ACME Solar Holdings Limited (ACMESOLAR) Earnings Call Transcript & Summary
July 30, 2026
Earnings Call Speaker Segments
Nikunj Seth
analystGood day, everyone, and welcome to the Q1 FY27 earnings conference call for Acme Solar Holdings Ltd, hosted by MUFG Entime. Just a reminder that every participant line is in listen-only mode, and once the presentation wraps up there will be a chance for you to ask questions. If you need help at any point during the call, please signal an operator by pressing star then 0 on your touchtone phone. Please be aware that this conference is being recorded. I'll now turn the conference over to Mr. Nikunj Seth. Thank you, and over to you, Nikunj.
Ankit Verma
executiveAppreciate that, Dhanesh. Greetings, everyone, and thanks for joining the Q1 FY27 earnings conference call for Acme Solar Holdings Ltd. Joining us from management are Mr. Mahesh Marupathe, Chairman and Managing Director; Mr. Nikhil Singhal, CEO; Mr. Arun Chopra, CFO; and Mr. Ankit Verma, Director and Head of Corporate Finance. At this point, I'll pass the call to management for their opening remarks. Thanks, and the floor is yours, sir.
Ankit Verma
executiveThank you, Nikunj. Good afternoon to all of you, and thanks for being with us today. My name is Ankit Verma, Director, Corporate Finance, and I'm glad to walk you through the key highlights from our results for the first quarter of FY ’27. Before I begin, I want to express our appreciation to every shareholder for the trust and support you continue to show us. We're also happy to have closed our QIP successfully, which speaks to the confidence investors place in our long-term vision. That gives us room to bring forward capex on our under-construction projects and achieve improved return economics. Now let me turn to our financial performance. This quarter is another landmark for the company, as we posted the highest revenue and EBITDA in our history. Revenue for the quarter came in at INR954 crores, up 63% year-on-year, and EBITDA rose 56% to INR831 crores. This strong showing came on the back of a higher CUF, revenue contribution from our BESS operations, and additions to renewable capacity. Our overall EBITDA margin was approximately 87%. Taking the businesses individually, our renewable energy portfolio posted an EBITDA margin of roughly 88% to 89%, and the BESS business delivered a margin of about 82%. That gap mainly arises because the cost of power purchase for charging the batteries sits within operating expenses.
Ankit Verma
executiveSo the blended margin really needs to be looked at with that in mind. Profit after tax came in at INR235 crores, an increase of 80% year on year, which works out to a PAT margin of roughly 25%. Our asset base grew substantially, reaching about INR25,000 crores, after new assets and batteries were commissioned. Capital expenditure for the quarter was approximately INR3,000 crores, and for the full year we raised our capex guidance to somewhere between INR15,000 crores and INR20,000 crores for this year. Turning to the Battery Energy Storage System updates. Consistent with our approach of deploying early, we commissioned roughly 2.3 gigawatt-hour during the quarter to date, which brings cumulative commissioned BESS capacity to about 3.62 gigawatt-hour. As a result, we now hold roughly a 40% share of India's cumulative commissioned BESS capacity to date, among the highest in the country. Our BESS operations contributed meaningfully on the financial side this quarter, as follows: of the INR954 crores in total revenue for the quarter, INR226 crores was generated by BESS power sales, with approximately 85% of that revenue under short-term contracts and the remainder from merchant sales. BESS power sales are producing a healthy annual EBITDA-to-capex yield of over 20%. Through our battery operations, we have demonstrated large-scale FDRE operations in a larger and more demanding manner, charging and discharging the batteries in 15-minute slot intervals. During the quarter we secured short-term BESS contracts, locking in over INR1,400 crores of revenue for part of the FY '27 BESS commissioned capacity.
Operator
operatorMy apologies for cutting in, but we can't hear you, sir. Sir, we still can't hear you <<operator_script>> Thank you. Ladies and gentlemen, the management line has been reconnected. Back to you, team.
Ankit Verma
executiveThanks. I was just getting to our BESS updates, so let me go over that again. Our BESS operations contributed meaningfully on the financial side this quarter. Of the total revenue of INR954 crores this quarter, INR226 crores was from BESS power sales, with roughly 85% of that revenue coming from short-term contracts and the remainder from merchant sales. BESS power sale is delivering a healthy annual EBITDA-to-capex yield of more than 20%. Through our battery operations, we have demonstrated large-scale FDRE operations in a bigger and more demanding way, charging and discharging the batteries in 15-minute slot intervals. During the quarter we secured short-term BESS contracts, locking in more than INR1,400 crores of revenue for partial FY ’27 BESS commissioned capacity. We will also keep participating and tie up more such contracts for full BESS capacity in ’27. Operational performance for the batteries continues to remain better than our design expectation, with round-trip efficiency of approximately 89%, depth of discharge of around 93%, and state of health being more than 99.9%. Plant availability for the batteries is also more than 99%. Now coming to our other business updates. We signed 600 megawatt of FDRE and hybrid PPAs with SECI during the quarter, which takes our total PPA signed capacity to 3,880 megawatt out of a total under-construction capacity of 5,080 megawatt.
Ankit Verma
executiveWe have roughly 1,200 megawatts of projects still awaiting signed PPAs, and those are moving along nicely — we expect to get them signed shortly. That brings our overall portfolio to 8,070 megawatts, which will involve about 20 gigawatt-hours of battery storage. In the quarter, we also hit the highest capacity utilization factor in the company's history, 30.9%, versus 28.5% in the same quarter a year ago. Power generation rose 23% year-on-year, reaching 2,020 million units. During the quarter, we arranged financing of roughly INR6,000 crores for our 700 megawatts of FDRE projects under construction, and as a result, debt is now tied up for almost 85% of the portfolio with signed PPAs. Before turning to sector updates, let me briefly touch on the recent incident at our ACME Suryoday BESS facility. As we said earlier, some media reports wrongly indicated that the fire had started inside the battery system. I want to reiterate that the detailed technical root cause analysis is now finished, and the investigation confirmed the incident stemmed from an electrical short circuit in the AC cabling between the transformer and power conversion system, which led to a localized fire and equipment shutdown. Importantly, no battery systems or any other equipment at the site were damaged.
