefore ocean freight. What this means is that we may not see a meaningful further decline in the landed cost of fuel from here. It's also worth discussing green power. Within our overall power requirement, the green power share rises each quarter. This quarter, green power made up roughly 12.7% of our total power requirements, compared with 10.5% in the previous quarter.

Atul Daga

executive
#6

That leaves out the Century assets. With this mix, the company is cutting roughly 5 lakh metric tons of fossil fuel each year, based on current capacity utilization. Logistics cost — the biggest expense for the cement industry. The railways extended the busy season surcharge exemption through June 2020, and that has helped keep logistics costs where they are now. The latest passenger fare increase appears to have been absorbed quite smoothly by the system, which gives us hope that rail freight won't rise for a while. Road freight rates, meanwhile, have climbed because of higher diesel prices. Synergies between the existing plants and the acquired assets have cut our lead distance by roughly 2% versus the prior quarter. As utilization of the Century assets picks up, that benefit may grow further. Last quarter, there were a number of questions regarding how the Century Cement asset was performing. We had only just taken it over. I lacked sufficient details to share with you. Now let me walk you through how the integration of Century assets is progressing. These assets are turning around quickly. In the month of December — not the quarter, the month of December — we reached a capacity utilization of 79%.

Atul Daga

executive
#7

Capacity utilization at these plants has been climbing month over month, averaging roughly 55% across the quarter. As you can appreciate, turning a category B brand into a category A brand within the same markets doesn't happen overnight. It takes time for the dealer community that sells a category B brand to alter the way they operate. Our team is working on it. In December, running the 14.6 million tons of capacity across the Century assets at 79% utilization, we hit 55% brand transition. By the end of September 2020, that figure will climb past 80%. We're capturing synergies across operations, manufacturing costs, and overheads. As things stand, production costs run roughly INR 425 per metric ton above those at our neighboring plants. That figure includes a structural increase of INR 70 per ton for MMDR royalty plus exceptional costs of about INR 125 per ton. Once the transition is finished, we expect our costs to line up completely with UltraTech's. We've been moving quickly to convert the Century brand to UltraTech and are confident the switch will be complete within 12 months, counting from 1st October 2019, when we began managing these operations. In my view, this acquisition will begin delivering EBITDA per ton above INR 1,000.

Atul Daga

executive
#8

So because of that, looking at this quarter's numbers as a steady-state run rate for the Century acquisition wouldn't really make sense. It's also worth bringing up UltraTech Nathdwara. In my view, it has reached nirvana, delivering EBITDA per ton above INR 1,500 while running at just 60% capacity utilization. Its production costs match our existing plants, or beat some of them. Those costs will come down further once a 10.5 MW WHRS plant is commissioned by March 2021. That will be our 11th WHRS unit. As demand picks up, my guess is this unit is set to power even bigger wonders. On WHRS, we now operate 103 MW in total, with another 39 MW under implementation. In the quarter, we finished selling a 6 lakh metric ton grinding unit in Bangladesh at an EV of $30.2 million. Our CapEx cash flows through December 2019 stood at INR 1,150 crore. By the close of fiscal 2020, we expect that figure to rise to INR 1,600 crore, versus the roughly INR 2,000 crore we guided earlier, which saves us INR 400 crore in cash flows. Orders are already placed for the 3.4 metric ton grinding capacity expansion in the eastern markets.

Atul Daga

executive
#9

Cuttack is going to be a greenfield capacity. There are two brownfield expansions — one located at Dankuni in West Bengal, and the other at Pataliputra in Bihar. Each of these three plants will produce composite cement. Commissioning of this expansion is expected by March 2021. I'm pleased to share — and you may have picked this up from yesterday's stock exchange release — that phase I of the Bara grinding unit, which we acquired through the deal with Jaiprakash Associates, has at last been commissioned. Turning to the Jaiprakash transaction, the Dalla Super unit, a 2.3 metric ton clinker plant, should be commissioned by March 2021 once all legal formalities are completed. There is some delay. Our existing clinker requirements are fully covered. That gives you an overview of the cash flows that have occurred and what is coming. Measured on 12 months performance, net debt to EBITDA stands at roughly 1.87% on a consolidated balance sheet, including Star Cement UAE. Over the first nine months of this year, we brought net debt down by about INR 3,486 crore. I'm glad to report that ROACE for the trailing 12 months has risen to roughly 11.2%, versus 8.9%.

Atul Daga

executive
#10

Return on equity now stands at 10%, up from 7.3% back in March 2019. Of course, you need to view these figures in light of how we front-loaded our investments. Considerable capacity remains at our disposal, and I'm certain interesting times lie ahead, with UltraTech uniquely positioned to capture the opening up of markets as we move forward. Many thanks for listening to me, and I'll now hand things over to you for further discussion and questions.

Operator

operator
#11

Thank you very much, sir. Ladies and gentlemen, the question-and-answer session is starting now. If you'd like to ask something, please press star followed by one on your touch-tone phone. Should you want to take yourself out of the queue, press star, then two. We ask that participants use their handsets when posing a question. Anyone wanting to ask questions, please press star, then one. Our first question comes from Bhoomika Nair of IDFC Securities. Please go ahead.

