Applied Digital Corporation (APLD) Earnings Call Transcript & Summary
July 27, 2026
Earnings Call Speaker Segments
Matt Glover
executiveThanks, operator. Hi, everybody. Glad to have you on Applied Digital's Q4 fiscal 2026 earnings call. Before the team gives its prepared comments, we want to note that certain things we say today might count as forward-looking statements under securities law and carry various risks and uncertainties. Because of that, we remind you that numerous factors exist, lots of them outside our control, that might make real outcomes and events turn out substantially different from what those forward-looking statements describe; for a fuller picture of the risks, uncertainties, and assumptions tied to our forward-looking statements, please look at what we disclose in the earnings release and the public documents we file with the SEC. We take on no duty or commitment to revise forward-looking statements so they capture situations or occurrences arising after the moment such statements are given, unless the law demands it; we likewise cover Non-GAAP financial measures and urge you to review closely our disclosures in the reconciliation tables linking to the relevant GAAP measures in the earnings release while evaluating those measures. Check our SEC filings for thorough disclosures and descriptions of our business, plus uncertainties and other changing circumstances, including, without limitation, the risks and uncertainties laid out under management's risk factors in our Form 10-K annual report and our Form 10-Q quarterly reports. You can look at Applied Digital's SEC filings at no cost through the SEC's site, www.sec.gov. One more reminder: this call is being recorded and will be posted for replay through a link in the IR section of Applied Digital's website; at this point I'll hand things over to Applied Digital's Chairman and Chief Executive Officer, Wes Cummins. Wes?
Wes Cummins
executiveThanks, Matt. Good afternoon, everybody. I appreciate you all being on the call for our earnings conference for fiscal Q4 2026. Applied Digital just wrapped a quarter that really set the tone, and it closed out a year of major transformation for us. Five campuses got signed to leases, and three of those came together within only the last four months. We built up $36 billion in total contracted long-term lease value, and roughly $20 billion of that arrived during the most recent quarter. That works out to a 125% jump in contracted lease value, supported by 1.41 GW of contracted critical IT load across every campus. As we've said before, three new campuses were recently inked — Delta Forge 1, Polaris Forge 3, and Delta Forge 2 — all with that same hyperscaler carrying a high investment-grade rating; these sites are located in three states spread over two separate regions of the country. Base term contracted lease revenue for Delta Forge 1 and Polaris Forge 3 comes to about $7.5 billion apiece, while Delta Forge 2 contributes roughly $5.2 billion. All together, that's about $20 billion in long-term contracted revenue coming from one world-class customer. Throughout the year, we brought 100 MW at Polaris Forge 1 online, hitting both our schedule and our budget. On top of that, we posted solid financial results, which you'll be hearing about shortly. Equally important, we strengthened ties with local communities — earning trust, making investments that last, and contributing to a better quality of life for residents. Right now we're building five multi-billion dollar AI factory campuses on behalf of three different hyperscalers, at a scale that we think reflects both how good our platform is and how much confidence these customers have in our execution. We reach this kind of scale by putting our proprietary data center designs and a world-class supply chain to work, letting us replicate builds efficiently across a range of geographies and climates. Our operating approach centers on what we call the franchise model. Each time we begin building at a new campus, we install that identical group of about 15 to 20 leadership positions, every one of them reporting directly to HQ. Thanks to this repeatable structure, combined with a robust supply chain and our status as an approved vendor to all the major hyperscalers, we can offer a platform that is both distinctive and capable of scaling; from our perspective, this approach ranks among the top reasons we have emerged as an obvious frontrunner in the sector. Taken together, we believe these capabilities give us a strong foundation for generating significant long-term value for our customers, our shareholders, and the communities we serve. What excites me even more is our pipeline past the 1.41 GW now under construction, especially since rental rates have climbed over the last six months. We're actively marketing another 1.7 GW across several states, and we expect this new capacity to bring in higher pricing. Demand is showing up not just for brand-new campuses, but also for extra capacity at locations we already have. At this moment, we are deep into talks with two current investment-grade clients, aiming to finalize lease agreements connected to their individual expansion choices—roughly 100 MW at one site and 150 MW at another. Our expectation is