Afcons Infrastructure Limited (AFCONS) Earnings Call Transcript & Summary

February 11, 2026

National Stock Exchange of India IN Industrials Construction and Engineering earnings

Earnings Call Speaker Segments

Operator

operator
#1

Good day, everyone, and welcome to the Q3 and 9 months FY2026 earnings conference call of Afcons Infrastructure Limited, hosted by DAM Capital Advisors Limited. Just a reminder that all participants will be in listen-only mode, and once the presentation wraps up, there will be a chance for you to ask questions. If you require any assistance during this call, please signal an operator by pressing star, then zero on your touchtone phone. Kindly note that this conference is being recorded. I'll now hand the conference over to Mr. Kishan Mundra from DAM Capital Advisors Limited. Thank you, and over to you, sir.

Kishan Mundra

operator
#2

Thank you, Pari. Good morning, everyone, and a warm welcome to Afcons Infrastructure's Q3 FY2026 earnings call. Management is with us today: Mr. Subramanian Krishnamurthy, Executive Chairman; Mr. Srinivasan Paramasivan, Managing Director; Mr. Ramesh Kumar Jha, the CFO; and Mr. Hitesh Singh, who heads corporate strategy. At this point, I'll hand the floor to Mr. Krishnamurthy for his opening remarks, after which we'll open the floor for Q&A. With that, over to you, sir.

Subramanian Krishnamurthy

executive
#3

Good morning, everyone. It's great to be speaking with all of you again. I want to thank our investors, analysts, and stakeholders for being here today. The presentation covering our financial results and investments for this quarter has been posted on the stock exchanges, and I trust you've had a chance to go through it. With me today are Mr. Paramasivan Srinivasan, our Managing Director; Mr. Ramesh Jha, our Chief Financial Officer; and Mr. Hitesh Singh, who leads corporate strategy at Afcons. Let me start by walking you through how we performed in the quarter that ended in December 2025. Over the 9-month period, revenue came in at ₹9,545 crore, which is a slight year-on-year dip of 0.9%. EBITDA grew 1.8% to ₹1,269 crore, and margin improved 35 basis points year-on-year to 13.3%. EBITDA does not include the one-time impact of the labor code. Profit after tax was ₹339 crore. Turning to Q3 FY2026, we posted revenue of ₹3,025 crore, down 9% year-on-year. EBITDA for the quarter came to ₹424 crore, with margins at 14%, which is a 50 basis point improvement year-on-year. Even with lower revenues, our margins have improved, and that is consistent with our guidance.

Subramanian Krishnamurthy

executive
#4

Profit after tax came in at ₹97 crore, against ₹149 crore in Q3 FY2025. That figure includes a one-time impact provisioning of ₹76.51 crore related to the new labor code. Our top line felt the effect of both execution-related issues and a general slowdown in infrastructure activity. A few recently won projects — among them certain quick turnaround, high-output jobs — are moving more slowly than we had expected. We also saw exceptional delays in converting certain large-value L1 projects. Another factor weighing on top-line growth was continued liquidity issues with certain government clients. We are actively working to overcome many of these impediments over the coming months. Beyond the financials, the quarter was marked by several operational milestones that highlight how deep our execution capabilities run. I am pleased to share, with immense pride, that Afcons completed the first 5.5 km TBM drive in the CIDCO water supply project — which also happens to be the first breakthrough for CIDCO. I would like to remind you that Afcons has set and broken its own record for the maximum length of tunneling of 777 m done in a month during this drive. The project team completed this activity 1 month ahead of schedule with remarkable accuracy, despite logistics and geotechnical challenges.

Subramanian Krishnamurthy

executive
#5

Sticking with the Afcons approach, the team pulled this off using creative methods, and one of those was chosen as the top paper at the Indian Lean Construction Conference in December 2025. The project also earned a merit award from the National Safety Council of India, for 2 million safe man-hours with no lost time injury. I'm proud as well to tell you that independent, prestigious recognitions during this quarter have confirmed our operational capabilities. Engineering News-Record, USA placed Afcons eighth among international marine and port facilities contractors and 12th among international bridge contractors in its 2025 rankings. Afcons has been named the Most Innovative Knowledge Enterprise at both India and global levels for the eighth time in a row. We are the only infrastructure company to earn this rare distinction for eight consecutive years. CII has approached our innovation drive, and they have given us the Grand Award for the top innovative company across all sectors and categories, and also in the service category. That means we are regarded as the most innovative company in the country. Looking forward, the operating environment for Afcons appears favorable.

Subramanian Krishnamurthy

executive
#6

While worldwide infrastructure work has generally been soft over the past 12 months because of geopolitical uncertainty, the pipeline of projects in the geographies we focus on has stayed strong, especially in the segments that interest us. According to various reports, this should strengthen even more. Through a robust ₹12.12 lakh crore allocation and other related policy announcements in the budget unveiled recently, the government in India has signaled continuity in its infrastructure growth policy. Ordering activity, though, has stayed subdued, particularly in our focus segments. We expect a pickup in Q4, in line with historical seasonality. That said, we have seen substantial growth opportunities that merit meeting our risk management criteria. Afcons will remain disciplined in pursuing growth, with a focus on operational excellence. I am confident in our ability to effectively navigate the challenges on our path, as we have demonstrated time and again, and to deliver long-term value to shareholders. Thank you for your continued support and trust. With that, I will now invite Mr. Paramasivan, our Managing Director, to share his remarks.

