operatorGood day, everyone, and welcome to the UltraTech Cement Limited Q2 FY 2022 earnings conference call. We should remind you that today's discussion may contain certain forward-looking statements, and so those must be viewed together with the risks the company faces. The company takes no responsibility to publicly amend, modify, or revise any forward-looking statements based on any subsequent development, information, or events, or otherwise. As a reminder, all participant lines are in listen-only mode, and you will have an opportunity to ask questions once the presentation concludes. If you need assistance during the conference call, please signal an operator by pressing star then zero on your touchtone phone. Please note that this conference is being recorded. I now hand the conference over to Mr. Atul Daga, Executive Director and CFO of the company. Thank you, and over to you, Mr. Daga.
Atul Daga
executiveThank you, Steven, and good evening, ladies and gentlemen. Thank you once more for being with us on today's earnings call, the 18th of October 2021, covering quarter two of FY 2022. First and foremost, festive-season greetings to everyone in India. My hope is that each of you, along with those who depend on you, has already received the COVID vaccination and can now break the monotony of working from home by heading back to your respective workplaces and enjoying face-to-face meetings with colleagues and associates. Here at UltraTech, our view is that working from home is here to stay, and so we are putting roster services in place, relieving office leaders wherever feasible, and redesigning our bigger offices to fit the new normal. As the saying goes, "New normal is never normal." Indeed, that is exactly what the cement industry is witnessing too. Time and again we wake up to reports of yet another cyclone — Ida, Tauktae, Yaas and whatnot. Cyclones used to bypass our shores, but these days they strike them repeatedly. The monsoon has carried on across the country through October as well and has only begun retreating over the last few days. The world is barely recovering from COVID's aftermath, and now fuel is putting obstacles in the path of economic growth.
Atul Daga
executiveLimited gas supply is driving up the need for electricity produced by coal-fired plants. Much of the jump in coal demand comes from economies that are recovering. China closed its coal mines initially and is now building up stockpiles of domestic coal along with gas reserves. Meanwhile, Russia keeps reducing what it supplies. Previously China wasn't buying coal from Australia, though lately I believe that situation is being worked out and they've begun purchasing from Australia. Fuel prices have rallied in a way we've never seen. Who could have predicted a rise of over $50 in under a month? On top of that, there are the inventory buildup needs of the U.S. and North Asia ahead of their winters. In India as well, every coal supply was being redirected to thermal power plants. There was some encouragement in today's newspaper that inventory at Coal India has been getting better and power rates on the exchange have come down. Given this sort of pricing in the coal market, pet coke turns favorable again when it comes to energy cost at today's coal price levels. I believe going back to pet coke makes greater economic sense. Tapping alternative coal sources wherever the most economical coal can be found is what's needed right now.
Atul Daga
executiveGetting more alternate fuel going in India is a slow process. During this quarter, alternate fuel made up 4.4% of the fuel we consumed overall, and we'll keep working to raise our sourcing of it from every possible source. That said, steps also need to be taken to safeguard our margins. Players in industries such as coal and other commodities are pulling in big money through price hikes and manufactured shortages. Cement can't simply go on squeezing out efficiency gains as the way to defend and cap margins. At UltraTech we've made the decision to raise cement prices to help cope with production costs that keep climbing. Coal spot prices right now are already 3X what they were in June 2021, while pet coke has climbed almost 2X. At some point in October, we raised prices across nearly every region. Prices have now returned to their pre-monsoon levels. That is definitely not sufficient to offset the cost pressure. It goes without saying that your infamous channel checks have likely already told you this. Turning to other costs, you'll have observed a rise at UltraTech. My request is that you not annualize those figures. When COVID first hit, we shared with you a plan to cut our overheads by roughly 10% over FY 2020.
Atul Daga
executiveYes, that's where we are. For FY 2022, our overheads should land at roughly the same figure as FY 2020, so we will have taken in 2 years of inflation. Now let me turn to the brighter side, which is demand. It looks robust. With the monsoon receding, volumes are climbing. Even with the heavy rain the country saw, UltraTech posted domestic gray cement volume growth of 8%, and 17% in white cement. Could we have done better? Yes, most certainly, but the rain gods had us at their mercy. When it rains, a pharma company would always push for more rain. A pharma company making an anti-malaria drug would push for rain, while a cement company would pray for the opposite. Q2 took a substantial hit from monsoons, which came in above normal across most parts of the country. In fact, as recently as yesterday, heavy showers were hitting some parts of Northern India and Kerala. On infrastructure, the government's trust remains very high, as it implements its INR 1.1 trillion project under NIP, slated for completion by 2025. If you briefly deep dive into the various subsets of infrastructure, roads stand out as the fastest growing sectors, with a massive plan to connect the entire length and breadth of the country under the Bharatmala Pariyojana project.
Atul Daga
executiveThere are already 20 expressways in operation, and another 30 are being built. Highway construction has nearly matched last year's pace, with 3,824 km finished through September. Ordering came in a bit slower, though we expect it to pick up during this quarter. Railways: starting in Q3, implementation at DFC has been accelerating, and the bulk of the work should wrap up by the close of fiscal 2022. Metro rails: 18 existing metro rail systems have begun extending their current lines, while 27 new metro lines are being added across the country. Irrigation projects are back on track as well. Airports: two major airports — New Bombay and Jewar — are expected to begin during this fiscal year. Airports in the major districts are moving forward under the UDAN scheme, aimed at boosting regional connectivity. On the commercial real estate side, the trend is mixed. Demand in the IT infrastructure space is booming again, spurring growth in commercial space. We're also seeing solid traction in urban housing across Tier 2 and Tier 3 markets. Infrastructure spending keeps driving the demand increase, with execution speeding up across every project. Just to briefly cover our expansion plans.
Atul Daga
executiveWe’ve commissioned a 1.2 metric ton greenfield expansion at our Bengal and Bihar unit. That forms part of the 3.2 million tons planned for this financial year. The 1.2 million tons is extra grinding capacity, and the clinker for it comes from our existing units in Chhattisgarh, East MP, and East UP. These expansions center on composite cement and, within total capacity, add under 1%, though they are certainly a small contribution toward raising blended cement’s share as we work to keep improving our CO2 emission norms. Next up this fiscal is the 2 million tons phase II of our Bara grinding unit. There were minor delays. It is on course now. We expect to commission it before this fiscal year ends. Every other project in the 19.5 million tons expansion remains on track, aside from minor delays of a month or two in some places. Given these coal crisis times, I’m glad to share that our Bicharpur coal block will also begin coal mining operations from Q3 FY 2022. That coal will be used at our Satna cluster plants. In this quarter, we also commissioned 12 MW of WHRS capacity and added 21 MW of solar capacity sites.
