Vishay Intertechnology, Inc. (VSH) Earnings Call Transcript & Summary

May 8, 2024

New York Stock Exchange US Information Technology Electronic Equipment, Instruments and Components earnings 42 min

Earnings Call Speaker Segments

Peter Henrici

executive
#1

Appreciate that, Livia. Greetings, everyone, and thanks for joining us for Vishay Intertechnology's first-quarter 2024 earnings call. Here with me are Joel Smejkal, who serves as our President and Chief Executive Officer, and Dave McConnell, our Chief Financial Officer. Earlier today, we shared the results for our first quarter. You can find a copy of the earnings release in the investor relations area of our site at ir.vishay.com. This call is streaming live online and is reachable through our website. Also, a recording of today's call is being made and can be replayed on our site. Throughout the call, we'll reference a slide presentation, which we've also made available at ir.vishay.com. Please note that on today's conference call, we'll be providing certain forward-looking statements addressing future events and performance. Such statements carry risks and uncertainties that might lead actual results to diverge from those forward-looking statements; to review factors that might lead results to diverge, kindly refer to today's press release along with Vishay's Form 10-K and Form 10-Q filings with the Securities and Exchange Commission. Our press release and this conference call include information on various GAAP and non-GAAP measures. A complete GAAP to non-GAAP reconciliation appears in our press release, and also in the presentation posted at ir.vishay.com, which we think you'll find helpful when comparing our GAAP and non-GAAP results; we rely on non-GAAP measures since we believe they offer useful insight into how our businesses are performing and ought to be reviewed by investors alongside GAAP measures. At this point, I'll hand the call over to our President and Chief Executive Officer, Joel Smejkal.