that these expansion deals will be executed under terms largely mirroring each customer's existing lease arrangements, but the rates involved would be considerably above what the present contracts carry, and the length could run longer as well. If signed, these agreements would push our total capacity to 1.66 GW and bring in over $6 billion of added contracted revenue, based on today's rates and term lengths. Because we expect better pricing and possibly a longer horizon, we believe the ultimate number will end up being higher. Crucially, we think this opportunity goes past merely adding contracted megawatts. As our platform keeps growing, we see a chance to boost operating leverage via premium pricing, and also to further diversify our customer base across both our current and upcoming campuses. Regarding our power pipeline, I'm particularly enthusiastic about our approach and our collaboration with Base Electron, an independent power producer that is working alongside Babcock & Wilcox, the regional utilities, and regional utilities to build approximately 1.2 GW of front-of-the-meter natural gas-fired generation in the Dakotas; we aim to put our shareholders in a position to gain from Base Electron's achievements, since we presently hold about 10% of the company. We believe there's a chance that's even better in the power supply itself, which is the single most precious and scarce asset in our industry; this generation ought to make it possible to grow at existing campuses, permit construction of additional ones, and improve our position in one of the country's most favored energy areas. Among the most abundant and cheapest energy sources in the United States is the Bakken Shale in North Dakota. Together with the region's naturally cool weather and pro-business climate, we think it's an outstanding fit for building data centers. Our core belief is that this combination creates a major competitive advantage and an entry barrier that is very difficult to replicate. If we continue adding that much capacity, the major cloud providers are going to keep choosing our locations. Now on the execution side. Our initial 100 MW came online at Polaris Forge 1 last fall, right on schedule, and we recently brought another 75 megawatts online at that same campus, also on time. Delivering on schedule really matters in this business, and we're confident that our history of doing so distinguishes us from others in the market. According to industry figures, about 90% of projects across the sector that exceed $1 billion in cost finish late or exceed their budgets. Being part of that other 10% is something we take pride in, and we're dedicated to keeping it that way. As of today, every one of our construction projects is proceeding on time and within budget. Now let's discuss the data center hosting segment. At our two North Dakota locations, this business supplies powered space for Bitcoin mining. It keeps delivering strong results and still ranks as the top return on asset operation within our portfolio. The key point is that the compensation we receive depends on how much data center capacity we provide to clients. As a result, even while customers are busy mining, we get paid regardless of where Bitcoin's price sits, which gives us a reliable, high-margin cash flow. Moving on to ChronoScale. During this quarter, we completed the spin-off of our cloud business, which began trading on Nasdaq under the ticker CHRN in early May. Applied Digital continues to hold a 96% stake, which means investors in our company still get to participate in the gains of that operation as it pursues independent expansion as a dedicated accelerated compute platform. At ChronoScale, meaningful progress has already been achieved in assembling its executive roster, most notably through Raj's appointment as Chief Technology Officer. Before joining, Raj put in more than 13 years at Tesla, serving as a vice president who answered directly to Elon Musk and managed an extensive set of responsibilities that included AI infrastructure along with one of the world's largest GPU clusters. ChronoScale also brought on Lawrence Lam as Chief Product Officer; he has over 20 years of experience scaling global cloud and AI platforms at firms such as Supermicro, and we think drawing talent of this level highlights how large the opportunity is for ChronoScale as a standalone company. This quarter, ChronoScale renewed a customer contract at higher pricing for its deployed fleet of GPUs. The company also started showing its secure enterprise environment to select partners. Its platform lets enterprises deploy AI in a secure, controlled setting, whether the data sits on-premise or with one of several major cloud providers. A wide range of AI models are supported by the platform, so partners can pick whichever suits their enterprise best. Past the enterprise cloud segment, ChronoScale is pursuing several sizable reserve contract possibilities. If those deals land on terms that work in the company's favor, they would allow hundreds of megawatts of compute capacity to be brought online through a long-term take-or-pay arrangement. On that note, I'll turn things over to Saidal Mohmand, our Chief Financial Officer, who will walk through the financials in detail. Saidal?
