VA Tech Wabag Limited (WABAG) Earnings Call Transcript & Summary
February 12, 2024
Earnings Call Speaker Segments
Operator
operatorGood evening, ladies and gentlemen, and a warm welcome to all of you on this earnings call held after the announcement of VA Tech WABAG Limited's Q3 and nine months FY 2024 results. Joining us today from the management team are Mr. Rajiv Mittal, Chairman and Managing Director, and Mr. Skandaprasad Seetharaman, Group Chief Financial Officer. Please note that on this call, the company might make some forward-looking statements regarding business prospects and profitability, and these may carry risks and uncertainties, so actual results could differ materially from what such forward-looking statements indicate. An archive of this conference call will be kept, and transcripts will be posted on the company's website. The results update presentation has been put up on the website as well as the stock exchange, and it gives an overview of the core offerings along with an analysis of the results for this period. We hope you have had a chance to go through it. We will begin with opening remarks from the management, and after that we will open the floor for the interactive Q&A. I now hand things over to Mr. Mittal, who will take you all through the key business highlights. Over to you, Mr. Mittal.
Rajiv Mittal
executiveThank you. This is the announcement of the Q3 and nine-month FY 2024 results for VA Tech WABAG Limited. Your ongoing support and engagement matter greatly to our growth journey, and we appreciate that you are with us today. With me on this call is Mr. Skandaprasad Seetharaman, our Group Chief Financial Officer. It is with enormous pride and joy that I tell you your company has reached 100 years of existence this year. I will say it again: 100 years of existence in the water sector. The last 100 years have been exciting and challenging, and also very rewarding. Over these years, WABAG has gone from a local startup unit to a large global corporation. We remain a pure play water company, focused on emerging markets and staying asset-light. This significant milestone stands as a testament to our unwavering commitment, resilience, and enduring spirit of innovation that has defined our growth over the past century, with an impact that resonates across borders, touching the life of communities, industries, and environment. For a century, we have been at the forefront of pioneering water solutions, driven by our unwavering commitment to quality, innovation, and sustainability. From groundbreaking technologies to comprehensive water management systems, we have played a pivotal role in shaping the landscape of water sector.
Rajiv Mittal
executiveFor WABAG, sustainability isn't merely a buzzword—it's part of who we are at our core. We're extremely proud that our project, the Jubail Industrial City Wastewater Treatment Plant and Water Reclamation Plant, MARAFIQ, in Saudi Arabia, earned the prestigious Energy Globe World Award 2024 in the water category in Norway. Then came another honor: we were named a national winner in KSA from Energy Globe in Saudi Arabia for the MARAFIQ project, which we received a few months ago. Our dedication to environmental responsibility stays unwavering. Looking ahead, we remain committed to helping advance a circular economy. Not long ago, WABAG formed a strategic partnership with Peak Sustainability Ventures to build 100 Bio-CNG plants throughout India, GCC, Africa, and Europe. Through this partnership, we aim to tap the untapped potential of organic waste to produce Bio-CNG, responsibly meeting energy demands and thereby helping cut greenhouse gases emission as well as air pollution. This initiative showcases our innovation and environmentally conscious approach, turning waste into renewable energy for a cleaner, greener, and more sustainable future. Our financial performance over the last nine months reflects our focus on delivering profitable growth, with a strategic emphasis on international geographies, industrial projects, advanced technology plants, engineering and procurement—which is the EP business—and long-term operation and maintenance.
Rajiv Mittal
executiveWe've kept enhancing our margin profile and sustained positive cash flow, which highlights how we're committed to long-term growth consistent with our strategy reveal. As the leader in the advanced technology business, most of our order intake comprises plants across desalination, recycle and reuse, and effluent treatment segments. Thanks to our ongoing emphasis on emerging markets and the work of our agile go-to-market teams, 59% of our order inflow this fiscal has come from international geographies. Every one of these orders was won facing strong international competition. Not long ago, we landed an industrial order valued at $33.5 million from SEPCOIII Electric Power Construction Co., Ltd., for engineering and procurement of a 20 million liter per day industrial wastewater treatment plant at the Ras Tanura refinery complex in the Kingdom of Saudi Arabia. This order, being executed for NEOM and Saudi Aramco and scheduled for completion over a 20-month period, stands as another testimony to WABAG's technology leadership in the oil and gas sector and lets us further cement our presence in the Middle East region. We've kept a high-quality order book of roughly INR 12,000 crore, with a healthy mix of 57% EPC and 43% O&M, the majority of which carry secured payment terms. What's more, our robust order book and pipeline visibility give confidence in our capacity to keep growing and create value for our stakeholders in the years ahead.
Rajiv Mittal
executiveI want to express my genuine thanks to every one of our investors for the trust you keep placing in WABAG. That backing propels us onward as we pursue our path toward worldwide leadership in the water sector. Our dedication to returning value to shareholders stays firm. Now we look ahead to a productive exchange during the question and answer session. But first, we turn to the financial highlights. At this point I would ask Skanda to walk you through those. Skanda, over to you.
Skandaprasad Seetharaman
executiveThank you, Mr. Mittal. Good evening, friends. I hope you've had the opportunity to go through the results update presentation that was shared and posted on our website. Let's begin with a few important operational highlights, and after that we'll cover the financial highlights for the quarter and for the nine months ended December 31st, 2023. Throughout the quarter, the pace at which our ongoing projects were executed stayed praiseworthy. New projects such as the Perur Desalination Plant in Chennai and the Pagla STP in Bangladesh have begun planning activities, with engineering advancing considerably and thereby making it possible to start procurement and construction. In particular, our major industrial projects — the Reliance desalination project in Jamnagar, Gujarat, and the AGCC project, SIBUR in Russia — are moving forward well and, as anticipated, are set to be completed in H1 of next fiscal. Our KMDA HAM project has now reached the commissioning stage, and we expect to wrap up the activities during this quarter. The STP HAM projects being constructed for BUIDCO at Digha and Kankarbagh, along with the 40 million liters per day Ghaziabad Nagar Nigam Tertiary Treatment Recycled Reuse Water project being built for GNN, have been advancing steadily, with engineering and procurement activities largely finished and construction work proceeding rapidly. As we have always said, our emphasis on the MEA cluster as the next growth engine continues to be strong.
Skandaprasad Seetharaman
executiveWe just won a 20 million liters per day industrial wastewater treatment plant at the Ras Tanura refinery complex in the Kingdom of Saudi Arabia, which fits well with our growth story in that region. The MEA cluster holds enormous promise, and going forward we'll keep working hard to turn a substantial share of the opportunities there into business. It's also a real source of joy and a validation of what we've been doing to improve margins, cash flow, debt reduction, and overall business progress. Our credit rating was recently raised to A+ with a positive outlook on a long-term basis, and we remain at A1+ on a short-term basis, which is the highest short-term rating. Turning to the financials, consolidated revenue from operations rose 8% year-over-year to INR 704 crore, driven by new and large projects starting to generate revenue and sustained execution pace on other projects already underway. That revenue growth came even after the strategic divestment of two of our subsidiaries during the last year. Consolidated EBITDA came in at INR 99 crore, and we kept a double-digit EBITDA margin, consistent with what we've been signaling in our interactions. We delivered yet another quarter of profitable growth, meaning our PAT grew faster than the top line.