Joel Smejkal

executive
#2

Thanks, Peter, and good morning to all of you. I appreciate you being on our Q1 2024 earnings call. On slide three, I'll begin my comments by reviewing how demand trended during the Q1 across end market, channel, and region. Dave will then walk everyone through the key points on our financial results and the guidance we're giving for the Q2 of 2024. Following that, I'll close with a look at our initiatives and goals for 2024, and afterward we'll gladly take whatever questions you have. For the Q1, our reported revenue came in at $746.3 million, a bit above the midpoint of the guidance range we provided, $715 million to $775 million. The inventory digestion that started weighing on demand in the prior quarter carried over into the Q1, and sequentially our revenue dropped 5%. Relative to passives, a bigger share of that excess inventory sits in semiconductor products. That said, as I noted last February, we anticipated that certain end markets would recover earlier, aerospace and defense in particular, and indeed that is exactly what occurred, with growth on both a year-over-year and quarter-over-quarter basis. Let's turn now to a closer examination of revenue by market segment, shown on the left side of slide three. Automotive, still the biggest source of total revenue, was down modestly by 0.7%, mainly because of adjustment and also because new annual contracts with OEMs and Tier 1s took effect on January 1. Demand from EV programs softened across most regions, whereas orders for hybrids and internal combustion engines are holding steady to rising. Whatever powertrain mix our customers choose, Vishay is well-positioned to serve their needs. Against the Q1 of last year, our automotive revenue rose 1%. Design activity and design wins in automotive kept growing and stayed concentrated on ADAS and e-mobility, including battery management systems, traction inverters, and onboard chargers. Even though current and near-term EV demand has moderated somewhat, automotive OEMs and Tier 1s are engaging with us more closely in design and technology capability discussions for their next generation EV projects. We show an 8% increase year-over-year in new design engagements with OEMs, plus multiple silicon carbide design discussions with potential new OEMs. Revenue from industrial customers, our second-largest revenue contributor, fell 6.2% from the Q4 and 23.9% versus last year's Q1, again the result of continued inventory digestion, primarily in semiconductors. Demand stayed weak in Asia, affected by the ongoing economic uncertainties in China. Europe and the Americas remained sluggish, and customers kept digesting inventory. Even though revenue was soft in the quarter, we saw improvement in infrastructure projects and renewable projects, where Vishay has high passive component count and some sole source positions; it should be noted, in the Q1, we received a sizable order from a European industrial customer for the grid. The order in the Q1 for one of our large capacitors was $77 million. This is a multi-year program with this customer. The commitment at this point is $145 million. This initiative is going to meet what they need from 2024 to 2027, and there is a bit of additional opportunity they bring. On the industrial side, design work keeps coming in at a healthy pace, up 22% from Q1 a year ago, and redesigning smart grid infrastructure plus industrial automation stay the top priorities for our customers everywhere, together with renewable energy generation and energy storage. Over in aerospace and defense, our revenue was up 13.6% from the Q4 and 34.2% from a year ago. Demand remains robust in commercial aviation and among weapons system contractors in the Americas and Europe, where munitions are being restocked and output of new weapon systems and communication systems keeps ramping. Because Vishay appears on the United States Department of Defense Qualified Parts List, we are very well positioned to keep growing in this market, since OEM and EMS companies need those products for their military-qualified builds. With book-to-bill above one when the quarter closed and customers asking for expedited delivery, we anticipate this market segment's demand will get stronger across 2024. Medical customer revenue dropped 4.3% from the Q4 and 18.3% from a year ago, with demand going back to more normalized levels. Design work stays strong around remote monitoring equipment and implantable devices. Our other market segments — computing, telecom, and consumer — saw revenue fall both sequentially and year-over-year, by 21.9% and 40.5%, respectively, which mirrors continuing semiconductor inventory digestion along with some pricing pressure. Telecom and consumer stayed weak, but computing picked up in Asia thanks to demand for AI servers and notebooks as the next computer upgrade cycle gets underway. Computing design activity is 21% higher year-over-year, fueled by AI server demand aimed at high-speed data transmission, accelerator cards, power management systems, and also standard data center servers. Now to our channel sales. OEM revenue dropped 6% from the Q4 and came in 7.8% under last year's Q1. Q1 demand, much like the Q4, had some automotive and industrial OEMs digesting inventory further, and new pricing took effect for annual contract customers. Customers say they still have inventory to work through for certain products, and short lead times mean they don't need to commit to long-term orders. EMS revenue rose 2.1% sequentially but fell 16.5% year-over-year, since those EMS customers serving aerospace and defense and automotive markets posted gains. For certain customers, though, the need to restock is minimal, given lead times are manageable in every region. Distribution revenue in the Q1 was down 4.9% from the Q4 and 18.8% under last year, as customers across all regions kept digesting semiconductor inventory. Distribution inventory globally was unchanged from the prior quarter at 26 weeks. POS worldwide was unchanged as well. That said, flat POS worldwide hid a 3.9% gain in the Americas, which shows strong sell-through of passives to aerospace and defense customers. According to what our customers tell us, we still anticipate the inventory correction lasting through the Q2, with recovery in the second half of the year driven by passives. For our passive components, the book-to-bill ratio is crossing into positive ground, with the strongest showing coming from aerospace, defense, and related markets. We're also seeing better booking trends in certain industrial end markets as well as in computing. On the semiconductor side, book-to-bill kept trailing what we see in passives, and that rebound will probably carry over into Q3. Last, through the quarter we kept pushing forward on our effort to build closer ties with our distributors, and our added capacity will let us supply what they need dependably across every market cycle. Leaders from our business units have gone out to visit the distributors. A number of these were first-time meetings, while others were return visits aimed at shoring up and enhancing Vishay's standing on distributor shelves through the addition of SKUs. Every one of these meetings has been informative and has generated a long list of action items... Before I hand things over to Dave, I want to say how deeply grateful I am to each and every Vishay employee for the ongoing energy and eagerness they bring to the changes happening across our company, for their dedication to converting our future potential into something real, and for the way they are collectively building Vishay 3.0. At this point I'll pass the call to Dave so he can walk us through our financials.