Ankit Verma
executiveWe headed that off through safety steps already in place spanning detection, suppression, and containment. These cover AI-enabled video analytics that spot fires early, arc flash sensors inside PCS panels, extra aerosol-based fire suppression systems within PCS enclosures, and stronger fire barriers separating electrical equipment plus better cable protection. On top of that, we hold long-term warranties for BESS and other equipment from the suppliers. We have likewise assembled a best-in-class in-house BESS team of 50 members, which handles overall integration, covering installation, commissioning, and operation of BESS. Now moving to key sector and regulatory updates. India's power sector saw a strong start to FY '27, helped by expanding economic activity, delayed monsoons, and elevated cooling demand. Aggregate electricity demand in Q1 rose 8.8% year-on-year to 485 billion units. Peak power demand likewise hit a fresh all-time high of 271 gigawatt during the quarter, and that momentum carried into July as well, when delayed monsoons and persistent humidity once more drove peak demand close to 270 gigawatt. India's installed power generation capacity surpassed 548 gigawatt as of 30th June 2026, with non-fossil fuel sources now making up approximately 54% of total installed capacity. During the quarter alone, the country added nearly 13.9 gigawatt of renewable capacity, lifting cumulative renewable capacity to 289 gigawatt. On the policy front, several developments are encouraging for the sector.
Ankit Verma
executiveMNRE has pushed the commissioning deadline to 31st December 2026 for open access and net metering renewable projects, which ensures a smoother shift toward cell-level list-II compliance. That also gives us more room to assess and commission merchant BESS projects co-located with solar generation. The Ministry of Power extended graded ISTS waiver benefits to projects delayed by transmission readiness, for PPAs signed up to 30th June 2026. This lowers financial risk for developers and brings greater clarity for DISCOMs, and it also helps our off-takers where GNA availability is delayed. In addition, CTU has started granting BESS connectivity via the right of first refusal route, which should speed up BESS deployment while strengthening grid reliability and enabling better participation during evening peak power demand. Going forward, our priorities stay focused on disciplined execution while we keep building a healthy project pipeline. We are raising our BESS commissioning guidance from 10 gigawatt-hour by calendar year 2027 to more than 10 gigawatt-hour by fiscal year 2027, effectively moving this milestone forward by nearly three quarters. For FY ’27, we also expect to commission 1.5 gigawatt of contracted renewable energy generation capacity, subject to timely availability of substation and transmission lines. We have already ordered more than 15 gigawatt-hour of battery from leading global suppliers, including CATL and HiTHIUM, well within our budgeted cost. From an industry growth perspective, we expect large bids going forward, especially across these categories: medium-term contracts, long-term peak power, RTC FDRE, CFD related to peak power, and state bids.
Ankit Verma
executiveWe'll keep actively chasing every one of those opportunities so we can take advantage of shifting market demand and merchant market dynamics. By 2030, we intend to push our target past 10 gigawatt, as we guided earlier, based on the fresh growth opportunities we're seeing in the market, and we'll keep you updated on that in the coming quarters. That brings my remarks to a close. Thank you for your continued support. We'll now be glad to take your questions.
Operator
operatorThanks a lot. At this point we'll open things up for questions. <<operator_script>>Our first one is from Subhadip Mitra at Nuvama Wealth Management. Go right ahead.
Subhadip Mitra
analystGood afternoon, and thanks for having me. First off, congratulations on a great set of numbers — it's clear that your approach of commissioning BESS early alongside short-term sales for peak power is paying off and showing up in the results. So well done on that. My questions are mostly about the BESS side, since that's clearly what's adding a lot of traction to the numbers. In your estimate, what quantum of open market or early BESS commissioning are you factoring in for the current fiscal in FY '27, and for the next couple of years? And the second question: in the current short-term contract with the INR1,400 crores of locked-in revenue that you mentioned, what would be the ballpark range of realizations you're looking for on the BESS short-term contracts?
Nikhil Dhingra
executiveOkay, okay, Subhadip. Appreciate the question. So as far as this year goes, by the end of this March we'll have 10 gigawatt-hour on a daily basis in terms of the capacity being sold. Naturally, as we go from 3.6 up to 10, that figure will keep growing month after month, and that's how we're contracting and planning for the capacity additions. And there's an upward bias on that number, since the contracting we've completed is well above 10 gigawatt-hour. So whenever deliveries happen, there could be an upward revision to that figure. As for the realizations from the contracted capacity, they fall, you could say, between INR8 and INR10 in terms of realizations, depending on the month and on the contract's volume. All of these are bids run on the DEEP portal and the HP-TAM markets. So that's the range that's publicly available.
Subhadip Mitra
analystGot it. And to follow up on that, the 10 gigawatt-hour figure by March ’27 is, of course, going to rise over the coming couple of years, I’d imagine. Do you have any rough range in mind, since my understanding is that the total will come to 20 gigawatt-hour? So how much of that would be available capacity over the next couple of years for you to consider?
Nikhil Dhingra
executiveRegarding open capacity, at present we have just 600 megawatt-hours that remains open, and that is also slated for a PPA. Our goal, therefore, is to reach zero open capacity by the close of this year. Operating any merchant volume outside a PPA is not something we intend to do. The aim is zero outside PPA. Everything we run sits inside PPA. The sole exception is a 300 megawatt plant, which is currently 300 into two and is being scaled up to 300 into four; that one has yet to be contracted. As for the rest, nothing is open.
Manoj Kumar Upadhyay
executiveLet me add something here — my name is Manoj — so I'd like to make this point: each year, no less than 10 gigawatt-hours of battery capacity will stay exposed to, will stay in, the merchant market, and the following year it moves into the PPA. So answering your question in two ways: first, we don't expose our battery to the merchant market across the coming 25 years, but our plan over the next five years is for at least 10 to 12 gigawatt-hours of battery to stay available to the short-term power market.
Nikhil Dhingra
executiveRight, that's a key distinction I should have mentioned. The thing is, as you correctly pointed out, we're doing capex early when it comes to the BESS installations. So you could say the first year will be merchant — roughly one year of merchant operations — but in terms of where it ultimately ends up, all the capex is allocated toward PPA. That's how it works. From a long-term perspective, there's no open position. Apart from the 300 megawatt plant, which is open right now, BESS isn't open — though we're aiming to include it in the upcoming bid.
