Adani Enterprises Limited (512599) Earnings Call Transcript & Summary
October 28, 2026
Earnings Call Speaker Segments
Operator
operatorLadies and gentlemen, good day, and welcome to the Adani Enterprises Q2 FY '27 Earnings Conference Call. [Operator Instructions] I will now hand the conference over to Mr. Alok Deora. Thank you, and over to you.
Alok Deora
analystThank you. Good evening, everyone. On behalf of Motilal Oswal, I welcome you all to the 2Q FY '27 Earnings Call of Adani Enterprises. So we have with us the senior management from the company led by Mr. Arun Bansal, Chief Executive Officer, Adani Airport Holdings; Mr. Muralee Krishnan, Chief Executive Officer, Adani New Industries Solar Manufacturing; Mr. Rajesh Poddar, CFO, Adani Airport Holdings; Mr. Manan Vakharia, Head of Finance, Adani Enterprises; and Mr. Jitendra Khyalia, Investor Relations at Adani Enterprises. So I would now hand over the call to Mr. Arun Bansal to provide opening remarks, and then we can take up the Q&A. Thank you, and over to you, sir.
Arun Bansal
executiveThanks, Alok. Good evening, everyone. Thank you for joining us today for Adani Enterprises earnings call for the quarter and half year ended September 30, 2026. AEL's portfolio comprises primarily of infrastructure-focused businesses, which spans across energy and utilities, transport and logistics and primary industry. It is my pleasure to inform you that AEL achieved credit rating upgrade to AA Stable by CARE during the first week of October 2026. Its highest ever long-term rating in its credit history. This upgrade serves as an independent validation of AEL's disciplined capital management and tight fiscal prudence. As we informed in our earlier discussions, AEL's current fiscal results will reflect value unlock from investments made over the last few years and moving progressively from build-out phase to value realization phase. AEL has reported its highest ever half yearly EBITDA of INR 11,958 crores. The strong EBITDA delivered is testimony of incubation business model and the strength of our diversified business platform, backed by strong operating fundamentals, increasing asset maturity and the ramp-up of newly commissioned Adani New Industries module line capabilities. AEL is now well positioned to sustain this growth trajectory going forward. Moving to our half yearly financial performance. On a consolidated basis, total income increased to INR 71,569 crores, an increase of 62% year-over-year. EBITDA increased to INR 11,958 crores, an increase of 56% year-over-year. Continuing profit before tax increased to INR 3,297 crores, an increase of 45% year-over-year. Adani Airport Holding Limited EBITDA reported growth of 52% year-over-year to INR 3,275 crores. And KCL Copper EBITDA reported EBITDA of INR 2,033 crores. Now let me move to business-wise update. Our data center business. Adani Connex has signed up a new hyperscale contract of 240-megawatt capacity, taking cumulative contracted capacity to 1.2-plus gigawatt. During the quarter, we handed over additional 29.2 megawatt data center to customers, taking operational capacity to 94.6 megawatts. Moving to airport business. Adani Airport is one of India's largest private airport platforms, operating a portfolio of 8 airports, including the greenfield Navi Mumbai International Airport and contributing approximately 23% of India's passenger traffic and 29% of country's air cargo volume, underscoring our scale and strategic importance in India's aviation ecosystem. Adani Airports delivered a resilient performance during first half of this fiscal and achieved highest ever half yearly EBITDA of INR 3,275 crores, which is close to full year EBITDA of financial year '25. This growth is achieved despite industry headwinds like elevated fuel prices and airspace disturbances, which have weighed negatively on passenger traffic. The effort put in over the last few years in developing non-aero strategy and ecosystem have provided resilience in this atmosphere. Our greenfield development of Navi Mumbai International Airport commenced its international operations effective 15th July '26. Indian domestic airlines, IndiGo, Air India and Akasa recently announced their operational plans to commence international operations and progressively expand from Navi Mumbai Airport. Moving on to financial and operational bank performance during Q2 financial year '27. We handled passenger traffic of 21.3 million passengers, total income of INR 3,786 crores, up by 20% year-over-year. EBITDA of INR 1,641 crores, up by 55% year-over-year, and aero and non-aero revenue delivered year-over-year growth of 9% and 57%, respectively. During the quarter, we added 8 new routes and 4 new airlines. If I move to Mining Services portfolio, during the quarter, we dispatched volume up -- stood at 10.7 million metric tons, while revenue stand at INR 998 crores and EBITDA of INR 407 crores. In Integrated Resource Management business portfolio, during the quarter, trading volume stood at 7.4 million metric tons and revenue stood at INR 7,169 crores and EBITDA of INR 654 crores. In copper business, we are now seeing capacity ramp-up. During the quarter, copper sales volume of 80.6 kilotonnes with capacity utilization increased to 64% Revenue increased to INR 14,843 crores and EBITDA increased to INR 1,283 crores. With this, now I hand over the call to my colleague, Muralee Krishnan, CEO of Adani Solar. Over to you, Muralee.