Dave McConnell

executive
#3

Thanks, Joel. Morning, everyone. We'll begin going over the first-quarter results by looking at the highlights found on slide 4. Revenue for Q1 came in at $746.3 million, which includes $3 million tied to the Newport acquisition we just wrapped up, and that figure sits inside the guidance range we gave. Sales fell 5% versus Q4, which came from a 3% drop in volume plus a 2.5% decline in ASPs. The bulk of that volume and ASP decline happened in our semiconductor business segments, which mirrors soft demand that continues in industrial end markets along with persistent pricing pressure in the distribution and EMS channels. Looking at reportable business segments, the $9 million revenue decline was mostly driven by MOSFETs and diodes, with each falling roughly 9% from the prior quarter, then opto and resistors, which were down 9% and 5%, respectively. Those declines got partly offset by revenue growth in inductors and capacitors. Versus Q1 of last year, revenue dropped 14.3%, which came from an 11.8% volume decline and a 3.6% ASP decrease. When the quarter closed, book-to-bill at Vishay stood at 0.82, made up of 0.73 for semis and 0.91 for passives. Total Vishay backlog was 5.0 months, versus 5.3 months when the previous quarter ended. If we look at the quarter-over-quarter backlog comparison by product category, semis backlog was 5.0 months versus 5.3 months, while passives backlog was 5.1 months versus 5.4 months. Moving to the following slide, which shows income statement highlights. Gross profit, including the Newport acquisition's impact, reached $170.4 million. Gross margin came in at 22.8%, and that figure absorbed a negative 74 basis point effect from Newport. Depreciation expense within gross profit for the quarter was $43.8 million. Versus Q4, gross margin fell mainly because of the lower volumes and ASPs I mentioned earlier, especially in MOSFETs, plus the negative margin effect from Newport. SG&A expenses totaled $127.7 million, versus $122.8 million in Q4. Operating income fell $35.2 million against Q4 because gross profit was lower. Versus prior year Q1, operating income declined to $115.9 million, pushed by lower sales volumes and, to a smaller degree, greater SG&A expenses. Operating margin was 5.7%, versus 9.9% in Q4 and 18.2% in Q1 of 2023. EBITDA for the quarter was $91.2 million, giving an EBITDA margin of 12.2%. Our normalized effective tax rate for the quarter was 29%. EPS came to $0.22 per share; that compares with EPS of $0.37 per share in Q4 and $0.79 per share in Q1 of 2023. Moving to slide 6, for easy reference, the presentation has a table showing revenue, gross margin, and book-to-bill ratios for every one of our reportable business segments. Turning to slide 7, we show our cash conversion cycle metrics. DSO was 51 days, one day above Q4, while DPO stayed flat at 31 days. At quarter's close, inventory stood at $665.8 million, which included roughly $11 million tied to Newport. We saw 104 days of inventory outstanding versus 101 days in the Q4, which brought the Q1 cash conversion cycle to 124 days. Slide eight shows cash flow from operations totaling $80.2 million for the Q1. Keep in mind that the Q4 figure was unusually low, a result of withholding tax payments on cash repatriation transactions. Relative to the Q1 of 2023, cash flow from operations came in lower, mostly because of reduced earnings. CapEx for the quarter reached $53.1 million, and $41.5 million of that went toward capacity expansion projects. Looking at a trailing twelve-month basis, capital intensity was 10.3% versus 9.5% during the same period a year ago. Free cash flow this quarter was $27.9 million, which contrasts with a significant use of free cash in the Q4 tied to elevated CapEx levels and taxes paid for cash repatriation. Stockholder returns in the Q1 came to $26.3 million, split between $13.8 million from our quarterly dividend and $12.5 million of share repurchases. During the quarter, we bought back 0.6 million shares at an average price of $22.17 per share. For 2024, our expectation remains to return no less than $100 million to shareholders. Cash and short-term investments fell to $833 million by quarter's end, after we used $168.6 million of cash on hand to fund the Newport acquisition. At the close of the quarter, we hold approximately $82 million of cash on hand in the U.S. Now to slide nine for our guidance. For the Q2 of 2024, we anticipate revenues of $750 million ± $20 million. Gross margin should land in the range of 21.7% ± 50 basis points. The Newport acquisition creates a drag of approximately 160 basis points on gross margin. We expect SG&A expenses of $130 million ±$2 million for the quarter, and $527 million ±$5 million for the full year. Our year, SG&A guidance includes the addition of approximately $8.7 million related to Newport, which is offset by adjustments to our planned 2024 spending, including lower headcount, freezes on hiring and salary increases, as well as non-discretionary travel; for 2024, we anticipate a normalized effective tax rate of approximately 29%-31%. Okay, I'll turn the call back over to Joel.

