executiveThanks, and good morning, everyone — welcome. Before management gives its official comments, we have to point out that certain things we say today might count as forward-looking statements under securities law, and those carry quite a few risks and uncertainties. Because of that, we want to warn you that numerous factors exist — many outside our control — that might lead actual outcomes and events to turn out materially different from what those forward-looking statements describe. If you want a fuller picture of the risks, uncertainties, and assumptions tied to our forward-looking statements, please look at the disclosures in our earnings release and the public filings we've made with the Securities and Exchange Commission. Apart from situations where the law demands it, we take no obligation or commitment to revise forward-looking statements so they capture circumstances or events arising after the moment such statements are issued. We'll also cover non-GAAP financial metrics, and as you weigh these metrics, we urge you to carefully read our disclosures in the reconciliation tables to the applicable GAAP measures in our earnings release. For thorough disclosures and descriptions of our business, plus uncertainties and other shifting circumstances — including, without limitation, risks and uncertainties identified under the caption risk factors and our IPO prospectus — we point you to our filings with the Securities and Exchange Commission. You can obtain Applied Blockchain Securities and Exchange Commission filings at no cost by going to the SEC website @sec.gov. One more thing: I'd like to let everyone know this call is being recorded and will be accessible through a link in the investor relations section of Applied Blockchain’s website. At this point I'd like to hand the call over to Applied Blockchain’s Chairman and CEO, Wes Cummins. Sir, please proceed.
Wes Cummins
executiveThanks, Jeff. Good afternoon, everyone, and thanks for being with us on the call covering our fiscal fourth quarter and full year 2022. We're a young company, but we've kept busy, and it's a pleasure to walk you through our progress today. To start, I'd like to draw attention to what we delivered in the fiscal fourth quarter, where revenue came in at $7.5 million, ahead of the $7 million to 7.4 million we had guided, a range that itself had already been lifted from our original $5.7 million to 6.2 million. Our first data center, which sits in Jamestown, North Dakota, has largely done very well on the things we can control. That facility powered up in late January, and by June more than 90 megawatts of its 100 megawatt nameplate capacity was online. That said, as we shared in mid-July, an equipment failure nobody anticipated occurred at the substation supplying power to the site, which caused a partial outage of roughly 50%. We anticipated that the power provider would bring full capacity back by early September, and they proved to be an excellent partner, working diligently and restoring full capacity in mid-August. As a reminder, no damage occurred at the Jamestown facility, it remains fully operational, and it can host the full 100 megawatts of capacity. As one anecdote, we heard from employees at that power provider who have decades of experience that they had encountered this problem only a handful of times over a career. So it really is a rare force majeure type of event. We're also still making headway on growing our co-hosting capabilities by building out and expecting to energize additional facilities. Our second facility shares a site with a wind farm in Garden City, Texas, and has plant capacity of 200 megawatts. Construction got underway in late April, the first buildings are up, and most of the electrical equipment needed is already on site. Our base case expectation is that we will start energizing Garden City in the fourth calendar quarter of 2022; however, we're ahead of schedule right now, so the start date could potentially move up. Our third facility, located in North Dakota at a site separate from our existing Jamestown facility, is likewise continuing to advance; we've signed a letter-of-intent with the utility and are in the late stages of design and pre-construction. Additionally, on August 15, we signed a purchase agreement for the raw land to help the site. We expect groundbreaking to occur in the third calendar quarter of 2022, with energization to begin early in the first half of calendar ‘23. For reference, we're a few weeks ahead of where we stood with our Jamestown facility at this point last year. With a slightly earlier start and significantly more experience, I would expect us to be able to bring this facility online a little earlier than we did with Jamestown. Now, this growth would not be possible without strong demand from a quality customer base. Let me pause here and restate one piece of how we operate. From day one, our approach has been to align ourselves with several of the most reputable and well-known organizations in the crypto space, and those relationships gave us know-how and assets right from our earliest days as we got our co-hosting operation off the ground. These partners haven't just put money into our business — they've also signed multiyear contracts for substantial power capacity with us. As a matter of fact, they've reserved all 100 megawatts at our Jamestown location, plus 85 megawatts at our second site, which gives us a revenue stream going forward that carries little risk. We follow a model where customers lock in capacity before we start construction on any site, and that meaningfully lowers our risk exposure while keeping us from having to put up datacenters on speculation that demand will eventually show up. Right now, every bit of plant hosting capacity is fully spoken for, whether by contract or by option. Beyond those strong partners, we also made a definitive move into serving public Bitcoin miners through the major agreement with Marathon Digital Holdings that we made public in July. Previously, we've shared with many of you our belief that publicly traded Bitcoin miners would wind up needing co-hosting services like ours. So it makes us proud that a top bitcoin miner — Marathon — chose us to handle their hosting requirements. Regarding the specifics of that Marathon contract, they signed a five year agreement with us covering 200 megawatts of hosting capacity, with an option allowing expansion of the deal to 270 megawatts. We anticipate hosting part of their contract at the Garden City facility I mentioned earlier, with the rest going to a third facility we're currently developing in North Dakota. Our expectation is to start energizing Marathon's miners during the fourth calendar quarter of 2022. And every miner tied to that 200 megawatt contract should be energized by the middle of calendar 2023. At this point I'll hand the call to our CFO, David Rench, who will take you through our financials and then give some closing remarks. David?