Paramasivan Srinivasan

executive
#7

Thank you, Mr. Subramanian, and good morning to all of you. I'd like to offer a warm welcome as well to every investor, analyst, and participant joining us. Your ongoing interest in Afcons means a lot to us, and we appreciate the engagement you bring into this discussion. As Mr. Subramanian laid out, the third quarter carried certain execution and sectoral headwinds that held back our performance. Even with our strongest efforts to soften those challenges, a few impacts lingered — mostly because of timing-related factors, not any structural problems inside the company. Our attention stays fixed on bringing the growth momentum back over the quarters ahead. Let me say a few words about the operating environment and how we expect it to develop. In India, the government has restated its long-term dedication to infrastructure development through the budget announced recently. Its vision for new high-speed rail corridors, dedicated freight corridors, and the development of tier 2 and tier 3 cities strengthens that continuity and gives the sector positive visibility. Beyond that, the push for domestic manufacturing of critical equipments, including construction equipments like TBM, is encouraging too, since it seeks to strengthen the Make in India initiative and also helps remove the challenges we saw when importing these equipments because of geopolitical issues. Turning to our focused international markets, we are continuing our drive across the international geographies and believe a healthy pipeline of projects exists, which gives us confidence that we will keep winning international jobs in our focus segments.

Paramasivan Srinivasan

executive
#8

Turning to the order book, I'm happy to report that we've recently won a road project in Uganda worth more than €100 million. That's an important win for us, since it strengthens the long-standing presence we have in Africa. At home, we picked up two marine contracts during the quarter valued at roughly ₹1,400 crore. These two contracts carry strategic importance for the government of India and fit with the wider goal of helping build infrastructure of national importance. With these awards in hand, total order inflow to date comes to about ₹3,700 crore, and our pending order book as of today is still healthy at ₹32,635 crore. Although inflows so far have fallen short of what we initially expected, we anticipate a few meaningful awards coming through in the current quarter, which ought to bolster our order book position. On that basis, we are hopeful of meeting our full-year order inflow guidance of ₹20,000 crore. Going forward, our project pipeline remains robust at approximately ₹3.8 trillion, spread across multiple geographies and sectors. Having said that, we are seeing competitive intensity rise in several segments, metros among them, where bids have grown increasingly aggressive. On the operational front, we remain cautious about our Jal Jeevan Mission projects in Uttar Pradesh.

Paramasivan Srinivasan

executive
#9

While the amount the government has set aside for Jal Jeevan Mission in this budget is roughly in line with last year's budget estimate, given what we've seen and the realities on the ground, we'd rather stay cautious. On our high-speed rail project, the second consignment of our TBM is still waiting for clearance. We're in close touch with the ministries and agencies involved to speed up the release, and we hope to see movement shortly. At the same time, we're working alongside the client and other stakeholders to assess alternative solutions so the impact on project timelines is kept to a minimum. In closing, our 9-month performance has been relatively flat because of the factors I've already described. While we're still striving for the 10% growth we guided to on the last call, a 5% growth looks clearly achievable. With a healthy order book, a deep and diversified pipeline, and a committed execution team, Afcons is well-positioned to regain momentum and accelerate growth in the periods ahead. We stay firmly focused on disciplined execution, prudent risk management, and delivering long-term value to all our stakeholders. Thank you once again for your confidence and continued support. I'll now hand the call over to our CFO, Mr. Ramesh Jha, who will take you through the details of our financial performance.

Ramesh Kumar Jha

executive
#10

Thank you, sir. Good morning, everyone. Before I get into the numbers, let me restate something I typically cover each quarter, and it matters even more this quarter: the quarterly figure fluctuates. Our company operates in construction. Margins in any given quarter shift depending on the nature, type, and quantum of work executed. Results for a quarter can differ from quarter to quarter and might not signal annual results or a trend. Now, specifically on the numbers: for the 9 months ended, we posted a top line of ₹9,545 crore, versus a 9-month top line of ₹9,635 crore last year, which means it has declined by 0.9%. In Q3, we achieved a top line of ₹3,025 crore against ₹3,332 crore in the prior year's Q3. There is a marginal degrowth in both the 9-month period and Q3. Now, this kind of top-line movement reflects stressed payments across projects and a few specific projects where certification and payments are slow. Jobs where we were declared L1 quite some time back have still not been awarded. Some recently bagged jobs have not picked up the way we expected. Also, a few fast-track projects are progressing at the normal pace.

Ramesh Kumar Jha

executive
#11

Turning now to margins. On the EBITDA front, across the 9-month period we posted ₹1,269 crore, equal to 13.3% of the top line, an improvement over last year's figure of 1,247, when the margin stood at 12.9%. So in percentage terms, EBITDA has risen. For the Q3 FY2026 quarter, we recorded ₹424 crore, and the EBITDA margin for that quarter comes to 14%, versus 13.5% in the quarter before. On that EBITDA figure, naturally, we have excluded the one-time exceptional provision tied to the labor code. That exceptional item relating to the labor code amounts to roughly ₹77 crore — ₹76.51 crore, to be precise, in this quarter. Turning to profit before tax, over the 9-month period we achieved ₹456 crore, and that figure is stated after making provision for this ₹76.5 crore labor code item. That equates to about 4.8%, against last year's 526, which was 5.5%. Looking at that 9-month figure of 4.8%, the exceptional item provision comes to roughly 80 basis points for the 9-month period.