Atul Daga
executiveThanks to these expansions, green power now makes up 15% of what we need overall. Before wrapping up, I want to cover cash flows. In value terms, working capital has gone up because purchase costs are rising. Even so, on this quarter's sales we still hold negative working capital of roughly 8 days-9 days. That negative working capital should improve further in the second half as inventories come down after the monsoon. Operating cash flow came to INR 1,750 crore. A big chunk of that went toward our ongoing CapEx plans. During the first half of this year, CapEx spending reached INR 2,300 crores, and we expect to finish the year at close to INR 4,000 crores-INR 5,000 crores of CapEx, all funded through internal accruals, while still deleveraging further. In this quarter, we brought our treasury surplus down to INR 7,600 crores and repaid INR 5,200 crores of long-term debt. As of quarter end, net debt to EBITDA stands at 0.47x on a consolidated basis, and that will only get better quarter-on-quarter from here. With sales volumes rising and expansions starting up, net debt reduction will definitely speed up as we go forward.
Atul Daga
executiveSo in closing, my view is that demand for cement appears to be tracking along a firmer trajectory. Fuel supplies and costs are under pressure, yet higher expenses should be offset through an uptick in cement prices. Ladies and gentlemen, let's sit back and enjoy the ride. Thank you, and I'll hand it over to you for questions. Joining me as well is our Managing Director, Mr. K. C. Jhanwar, who will field any questions.
Operator
operatorThanks a lot. We’re going to start the question-and-answer session now. Our first question comes from Sumangal Nevatia of Kotak Securities, who is on the line. Please go ahead.
Sumangal Nevatia
analystYes. Good evening, and happy holidays to all. Mr. Daga, my first question concerns cost. Could you expand a bit further, particularly on fuel cost? Right now the economics of pet coke and thermal coal are in a very shifting, very dynamic situation. Also, given the inventory we hold, how do we see coal costs shaping up over the coming quarters if spot prices hold for another couple of months? And there is a spike in employee cost. Should this be treated as a new run rate going forward?
Atul Daga
executiveRegarding fuel costs, I really can't predict any better than you can. We have no idea where the peak sits or when things will begin to shift direction. What we're broadly hearing is that there are at least a few more months of pain ahead on fuel cost. More significantly, we are passing along every one of these cost increases through cement prices. When it comes to availability, I don't currently see a problem with imported coal supply. In any event, we had only a very loose reliance on domestic coal. A shade under 15%, or perhaps 12%, of domestic coal makes up part of our fuel mix. Everything else is imported. Turning to employee costs, as all of you know, no increments were granted last year under our COVID plan. This year, increments were granted, taking effect during this quarter, and they will rationalize as we move forward over the coming years.
Sumangal Nevatia
analystGot it. And second, sir, on the demand side, you gave some very strong commentary during your opening remarks. Is there any ballpark figure for industry demand growth in the second half that you're working with internally or expecting? Any quantification or guidance on that?
Atul Daga
executiveI'd feel quite comfortable putting it somewhere in the 6%–8% range over the coming six months, and that might even be on the cautious side. K. C. Jhanwar, would you like to add anything?
Kailash Jhanwar
executiveRight, and yes — as Atul correctly pointed out, this is a really difficult period right now, since fuel costs have risen so much, and that will clearly push cement prices up as well. We're all aware that steel prices have actually doubled over the last few months. There could be some effect on the demand side, but even so, we can comfortably still assume roughly 6%-8%. From what we understand, demand ought to hold up. Everyone here knows these are peak months when it comes to cement demand.
Atul Daga
executiveOnce the festive period wraps up — November, Chhath Puja, though I can't recall exactly when that falls in India — typically from that point on, we begin running short of capacity. That's the pattern we witnessed last year in January and March, and my expectation is that it will happen again.
Sumangal Nevatia
analystGot it. One final item: that European loan asset we hold — we've put it in discontinued operations. Is there any update on recovering that?
Atul Daga
executiveOur talks are pretty far along at this point, and my feeling is that by the end of December, we'll be reporting that transaction as closed as well.
Sumangal Nevatia
analystUnderstood. All right, thanks a lot, and I’ll rejoin the queue. Thanks, and best of luck.
Atul Daga
executiveThanks.
Operator
operatorThanks. Our following question comes from Raashi Chopra at Citigroup. The line is yours — please proceed.
Raashi Chopra
analystThanks. I have a couple of quick cost questions for Atul. First, in the prior quarter, I believe our coal consumption cost came in at roughly $123. For this quarter, do you have a blended cost figure?
Atul Daga
executiveFor this quarter, we're looking at just slightly below $110.
Raashi Chopra
analystThat's under what we-
Atul Daga
executiveMy mistake — it’s $120, not $110. $120.
Raashi Chopra
analystOn a quarter-over-quarter basis, it's pretty flat.
Atul Daga
executiveYeah, it's pretty flat.
Raashi Chopra
analystDid you reach this one because you had the inventory?
Atul Daga
executiveWe held inventory, and we've entered into some smart contracts that let us buy fuel at reduced costs.
Raashi Chopra
analystWhat’s your expectation for the third quarter?
Atul Daga
executiveIt's bound to go up. I would expect — here's a chart — $120 could go up.
Kailash Jhanwar
executiveSeventy, one hundred eighty.
Atul Daga
executiveNo, perhaps it rises by another $10 or $20. Use the mean.
Raashi Chopra
analystRegarding that INR 10 and INR 20 in our third quarter, my guess is you're still referring to some inventory in the current quarter. Given where pricing stands right now, this looks like the peak. Will the fourth quarter come in higher?
Atul Daga
executiveRajesh, I can't promise what the peak will be. I don't know how much longer these prices will continue rising. Yeah, we are going to see our fuel costs increase going forward.
Raashi Chopra
analystOkay, Sachin — about those price hikes you mentioned that sort of offset cost inflation. When you look at that, is the aim to kind of hold that EBITDA level compared with 1Q, or compared with last year? And when you say absorbing cost inflation, again, which direction are we talking about?