Skandaprasad Seetharaman
executiveFor the quarter, consolidated PAT came in at INR 63 crore, which is a 34% increase year-over-year. Across the nine-month period, consolidated operating revenue was INR 1,922 crore. Consolidated EBITDA rose to INR 261 crore, with a healthy margin, thanks to execution efficiencies and a lower total cost of operations, TCO. On a consolidated basis, PAT attributable to owners was INR 173 crore, a rise of 40%, 40% year-over-year. We ended this quarter, as well, in a net cash positive position, which shows our efficiency in managing cash and debt. Return on capital employed remains strong too, at roughly 20%, which reflects our asset-light, technology-focused approach. To our clients and partners, thank you for your trust and collaboration. Your support has been the bedrock of our success. As we mark 100 years, we renew our commitment to delivering the highest quality services, meeting and exceeding market expectations. We also offer heartfelt thanks to our bankers, investors, fellow WABAGites and all stakeholders for the continued support extended to us. With that, we now open the floor for the interactive question-and-answer session.
Operator
operatorWe appreciate that. At this point we'll open the floor to questions. To submit a question, you can press star and one on your touch-tone phone. Should you want to drop out of the queue, press star and two. We ask that participants speak through their handsets when posing a question. Ladies and gentlemen, so that management can take questions from everyone on the conference, kindly keep your questions to two per participant. If you have follow-up questions, please get back in the queue. Our first question comes from Koushik Mohan of Ashika Institutional Equities. Please go ahead.
Koushik Mohan
analystHello there. Hi. Congrats on the strong results. Right now our order book sits at roughly INR 12,000 crore. Could you describe the landscape, and how long will it take us to execute that entire book? What portion will be executed in Q4?
Skandaprasad Seetharaman
executiveLike we mentioned earlier, our order book breaks down as 60% EPC and roughly 40% O&M. Typically, EPC orders run for about three years, while O&M is long-term, spanning anywhere from 5 to 15 years. You can figure 8 to 10 years as the typical execution period for this order. Broadly speaking, this year, even following the divestment of our two overseas subsidiaries, we would generally expect to see growth in our numbers. As we've already shown at the YTD December stage, we anticipate that same momentum carrying through into the fourth quarter.
Koushik Mohan
analystUnderstood. Sir, my next question is a follow-up regarding trade receivables. Sir, at present we are carrying a buildup of INR 1,665 crore in trade receivables. What would our receivable days be, and what do our contracts with clients stipulate? At what point can we expect this whole trade receivables balance to turn into cash, and what length of time would that require? Is there any bad debt on this, or is there none?
Skandaprasad Seetharaman
executiveLook, as you mentioned, every order we book at present has payment security behind it. These are either multilateral, sovereign-funded, backed by the federal government, or LC supported. I don't think any doubt should exist on your part regarding the collectability of these projects. Receivables move through their cycle. Projects sit at different stages. What we've done is manage to sustain a working capital position, since normally we hold a general back-to-back arrangement. When a vendor supplies and the customer accepts, they pay, and we can pay the vendor. We also handle our working capital through various instruments such as LC and LCBGs, plus various other instruments that give us credit periods. No concern exists there as far as we can see. Yes, we have improved consistently on receivable collection dates, and you will see that going forward as well. But I want to underline once more that you have already observed the last three years, and all these quarters too, how we've managed to keep a net cash position and also generate operational cash flow. That is achievable only via an efficient cycle of debt and cash management.
Koushik Mohan
analystAppreciate the answer, sir. Thank you for that. Sir, turning to the projected growth side—sir, not long ago I came across one video-
Operator
operatorPardon me for cutting in, sir. Could I ask you to get back in line, since quite a few participants are waiting their turn, please.
Koushik Mohan
analystSure.
Operator
operatorYeah. Thanks a lot. Our next question comes from Ashish Soni with the family office. Go ahead, please.
Analyst
analystSir, I wanted to ask about the future opportunities in green hydrogen and semiconductors. When do you think anything could materialize, and how soon?
Rajiv Mittal
executiveRight now, both of those sectors have enormous future potential. Post-COVID, everyone is keen on being self-reliant. Be it Asia, the U.S., or Europe, each is establishing its own chip manufacturing base. Making chips requires ultra pure water. We've already completed a plant and have a reference for that, yet we keep searching for more advanced technologies that are available, since as a technology company we always want to deliver the best to our clients. Our sense is that over the next couple of years, we'll see solid potential in semiconductor water demand. When it comes to hydrogen, particularly green hydrogen, water is needed as a raw material, because the electrodes generate hydrogen by splitting water. Clean water is the raw material, and that's exactly what we specialize in. We'd like to secure our position with the various developers and technology providers as a water partner. It still isn't economically viable. Even so, much of the advanced world will invest in this hydrogen, which will cut greenhouse gases, a target they must meet. But for it to become economically viable, my personal guess is anywhere from three to five years.
Rajiv Mittal
executiveWhen it arrives, it behaves much like solar. It’s going to experience truly exponential expansion and remain at that level for decades.
Analyst
analystOn the Bio-CNG side, when do you figure something could start showing up over revenues?
Rajiv Mittal
executiveI'd say we're expecting this to happen right away, since we already have certain plants in mind, and we think we should be able to sign something in the first quarter of next fiscal year, and typically, executing this project will take roughly 9 to 12 months.
Analyst
analystSo really, what you're getting at is that semiconductors would perhaps be a nearer-term opportunity, while green H2 could be more of a longer-term one — is that right?
Rajiv Mittal
executiveYeah, my own personal guess would be at least 3 to 5 years.
Analyst
analystOkay, thanks. Best of luck.
Operator
operatorThanks. We'll take our next question from Amish Kanani at JM Financial Services. Go right ahead.
Amish Kanani
analystHello there, and congratulations on the strong profitability figures. We noticed that revenue for the nine months comes to roughly INR 1,900 crore, while order intake appears to be around INR 1,761 crore. Do you feel good about that, and does it match what you were expecting? Normally, we'd want our orders to exceed revenue. So is there a chance to close that gap over the remainder of the year? With that in mind, how are the opportunities in the Middle East and India shaping up in terms of pipelines?
Rajiv Mittal
executiveAmish, you're absolutely correct. Every company would prefer order intake to come in a bit above revenues. That said, right now we're very fortunate to be holding INR 12,000 crore, which already provides visibility of almost three years. So that's not something worrying us, and it won't push us into making a poor decision or picking the wrong order or bidding in desperation. As we mentioned earlier in our speech, our priorities remain payment security, margin, cash flow, and technology selection as the basis for choosing our order intake. We're quite hopeful because the market is flooded with inquiries. It's simply a question of time — how long it takes. Although India, owing to the forthcoming election, will slow down somewhat over the next few months. We have moved a lot of resources into international markets, and we're hopeful that some projects in India and many more from international markets you can see in the next couple of quarters.
Amish Kanani
analystOkay, sir. Sir, could you give us a sense of how working capital is shaping up — both on the working capital side, including the retention money we're expecting some release from on Qatar and Tunisia, if I remember correctly, and also our net cash position?
