Caledonia Mining Corporation Plc (CMCL) Earnings Call Transcript & Summary

May 12, 2025

NYSE American US Materials Metals and Mining earnings

Earnings Call Speaker Segments

Mark Learmonth

executive
#1

Appreciate it. If we could go to the disclaimer section, we'll cover the forward-looking statement. Fine, that's the standard disclaimer and forward-looking statement, and I'll assume everybody will take note of it. Let's turn now to the people presenting. Okay, I want to introduce each person. To start, that's me, Mark Learmonth, the CEO of Caledonia. I'm located in Jersey — Jersey is where I am today. Ross Jerrard, our CFO, is with me. He's seated directly beside me. In Harare, Victor Gapare is with us, and he serves as an executive director of the company. James Mufara has also joined us — he's our chief operating officer and works out of Johannesburg. Joining us is Craig Harvey, our VP of technical services, who will share a few remarks regarding the exploration program and the near-term learning opportunities we have; Rusiano Tsoka from Blanket Mine is also here. His role is the group's Safety, Health, and Environmental Manager, and he'll give a brief update on our new safety initiatives. We also have with us Maurice Mason, Vice President, Corporate Development and Investor Relations, along with Camilla on Group Comms. That's quite a sizable team, and there's a lot of ground we're going to cover. I'll move through some of the slides rather quickly so my colleagues have room. Please let's go to the next slide. I'm not going to dive into that — I won't begin throwing figures around, since Ross will take care of that part. That wasn't the case. The quarter was spent: solid financial results, gross profit at a record level. We made the balance sheet stronger — to be more precise, at the close of the quarter, in early April, by completing the successful divestiture of the solar plant. Ross will share more details on that with you. Obviously, the elevated gold price was a help. We achieved a realized price of just under $2,900 an ounce, which gave everything a boost. And a solid operational showing too. Output was robust; we generated and sold 19,000 ounces of gold versus 17 and a half during the same quarter a year earlier. There's one item I'd like to address, and that's the last bullet point. I'd like to highlight a few moves we've made to reinforce both the board and our leadership group. We've brought on two additional non-executive directors as of late: Stefan Hayden, whose background is in mining engineering and metallurgy and who spent time at ArcelorMittal before this, and Lesley Goldwasser, who comes to us from the United States and will provide assistance and backing, especially when it comes to corporate finance and allocating capital. At last week's most recent AGM, one NED stepped down. His name is Johan Holtzhausen. He left his non-executive director role, and he had also served as audit committee chairman. Before we go further, I want to address the board-level adjustments. They stem from a planned, methodical succession process. Our goal is to swap out a couple of non-executive directors on a regular basis, so we avoid a sudden cliff effect where many seats turn over at once. Nothing improper is going on here. On another note, Ross joined us as CFO two months back. Just before he takes everyone through the financials, he'll say a few words. We're thrilled to have him on board. Should we move to the next page? All right, what follows is just a summary. My colleagues will walk through each of these numbers in full detail. The finance side will be handled in greater depth by Ross, while operations will be addressed in greater depth by James. Since there's a great deal on our plate, I truly would not devote any further time to this page. So with that, I'll pass things to Ross so he can guide us through the financial results. Before that happens, could we just hold on this page so Ross can introduce himself and share a few words regarding why he came to Caledonia and what specifically drew him? Ross, the floor is yours.