Ramesh Kumar Jha

executive
#12

Turning to Q3, profit before tax came in at ₹123 crore, compared with ₹200 crore of profit before tax in Q3 FY2025. For the 9-month period, profit after tax stands at ₹339 crore versus ₹376 crore in the same 9 months of the prior year, and for the quarter, profit after tax is ₹97 crore, which works out to 3.2%, against ₹149 crore recorded last year. Now I'd just like to walk through EBITDA. When we calculate EBITDA, BG commission is treated as part of our operating expenditure. What we're referring to as EBITDA is after removing BG commission from operating expenditure. This quarter, due to a labor code-related provision, there is a one-time impact, which, of course, we have not factored into the EBITDA calculation. We have factored it into profit before tax and profit after tax. As for other income, in our calculation we include other income as part of other operating revenue. Here, as we explained earlier as well, our other income is something that forms part of operating revenue — items like arbitration interest, foreign currency exchange gain, and miscellaneous incomes are recurring and very integral to our business. Therefore, this needs to be considered as part of other operating income. For the 9-month period, this amount was ₹211 crore in other operating income.

Ramesh Kumar Jha

executive
#13

Because we've already hit a 13.3% EBITDA margin across 9 months, our full-year EBITDA ought to come in above the roughly 11% guidance we typically provide. That said, something could come along and knock us off course — I'm not pointing to any particular project, just noting that each year we hand out guidance of about 11%. We've already outperformed that, and every project we have is performing reasonably well. The annual figure should land above the annual guidance we normally give. For the 9 months, it stands at roughly 13.3%. On profits, the profit for the period mirrors last year's once you adjust for the one-off exceptional item tied to the labor code. Naturally, this incorporates some upside from the arbitration award as well as from margin gains on a few projects. In certain projects too, we might save on material cost and other operational improvements, and that has lifted the margin overall. Specifically on the rise in finance cost, our average borrowing cost for the 9 months of FY2026 has improved versus what we achieved in the same 9 months last year. During the 9 months, average borrowing went up.

Ramesh Kumar Jha

executive
#14

The reason for that is a blockage in working capital, since payments have not been flowing very smoothly across this 9-month period. Even though the average cost of borrowing has improved, the total interest cost on bank borrowings has risen. On top of that, interest-bearing advances for the period ending December 2025 have nearly doubled to roughly 40% of overall advances from customers, versus last year when the interest-bearing advance was around, say, 20%, 22% of total advances. This time it came in at about 39%, 40%. As a result, interest on customer advances has also gone up, which pushes the overall interest cost higher. We expect things to get better once our L1 orders materialize, since a large portion of the international orders carry interest-free advances. We have also provided for accelerated depreciation in this quarter. Out of total depreciation of ₹354 crore, more than 1% of the cost component within depreciation relates to accelerated depreciation. Our profit figures are after taking accelerated depreciation into account. On ROCE, for the 9 months it is around 14%, or 13.4% to be very precise, after considering exceptional items. We'll look at these numbers on an annual basis, because that will make more sense.

Ramesh Kumar Jha

executive
#15

On the networking capital front, it's still sitting at an elevated level. Since January we've seen some modest improvement in payments, but the stuck payments aren't budging, and that's the crux of the challenge. We anticipate better collection this quarter. Recovering a few of those stuck receivables, plus collecting good advances, should definitely improve things from where we stand today. On debt, the figure has stayed in a range similar to September's, at ₹3,633 crore gross and ₹2,779 crore net. Net debt to equity comes to roughly 0.5 times net worth. Where liquidity is concerned, the company is very comfortably placed, since we keep a very healthy cash and bank balance and hold a large amount of unused bank limits. On behalf of Afcons Infrastructure Limited, thank you all for joining this call. I'd now ask the moderator to open the floor for questions and answers. Thank you.

Operator

operator
#16

Thanks a lot. We’re moving into the Q&A portion now. If you’d like to ask something, press star and one on your touchtone phone. To take yourself out of the question queue, press star and two. We ask participants to use handsets when asking a question. Ladies and gentlemen, we’ll pause briefly while the question queue is put together. Our first question comes from Aditya at Investec. Please go ahead.

Aditya Bhartia

analyst
#17

Good morning, sir. My first question concerns where our projects stand at L1. These are projects that have remained stuck at the L1 stage for quite a while, and even the Croatia projects, I believe, are taking longer than we had anticipated. I just want to get a sense of how you expect them to be placed. Is there a risk that some of them could be canceled? That is my first question. My second question relates to margins, which have been quite strong over the last few quarters, and this has happened even though the overall pace of execution has not been very strong and, as you noted, competitive intensity has been quite high. What is really driving that, and how sustainable should we regard the current margins as being? Thank you, sir.

Ramesh Kumar Jha

executive
#18

Thanks, Aditya. First, regarding L1 status, let me start with Croatia. On Croatia, the railway project has reached an advanced stage of being awarded. We understand from the government that approvals at all levels are complete, and this will be the biggest contract Croatia has ever given to any contractor. So it is only waiting for the PM's approval. Once that happens, we are likely to have this job awarded very soon. Financial institutions and others have already granted their approval. As for road jobs, that is in process. There are a couple of road jobs where, I would say, bids were opened before ours, and those are being awarded now. After that, this one will be awarded. All 3 jobs in Croatia are on track for award. While the railway job can be expected anytime now, the road jobs could go toward the end of March or early next quarter. That is what we are waiting for. Regarding the Maharashtra jobs, from our interactions we learned that all 22 packages of the Maharashtra project jobs are going for rebid. Since more than 1 year has passed, land acquisition has not been completed in all the cases, they would like to have price discovery again, and therefore a repackaging could be done and it could go for rebid.