Saidal Mohmand
executiveThanks, Wes. Before we dive into the quarter, I want to spend a moment on financing, because over the past several months our team worked incredibly hard to secure a cheaper cost of capital. During the quarter, and not long after it wrapped up, we completed $2.15 billion in 6.75% senior secured notes, with the proceeds going toward our Polaris Forge 2 campus. On top of that, we completed a $300 million senior secured bridge facility, with Goldman Sachs serving as lead, we secured a revolving credit facility worth as much as $550 million, and we completed $1.59 billion in 7% senior secured notes to fund the fourth building at our Polaris Forge 1 campus. Bringing our total cost of capital even lower remains one of the things I care about most. A big part of how we've gotten there comes from what we've accomplished alongside CoreWeave at Polaris Forge 1. Through reorganizing the leases at that location via a special purpose vehicle, and by establishing a memorandum of understanding tied to the credit backing our debt financing, we were able to issue our latest $1.5 billion in notes at 7% — that's 225 basis points tighter than our initial placement, which carried a rate of about 9.25%. Also a positive sign: the notes tied to our first two HPC builds at Polaris Forge 1 are being traded in the secondary market at a much narrower spread now, and in our view that puts us in a strong position to refinance that debt more cheaply later on. Through these deals, we've locked in the funding we need for all 400 MW at Polaris Forge 1 plus the 200 MW at Polaris Forge 2. Looking ahead, we anticipate that securing financing for the next three campuses should be fairly uncomplicated. Per our Macquarie agreement, they cover three-fourths of the equity. Because those campuses are leased to a hyperscaler with a high investment-grade rating, we expect attractive terms when we place future debt. Beyond that, when we sign leases directly with investment-grade hyperscalers, we're able to keep our cost of capital attractive for the full duration of the lease. That's different from indirect or backstop leases, where things get uncertain once the first five-year term ends. Taken together, we see this financing approach as something we can replicate, and it keeps getting more efficient as our cost of capital continues to improve. Now, onto the quarter. My remarks will address the fourth quarter figures. Just to clarify, unless we say otherwise, all of these numbers relate solely to our continuing operations. For the fourth quarter, revenues came in at $258.7 million overall, consisting of $208.2 million from services and $50.6 million from data center rental and other revenue. On the whole, total revenues rose 407% versus the comparable quarter a year earlier. During this quarter, revenue from our HPC hosting operations reached $203 million. That figure breaks down into $152.4 million tied to tenant fit-out services, $44.1 million from base rent, and $6.5 million from tenant recoveries. As for the data center hosting segment, which runs our crypto data centers, it delivered another robust quarter, posting $37.3 million in revenue — essentially flat compared with the same period last year, reflecting steady operating conditions. This business's performance leaves us nothing short of delighted — no other part of the company matches the return on assets it consistently delivers, generating $12.5 million in segment operating profit in just one quarter against $113.8 million in reported assets. Since we hold a majority stake in ChronoScale, its $18.8 million of revenues for the quarter were consolidated into our results. ChronoScale is following a strategy that's distinct from our core operations and now runs as its own publicly traded entity, so we've taken that segment out of our Non-GAAP results. Services cost of revenues went from $138.9 million up to $208.2 million this quarter. That rise came mainly from the $145.6 million of tenant fit-out services carried out inside our HPC hosting business. Looking at Q4, revenue from data center rentals and other cost items totaled $25.1 million. The biggest piece of that was about $14.1 million in depreciation and amortization associated with Polaris Forge 1, which is our initial HPC data center. Another $6.4 million came from costs that tenants reimburse us for, and $4.5 million covered staff and other operating expenses tied to running our facilities. On the SG&A side, we went from $124.3 million up to $165.3 million for the quarter. The increase largely came from $116.8 million in stock-based compensation, driven by accelerated vesting of some employee stock awards, along with grant activity tied to the separation of the cloud service business and higher headcount — plus $7.3 million in personnel expenses, also linked to the rise in headcount. One item deserves attention this quarter. Of our stock-based compensation, $47.9 million was tied to one-time awards associated with the ChronoScale transaction, while $65.1 million was tied to performance stock units. Net loss attributable to common shareholders was $111.6 million, or $0.39 per share. Adjusted net income reached $12.9 million, or $0.04 per diluted share. Depreciation for the quarter totaled roughly $18.2 million. On an adjusted EBITDA basis, we hit $42.4 million, up from $1 million during the comparable period last year. Net operating income, which we call NOI, came to $39.9 million, representing a 91% margin. Our definition of that metric is HPC base rental revenue less rental operating expenses, property taxes, and insurance costs. Turning to the balance sheet, we believe our standing is quite solid. At quarter's end we held $4.2 billion in cash, along with $5 billion of debt and approximately $1.7 billion in equity. In reviewing these figures, keep in mind that on the HPC data center side, our present financials mostly reflect only the first 100 MW that are operational and generating contributions throughout the quarter. Looking ahead, with additional capacity set to activate, shareholders should anticipate a notable jump in our results over upcoming quarters and years. Currently, we are working toward 1.5 GW of HPC AI infrastructure. We expect this buildout to drive substantial expansion in revenue, EBITDA, and NOI once those megawatts are brought into service. With that, I'll turn things over to Wes for his closing comments.