Bhoomika Nair

analyst
#12

Good evening, sir, and thanks for the thorough opening comments. I just wanted to get a bit more clarity on Century. We've obviously seen realizations improve, and we're in the middle of the brand transition. I was hoping you could help me understand what the average realization gain has been for Century on a per-ton basis. If you could also share some detail on the EBITDA for that asset.

Atul Daga

executive
#13

On realizations, any gain would come through as a percentage. At this point, our attention is largely on the brand transition, and that yields just a marginal improvement. From the January-March quarter, prices will begin to come down in step with UltraTech. Turning to EBITDA per ton, operating EBITDA excluding one-time costs should land at roughly INR 267 per ton.

Bhoomika Nair

analyst
#14

So from that standpoint, going forward, we'll keep incurring that INR 70 and INR 125 cost.

Atul Daga

executive
#15

No, no. Just INR 70 per ton — that's the MMDR royalty. The one-time cost we took this quarter came to roughly INR 31 crores, and in the January-March quarter I'd put it at give or take INR 25 crores to INR 30 crores. After that, it's done. Starting in April, all we'll have is that INR 70, since I can't really call it an exception business, so.

Bhoomika Nair

analyst
#16

So at that point, that's when we're saying we'll reach INR 1,000 EBITDA per ton — sometime within one quarter, would that be a fair way to understand it?

Atul Daga

executive
#17

Sure thing. Capacity utilization came in above 80%.

Bhoomika Nair

analyst
#18

Understood, that's great. When the balance gets transferred, or the Balance brand transition takes place during the course of FY 2021, and the Baikunth plant also moves over at a later stage, EBITDA per ton should improve broadly, tracking the realization.

Atul Daga

executive
#19

Yes. When I mentioned that we'd complete more than 80% of the brand transition, the Baikunth plant wasn't included in that figure. For strategic reasons, Baikunth will keep selling Birla Gold or the Century brand for a while yet. In the end, the team is settling on the conclusion that we'll need to shut that line down and install a new one, unless some alternative technology or upgrade can enhance the cement quality produced at that facility. Of the 14.6 million tons of acquired capacity, Baikunth accounts for 2.4. Baikunth is 2.4. The 12.2 million tons would be 100% UltraTech, while this 2.4 will carry on for some time under the old brand. It sells only in the Chhattisgarh market, which is a market with very low prices.

Bhoomika Nair

analyst
#20

Got it. My second question concerns volume — you provided a bit of detail there.

Atul Daga

executive
#21

We provided the complete color.

Bhoomika Nair

analyst
#22

Yeah, I was hoping to get a bit of a read on real estate. How’s that side doing? You mentioned infrastructure as a major demand driver — could you shed some light on what’s happening with real estate activity?

Atul Daga

executive
#23

From everything we've heard, and I offered a brief look at the knowledge we've picked up. We're observing better performance in new launches across metro cities. Now, one has to examine new launches carefully. These aren't luxury apartments. To take the city of Mumbai as an example, launches with ticket sizes between INR 1 crore and INR 1.5 crore are growing, whereas luxury apartments priced above INR 3 crore, or units of that kind, simply aren't selling, and not many new projects are being introduced. We've been informed that Mumbai carries surplus inventory of roughly 24 months. Bangalore, an intriguing market, meanwhile has an inventory of eight to nine months. As this stock of unsold homes gets tighter, you begin to see new projects emerging quickly. With RERA now in force, project execution cannot be delayed in any way. Any project launched under RERA will also see execution completed on schedule. That's good for cement.

Bhoomika Nair

analyst
#24

Thanks very much, sir — all the best to you, and I’ll rejoin the queue. Thank you so much.

Atul Daga

executive
#25

Thanks.

Operator

operator
#26

Thanks. Our following question comes from Apoorva Bahadur at Jefferies. You have the floor.

Apoorva Bahadur

analyst
#27

Hello, and congratulations on a solid set of results in what was clearly a tough quarter. I have a couple of questions. I'd like to understand something about the one-time settlement. Is it fully completed at this point, or should we anticipate additional settlements of this kind going forward?

Atul Daga

executive
#28

No, that program has ended. It wrapped up on January 15th — January 15th. The government shut the door on anyone who wanted to come in under amnesty. There's nothing novel about this. Several amnesty programs have also appeared over previous periods.

Apoorva Bahadur

analyst
#29

Mm-hmm. Okay. What would the tax benefit amount to? I believe your presentation mentioned a range of 40% to 70%?

Atul Daga

executive
#30

That INR 133 crores works out to roughly 50% of the principal on the demand, which was disputed and contingent. Because it was contingent, no provisions were taken, so it hits P&L as a direct charge. That said, the contingent liabilities that got extinguished come to INR 832 crores. The larger point here, Apoorva, is this: say a matter is sitting in the Supreme Court and the court drags it out, with the ruling coming three years or four years later — that INR 832 crores would by then have grown to INR 1,100 or INR 1,200 crores with interest compounding.

Apoorva Bahadur

analyst
#31

Understood.

Atul Daga

executive
#32

We figured the smartest move was to resolve these cases and get on with things.