Subhadip Mitra
analystGreat, great — that makes it very clear. Thanks a lot, and congratulations again.
Nikhil Dhingra
executiveThank you.
Operator
operatorThanks. The next person in the queue is Aniket Mittal with SBI Mutual Fund. Your line is open.
Aniket Mittal
analystThanks. Looking at the presentation, the GNA timeline for the SJVN FDRE is around June 2027. So I just wanted to get a sense of how you're viewing the commissioning for that. Would you prefer to bring the battery forward first and let the solar commissioning slip past FY ’27, or what are your thoughts there?
Nikhil Dhingra
executiveYes, please. Aniket, you're absolutely right. The battery for those two plants has already been commissioned — if you look at Hirgarh and Bikaner-2, those two BESS units for the SJVN plant are already commissioned. So that is done, as you rightly noted. But the GNA connectivity is scheduled for the month you also mentioned next year. That's the only time we can commission the solar, so that's how it will work.
Aniket Mittal
analystGot it. So that capex would be delayed as well, right — things like the modules and so on, since you haven’t ordered those yet?
Nikhil Dhingra
executiveSo the way we're approaching it is that, yes, capex for the non-module portion is mostly finished. We've completed, let's say, 80% of the transmission line plus the remaining substations and plant infrastructure. As for modules, we're watching for opportunities — at the moment, module prices are below INR12, right? They sit around INR11.60 thanks to shifts in Chinese regulation. Through December it's a favorable window to purchase modules when you're buying Chinese cells. So we'll stay very opportunistic on modules and the other procurement, though we also want to keep interest during construction to a minimum. We'll weigh those two goals and go ahead with module purchases, right? And we're also asking whether the GSS side could be moved up, which we're working on as well. That's how we're proceeding. On Fatehgarh-2 specifically — separate from your PPA question, not connected to it — the bay at Fatehgarh-2 is charged. So if you wanted to supply nighttime power, which for this particular PPA we don't want to do, but for future PPAs or other PPAs we're pursuing there, the bay will be charged — it's charged at present — so it can evacuate nighttime power, though that isn't relevant to what you asked.
Aniket Mittal
analystGot it. Regarding those INR1,400 crores of contracts that are already locked in, what tenure do they typically carry, and how many units in aggregate are we required to supply under them?
Nikhil Dhingra
executiveSo look, Aniket, the realizations we referenced are roughly INR8 to INR10, and in certain instances even more. From that you can work out the unit count, since capacity stands at 3.6 right now and is headed to 10. Capacity will therefore continue to build up, and that is how the volume-weighted megawatt-hour gets calculated. Regarding the type of contracts, they run through March. We took part in a few bids in which states are purchasing power for March as we speak. Given the El Nino effect, states are doing a great deal of planning around the shortage they anticipate over the monsoon months. We are seeing robust demand as well. So generally, they are under a year. Every one of these is under a year, since that is where the short-term market sits when it comes to contracts. Yet we are also seeing mid-term bids emerge from a number of states, where they are considering five-year contracts. But for that five-year contract, we have just one project we could offer from, as we said, which is presently non-tied up. So we are seeking bids only under one year, taking into account our commitments and other considerations.
Nikhil Dhingra
executiveSo those are usually — you could say — no more than one year out, but the typical window is roughly six to nine months in advance.
Aniket Mittal
analystGot it. And during this quarter, with the battery we've got, what's the average number of cycles we're running per day?
Nikhil Dhingra
executiveA single cycle per day.
Aniket Mittal
analystA single cycle each day. All right, that's fair. And I just want to confirm something: regarding the 20 gigawatt-hour battery, what portion have we contracted out so far?
Nikhil Dhingra
executiveSo nearly all of it is under contract now. You could say roughly 90% has already been locked in. And regarding when we buy batteries, that's a key point — we expect this year to be a good moment to make those purchases, since a 6% export tax is being introduced in China starting in January. That's another factor, and naturally, on the merchant market side, the sooner the better as well. With that in mind, we've essentially contracted all of it as far as the contracts go. Anywhere the PPA hasn't been signed, we don't treat that as something requiring an order. So that's what remains. But wherever a PPA is signed, we've placed the battery order there.
Aniket Mittal
analystGot it. I’ll get back in line for any additional questions. Thanks.
Operator
operatorThanks. The next person to ask a question is Mohit Kumar of ICICI Securities. You're up.
Mohit Kumar
analystGood afternoon, and thank you for having me, and well done on a strong quarter. For my first question, could you walk us through depreciation and interest for the quarter, particularly on the batteries, which ran through the P&L?
Nikhil Dhingra
executiveOkay, so where the policy is concerned, batteries get depreciated over 20 years. So on the actual figure, let me just hand it over. Arun, would you lay out those numbers for us?
Arun Chopra
executiveIn the battery segment, the interest component comes to roughly INR32 crores, while depreciation accounts for approximately INR27 crores.
Mohit Kumar
analystGot it. My second question concerns the free exit option that CERC introduced, or conversion to the merchant route, for projects that don't have a signed PPA. I believe you said in the PPT that this works in our favor. Could you walk us through, in somewhat finer detail, how this affects us?
Nikhil Dhingra
executiveAbsolutely, absolutely. So, as you'd have noticed, Mohit, the majority of our PPAs are signed, and the remaining LOAs that are still outstanding are likewise on a solid path toward being signed. So we'll benefit from this freed-up connectivity — where the PPAs aren't signed and where people haven't, where people don't wish to pursue, say, the alternatives that CERC is proposing, such as setting up a merchant plant or setting up a C&I if their PPAs aren't signed. So we anticipate that a substantial amount of connectivity may be freed up through this initiative, which is a good initiative from CERC. So that's how we're optimistic regarding the future growth that we were seeking — you know, always the highest GHI connectivity. So this will let us try and, say, if there are options for this connectivity that gets freed up, it will help us secure that, which we couldn't have secured had this initiative not taken place. And second, it will also help the CTU plan future connectivity better, which is good for the grid in terms of the country overall — that the connectivity is properly utilized and not stranded.