David Rench
executiveThanks, Wes. Good afternoon, everyone. I want to mention before I get into my comments that, just like on last quarter's call, we won't be offering any comparison to the prior year, because we had no operations during that comparable period. For the fiscal fourth quarter, revenues came in at $7.5 million, which, as Wes said earlier, exceeded the guidance we had given of $7 million to $7.4 million, and that guidance had already been raised from our original range of $5.7 to $6.2 million. All of that revenue came from our hosting operations, since we're still ramping up power generation at our first hosting facility, located in Jamestown, North Dakota. Upfront payments are not included in hosting revenue; those get recorded as deposits or deferred revenue. Our cost of revenues for the fiscal fourth quarter was $7.4 million. Electricity costs tied to Jamestown make up the bulk of that cost of revenue. The remaining costs include personnel expenses for employees working directly at the hosting facility, plus depreciation for equipment and service and hosting facility. Selling, general and administrative costs accounted for almost all of our total operating expenses in the fiscal fourth quarter, which were $4.3 million. Adjusted net loss from continuing operations for the fiscal fourth quarter came to $4.3 million, or $0.06 per diluted share, using a weighted average fully diluted share count of $76.6 million during the quarter. During the fiscal fourth quarter, we recorded a net gain from discontinued operations of $1.8 million. Mining revenues and a gain on the purchase and subsequent resale of miners account for that figure. Our net loss for the fourth quarter was $2.8 million, or $0.04 per diluted share, again based on a weighted average fully diluted share count of $76.6 million during the quarter. Adjusted EBITDA, a non GAAP measure, for the fiscal fourth quarter showed a loss of $3.1 million, which beat our guidance for a loss of $4 million to $4.6 million. Finally, turning to our balance sheet, we closed out the fourth quarter of 2022 with $46.3 million in cash and equivalents along with $7.2 million in debt. We also finished the quarter with roughly 97.8 million shares outstanding. As a reminder, we converted all of our outstanding preferred stock into common stock at the same time as our IPO in April 2022. After our fiscal year ended, we announced the share count reduction tied to SparkPool leasing cryptocurrency operations and failing to fulfill its obligation under a past service agreement. Because of that, you'll see that our outstanding share count as of the end of August, as shown in our 10-K, was approximately $92.8 million. Also, back in August we announced that we had agreed to a $15 million credit facility with the North Dakota based thing, and the proceeds from that facility will go toward repaying our existing debt and giving us extra liquidity to fund our ongoing datacenter buildup. I should point out that because of economic incentives tied to the state, we anticipate a 1.5% interest rate across the initial 13 months, after which it goes back to 6.5% for whatever remains of the term. Now, moving on to guidance for the fiscal first quarter that closes on August 31, 2022: our expectation for revenue is somewhere between $6.5 million and $6.9 million, which works out to $6.7 million at the mid-point, and we anticipate an adjusted EBITDA loss somewhere from $2.2 million to $1.8 million, or $2 million at the midpoint. Keep in mind these guidance numbers take a hit from the constrained power available at the Jamestown datacenter, a situation that got resolved in mid-August. That wraps up my financial summary. At this point I'll hand the call over to Wes for closing remarks.