Apoorva Bahadur

analyst
#33

Sure, that’s understandable. Second, in general, your premium cement segment is growing volumes in that market. I just wanted to check whether we’re still holding those EBITDA margins of INR 5 to INR 10 per bag. Looking ahead, do you expect those margins to stay in place, or will they face pressure as competitive intensity rises in that market too?

Atul Daga

executive
#34

Nope. Our premium items are still going to bring in a bigger EBITDA per ton.

Apoorva Bahadur

analyst
#35

We're holding the INR 5 to INR 10 per bag EBITDA per ton margin. Per bag — sorry, EBITDA per bag.

Atul Daga

executive
#36

It's a bit above that, actually — somewhat higher still — though INR 10 is a reliable figure to use in your math. When volumes rise, EBITDA per bag rises as well, thanks to operating leverage or cost absorption.

Apoorva Bahadur

analyst
#37

All right. Thank you. Sir, one final point: during your presentation, you noted that fly ash prices went up. I'd like to understand whether that's a seasonal effect or whether there's some particular cause behind it, and how you expect that trend to develop going forward?

Atul Daga

executive
#38

Broadly speaking, seasonality plays a role, since a power plant going offline all at once creates a shortage in a given region. Take slag, which you've witnessed before — the steel sector spotted a chance there, and power plants have likewise spotted a chance to earn money from fly ash. Roughly a decade back, fly ash carried a negative cost. Today, we have to bear a cost for it. This is opportunistic rather than strictly seasonal. Certain cases may be seasonal as well, but mostly it stems from a power plant being shut down.

Apoorva Bahadur

analyst
#39

All right. If we move forward with renewable, there may be some increase here as well.

Atul Daga

executive
#40

It could go lower as well, in either direction. Given how large our operations are, any major power plant would be glad to enter a long-term arrangement with UltraTech, and we're pursuing those sorts of strategic moves to secure our costs.

Apoorva Bahadur

analyst
#41

That’s clear, sir. Last thing, if I can fit in one more. I missed the part about your expansion, for the most part. Could you go into more detail on that — the 3 plants you’ll be commissioning.

Atul Daga

executive
#42

Why don't you go ahead and cover that as well? We have three plants with combined capacity of 3.4 metric tons. Of that, Cuttack is the greenfield grinding unit at 2 million tons, and the brownfield expansions are 0.7 million tons each — sorry, 0.6, not 0.7 — 0.6 each at Dankuni and Pataliputra. That comes to roughly 3.4 MTPA in total. Commissioning should happen by March 2021. The overall capital commitment, which I didn't bring up earlier, is around 900-something — INR 900 crores. 940 crores.

Apoorva Bahadur

analyst
#43

Perfect, sir. Many thanks. I’ll rejoin the queue.

Atul Daga

executive
#44

I appreciate that.

Operator

operator
#45

Thanks. Our following question comes from Indrajit Agarwal at Goldman Sachs. Your line is open.

Indrajit Agarwal

analyst
#46

Hello, sir. Thank you for the chance, and congratulations on a solid set of numbers. I'd just like to get a bit more clarity on the brand transition piece. If you look at the other two acquisitions, Binani and JP for instance, we completed those in a much shorter time, right? Roughly 40 to 50 days. With this one, it's taking us somewhat longer. What makes it different this time?

Atul Daga

executive
#47

Starting in December, it takes roughly six months. By the April–June 2021 quarter, we should be at 100% of the convertible possible plants. Baikunth isn't possible, so we should leave it out of the count. That's a six-month timeline. Don't count October and November. The first two months go into settling the plants, aligning people, aligning processes, et cetera. The bigger question is why it takes so long. You have to understand where these plants are located. The Manikgarh plant we acquired sits 20 km from our existing Awarpur plant. The Baikunth plant near Raipur is 35 km–50 km from two of our existing plants in Chhattisgarh. The Maihar plant is less than 70 or 80 km from two of our plants, Bela and Siddhi. Sonar Bangla, which of course is doing very well, caters to the Northeast markets. Here we arrive in the Northeast markets with a big bang. As for all the other plants, since they operate in the same market where we already existed, there is a gradual transition. I cannot simply uproot an existing brand and start selling another one. This isn't about selling a label. It's about convincing the customer on quality — the benefits of the product we're selling now versus what they were buying before.

Atul Daga

executive
#48

Losing that customer isn't something I want either. My goal is to persuade them to pay more. That's the reason it takes a bit longer. The JP acquisition, if that's what you meant, converted very quickly. The Bela Siddhi plant in the Central market was our first foray into that region. For us it was untouched ground. We went straight in with a category A brand launch rather than a conversion. Through the JP acquisition, the Vizag market was being served from the Tadipatri plant, which sits much farther away than this one, and this plant gives us access to the industrial development and that market. We were able to introduce our product and grow volumes there. Then there's the Dalla plant, which again supports us in the eastern markets. An easy transition. The Baga plant, up in the hills of Jammu itself, Himachal. We had only a very small presence because material was being supplied from the foothills, and that was exorbitantly expensive. Small supplies. Now an opportunity came to launch at big scale. We've managed to do that. Nathdwara, a similar story. We were already in the Rajasthan markets and in the Gujarat markets. That location lets us split Rajasthan into two territories, and we've been able to serve western Rajasthan at a much more granular level, which helps us capture that market.