Skandaprasad Seetharaman
executiveEven for this quarter, Amish, we're sitting in a net cash positive position. We've already seen retention on the MARAFIQ project recovered during the first half of this year. The remaining two projects are at advanced stages of closing. So over the course of this year, we'll see those projects completed. In 2024 and 2025, we will complete these projects and clear the capex liability, which makes them eligible for collection of those retentions. As I explained, looking at working capital today — with the order intakes, with our debt under control, and with the net cash position we're maintaining — I'm sure you understand that working capital is fairly okay.
Amish Kanani
analystYes. Sir, could you provide the net cash figures as of December 31st, and also the free cash flow for nine months at least, if not quarterly — we generated positive free cash flow, sir?
Skandaprasad Seetharaman
executiveFor the nine months, we did turn free cash flow positive, and we closed with a net cash positive position of roughly INR 100 crore.
Amish Kanani
analystThat’s really encouraging, sir. Best of luck. Thank you.
Skandaprasad Seetharaman
executiveAppreciate it.
Operator
operatorThanks. Our next question comes from Arun Kailasan at Geojit Financial Services. Go ahead, please.
Arun Kailasan
analystYeah. Thanks for taking my question, and congratulations on reaching 100 years. I just wanted to ask about the EPC municipal segment. Over the past three quarters, on a YoY basis, the revenue we've booked has come in below the prior-year comparable period. The execution figures also suggest that execution has been on the lower side. Are we facing any kind of stuck-up in this particular segment, sir?
Rajiv Mittal
executiveNo. This is something—if you recall, in the last few quarterly discussions we've had with you—that was very much anticipated, because three of our large projects, whether it's Chennai desalination, Bangladesh Sewage Treatment Plant, or the CIDCO water, were all secured roughly nine months ago. Typically, getting the contract signed and establishing the zero date takes around three to four months. Following that, roughly four to six months are needed to complete the engineering. That's exactly where we stand with these three projects—just in the final stages of engineering, which sets the stage for procurement and construction. We've consistently told you that only toward the third and fourth quarter can we see some revenue flowing. Starting from the first quarter of next fiscal, we'll see momentum building, and we'll see much higher revenues, because construction and procurement would have picked up. So this was expected, and this will always happen when you secure large projects like these.
Arun Kailasan
analystAlright. Sir, my next question is about overall operating costs. On a consolidated basis, our total operating cost came in lower. Yet looking at the standalone basis, we're seeing higher costs — reported higher. Is there some particular reason for that?
Rajiv Mittal
executiveI mean, India is obviously an inflationary market — all of us operate there. Right now we're a growing company, and there's enormous pressure from people who want to get into water to poach our staff. So we have to offer competitive salaries in that market. On top of that, our headcount is rising as well, since our workload is significantly larger. But internationally, we're bringing it down — those are high-cost geographies. Certain activities that used to be handled in the international geographies are now being moved to India so we can keep overall costs under control, and that's part of our strategy, and I think it's working well for us.
Arun Kailasan
analystOkay, sir, if I could just fit in one final question. It concerns those 100 Bio-CNG plants we have. May I ask — since you mentioned in response to an earlier question that a couple of water treatment plants have been identified — so these will be built at facilities that already exist. Is our intention to generate Bio-CNG from some of that waste coming out of water treatment, such as slurry or sludge, and so on? Is that what's planned? And on the cost side, what sort of figure are we looking at for this? If you could speak to that.
Rajiv Mittal
executiveYou're absolutely right that we need to identify where the easiest gains are. As you pointed out, the quickest win sits in our current plant, where we'd capture the biogas, clean it up by stripping out the impurities, and then compress it for use as fuel. That piece will happen within the coming three to six months, and after that, building the purification facility plus the compressor facility takes roughly 9 to 12 months. That's the plan, I'd say. And it won't apply solely to wastewater municipal projects — it can work for industrial projects, for municipal solid waste projects, for fresh mud. Whatever type of organics can be turned into methane, we'll deploy these technologies to turn it into methane, so that a valuable product in the form of a fuel — clean and green — gets produced, and that product carries a market value. So that's our plan. To start with, in order to demonstrate this concept, we're going to put up somewhere between four and six plants over the next 12 to 15 months.
Arun Kailasan
analystSir, when it comes to the cost basis, what amount should we expect to incur?
Rajiv Mittal
executiveWhether the asset already exists makes a difference—if it does, getting this plant up and running will likely run a couple of million U.S. dollars. If, on the other hand, the asset doesn't exist yet, the figure is roughly $4 million for each plant.
Arun Kailasan
analystRight. Okay, sir. That’s everything from my side. And congratulations again. Thank you.
Rajiv Mittal
executiveI appreciate that.
Operator
operatorThanks. Our next question comes from Arun Chakravathy, an individual investor. You have the floor.
Arun Chakravathy
unknownHello there. Good afternoon to you, Mr. Mittal.
Rajiv Mittal
executiveGood afternoon.
Arun Chakravathy
unknownHow are you doing, sir?
Rajiv Mittal
executiveI'm doing well. How about you?
Arun Chakravathy
unknownI'm doing well. I just have a single question regarding that TSGENCO arbitration award. Have you gotten anything yet?
Rajiv Mittal
executiveI believe right after that award came the election and then a shift in government. So the ministry and the bureaucrats, I think, are now being appointed. We therefore expect that during the first quarter we should be hoping to receive this, and there are certain other legal matters that the TSGENCO legal team has to clear, which I believe will be cleared this quarter, and that will pave the way for us to collect our money starting in the first quarter of next fiscal year. So perhaps across two, three, four tranches, we should be able to collect the full amount.
Arun Chakravathy
unknownAlright, that's encouraging to hear. And congratulations on the strong results you posted this quarter.
Rajiv Mittal
executiveThanks.
Arun Chakravathy
unknownMuch appreciated.
Operator
operatorThanks. We’ll take the next question from Dhananjay Mishra at Sunidhi Securities. Go ahead, please.
Dhananjay Mishra
analystYeah, thanks for the chance to ask, and congratulations on the excellent operating performance. As you mentioned, with this being an election year, the domestic market will be a bit slow, or even with the current geopolitical situation. Could you give some sense in terms of bids, which orders are expected over the next 12 months, particularly the domestic ones?
Rajiv Mittal
executiveLike I mentioned, we're anticipating this downturn to last roughly 4 to 6 months, and that's what we're focused on today. We've redirected quite a few resources toward the international market. Many bids are currently being processed. In some of those bids, we already hold preferred bidder status. Over the coming 4 to 6 months, we expect to be able to announce a handful of additional international orders. If we're lucky, a few of them could turn out to be large orders. We'll keep working with Indian clients as well, on the industrial side and the municipal side alike, to build a solid order pipeline, and we believe that right after the elections, this too should be capitalized on.
Dhananjay Mishra
analystThis Libya order has existed as a framework order for quite a long time. Why is it not turning into an actual order?