Nikhil Dhingra
executiveAnd it's beneficial for batteries too, since nighttime will arrive in those areas as well, because certain of these interconnections carry a right of first refusal that is going to be released. So that's going to unlock a great deal of either non-ROFR interconnection or ROFR interconnection, all of which ties back to the solar interconnection. So it's a very positive step for us and for the industry.
Mohit Kumar
analystMy final question is this: what should we expect for bidding activity across the coming nine months of this fiscal year when it comes to REs? We've observed a general slowdown in bidding, particularly during the last quarter and in FY ’26.
Nikhil Dhingra
executiveOkay, regarding the bidding side — as you're aware, there's just one REIA, and it's now been six months since that initiative began. SECI is pulling all the bids together, and they've introduced a rule that they won't launch a bid until there's a fairly firm prior commitment on how much power is needed. So what we're observing is that the bid-to-PPA cycle time should shrink as a result. Of course, the number of bids from SECI has come down for that reason, since they're reworking their entire sales and procurement setup in line with this Ministry guideline. So from them we've seen a solid amount of PSP, a solid amount of wind, a solid amount of four-hour peak power bids, and the full round-the-clock FDRE bid. So we expect very large bids, and CFD — contract for difference — is another one. All of these are very solid bids supported by demand from the counterparties. Bengal is coming up with a substantial requirement after the elections, and there are plenty of other states coming forward too, and for the round-the-clock FDRE, let's say there's good demand.
Nikhil Dhingra
executiveThese are all high crore-per-megawatt capex bids, so in terms of capex and ROCE, these bids are very significant, and it is good for serious players because connectivity is needed at multiple places, and integration of various sources is needed. So that is there. Then other than SECI, a lot of medium-term bids are coming up from the states, like we said, like a 5-year peak power procurement; even Gujarat and a lot of other states are coming up with their own FDRE in terms of the high creditworthy states. So that's again a good opportunity, and with the ISTS waiver going, there is again a move towards BESS tenders and again a move towards putting up projects in high resource states; some states are going for that, like Maharashtra is also coming up with those kind of bids. So the format of the bids has changed. There is no solar bid which will come, right? There is no — of course pure wind bids will continue coming, but the battery-related bids will be the focus. There is no bid in renewable which will come other than PSP which will not have battery. So you will see that the focus will be — and also there is a right-sizing of battery bids which will happen because of delay in the VGF-based projects which was done by various states.
Nikhil Dhingra
executiveStates are also going to assess how they realign after those bids, specifically regarding how those bids actually get executed. You'll see that realignment taking place right now, since they had been counting on that execution—yet it isn't materializing, given how competitive those bids are. So there's some realignment, and that's why volume is low at present, but the structure being established and the demand drivers are very strong.
Manoj Kumar Upadhyay
executiveIn terms of megawatts, I'd like to add one more point: the megawatt count may be smaller, but every single megawatt will be equivalent to 4 megawatts of solar, since these are around-the-clock type of power, which we expect more and more to come in.
Mohit Kumar
analystGot it, sir. That's completely clear, sir. Thanks, and best of luck to you, sir.
Nikhil Dhingra
executiveThanks.
Operator
operatorThanks. The next question we have is from Sambhav Kela at HSBC Bank. You may proceed.
Sambhav Kela
analystYeah, thanks for the chance to ask. My first question concerns the PPAs you signed during this quarter. So, regarding those 2 projects, were there any changes in terms that let you, or made it possible for you, to get those PPAs signed, particularly for the hybrid project? And if you could also go into more detail about how those 2 projects are configured?
Nikhil Dhingra
executiveRight, right, right. So for the hybrid project, what we've done is offer one hour of battery — that's a change from the standard configuration, right? And the second project we've signed is, which one?
Manoj Kumar Upadhyay
executiveWe posted INR6.28.
Nikhil Dhingra
executiveYeah, that's not changing. That project configuration stays exactly the same.
Sambhav Kela
analystRight, understood. And second, looking at your PPT from the last quarter, there's one project awarded under ACME Marigold LOA where you noted that you'd been invited to sign a PPA. So is there any progress on that — what's the latest?
Nikhil Dhingra
executiveYeah, yes, absolutely. So that agreement is actually in the process of being signed with a state up in the Northeast. They’ve been taking their time because, as you probably know, the Railways’ position as an open access party is right now being revised by the Supreme Court — you must have followed that proceeding. That’s the reason it has taken a while. We’re still at a very advanced stage, and we have already given the bank guarantee for signing the PPA. So it should be signed very, very shortly. Some of the delay came at their end, on the state side. REMCL has been very proactive about this, but the Railway unit in the Northeast took a while. So at this point it’s 100% going to be signed very soon.
Sambhav Kela
analystUnderstood, understood. And finally, just to clarify something about the projects that were meant to come online this year and where the GNA timeline extends well into FY ’28: what you’re saying is that you might run BESS on those projects, but you won’t bring them into service early and run them on T-GNA — is that right? Have I got that correct?
Nikhil Dhingra
executiveLook, the Ministry is asking everyone to hold off, in light of the curtailment in Rajasthan and elsewhere. No ministry wants people to commission right now, because the industry made a representation that a lot of curtailment is taking place across the entire state. Nobody in the industry would want to commission on T-GNA, since the curtailment you get is not good for your shareholders or anyone, right? Even the lenders wouldn't like it. So it's prudent to plan in a way that you supply only where your off-take is there, where your lines are ready, where all the elements of the line are ready, right? You right-size your plant. So wherever the solar GNA is available, right, we will try to prepone the plant as much as possible, because early commissioning of the whole plant is always beneficial for us, and we will keep doing that. But wherever the solar GNA is not available, it makes no sense to buy modules and leave them stranded, or not generate the whole PPA power, because that is IRR decretive. So we will never do that.
Manoj Kumar Upadhyay
executiveTo clarify, I think your question also — we’ll get the plant ready when it comes to the transmission line, the substation, and even the whole balance of the plant. What we’ll do is operate the battery there at the plant, and once the daytime GNA becomes operational, we’ll begin feeding solar.
Sambhav Kela
analystUnderstood, understood. Appreciate it, appreciate it. That is everything from me. Thank you.