Joel Smejkal

executive
#4

Thanks, Dave. During the Investor Day that took place on April 2nd, we discussed how we must grow our capacity so we can be a dependable source of supply for a growing number of customers, and also bring in new ones. Based on what we hear while traveling and communicating with customers, it's obvious they expect more from Vishay. As our relationships with customers go deeper, expanding capacity is one piece that lets us scale up and back their growth. The second piece is our pledge to innovate and deliver products that align with where their technology is headed in the mega trends of e-mobility and sustainability. So that we can honor what we've promised customers, speed up revenue growth, generate stronger returns, and serve our addressable market more broadly while enlarging our product portfolio, we are carrying out a five-year strategic plan, activating the eight levers shown on slide 10. Growing capacity stands as one foundation of that growth plan. On the first earnings conference call, in February 2023, I told everyone that we intend to put $1.2 billion of CapEx in over three years, with 70% of that designated for expanding internal capacity. When we acquired Newport Fab in March 2024, we tacked $200 million onto our three-year CapEx plan. Later, as our COO Jeff Webster laid out in detail at the Investor Day, our five-year strategic growth plan calls for investing $2.6 billion in total across 2023 and 2028. For 2024, our plan is to spend $435 million on CapEx, and roughly 7% of that goes toward expansion projects, which should come online in 2025. The capacity expansion investments from 2022 and 2023 have arrived and are in qualification. Now I want to walk you through how five of our expansion projects are progressing. Number one concerns expanding internal capacity. In La Laguna, Mexico, we commercially qualified inductors and started shipping products in Q1 2024. Automotive qualification is in progress, set to finish in the second half of 2024. Customers are visiting and booking audits. You may recall that this site doubles our capacity for the inductor portfolio, the power inductors. For 2024, we anticipate a capacity increase of 15%. In Juarez, Mexico, we commercially qualified the resistors, the current sense resistors, and shipped product during the Q1. Some automotive qualified products are going out now, and a schedule of customer audits will keep coming through. This expansion likewise doubles our capacity. We anticipate annualized capacity rising 15% in 2024. In Taipei, Taiwan, we are commercially qualifying our diodes and expect shipments to start in Q3 2024, while automotive qualifications there keep moving forward. We anticipate annualized capacity rising 5.5% in 2024. Still, larger capacity expansions will occur on select key products, in the range of 32%. In Turin, Italy, because the government delayed environmental approval, we now expect to ship commercially qualified diodes and wrap up automotive qualification early in 2025. And fifth, finally, is Newport. Regarding the fab, we assumed operational control on March 6th. At present, we're executing five technology transfers — three involving MOSFETs, one for opto, and one for resistors. December saw the ordering of 80% of the tools, while the remaining tools we require will be ordered this month, in May. Qualification of the product transfers is set to start in Q4 and carry over into the first half of 2025. Should we turn to external capacity expansion, that would be Key Foundry, Korea. During 2024, our plan is to finish six technology transfers covering MOSFETs and ICs. Two of these technologies are automotive products, whereas four are commercial transfers. We anticipate engineering samples being ready for these six technologies in Q3 2024 and Q4 2024; we anticipate finishing manufacturing qualification in Q4 2024 and Q1 2025, and starting volume shipments in Q2 of 2025. Our aim is to boost annualized MOSFET capacity by 11% in 2025 versus 2024, including an 18% capacity rise for the split gate products, charge balance products where we have underserved the market. As a reminder, this Key Foundry fab represents an intermediate step in raising our capacity while we finish the 12-inch fab addition, located in Itzehoe, Germany, slated for 2026 and early 2027. Turning also to external capacity, throughout Q1, we brought on three subcontractors for passives and one for semiconductors; beyond expanding capacity for certain commodity products, we're likewise introducing new products into our portfolio provided by these subcontractors. For 2024, we established goals for external capacity usage on our journey toward hitting our 2028 targets. We anticipate producing 3% of revenue from outsourced passives in 2024 as we keep qualifying suppliers. We anticipate 41.5% semiconductor production from outsourced wafer fabs in 2024. We anticipate 27.4% semiconductor production from outside assembly in 2024. Moving now to innovation and speaking of silicon carbide, the 1200 V planar technology, we remain on track. We gave samples in the first half of last year to customers, and now the silicon carbide package types for three distinct resistance and current capabilities will be available within the next couple of weeks. They will appear on our website and be released. Development of the 1200 V trench technology, the 1700 V planar, and the 650 V planar technology is taking somewhat longer than we'd prefer, since our foundry partner is presently heavily loaded with silicon carbide demand. This highlights the significance and the reason we're eager to shift the development of these technologies to Newport in 2025 and 2026. Speaking of Newport, the site itself, activities are starting this quarter owing to the given priorities — first qualifying and transferring the silicon technologies so we can commence activities. The tools we mentioned were ordered with a delivery timeline of late Q4 2024 and early Q1 2025, the tools for starting silicon carbide qualification, the process development. Taking into account each of those efforts—our in-house capability, capacity from outside partners, the subcontracting work, what we're doing with silicon carbide technology, plus the Newport expansion—all of it is already moving forward during 2024. Our aim is to have these pieces in place so we can assist the customer as they scale up. That's what the 3.0 strategy is about. To wrap up, the strides we're making under Vishay 3.0 have us enthusiastic. Whether it's building out factories, connecting with customers, growing our part number count, or pursuing innovation, every one of these is trending positively. We're using this flat market as a chance to put money into capacity that helps us catch up and to sharpen how people see us as a dependable supplier. That way, when demand picks up—driven by e-mobility and sustainability trends—we'll be completely ready. That wraps up what we had prepared. At this point, we're glad to take whatever questions you have. Livia, please bring us the first one.