Wes Cummins
executiveThanks, Saidal. It’s clear the build-out of AI infrastructure has reached an important new stage. Hyperscalers aren’t merely putting money into AI infrastructure anymore. Their commitments are ramping up at a scale we haven’t seen before. U.S. tech firms have by now signed on for about $850 billion in data center lease obligations across the coming several years — a jump of roughly $570 billion compared with a year earlier, which is over three times what prior levels were. These aren’t projections. They are long-term contractual obligations, and they’re backed by many of the biggest technology companies in the world, which have among the largest, strongest balance sheets and credit ratings. At the leading hyperscalers, spending on AI infrastructure is expected to hit about 3.2% of U.S. GDP in 2027, exceeding projected U.S. national defense spending for the first time. When you put those long-term commitments together, they strengthen our belief that we are still in the early chapters of what we think may be among the biggest infrastructure investment cycles in modern economic history. In our view, Applied Digital is positioned well to take advantage of that opportunity. As I close, I want to share a few last reflections. Constructing AI infrastructure at scale is extraordinarily complicated. Juggling aggressive build timelines, what customers expect, power infrastructure, and partnerships with communities is no easy feat. Throughout, our guiding principles have stayed amazingly straightforward. Do things the right way; for our customers, that means providing high-quality, GPU-ready data center capacity on schedule. That dedication shows up both in the customer relationships we are forming and in the industry recognition we have earned; for our communities, it means serving as a trusted partner that generates enduring economic value. From day one, we have believed in building alongside our communities, rather than just putting buildings in them; we engaged early, listened frequently, and worked hard to make sure each project leaves a positive impact that lasts. The jobs, tax revenue, and long-term investment we deliver help reinforce local infrastructure, assist schools, support first responders, and open opportunities that can genuinely transform these communities. Our operations are producing measurable benefits right now. At Polaris Forge 1, our use of surplus regional grid capacity has already given back more than $45 million in electricity credits to local ratepayers. If you want to see how we do things for yourself, I’d encourage you to watch our Behind the Build docuseries, where we share the town hall meetings and community conversations, which are a key part of every project we take on. Last, one year ago, we set a target of $1 billion of net operating income within five years. We now expect to reach that run rate goal one year from now. That puts us three years ahead of schedule. Our platform is now backed by roughly $36 billion of long-term contracted lease revenue. Even more important, we think the way our contracts are structured — with the majority directly with investment-grade customers — creates a durable foundation for earnings and cash flow, one we can keep growing as customer demand keeps rising; the competitive advantage our established footprint gives us is hard to overstate. Our existing campuses can expand, and in certain cases, expand substantially. Our view is that growth within the campuses we already have gives us line of sight to more than 5 gigawatts of critical IT load by 2032. Making use of infrastructure that's already in place on those campuses doesn't just cut the time it takes to build; it also lifts returns through scale efficiencies and by creating regions of excellence. The partnership we have with Base Electron is meant to add the power needed for that growth. We do anticipate bringing more new campuses online both this year and next, which compounds both the potential for growth and diversification. Compared with our call a year ago, we've gone from 1 campus to 5, grown contracted revenue from $7 billion to $36 billion, and brought on more than a gigawatt of capacity with investment-grade customers, over 80% of which is leased to a high investment-grade customer. We've brought substantial capacity online on schedule and within budget; we've also cut our cost of capital sharply. I couldn't be prouder of our team and what they've achieved. The opportunity ahead is substantial, yet our focus hasn't shifted. Execute with discipline, deliver for our customers and our communities, and build long-term value for our shareholders; with that, operator, we're glad to take questions.
Mike Grondahl
analystHey, thanks, guys. A lot of what we've been asked about recently centers on those three leases signed lately for 810 MW, plus the lower yield — or the development cost that came out of it — compared with what your peers are seeing. Could you walk us through Applied's approach when it came to signing those three leases?
Wes Cummins
executiveSure, Mike. If we look back at what we've been trying to accomplish over the last 12 months, the aim was to establish a strong foundation for Applied Digital. We've discussed this across many quarters. CoreWeave was our first signing, followed by an investment-grade hyperscaler. Once CoreWeave was signed, we committed to reaching 70% of contracted lease revenue coming from investment-grade hyperscalers. That's been a major achievement on our part. We brought in two investment-grade hyperscalers. We're above 70%. Before long, I believe we'll be near 80% — right now it sits at 76% on investment grade. We reached that milestone. On the yields, from a cost standpoint, I'd say we're pretty conservative. Our intent is to set expectations we can meet at minimum, and possibly exceed. On margin and cost, we're fairly conservative on pricing as well; those negotiations stretched out over a considerable period. I do believe pricing has moved higher, as I noted in the script, and I think that will show up for us in what lies ahead. As for where our lease return rates land, if you compare against the whole industry — and only a tiny slice of it is publicly traded — if you look industry-wide at firms that were signing leases at this size with these kinds of customers directly, we'd fall right within the range, and possibly in the middle leaning toward the upper portion of that range of contracted lease rates, again, for these kinds of customers with this duration and this scale. I think we can push our financing costs down substantially. The key thing, Mike, is that we have a really strong foundation. You can run the numbers and sort of work through it — we currently have roughly two plus billion in net operating income contracted annually; from there we can build. With very strong customers. As for how those returns play out — and this is how I and our team have viewed it from the start — when we got into this business, these businesses, whether publicly traded or private, when deals get done, they go for 20x- 25x that NOI figure; that was really our objective, to land very strong leases and very good SLAs. I've spoken about that quite a bit, since lease yields over the long run really hinge on your SLAs once the building is up and running. From a contractual standpoint, I believe those are secured. That accomplishment is something I take genuine pride in.