Atul Daga
executiveMy goal is to hit the best-in-class EBITDA margin we would have achieved. Our effort will be to avoid being bent out of shape by rising fuel costs. At steady state, if I look at it, 34%, 35% is a very high number, but at steady state, 26%-28% would be a solid range for benchmarking performance.
Raashi Chopra
analystYou've raised prices since October. Roughly how big was that increase?
Atul Daga
executiveIt varies by market, and on average, I'd say INR 10 to INR 15 has already increased.
Kailash Jhanwar
executiveRight, so the price has climbed by INR 10 to INR 15, and as you're aware, that differs across markets, and at times discounts vary by market as well.
Atul Daga
executiveIt's between INR 10 and 15, Rajesh, throughout the whole country, and the encouraging thing is that every region has taken in these increases. Beyond that, among infrastructure companies and within the dealer community, there's a widespread belief that further price increases are coming soon, so resistance is quite minimal.
Raashi Chopra
analystAlright, one final point. Regarding the coal block, that coal is going to be utilized.
Atul Daga
executiveIn the power plant.
Raashi Chopra
analystRegarding the power plant. Correct.
Atul Daga
executiveYes. We can also blend it in the kiln, as well as at the power plant.
Raashi Chopra
analystRoughly what share of that coal can you replace?
Atul Daga
executiveSo Rajesh, that makes up only a quite small share. On the capacity we have today, I believe we're looking at roughly 12 million tons of fuel, give or take.
Kailash Jhanwar
executiveCorrect.
Atul Daga
executiveFor this coal block, the yearly mining plan comes to 750,000 tons, which is under a million tons per annum.
Raashi Chopra
analystAlright, final question — how far ahead is the lead this quarter?
Atul Daga
executiveCould you repeat that, please?
Raashi Chopra
analystCould you clarify the lead distance? You mentioned that the geographic mix has also benefited freight costs. First, what does that mean? Second, what exactly is the lead distance?
Atul Daga
executiveLead distance. Sorry, I thought I heard trade. It's roughly 425 kilometers.
Raashi Chopra
analystAll right, understood. All right, thanks.
Atul Daga
executiveThank you, Rajesh.
Operator
operatorThanks. Our following question comes from Pinakin at JPMorgan. You may proceed.
Pinakin Parekh
analystThank you so much, sir. To start, I'd simply like to get a clearer picture of this trend in energy costs. On slide number 17, there's a green line showing the pet coke price index, and next to it a black line for the energy cost index. Right now, that green line sits at almost half the level of spot pet coke prices. If we consider spot prices for thermal coal and pet coke, and assuming no inventory benefits were in play, by how much would energy costs have been higher? And if spot prices stay where they are from this point, the figure of roughly INR 1,100 a ton ought to be INR 1,500, INR 1,800, INR 1,300. How should we think about overall cost inflation going forward, sir?
Atul Daga
executiveSure. Pinakin, one factor is the inventory we're carrying forward. The other factor is improved efficiency. We've consistently been reducing both our power usage and our heat usage. Power usage is down 4% YOY. That's one factor. That's where the large difference, the delta between INR 240 and INR 126, comes from. Of course, this is just a schematic reference, since I've only used the pet coke price index, I haven't used the coal price index, and blending ratios will keep changing. To answer your question, INR 1,100 could be INR 1,300, but not INR 1,500.
Pinakin Parekh
analystThanks.
Atul Daga
executiveHello?
Pinakin Parekh
analystMy apologies — the spot prices for thermal coal and for pet coke.
Atul Daga
executiveYeah.
Pinakin Parekh
analystGot it, sir. For my second question: beyond energy costs, if we look more broadly, inflation is creating a cascading effect across other line items as well, since rent is climbing and diesel prices are beginning to rise. You said packaging costs are up too. When we consider total costs across the next 2 quarters, taking 2Q realization as the starting point, if we were to return to the first-quarter EBITDA margins or EBITDA per ton, how much of a price increase would the industry require? Would a 5% price hike be enough for the industry to absorb all these costs and get margins back, or are we discussing 10%-15%?
Atul Daga
executiveIf we took INR 350 as the base price, then a minimum of 10% would be needed.
Pinakin Parekh
analystTo cover every one of those costs, and for you to go back to the first quarter.
Atul Daga
executiveIf we return to the Q1 margin, since the Q1 you're talking about is an extremely high margin level.
Pinakin Parekh
analystYes, sir.
Atul Daga
executiveYeah.
Pinakin Parekh
analystAll right, I’ve got it—that’s completely clear. Thanks.
Atul Daga
executiveThat is going to take place.
Pinakin Parekh
analystGot it, sir. Thanks so much.
Operator
operatorThanks. Our following question comes from Ashish Jain at Macquarie, whose line is now open — please proceed.
Atul Daga
executiveHello there, Ashish.
Ashish Jain
analystHello, sir. Good evening. Sir, once more my question returns to what was asked earlier. First, regarding power and fuel cost: if I understood your remark correctly, compared with the $120 you described as a blended consumption cost, and against that, if I paid $220 or $230, we would see energy cost rise by only ₹200? Is that right?
Atul Daga
executiveRoughly speaking, that's right.
Ashish Jain
analystAlright. Sir, regarding that $10 figure you mentioned as a possible Q3 impact on the fuel cost side — is that a favorable number for all of Q3, assuming reasonable production?
Atul Daga
executiveYeah.
Ashish Jain
analystSo even in Q4, based on the contracts we have, you don't think the $210, $220 is going to hit us?
Atul Daga
executiveIt remains to be seen whether Q4 finishes at $220 or above. We’ll do our best to preserve the different expertise the team possesses—the different levels of expertise the team has in sourcing and planning will come into play—and we’ll do our best to keep our energy costs as controlled as we can.
Ashish Jain
analystNo, sir. My apologies. Just to stay on this point, what I'm trying to get at is whether, either because of our contracts or through some other sourcing mechanism, we could still source coal even when spot is $220 — are we sourcing at $160, $170?
Atul Daga
executiveThat’s something I’d like to be able to do.
Ashish Jain
analystAll right. To some degree, the price set by the market ought to—
Atul Daga
executiveIt's going to catch up.
Ashish Jain
analystAll right, that sounds good.
Atul Daga
executiveAshish, I can’t say if that will occur in Q4 or Q5 — which is Q1 2023.