Matt Sheerin

analyst
#5

Yes, thanks, and good morning to all of you. To start, I'd like to ask about the gross margin guidance and what framework we ought to use for it as the year progresses and sequential growth begins to appear with the cycle recovering. Normally, on volume growth you contribute an incremental margin of about 45%, though there are headwinds from Newport, plus, as I see it, additional capacity and greater depreciation; so what framework should we use for gross margins over the coming quarters?

Dave McConnell

executive
#6

... Matt, this is Dave. So our expectation, I believe, is that the second half will come in ahead of the first half, mostly because of higher demand from aerospace, defense, and automotive. For the remainder of the year, we expect ASPs to stay fairly stable, given that the OEM contracts were already locked in during quarter one. The problem, same as everyone else, is that right now we have limited visibility on volume.

Matt Sheerin

analyst
#7

All right, but then, say, when it comes to volume, are there any additional effects besides Newport or anything like that? Or has it really reached the point where it's simply about volume returning?

Dave McConnell

executive
#8

That's right, only volume.

Matt Sheerin

analyst
#9

All right. Then regarding average selling prices, it appeared as though ASP decline was bigger during this quarter. Can you give us more detail on MOSFETs and semis compared with passives, plus what should we expect? It sounds as if you're telling us conditions have steadied, yet it seemed we were witnessing additional pricing strain.