Atul Daga

executive
#49

I hope my explanation has come through clearly.

Indrajit Agarwal

analyst
#50

Sure, thanks for the detailed response. Just one follow-up: for that second plant, will there be any additional CapEx we need to incur?

Atul Daga

executive
#51

There will be, certainly. We haven’t finalized the plans yet. As soon as we do, we’ll let you know.

Indrajit Agarwal

analyst
#52

Okay, one final housekeeping item. Could you give us some detail on the working capital release for the third quarter and for the nine months overall?

Nilesh Garg

executive
#53

Yes. During the third quarter, we basically released roughly INR 834 crores, and that's mostly because of inventory liquidation.

Atul Daga

executive
#54

He didn't inquire which account. Don't mention that to him. Roughly INR 1,000 crore in working capital release.

Indrajit Agarwal

analyst
#55

Thanks. Many thanks, sir.

Atul Daga

executive
#56

You brought up the capital spend.

Operator

operator
#57

Could we move on to the following question?

Atul Daga

executive
#58

Yes, go ahead.

Operator

operator
#59

Sure. Next up, we have a question from Amit Murarka at Motilal Oswal. Go right ahead. Amit Murarka with Motilal Oswal, your line is no longer muted. Kindly unmute.

Amit Murarka

analyst
#60

Hi, good evening, Mr. Daga. I’ve got just a couple of questions. First, in the presentation, I noticed you said trade sales were up roughly 3% year over year this year. Overall volumes fell 4%. Does that mean your institutional volumes, or the infrastructure volumes, were basically the weak spot here?

Atul Daga

executive
#61

Sure. In a tough market, it's widely understood that infrastructure work has decelerated. It was simple to concentrate on the trade market.

Amit Murarka

analyst
#62

So what did that trade versus non-trade breakdown look like in the quarter?

Atul Daga

executive
#63

68% comes from trade.

Amit Murarka

analyst
#64

Sure. Regarding infrastructure, since we're seeing certain coastal projects get the green light and work continuing on the Mumbai–Nagpur highway, would you anticipate a pickup in that segment going forward?

Atul Daga

executive
#65

Yeah, absolutely. Like you said, that's the brightest spot, I'd say — the fact that things are improving. Look at Mumbai and Maharashtra. In Maharashtra, both of our plants are running at full throttle — Panipat and Navapur — and now, with the Mumbai-Nagpur Expressway plus the coastal roads, that should pick up too. Cement consumption hasn't begun yet, but it's going to pick up.

Amit Murarka

analyst
#66

Alright. And regarding petcoke as well, essentially, fossil costs decreased during this quarter, though the presentation cites $80 as the consumption cost.

Atul Daga

executive
#67

Yes.

Amit Murarka

analyst
#68

But I do think the spot prices for the stock have been significantly lower. So again, could you put a number on what sort of benefit might come through in 4Q as well now on the pet coke side?

Atul Daga

executive
#69

As I recall, I did bring that up. We consumed at INR 80, and when your purchase price sits around INR 70, that INR 10 gap — plus or minus INR 50 a ton in costs — should show up in the following quarter.

Amit Murarka

analyst
#70

Okay. And finally, regarding the Bara grinding unit — that's phase I, and there's also a phase II of another 2 million tons. First, when is this going to be commissioned? And second, what ramp-up schedule do you expect here, considering that the Dalla Super clinker will be coming later?

Atul Daga

executive
#71

I made it clear that clinker is not in short supply for us. From Siddhi, where we have excess clinker, we send clinker to Bara. Over the next couple of months, Bara will ramp up this 2 million ton capacity. Phase II, I expect, will be commissioned by September 2020.

Amit Murarka

analyst
#72

Okay. For phase II as well, will there be sufficient clinker? I understand phase I.

Atul Daga

executive
#73

Yes. We’ll have sufficient clinker.

Amit Murarka

analyst
#74

Alright. That covers everything, then. Appreciate it.

Atul Daga

executive
#75

Thank you.

Operator

operator
#76

Thanks. Our next question comes from Ritesh Shah at Investec Capital. Ritesh, the line is yours — please go ahead.

Ritesh Shah

analyst
#77

Appreciate the chance to ask, sir. First off, sir, when we compare the volume growth we posted this quarter against how the industry grew, I don't have that industry figure. Sir, how do you view it? On a year-on-year basis, are you satisfied with the volume growth we delivered? I mean, the de-growth.

Atul Daga

executive
#78

In my view, we did better than the industry.

Ritesh Shah

analyst
#79

Sir, could you help with something? What figure did the industry post for growth? A general number would basically be useful.

Atul Daga

executive
#80

It's hard to put an exact figure on it, since this is a fragmented market with a lot of unlisted players out there. If I gave you a number, it could send the wrong signal, so I'd rather not comment on that.

Ritesh Shah

analyst
#81

Okay. Sir, to flip that around, in any of the regions, have we lost market share, given the decline we've seen? Is it that the industry's de-growth would have been higher than what we reported?

Atul Daga

executive
#82

Not really. My sense is that our market share has improved. There could be a figure at the district level that I don’t have in front of me. Broadly speaking, our share of the market has gone up overall.

Ritesh Shah

analyst
#83

This would be across regions, correct?