Operator
operatorThanks. We’ll take our next question from Apoorva Bahadur at IIFL Capital. Please go ahead.
Apoorva Bahadur
analystHello, sir, and thanks for taking my question. During your presentation and in the commentary, you noted that BESS capacity has been locked in that will generate roughly INR1,400 crores in revenue this year. Could you tell us what portion of that BESS capacity is now locked in, and how much storage inventory remains available for further monetization?
Nikhil Dhingra
executiveSo, Apoorva, we did bring up INR1,400 crores — you could put that at roughly 70% to 80% of the capacity we have locked in, with 20% still open. That figure assumes something like 10 gigawatt-hours by March. Should we exceed that, we'd have to contract for it, but we're being a bit — essentially we want to allow for any supply chain or similar problems, which is why our guidance sits at 10 gigawatt-hours.
Apoorva Bahadur
analystAll right, so would the EBITDA margins be comparable to 1Q at 82%, or do you anticipate some shift there too?
Nikhil Dhingra
executiveLook, as you're aware, Q1 is a somewhat stronger quarter, but given that commissioning took place in a staggered way, right, so interest and depreciation, we'll just have to wait and see. I'll need to get back to you on that. Still, broadly speaking it's not too far off from this, right, and power cost was comparable as well, so it ought to be comparable. My sense is it won't differ much, perhaps 2% to 5% here or there, but nothing major.
Apoorva Bahadur
analystGot it — that's quite useful. Also, in your presentation I believe you gave the capital cost for BESS, which came in at roughly INR93 lakhs per megawatt — per megawatt-hour, if I'm not mistaken — so that works out to about $100 per kilowatt-hour. How do you view this trend? I think the first few batches we ordered came at a somewhat lower rate, so what is the price right now for BESS delivered into India?
Nikhil Dhingra
executiveCorrect, correct, correct, correct. You’re absolutely right there, Apoorva. So the first BESS we placed orders for came in at cheaper prices, and then naturally lithium carbonate is a commodity that swings a great deal, and naturally China again has supply-demand economics at work through which these things unfold. So that INR93 lakh could rise, right, it could rise for future BESS, but again not by a very large percentage, not beyond perhaps 5% to 10%.
Arun Chopra
executiveThat falls inside the cost we budgeted.
Nikhil Dhingra
executiveWe're staying inside the budgeted cost. Since the other components are saving us money — the PCS is arriving below what we budgeted, and the remaining components are coming in as well — and keep in mind, we're building at substations where the line already exists, right, both line and substation are already in place, so that also helps us save on cost. Another thing: we aren't factoring the hedging gains into this cost, because we've already hedged over $300 million of dollar, from which we have a lot of hedging. So we're giving you the cost as we're spending it, and there will be — in terms of the, because we've locked in a rate of around INR89, INR90 in some, and in some cases INR92, INR93 too, depending on where the dollar stood at that point, but we keep hedging whenever the opportunity comes, because you know it's a very volatile world. So we keep looking for opportunities to hedge. So that gives you, you could say, a positive bias when it comes to reducing cost on the — because of the dollar movement.
Executive
executiveAnd that INR93 lakhs you’re referring to consists of — since it’s a capitalized cost — IDC, EPC profit,
Nikhil Dhingra
executiveAll of it. Right.
Manoj Kumar Upadhyay
executiveYeah, so that's INR93 with the transformer stage included — the whole thing.
Apoorva Bahadur
analystAlright, alright, got it. Sir, I'd also like to hear your perspective on how deep the merchant market is — specifically, how much BESS capacity it's able to support, right? The reason I ask is that arbitrage looks so attractive that I think plenty of players are diving in headfirst, a lot of BESS capacity has already been awarded, and at this point probably the whole industry is attempting to copy our strategy. So what's your view here — I mean, how long do you expect these spreads to stay around where they are, or do you anticipate compression, and if so, by when?
Nikhil Dhingra
executiveLook, Apoorva, this is a really important question, and one we keep going back and forth on. The main point is that this market is still very nascent when it comes to BESS availability, right? Peak power demand has always existed, but it was being met through other means. Say we approach states about selling this power — what they tell us is that they purchase round-the-clock power, they purchase thermal, right? They're going thermal because there's no gas this year. So thermal is what people are buying. When they run the maths on purchasing thermal to cover their peak requirement, they end up buying it for more hours than they actually need for that purpose. When they examine the real problem they face — which is during those four hours or six hours, mostly at night — this product simply wasn't there until last year. So it was an unmet need last year, yet no supply of that product existed, right? So if you look at the four and a half, let's say 40%, we and Adani are doing it, right — quite a small supply if you view it from the BESS side, right?
Nikhil Dhingra
executiveAnd honestly, no one is really pursuing merchant, correct? People are people like us, and I'm sure even Adani would have a plan to lock it into long-term contracts, right? So folks aren't building dedicated merchant plants, right, that stay online for 25 years. Everyone will be like us—we have a steady pipeline that keeps coming every year. So first, I wanted to make clear that the supply for pure merchant won't be very large, right, because some of our plants will go into PPAs, then we'll again move into executing new projects, so as Manoj ji guided, we'll have 10 gigawatt-hours on, let's say, a merchant basis each year because we are executing projects, right, that have PPAs. So on the supply side, I'm not very bullish about huge supply entering BESS on an open basis, right? So there'll be very opportunistic supply coming into BESS from the supply side first, right? On the demand side, this has opened up something very new—let me say each state is now evaluating it very seriously, because they weren't aware of this availability, right? And they weren't aware of the ability to supply, right?
Nikhil Dhingra
executiveWe're providing 15-minute power on demand each day, correct? They didn't realize that battery can deliver this kind of very precise supply, since trust in batteries is low, right? It's new to everyone, right, suppliers and buyers alike. So that trust is building state by state. So let's say we'll be supplying to roughly six or seven states at present, right? They've taken power from us, Adani, various other players too — everybody's doing it. So trust is growing, and now the bids that come will factor in that supply. Previously bids were essentially compared against round-the-clock power or gas power, which is far, far higher than this cost. So both in terms of the — so that's that. In terms of absolute quantum, as solar — see, all the FDRE that's coming, or all the peak power that's coming, or even the connectivity the Ministry of Power is providing, all battery comes with solar. No battery is coming without solar, because it's all co-located solar. So you're not actually seeing the sync the grid needs, because of excess solar.