Ramesh Kumar Jha

executive
#19

That’s the indication we’ve received, although officially they haven’t said that. So for Maharashtra projects L1, under our internal plan, we don’t expect to win them in the near future. The second

Aditya Bhartia

analyst
#20

Does that also cover the Pune Ring Road projects, sir? Pune

Ramesh Kumar Jha

executive
#21

Regarding Ring Road and Nagpur-Gondia, from what we've gathered on both, changes are being made to them, and as a result, a rebid is coming. That's the signal we're getting. Officially, no word has come to us on that.

Aditya Bhartia

analyst
#22

Yes, yes, yes. A few of the Pune Ring Road packages had already been awarded, right? Is that not the situation?

Ramesh Kumar Jha

executive
#23

That was granted close to 2 years ago. This particular bid was solicited around Jan 2025. The bid got opened in Jan 2025. That one was awarded well before, around March or earlier in 2024. That portion of the work is currently underway. This portion of the work is what they are pursuing a rebid for, as we understand it.

Aditya Bhartia

analyst
#24

Got it, sir. Got it.

Hitesh Singh

executive
#25

Good morning. Aditya, regarding margins, let me split this into three parts. First, as we've said before, whenever we bid on a project, we always keep a margin threshold in mind, and that margin will remain in the project unless something goes completely wrong — only then would it not. Otherwise, we'll hold that kind of margin. That's the first point. Second, we've also mentioned that projects carry certain risk and contingency provisions, and we always strive to save on those risk and contingencies, make improvements to certain methods and designs, and thereby enhance the margin. That's the second aspect. Third, we've received some award, and because of that too, there's some upside. That's why, on a consistent basis, we say that an 11% EBITDA margin is something that will be there. If you look at, say, the last 10, 12 years, we've largely been there — some years maybe around, say, 9.5%, but by and large we're around, say, 10% plus, and in recent times 11% plus. That is something sustainable. The rest depends on how well we're able to save on those risk and contingencies, and if some arbitration award comes in, that also tends to lift it up.

Aditya Bhartia

analyst
#26

Got it, sir. So going forward, should we begin assuming that we can produce greater margins rather than 11%? Or does this look like somewhat of an anomaly, given perhaps certain arbitration awards we received and some projects that are close to completion?

Ramesh Kumar Jha

executive
#27

That 11% is certainly going to be there. The margin we're seeing right now isn't there purely because of the arbitration award, since the arbitration upside accounts for only a small fraction of it. The rest of it comes from the improvements we've made in the project. Some projects we're finishing ahead of schedule. On some projects we're improving designs and methods, and we're saving on certain costs. We're saving on some material procurement and other aspects. That's where this improvement is coming from. Without question, the margin will be north of 11%, but for the moment, let's keep it at 11% plus.

Aditya Bhartia

analyst
#28

Yes, sir, I understand. Thanks.

Operator

operator
#29

Thanks. Our next question comes from Mohit Kumar at ICICI Securities. Please go ahead.

Mohit Kumar

analyst
#30

Yeah. Morning, and thanks for the chance. My first question is, sir, revenue growth has been benign for the last couple of years, and order inflow has also been subdued for the last 9 months. I understand they're sitting on a large L1 position, but there's also likely some cancellation. My question is, in this context, how do you think about growth in FY2027? Revenue growth, yeah.

Ramesh Kumar Jha

executive
#31

Given that order intake has been delayed, a portion of those orders—spread out in staggered fashion—we had anticipated arriving throughout the year, and now they are all clustering toward the close of the current quarter, toward the final quarter of the year. Considering the mobilization and other requirements that projects of that size demand, in our view it is far too early to say what growth will look like in the next quarter. As soon as the orders are secured, we will return to you with specific guidance for the next year.

Mohit Kumar

analyst
#32

Got it. My second question concerns the Jal Jeevan Mission. What does the order book stand at presently? Naturally, during the last 9 months, I don't believe spending on Jal Jeevan Mission has been especially heavy. I also gather that things began picking up from January. Could you please shed some light on Jal Jeevan Mission orders and share how you see it and what you are observing on the ground at this point?

Ramesh Kumar Jha

executive
#33

When it comes to the Jal Jeevan Mission projects, the biggest issue we're facing is in UP. In UP, the pending balance order stands at roughly around

Hitesh Singh

executive
#34

₹500 crore.

Ramesh Kumar Jha

executive
#35

Apologies — it's approximately ₹500 crore. The client's current outstanding stands at ₹405 crore. Although meetings took place at the Chief Minister's level and so on as early as October, not much progress has occurred when it comes to cash flows. We're still waiting for cash flow to come in so that we can — in the meantime, whatever business decisions are required regarding the project, we've already made them by slowing down and likely trimming our establishment; those sorts of rational calls have been taken.

Hitesh Singh

executive
#36

Mohit, just to add on that, the balance order book tied to the Jal Jeevan Mission totals roughly ₹1,300 crore. As sir explained, UP accounts for ₹530 crore, and that's the largest portion. Another, let's say, ₹500-odd crore sits in MP, where we don't anticipate any issues. We're executing the work, submitting bills, and getting paid as well. In Rajasthan, we've begun the third job. There, roughly, let's say, ₹300-odd crore is in Rajasthan. Because it's at a very early stage, we don't foresee any challenge in Rajasthan. Altogether that's about ₹1,300 crore. UP is the one we need to watch, and in UP too, from January onwards, they've started releasing payment. We received close to ₹15 crore during the month of January. They've promised that they will release payment. We need to see how it plays out. Yes, Mohit.