Wes Cummins
executiveThanks, David. As we finish up the remarks we'd readied, I want to bring you up to speed on how robust the appetite for what we offer continues to be, despite all the press coverage regarding turbulence in digital assets. The core idea behind our strategy hasn't changed: when it comes to the majority of businesses mining Bitcoin, securing electricity at a fair price along with the supporting infrastructure is still the biggest constraint, and that cash rate just keeps climbing. Given that situation, mining companies remain very eager to strike deals with Applied Blockchain, which puts us in a highly favorable spot for expansion — we're able to construct datacenters with the income basically locked in through contracts before we've even started digging. On top of that, we continue to hold productive conversations with several prospective clients outside the cryptocurrency space. During our previous discussion, we mentioned that we plan to provide hardware hosting for additional use cases down the line — things like image processing, graphics rendering, artificial intelligence, machine learning, or even other blockchain networks. We're optimistic that before too long, we'll be able to share news about our first agreement with clients of that kind. The final subject I'd like to address is how we intend to finance these various expansion prospects, particularly since capital markets have become restrictive for numerous businesses tied to cryptocurrency. One thing we've introduced to our funding approach since that earlier call is the requirement of a substantial upfront payment when signing new hosting agreements. This prepayment gets amortized back to our customers across the first twelve months of operations. That gives us non-dilutive capital for site construction, and once we're operational it keeps us in a cash flow positive position right from the start. From there, we're able to combine that prepayment with smaller amounts of cheaper debt—debt backed by our infrastructure assets—to fund most of what it costs to build out our datacenters. A good illustration of our debt situation is that $15 million credit facility David brought up, which carries a 1.5% interest rate across the initial 13 months — and yes, that's months — an almost unprecedented rate for an organization our size, and within the sector we operate in; we credit this to being situated in states that are friendly toward our business, and to having a distinctive, lower-risk business model that conventional lenders find agreeable; additionally, remember that we hold a joint venture with Bitmain covering as much as 1.5 gigawatts, in which Bitmain covers 20% of the equity contribution. With these alternatives, plus the cash we already hold and the money we'll generate down the road as additional plants come online, we're set up really well to keep executing on our expansion strategy. At this point, we'd love to hear what you'd like to ask. Operator?
Chris Brendler
analystHello, and thank you. Good afternoon, and congratulations on the strong results. Wes, could you provide some detail regarding the gross margin forecast and also tell us where power prices currently are? Also, should we anticipate that gross margins will get better going forward simply because we're in something closer to a typical power environment, or was the outage clearly having an effect on that too? So, just on a normalized, like-for-like basis, what does the gross margin outlook look like — is it going to be ‘23?
Wes Cummins
executiveYes, thank you, Chris. I'll offer a couple of remarks, and then I'll hand things over to David to address this. Keep in mind that was the quarter that closed in May. During a few of those months, as we were increasing capacity, we still owed minimum payments to the electricity supplier regardless of how much we actually consumed. That weighed heavily on gross margin for that period. You should see that situation improve once we get to the August quarter, and in August the outage won't affect gross margin nearly as much. It will cost us somewhat on labor — specifically direct labor, since we didn't reduce headcount as far as we could have. Before handing things to David, one more point on electricity: costs have clearly gone up. We have discussed this topic previously. It still shows up to some degree within our operations. That said, we take great care when it comes to our power sites and the agreements we enter into, and we invest considerable effort to ensure those agreements are of very high quality—ones that allow us, as much as possible, to approach fixed pricing. Within the utility or electricity sector, achieving a genuinely fixed rate is quite difficult, though we get as near to it as we can. Some strain on that front will appear, yet not significantly going forward. With that, I'll hand things to David to explain what you ought to watch for.
David Rench
executiveOur contracts include escalator provisions, so I believe that provides some defense for the margin, and going forward, a 25% margin seems like a sensible expectation to have.
Chris Brendler
analystThat's excellent, and it really helps. Let me just ask a quick follow-up regarding both of your responses about Marathon. You mentioned that a significant share of the power capacity is already under contract. I believe we've heard from some others, Argo included, earlier today, saying they were somewhat hesitant to enter a power agreement based on current pricing. Could you tell us how large that portion is? What percentage counts as significant — I'd guess above 50%? And what pricing should we expect for that power contract once it's finalized?