Atul Daga

executive
#84

Yes, when you look at it across all of India.

Ritesh Shah

analyst
#85

All right, that's useful. Sir, second, carrying on from the earlier question, you said we now have sufficient clinker. That's even though there's a delay with JP Super, and phase I at Bara has been commissioned. As I recall, Century also had a deficit of a million tons. Sir, when you say there's no deficit, are you accounting for the OPC, PPC, PSC mix?

Atul Daga

executive
#86

Yes, that's handled, and the surplus clinker we have at Siddhi as well. At the plants we acquired, there's inherent debottlenecking capacity that's available.

Ritesh Shah

analyst
#87

All right. Sir, for a better grasp of the picture, how should we view OPC, PSC, and PPC within the composite cement mix — let's say for FY 2020 and FY 2021?

Atul Daga

executive
#88

If we look at blended cement on a blended basis, where does that stand right now at 68%? For FY21, blended cement is at 68%. We expect that figure to land near 71%. That's blended cement, which covers PPC, slag, and composite.

Ritesh Shah

analyst
#89

Regarding FY20, that's useful. Sir, two final questions. Sir, with wall putty, our understanding is that market share has been lost. By not giving discounts on smaller kg bags — 1 kg and 5 kg — the peer set has benefited. Sir, this has been happening for roughly the last six months. Sir, any thoughts on this? First, if you could provide some numbers here on the top line and EBITDA, that would be helpful. Are we comfortable with this market strategy of losing market share?

Atul Daga

executive
#90

Our pricing stance is something we intend to keep, and we serve a core market. I don't believe domestic players are picking up share. What's benefiting more is imported product—shipments out of UAE or Middle East markets that have made their way into India.

Ritesh Shah

analyst
#91

Sir, what I meant was wall putty.

Atul Daga

executive
#92

On wall putty, I was talking about white cement. Yes — with WallCare Putty, the paint companies are the ones picking up share. I'd say we don't want to give up ground on where we've set our pricing. For the time being, we'll accept things the way they stand.

Ritesh Shah

analyst
#93

All right, sir, one final question. Regarding the incentives for that eastern expansion you mentioned across the three locations — 1 greenfield and 2 brownfield — have those incentives been finalized? What we're hearing is that states are being slow about handing out incentives. Sir, please set me straight if I've got that wrong.

Atul Daga

executive
#94

Yes, that's exactly right. There's virtually no cash flow coming from the states. In Odisha, the policy is in place. We'll pursue our incentives for the Cuttack grinding unit.

Ritesh Shah

analyst
#95

Alright, sir, nothing has been finalized.

Atul Daga

executive
#96

Nothing has been finalized. Bengal, in my view, is genuinely a dry state across the board. Incentives are hard to secure in West Bengal. Bihar has introduced a policy as well. Mukesh? Does Bihar have a policy too? Bihar likewise offers an incentive policy, and we will apply for incentives there.

Ritesh Shah

analyst
#97

Alright. Sir, I have additional questions, so I'll rejoin with you later. Thank you very much.

Atul Daga

executive
#98

Thanks.

Operator

operator
#99

Thanks. Our next question comes from Tejas Pradhan at Citigroup. The line is yours — go ahead.

Atul Daga

executive
#100

Hello there.

Raashi Chopra

analyst
#101

Hello, Raashi speaking.

Atul Daga

executive
#102

Hello there, Raashi.

Raashi Chopra

analyst
#103

Hi, gentlemen. It's Raashi here. Yeah.

Atul Daga

executive
#104

Raashi, could you speak up just a bit? A little louder, Raashi.

Raashi Chopra

analyst
#105

Is this better than what you had mentioned?

Atul Daga

executive
#106

Yes, that's an improvement.

Raashi Chopra

analyst
#107

You mentioned that prices have risen in certain areas. Please correct me if I'm mistaken, but my understanding is that the west and a portion of the south haven't seen improvement yet. You also indicated that the dams and a few of the irrigation projects have gotten going. Demand in the western market seems to be recovering somewhat. Is this simply a question of — is this a timing purchase before we witness price gains broadly, or has the pickup not moved forward during the worldwide demand period?

Atul Daga

executive
#108

I didn't catch that. Which regions are you hearing about where prices are picking up?

Raashi Chopra

analyst
#109

I asked whether pricing had gotten better across the whole southern region and the entire western region?

Atul Daga

executive
#110

No, that's not the case everywhere. Gujarat, for instance, isn't showing it. Maharashtra is improving, though. Some parts of the South are improving as well. In the North, Rajasthan is getting better. The East is expanding very fast, posting double-digit growth once more this quarter. We'll begin to see pricing get better.

Raashi Chopra

analyst
#111

Is the pickup in demand we're seeing down in the South not yet fully showing up in higher prices?

Atul Daga

executive
#112

Not at this point. My view is that once capacity utilization begins rising, you'll begin to see better pricing.

Raashi Chopra

analyst
#113

Roughly speaking, where does utilization in the south stand at the moment?

Atul Daga

executive
#114

What are the prices right now?

Raashi Chopra

analyst
#115

Utilization down in the south.

Atul Daga

executive
#116

Utilization — hold on a second — it's roughly 70%.