Ashish Jain
analystRight, okay. Second question, sir, about the CapEx plans. You mentioned that some delays are showing up, and from what I understand, you indicated one or two months. Are these delays happening across locations, or only at one or two locations?
Atul Daga
executiveA couple of sites. In Odisha, we encountered a few delays — that is the sole hold-up. Honestly, I believe things have actually caught up since then. Chhattisgarh, for instance, had fallen behind, and they've caught up remarkably well. Same with Pali — they've caught up remarkably well. Those are the bigger sites; the rest are smaller. Cuttack saw the largest delay.
Speaker
unknownDhar as well. Did Dhar get delayed too? Yeah. No, Dhar was also picked up.
Atul Daga
executiveDhar has also picked up, sorry about that. Of that 19.5, 3.2 million will be commissioned this year, and next year, each quarter we'll have some out of the remaining 16 million tons. I gave the schedule in the earlier presentation, one of the — I think the quarterly or the CapEx plan presentation. That schedule we will be able to meet. A month here or a month there. Hello? Ashish?
Operator
operatorAshish Jain here. Can you hear me okay?
Atul Daga
executiveIt seems like he's disconnected or lost the signal.
Operator
operatorRight, it looks like we dropped the connection for Mr. Jain. We'll take the next question, which comes from Amit Murarka at Axis Capital. Go ahead.
Amit Murarka
analystHello there. Good evening, Mr. Daga. For my first question, I'd like to ask about mix. How did the trade mix break down during this quarter?
Atul Daga
executiveTrade mix accounts for 67%.
Amit Murarka
analystSo, generally steady, then.
Atul Daga
executiveRight.
Amit Murarka
analystRegarding other operating income as well, it looks like there’s been a pretty steep increase this quarter. Is there any explanation for that?
Atul Daga
executiveIncentives continue to fluctuate. During this quarter, our Dhar incentive came in, certain incentives lapsed, and some additional miscellaneous income may also arrive. That would be a one-off, and I would see stability at the level we have maintained, around INR 60 crores-INR 70 crores per ton.
Amit Murarka
analystRight, okay — in that sense, this quarter is nearly twice what you'd normally see for the run rate.
Atul Daga
executiveYeah.
Amit Murarka
analystAlright. And on capacities too — clearly you've pointed out the expansions currently underway, which remain on schedule and ought to wrap up, say, by March 2023. Since you know it takes, say, 18 months or 2 years, or even longer in the case of a greenfield, are you considering additional expansions more from an FY 2024 and beyond pipeline standpoint?
Atul Daga
executiveRight, growth is something we can't afford to halt. As you're well aware, India stands alone as the market projected to expand at 6%-7%. When I consider a 10-year CAGR, 6%-7% is a figure we can move forward with confidently. Should we fail to grow, we'll begin surrendering market share.
Amit Murarka
analystAll right. So let's assume that sort of capacity growth rate, then, on a usual basis.
Atul Daga
executiveInorganic or organic.
Amit Murarka
analystAll right. And on capital allocation — you're moving pretty quickly toward a net cash balance sheet now. So what's the plan there? Is inorganic back on the radar, or how are you thinking about it?
Atul Daga
executiveIt's always on the radar. We would look for the right opportunity. As you know, with capital allocation, returns to shareholders are going to rise. We stepped that up in the last financial year. I think the board made a very well-thought-out decision here after reviewing the long-term cash flow plan — that we'll be able to increase shareholder returns once we've accounted for our growth requirements, which won't be leveraged.
Amit Murarka
analystWould it be accurate to say that the balance sheet won't become one with net debt, perhaps even in the event of an acquisition or something like that?
Atul Daga
executiveNope. Should an acquisition happen, you'd see leverage for a single year, since with an acquisition the payment comes up front.
Amit Murarka
analystYeah.
Atul Daga
executiveIt also hinges on the size. If it’s a small 1 million ton deal, you won’t even notice that the balance sheet has taken it on. But if it’s a 10 million ton or a 13 million ton acquisition, then a bump up for a year will occur.
Kailash Jhanwar
executiveIt really comes down to what type of opportunity comes our way, and clearly, if that opportunity is fairly large, then, as Atul correctly pointed out, it could have some effect year-on-year.
Atul Daga
executiveI believe I've brought this up before as well, at some forum. Your financial models are going to show you the EBITDA size for UltraTech in FY 2024. In FY 2023, with all the capacity, 20 million tons of fresh capacity coming online and stabilizing in 2024 — 2024 represents the new normal EBITDA for UltraTech.
Amit Murarka
analystYeah.
Atul Daga
executiveUse a rule of thumb for whatever leverage you're planning on that, and it amounts to a one-year reduction.
Amit Murarka
analystRight, understood. And finally, regarding Super Cement, I believe there have been a few additional delays. Could you shed some light on that too?
Atul Daga
executiveWe keep running into unexpected and unfortunate situations at the bureaucratic level. We had planned to fast-track things, but then the PM visit came up, so everyone shifted focus to that. Meetings aren't happening, or someone isn't available, and so on. That said, March 2022 is a very realistic target for having our plant cleared up and ready to start work. March 2022, yes.
Amit Murarka
analystAlright.
Atul Daga
executiveI won't drag you through all the fine details.
Amit Murarka
analystYes, of course.
Atul Daga
executiveYeah, the things that were already in place.
Amit Murarka
analystI recall that once you take ownership of the plant, there's also a certain amount of work that will need to get done, since it has been closed for quite a while.
Atul Daga
executiveRight, so we've got the CapEx plan clearly mapped out. Should I manage to finalize it by December, then January is when we'd kick off work. March is tight, honestly. Come April, clinker production begins from that point. That's a 2.3 million ton clinker.
Amit Murarka
analystCertainly. That covers everything. Thanks so much.
Atul Daga
executiveAppreciate it.
Operator
operatorThanks. Our following question comes from Ritesh Shah, who is on the line from Investec. Go right ahead.
Ritesh Shah
analystHello, sir. Appreciate the chance to ask. Two questions, if I may. First, could you possibly break down that figure of INR 286 crore? You mentioned an incentive tied to the Dhar payment. On that point, I'd like a broader response from you about the kinds of incentives you anticipate — whether from Dhar or Pali, or from the additional announcements you've already made. That's my first question.