Wes Cummins
executiveOf course. So for Texas, we're set, correct? We clearly have the Jamestown site for that contract, and it was — it is a 5-year arrangement. It includes a minor adjuster that honestly doesn't shift much from one year to the next, though it does move somewhat month to month based on what happens that month. Regarding Texas, we'll be sharing much more about our plans at Garden City within the coming weeks, when we — we are under an NDA with our partner in that location, who is an asset owner. We'll discuss that considerably more, and we should hopefully make an announcement during September, at which point we can speak about it more openly. That said, for us it's mostly a fixed contract, one that has been hedged going forward. There is a bit of variability in it, yet it provides us with fairly solid predictability regarding that power price. We don't disclose precisely what our power prices are, but broadly speaking, we aim for below $0.04 at the majority of our facilities. As for where we stand at our new facility in North Dakota, we have a term sheet signed there, and we're getting to the point of signing the ESA — we've gone through that process in North Dakota previously. So before we actually sign the ESA, we must appear before the PSC for approval. Even in today's environment, we have terms established for that, and the power rates are extremely appealing to us. Beyond that, everything will pass through into the pricing we offer our customers too.
Chris Brendler
analystThat's excellent. What I really like about this aspect of the model is simply getting — being secured upfront and then just earning a spread. One final thing, very quickly, early September is when things get switched back on. We're at late August at this moment; so is early September still the plan?
Wes Cummins
executiveOh, apologies. I didn't mention this in the remarks, and we switched on last week. We got it going sooner than planned. We brought the North Dakota facility back online.
Lucas Pipes
analystThanks a lot, operator, and good afternoon to everybody. Congratulations on what was announced over the past few weeks. That is genuinely outstanding work. Wes, for my first question I'd like to pick up on a point you raised during your prepared remarks; you brought up possibilities in mining beyond Bitcoin. Could you frame the order of magnitude we should be thinking about — is that tens of megawatts, or hundreds of megawatts? How large would you initially size this up? I realize over the longer term this is an enormous market, but for Applied, how big is the opportunity near term? Thank you so much.
Wes Cummins
executiveSure. Appreciate the question. So regarding when we examine opportunities outside of crypto, we've held discussions with several parties, and it spans anywhere from running something like an alpha test at our facility, in its current state, all the way to constructing somewhat more substantial infrastructure, whether within the buildings we already have or through a new build. As a matter of fact, one of them has progressed to where we've requested — we actually have one of our power providers in Jamestown provide us an extra 20 megawatts, possibly uninterruptible power, for this, but it's going to range from that all the way to conversations with one extremely large potential customer that would truly serve as that anchor tenant for us, comparable to the way Bitmain came in for us on Bitcoin, since that can genuinely springboard us into more traditional applications such as HPC, but we're receiving a great deal of interest and I'm feeling really good about that. And that's among the reasons we also announced the name change earlier today, simply to reflect the fact that we remain obviously laser focused on the Bitcoin mining while also branching out into other applications.
Lucas Pipes
analystThanks, Wes. Regarding my second question, I was hoping to get into the topic of how financing is looking out there. On August 12, you got that $15 million credit facility from the bank headquartered in North Dakota, and going forward, how repeatable and scalable is this particular funding source? I appreciate your perspective on this.
Wes Cummins
executiveAbsolutely. Let me offer a few thoughts. After that, I'll hand things to David for that. However, the group in that area has truly excelled at building out that network for us. So what we initially moved toward is essentially community banks located in the regions where we are constructing. We've connected with certain programs, particularly in North Dakota. Yet we will also have financing arranged for Texas within the coming few weeks at a favorable rate; so they've truly excelled at that, and we're attempting to grow that toward a higher tier of banks. And we're far from the money center banks at this point, but we're getting—banks are, I believe, becoming more at ease with what we're doing as they watch these facilities come online, and they observe the model. What's genuinely beneficial for us is that when they examine these, it appears far more similar to a typical real estate transaction to them, since we have customers holding contracts, with agreements on both sides. So it's straightforward, despite the fact that it's crypto, for them to sort of get their heads around simply the real estate aspect and the colocation possibility, but I'll hand things to David to add anything regarding that.