Rajiv Mittal
executiveTurning to Libya—you're familiar with how the geopolitical picture shifted there, with the revolution in that country. At this point the nation is stabilizing, and gradually, in line with what they can afford, they're handing us projects one at a time. We mentioned previously that we had just completed the Tobruk Desalination Plant, which serves as a drinking water source. They've now begun talks with us on those 2 or 3 framework orders that you're referring to. Prices have already been escalated by them since time has passed. Together with the client, we've reached a new figure, recognizing that time has passed, so the pricing carries escalation. A new figure has been settled on, and the moment it gets passed in the cabinet, I believe they'll move ahead with opening the LC. We won't begin without an LC. As soon as that LC is opened, we'll start this project right away. We're quite hopeful that over the next couple of quarters, we should manage to start at least a couple of these projects.
Dhananjay Mishra
analystAlright, sir, that’s everything from my end. This year we’re set to hit our highest EBITDA and PAT ever, and I hope that in the years ahead we’ll also be posting our highest revenue ever. Thank you.
Rajiv Mittal
executiveWe will celebrate together.
Dhananjay Mishra
analystYeah.
Operator
operatorThanks. Our following question comes from Nikhil Abhyankar, who is on the line from ICICI Securities. Kindly proceed.
Nikhil Abhyankar
analystHello, sir. Thank you, and congratulations on such a strong set of results. My question again relates to order inflows. You said that most of the order inflows you anticipate will come in the next 4 or 6 months. Should we take it that no meaningful order inflow will arrive during the financial year?
Rajiv Mittal
executiveYeah, definitely, it will be. You probably also heard me mention it earlier in my remarks and during some of the Q&A as well — that orders are going to come. They'll come in India too, but most of the orders over the next four to six months are going to come from international geographies. We're not saying there won't be any orders. What we're saying is that they'll come from international geographies — I'll repeat that.
Nikhil Abhyankar
analystAll right. But on the domestic side too, you're looking for a substantial—
Rajiv Mittal
executiveYeah, once that code of conduct is in place, we're going to see activity that's subdued.
Nikhil Abhyankar
analystUnderstood.
Rajiv Mittal
executiveAs you're aware, for a minimum of four months, nothing is going to happen until the results come out and a new government gets formed, and the ministers along with the bureaucrats are installed in their positions.
Nikhil Abhyankar
analystRight, could you give us the figure for those projects where bids have already gone in, and what's the total value of those bids?
Rajiv Mittal
executiveWe've put in a bid worth over $1 billion, and there's a further $1 billion that we're still working on — those bids will be submitted within the next three to four months.
Nikhil Abhyankar
analystSo $1 billion — is that split between international and domestic, you're saying?
Rajiv Mittal
executiveYes. Group total.
Nikhil Abhyankar
analystAlright, got it. Sir, this last one is about the HAM projects. If I'm not mistaken, there are 3 HAM projects, and we were also considering monetizing them. Is there any update on that?
Rajiv Mittal
executiveRight. For the Kolkata plant, that first one, we're looking at reaching commercial production during this quarter. The remaining two ought to come online in the first half of next fiscal year. As soon as commercial production begins, revenue starts flowing, and that's the point where we anticipate the majority investors stepping in to take control. We'd wrap up our EPC work and then keep handling long-term O&M — roughly 15 years of O&M. At that stage, once those investors feel comfortable with how the assets are performing, we could even consider monetizing our investments.
Nikhil Abhyankar
analystSo essentially, there are 3. Of that total, 2 are going to be up and running, while 1 is going to remain in the construction phase — is that right?
Rajiv Mittal
executiveMy apologies — I didn’t catch your question. Could you say it again?
Nikhil Abhyankar
analystWe have three HAM projects; 2 of them are going to be up and running, and 1 remains in the construction stage.
Rajiv Mittal
executiveNope. One is going to be up and running during this quarter.
Nikhil Abhyankar
analystAlright.
Rajiv Mittal
executiveThe remaining two should be up and running during the first half of next year — that's the next calendar year.
Nikhil Abhyankar
analystGot it.
Rajiv Mittal
executiveEach of the three has reached advanced stages.
Nikhil Abhyankar
analystGot it. Moving forward, I just wanted to get a sense of whether, let's say, over the coming 3 or 4 years, if we build up a portfolio of these HAM assets, we could even consider an InvIT instrument as a way to monetize those assets?
Rajiv Mittal
executiveRight, that's just how it has to be, since we've said to you all along that we're an asset-light company. Staying invested isn't our job. Once we're the technology partner and we've shown the construction, the EPC performance, and then, moving ahead, the O&M performance, I think at that point we can definitely monetize the share of the investment that's ours.
Nikhil Abhyankar
analystAlright. Alright, sir. Thanks a lot. Wishing you all the best.
Operator
operatorThanks. Our next question comes from Rucheeta at iWealth Capital. Your line is open — go ahead.
Rucheeta Kadge
analystGood evening, sir. My question is about the European subsidiary. In the same quarter last year, what were its revenue and EBITDA?
Skandaprasad Seetharaman
executiveLook, we don't disclose those figures at that level of detail. For context, though, if you mean the European subsidiary we sold off: across the nine months, roughly INR 130 crore to INR 140 crore is tied to those subsidiaries. On an annual basis, the subsidiary's revenue comes to around INR 200 crore. That's on a like-for-like basis, in case you want to adjust between the two groups. EBITDA will be next to nothing, and that's part of why we chose to divest these operations — weaker EBITDA and profitability alongside higher revenue. From a strategic standpoint, our aim was to retain Europe as a tech hub while focusing operations on the emerging economies.
Rucheeta Kadge
analystAll right, sir. Sir, when we compare December with December, our EBITDA has risen by roughly 78%. I just wanted to get a sense of how much of that came from the EP work we carried out and how much came from EPC?
Skandaprasad Seetharaman
executiveLook, this is going to shift from one period to another. It will definitely vary period to period, Rucheeta. That said, in general, close to one-third of the revenue we get from EPC has typically been coming from EP. At times that figure runs higher, and at other times it runs lower. During these nine months, the mix would carry a bigger share of EP, coming for instance from SIBUR, or the industrial work from Reliance, along with several of the other HAM projects and EPC projects. This mix is not constant. That's the reason I put it at about 1/3 of EPC revenues being made up of EP as a rule.
Rucheeta Kadge
analystAlright, sir. Alright. Just one final question from me. Over the next two years, what sort of order book growth are we expecting?
Skandaprasad Seetharaman
executiveMy view is that 10%-15% is a reasonable estimate, though naturally the market is pretty lively. This sector is quite bullish, and we have a lot of confidence coming from the Middle East, Africa — all those geographies are firing on all cylinders. So we'll see. These will probably — we'd be glad to surprise the market, but a fair assumption to make is roughly 10%, 15%.
Rucheeta Kadge
analystAll right, sir. All right. And what about this year?
Skandaprasad Seetharaman
executiveLook, I wouldn't look at it year by year. Our projects have a three-year span, so you really can't put us in a year-by-year box. I did give you a CAGR figure. We're over INR 12,000 crore — about that level — and we'll be hoping to keep it at least there. If we're fortunate enough to land a few bigger projects, we'll likely grow it this year as well.
Rucheeta Kadge
analystGot it. Thanks a lot.
Skandaprasad Seetharaman
executiveMuch appreciated.