Nikhil Dhingra
executiveThe synchronization happens when you add net battery capacity without solar. So what we observe is that as new solar gets added and, say, more thermal generation ramps down, the need for peak power will rise—going well beyond where it stands today. So as far as the factors behind it, that's what's there.
Manoj Kumar Upadhyay
executiveYeah, I'd like to add something here — this peak is actually being driven by the duck curve phenomenon. So, as you know, we're adding rooftops — 6 gigawatts, 7 gigawatts of rooftop — and what happens is that when you add rooftop, that also shows up in the grid. We're adding Kusum, which also shows up in the grid. You're adding B2B type, so that too shows up in the grid. As the duck curve pushes toward zero, demand for peak power will rise on both sides. My own conclusion at this point suggests roughly 300 gigawatt-hour, but I see it getting pushed higher as we add more solar — like Nikhil shared, in every FDRE we're adding more solar to the grid. As more and more solar comes in, the evening and morning peaks will be pushed higher. So I see us getting close to 400 gigawatt-hour to 500 gigawatt-hour. In the positive scenario, it could even touch something like 1 terawatt-hour. That's where this market is headed.
Apoorva Bahadur
analystThat's quite interesting, sir. I really appreciate you offering that perspective. And finally, I think I just want to bring up what might be a temporary slowdown in renewable auctions. Do you perceive some kind of shift in the demand pattern, as you mentioned, owing to rooftop and owing to C&I — and specifically regarding C&I, do we have any plans to enter that space, or anything on the captive side that you're considering?
Nikhil Dhingra
executiveOkay, so on the bids side, Apoorva, as we mentioned, there's a recalibration happening due to the format change and the shift in how binding the bids are. What we anticipate is that government-backed or SECI-backed bids will show up pretty strongly over the next six to nine months, and beyond that point — since there's a clear plan in place and they're procuring other commodities such as green ammonia and various other items — that will contribute further to overall demand. They're diversifying their procurement, so that's point one. Then we and the states will also come in, the CFD will come, peak power bids will come. So there's going to be a revival there, and we're quite positive about it. Second, regarding the C&I segment, that's something we're evaluating in terms of various factors, but as long as our pipeline and the IRRs on government bids remain strong, it will always be in competition with C&I for that, and we will never dilute the mid-teen or high-teen returns that we target for this.
Nikhil Dhingra
executiveAnd our emphasis is also on CTU projects, since that gives us flexibility to use that power for peak power or for various use cases. So we'll always seek C&I customers that are CTU-connected, and naturally we will certainly move into some of the other non-government use cases over the next few quarters. We're actively exploring that, and we've made solid progress on it as well. Whenever anything concrete emerges, we'll update you, but there's a definite plan to do that.
Apoorva Bahadur
analystAbsolutely, thank you very much. Wishing you the very best.
Nikhil Dhingra
executiveThank you.
Operator
operatorThanks. The next person in the queue is Nikhil Abhyankar from UTI Mutual Fund. You have the floor.
Nikhil Abhayankar
analystSir, I just want one clarification. For example, with BESS, if we look at EBITDA, it has grown by almost 20-odd percent, while we haven’t really made significant capacity additions as such. So what exactly is driving that figure, and if you can also quantify the impact of curtailment in this quarter and year-on-year?
Nikhil Dhingra
executiveCorrect, correct. That's a really key question, Nikhil. So when you look at this quarter, our CUF rose by roughly 30.9% — it climbed to 30.9%, which is the highest we've ever seen. So that's the single biggest driver behind the stronger EBITDA for this quarter. On a year-on-year basis, we moved from 28.5% up to 30.9%, right? And versus the prior quarter as well, we're up meaningfully. So that's the main reason, right? What was the second part of your question? Let me also mention this: we keep repowering the plant on an ongoing basis. So the plant you saw, maybe last year, and what we did this quarter in terms of repowering the existing plant — that's also reflected in these numbers. So those are the two factors driving the EBITDA, aside from the BESS. You asked something else — sorry, there was a second part to your question that I missed.
Nikhil Abhayankar
analystOn curtailment — how it looked this quarter and compared with the same period a year earlier.
Nikhil Dhingra
executiveRight, right. So curtailment accounted for roughly 1% of revenue, and that came solely from the state — solely from projects based in the state. So on total revenue, curtailment was 1%, under 1%.
Manoj Kumar Upadhyay
executiveRight, so that's one factor behind our current thinking — even with the state-based project, we're considering adding a modest amount of battery, which would let us take advantage of that down the road.
Nikhil Dhingra
executiveOkay, I believe we left that out of the industry update. A circular has now been issued permitting the surplus renewable power you produce from solar to be routed into batteries. That’s a helpful OM coming from the Ministry. So across all our state projects we’ll do this — whatever megawatt-hour we can, we’ll charge entirely from that excess generation; it makes complete sense, and doing so will fully remove the curtailment portion. Naturally it will be seasonal, but we’ll size it to eliminate as much as we can, and the DSM as well. So those two things will help once these batteries we’re adding are in place. Going forward, we intend to eliminate it. Of course, we have certain regulatory fixes for this that we’re again raising at the appropriate forums so the same curtailment-related provisions that exist in the central grid are also present in the states, but some operational changes are underway and some regulatory changes are underway to bring down that 1% figure.
Nikhil Abhayankar
analystOkay, sir. Thank you very much, and best wishes to you, sir.
Nikhil Dhingra
executiveThanks.
Operator
operatorThanks. We’ll take our next question from Anuj Upadhyay at Investec. Please go ahead.
Anuj Upadhyay
analystHey there, hi. Thanks for the chance and congratulations on a solid set of numbers. So just a clarification on a question that a previous participant asked. You mentioned INR1,400 crores of locked-in revenue from the BESS. Does that come from the whole 10 gigawatt-hour, because in the presentation you've highlighted that 50% of this 10 gigawatt-hour of BESS is largely toward or serves the FDRE, upcoming FDRE projects. So how exactly should we read through that? Is it from the 50% where we've locked in INR1,400 crores of revenue, or is it for the entire 10 gigawatt-hour?