Muralee Krishnan
executiveThank you, Arun. Good evening, ladies and gentlemen. Adani New Energy Ecosystem is developing an end-to-end integrated ecosystem for manufacturing solar modules and wind equipments. As all of you know, Adani Solar has featured in the Alight list of top 10 global solar module manufacturing and Adani Wind became the only Indian company in top 15 global wind turbine manufacturers. I'm happy to inform you that we have commissioned the remaining module line capacity of 4.3 gigawatts on 31st of August 2026, completing our expansion to 10 gigawatt module line capacity. We are on schedule to commission the solar cell line of 6 gigawatt by end of this financial year. During the quarter, domestic module sales have increased to 1,478 megawatts, up by 35 percentage year-on-year basis. This demonstrates strong demand of Adani solar modules in domestic market, which has fully absorbed the export intake. Now moving into the financials and operational performance of Q2 FY '27. The module sales was 1,478 megawatts, up by 35 percentage year-on-year. Wind turbine sales was to 35 sets, up by 25 percentage year-on-year. Total income stood at INR 3,669 crores with an EBITDA at INR 1,094 crores. Now the session is open for question and answers.
Operator
operator[Operator Instructions] We have the first question from the line of Manish Somaiya from Cantor.
Manish Somaiya
analystCan you hear me?
Operator
operatorYes, we can hear you, Manish.
Manish Somaiya
analystOkay. Wonderful. I wanted to ask my first question on the airport business, specifically on Navi Mumbai, perhaps if Arun can talk about the key traffic yield and cost milestones over the next 12, 15 months that we should be thinking about as that airport ramps up? And what are sort of some of the meaningful contributions to profitability and cash flow that we should think about?
Arun Bansal
executiveNo, thanks for your question. So NVL, as I said in my commentary, we started the commercial international operations from 26th of July. As you might have seen recently, together with Indian carriers, IndiGo, Akasa and Air India, we have announced the new international routes. Actually, IndiGo has announced 12 new routes from Navi Mumbai, starting from December up to April, summer scheduled '27. Air India Group has announced 7 international routes from Navi Mumbai and Akasa has announced additional. So that makes 19 international routes is existing from Navi Mumbai. Domestic also, we see a proportionate growth. So our guidance is that we will exit next financial year with full capacity at Navi Mumbai. So Navi Mumbai, as you know, the capacity we can handle is max 20 million, which is 5 million international and 15 million domestic. And we will exit next financial year, i.e., Q1 2028 running with a run rate of $5 million per quarter.
Manish Somaiya
analystOkay. That's helpful. And then on data centers, it's obviously great to see the tie-up with a new hyperscaler. The capacity is now 1.2 gigawatts plus. If you guys can help us understand how we should think about the commissioning schedule and what level of equity and CapEx we should be kind of baking in as we think about that?
Arun Bansal
executiveManan, over to you.
Manan Vakharia
executiveYes. So in terms of data center, we will stick to what we discussed in terms of our earnings call discussion during Q1 where we are expecting in the range of 120 to 150 megawatt of operational capacity as a capacity of when we exit FY '27, the current fiscal. And over the next 12 to 18 months, we will significantly ramp up all the remaining projects, and we should be expecting close to 500 megawatt of operational capacity, which will be -- which we will start billing to the customers. In terms of the CapEx and equity requirement is something where we expect this project to be funded at approximately 20-80 to 30-70 kind of scenario. And we will have the same CapEx numbers as generally are there for any other players because we are primarily in the core and Shell MEP and all the structure and we are not a full player where we install our servers also because that is in the scope of customers.
Manish Somaiya
analystOkay. And then just lastly on roads for me. Now that Ganga Expressway is operational, how should we think about the recurring toll and annuity income becoming sort of the dominant force when it comes to earnings because that's something that I think we have yet to see. So I'm hoping you can help us with some of the key milestones we should be watching for over the next few quarters.