Operator
operatorThanks. Our next question comes from Omkar Jahagirdar, an individual investor, who is on the line. Please go ahead.
Omkar Jahagirdar
unknownThank you, sir, for the opportunity to ask. Let me congratulate you and the WABAG team on achieving the highest operating margin ever recorded in WABAG's history. Since 2018, our order book stood at INR 10,000 crore. At last, following wins on two major projects—Chennai and Bangladesh—that figure has reached INR 12,000 crore. Regrettably, the letter of credit and other formalities were slow to complete, and for that reason these two large projects have produced no revenue so far. My question is whether WABAG will perform better in S2, and whether the yearly numbers in revenue terms will exceed those of last year? Also, is WABAG confident of surpassing last year's revenue figures, or will it end the year with revenue close to last year's level, given that our nine-month total revenue is INR 120 crore lower than the prior year? That was my first question. As for my second question, I will respond later, once I have the answer to this one.
Rajiv Mittal
executiveLook, you're just looking at the absolute numbers as they're declared. A moment ago, one of our friends posed this question about the two subsidiaries we've divested. You need to keep in mind that our figures ought to be viewed relative to those two divested subsidiaries, regarding which our CFO has stated that on an annual basis, their revenue will be roughly INR 200 crore. So if we achieve the same figure as last year, we have to recognize that we've delivered INR 200 crore additional. That's the only message I'd like you to take note of.
Omkar Jahagirdar
unknownSir, I just want to get a clearer picture here — is it that billing hasn’t happened yet, or would you say that execution on some of these projects has been slow, given that the order book has grown to almost INR 12,000 crore while previously we were bringing in INR 10,000 crore? Is there any particular reason for that, or is it, as you said earlier, that execution only kicks in after six months or nine months, a bit better than in the initial months?
Rajiv Mittal
executiveYes, exactly — you answered your own question there. This is the same point we went over earlier, when our friend raised it. Establishing the project takes roughly three to four months. As you correctly put it, the letter of credit and contract signing — these are multilateral projects. One is funded by JICA, and the other by the World Bank. The formalities that had to be completed are now finished. After that, the engineering work has to be carried out, since this is an EPC — engineering, procurement, and construction — order. So the E has to be done. Engineering must be completed: conceptual engineering, basic engineering, and detail engineering. Once the detail engineering gets approved, that creates the conditions for procurement and construction. For the two projects you mentioned, we have reached that point now. Some revenue growth will come from this project itself, but the actual step-up will occur starting in the next fiscal year.
Omkar Jahagirdar
unknownSo, are we confident that this year we'll beat the FY 2024 revenue figure, or will we end up close to last year's number?
Rajiv Mittal
executiveWhat I'm getting at is this: suppose we go with the second option you laid out, and we end up closing close to last year's figure — even then, we'd still have grown by INR 200 crore, since we divested two subsidiaries whose combined revenue came to INR 200 crore. Just bear that in mind.
Omkar Jahagirdar
unknownAll right, understood. Sir, moving on to my second quick question—
Operator
operatorI apologize for cutting in, sir. Since multiple participants are still waiting, could we ask you to rejoin the question queue for follow-up questions, please.
Omkar Jahagirdar
unknownAbsolutely, thank you.
Operator
operatorThanks. Our following question comes from Kaushik Poddar at KB Capital Markets. Go ahead, please.
Kaushik Poddar
analystYou mentioned just now that you've put in bids worth $1 billion, and that you plan to submit another $1 billion during the next quarter or thereabouts. So with that $2 billion in mind, what has your strike rate been historically?
Rajiv Mittal
executiveSo if you look at that international market in general, we're at roughly one in five or one in six. An average of about 15%-20% is fair to say.
Kaushik Poddar
analystAll right. If we use 20%, that comes to $400 million, which works out to roughly INR 3,200 crore. Will there be additional amounts the following year, or how does that look? Since your turnover this year will be around INR 3,000 crore, if I take that figure, then perhaps there won't be much growth next year — is that right?
Rajiv Mittal
executiveWhat makes you ask that? Our friend and I were just talking about how the projects we signed — those that moved from INR 8,000 crore to INR 10,000 crore, and from INR 10,000 crore to INR 12,000 crore — have truly gotten underway now, since the engineering work is finished. That alone is going to drive growth. Right? First point. Second point, the fresh orders that are set to come in will also drive growth during the second half of next fiscal year. This is an ongoing cycle: we win projects, we execute them, then we win more and execute those too. So for WABAG, growth is inevitable. You will see growth. The only thing in question is how large that growth will be. It remains to be seen — the pace of order intake and the pace of execution will set the pace of growth. Growth is inevitable.
Kaushik Poddar
analystAll right. Is it possible to speed things up to roughly 15% in the coming year? In other words, should we expect that 15% next year?
Rajiv Mittal
executiveWe can all look forward to it — there's no doubt about that. But we also need to stay realistic. You'll have to build your own models as well. Our long-standing belief is in offering a slightly conservative outlook so that we're able to beat it. So we'd prefer your outlook to be a bit conservative, which lets you end up with positive surprises.
Kaushik Poddar
analystAlright, thank you.
Operator
operatorThanks. We’ll take the next question from Axay Shah at KRIIS PMS. Your line is open.
Axay Shah
analystThanks, sir, for the chance to ask. So what I'd like to get clear is whether the EBITDA margin differs between an Indian project and an international one.
Rajiv Mittal
executiveYes, broadly speaking, the answer is yes. That’s why our Wriddhi strategy has concentrated on markets outside India. It’s also why we stated that MEA — the Middle East and Africa — will be our priority for FY 2025. The reason is that cash flows should be stronger, advanced technologies will be deployed, and EBITDA margins should improve. We’re also looking to take on more international projects by acting as an EP contractor instead of an EPC contractor where possible. In fact, the most recent order we announced is an EP order rather than an EPC order. So EP orders should deliver even better margins than EPC orders.
Axay Shah
analystRight, and sir, a few rivals in India are earning margins of 20%-25%. So is the technology different in their case, or is there another reason for that?
Rajiv Mittal
executiveI’ll leave that as it is — I don’t know. I think those companies are the ones you should ask, but that isn’t the market we’re in. Maybe they have some other clever reasons.
Axay Shah
analystAll right. Thanks, sir.
Operator
operatorThanks. Our next question comes from Rishikesh at RoboCapital. Please go ahead.
Rishikesh Oza
analystYeah, hi, and thanks for taking my question. I'd like to ask about the split between O&M and EPC, which right now sits at 18% and 82%. Looking ahead over the next two to three years, how do we expect that mix to shift?
Skandaprasad Seetharaman
executiveCould you say that again for me, please?
Rishikesh Oza
analystRight, of course. At present, the split between O&M and EPC sits at roughly 18% and 82%. Over the coming two to three years, how do we expect that mix to shift?
Skandaprasad Seetharaman
executiveThat figure has been provided to you, though what we're concentrating on right now is the 20/80 split — 20% O&M and 80% EPC. Down the road, we'd want that to shift to 22% and eventually reach 25% over a period of three to five years. Our aim is to keep enhancing the balance between O&M and EPC, since doing so delivers greater visibility for us, more predictability, improved cash flow, healthier margins, and reduced risk.