Raashi Chopra

analyst
#117

Alright, just one more question, and it isn't tied to the results. Regarding Emami, what timelines are you looking at? I know you all have put in a bid — what are the timelines for closing?

Atul Daga

executive
#118

Surprise, everyone — I hope you're all paying attention. Emami? I never put in a bid for it. So all those stories you folks saw in the papers, you should throw that out the window.

Raashi Chopra

analyst
#119

My apologies — you mentioned that no bid was submitted.

Atul Daga

executive
#120

We didn't place a bid whatsoever. I tend to be surprised by what shows up in the papers. That asset holds zero interest for us.

Raashi Chopra

analyst
#121

Alright.

Atul Daga

executive
#122

Some folks had concerns regarding our cash flow, and we are just as focused on that as you are.

Raashi Chopra

analyst
#123

All right, understood. All right, thanks.

Atul Daga

executive
#124

Yes.

Operator

operator
#125

Thanks. Our following question comes from Sumangal Nevatia of Kotak Securities, who is on the line. Go ahead, please.

Sumangal Nevatia

analyst
#126

Good evening, sir. For my first question, again, I want to dig a bit more into demand. Over the last two months, has it been more restocking demand, or are we actually seeing real project demand growth?

Atul Daga

executive
#127

When you say restocking, what exactly are you referring to? Cement is never stocked — Sumangal, depot stocks or warehouse stocks will be two days, three days. Those warehouses are small. I'm not sure what you mean by restocking.

Sumangal Nevatia

analyst
#128

No, generally what we're hearing is that in December, people expected prices to go up a lot in January.

Atul Daga

executive
#129

No, I believe you've got the wrong information there. On the ground, there is real activity happening, and it's taking off.

Sumangal Nevatia

analyst
#130

Is that starting more from January, or December?

Atul Daga

executive
#131

I'd say December. That's the month when we began to see things pick up, and it also helped us get better capacity utilization. As I mentioned in my commentary, we have seen improvement in the Century assets. November came in better than October. December came in better than November. On the Century assets, we hit nearly 79%, 80% capacity utilization, which is up from below 50% a quarter ago. This is real work taking place.

Sumangal Nevatia

analyst
#132

Got it. Second, regarding our volume growth — I believe last December, Nathdwara only covered about 18 days or so. If you strip out Nathdwara, that's a volume decline of 7%-8% YOY. Is that calculation correct?

Atul Daga

executive
#133

So from Nathdwara. This is really challenging, since we’re moving material back and forth across routes. If, say, we weren’t shifting material out of Nathdwara, then I’d have been moving it from Aditya Cement and Kotputli instead. Past a certain point, separating what’s old from what’s new simply isn’t feasible for us.

Sumangal Nevatia

analyst
#134

All right. So you're still fairly confident that we haven't lost market share, and that industry volume growth overall would have fallen by over 4%, 5%?

Atul Daga

executive
#135

No, at no point did I mention an industry-wide drop in volume. For the industry, any decrease would be just 1% or 2%, or nothing worth noting.

Sumangal Nevatia

analyst
#136

Got it. Okay, just a small point of clarification. Has there been any movement on Nathdwara's non-core assets?

Atul Daga

executive
#137

I neglected to give an update. Merchant bankers have been appointed for China, and non-binding bids have come in. Action will be taken afterward. My thinking was after Chinese New Year — the Chinese New Year holidays start today, and the country completely shuts down for 15 days. Now I'll have to wait for this new virus issue that has arisen. I don't want to travel to China. We will look at the next steps on China in the month of March. As far as Europe goes, things are progressing well. We might be able to close the deal by June. Dubai, unfortunately, no suitable buyer has been found by us. We are trying to operate the plant and improve its efficiency.

Sumangal Nevatia

analyst
#138

Got it. Okay, thank you, and best wishes to you, sir.

Atul Daga

executive
#139

Appreciate it.

Operator

operator
#140

Thanks. We'll take the next question from Navin Sahadeo at Edelweiss Securities. Go ahead, please.

Navin Sahadeo

analyst
#141

Hi there.

Atul Daga

executive
#142

Hi there, Navin.

Navin Sahadeo

analyst
#143

Good evening, sir. I have a couple of questions. Regarding Nathdwara Cement specifically, you said capacity utilizations stayed at 60% during this quarter — I believe that figure has held around that level for some time now.

Atul Daga

executive
#144

Yes, my apologies — please continue.

Navin Sahadeo

analyst
#145

Right. What I was really asking about is Century Textiles — those assets look like they're ramping up nicely. December, as you mentioned, came in at 79%, Nathdwara is still at 60%, and I believe the overall region itself up north could be at least upwards of 75% or 80% or so.

Atul Daga

executive
#146

No, plant-to-market ratios are really set by the market mix. There's surplus capacity in the market, and we'll use whichever plant is most L1 when it comes to logistics cost to serve that market.

Navin Sahadeo

analyst
#147

Right, got it. So essentially, there’s probably room for other plants to run at a considerably higher utilization.

Atul Daga

executive
#148

Yes. It’s possible.

Navin Sahadeo

analyst
#149

All right. Regarding Century Textiles, you mentioned the quarterly average came in at 55%, yet the exit figure stood at roughly 79%.

Atul Daga

executive
#150

Yes.