Manan Vakharia
executiveSo I think we have -- starting last quarter, we have fairly entered into an area where the numbers in the P&L or the reported numbers reflect the annuity income as well as ongoing toll income. What we should expect going forward is the increase or the optimum utilization of the roads where the toll covers are to be generated. So as the traffic grows and as the traffic picks up across the lines of newly commissioned toll roads, including Gaga Expressway, you will see those ramp-up number coming in. But when you compare year-on-year because of how the IndAS accounting works for the service concession accounting, you will see some kind of variability in the revenue numbers. I understood pretty much that is your question. Otherwise, you will see the normalization has already happened, and you will see this continue for a few quarters in the next period. But as the construction starts for the new projects, you will see that again being reflected in the P&L.
Operator
operatorWe have the next question from the line of Mohit Kumar from ICICI Securities.
Mohit Kumar
analystMy first question is on the Bangalore tunnel project, I think the L1. Is there any update on that project if you can share?
Manan Vakharia
executiveNo. So it is at the same level. So that is what we know from the authorities that we are L1. There is no further development there as of.
Mohit Kumar
analystUnderstood. Coming back one suggestion for the road EBITDA. Of course, we understand that we are doing AST accounting. Is it possible to share the operational EBITDA going forward given that the -- of course, for the -- our last 3 projects have got operational for Ganja Expressway. Is it possible to share the operational EBITDA going forward in the PPT, that will be helpful for us.
Manan Vakharia
executiveSure, Mohit, you can include this, but for your reference and for the benefit of everybody, we will share the numbers over the call as well. So our EBITDA for roads business for Q2 is INR 354 crores and Q1 was INR 288 crores. So that takes us to a half yearly number of around INR 642 crores of EBITDA for roads.
Mohit Kumar
analystUnderstood. Coming back to the airport business, I think we are expecting to commence the work on Phase 2 of Navi Mumbai. Is there any -- can you just update us on that, given that the -- of course, the traffic is below par, are we postponing that CapEx? And the second question on the airport business is last year, if you look at the non-aero business, I think we took over the ground handling, I think somewhere in Q1 FY '26, right? And that particular revenue is not present in the base quarter, while you see that number is present in the Q1 and Q2 FY '27. Can you help us understand that line item?
Arun Bansal
executiveI'll take the first question, Arun here, and then Rajesh will help you with the second question on exact number. So Phase 2 of Navi Mumbai has already kicked off. We have already onboarded the international consultant and the design work is ongoing. We are also in the process of finalizing the GC contractor, which will be onboarded within very, very soon. So Phase 2 of Terminal 2 of Navi Mumbai, the actual work will start within the month of November this year.
Mohit Kumar
analystUnderstood. And on the ground handling, sir?
Arun Bansal
executiveYes. So in case of ground handling, Rajesh. So in case of ground handling, we had commenced operations at Mumbai, Ahmedabad, Navi Mumbai through 100% subsidiary, AGH Port. And during this particular H1, we have earned a revenue of around INR 339 crores for the 6 months period.
Mohit Kumar
analystSo this was not present last fiscal completely. Is it right?
Arun Bansal
executiveYes, it was not part of...
Manan Vakharia
executiveSo Mohit, the entity was acquired and in-sourced somewhere in the middle of November. So it actually was present for approximately 3 or 4 months in the last financial year. So yes, if you look at the half year number, it was not materially there.
Mohit Kumar
analystUnderstood. Understood. Now my question on the solar and wind. Sir, on this particular quarter, do you have any idea how much is sold in the rooftop? And are you thinking about setting up ingot and wafer now?
Muralee Krishnan
executiveSo there are 2 questions. One is that on the rooftop, actually 56% of our sale was into the rooftop. And in terms of ingot wafer, I would say that we already have 2.2 gigawatt of ingot wafer capacity and the balance capacity will come up by 2028, which we are already working on. The engineering work has already started. So that will well align with the ALM policy.
Mohit Kumar
analystSo you commenced work on the balance 8 gigawatt of ingot wafer. Is that understanding correct, sir?
Muralee Krishnan
executiveYes, it will be actually a bit more than 6 gigawatts because in the -- if you look at technically, the yield factor is approximately around 87 to 88 percentage to the nameplate capacity world over. So accordingly, the capacity installed will be slightly higher than the cell capacity what we have already in hand.