Atul Daga
executiveBefore I forget, let me say this first: your questions are lengthy and more complicated than usual. Nowhere are incentives standardized. You must go to the authorities, the regulatory body, and check what is most feasible under the scheme currently running. All of a sudden a new scheme is announced. Whether you qualify or don't qualify, it's all a mixed bag. Our project returns don't rely on incentives in any way. Incentives are always a bonus on top. Take Pali, for instance — I expect to commission it by September 2023. When will I receive the incentive? The application is at a fairly advanced stage. When will I get it? I don't know. Practically every project sits at various stages of consideration at the state authority levels, so it remains to be seen when we get it.
Ritesh Shah
analystSir, to return to Dhar — my understanding is that with the previous government, cement carried negative risk for MP.
Atul Daga
executiveYeah.
Ritesh Shah
analystFollowing that, it was removed. I'm certain we'd have realized some advantages here. Sir, if you could draw a comparison with this to help grasp the project's IRR more clearly, that would be helpful, if you're able.
Atul Daga
executiveI'll share the details with you separately. Now, in the past, incentives were tied directly to VAT. At present they can't be tied to SGST, since from the state exchequer's point of view it's very difficult to track how much material gets sold inside the state and how much has moved out. They keep putting together various packages to encourage investments. For Dhar we have an entirely different incentive package, and at Pali we're pursuing a completely different hypothesis. It's entirely different.
Ritesh Shah
analystSure. Sir, for my second question, I'd like to return to the topic of cost inflation. Sir, what does our procurement strategy look like? Essentially, when we buy fuel, we have the option of pet coke, which you mentioned will take up a larger share going forward. With pet coke or coal, there will be spot contracts as well as medium-term and long-term contracts. I just wanted to get a sense of what our sourcing strategy is when we say our cost will rise by only $20-$30 next quarter. Is it that we have already locked in something at a low cost? I just wanted some sense of the thought process behind that.
Atul Daga
executiveRather than provide precise details, which would be confidential from a competitive standpoint, I'll give you a broader picture. In cement, we are clearly the biggest fuel consumer — 12 million to 13 million tons of fuel. We can't rely on spot purchases alone. We use a blend of approaches. We enter long-term contracts at fixed prices. We also have long-term contracts on index-linked prices, at a discount to the index, and we draw on different sources to try to manage the average cost. We blend fuel internally as kiln feed to bring down the average fuel cost. We're working to raise our alternate fuel share so that dependence on fuel declines. We're expanding our WHRS capacity, which is helping me cut my fuel consumption for power.
Kailash Jhanwar
executiveWe also have several programs already underway when it comes to fuel and power.
Atul Daga
executiveEfficiency.
Kailash Jhanwar
executiveThat gain in efficiency.
Atul Daga
executiveConsumption.
Kailash Jhanwar
executiveYeah, consumption typically. It's actually a mix of several factors, and naturally, the blended portion of that.
Atul Daga
executiveWe keep working to boost our conversion ratio, and that's also assisting in making fuel consumption better.
Ritesh Shah
analystAppreciate it, sir — that's really useful. I'll get back in the queue. Thanks a lot.
Atul Daga
executiveAppreciate it.
Operator
operatorThanks. Ahead of the next question, one note for everyone on the call: kindly keep it to 2 questions per participant. If anything else comes up afterward, we'd ask that you get back in the queue. Our next question comes from Madhav Marda at Fidelity International. Go ahead.
Madhav Marda
analystYeah. Hello, sir. Good evening. I really appreciate you taking the time.
Atul Daga
executiveYeah.
Madhav Marda
analystI just wanted to ask something quickly, sir. So basically, since UltraTech is, as you said, the biggest consumer in Indian cement, and we have all these long-term contracts — if we look at some of the smaller players in the industry, would they too be able to get such long-term contracts, which would be at kind of more fixed prices and more favorable prices, or would such contracts be more limited to the bigger players in the industry?
Atul Daga
executiveWould you rather pose those questions to them rather than to me about them?
Madhav Marda
analystMaybe we should flip that around and have you pose the questions to them instead.
Atul Daga
executiveMadhav, there are definitely advantages that come with scale and size, and UltraTech certainly has those. As for what others are doing, I'd rather not comment on that in a public forum.
Madhav Marda
analystAll right. Then my second question is this: as you mentioned, price increases ought to occur given how sharply coal and pet coke expenses have risen. Broadly speaking, should we expect that to show up starting in January once the peak season begins, or might it arrive even sooner?
Atul Daga
executiveMy apologies. Madhav, could you ask that again?
Madhav Marda
analystNo. The price increases would generally take effect, as is typical, starting in January and continuing from there, when we hit peak season—
Atul Daga
executiveStarting from October, yes—from October 7th onward.
Madhav Marda
analystAlright, we'll continue moving forward as we go through the quarter.
Atul Daga
executiveRight. For sure. A lag effect isn't possible in this case — if it were, the harm would land in this quarter.
Madhav Marda
analystAll right, got it. Fine, sir. Thanks.
Operator
operatorThanks. We’ll take the next question from Satyadeep Jain at Ambit Capital. You’re live.
Satyadeep Jain
analystHi there. Thanks for letting me ask. First, regarding inflation in capital costs—considering current steel prices and cement prices, are you noticing any increase in capital costs on the project you already have underway, or if you were to launch a new project? Could you say more about that?
Atul Daga
executiveI'll address the second part of that question first. Clearly, a brand-new project is going to be considerably more expensive. With a greenfield project, you'd very easily exceed $100 a ton. When it comes to the projects we already have underway, we're seeing certain cost overruns, yet at the same time there are cost reductions as well as optimizations. Once again, because of bulk purchasing and the longer-term contracts we've secured, we've managed to a large extent to ride out the surge in steel prices. I mean, steel work turns into a significant element of CapEx costs. K. C. Jhanwar, would you like to add anything?
Kailash Jhanwar
executiveYes, and just to add a bit more on that — the big contracts for the technology supply and the steel portion had been fairly well locked in before steel and the other metals began rising sharply in price. So I don't expect any major surprise on the cost side. There may be a few small items here and there. We could see a very marginal increase, but we're making every effort so that through better efficiency or other improvement initiatives, we can hold the cost within the budgeted figure.
Atul Daga
executiveIs the total project cost INR 19.5, or is it INR 6,800?
Kailash Jhanwar
executiveYeah.
Atul Daga
executiveIt's somewhere in the vicinity of, just a bit below INR 7,000 crores. From what I recall, INR 6,800 is the figure. That's where we'll stay.