Rishikesh Oza
analystWhat are the EBITDA margins for both segments — for EPC and for O&Ms as well?
Skandaprasad Seetharaman
executiveWe've provided you with a rough average of about 14%, and that's what we're achieving. As you can see, EPC is going to come in at 12%-12.5%, while O&M will land at 15%-16%.
Rishikesh Oza
analystOne final question, if I may. You mentioned a bid pipeline that currently stands at $1 billion, and you're planning to bid another one. I just wanted to get a sense of how this number used to be, say, five years back. Just a broad sense, not an exact figure, but to get a broad sense.
Skandaprasad Seetharaman
executiveThat figure has to rise, since project ticket sizes are climbing steadily in India as well as globally. In earlier days, this number was considerably lower, and looking ahead, we expect those figures to climb even further.
Rishikesh Oza
analystAll right, thanks a lot.
Operator
operatorThanks. Our next question comes from Sachin Jain, an individual investor, who is on the line. Please go ahead.
Sachin Jain
unknownHi there. Hello, Rajiv. Appreciate the chance to ask. My question is this: water as an opportunity is really gaining a lot of momentum around the world. From what I understand, you have an order book of more than INR 12,000 crore, and you're expected to win plenty in MEA. If you were to paint the picture for the coming three to four years, qualitatively, how big do you think WABAG can become? I mean, without giving numbers, just broadly your aspiration, if I'm to decode how you see WABAG over the next five years.
Rajiv Mittal
executiveStrictly speaking, even at 10%-15% annual growth—the CAGR we'd anticipate achieving—we'd require something along the lines of an order book near INR 20,000 crore. Our top line ought to exceed INR 6,000 crore-INR 7,000 crore. That's where this company ought to stand: top line more than doubled, order books nearly doubled. Most crucially, as we expand, we're likewise observing—and you're observing—that when we take the right steps, our valuations expand too.
Sachin Jain
unknownOkay.
Rajiv Mittal
executiveIt's not just our top line and bottom line that are growing — our key multiples are growing too.
Sachin Jain
unknownSir, as you mentioned, if over time O&M as a share — say your goal of getting it to 25% — could that then bring EBITDA margins to around 18%-20%? Is that achievable with a mix like that?
Rajiv Mittal
executiveI believe I'd genuinely prefer to approach this the way you are, Sachin, but I'd rather not offer a comment. We'll proceed one step at a time instead of making quantum leaps. Our preference has always been to move a step at a time—observing how the market is evolving, how competition is evolving, what types of projects are emerging, what the customer's thinking process looks like—and to take a step at a time. Today, we moved from 8% to 10%, 12%. Today, we can declare 14%, 15%. I think over the last three to four years we have demonstrated how margins can grow. I trust we have a setup, and we have the right strategy in place to keep this growth momentum.
Sachin Jain
unknownAnd sir, one final question. Is there any project you didn't bid on but wanted to, because of some constraint? Are there any projects you didn't bid on, sir?
Rajiv Mittal
executiveYeah. There are a lot—a lot, a lot, a lot of them. Not just one. I couldn't even list them all. Plenty of projects we politely steer clear of. Anything that doesn't fit our strategy, doesn't fit our customers, doesn't fit plenty of other considerations—we choose to keep our distance. And you—
Sachin Jain
unknownNo, sir. What I'm asking about is the project that does meet your criteria, yet couldn't go ahead because of some constraint on your side. That's what I was trying to ask.
Rajiv Mittal
executiveNo, I think if it meets all our parameters — like they say in a marriage — so if we get everything, we would have gotten the project. Not only bid the project, we will win the project.
Sachin Jain
unknownSure. Basically, on our side there aren't any internal constraints — whether that's the balance sheet or anything else.
Rajiv Mittal
executiveAbsolutely not. As a pure play company, we currently hold one of the strongest balance sheets in the water sector. We face no problems whatsoever. Right now, we are a player that has been shortlisted and pre-qualified for desalination projects in Egypt exceeding 1,000 million liters per day. We are bidding on a 1,500 million liters per day sewer treatment plant in CIS countries. The size of a project is not a concern for us in the slightest, and our balance sheet can comfortably support this type of project. Over the last 25 years, we have shown that we grew from our internal approvals. We have not gone out and even generated funds. That is why, even if you read our credit rating, which just came out two days back, you will see that they agree with us that we have everything required. That is the reason they have given us a positive outlook — the company has all that is required for growth, and hence they have given us an A+ positive outlook.
Sachin Jain
unknownSure. Congratulations, sir. Best of luck. It's great to see the company at an inflection point. Wishing you all the best.
Rajiv Mittal
executiveThank you.
Operator
operatorThanks. Our next question comes from Hemant, who is an individual investor. Go right ahead.
Speaker
unknownHello there. Congrats on those strong results. Sir, I appreciate the chance to ask. I have two questions, really. First, we're going to set up 100 Bio-CNG plants, and that carries a revenue potential of about INR 200 million, correct? I just wanted to check: does the order book as it stands today leave out that INR 200 million potential from the 100 Bio-CNG plants?
Rajiv Mittal
executiveYes, absolutely. It's only an initiative that has been announced so far. No orders have been booked. That's what I said earlier when this question came up. We'd likely begin booking orders in a couple of quarters. After that, we'll start including those order values in our order book. Right now, this order book contains no value for those plants.
Speaker
unknownWhat kind of revenue are we going to be booking in FY 2025 from this contract?
Rajiv Mittal
executiveThis won't serve as a revenue driver. What it will be is a major bottom-line driver, a visibility driver, and most importantly, it's meant for a circular economy, a green economy, cutting greenhouse gases, and our contribution to sustainability. That's exactly what it will be. Naturally, there will be a top-line effect. There will be a bottom-line effect. It will generate cash. But most importantly, it will also bring plenty of other benefits to the globe at large and to society.
Speaker
unknownSir, how long would it take to get 100 Bio-CNG plants installed?
Rajiv Mittal
executiveTo start with, as I mentioned, the plan is to establish four to six plants during year one in order to prove out the concept. After that concept is proven, I think growth will take off dramatically — perhaps 20 or 25 plants annually — and across a five-year span, we could reach 100 plants.
Speaker
unknownAnd how many projects are we L1 on, then? Could you list those out for us, please?
Rajiv Mittal
executiveI won't mention L1, since that's how it gets assessed and all of that. What I'd call us is the preferred bidder on a couple of projects, and those are probably going to be awarded within the next three to four months.
Speaker
unknownWould you mind putting a number on that, sir?
Rajiv Mittal
executiveWhat's the order count?
Speaker
unknownIn terms of revenue, what that number is.
Rajiv Mittal
executiveThe figure comes to roughly $100 million.
Speaker
unknownOne hundred million dollars. All right, thank you.
Operator
operatorThanks. Our following question comes from Sriharsha KJ, an individual investor, on the line. You may proceed.
Sriharsha KJ
unknownHello. Sir, this concerns the outlook for the Russian market. On a few earlier conference calls, you mentioned the huge opportunities that exist in Russia for desalination projects. Yet up to now, we have not received a single order from that market. Looking ahead, what are the prospects there in Russia?