Mohit Kumar
analystUnderstood. So is it possible to share the solar order book and the wind order book at the end of Q2?
Muralee Krishnan
executiveSo in general, I can only say that our capacity is already booked for it, both for wind as well as solar. We will not be in a position to give you the exact number at this point in time, but I can assure you that the order book is already full.
Mohit Kumar
analystUnderstood, sir. Last question, sir, how much was CapEx done in H1? And is it possible to give us the broad breakup of the CapEx segment-wise?
Manan Vakharia
executiveMohit, what we have done is we have included staged FAQs as a part of our earnings presentation, where we have included a full breakup in the appendix for the CapEx.
Mohit Kumar
analystSure, sure. Understood. And sir, one more question, if I may ask. In your PPT for data center, I think there was the contract reservation, right, which was 1.2 gigawatt. I think this was shared, I think, by end of F '26. Do we have similar number for by end of Q2 FY '27?
Manan Vakharia
executiveSorry, come again?
Mohit Kumar
analystIn an investor PPT, which was shared earlier, there was a data center capacity of 1.2 gigawatts, which was under contract reservation. Can you help us understand the definition of contract reservation? And what is that number at the end of Q2 FY '27?
Manan Vakharia
executiveSo see, what you can refer our data center slide, what we have included as a part of our presentation. So we are constructing data centers of 1.4 gigawatt capacity.
Mohit Kumar
analystCorrect.
Manan Vakharia
executiveThose are at various stages. Out of this, the capacity of 1.2 gigawatt is already tied up and is at a different level of implementation and the project construction. And the remaining capacity is open, which can be taken up by everybody.
Mohit Kumar
analystMaybe I'll take it offline.
Operator
operatorWe have the next question from the line of Prateek Kumar from Jefferies.
Prateek Kumar
analystCongrats for a great set of results. My first question is on Airport business. Can you discuss progress on real estate CapEx and any specific milestone you are looking at by end of FY '27, FY '28 for Citywide development?
Arun Bansal
executiveYes. So Citywide development, we have signed the contract, the HMA for all the hotels we are building basically with our partners. The work is ongoing at 5 assets, Mumbai, Navi Mumbai, Ahmedabad, Jaipur -- sorry, Lucknow and Guwahati. And the work at Jaipur will start very, very soon. The Phase 1, as I call it, we will be live at Ahmedabad by October 29 at Mumbai and Navi Mumbai by March 2030. Then we are undertaking some major CapEx project on aeronautical side. As I said before, we are building a completely new terminal, Terminal 2 at Navi Mumbai. We are doing a redevelopment of Terminal 1 at Meal, which will start from Q1 next year. We are building a completely new integrated terminal at Ahmedabad in line with the Commonwealth Games, which Ahmedabad City will host in October 2030. So that terminal will be ready. And we are doing some minor additions of capacity at Terminal 2 in Mal, building additional capacity at Trivandrum and a new terminal at Jaipur. So there are a lot of CapEx -- heavy CapEx items, which are work in progress from now until 2029, 2030.
Prateek Kumar
analystSure. In the data center business, can you discuss the recent joint venture with Jabil Adani Jabil partnership? What is the scope of the business? And what is the -- is this a new CapEx which the company is envisaging? And other question on data center is like we do read about a lot of position for data center setup like particularly in Vizag and Navi Mumbai and where we are like looking to set up large projects. Can you discuss status of land acquisition or whatever is required for these projects, which just suggests that our projects are on time and we are looking at 2 gigawatt capacity by probably FY '30?
Manan Vakharia
executivePrateek, so you have 2 parts in your data center question. So I'll take first about Jabil. So yes, so the present joint venture, which is with EdgeConnex is completely a data center play in terms of it operates in building and constructing the data centers, core NL, ABP solutions and other related stuff, which you know about this. And what goes inside the data center is generally within the scope of customers. Now what we seek to do with Jabil is that it's a completely new development, different and separate from AdaniConneX, where Adani Enterprise and Jabil are looking to manufacture the AI racks and the data servers and related equipment. And the manufacturing facility set up -- will be set up in the country. So it is still at an MOU stage, and we are looking to finalize the definitive agreement over a few months. And once we have those signed, we will come up with the proper disclosure in line with the regulatory requirement, and we'll have the details included in our CapEx and other segments. So that was part of your question. On part 2, yes, the various data center locations, which we have defined in our earnings presentation, we have access to majority of those lands and are already acquired and are in the very advanced stage of completing the acquisition. So we are very confident that these projects will be completed as planned and as envisaged.