Operator

operator
#37

Vishal, are you there? We're not getting any reply, so shall we go on to the following question, sir?

Paramasivan Srinivasan

executive
#38

Please continue.

Operator

operator
#39

Just a quick reminder for everyone: if you’d like to ask a question, press star and one now. Again, to ask a question, press star and one at this time. Our next question comes from Ashish Shah with HDFC Mutual Fund. Please go ahead.

Ashish Shah

analyst
#40

Thanks for taking the question. You noted earlier that a favorable arbitration outcome also would have affected margins in this quarter. From the notes to accounts, I see ₹165 crore of revenue has been recognized in the P&L related to the Chenab Bridge arbitration award. Could you clarify whether that ₹165 crore goes straight through to EBITDA and below, or whether some cost component is attached to it as well? What would the EBITDA impact of this ₹165 crore be? That is my first question, sir.

Ramesh Kumar Jha

executive
#41

It's not the entire amount that's hitting EBITDA. There's a cost component in there as well.

Ashish Shah

analyst
#42

Alright. Sir, could you give us a figure for what 165 does to EBITDA?

Ramesh Kumar Jha

executive
#43

We don't have that exact figure right now. As for the EBITDA impact, it might be—let's say—roughly 23% of that amount.

Ashish Shah

analyst
#44

24%. 23% to 24% out of 165. Okay. All right. That same note points out that we're still carrying another ₹115 crore on this particular project. The arbitration awarded us the full 243, and 115 is still outstanding. What's going to happen with that amount, sir? Do we need to impair it, or do we keep pursuing another round of arbitration for that 115? No,

Ramesh Kumar Jha

executive
#45

As far as this arbitration goes, it involves several accounts, and one of those cases has been resolved and we've received the award. The case concerning ₹115 crore will be taken up in due course.

Ashish Shah

analyst
#46

All right. That hasn't gone to a hearing yet, or anything along those lines.

Ramesh Kumar Jha

executive
#47

The arbitration process is still underway, and at some point the award is going to come down.

Ashish Shah

analyst
#48

Got it, sir. There's one more item we've disclosed as well. From what I've read — perhaps this is a small additional point — a bond in Gabon has been encashed for an amount equivalent to roughly ₹191 crore. Could you share anything on this: what actually happened, what impact it has on our numbers, and so on?

Ramesh Kumar Jha

executive
#49

Regarding Gabon, we're handling that project for a French fund — Meridiam, the France-based fund, through their own arm. It's a PPP project together with the Gabonese government, and we're the EPC player. Over 90% of the project was finished quite a while ago. It's been in use for more than 2 years at this point. Even so — originally this was a joint venture between Meridiam and Arise of Dubai. Arise of Dubai exited somewhere along the way, and we weren't aware of that fact. SAG is the client, and they carried on with this. They weren't taking over the project because, upon takeover, a lot of funds becomes due. At one stage we had even the government of Gabon telling them to take over. Fearing they'd have to pay the money, they proceeded with an encashment, and we went to court as well. The French court initially stayed the guarantee proceedings. Then, at the later hearing, while they largely agreed with our argument of abuse by the employer, they nonetheless said the EPC contract is independent and the bank guarantee contract is independent. So with the bank guarantee contract, there's no recourse but to pay.

Ramesh Kumar Jha

executive
#50

So that's the way the encashment took place. The ICC arbitration is already underway. We feel confident about it. It was over the course of this matter that we also came to learn certain facts that had surfaced for us while these legal proceedings were going on. We have strong confidence that we will win the award in the ICC arbitration. As far as this job goes, we don't anticipate any impact.

Ashish Shah

analyst
#51

That ₹191 crore, wouldn't it be sitting in debt today? To honor the bond, we would have had to take on debt. To that extent, our debt would have risen.

Ramesh Kumar Jha

executive
#52

Right.

Ashish Shah

analyst
#53

Okay. Sir, finally, regarding the execution constraints we discussed, my impression now is that the UP order book is only around 530-odd crore out of our total order book of roughly 30,000-odd crore. The TBM issue, of course, is still ongoing. Aside from UP, could you point to any particular project segments where progress has been slow? We understand the bullet train situation. In terms of at least the backlog, UP appears to be a fairly small amount within the overall picture.

Subramanian Krishnamurthy

executive
#54

Hey Ashish. It's really hard to get into the specifics of particular projects, but there are some domestic ones where we expected things to move ahead more quickly, and that's the assumption we built into our plans. For a range of reasons, progress hasn't been as quick as we'd expected. That's the reason this delay has come about. These are mostly domestic projects.

Ramesh Kumar Jha

executive
#55

This covers, in certain instances, adjustments to scope along with other factors, and those made it necessary for the whole plan to be changed entirely.

Ashish Shah

analyst
#56

All right. Regarding this execution run rate, are we seeing any signals, or is this

Subramanian Krishnamurthy

executive
#57

Is that what it looks like once normalized? That is indeed how it appears. Things will return to normal, since some scope changes exist and certain approvals were pending — those have come through and will come through in due course — and we expect the pace to catch up very soon.

Ashish Shah

analyst
#58

Okay, sir, thank you. Thanks so much.

Subramanian Krishnamurthy

executive
#59

Thanks, Ashish.