Satyadeep Jain
analystAll right. On the projects you already have, you're well covered. If you were to launch a new project, then obviously you'd see some capital costs there.
Atul Daga
executiveRight, so costs are going to rise in that area.
Kailash Jhanwar
executiveSure, of course — since it's one, general inflation, the effect of the exchange rate, and so many other factors come into play. It isn't just cement; I think it applies to all metal prices, from copper and aluminum to everything else.
Atul Daga
executiveAll of it has risen.
Kailash Jhanwar
executiveContractor expenses are also climbing considerably at this point.
Atul Daga
executiveIf you consider a typical greenfield cost of, say, $90, that figure would definitely rise to $110.
Satyadeep Jain
analystAlright. Next, you mentioned imported coal, but turning to domestic coal for your CPPs as well, what type of long-term FSAs do you hold with Coal India regarding coal consignment?
Atul Daga
executiveRight now, Coal India is also calling off the shipments and the coal.
Kailash Jhanwar
executiveAt the moment, they have completely halted giving coal to the non-power sector. Sure, clearly it's the mix of FSA, the auctioned coal and.
Atul Daga
executiveWhat percentage of that is domestic coal?
Kailash Jhanwar
executive17% combined.
Atul Daga
executiveCombined. Between the kiln and our power plants, the overall 17% fuel reduction is domestic, and that was previously supplied through auction coal or FSA. Don't factor in what's occurring today or yesterday as of now, since I believe that's temporary. Coal India will get its reserves back on track. Delays happened due to heavy monsoons. Movement wasn't taking place, and so on. As the season improves, things will return to normalcy in Indian domestic supply.
Satyadeep Jain
analystAlright, so when you're doing your planning and running through various scenario analyses, normally the power situation gets better in winter and supplies improve. But if that doesn't happen, what fallback option are you considering for your CPPs?
Atul Daga
executiveWell, we’ll also need to rely on green power and on coal that we import.
Satyadeep Jain
analystAlright, thanks a lot.
Operator
operatorThanks. We’ll take our next question from Navin Sahadeo at Edelweiss. Go right ahead.
Navin Sahadeo
analystYeah. Good evening, sir. Hello, can you hear me?
Atul Daga
executiveYes, Navin. How are you doing?
Navin Sahadeo
analystI'm doing well, thanks. Thank you, sir, and thanks for the chance to ask. I have two questions. The first is really a clarification, so apologies if this has already come up. You mentioned that in Q2 average fuel cost came to roughly $120, which at today's spot levels would be above $200. On that rise, the biggest impact we'd feel in terms of an increase in average fuel cost would be only around INR 200, or approximately $3. Have I got that right?
Atul Daga
executiveRight, yeah — that happened during Q3.
Navin Sahadeo
analystSo, that was during Q3, correct?
Atul Daga
executiveYeah.
Navin Sahadeo
analystSo for Q3, we're looking at fuel costs going up by about INR 200 per ton, and then there's another impact coming in Q4.
Atul Daga
executiveYou’ll see.
Navin Sahadeo
analystCorrect.
Atul Daga
executiveSpot’s performance is unbelievable.
Navin Sahadeo
analystOkay. Suppose I just asked this: take Q2, the quarter we're in now, where the base sits around $120 and spot is $240 to $250 — I really hope it comes down as fast as it climbed. If we assume things stay at today's pace, what's the cost delta?
Atul Daga
executiveApologies — which period are you referring to? We covered that just now.
Navin Sahadeo
analystRight, you mentioned this is Q3.
Atul Daga
executiveThe cost of fuel increases by INR 200, INR 300, and INR 200.
Navin Sahadeo
analystDuring Q3?
Atul Daga
executiveYeah.
Navin Sahadeo
analystIf we use today's spot price, what does that figure rise to?
Atul Daga
executiveRight now, spot ought to rise by perhaps another INR 500. If I were to take in all of it at $225, $230, $240.
Navin Sahadeo
analystGot it.
Atul Daga
executiveI'm quite at ease and rest well through the night, since we're handing it over to you in the event that you're building your home.
Navin Sahadeo
analystNope, I took care of that already last year. Thanks.
Atul Daga
executiveYou're now number two in your villa in Alibaug. I'm aware of that, Navin.
Navin Sahadeo
analystOkay, thanks a lot for that. On the second question, it's regarding the fuel mix. Pet coke has been declining since Q4. I believe it stood at 28%, 30% in Q4. In this quarter, we came in at roughly 17%, 18%. As things stand now, how does that fuel mix break down broadly between pet coke and imported coal — how should one think about it?
Atul Daga
executiveWhat percentage did pet coke come in at — 18%?
Navin Sahadeo
analyst19%.
Atul Daga
executivePet coke came in at 19%.
Speaker
unknownAt this point, he has an interest in you.
Kailash Jhanwar
executiveTo add to that, look, the fuel mix is really dynamic, because at one point coal was very competitive and pet coke had gotten expensive. Now pet coke is just as competitive. Second, the big challenge now isn't price. Honestly speaking, it's availability and fuel security. We've built a reasonably strong ability to switch from one fuel to another very quickly without losing much time. It all hinges on what the prices of pet coke and coal turn out to be.
Navin Sahadeo
analystNo, exactly, sir — that's the very reason I raised this question: price isn't the issue here; it's availability.
Kailash Jhanwar
executiveYeah.
Navin Sahadeo
analystIf you look at it on a kcal basis right now, my sense is that imported coal is considerably more expensive than pet coke.
Atul Daga
executiveThat's correct.
Navin Sahadeo
analystSecuring pet coke supply is difficult.
Kailash Jhanwar
executiveYes.
Navin Sahadeo
analystSo with that in mind, as we're talking right now — and like you mentioned — petroleum coke has once again turned into the preferred fuel. In terms of percentage, how high could that figure climb?
Atul Daga
executiveYou’d have a better sense of that than I would. That’s a question for a coal analyst, not for someone in the cement industry.
Kailash Jhanwar
executiveHonestly, it's really tough to forecast. You're absolutely right that pet coke isn't available in anywhere near the same quantity as coal. What it really comes down to is the kind of situation that develops across various regions of the world, and not just in India.
Navin Sahadeo
analystAll right, and just one final—
Atul Daga
executiveNavin, to put your mind at ease on this, two points. Right now the pipeline hasn't choked, so flow is continuing, and we're making sure that not one of our operations — not a single plant — will be hurt or shut down due to fuel not being available.