Mike Grondahl
analystUnderstood. Perhaps this one's for Saidal. Could you discuss how you approach handling your cost of capital, specifically regarding both debt and equity?
Saidal Mohmand
executiveYes. Excellent question. First, I believe, as Wes mentioned, the kind of hyperscaler we sign contracts with, dealing directly with the end investment grade hyperscaler, especially at rates sitting at the top of the range where such leases typically get done and/or where our competitors show up, that serves as something enabling you to bring down your expense to the initial if it runs 15 years or perhaps even more. I think compared to, and I mentioned this in the transcript, certain shorter duration backstop leases where guarantees expire following five years. That represents one way of lessening risk and building a steady return. When you consider it, we discussed our flywheel, and that flywheel truly consists of three pieces. The first piece, since Macquarie provides three-fourths of the equity, comes from the Applied balance sheet. Using our corporate cash flows, our low-cost revolver which we recently secured, we're able to fund the initial portion at a very appealing expense. Our revolver right now sits at SOFR plus 225 basis points. The MAM equity, I believe, is one area people often miss and how it's an appealing kind of capital. Macquarie provides through their $5 billion JBOF to us, three-fourths of the equity needed. When you examine the 1.8x MOIC on that transaction, it's approximately a mid-teens IRR across the whole period. If you stack that against simply issuing common stock, which can be very dilutive if you believe current and past prices are extremely undervalued or even a better choice versus sizable convertible debt offerings, which is a common way to fill in the equity. I think considering convert, for example, even though the convert gets depicted as an inexpensive cost of debt, there are drawbacks to having it at a large scale. First, it's negative from a credit ratings standpoint, which can hurt your cost of capital and then can also create an overhang on the equity if you ever reach periods of turbulence when you must refinance it and it's genuinely handled as debt. That's one item. When you look at the cap call math as well, correct? The cost of capital from issuing equity when severely undervalued or pursuing convert can be well above or beyond 20%. We believe the MAM is a programmatic, steady method for funding most of the equity. The third piece of the flywheel we possess is essentially the site-specific debt. The first form comes via construction; we access it mostly through the project bond markets as of today. You can also tap the project finance sector through banks, and that tends to come cheap; after that, what happens is that once two years pass for the bond, or when RFS kicks in for that project finance arena, you're able to move into something closer to permanent financing by way of CMBS, ABS, or you can stay in the 144A IG market. Because of that, both your construction cost and the cost of your financing go down, correct, since construction risk gets removed. I believe we come at this in three distinct ways, and every one of them involves keeping leverage at a very conservative level. Suppose you use an 80% LTC and factor in what we must build out for our 1.4 GW that's contracted, plus our average annualized NOI of $2 billion — that puts you under 7x leverage, far beneath comps, especially in the private markets, where leverage runs above 10 turns. That's our approach to financing, and we aim to do it conservatively, programmatically, and in a stable fashion.
Mike Grondahl
analystUnderstood. Appreciate it, everyone, and I hope fiscal year 2026 goes well for you.
Nick Giles
analystYes, thank you, operator. Good afternoon, everybody. My question is about how CapEx spending will be paced across the rest of the calendar year. Quarter-over-quarter spending appears to have risen considerably, which is what we anticipated, so I'm wondering whether you can give any kind of run rates for how that should progress quarter-over-quarter as we attempt to build models for 2026 and 2027. Thanks.
Saidal Mohmand
executiveYes, Nick. On CapEx, for the next quarter you should figure on roughly $600 million-ish. That represents an increase as construction on the new campuses moves into more advanced phases. I should point out, though, that as you can see, we've gone to the financing markets for these sites earlier in the construction process, unlike the first two Ellendale buildings, which were much further along compared with, say, where PF2 stands today.
Nick Giles
analystUnderstood. Thank you, Saidal. Perhaps regarding that limited-access cash total, which exceeds $2 billion, could you remind everyone how it breaks down among the deferred reserve, the letters of credit, and also what timing we should anticipate for that money becoming available?
Saidal Mohmand
executiveYes. The bulk of that restricted cash related to the Polaris Forge 2 bond; those funds sat in escrow pending the ESA being freed up, and we did free it, if I recall correctly, during June; from then on that money has no longer been restricted. When our 10-K comes out, it will include more specifics about the actual status of those accounts.
Nick Giles
analystUnderstood. Excellent. Alright, I'll hand it over, but thanks for the update, everyone, and good job.