Operator

operator
#60

Thanks. Our next question comes from Shravan Shah at Dolat Capital. Please go ahead.

Shravan Shah

analyst
#61

Hello, sir. I have a few questions. To follow on from what was asked before: regarding the bond — the French one — please correct me if I have this wrong, but from what I understand, Meridiam French has already filed for bankruptcy. So when you say you're confident about recovering this 194-odd crore, could you explain how that would be possible?

Ramesh Kumar Jha

executive
#62

Let me just add one thing here — the project we're working on has Meridiam as its parent entity, but the work itself is being done for SAG, a Gabonese entity. This is a BOT project in Gabon, and it's for the government of Gabon. From the moment tolling begins, payment will come out of that toll revenue. Our recourse sits with the Gabonese entity, not with Meridiam, the French entity. The contract fell under French law — that's the reason the matter ended up in a French court. Other than that, it's with SAG.

Shravan Shah

analyst
#63

Alright, understood. A few additional questions. So when we mention that we're anticipating ₹20,000 crore of order inflows for FY2026, ₹3,700 crore, which includes this Uganda project, has already been secured. Now, all of Maharashtra, as one could put it, is cancelled. Could you help me make sense of this Croatia situation — the full ₹11,300 crore — even though you mentioned that the road portion might slip into April as well. In that ₹20,000 crore, are we counting the complete ₹11,300 crore as an LOA by March?

Ramesh Kumar Jha

executive
#64

We’d rather not get into specific jobs, since we want to keep things confidential among competitors and so on. With that in mind, it’s enough to say that at any given time you’d see roughly ₹40,000 to ₹50,000 crore of value in bids we’ve submitted that are always waiting to be opened—that kind of thing is very much there—plus there’s Croatia, which is at an advanced stage, and a few others that are also at an advanced stage. In some cases, they’re at the final stages of closure and all that. So we’re confident of hitting our guidance of ₹20,000 crore for the year, and the balance of about 16,000 and odd crore—₹16,300 crore—we’re confident of achieving during the current quarter.

Shravan Shah

analyst
#65

Right, so I was hoping to get some clarity on whether that remaining 16,000 figure represents the full amount for the new item we're considering, rather than the conversion of L1 over to LOA, Croatia?

Paramasivan Srinivasan

executive
#66

Right. In that figure, the only item we've included is the Croatia rail project, which comes to roughly ₹6,500 crore. Everything else falls under the new projects that are currently in the tendering phase. Within that ₹16,300 crore, we haven't counted any other L1.

Shravan Shah

analyst
#67

And then looking ahead as well, this sort of run rate — ₹20,000 crore — is that roughly what we should be thinking about maybe in FY2027 and '28 too? Is that how one should see it?

Paramasivan Srinivasan

executive
#68

That's the goal, and for order booking next year we'll also be aiming at roughly ₹20,000 crore.

Shravan Shah

analyst
#69

When it comes to execution, at the start, sir noted that we're still hoping for 10% growth across the whole full year, though 5% is achievable. Even if I run the math on 5%, that implies in Q4 we'd need something like a 20%, 19% growth. That implies roughly a ₹3,500 crore figure, which is a ₹3,800 crore figure. Roughly a ₹1,000 crore QoQ improvement. Are we already seeing that sort of improvement at the project level? Because you also pointed out that there are still payment issues, scope change, all these things. I just wanted to understand.

Paramasivan Srinivasan

executive
#70

So roughly speaking, within 40 days we've already completed about 1/3 of whatever the target is for quarter 4 in order to reach 5%. That should give you a sense of how confident we are.

Shravan Shah

analyst
#71

Right. Understood. I've got that. On a few balance sheet items — you mentioned gross debt and net debt, but I missed that portion. Could you spell it out again? And perhaps debtor, inventory, creditors, mobilization, retention, unbilled — if you could share those, it would help in understanding how working capital is moving.

Ramesh Kumar Jha

executive
#72

On working capital right now, I don’t have the complete breakup, though I can share the debt figure. Gross debt comes to ₹3,634 crore on a gross basis, while net debt stands at 2,779. Overall, the balance sheet metrics are broadly in line with what we saw in September, and those figures are already included in the presentation.

Shravan Shah

analyst
#73

Right, got it. So for capex up to this point, across 9 months, what's the total we've spent? We were thinking around 1,100-odd crore. What does that come to for the full year, and perhaps for next year as well, if you're able to give that?

Ramesh Kumar Jha

executive
#74

Regarding capital expenditure, for the current financial year, as you correctly noted, we had earmarked ₹1,100 crore. Within that ₹1,100 crore, the tunnel boring machine tied to this high-speed rail project accounts for roughly ₹700 crore. The remaining ₹400 crore is what we intend to carry out. This TBM depends on movement from China. Should the approval come through, we would land at approximately ₹1,100 crore for this financial year. If that does not occur, we may instead come in at around ₹400 crore.

Shravan Shah

analyst
#75

All right, so through 9 months so far, how much have we gotten done at this point?

Ramesh Kumar Jha

executive
#76

Across 9 months, we've achieved approximately ₹200 crore.

Shravan Shah

analyst
#77

All right, so in H1 I believe that figure stood at 230-odd crore, and nothing has been—

Ramesh Kumar Jha

executive
#78

The figure is roughly comparable. Typically, capital expenditures don’t follow a proportionate pattern month by month. These are high-value equipment items, and the timing shifts, which is how they end up being recorded.