Navin Sahadeo
analystSure, that's definitely a draft of ultimate.
Atul Daga
executiveTo me, that's the advantage of being a big player. You've got the reach, plants in every location to secure resources. And second, I'm resting easy since the cost is getting passed along to the consumer.
Navin Sahadeo
analystExcellent. That's very kind. If I could just squeeze in one final question. Sequentially, staff cost is up. I realize other expense has risen due to maintenance. Staff cost is up from one quarter to the next. That reflects the increment.
Atul Daga
executiveAs I mentioned before, the increase was included during this quarter.
Navin Sahadeo
analystRight. Is it fair to treat that as a normalized base for analysis? The other expenses aren't something we can analyze. Can we?
Atul Daga
executiveOne-time bonuses were also included in that. It’ll come in lower—not at the same level.
Navin Sahadeo
analystGot it. Thanks. Thanks a lot.
Atul Daga
executiveAppreciate it, Navin.
Operator
operatorThank you. Ladies and gentlemen, so that everyone has a chance to ask questions, please keep your questions to two per participant. If you have any follow-up, we ask that you rejoin the queue. The next question comes from the line of Girish Choudhary from Spark Capital Advisors. Please go ahead.
Girish Choudhary
analystYeah. Good evening, and thanks for the chance to ask. Most of what I had has already been covered. One thing — if you could share the regional pricing trends the way you usually do on a sequential basis, that would be great.
Atul Daga
executiveWhat are the regional pricing trends referring to?
Girish Choudhary
analystYeah, over the course of the quarter.
Atul Daga
executiveRegarding the most recent quarter?
Girish Choudhary
analystYes, that’s for UltraTech.
Atul Daga
executiveGirish, do you have those figures? First, average prices across all of India rose roughly 4%-5%. North and east saw a 2%-3% gain. Central held steady. West posted a 5%-7% rise. South was unchanged.
Girish Choudhary
analystThose were on a year-over-year basis, correct?
Kailash Jhanwar
executiveYear over year.
Atul Daga
executiveYes, that figure is year over year.
Girish Choudhary
analystCould you give us the sequential number, if that’s available?
Atul Daga
executiveOn a sequential basis, pricing slipped a bit, roughly 3%. The eastern markets saw the sharpest decline, near 10%. Beyond that, it was around 3% on average, give or take.
Girish Choudhary
analystUnderstood. Thanks.
Operator
operatorThanks. Our next question comes from Rajesh Ravi at HDFC Securities. Mr. Ravi, your line is open, so please go ahead with your question.
Rajesh Ravi
analystHi, sir. Good evening. Earlier in this call, you said that for the second half you're expecting 6%-8% volume growth. If we work that out for the whole year, it comes to roughly 13%. That's about 97 odd million tons of gray cement sales — is that what you're looking at?
Atul Daga
executiveThat would be my guess as well.
Rajesh Ravi
analystThanks. Next, looking at how gray cement did: on a quarter-over-quarter basis, once you adjust for the other two businesses, realization is lower by only 1%. Is there a particular cause for that? Since in the markets, as we understand it, prices fell 3%-4% across markets, except for North and Central, where they appear roughly flat. Has there been any shift in sales strategy that lets you post a smaller sequential decline?
Atul Daga
executiveAre you a shareholder, Rajesh? Yes or no?
Rajesh Ravi
analystNope. That's not me.
Atul Daga
executiveIn that case, UltraTech is the one you should be holding. As the industry leader, it has consistently earned respect when it comes to pricing relative to the other players, in my view.
Rajesh Ravi
analystMm-hmm. Alright. Regarding costs, looking at those line items you referenced in the PPT, if I pair that with gray cement realization, we're seeing roughly INR 330 or so of QOQ decline in your EBITDA margin. Is that entirely attributable to power and fuel cost, or—
Atul Daga
executiveCost. It all comes down to cost, cost.
Rajesh Ravi
analystSo starting this month, you're expecting to see that realization go up — is that the right way to look at it?
Atul Daga
executiveYeah. The monsoon window is inherently quite challenging. Volume is under pressure, and despite those intense rains—I don't think anyone else praised us for it, but I'll accept your compliment that we achieved volume growth of 7.5% to 8%. As soon as the monsoon conditions began easing, we seized the chance to raise prices.
Rajesh Ravi
analystAlright. Regarding costs, with the 13 MW of WHRS you've installed, what does your total installed capacity come to after that?
Atul Daga
executiveThe presentation mentions it, right—150-something?
Speaker
unknown137.
Atul Daga
executive137 megawatts of waste heat recovery systems.
Rajesh Ravi
analystAlright, 137 MW.
Atul Daga
executiveYou're not a shareholder, yet your questions are quite sharp.
Rajesh Ravi
analystAnd finally, turning to capacity.
Atul Daga
executiveRajesh, I'll pick up one of the other questions now.
Rajesh Ravi
analystAlright, sir, welcome, and thank you.
Operator
operatorThanks. We’ll take the next question from Prateek Kumar at Antique Stock Broking. Your line is open — please go ahead.
Prateek Kumar
analystGood evening, sir, and thank you for the chance to ask. My first question concerns the truckers problem in the eastern markets. Does it affect us as well? A strike took place, and it caused a slowdown at certain plants in Chhattisgarh. Has that matter been settled?
Kailash Jhanwar
executiveRight, so the trucker problem does exist in Chhattisgarh. The positive side is that we aren't hit too hard, clearly, since every one of our plants actually has railway siding. Sure, there's perhaps a slight effect on road transport from the plant. From what I know right now, it's being sorted out tonight or by tomorrow morning. An understanding has almost been reached. We'll see, because these negotiations and discussions have been going on for the last 3 days. Yes, we're close to arriving at some understanding.
Prateek Kumar
analystThank you, sir. My second question concerns that demand trend chart we typically include in the presentation — it's quite helpful as well, and it noted that the central region saw flat growth over the quarter. Is that purely a reflection of the monsoons?
Atul Daga
executiveRegarding monsoons, places such as Bhopal and Madhya Pradesh experienced heavy rainfall during this period.
Prateek Kumar
analystOkay. When it comes to demand tied to elections coming into UP, is that something you're actually seeing on the ground, or is the monsoon also having some sort of impact on it?
Atul Daga
executiveNope. So at that point, election-related demand is going to work in your favor. Demand in 2022 and 2023 will be entirely driven by elections. The general elections take place in 2024. You saw what took place in 2019.