Navin Sahadeo

analyst
#151

Since the March quarter is only an improvement compared with the December quarter, is it fair to easily expect utilization of about 85% odd for the full period?

Atul Daga

executive
#152

It's definitely possible. The way things are right now, volumes are rising. Demand is rising, so it could get to 85% as well.

Navin Sahadeo

analyst
#153

Alright, my final question concerns the petcoke usage. The presentation references total petcoke at roughly 77% compared with 69%. My assumption is that figure applies to the quarter.

Atul Daga

executive
#154

Yeah.

Navin Sahadeo

analyst
#155

Looking at your November corporate dossier, or the November company presentation, what I notice is that for the first half, pet coke consumption actually stands at 64% versus 71% last year. During that same period, I believe we're ramping up pet coke usage at both Nathdwara and Century. I just wanted to confirm that.

Atul Daga

executive
#156

No, absolutely. You've got it exactly right. There's no confusion at all. Century has now come in, going from an insignificant petcoke level to a high petcoke level. Nathdwara went from zero petcoke to now 100% petcoke. This quarter has an advantage when it comes to petcoke consumption. These days, petcoke has lost its shine, because it can easily be swapped for U.S. coal. U.S. coal also has a high calorific value. Whichever one sells cheaper is the one that will be used.

Navin Sahadeo

analyst
#157

Understood. Just one final question, if I can squeeze it in. Sir, during the prior quarter's conference call, you appeared quite focused on Emami Cement. I believe there was a question regarding whether the CCI would pose a problem, or even to the point that, given you were already announcing an expansion of more than 3 million tons there, whether you would remain interested in Emami. Now there seems to be a change of heart. You stated that you are not interested in their assets. If you could shed some light so we can understand what might be behind that.

Atul Daga

executive
#158

We took a hard look, performed the due diligence, and invested substantial effort into grasping the value it would contribute. They lack clinker, though there is spare mining capacity plus a certain land bank. You cannot pitch me a dream and then price it at an EV matching that of a plant in operation. A significant gap existed. Due diligence also surfaced plenty of other problems that left us uneasy.

Navin Sahadeo

analyst
#159

Understood. The valuation disconnect from last year — understood, that's useful. Just a single housekeeping item: the white cement volumes and revenues you typically provide — Nilesh shares those, I believe.

Atul Daga

executive
#160

This quarter came in at 3.46 lakh tons, versus 3.7 lakh in last Q3 2019.

Navin Sahadeo

analyst
#161

Revenues?

Atul Daga

executive
#162

Revenue. For this quarter and the one before?

Nilesh Garg

executive
#163

INR 500 crore last year.

Atul Daga

executive
#164

During the prior year.

Navin Sahadeo

analyst
#165

What were RMC's revenues?

Nilesh Garg

executive
#166

This year it's INR 500 crore, and last year it came to INR 520 crore.

Navin Sahadeo

analyst
#167

Thanks. That’s useful. I really appreciate it.

Atul Daga

executive
#168

Appreciate it.

Operator

operator
#169

Thanks. Our next question comes from Rajesh Ravi at HDFC. Go ahead, please.

Atul Daga

executive
#170

Hello there, Rajesh.

Rajesh Ravi

analyst
#171

Yeah. Hello, sir. Good evening. I’ve got a few questions. Regarding the East expansions that you’re just moving ahead with, what kind of clinker backing do we have? Or are we considering some clinker expansion opportunities in the East? Second would be on the WHRS — at all locations, and what capacities are we adding over the next one, two years?

Atul Daga

executive
#172

At Hirmi we have clinker on hand, and there's some surplus flowing in from Maihar. If you look at Century on a standalone basis, from their point of view they were short on clinker, but once we merge it into our wider network, we do have surplus clinker coming out of Maihar. The debottlenecking work we're carrying out at the Century plants will help us cover what's needed at Cuttack, Dankuni and Pataliputra. Dalla, as it stands, is also going through debottlenecking, and that isn't a heavy CapEx item. It's routine work that's being done, and it's freeing up clinker capacity for us.

Rajesh Ravi

analyst
#173

Daga, my friend, when do you anticipate the clinker will be up and running?

Atul Daga

executive
#174

Dalla Super. I'd keep time available and make the commitment by March 2021. Considerable progress has been achieved in the UP government. The files have now gone to the central government, to the MOEF, and hopefully clearances will come in time for March 2021, with clinker going on stream. Nilesh, you asked about WHRS. Nilesh, just tell the locations.

Nilesh Garg

executive
#175

We'll have the Gujarat plant, Andhra at the Tadipatri plant, in the central market, the Baga plant, and then Nashik.

Atul Daga

executive
#176

Malanker. Alright. Malanker, the Century facilities are going to be looked at as well when it comes to expanding WHRS. I believe my colleague cut me off since the board hasn't given its approval yet. We're still finalizing the proposal.

Rajesh Ravi

analyst
#177

All right, just building on that question. Right now we have roughly 85 MW of WHRS, is that correct?

Nilesh Garg

executive
#178

103 megawatts.

Atul Daga

executive
#179

Today.

Rajesh Ravi

analyst
#180

All right, did we add something during this quarter, Q3?

Nilesh Garg

executive
#181

In the prior quarter.