Prateek Kumar
analystAnd just to confirm, you said operational capacity moves from current 95 to 125 '27 and 500 by FY '28. Is that the number you said?
Manan Vakharia
executive500 over the next year, 18 months, yes. So practically, yes.
Prateek Kumar
analystSure. On Road segment, the performance or progress or the ramp-up at the new project seems a bit slow. Is that underwhelming versus company's own estimates? And how do you see like kind of progressing on a quarterly basis?
Manan Vakharia
executiveI think it is progressing well, but they are slightly off the mark where we would otherwise like those numbers to be in terms of the capacity ramp-up at the toll projects. But this is practically Q2 being a seasonally rainy season plus the heavy floods and the situation in the north part of the country. So we will discount that. But as we speak today, we are seeing a good progress at the increase towards what we are expecting the number to be. So yes, it's slightly off the mark currently. But yes, we will catch up in the next 2 quarters.
Prateek Kumar
analystLast 2 questions. Firstly, on Anil, we have commissioned new capacity of module. What is the run rate of volumes with the significant increase in capacity which we have now over the next 2 quarters?
Muralee Krishnan
executiveYes, we are expecting about 2 gigawatts for the next quarter. And that will be the run rate that we should be going with the new capacity coming in.
Prateek Kumar
analystAnd what is the mix of volumes [Audio Gap]
Unknown Executive
executive[Audio Gap] Number one, we are heavily investing in digitization. So we are working with Adani One app, which we have revamped to focus only on airports. And hence, we are able to increase the penetration year-over-year. This quarter, we had almost 25% of our non-aero transactions happened over digital. As a result of that, we are able to increase the average transaction value per passenger. We are able to increase the penetration. And the third thing is we are able to premiumize most of our shops. We have brought in new lounges on board. And of course, Navi Mumbai initial ramp-up also helped because Navi Mumbai, there was no non-aero revenue last year. So combination of all those has helped and partly also the ground handling services as one of the colleagues asked, there was no ground handling last year, which got incorporated this year. So multiple factors contributed to a strong non-aero growth.
Biplab Debbarma
analystNow...
Operator
operatorMr. Biplab, if you could come kindly closer to the microphone as we are unable to hear you very clearly.
Biplab Debbarma
analystIs it okay now?
Operator
operatorThis is much better, yes.
Biplab Debbarma
analystOkay. Okay. So my second question is on the CapEx commitment. You have quite significant CapEx expected in airports, in data centers, I think even in defense. So could you give us some kind of color on the CapEx commitment over the next 3 to 5 years? And which business segment will have significant CapEx? That's my second question.
Arun Bansal
executiveSo we have given the CapEx, which is already incurred as a part of our standard details in the presentation itself. In terms of the outlook, we will stick to what we outlined in our earnings call during Q1. So we expect to do the CapEx at a run rate of around INR 40,000 crores. So we may be somewhere in the INR 35,000 crores to INR 40,000 crores which is the rate we expect to continue over the next couple of years. INR 350 crores to INR 400 crores. And the heavy lifting will be done obviously by airports.
Biplab Debbarma
analystOkay. That's fair. And just wondering, sir, you had an excellent result. And what kind of EBITDA do you think in FY '27 we will end up with and the kind of margin that we think that we will do in FY '27, '28?
Arun Bansal
executiveI think Biplab, we refrain from giving any specific financial guidance. My apologies for not being able to answer this, but yes.
Operator
operatorWe have the next question from the line of Alok Deora from Motilal Oswal.
Alok Deora
analystCongratulations on decent numbers. Sir, I just had a couple of questions. The copper business has seen significant traction. So do we see this run rate kind of continuing? Or would we even see better run rate in coming quarters? So that is question one. And the second question is that we have been seeing that airlines being a little hesitant to move from the T12 airport to Navi Mumbai. So what kind of implications can we -- can it have on us? Or if you can just throw some light on that? Or is there any impact at all?