Prateek Kumar
analystI was referring to the state elections in UP.
Atul Daga
executiveNo, I meant not just the state elections — I'm also talking about the general elections that are coming up as well. In 2022 and 2023, we're going to see very strong demand momentum.
Prateek Kumar
analystThanks, sir. Those are the questions I have. I’ll come back to this.
Atul Daga
executiveAbsolutely.
Operator
operatorThanks. Our following question comes from Mihir Zaveri at Avendus Capital. The line is yours — please go ahead.
Mihir Jhaveri
analystThanks for the chance to ask. Dhananjay, I wanted to follow up on that demand figure you mentioned for the second half — the 6%-8%. From a pure math standpoint, the base in Q3 and Q4 is quite high. Last year was phenomenal given the COVID situation. Q1 was very strong as well. How should we think about it? Is there any risk to that 6%-8% guidance?
Atul Daga
executiveNope.
Mihir Jhaveri
analystOur starting point is extremely elevated.
Atul Daga
executiveI covered the infrastructure sector at considerable length in my commentary, so let me lay out the fundamentals for you. What we're seeing now is that in the post-COVID period, urban housing has been recovering as well. The monsoons have been favorable, harvests have been strong, and rural demand is going to keep enjoying a party time. Infrastructure kept expanding the whole time. Before COVID, it was rural markets and infrastructure that carried the demand. Now you're seeing urban housing join in too. I also mentioned the commercial demand tied to IT, which is picking up in Karnataka, in Andhra in a major way, and in Tamil Nadu substantially. You're going to witness an enormous volume of cement consumption down the road.
Mihir Jhaveri
analystAlright, sir, just one point of clarification regarding the cost side, sir. As for the cost impact — probably what you pointed out, given that Q3 will see a smaller impact. The cost impact clearly will carry on, based on the current spot price, in Q4 and in Q1 as well, correct?
Atul Daga
executiveThat's correct.
Mihir Jhaveri
analystAlright.
Atul Daga
executiveThe expense is going to go northward.
Mihir Jhaveri
analystAlright. Many thanks. That covers everything on my end. I appreciate it.
Atul Daga
executiveAppreciate it.
Operator
operatorThank you. Our following question comes from Kamlesh Parmar, who is calling on the Prabhudas Lilladher line. Please proceed.
Kamlesh Parmar
analystSir, just one question, if I may, about your Middle East and overseas operations. From what I understand, this quarter has ranked among the weakest in roughly 18 quarters or so. Our derived or imputed EBITDA came to only about INR 8 crore. What explains that? Was there some one-time cost involved?
Atul Daga
executiveThis was just a short-term bump in the road. The first factor is higher costs in the U.A.E. market, plus export markets into Sri Lanka out of India taking a hit. Shipments from our Gujarat plant into Sri Lanka slowed somewhat. Now I believe a catch-up is coming, since in Sri Lanka we sell nearly 1.5 million tonnes per annum. That market had a controlled price regime, and it has now moved to free pricing. Prices there are decontrolled. Price increases have already gone through in Sri Lanka. My expectation is that it comes back. It's among the weaker quarters for our overseas operations.
Kamlesh Parmar
analystFinally, sir, we understand that Q2 combines maintenance expense with reduced efficiencies. For instance, considering Q3, when we might see peak volume — a very strong quantity of cement — and on top of that, improved efficiency. Second, we'll face a higher energy cost. With that in mind, for Q3 and Q4, there's also a fixed cost component. How should we view the cost? I know many questions have been raised, and I believe most of it has already been covered. Taking fixed costs, shutdown cost, all of that into account, for Q3, Q4, or H2 combined versus Q2, how would the cost play out in terms of the overall trajectory?
Atul Daga
executiveLet me give you a bit of an overview. If you work out our operating leverage across the past 3 or 4 quarters, that will give you your answer.
Kamlesh Parmar
analystAll right, thank you very much.
Operator
operatorThanks. We’ll take one final question from Sanjeev Kumar Singh at Motilal Oswal Financial Services. Go ahead.
Sanjeev Kumar Singh
analystThank you, sir, for giving me the chance to speak. First, I'd like to get a sense of what kind of capacity additions you expect across the industry. Second, regarding inorganic growth, I believe one of your presentations mentions that opportunities for inorganic accretion of 50 million to 60 million tons exist. Do you have any thoughts on that? Are attractive assets out there? Once profitability is stronger, will sellers come forward?
Atul Daga
executiveTo start with, for this year I'd anticipate somewhere in the range of 20 million to 25 million times, with a slowdown in the following year. Over the longer run, my view remains that things will change as auction mines begin operating. Somebody recently acquired a small mine in Chhattisgarh for INR 660. Earning a return from resources that costly is fairly unrealistic. You won't come across many of those. On top of that, you should consider which mining resources every player holds and where those locations sit. That data is readily accessible.
Sanjeev Kumar Singh
analystCorrect.
Atul Daga
executiveIf someone chooses to operate a facility with merely five years or 10 years of lifespan, may God protect them, and may God protect the investor putting capital into such a business. On expansion, 20 million tonnes are coming up. Again next year, a substantial portion of our expansion — 15 million tonnes — is coming up next year. Past that point, I would characterize it as a slowdown in investments. Regarding acquisitions, we remain open to any target that presents a profitable growth opportunity. Growth meaning an increase in my market share, and profitable — obviously it must deliver a return on my investment. At present, there are a couple of transactions I am looking at. Small ones, very small ones. I am sure there will be parties who wish to cash out at one point or another, and we will be there to hold a discussion.
Sanjeev Kumar Singh
analystAlright, sir, a second point — just to clarify. Did gray cement realization fall 2.5% QOQ? Going by the presentation, it appears the decline was 2.5%. Is that right, or was it below that?
Atul Daga
executiveWhen compared with the prior quarter, realization has declined.
Sanjeev Kumar Singh
analystYeah.
Atul Daga
executiveRoughly 2.5% to 3%.
Sanjeev Kumar Singh
analystAll right, thank you very much, sir.
Atul Daga
executiveI appreciate that.
Operator
operatorAppreciate it. Everyone listening by phone and on the private line, that brings this conference to a close. Thanks to each of you for being with us. You're free to hang up your lines now.
Atul Daga
executiveI really appreciate it.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete UltraTech Cement Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to UltraTech Cement Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in UltraTech Cement Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.