Joel Smejkal

executive
#10

Yes, pricing strain. The stock sitting in the channel—be it the distributor, the EMS, or the OEM—everyone is attempting to clear that stock. Utilization of capacity at us and at competitors runs in the mid 50%, 60% based on what we've observed. So there's an effort to shift inventory. Some price pressure exists, along with ship and debits, to get that inventory moved through. That is something we see. The ASPs during Q1 were roughly tied to the contract, the annual agreements we hold with a number of our strategic accounts; that likewise had an effect on Q1, though the bulk of it came from price pressure on the semiconductors.

Dave McConnell

executive
#11

On the semis

Joel Smejkal

executive
#12

On MOSFETs and diodes.

Matt Sheerin

analyst
#13

All right. So what's making you feel like things have leveled off at this point? Does that come from the deals you're looking at with your customers, or something else?

Joel Smejkal

executive
#14

It comes from the deals themselves. Those yearly contracts are already locked in. Given those big customers holding yearly contracts, I don't anticipate any further changes. Ship and debit could keep going somewhat longer on the semiconductor side, though far less so with passives. Channel stock levels for passives aren't too high, which means passives are pretty steady. Semis will face a few spot-related pressures, but nothing that strikes us as overdone.

Matt Sheerin

analyst
#15

Alright, Matt, that's all I had. Appreciate it.

Joel Smejkal

executive
#16

Thank you, Matt.

Dave McConnell

executive
#17

Thanks, Dave.

Ruplu Bhattacharya

analyst
#18

Hi, thanks for taking my questions. Joel, distribution inventory stood at 26 weeks. What do you see as the new normal for weeks of inventory at distribution? I know you were looking to add some of your product lines at, at distribution; and the second part of that is, how many additional quarters of inventory correction do you anticipate? I think you mentioned that you expect some improvement in the second half, but is that more a Q4 expectation? I mean, do you think it's only one more quarter of inventory correction, or could it be extending into Q3 as well?

Joel Smejkal

executive
#19

All right. Around 26 weeks is roughly the level we're looking at. You might recall from earlier calls that we were deliberately building up inventory. We kept adding SKUs, and we've carried on doing so. We basically indicated 26 weeks would be something like a ceiling, and that's the position we're in now. Order rates from the distributors have been adjusted, so the backlog today looks more like a just-in-time form of supply rather than stocking. SKUs are still being added, so I'd say right now, 26 weeks is where we ought to be. As POS rises, there's a bit of worry that inventory could get deplenished, depleted quickly. Regarding the quarters of inventory correcting passives, I believe we feel pretty good; it will carry through Q2, and after that, in the second half of the year, passives will be moving toward a more normalized trend; even so, we anticipate POS going up. When it comes to semis, I think that extends past Q2, it will reach into Q3, and then we believe Q4 could be the quarter in which semi inventory gets digested, we're closer to par with the OEMs, and this inventory digestion wraps up.

Ruplu Bhattacharya

analyst
#20

All right, I appreciate that. Thank you for the specifics. Let me pose a few questions to Dave. Dave, it's good to talk with you during this call.

Dave McConnell

executive
#21

Thanks.

Ruplu Bhattacharya

analyst
#22

You brought up an industrial win worth $77 million. When should we expect the revenue from that project to start flowing in?

Dave McConnell

executive
#23

That was what you were talking about.

Joel Smejkal

executive
#24

I can actually speak to that. Those are purchase orders that have come in already during the first quarter. This involves heavy materials. As their program gets underway, the business volume we're anticipating for 2024 is roughly EUR 18 million to EUR 20 million. 2025 and 2026 will be the peak years. We're pretty thrilled about this project. It's an industrial smart grid design that we've spent a number of years working on, and it's now entering production. So that's an encouraging signal. All of us have been waiting for industrial to begin moving, and here's a very big industrial leader that has handed us the purchase orders, and we're beginning to plan how to support them.

Ruplu Bhattacharya

analyst
#25

Alright, I appreciate it. As far as the Cash Conversion Cycle goes, what's the right way for us to frame that, and also Free Cash Flow, for the June quarter as well as the quarters that come after? What's your view on the direction there?