Muralee Krishnan
executiveSo let me answer the airline question, and then Manan, my colleague will answer the copper question. So airlines, of course, this is a very consultative and long drawn process where we need to get the confidence of airline that infrastructure is ready at Navi Mumbai, and it always happens whenever new infrastructure comes in. As you would have seen on this Sunday and Monday between 3 domestic carriers, we have announced the movement of between those 3 18 international flights from existing Mumbai to Navi Mumbai that catered for roughly yearly volume of 3 million. And we are in discussions with more airlines to move the traffic for us to be able to redevelop the T1. And we are fairly confident, as I said earlier, that we will end financial year '27, '28 with a run rate of 20 million, which is the peak capacity of Navi Mumbai. Over to you, for copper question.
Manan Vakharia
executiveThank you, sir. So copper is -- yes, so we have 2 very good quarters in terms of Q1 and Q2 and the Q2 has been very good. So if you look at the margins that we make on our revenue so EBITDA as a percent of revenue, it has been around 7% to 8.5% is the range where we have operated. But on a long-term basis, our estimate is because this is very commoditized business and the prices have ramped up in some of the byproducts like sulfuric acid. So that is something which have contributed to the good set of numbers. But on a long-term basis, yes, our utilization of the plant and the ramp-up will increase from 64% in Q2 to around 80%, 85% as we close this current financial year. So the absolute number will definitely increase in terms of revenue, but for current fiscal will be slightly higher. But yes, on a long-term basis, it will be around 4% to 6% is the range where we will operate as a margin. But yes, as we increase our utilization, the absolute number can be around the same number where we are.
Alok Deora
analystGot it, sir. Sir, just one follow-up on the airlines answer, which you had given. So just wanted to understand if there is any delay in airlines remaining airlines willing to shift the operation. So does it have any implication on us or it really does not change anything as far as we as an airport operator is concerned?
Arun Bansal
executiveNo. So the time line to start the redevelopment or demolishing part of T1, we will start from summer schedule, which is April 2027. So airlines will have to make a choice, certain airlines, not all, either they move to Navi Mumbai or temporarily stop flying to Mumbai. These are -- I'm mainly talking about international airlines. But there are very few discussions left, and I'm fairly confident that collaboratively in next 1 month, we would be able to come to a conclusion with those airlines also. There might be 1 or 2 airlines who decide not to operate from Mumbai for a couple of years, but that will have almost no impact on the overall passenger count.
Operator
operatorWe have the next question from the line of Prateek Singh from IIFL Capital.
Prateek Singh
analystThe first question is on the solar business. Just looking at it, it looks like realizations have fallen on a Q-o-Q basis, but EBITDA margins or EBITDA per unit has gone up. So what are the key 2, 3 parameters which are driving it?
Rajesh Poddar
executiveYes. So if you look at the Q1 results, what we have given as well as in the earnings call, we mentioned that we have closed some of the advanced order stations, which is approximately around INR 89 crores impact that has come up. So that is one of the main reason for this impact.
Arun Bansal
executiveDoes that answer your question?
Prateek Singh
analystYes. Understood. Now second, on the data center business, as you are incrementally signing contracts with multiple hyperscalers sequentially every quarter. On a like-to-like basis, I understand it might be difficult, but on a like-to-like basis, are you seeing an increase in rental rates over time in dollar terms?
Arun Bansal
executiveSo we can get you the specifics and come back on this. But broadly, there has been some increase in the rates over the last 6 months, but they are not material in terms of where we are looking at those numbers. So broadly the ROCE or the return on capital we were making earlier are stable in terms of the data center that is our scope of work.
Prateek Singh
analystUnderstand. But given that we lock in capital INR 60 to INR 80 crores per megawatt and we have seen commodity price inflation, there is a tightness in equipment supply as well. So there might be a risk that CapEx per megawatt would be going above what we earlier thought maybe 6, 7 months back. So is this something when we negotiate with hyperscalers, they agree and they agree to higher rates? Or we are still in the process where we want to lock in as much capacity as possible and at slightly higher rates than needed?
Arun Bansal
executiveWhen I answered earlier, what I meant was we protect the return on capital employed that we want to make as a part of this business. So wherever we are seeing the increased CapEx, that will be factored in when the billing is considered for the new or the new sign-up of the project which we are doing. So given that discounting for that, everything the rates are more or less stable in the broad range where we were.
Prateek Singh
analystUnderstood. My third question is on the copper business. So we have been hearing a lot, obviously, TCRC negative availability of concentrates is very tight globally. Have you been facing any issues sequentially in procuring supply or things are fine right now and we are able to procure supply at decent...