Atul Daga

executive
#182

In Q2, not Q3, those were added. Those were added during the second quarter.

Rajesh Ravi

analyst
#183

All right, which location was that, sir?

Nilesh Garg

executive
#184

So essentially, it's been partially commissioned at Gujarat, Tadipatri, and Rajasthan — specifically at the Kotputli plant.

Rajesh Ravi

analyst
#185

So, roughly 5 to 6 MW apiece.

Atul Daga

executive
#186

Yeah.

Rajesh Ravi

analyst
#187

So the final target is 131 MW — is that what's left for you? 141. Another 141. Got it.

Atul Daga

executive
#188

As far as 141 goes, all of that has been approved and is underway. The next phase is something we'll examine, since it would take in roughly 11 plants, correct?

Nilesh Garg

executive
#189

Correct — 11 plants.

Atul Daga

executive
#190

That represented roughly 11 integrated plants out of 22. There's also room to implement WHRS at additional plants.

Rajesh Ravi

analyst
#191

Okay, thanks. Sir, just two final questions, if I may. The first one concerns Binani. What was it that allowed you to lift EBITDA margins by 1,500%? From what we understand, pricing has been fairly stable, yet even so, that is a very strong figure. Perhaps we could start with that one, please.

Atul Daga

executive
#192

In that market, our brand enjoys a very strong level of respect.

Rajesh Ravi

analyst
#193

Alright.

Atul Daga

executive
#194

We move over, I believe, 25 million tons each year. In terms of capacity, roughly 25 million. The key thing is that in northern markets we hold a very solid position, and the price premium we get in the market is quite strong. On cost advantages, we've managed to push very hard through the improvement program at the Nathdwara plant. Logistics cost is one of the biggest factors. It's a really favorable location. That plant occupies a sweet spot. Right on the Gujarat and Rajasthan borders, which gives it an optimal edge on lead distance.

Rajesh Ravi

analyst
#195

So what margin would actually be sustainable? Earlier, we were factoring in that INR 800 to INR 900 would represent a sustainable EBITDA margin. In this Q3, it sold at INR 1,500. No, I mean, as an analyst, we weren't obviously factoring in 1,000-plus, and 1,500 in Q3 obviously sets a high benchmark for this plant.

Atul Daga

executive
#196

Yeah. I won’t allow it to drop under the 4-digit level.

Rajesh Ravi

analyst
#197

Appreciate that — that's excellent to hear, sir. And finally, since you're not moving forward with the Emami deal, at least for the time being, and given that your own expansions are in place.

Atul Daga

executive
#198

No, at least not at this point — never.

Rajesh Ravi

analyst
#199

All right. All right. In your view, will competition stay high in that market? That market is likely to stay fairly fragmented, and a lot of capacity keeps building up across Odisha and West Bengal — grinding units and all of that.

Atul Daga

executive
#200

Right.

Rajesh Ravi

analyst
#201

How are you thinking about pricing holding steady in the eastern market?

Atul Daga

executive
#202

East, I believe demand is really strong at the moment as well. Each time new capacity settles in, prices adjust somewhat, and after that they recover. Even so, that has not done anything to lift the zone's overall EBITDA.

Rajesh Ravi

analyst
#203

Yes.

Atul Daga

executive
#204

If you looked at East on its own — if you had the results of companies just for the eastern zone — I don't believe anyone would be producing a four-digit number in those eastern markets.

Rajesh Ravi

analyst
#205

That's right.

Atul Daga

executive
#206

This is a market where capacity utilization is high, with solid operating leverage.

Rajesh Ravi

analyst
#207

Yes. Thank you very much, sir. I appreciate you taking my questions, and best of luck. That's a strong set of numbers from you. Keep it up. Thank you, sir.

Atul Daga

executive
#208

Thanks.

Operator

operator
#209

Thanks. Our following question comes from Bhavin Sheth at Enam Holdings, who is on the line. Please proceed.

Bhavin Sheth

analyst
#210

Good evening, sir. I have two questions. First, could you share the average lead distance for the quarter and for the nine months, if you're able to give us an approximate figure?

Atul Daga

executive
#211

Roughly 400 km.

Bhavin Sheth

analyst
#212

Roughly 400? That figure would come once Century, Binani, and all the rest are included.

Atul Daga

executive
#213

Yes, Century, Binani, and clinker — since clinker gets shipped over long distances. We also move clinker from the south to the east.

Bhavin Sheth

analyst
#214

Okay, sir, what was the white cement figure — INR 150 — and what did RMC EBITDA come to this quarter? If you gave that number, I missed it.

Atul Daga

executive
#215

No, that's hard to calculate on its own.

Bhavin Sheth

analyst
#216

What's the total figure you have for the quarter?

Atul Daga

executive
#217

Nope, I wouldn’t view EBITDA on its own. For us, that’s cement.

Bhavin Sheth

analyst
#218

All right. Thanks, sir. Yes.

Atul Daga

executive
#219

I appreciate that.

Operator

operator
#220

Thanks. Everyone, that was the final question. Speaking for UltraTech Cement, that brings this conference to a close. We appreciate your participation, and you can go ahead and disconnect your lines now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete UltraTech Cement Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to UltraTech Cement Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in UltraTech Cement Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.