Shravan Shah

analyst
#79

All right. Suppose this ₹700 crore TBM slips into the following year — then for next year, could one be looking at capex of this 700 plus perhaps another 700, so somewhere around ₹1,400 to ₹1,500 crore?

Ramesh Kumar Jha

executive
#80

We have to look at this closely, since with a lot of the projects, the way we viewed things at the start of FY2026, several projects were already underway, and at that point we expected new projects to come in. As things stand right now, the projects that exist will be finishing up. A big portion of the equipment will be freed up from those current projects. You won't simply add 700 plus 700 directly. We need to rationalize it. It will be, let's say, roughly, if this TBM slips into the following year, then capex of about ₹1,000, ₹1,100 crore will be there.

Shravan Shah

analyst
#81

Finally, if we look at the current order book we have, which is 32,500, and perhaps add this 1,000 crore from Uganda, and assume no additional inflows arrive, how much revenue could one expect in FY2027 from that 33,000 to 34,000-odd crore?

Ramesh Kumar Jha

executive
#82

We’ll revisit that figure, perhaps in the next quarter, since it’s still too soon—we need to complete the detailed planning.

Shravan Shah

analyst
#83

On the whole, is that 3-year execution? That's one way to view it, or it might be a 3

Ramesh Kumar Jha

executive
#84

And a year and a half? Our average execution period is 2 and a 1/2 years. That is what we have consistently communicated.

Shravan Shah

analyst
#85

Alright. Alright. Thanks, and best of luck to you, sir.

Ramesh Kumar Jha

executive
#86

Thanks.

Operator

operator
#87

Thanks. Our next question comes from Balasubrahmanyam at Arihant Capital. Go ahead.

Balasubramanian A

analyst
#88

Good morning, sir. Thanks a lot for giving me the chance to ask. Sir, on this Vadhavan Port, the technical bid has been opened, and the estimate is roughly ₹5,100 crore. When can we expect the award, sir? It says Q4.

Hitesh Singh

executive
#89

Regarding Vadhavan Port, a security clearance process has been initiated for every bidder. Normally, with a lot of government contracts, only the bidder that wins gets subjected to the security clearance. In this case, they have stated that every bidder will undergo security clearance. They are still waiting on the security clearance. As soon as the security clearance is received, the bid can be opened.

Balasubramanian A

analyst
#90

Sir, if I may — I believe our interest-bearing advances have risen to somewhere between 20% and 40%, and that pushes interest cost up. Once international orders come in, how will that mix shift?

Hitesh Singh

executive
#91

We’re seeing more than ₹11,000 crore of international orders where we’re L1, and on some domestic projects as well we receive interest-free advances. From what we’ve observed over the last 3, 4 years, the interest-bearing portion has typically been around, say, 20%, 25%. Right now it’s at a somewhat elevated level. Putting an exact percentage on it is difficult, but you can take the guidance that previously it was around 20%,

Balasubramanian A

analyst
#92

Twenty-five percent. Thank you, sir.

Hitesh Singh

executive
#93

I appreciate that.

Operator

operator
#94

Thanks. We’ll take the next question from Vaibhav Shah at JM Financial. Go ahead.

Vaibhav Shah

analyst
#95

Yeah. Sir, where does our total L1 position stand right now?

Ramesh Kumar Jha

executive
#96

Our total L1 position stands at ₹11,300 crore. Within that L1 position, the Maharashtra job has been taken out, since what we have internally on that one is that these are headed for rebid.

Vaibhav Shah

analyst
#97

Alright. Sir, in terms of EPC, how large might the Vadhavan opportunity be for us over the medium term?

Ramesh Kumar Jha

executive
#98

Regarding Vadhavan, we've submitted solid bids at this point, and we're also taking part in the bidding for the remaining contracts. In our view, Vadhavan Port holds attractive opportunities.

Vaibhav Shah

analyst
#99

Could you put a number on the size of that opportunity?

Ramesh Kumar Jha

executive
#100

Those figures are estimates, and they could be for the total — if you're looking at EPC value, it lands somewhere around ₹15,000 crore.

Vaibhav Shah

analyst
#101

Are we putting in bids on every one of those packages?

Ramesh Kumar Jha

executive
#102

Yes. There's one package that was awarded where we hadn't taken part — roughly ₹1,300 crore. Every other package, we're in the mix. We've either already participated or we're participating.

Vaibhav Shah

analyst
#103

All right. Sir, how big is our bid pipeline right now, and could you break that down by the main verticals?

Ramesh Kumar Jha

executive
#104

Right. Our present bid pipeline, extending over the coming 2 years, stands at nearly ₹3.8 trillion. It's nicely distributed among all the segments — all four key segments in which we're actively taking part. The biggest portion, roughly 35%, sits in urban infrastructure, which handles metro, bridges, elevated corridors, and things of that nature. About 30% is in hydro and underground, covering water, road tunnels, and similar works. Nearly 20% falls under marine and industrial business, and roughly 15% will be in surface transport, meaning our road business and railways business. As for domestic versus overseas, about 1/3 will be overseas and 2/3 domestic.

Vaibhav Shah

analyst
#105

All right. Last question from me, sir: when do you anticipate NHAI awarding picking up? And what does our pipeline from NHAI specifically look like at the moment?