Rob Brown
analystHello, everyone. Nice work on everything so far. I just wanted to dig into a couple of the customers you brought up that you're apparently considering growing — I believe 100 MW and 150 MW. Could you give a bit more detail on how that would unfold? Would those be current locations, and perhaps add some context regarding the remarks about rate increases?
Wes Cummins
executiveOf course, Rob. Regarding the expansions, when we began constructing Polaris Forge 2, we began constructing two buildings, 300 MW. We signed 200 MW; we anticipate signing that extra 100 MW shortly with the same tenant at that campus. At one of our Delta Forge campuses, we're in talks, as we noted, at an advanced stage of negotiation with the tenant there regarding a third building on one of those campuses. As I said during my prepared remarks, we do anticipate substantially higher pricing on both of those expansions, plus new campuses and new capacity that we sign going forward. We've observed other contracts out there. It's excellent to see pricing rising across the industry. That provides a really strong signal of where demand stands.
Rob Brown
analystAll right, that's helpful. Regarding Base Electron, in what way do you expect it to generate additional customer interest, given that you've got power capacity in North Dakota enabling you to add capacity there, simply from what Base Electron provides?
Wes Cummins
executiveYes. Like we said, we've made public that 1.2 GW is under construction in North Dakota; every bit of this is front-of-the-meter on-grid capacity. We're also developing a second project in that state, located in another area. These are going to pair with the utilities we already partner with. They will supply that capacity to our data center campuses, and additionally to other retailers across the regional system. That represents a beginning for Base Electron. We anticipate considerable growth from there. We discussed our campuses back when we first began with them. We executed initial capacity agreements. The physical infrastructure, the transmission infrastructure, exists to grow the campuses substantially. We need to bring in some additional electrons. It won't solely be us, or rather, it won't solely be Base Electron contributing more power generation to the network. We anticipate many other power generation projects in the area too. As that extra generation is brought online across the coming few years, we'll have the ability to grow every one of those campuses. Each of them exceeds a gigawatt. As I said, one particular campus exceeds a gigawatt by a substantial margin. We're enthusiastic about that whole region; that's where we began. We've achieved tremendous success developing in North Dakota, and we're eager to keep building on that. Rob, finally, as I noted during the prepared remarks, we have a clear line of sight from our current campuses to more than 5 GW of critical IT load capacity. A major contributor to that is the Base Electron generation additions.
Rob Brown
analystOkay. Thank you. I'll turn it over.
Wes Cummins
executiveThanks.
Derrick Whitfield
analystThanks, and good afternoon, everyone — congratulations on what you've achieved commercially during the past 12 months. First off, I'd like to begin by asking about the demand picture, perhaps as it relates to the top-tier investment-grade hyperscalers as well as the tier right below them. With inflationary pressure in the mix, are you detecting any shift at all when it comes to demand?
Wes Cummins
executiveNo, we have not observed that. During my prepared remarks I noted that market pricing is trending upward. In my view, that serves as a solid signal regarding demand relative to supply. Across both of those categories you just named, demand in the market remains remarkably strong.
Derrick Whitfield
analystThanks. From what you said in your prepared remarks, it sounds like your projects remain in that $11 million to $13 million for each megawatt range. That being the case, which general conditions would cause you to land at the lower end rather than the higher end of that range? Do you anticipate any regional variation tied to labor conditions in those areas?
Wes Cummins
executiveLabor is a major challenge that we've been working through, and I anticipate we'll keep working through it in just about every region. One of the things we do regarding labor. Let me step back and begin with the high and low end of the band. At the high end of the band, certain site-specific factors usually play into that. When we begin a new campus, you'll usually find our builds at the higher end of that band, since we fold in all campus costs with the first building, first two buildings. That usually covers new substations and transmission on campus, the land, and the power site itself. That tends to push it toward the high end while we try to bring it down over time as we add more buildings on those campuses. You brought up economies of scale as we progress at each individual campus. There are other factors, depending on, for instance, one of our sites in the south will be somewhat higher because of extra dirt work and site prep due to the type of soil that we're dealing with. Certain very specific things occur on a location-by-location basis. The rest of what we do is really dialed in at this point from supply chain, from construction process and construction. Labor rates have stayed fairly steady over the past six months. We do a lot of work in two ways on labor. First, we try to stay out of the most crowded markets. You see it's, we're the only ones that are really building right now in North Dakota; we have a few other markets that are not as crowded as say like Texas or West Texas or some of the other markets that you have 100+ projects happening. We try to stay in less competitive markets from a labor perspective; we do a lot of education in those markets. We work with local technical college and vocational schools. We do that right at the beginning; we've been doing that for a while in the Dakotas. When we move into other states, one of the first things we do is work with the local vocational technical colleges; we even work with them to set curriculum; we typically make some donations, but we want to train people up that'll work construction and operations in our facilities.