Nikhil Dhingra
executiveOkay, so there are two parts to what you asked. First, as we said, roughly 70% to 80% of the 10 gigawatt-hour we've contracted is already accounted for, correct? That leaves 20% still to be contracted. And as for the — what was the second part of your question again?
Arun Chopra
executive50% —
Nikhil Dhingra
executiveActually, 50% isn’t correct—what we said is that all of our capacity will go to PPAs, except for the 1,200 megawatt-hour that’s currently in the merchant book, and that will also be directed toward future bids. So unless you’re referring to something specific, there is no 50% ratio.
Manoj Kumar Upadhyay
executiveNo, actually his question also touched on the fact that a portion will go to the FDRE project that's getting commissioned — for those projects, we've already counted them in revenue. So that isn't part of this sale. So wherever the battery is headed to the FDRE, yeah, you're right, maybe you mean Neemuch or some other plant. Yeah, yeah, so that hasn't been factored into this merchant sale, yeah.
Nikhil Dhingra
executiveThat isn't included in the merchant sale.
Anuj Upadhyay
analystOkay, so typically it's around 5 to 6 gigawatt-hours that we've contracted on a short-term basis, and that could bring in roughly INR1,400 crores in revenue. And as you mentioned, Manoj sir, each year we'd generally have about 10 gigawatt-hours of open capacity — particularly for short-term deals in any given year — so one might expect that INR1,400 crores could rise further, perhaps to somewhere like INR2,000 or INR2,200, or even INR2,500 crores in revenue starting next year?
Nikhil Dhingra
executiveYes, we will — we'll essentially confirm that at delivery. As things stand, what we're delivering is the only thing we're discussing.
Anuj Upadhyay
analystFair point. And in this case, one cycle takes 3 or 4 hours for the BESS, correct?
Nikhil Dhingra
executiveUsually it’s 4 hours — typically 4 hours. Just in a single project, we were doing 2 two-hour blocks, and that’s now being expanded to 4 hours. So yes, generally 4 hours; in certain cases, 6 hours as well, based on what the PPA calls for. A few states are purchasing 6-hour power too — for example, until 12 o’clock, until 2 o’clock.
Anuj Upadhyay
analystAlright, alright. And do you have any plans to address the data center needs on the C&I side?
Nikhil Dhingra
executiveAnd so, yes, that sector is quite promising, and we're putting a team in place around it. We've begun with recruitment as well as the other important strategic planning efforts. Naturally, this is something we're keen to explore, subject to profitability, correct? We want to participate in the segment that provides us with long-term concessions and also aligns with our strengths — which are, you could say, around constructing infrastructure and constructing infrastructure tied to power, correct, and also the associated related competencies we possess. So we definitely do not want to disregard this segment. And naturally, we're developing our strengths around it, both in terms of capabilities and in terms of marketing as well. So yes, this is something that will — and from a macro perspective, it will of course contribute to what the Southern states and Western states in India require, which is a major positive in terms of the round-the-clock renewable power it will add, and we're going to see a great deal of procurement driven by this, and apart from EV, correct, this is the single largest segment we see that will boost power demand for renewables and and and the peak peak demand in the country, so.
Manoj Kumar Upadhyay
executiveThere are a couple of points I'd like to flesh out. First, as we bring on more and more EV, the peak power demand for one hour, two hour, three hour is going to keep rising, particularly during the evening and daytime. And the second is, as we're saying here, even Solar Energy, SECI, is now setting up a platform through which they'll team up with the data center, they'll work with the data center to procure power for that. So if they also get involved — they're active in this space as well — then should they turn into a customer, should they turn into an aggregator, we would be very glad to take part in those bids.
Nikhil Dhingra
executiveAnd even with the direct payers — the direct, right, even with those direct payers — since they’re highly credible players, the only other thing we’re working out at this moment is the profitability metrics. Because the profitability we’re seeing, sure, from a headline standpoint it’s a good headline, but profitability is something where, I think, on both the cost side and the pricing side, we really need to work to get the right amount of profitability using the competencies we have. So that’s what we’re trying to figure out a solution for, and this is the segment we’re working on, so we’ll update you whenever anything concrete comes up on this.
Anuj Upadhyay
analystYes, sir, thank you — that's quite helpful, and best of luck to you, sir.
Nikhil Dhingra
executiveThank you.
Operator
operatorThanks. We now take a question from Yogesh Patil of Dolat Capital. The line is yours — go ahead.
Yogesh Patil
analystThank you for giving me the chance, sir. You mentioned that 10 gigawatt-hours of BESS capacity is going to be offered to the short-term market during a specific year within the coming three to four years — so what should we assume the BESS revenue would be from that kind of 10 gigawatt-hour capacity? Alternatively, could you give us guidance on that same annual basis? That is my first question.
Nikhil Dhingra
executiveSorry, Yogesh — I didn’t catch that. What exactly do you need on 10 gigawatt-hour?
Yogesh Patil
analystSo you're saying that roughly 10 gigawatt-hours of BESS capacity will be made available to the short-term market in a given year over the next three to four years — is that right? Then what should we assume for BESS revenue from that 10 gigawatt-hour capacity? Would it come in above INR1,400 crore, given that 80% of the 10 gigawatt-hour capacity is already tied up and we expect about INR1,400 crore of revenue this year. So would this INR1,400 crore plus phenomenon also apply in the years ahead, or — to put the question again — is it limited to the El Nino year, with power demand normalizing to 6% from next year onward, hydro power coming back into the game, and BESS short-term revenue realization running lower, because realizations are better right now and that's what's giving an edge, whether on a short-term basis in DAM or HP-DAM across these markets. Just wanted to get your view on this side.