Ramesh Kumar Jha

executive
#106

On NHAI, our participation is highly selective, purely because the qualification bar is set so loosely. Lately they've mentioned that we've been in ongoing dialogue with both NHAI and the MoRTH office, and recently they've signaled an intention to return to the earlier approach where large-value contracts are awarded on a prequalified basis — that sort of thing. Implementation is still nowhere to be seen. Given the execution delays NHAI is currently facing, they're considering reverting to that prior model. Right now, under the new format that's emerging, each bid draws roughly 18, 20, 30 bidders, with pricing dropping as far as -40%. That's not a market we wish to operate in. Our approach to NHAI bidding will be extremely selective.

Vaibhav Shah

analyst
#107

Okay. Sir, and finally, do we have any room for BOT opportunities?

Ramesh Kumar Jha

executive
#108

Regarding BOT, our plan isn’t to take part as a BOT player. As an EPC player, we would team up with concessionaires. If qualification rules or other needs call for a small nominal stake to be held, we might view that positively. Beyond that, we’re looking at investors or comparable concessionaires who bid for it while we serve as the EPC partner. That’s the approach we have in mind.

Vaibhav Shah

analyst
#109

All right. Thanks very much, sir. That covers what I wanted to ask.

Ramesh Kumar Jha

executive
#110

Thanks.

Operator

operator
#111

Thanks. Before we move on to the next question, we'd like to remind everyone that you can press star and one to ask a question. Our next question comes from Mudit Bhandari at IIFL Capital. Please go ahead.

Mudit Bhandari

analyst
#112

Hello, sir. My question concerns execution. If you examine the order book and leave out all JJM and the other projects you mentioned, even so, we have quite good visibility. You noted there are certain clearances or approvals still pending, along with a change in scope. Could you quantify how much of these projects is still awaiting clearance or is going through changes?

Hitesh Singh

executive
#113

Mudit, putting a number on those projects is really tough. Some of them are only just starting execution, and that's the reason for the teething problems. Usually this type of issue comes up and gets sorted out fast, but with a few projects it's taken longer. That's one side of it. The other piece is that with certain projects we thought the turnaround would happen much, much faster, and it hasn't. So it's a combination of those two things, but it's very hard to put a figure on how many projects are going through this. As we said before, most of the teething issues are now resolved, and we expect to see the benefit of that in this quarter.

Mudit Bhandari

analyst
#114

Understood, sir. Do you have any color on which part of this project that will be?

Hitesh Singh

executive
#115

Once more, it breaks down mainly into three segments: the urban infrastructure business, the marine business, and the hydro and underground business as well.

Mudit Bhandari

analyst
#116

Understood. So our expectation is that these approvals — or at least most of them — will come through during this quarter?

Hitesh Singh

executive
#117

That has taken longer than we expected, and they have already come through.

Mudit Bhandari

analyst
#118

You're saying that every one of the approvals has already come through.

Hitesh Singh

executive
#119

The majority of those have arrived.

Mudit Bhandari

analyst
#120

Right. That’s the reason it gives us confidence that we can achieve booster growth in 4Q.

Operator

operator
#121

Thanks. Our next question comes from Bhavin Modi at Anand Rathi Financial Services Limited. Go ahead, please.

Bhavin Modi

analyst
#122

Sir, just a single question. Regarding the bullet train projects, how much work have we actually executed? And how much of that has been recognized in revenue?

Ramesh Kumar Jha

executive
#123

Once more, when it comes to figures tied to a specific project, we'd rather not share those at this point. On the percentage side, we can say that roughly 30% of the project has been finished — that's the physical progress — and on that basis, both revenue and cost have been recorded.

Bhavin Modi

analyst
#124

Right, sir, we haven't billed the client yet, correct? This is going to sit as unbilled revenue.

Ramesh Kumar Jha

executive
#125

No, no, no. What I’m saying is that 30% of the project is complete. So costs have been recorded, revenue has been recorded as well, and billing occurs according to the payment milestones. For the most part, it will be finished. Billing has already taken place. Just to give some perspective, there’s NATM tunneling, there’s TBM tunneling, and there’s shaft creation tied to TBM tunneling and other such items. Apart from the TBM-related work, most of the remaining work is done. There are a few other buildings and so on, and those can be finished only once TBM tunneling is complete. Beyond that, everything else is, by and large, in the final stages of completion.

Bhavin Modi

analyst
#126

Understood. Understood. That's all I have to say. Thanks.

Operator

operator
#127

Thank you. Ladies and gentlemen, that was the last question for today. I now hand over the conference to management for closing comments. Over to you, sir.

Ramesh Kumar Jha

executive
#128

We appreciate all of you staying interested in us. Our confidence is strong that Afcons will generate value over the long term for every stakeholder. Keep your investment with us, and we will be glad to have you with us on the journey. Thank you.

Operator

operator
#129

I appreciate that.

Ramesh Kumar Jha

executive
#130

Let me say again that although numerous IT firms and other businesses run operations in India, and a lot of those are viewed as innovative, the fact that CII has picked us out across segments as the most innovative company is something really, really distinctive. Within a construction sector, receiving that sort of recognition is quite uncommon. That's because innovation tends to be measured in manufacturing or similar areas. For a construction sector spanning many remote projects, being named the most innovative company is a very special honor. I'm quite certain everyone of you would agree with that. Thank you so much.

Operator

operator
#131

Thanks. That brings this conference to a close on behalf of DAM Capital Advisors Limited. We appreciate your participation, and you can go ahead and disconnect your lines now. Thank you.

Subramanian Krishnamurthy

executive
#132

Thanks.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Afcons Infrastructure Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Afcons Infrastructure Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Afcons Infrastructure Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.