Derrick Whitfield
analystThat's a solid update, and once more, congratulations on what you've achieved.
Wes Cummins
executiveI appreciate it.
George Sutton
analystThank you. Wes, I was hoping you might describe what's holding back your growth. Clearly, demand doesn't appear to be one of those constraints, so when we consider power, supply chain, and how many teams you can manage simultaneously, where do you expect the bottleneck to be?
Wes Cummins
executiveYeah. George, I think that's an excellent question. Power absolutely sits at the top of the list regarding when it's obtainable and the amount, since we've signed contracts for, I believe, 2.1 GW of utility power during the last year. That's certainly one factor; it's a matter of when power can be secured and then aligning our construction start date to coincide with the point at which power is ready at that site. That's one. Supply chain is another. As we've discussed on numerous occasions previously, we performed very effectively on supply chain several years back, securing a substantial capacity for electrical, for all the energy, the mechanical, electrical, and plumbing. There are always going to be constraints. I recall mentioning at some stage that we had roughly 700 MW annually. That's critical IT load. We've committed to building 1.5 GW across the coming couple of years; we're clearly surpassing that somewhat. Those two are certainly among the largest constraints. We have an excellent process when it comes to construction and pace. Our initial building at Polaris Forge 1 required roughly 24 months from construction commencement to RFS. Our second building at that location took less than 12 months. We've truly refined things, and we keep improving. The team keeps improving, with each iteration we complete, in how we order tasks, how we simply make everything far more efficient throughout the construction process. I feel quite confident about that aspect. Handling supply chain and power are likely the two largest limitations right now.
George Sutton
analystI've been wondering — clearly, we're in a market that has turned extremely wary when it comes to AI. Your shares have been dragged into that, yet nothing you're describing during this call reflects several of the worries floating around out there, whether about NIMBY or about open models. Could you lay out a broader AI thesis as you view it right now, set against what the market believes?
Wes Cummins
executiveOf course. Looking purely at demand, this may come across as odd, but I consider myself a pretty conservative individual, and that's the reason that throughout the last 12 months we've concentrated so heavily on top-tier customers and contracts built to last; that slogan of ours really was contracts built to last — durable in terms of our capacity to deliver, in terms of whether our customers could walk away, and likewise on the SLA side, since if you run the sites poorly, then in nearly every case I've witnessed among others in this industry, your customers gain the right to walk away; that has genuinely been the priority, ensuring we land those kinds of contracts. We construct the appropriate kinds of buildings. We attempt to make them as efficient as they can possibly be. We refuse to cut corners merely because doing so might reduce costs, since keep in mind, we must run these buildings for no less than 15 years under the contract, while we believe they are assets lasting 30+ years. We construct buildings we are able to operate, and that we believe will satisfy every one of those SLAs across a very extended stretch of time. That was the priority — ensuring we possessed that sort of platform. As for us, we concentrated on high investment grade hyperscalers, investment grade hyperscalers, and companies of that nature. What did we deliberately steer clear of? We steered clear of inking leases with the extremely large model companies; those are wonderful companies, but I can't predict how that unfolds down the road. We witness this volatility. We witnessed it with DeepSpeed in 2025. We witness it with Gemini in 2026 now; we witness this volatility. Beyond those models, we witness the volatility simply among U.S.-based companies. Had we been talking at this same point 12 months ago, OpenAI was unquestionably the best; they had rolled out GPT-4o in April of 2025, and they were performing incredibly well, after which it shifted to Google and now to Anthropic; we simply maintained a real focus on the very best companies holding those high investment-grade ratings. What appears to be happening, George, whether it's open source or closed models — that's an entirely separate argument — is that they all appear to require a substantial amount of compute. They appear to consume the same amount on inference, or slightly more on inference. Compute remains the foundational layer. I feel quite confident about where we stand in that market and about the demand for compute, no matter which direction the world heads from a technology standpoint across the coming few years.
George Sutton
analystAwesome. Thanks for the thoughts. Appreciate it.
Wes Cummins
executiveAbsolutely.
John Todaro
analystHey. Hi, everyone. I appreciate you taking my question, and congratulations on the progress so far. I suppose I'll return to that earlier question about the growth governor. Wes, I believe you said previously that seven campuses could be worked on at the same time. Right now you're at five. My assumption is that as some are finished, you bring in others. Does that figure get pushed even beyond seven? The 1.7 GW currently being marketed — will that essentially fall within what you're able to handle concurrently?