Nikhil Dhingra
executiveRight, right, right. No, that's a very important question you've raised, Yogesh. So there are two parts to what you're asking — one is on volume, which we can do, and the other is price, right, price we can do. So on volume, what we've contracted is only 80% of the volume we're targeting, so that definitely pushes overall revenue above INR1,400 if we end up tying up that additional 20% of volume, right? So that's the current tie-up for this year. On price stability going forward and whether this was an exceptional year or not — the key thing we're finding is that a lot of states haven't yet started buying BESS power, like I answered earlier in the previous questions. So this market isn't tapped yet, because if you look at India, very few DISCOMs have bought BESS power, since it's a new form of power. The entire capacity has come up over the last six months. Whatever capacity exists in India has come up in six months. So with any capacity, it takes time for people to rely on it.
Nikhil Dhingra
executiveAnd so we expect those fresh tenders coming through to concentrate on that. Consequently, on the demand side, we are not seeing any deceleration. Naturally, when it comes to pricing, an alternative supply has to exist, correct? Should the hydro capacity return, should there be a fixed cost, should it in any case have been unable to satisfy that peak demand — that is precisely where I believe, even under El Nino, there could be — and beyond the physical or scientific elements, there are election-linked elements that emerge, right, there are certain heat-related elements apart from El Nino, plus air conditioner penetration and various other matters. So across the board, our macro analysis shows no deceleration, since we have a team that works to maximize revenue and forecasts it, and naturally we are employing multiple systems as well. Hence, in pricing too, we foresee no deceleration over the coming 3 years, and naturally we are able to forecast past 3 years, though that is genuinely vulnerable to shifts. Still, on the basis of multiple elements, we foresee no deceleration, and we discussed the duck curve and various other matters.
Manoj Kumar Upadhyay
executiveSo, as we mentioned before, first off, that 300 gigawatt-hours of existing demand that has to be served — that in itself is an extremely large figure to handle. And as we keep adding increasing amounts of solar on rooftops, and increasing amounts of solar under Kusum, what that adds up to is a more pronounced duck curve. That duck curve is going to make the evening and morning costs higher, and this duck curve phenomenon isn't solved by hydro. Hydro, for instance, when it operates, operates around the clock, particularly during the period when it is running. So the peak-type demand that shows up — those can either be handled by gas peakers, if we come in cheaper than batteries, and a third option is pumped storage; those are the three solutions for this short-term peak.
Nikhil Dhingra
executivePumped storage also stands out as the most competitive option when you're talking about an 8-hour to 8-hour solution.
Manoj Kumar Upadhyay
executivePumped storage is also very competitive for a solution of 8 hours to 8 hours, and bringing it in will take a long time — at least three, four years. So the way we look at it, over the next five to 10 years, from a macro standpoint, peaking demand — as in Europe and the US — is in fact rising higher and higher every year, so I expect the same thing to happen in India.
Nikhil Dhingra
executiveAlso regarding costs, just to give you some guidance on the technology side, sodium batteries are progressing well globally and in China. You’ve probably seen that at InterSolar they discussed supplying these batteries in Europe for cold climates. So on the cost front too, there are positives that could occur, which would extend battery life to, you could say, closer to the PSP timeline. So that’s a really key development that’s going to happen, which could shift profitability in terms of the overall peak power dynamics.
Yogesh Patil
analystSo your view is that a revenue run rate of roughly INR1,400 crore could be achievable within the next three to four years, given a capacity of about 10 gigawatt-hours under a short short-term contract, correct? And for our financial modeling over the coming two to three years, would it be fair to assume revenue of INR1,400 crore plus?
Nikhil Dhingra
executiveIt's a highly specific forecast we need to produce, taking into account the PPAs that we hold, correct, and also taking into account the pipeline that we have, right? Our goal is that we have to carry out this 10 gigawatt-hour of bids, which of course depends on the PPAs coming back. At present we have, so you can make that assumption for the coming two, three years, since we have that pipeline, right, and we know the GNA, and we know, so for the coming two, three years you are able to make that assumption,
Manoj Kumar Upadhyay
executiveYou're saying it's actually above INR1,400 crore?
Nikhil Dhingra
executiveActually, even more so — so that's, that's based on our PPA timeline, since it's quite specific, correct? So as we move forward, right, when it comes to securing new bids, when it comes to winning new business, our plan is that we'll keep growing that business, because this is what we believe in, that we ought to do peak power, right, past 2028-’29 is what I'm referring to, that we should keep pursuing such business which gives you this opportunity, because we like this business in terms of the speed — you could say the speed of implementation — in terms of how the technology moves, in terms of the basic demand-supply gap. So we — you can make that assumption for two, three years, but past two, three years it depends on the market, how, how we're able to secure those PPAs, how the profitability holds up for those PPAs, and naturally we'll keep looking for those opportunities to replicate this past two, three years as well.
Yogesh Patil
analystMoving on to the next question, which is about EBITDA margin. If we strip out the BESS revenue along with the EBITDA contribution coming from the BESS side, what would our clean or core EBITDA margins look like for the business in the quarter of FY ’27, and what guidance would you give for the core business’s EBITDA margin over the coming three, four quarters, taking into account that the BESS EBITDA margin would be 80% to 82%?
Nikhil Dhingra
executiveSo if you take BESS out of the picture, the EBITDA margin for this quarter comes to 91%, correct, and that's I believe with
Arun Chopra
executiveThat stays static — looking at the prior four quarters, it hovered near 90%, 91%, with the exception of Q2, when in September ’25 it came in at 88%, 89%.
Nikhil Dhingra
executiveBasically, that comes down to seasonality — it can range anywhere from 88% to 92%, or 88% to 91%. That's the way we're able to give you guidance on it, and as we said earlier, we continue doing repowering to keep improving it. So that's just how it stands, and further movement would depend on project profitability as well — for instance, there are FDRE projects coming up, which could help in revising this EBITDA margin, since the realizations on those are healthier compared with plain solar bids, and also it is, yeah, so those are the things.
Yogesh Patil
analystYes, thank you very much, sir, and best of luck.
Nikhil Dhingra
executiveI appreciate that.
Operator
operatorThanks so much, sir. Ladies and gentlemen, that was the final question for today. With that, we're wrapping up today's conference call. On behalf of ACME Solar Holdings Limited, that brings today's conference call to a close. Thank you for joining us, and you can disconnect your lines now. Thank you.
Nikhil Dhingra
executiveI appreciate that.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete ACME Solar Holdings Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to ACME Solar Holdings Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in ACME Solar Holdings Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.