Arun Bansal
executiveSo far as the procurement of raw material is concerned, we have not seen any significant challenge in terms of what we are hearing otherwise in the market because we have some of the long-term contracts tied up to a significant part of our requirement that insulates us from such variations in the market. So as of now, we have not seen any situations where we are not able to procure the...
Prateek Singh
analystJust 2 bookkeeping questions very quickly. Your investments in JVs and associates is around INR 2,400 crores in first half, similar level which we did in the entire F '26. So to assume it's largely data center?
Arun Bansal
executivePrimarily data center, yes. You are saying investment in equity accounted investments, right?
Prateek Singh
analystCorrect.
Arun Bansal
executiveYes. So that is...
Prateek Singh
analystOkay. And the last question, I can take it offline also. So the other expenses line item in our P&L at INR 6,700 crores this quarter is the lowest in 3 years. What exactly is driving it?
Arun Bansal
executiveSo that will go down to, again, the Ind AS accounting of the service concession contracts where the construction of road activities are generally passed through P&L. That's why you see the P&L floated to the extent of revenue and expenses both because the construction expenses are passed through your P&L. And that is something which is causing the variation in the other expense.
Operator
operatorWe have the next question from the line of Kartik from Kotak Securities.
Kartik Kohli
analystVery strong growth. Is there an element of fixed portion of this non-aero revenue being accounted for, which is related to new shops being opened let's say, Navi Mumbai Airport or the newer renovated shops open Mumbai Airport. Is there a fixed element to this which is contributing to the growth on a Y-o-Y basis? That will be my first question.
Rajesh Poddar
executiveNo, thanks for the question. So there is one element which was specific to Q2, and that is the new hangar sale we have done at Navi Mumbai, which got recorded in Q2 financials. all the new opening of shops, new lounges, everything is a recurring business, which will continue.
Kartik Kohli
analystMy second question is on data centers. So it is more on the broader business. We wanted to understand that you sign up...
Arun Bansal
executiveWe can't hear you clearly.
Operator
operatorMr. Kartik request you kindly come closer to the microphone so we can hear you loud and clear.
Kartik Kohli
analystIs it better now?
Operator
operatorYes, we can hear you now.
Kartik Kohli
analystSo last thing on data center. I wanted to understand from a broader business perspective, now that you are signing contracts with a lot of hyperscalers across the globe and a lot of these players have undertaken a lot of debt. So is there a fail agreement with such hyperscalers in terms of take-or-pay agreements and any such protections that would allow you to recoup at least part of the revenues if such hyperscaler customers end up not taking up capacity in the event of the -- at least from their individual finance is not working out. Is there a fail for that?
Arun Bansal
executiveI think it is there as a part of normal contractual commitment. It is always there. There are safeguards the which are built out in any agreement as those are the on specifics of take-or-pay, I think we will have to check and come back after the contract and the...
Kartik Kohli
analystOkay. Understood. Secondly, on the services business within Adani Connex, just wanted to understand what sort of services are being envisaged there and what sort of contribution to overall margins that can come from there? Is there a sense we can get here?
Arun Bansal
executiveYou said Adani Connex, right?
Kartik Kohli
analystYes. So within the business, there is a managed service element and O&M element. I just wanted to get a sense of what sort of EBITDA contribution or at least on a margin contribution that can come from...
Arun Bansal
executiveSo I think we have not given publicly disclosed as a part of our presentation the data center number yet, which we plan to do somewhere towards the end of the year. So we will have the financial disclosure coming up there. So I think that is where we will try to include those breakups as well. But largely, the majority part of the revenue and the EBITDA will flow from the lease rental kind of mechanism where the offtake is taken up by the hyperscalers.
Kartik Kohli
analystUnderstood. Just to slip in one last question because you mentioned on copper that a major chunk of your raw material from that -- from the perspective of the copper business is already taken care of. Could you specify to what degree that you have a contract in place for your capacity utilization?
Arun Bansal
executiveIn terms of offtake or the procurement...
Kartik Kohli
analystProcurement, whatever...