David Rench
executiveAbsolutely. To echo what Wes mentioned, this approach can clearly be replicated—it's a conventional business framework, and as a piece of real estate for our company, it's receiving quite favorable evaluations. So overall, it's performing quite effectively.
Lucas Pipes
analystThanks. A fast second question. Thinking about how we expand capacity and what the company requires in terms of capital — is there some ratio my model ought to assume? Should it be 50% loan to value, 70%? What would you consider a solid target there?
Wes Cummins
executiveLucas, I'd say the short term aim is reaching 50% loan to value; after that, as things develop, we should be in a position to raise it; still, getting to 50% is really the objective. With a fresh loan, Jamestown currently sits a bit nearer the 40% area; so we want to keep pushing that upward.
John Todaro
analystThank you. Nice work on the quarter, everyone. I have two things. First, regarding finishing the outage earlier than planned: at the start, you had been targeting September, and at this point it seems we're ahead of that timeline. So what was the length of the downtime — was it 4 or 5 weeks?
Wes Cummins
executiveLet me think. It ran nearly 2 months.
John Todaro
analystAlmost —
Wes Cummins
executiveIt took place, in our view, so as that schedule progressed, that occurred somewhat toward the end of June. And at that point, we didn’t know for sure when it would be restored. One possibility was that it might return within several days. Quite a bit of testing was carried out, and once we gained real certainty about the date it would be back up, that’s when we made the AK.
John Todaro
analystAll right, understood. All right, that gives me something useful for the model I'm building. And then, thinking about those potential growth avenues down the road, it does seem like an appealing set of options, but is there, I suppose, anything further you can share regarding how the unit economics stack up against those of Bitcoin miners? Would gross margin shift as a result, if you could offer any extra detail on that, as you move in the direction of this different lineup and away from Bitcoin mining?
Wes Cummins
executiveOh, you're asking about the HPC, right? HPC in the broader sense.
John Todaro
analystExactly. Yes.
Wes Cummins
executiveYeah, my sense is you ought to anticipate — if you look at other companies, more traditional data centers, I suppose — a bigger gross margin. Those locations, though, particularly when you weigh the various pluses and minuses, deliver a larger gross margin, and a customer base that's more traditional, shall we say, maybe steadier. On the flip side, you'd need either to retrofit what you already have to handle this, or construct new capacity co-located alongside our sites, and the CaPex on those would certainly run roughly double, probably, compared with what we spend on the Bitcoin mining side for crypto colocation. Even so, the economics look really appealing. I mean, to build on that point, John, the actual objective here is pulling high performance compute off workloads that can be moved away from applications or places requiring really low latency. So facilities designed for things such as video streaming — relocating those into what we regard as truly ultra-low cost sites, excellent power pricing, everything you'd want for Bitcoin mining, yet usable for HPC too, just sort of the non — the connections stay high speed, simply not ultra-low latency.
Mike McHugh
analystHello, I'm Mike McHugh, here on behalf of Mike Grondahl alongside John. We appreciate you fielding our inquiries. Perhaps to start, regarding that legislation that got approved and signed into law — is there anything there that stands out as advantageous to you, presumably related to how the tax credit gets financed?
Wes Cummins
executiveWhich particular bill are you referring to? I'm not sure.
Mike McHugh
analystJust touching on certain aspects of green energy.
Wes Cummins
executiveI believe the inflation that was enacted— Wes Cummins: Got it; so at the start, I don't anticipate much of anything coming our way from that. For the most part, the partners—the folks we're aiming to team up with—will be the ones who benefit. That probably means additional renewable capacity will be brought online, but as of now, I don't see us receiving any benefit in a direct sense.
Mike McHugh
analystAlright, and then perhaps regarding staffing, where does that stand at present compared with the prior quarter? And then what should we expect for in-house staffing over the coming 6 to 12 months?
David Rench
executiveYeah, I believe we currently have roughly 70 staff members. And we'll keep expanding that as we bring the centers online. So we'll likely be moving up to around 100 by the next quarter or thereabouts.