Rajiv Mittal
executiveI believe everyone needs to be extremely cautious here. As a global player, we're seeing sanctions grow stronger and stronger, and many of these products originate in our developed world—and even on the client side, they're a bit slow when it comes to awarding. We're also somewhat slow in developing this project until we can see some future in it, and the sanctions are being a little lenient. Right now, I'd say we're a bit slow on taking any orders, and clients are also somewhat cautious about awarding, since many of the products required for desalination come from the advanced European and U.S. markets.
Sriharsha KJ
unknownAlright, thank you sir. One more question: back in January of this year, Mumbai put out some tenders for its desalination project. Did you file a bid for that project, and do you think it will be awarded?
Rajiv Mittal
executiveWhether that project gets awarded isn’t something I’d comment on. Only the Mumbai or Maharashtra government can make that announcement. As of today, we haven’t submitted, since these were Swiss auction projects, and we don’t want to get involved until we’re clear that they intend to consider alternative contractors for the Swiss auction. We’ll probably take a call after the election.
Sriharsha KJ
unknownAlright, sir. Appreciate it, sir.
Operator
operatorThanks. Our next question comes from Prashantkumar Hazariwala, who is an individual investor. Please go ahead.
Prashantkumar Hazariwala
unknownHello there, and good evening, sir. What I'd like to ask is this: how many facilities are we planning to put in at our locations — can this Bio-CNG plant be set up at the sites we're already operating?
Rajiv Mittal
executiveWe do have certain projects at our own sites, and our initial plan is to put the plant in there, since that route will let us show this concept in the quickest and least expensive way. Selling the concept itself needs to happen first, and that is exactly what, as I mentioned earlier, we will do during the first year by demonstrating the straightforward ones, which sit mostly at sites we already operate, and that will come to roughly four to six within the coming one year.
Prashantkumar Hazariwala
unknownOkay. So how much revenue might that bring in? Do you have any rough figure for those four or five sites?
Rajiv Mittal
executiveCould you repeat that? What are we able to get?
Prashantkumar Hazariwala
unknownWhat sort of revenue might we be able to generate from those four, five sites? Just a ballpark figure, if you have one.
Rajiv Mittal
executiveNot much, really. Like I mentioned, you're looking at roughly a couple of million on average for each site, even across six plants. It could come to around $15 million.
Prashantkumar Hazariwala
unknown$15 million. Okay, so what sort of cost is that going to carry?
Rajiv Mittal
executiveWhat type of cost are we talking about?
Prashantkumar Hazariwala
unknownWhat type of corpus is required for us to carry out this sort of plant?
Rajiv Mittal
executiveThe cost is going to come to $15 million, and after that, revenue will hinge on how effectively we can market this CNG or compressed biogas as a fuel — that's the income we'll be bringing in annually across the following 20 to 25 years.
Prashantkumar Hazariwala
unknownOkay, sounds good. Thanks a lot.
Rajiv Mittal
executiveI appreciate that.
Operator
operatorThanks. We’ll take the next question from Tej Patel at Niveshaay Investment. Your line is open—please proceed.
Tej Patel
analystHi there, can everyone hear me okay?
Rajiv Mittal
executiveYeah.
Tej Patel
analystYeah. Thanks a lot for giving me the chance. My question comes from a broad perspective — we've seen our margins go up from 8%-9% over the past few quarters, moving from 12%-14%. What are the main factors behind that? Is it a shift in product mix, such as the EPC? Is it a shift in geographic mix, or some other cause? That's my first question.
Skandaprasad Seetharaman
executiveTej, it's really a mix of every one of those factors you brought up, and that fits with our overall strategy. We're pursuing additional EP projects, pursuing additional industrial projects, expanding further internationally, strengthening our O&M base, handling cash more effectively, getting to net cash positive, and managing our borrowing rates. Each of these has played a role in both the profitable EBITDA growth and the PAT growth.
Tej Patel
analystUnderstood, sir. Just one more question. Sir, if I look at some of the projects that only involve constructing sewer networks, right? We've taken on those projects in the past as well. There are other projects that only involve undertaking the creation of the STPs and the WTPs. I just wanted to understand what the margin difference would be between, let's say, sewer network projects and then an EPC designing project for an STP?
Skandaprasad Seetharaman
executiveEvery project has its own characteristics. And more importantly, networks alone aren't what we construct. That isn't the business we're in. Our focus is fundamentally on treatment plants. A network may come along as an accessory, but it can't sit at the core of what we do. Our role will be that of a technology and process contractor, rather than a civil contractor. Nor will we be one as well. On margin profiles, we're probably not in a position to comment, since we don't operate in the civil network space.
Tej Patel
analystUnderstood, sir. That's not a problem at all. Many thanks, sir.
Skandaprasad Seetharaman
executiveAppreciate it.
Operator
operatorThanks. Our following question comes from Arkopratim Pal, who is on the line with Sanjay Agarwal Broking. Go ahead, please.
Arkopratim Pal
analystGood evening, everyone. Can everyone hear me okay?
Skandaprasad Seetharaman
executiveYes. Could you speak up a bit?
Arkopratim Pal
analystYes, of course. Can you hear me at this point?
Skandaprasad Seetharaman
executiveImproved.
Arkopratim Pal
analystRight, and to start, congratulations on that strong figure. Most of what I wanted to ask has already been covered. I just had one point on that. Assuming the project stays as it is, we should certainly see better profitability. Do you expect that we'll continue receiving overseas orders going forward, so that the margin stays at a higher level? Previously our margin stood at 8%, 9%, and 10%, whereas today it's very good at 12%, 13% or 14%. Do you think that margin can be sustained over the next six months and in the near future as well?
Skandaprasad Seetharaman
executiveLook, we're still sticking with the same strategy — concentrating on EP industrial and international projects, and bringing O&M into the mix as well — and that's exactly how the margin profile has gotten better over the years, as you correctly pointed out. We stay fully committed to that strategy, so I don't see any reason the margin would come in any differently. If anything, as time goes on, all we'll be aiming to do is push it higher through better products.
Arkopratim Pal
analystAll right, okay. And I'm also just trying to get a handle on this — say we look at the Chennai project, where you recently landed a sizable win. How does that split between EPC and O&M?
Skandaprasad Seetharaman
executiveLook, what we have here is a composite bid. Any time you have to carry out a DBO — a design build operate project — that's what a composite bid is. What you need to deliver is the most effective life cycle cost. Winning isn't just about EPC or O&M, since this particular bid involved 42 months of construction plus 20 years of maintenance. So it's a composite bid, one where a life cycle evaluation gets done, and that's the basis on which it's assessed — from both a price and a technical standpoint.
Arkopratim Pal
analystAll right. Thanks, sir. Thanks. And again, many congratulations to you.
Skandaprasad Seetharaman
executiveThank you.
Operator
operatorThanks. We’ll take the next question from Akash Pawar at Sahasrar Capital. Go ahead, please.
Akash Pawar
analystHi there, can everyone hear me okay?
Skandaprasad Seetharaman
executiveCorrect, that's right.