Arun Bansal
executiveYes. So in terms of offtake, if you really look at, we have 2 joint ventures which are in-house in terms of the copper tubes. So that gives us assurance of the offtake for around 12% to 15% of our capacity. Excluding that, copper is something which gets imported in the country. So we are always demand heavy country against what is the supply available in the country. So that's why we are not very much worried about the offtake is concerned. In terms of procurement, we have already tied up approximately 50% to 60% of our long-term requirement on the long-term basis. And on a short-term basis, another 20% is already contracted. So we expect the plant to continue to operate towards the end of the year by 80%, 85%, as I highlighted earlier. So that's where -- I think -- so in that sense, we are fully secured from the supply chain economics as well as the...
Operator
operatorWe have the next question from the line of Prateek Kumar from Jefferies.
Prateek Kumar
analystI have just one question. We had acquired the assets by NCLT route earlier this year cement business and power business to the company. hotels and the big land parcel in all kind of remained Adani Enterprises. What are the plans for all these assets? [indiscernible] restart happened in Adane Enterprise itself...
Arun Bansal
executiveYou are right. The entity was Adani Enterprises, but the implementing agency for -- it was not Adani Enterprises. It was a private entity called Adani Infra India Limited. So nothing of the remains with us and is completely off the table for Adani so far as AEL is concerned.
Prateek Kumar
analystHotel projects and the land parcel is now of the company?
Arun Bansal
executiveWe have not contributed any equity or any funding the project. So we are...
Operator
operatorWe have the next question from the line of Deval Shah from RBSA Investment Manager. We're not able to hear you very well. Kindly come closer to the microphone. Yes, we can hear you now.
Deval Shah
analystYes. So I just wanted to get some more insight on the primary industry. I see that we have significantly increased our EBITDA, and this includes the metals, mining and the specialist manufacturing. Significantly probably would be contributed by the copper, but I would just like to get some more insight into this INR 5,000 crores.
Arun Bansal
executiveSo you are right. Primarily the increase which you see on the first slide or the second slide of the presentation has come from the copper. Apart from that, the major integrated resource management and the mining services for which we disclosed the results and the segmental numbers separately. And one more part, which is part of the primary industry is carmine. And that is against the last year because of the coal prices are good and the plant is running at an optimum capacity, the mine is running at an optimum capacity. EBITDA has started flowing from that as well. And that is where we have for the quarter 2, we have done an EBITDA of around INR 470 crores. And cumatively,DA INR 840 crores, which was our annual run rate expected. So because of the good prices, those numbers come remain.
Deval Shah
analystOkay. And about the special manufacturing -- so can you please give some more insight into it what sort of capital we are committing and the size which probably we are thinking of in terms of the revenue and the EBITDA?
Arun Bansal
executiveSo the specialized manufact is primarily that we refer to. And so in terms of the overall numbers that we are presenting, those are not very significant and that's why they do not pass the criteria of segment reporting. And hence, those are not separately reported. But yes, we are doing meaningful work there, but nothing which can be...
Deval Shah
analystOkay. And since last what I've seen that we have almost about 18% to 20% of our capital has gone into PVC. So can you please give us more insight on the time lines about the PVC business and where we are, some more insight into the entire segment?
Arun Bansal
executiveSo we are constructing 1 million metric ton capacity plant at Mundra and where it's approximately INR 26,000 crore CapEx that we are building up there. Out of which, I think we have already closed 60% mark in terms of the project spend as well as the construction on ground, which we propose to do there. So as per time line, the first part of the overall CapEx is expected to get commissioned in the next fiscal -- so that's where you will see some kind of numbers coming in. And after it gets commissioned over a period of next 6 to 9 months, the plant will get stabilized and we'll see the numbers going in. So that's where we are in the PVC. So the plant is progressing well and on schedule.
Deval Shah
analystOkay. So we have -- so to our understanding that we only have a plan for manufacturing the PVC, right? So anything apart from -- so is there anything else on the PVC line or it's just PVC or anything else on the chlor-alkali?
Arun Bansal
executiveSo yes, the chlor-alkali is also there. So PVC and related chemicals and the material around it.
Operator
operatorLadies and gentlemen, that was the last question. I now hand the conference over to the management for closing comments.
Arun Bansal
executiveThank you so much for all the questions, and we close this session. Thank you so much.
Operator
operatorOn behalf of Adani Enterprises, this concludes the conference. Thank you for joining us, and you may now disconnect your lines.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Adani Enterprises Limited transcript — plus 258,000+ transcripts from 12,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Adani Enterprises Limited earnings transcripts and 258,000+ others is available through the
EarningsCalls.dev REST API. Plans from $24.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Adani Enterprises Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.