Wes Cummins
executiveRight, and you ought to be thinking about these locations. So looking at it from the company's standpoint, I'd say we're largely done with construction, though a handful of roles remain unfilled at present; however, each time a fresh facility launches, you'll typically bring on roughly 20 to 30 staff members there.
Mike McHugh
analystUnderstood — perhaps a brief follow-up on that point: hiring market notes, spaces — are they getting somewhat better, or are things locked in?
Wes Cummins
executiveMy apologies — could you say that again?
Mike McHugh
analystAnd what about the labor pool for those facilities you've been building out —
Wes Cummins
executiveYeah, it really depends on the location. In Jamestown, things have gone quite well for us. Garden City got off to a sluggish beginning, though lately we've seen a lot more progress there. As for the new site, we will certainly be relocating some staff from Jamestown to those new locations, which sit roughly 90 minutes from Jamestown. That said, it's a smaller community, so we'll have to wait and see how that works out, but up to now it's gone very well. I believe we're off to a strong start in Garden City; the lead person we have there, the manager who's in place, was actually someone from Jamestown who performed really well. So our HR team has done a solid job entering these smaller markets and assembling a strong workforce for us.
Rob Brown
analystGood afternoon, and thank you for taking my question. Regarding the Garden City facility, I believe you mentioned that most of the equipment was already in place. Do you still have any supply chain dependencies there, such as getting transformers, or is that essentially settled? Is the remaining factor simply the time required to finish this facility?
Wes Cummins
executiveWe feel quite positive about the supply chain situation there, and also for the new site in North Dakota. Transformer orders were placed more than six months back, and we essentially secured our position in the queue for those; that aspect has actually become somewhat easier for us. There is also this switch gear—I ought to have an update, but I joined the call without obtaining it—yet we already have several buildings standing. The exact count, I'm not sure. Those remain in progress, and there will be some finishing work left to do. Still, the supply chain elements are coming together quite nicely for that project, and I expect the same will hold true for us in North Dakota.
Rob Brown
analystAll right, that's excellent. Now, regarding the pipeline for new business — what's your status when it comes to signing additional contracts? And at what point do you anticipate turning attention to your fourth and fifth facilities?
Wes Cummins
executiveYeah, so at the moment we are in negotiations on a single rather sizable contract. Beyond that, we actually have a few out for contracts in the 100 megawatt plus category, and my expectation is that we could get those signed prior to the year's end. We've also got sites that have already been assessed, and the development and construction on those can begin the moment those deals are signed. That said, to be honest, at present we've got our hands quite full with the 2 sites currently under construction — we have to bring those online, and really the cash flow they generate is what will fund our following site — so it's simply about sequencing things, though we absolutely continue to see demand. And we keep assessing; I believe we've got around 10 or 12 sites in our pipeline that are being evaluated.
George Sutton
analystThanks, Wes — I just wanted to pick up where we left off with that previous question. You talked about supply and infrastructure, and you brought up strong demand. I'd guess that plenty of people who aren't tracking this very carefully would figure that kind of strong demand has dried up by now. Could you walk us through what you're seeing on the demand side? Is it truly a case of build it and they will come?
Wes Cummins
executiveYeah, I'm not sure — that's a really good question. I couldn't tell you where the ceiling is. Still, my sense is demand remains quite substantial, and how it works is fascinating, since a large number of either rigs already sitting here — mining gear, servers on site — still need power hooked up, or those units are scheduled for delivery under yearly contracts during the coming 6 months and will need power hooked up as well. That situation is really what's pushing demand so hard. Looking beyond that, it hinges, I suppose, on what equipment costs, what electricity runs you, and where the break-even point lands. That said, given where Bitcoin is priced today, you likely won't find many people eager to go out and purchase a great deal of additional new gear. So that could begin tapering off, perhaps around 6 months down the road; even so, plenty is still arriving and requires connection. We therefore continue to see that demand at present — I'd rather not speculate about what things look like 6 or 12 months ahead unless prices shift — yet today the demand is enormous, and we can't build fast enough to satisfy it.
George Sutton
analystGreat, and that's pretty much what the second North Dakota facility looks like, with an LOI already signed. Could you clarify for us — I believe it's only the PSE meeting and approval left? Is that truly everything standing between this and what amounts to a definitive agreement?