Wes Cummins
executiveYeah. Excellent question. Yes, as I said, seven previously. I'd say I think we're capable of going beyond that. Let's reach that point and observe how things are going. One thing, John, we're not looking to do is stretch ourselves too thin. We want to ensure we're always positioned correctly to execute and deliver; that comes first. When I walk through the risks, initially it's signing contracts, then second comes delivery. We've got those two sorted out, and third is operations. We've now been running the first building for about 8 months. That's going very well. We're getting all of those elements dialed in quite well. I simply want to ensure we keep executing and delivering on time for our customers, because that's such a crucial thing. If we need to halt at seven, I'd prefer that, and we'll halt at seven. We'll see once we arrive there and how far we believe we can go with managing the construction process. As was mentioned, there are certainly some constraints in the supply chain; we've managed to keep pushing that limit further. I can't say with certainty where that limit is. That supply chain limitation definitely does exist out there. I still think we'll find out whether we reach the seven campuses. We're clearly marketing to that now. If we feel at ease with that, then once we arrive there, we'll find out whether we feel at ease exceeding it.
John Todaro
analystGot it, thank you. Saidal, I believe you brought up the NOI margin being at 91%. I'm just curious whether that's more of the figure we ought to treat as the goal for all of the contracted capacity, or whether something like the mid-80s, which I think is roughly where we sit, is the fairer way to look at it.
Saidal Mohmand
executiveLike Wes said before, correct? Our approach is to set margin targets with a conservative bent, and then clearly we go out and hit the upper end. It's a blend, right? First, once a site is up and running after that initial RFS date, you ought to see our margins keep climbing. For one thing, we get more proficient at running the site. Second, you should also see certain economies of scale kick in as additional buildings come online inside a given campus. That is certainly what we're aiming for. How quickly we arrive there for each campus, right, may vary based on the region, but that's the direction we're heading in too.
John Todaro
analystI see. That makes sense. Thanks to both of you. I appreciate it.
Wes Cummins
executiveThanks.
Darren Aftahi
analystHi, everyone. I appreciate you fitting me in. I have two, if that's alright. Regarding Base Electron, could you provide a rough idea of when that capacity is expected to become available? And then Wes, when you mention that your North Dakota properties could grow to different levels, what portion of that depends on Base Electron as opposed to simply utility expansion? Then for my second one, apart from the 250 MW you mentioned, for the marketing of the remaining 1.5 GW, I suppose, how would you describe that split between current customers that have already contracted capacity and perhaps some parties that have been left to further negotiations? Thanks.
Wes Cummins
executiveAbsolutely. As for Base Electron, the timing falls in 2029 and 2030 for that first capacity, and after that it keeps ramping up. In North Dakota, we have a few other projects — transmission projects as well as generation projects — that will slot in well. We have plenty to construct for 2026, 2027 and part of 2028. Then we expect extra power capacity to come online around then, allowing us to keep growing those campuses. Both matter for hitting that target: Base Electron and the added power projects underway in the area, along with transmission projects. A JETx line connecting Ellendale and Jamestown is going to come online and boost the Ellendale power capacity for us too. Darren, what was your final question again?
Darren Aftahi
analystIt was more about the power that you're marketing at this moment, like relatively to new customers versus others. Yeah.
Wes Cummins
executiveYeah. At this moment, Darren, just given what we have going on, my expectation would be that it's new customers.
Darren Aftahi
analystFair enough. Thank you. Appreciate it.
Wes Cummins
executiveAbsolutely.
Michael Donovan
analystI appreciate you fielding my question, and congratulations on how well things have been carried out. The AI factories you've built are meant to accommodate varying kinds of compute and differing densities. Lately, what shifts are you noticing in what customers need, aside from GPUs — especially when it comes to CPUs, memory, and networking?
Wes Cummins
executiveRight. You're correct that we've created an architecture with a lot of flexibility, one that can support GPUs, TPUs, CPUs. Once you drill into that level of specifics, though, it truly varies from one customer to the next, and that kind of granularity isn't something we always encounter in our work. We receive specifications for how to proceed since we handle the fit out, how we carry out fit out. We have a rough sense of what they're up to, but not to a degree that I'd feel comfortable offering you insights you ought to depend on regarding patterns of CPUs versus GPUs and storage amounts; we do construct highly adaptable facilities, and we address that from a design standpoint so that you can place virtually anything you'd like, and even if you reverted to a standard cloud format with significantly reduced power density, our facilities would remain suitable for that too.
Michael Donovan
analystAppreciate that.
Wes Cummins
executiveSure.
Wes Cummins
executiveAppreciate you all being here for the fourth-quarter call, and I'm looking forward to talking with you in October. Thank you.
Operator
operatorThis concludes today's call. Thank you for attending. You may now disconnect.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Applied Digital Corporation transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Applied Digital Corporation earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Applied Digital Corporation or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.