Akash Pawar
analystYeah, I just had a couple of questions. In a recent interview, you mentioned growing your order book by around 15%-20% over the next couple of years. I just wanted to understand what the base is that we're talking about here. Are we talking about YoY growth on the FY 2023 orders, the closing order book? Or is it on the current order book that we have?
Skandaprasad Seetharaman
executiveRight now, our order book sits at roughly INR 12,000 crore, and that's the level we're going to aim to keep expanding — not only across a single year, but I'd say over a period that amounts to a CAGR. The growth range we're discussing spans three to five years. Given how bullish the market is, and the bullish sentiment across the sectors where we operate, that's the CAGR growth we anticipate.
Akash Pawar
analystAlright. The following part dealt with the problem of groundwater being depleted. I simply wanted to get a sense of how large an opportunity recharging groundwater represents for us.
Skandaprasad Seetharaman
executiveLook, this is going to be enormous. In particular, we've already proven it in Chennai. There's a recycling facility that we built and are running. We're putting up a recycling plant in Ghaziabad for exactly that purpose, where industries will consume the water. And it isn't limited to India — even in overseas markets, this is growing more and more common, with sewage or wastewater ceasing to be waste and becoming an economic resource instead. That's going to be crucial. As we've said before, there are 3 main sectors we intend to focus on as a product. Desalination, which is high technology; recycle reuse, which adds to the circular economy; and industrial and international projects, which let us roll out advanced technology and establish key references in the oil and gas sector around the world. This is going to be a really strong opportunity.
Akash Pawar
analystAlright, thanks.
Operator
operatorThanks. Our next question comes from Ramanuj Chandak at Chandak Brothers. The line is yours — go ahead.
Ramanuj Chandak
analystGood afternoon, sir. Can you hear me okay?
Skandaprasad Seetharaman
executiveCorrect.
Ramanuj Chandak
analystAlright, two questions from me. First, given how China is becoming more aggressive and political tensions are escalating on account of China, do any of our suppliers come from China, and what's the situation with WABAG's subsidiary there? Are we exposed to China in any way? My second question: you've formed a partnership with Peak Sustainability Ventures for 100 biogas plants. Who are the target customers, and to whom will that biogas be sold?
Skandaprasad Seetharaman
executiveLet me start with your second question. In terms of biogas, the facilities involved will be the treatment plants we already have, plus organic waste from a range of other sources, which will be used to generate biogas. The customer could be anyone wanting Bio-CNG as a fuel. Compressed biogas can be fed into the pipeline. We keep seeing more and more off-takers. Customers are not in short supply there. What is in short supply is people capable of building high-quality plants that recover biogas well. I believe your other question concerned China. We are an international organization. A substantial portion of our business also involves exporting from India, and we purchase from various European vendors whenever we operate internationally. We have no dependency on China as such. In fact, most vendors would be international vendors, along with Indian vendors of very high quality. There is no dependence on China.
Ramanuj Chandak
analystRegarding biogas, sir — will it be sold in cylinders, or would it be distributed some other way? As we've observed, a lot of biogas projects across India have failed in the past, largely because they can't locate buyers.
Rajiv Mittal
executiveI apologize — could you speak up just a bit? That way we can hear your question clearly and give you an answer.
Ramanuj Chandak
analystSir, honestly, in the past we've observed quite a few biogas plants at small and medium scale. The reason they failed is that they couldn't locate customers who would purchase their biogas. So what medium will you use to sell this biogas? Will cylinders be the channel, will it be pipelines, or something else?
Rajiv Mittal
executiveWe’ve seen this work, and our track record over the last 20 years is very strong. We’ve built biogas plants ourselves, and we’ve used most of that biogas for our captive projects to generate electricity—and with that electricity, we’ve run the plant instead of drawing power from the grid. We have a very successful record with this approach. What we’re discussing now is moving higher up in the value chain.
Ramanuj Chandak
analystYes.
Rajiv Mittal
executiveRather than combusting it in generators to produce power, our intention is to turn it into CNG, which carries considerably greater value compared with electricity, and doing so would require only minimal biogas purification. From what we've seen, at minimum none of the facilities we operate has ever come up short on this, and we're highly confident in our ability to create value.
Ramanuj Chandak
analystSir, how much does biogas cost per kilo compared with LPG? And what's the price on the market right now?
Rajiv Mittal
executiveThose two should be quite similar, since biogas is essentially compressed natural gas. And natural gas—what is it? Methane. That's exactly what biogas consists of: methane. So the two are the same.
Ramanuj Chandak
analystAlright. Sir, what does biogas cost per kilogram right now? Do you have a rough estimate for India?
Rajiv Mittal
executiveThat really comes down to the application. Boilers are one place it gets used. Another is producing electricity. And it also serves as fuel for vehicles. On the vehicle fueling side, I think you can look at any fuel station and see what biogas costs for fueling vehicles. That figure is the price as it stands today.
Ramanuj Chandak
analystRight, so what criteria are you using when deciding where to put a Bio-CNG plant — I mean, what types of areas would you choose for one?
Rajiv Mittal
executiveWe've addressed this previously: for existing assets, our estimate comes to roughly $2 million-$2.5 million for each plant. Naturally, that depends on how large the plant is. Should we need to build a new asset, the figure would be $4 million-$5 million.
Ramanuj Chandak
analystOne final question. Suppose China also invades Taiwan, which it has been saying for a long time. Let's say Chinese companies are out of this market. Would WABAG benefit from that directly?
Rajiv Mittal
executiveApologies, we can't hear you clearly. Please move nearer to your microphone and talk.
Ramanuj Chandak
analystSir, suppose we say—
Rajiv Mittal
executiveJust direct your comments to the speaker, please.
Ramanuj Chandak
analystOkay, sir, China has repeatedly stated over time that it will invade Taiwan. Let's suppose China truly does invade Taiwan. Would that generate a lot of opportunities for WABAG, or would it not make much of a difference?
Rajiv Mittal
executiveThe impact won't be significant, since we operate on a worldwide basis and we're already seeing plenty of opportunities. Gaining a single additional opportunity isn't going to change much for us.
Ramanuj Chandak
analystThank you very much, sir. I really appreciate it.
Operator
operatorThanks. Our next question comes from Faisal Duber at HD Hava and Company. Go ahead, please. I'm sorry, we can't hear you.
Rajiv Mittal
executiveMr. Faisal, we can't hear you.
Operator
operatorSince the participant hasn’t responded, we’ll treat that as the final question. Because of the time limit, this will be the last question. At this point, I’d like to turn the conference over to Mr. Rajiv Mittal for closing remarks.
Rajiv Mittal
executiveThanks, everyone, for joining us so actively on this Q3 and nine months FY 2024 earnings call. The analyst presentation is now up on our website. Should you have any additional questions, you can reach out to our IR advisors at Adfactors, or feel free to contact us directly. Thanks again, and here's hoping the next century turns out even more remarkable than the last one. Bye-bye.
Operator
operatorThanks. That brings us to the end of this conference on behalf of VA Tech WABAG Limited. We appreciate your participation, and you can go ahead and disconnect your lines now. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete VA Tech Wabag Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to VA Tech Wabag Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in VA Tech Wabag Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.