Wes Cummins
executiveYes, we could reach definitive sooner, but around that time, those are the two remaining pieces; the LOI lays out every term, and the definitive is mostly negotiated already. At this stage, there are many puts and takes regarding what you'd like in the agreement — pricing isn't the only thing. Then over the coming two months, we'll appear before the PSC and hopefully secure approval so we can fire up that facility. As I mentioned, we're several weeks ahead of last year's pace, we've gained experience up there, and we understand how to navigate North Dakota quite well by now, plus it's a wonderful state to operate in. So I feel very positive about that site.
George Sutton
analystGreat. If I may, just one final question. Regarding that 75-megawatt possibility at Marathon, could you share anything about what kind of timeline is involved there, and if the facility were already up and running today, is that something they'd probably go for?
Wes Cummins
executiveYeah, so that option has no fixed end date, meaning if they want to draw more from us, they clearly also have another supplier in the mix. And we already hold a sizable contract that we need to deliver on for them, bringing them online for the 200, but there's no deadline attached to it, and my sense is that if we come through on getting them connected on schedule, and both they and we run our other location the way we do up in North Dakota, I believe they'll be happy with that, and my hope is they'd decide to move ahead with those extra megawatts.
Kevin Dede
analystHi, Wes, thanks for taking this; but could you — is there a way to quantify or can you offer some sort of quantification for your infrastructure to be built and the cost? Maybe in $1 per megawatt time sort of framework?
Wes Cummins
executiveHey, yes, absolutely. Hey, Kevin, been a long time. Good to hear from you. The, we've talked about this publicly before about. You should think about $350,000 per megawatt cost to build.
Kevin Dede
analystThen you brought up that 2x figure when discussing HPC.
Wes Cummins
executiveRight, we're only beginning to work on that. We're examining designs for it, though it's certainly pricier. Incidentally, you should note that both revenue and EBITDA for each megawatt come in much higher as well, since there's far more equipment involved that you're operating — picture running CPUs alongside GPUs from Nvidia or AMD that, despite being quite power efficient, nonetheless draw substantial power, given the heavy computing processing they perform.
Kevin Dede
analystGot it. Has putting immersion in Garden City been something you've thought about?
Wes Cummins
executiveYeah, so testing is happening soon — I believe we'll have it running in roughly 3 weeks, maybe 2, somewhere around there — and our initial immersion containers, the ones we plan to test, are arriving. That's something we're exploring. The thing is, Kevin, given how our facilities were constructed, should a strong immersion option, or hydro cool or similar, emerge later on, we'd be able to retrofit our facilities for it.
Kevin Dede
analystAll right, and after that —
Wes Cummins
executiveStill, that's certainly something we're examining.
Kevin Dede
analystRight. So in that situation, what happens to the cost of your infrastructure per megawatt?
Wes Cummins
executiveYeah, I believe if immersion were added to our current operations, you'd be looking at an increase somewhere in the range of 50,000 to 150,000 per megawatt, that's how it stands at present. And likely leaning toward the middle to higher portion of that range. So far we haven't discovered any immersion. Hopefully we will, that is genuinely cost effective when comparing price against what we're charged. So, but we're always searching.
Kevin Dede
analystWith regard to that $0.04 goal for power — and I should say sorry, since I'm just getting up to speed on this story — but has the power setup with your partner in Garden City been laid out? Are you located behind the meter? Once that PPA is signed, is there a chance to sell back?
Wes Cummins
executiveYes, so as I mentioned, I believe someone asked something similar earlier, but an NDA with that partner of ours keeps us from discussing it. So once we're able to share details, we will, and ideally that happens within the next few weeks.
Wes Cummins
executiveAlright, thank you all for being on this call, and I appreciate the questions. If there's anything else, don't hesitate to reach out to us, and I'd like to express my gratitude to each of our team members. It has been very enjoyable, though also a great deal of effort bringing everything together across more than 12 months, but I simply want to thank everybody who has dedicated significant effort and many hours, and we'll speak with you again in the next quarter. Thank you.
Operator
operatorWe appreciate everyone being here for Applied Blockchain's call about our earnings. At this point, you're welcome to leave the line.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Applied Digital Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Applied Digital Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Applied Digital Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.