Dave McConnell

executive
#26

Therefore, I don't anticipate significant shifts in how quickly we turn cash. Stock levels are pretty even compared to the prior quarter, and Newport is already included in the figure for quarter one. Regarding generating free cash, I believe during our Investor Day, Ruplu, we showed a, a chart pointing to a somewhat negative figure for this year, and I think that remains our, remains our outlook.

Ruplu Bhattacharya

analyst
#27

Okay.

Dave McConnell

executive
#28

Not changing it.

Ruplu Bhattacharya

analyst
#29

All right, understood. So Joel, perhaps this is my final question. One of those strategic growth levers that appears on slide 10 involves boosting the technical headcount. Could you speak to whether that effort has wrapped up, or whether additional headcount is still desired? And if more is wanted, in which particular areas or geographies would you need to add it, and what effect would that have on SG&A? Thank you.

Joel Smejkal

executive
#30

All right. Thanks, Ruplu. Our technical engineering staffing is going to keep growing. When we talk with customers, they want Vishay to provide more hands-on technical support. That might be OEMs, Tier 1s, or EMS companies too — on one of the recent calls we noted that Jabil gave us early access to their design engineers, and Flex did the same. We're collaborating with their technology groups. This is something new for us. We've also met other EMS customers, and they're inviting us to come in and assist their design teams in pushing projects ahead. So we're revisiting our maps across the Americas, Europe and Asia, and we're beginning to establish what comes next — adding more engineering talent in the field. That's going to arrive in the second half of the year. SG&A expense will rise somewhat, but I believe the worth of engaging customers and moving their projects forward will deliver returns for us. These are opportunities we didn't have before, and I think customers make this point very plainly: Vishay, you're putting money in to scale. You're putting money in to scale right now. We find it's in our interest to grow closer together. Vishay can be present as volume production rises, and you can back it up.

Ruplu Bhattacharya

analyst
#31

Thanks. I appreciate all of that information.

Joel Smejkal

executive
#32

Thanks, Ruplu.

Joshua Buchalter

analyst
#33

Hey, everyone. Appreciate you taking my question, and I'd like to add my voice to the welcome for Dave to the fun of the earnings call. First off, could you perhaps give us some direction regarding the duration or the pattern of the Newport gross margin pressures? And is there a certain revenue threshold we must reach for that to begin easing, or does it stay fixed going forward due to the foundry setup, at least across the coming 2 years? Thanks.

Joel Smejkal

executive
#34

I'll take the first stab at that, and then Dave can chime in. At this point we have a fab that is only partly utilized, and by partly utilized I mean the prior owner is on its way out. The volume they pledged to us is going to shrink each quarter. The Q2 volume is locked in, and we're working toward it. Their volumes begin to taper in Q3 and Q4. This will hurt margins since production volumes are dropping, and at the same time, we're accelerating our technology transfers, which as we said will begin qualification in Q4, with production kicking off in the first half of 2025; so we're aiming to counterbalance the departure of the prior owner, with that business shrinking, by having Vishay come in. So the back half is where we'll feel it. Dave, do you have anything you'd like to add?

Dave McConnell

executive
#35

Absolutely, Josh. So when we look at Q2, our guidance reflects a 160 basis points hit to margin tied to Newport. That comes off sales of roughly $15 million. Then in Q3 and Q4, that revenue figure falls once more to about $5 million, which means it's basically insignificant from a sales standpoint. As a result, for Q3 and Q4, we estimate the overall margin effect is nearer to 170 basis points, Josh.

Joel Smejkal

executive
#36

Thanks, Livia. Once more, I appreciate all of you being here today and taking part in this look at how we did in Q1; we're eager to speak with you at the start of August, when we'll share what happened in Q2. Thanks once more. Enjoy the rest of your day.

Operator

operator
#37

That brings today's call to a close, everyone. We appreciate you joining us, and you're free to hang up now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Vishay Intertechnology, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Vishay Intertechnology, Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Vishay Intertechnology, Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.