Ross Jerrard

executive
#2

Thank you, Mark. Hello everyone, and good afternoon. I'm delighted to walk you through the financial results we're reporting today. This is my first occasion in the CFO seat. Let me share a bit of background about myself. My name is Ross Jerrard. I came to Caledonia following a stretch of just under ten years at a business known as Centamin PLC, a FTSE 250 company with a dual listing. AngloGold Ashanti acquired it in late 2024 for $2.5 billion. While I was with Centamin, we hit a great many milestones during those years, a few of them strong and a few of them less so. What matters most is that, across the latter half of my tenure there, the work was essentially steering the turnaround of a tier one mine — the Sukari Gold mine located in Egypt — repositioning that operation for the coming ten years and well past that. That turnaround involved examining output schedules and mine lifespans, yet crucially it also meant driving down the all-in sustaining cost base and preparing that asset to serve as, or deliver, the growth engine behind a multi-asset portfolio. Through steady execution, we managed to prove that turnaround had worked and essentially strengthened, or built out, the investment thesis for a mine in Egypt — a nation that had genuinely been something of an unfamiliar mining jurisdiction, that being Egypt. The end outcome was that we placed both the business and the nation on the map as a mining jurisdiction, or destination, that could no longer be overlooked. Tying that back to the reason I came to Caledonia, I notice several parallels there, in the sense of owning a fantastic operating mine at Blanket. As you're aware, it has been in production across a substantial stretch of time and, crucially, has a lengthy and thrilling future in front of it. It's performing well, and with additional optimizations and cost cuts, we have every chance to transform this into a genuine cash, or a significant cash, generator that will support or supply a solid platform for upcoming growth and development possibilities. A great many of those possibilities already sit within the portfolio, which makes it all the more thrilling. We're operating in Zimbabwe, a mature mining jurisdiction. As I mentioned, Blanket has been producing since 1907, and we have a highly skilled workforce who understand how to operate in the country. On a personal level, I hold a strong bias, and I'll be upfront about that. I was born in Bulawayo, so that's wonderful, and I'm genuinely thrilled about spending more time back in the country. I consider it a thrilling jurisdiction to operate in, especially when you glance at other parts of the world and especially across Africa. I think we are extremely lucky to be able to operate in the country that we do. This really is shifting the notion of perception versus reality when it comes to operations there. I'm extremely thrilled about both Caledonia and the Zimbabwe opportunity. When you examine it, it comes down to both the quality of the assets, the quality of the team already in place, and the opportunities we have to maximize this growth. It's genuinely rather appealing and compelling. That's me. Now, an important thing is to really dig in and examine the quarter more closely. Please let's move to the following slide. Gold revenue during the quarter rose to $56 million. Compared with the same quarter last year, that represented a 46% increase. Strong gold output was truly the driver here, from both Blanket and Bilboes Oxide. Output reached 19,000 ounces, a 9% gain versus the comparative quarter, helped further by an average realized gold price of slightly below $2,900 per ounce, which rose 42%. Naturally, this rise resulted in a larger royalty payment for the period, and as you'll notice, that figure climbed by a comparable 47%. Later on in this presentation, James Mufara, our CEO, will walk everyone through several of those operational highlights. Essentially, more tons mined and milled drove this, and that fed through to production costs. Deliveries during the quarter made for a strong volume equation; that's where you observe production costs rising roughly 19%, to $22.6 million, measured against the comparative quarter. Higher costs for labor, power, and consumables were the main cause. We'll cover that in greater depth afterward in this presentation, regarding that specific point. Crucially, as the bottom right of the chart shows, gross profit came in at $26.9 million, a 95% improvement and, notably, a record for any quarter. Let's pause here and explore that gross profit, along with the trends, in greater depth. Please let's move to the following slide. On this slide, you're able to see how our profit profile has been mapped across earlier periods — 2023, 2024, and on into 2025 — and a steady, meaningful rise in gross profits is evident throughout. What matters greatly is that we've risen substantially following those difficulties in 2023, where the gap between the orange line and the blue line, which represents Blanket standalone, is visible. Those difficulties were essentially what we called the Bilboes Oxide phase. That drag on gross profits from Bilboes is gone now. In essence, Bilboes now covers its own costs and creates no negative effect anymore. That's a genuinely significant story in terms of how everything has come together. In my introduction I mentioned resets, and I believe this stands as one obvious illustration of resetting the strategy, taking another look at the group and the benefits, and witnessing those benefits genuinely materialize — both through the direction of that gross profit line and through our capacity to soften some of these difficulties. I'd like to return now and discuss those production costs in a bit more depth. Please let's move to the following slide. Looking at our guidance ranges for Blanket Mine, which sit at $1,050-$1,150 per ounce, we've come in somewhat above that band. The primary drivers behind those increases appear on the left-hand chart, mostly in that dark blue shade representing labor, consumables, and admin expenses. A portion of those labor and consumable figures stems directly from the extra difficulties we faced, plus the overtime hours worked to hit our targets for the period, along with production bonuses that had to be paid out to get us through the quarter. That said, we've got a number of initiatives underway that should tackle these costs. My view is that, on the whole, annual guidance has come down nicely inside the range and will be met across the year. We aren't worried about that as these initiatives take effect. James will once more go through a few of the initiatives we're bringing in. Over on the right side of the chart, you'll find the all-in sustaining costs; admin and capital expenditure have weighed on these, and both run higher compared with the same quarter a year ago. Many of those admin expenses, once again, are one-time in nature, and we're also carrying a larger CapEx profile that had been planned for this year.

Ross Jerrard

executive
#3

Looking ahead across the year, we anticipate these will settle down and return to the guided ranges. Pardon me. When we add up some of those non-recurring charges, the figure comes to roughly $2.2 million, which in per-ounce terms works out to $110 an ounce, falling below that once you strip them out. Strip those out against the guidance ranges, and we sit comfortably inside the range, or in fact at the lower bound of it. Those costs will be discussed shortly. Let's advance to the following slide, if we may. Delving a little deeper beneath the gross profit lines, the first item concerns those net foreign exchange losses. I'm pleased to report that exchange losses did not hit us hard this period, unlike the $4.9 million seen in the prior quarter. Though that's a welcome outcome, we are genuinely working hard to manage and reduce the effects of any currency devaluations on the business. This remains an ongoing effort. Crucially, that exchange loss covers both realized and unrealized amounts, regarding what was incurred during the quarter. While our position is strong, it amounts to a close monitoring exercise when it comes to the business impact. You'll notice a reference to the rise in working capital. A substantial portion of our cash is being channeled into working capital, prepayments, stores, inventories and similar items, as we seek to best reduce any currency effects. This has proven helpful, yet it remains a close monitoring exercise as we move ahead. Corporate stood out as a major line item, as you'll observe, totaling $6.9 million. That stemmed from several one-off settlements related to the restructuring of our HR strategy and headcount, along with various matters arising in the admin area. One admin item in particular deserves mention: the company had earlier taken out a series of gold hedges, or more precisely put options, that established a floor for the gold prices to be received. Those hedges, or put options, amounted essentially to an insurance policy setting the floor, so that we would not suffer from any upside in gold prices. I'm happy to report that given where the gold price stands and where it is anticipated to head, those prices exceed the hedge limits, meaning we have fully expensed the hedges, and they have been written off in the income statement to the tune of $1.3 million within that category. That's a favorable situation, even though we never actually wish to use a hedge. It resembles an insurance policy — you never want to dive in and use it; that has produced a consequential effect on the income statement. Let's proceed to the following slide, where we'll take a brief look at the cash flows for the period. We saw a rise in cash generated by our operations. For this period, we reached $18.7 million, which came from the factors we already talked about regarding how gold price, output, and expenses were presented, along with a boost in working capital. As you can observe, there's a growth in trade and other receivables that I brought up earlier. That was a deliberate choice concerning what we disbursed. Net cash from operating activities has more than doubled, hitting $13.3 million versus $4.9 million in the same quarter last year. Despite the larger tax burden, this gives us a strong base for partially funding capital projects and lowering debt internally. As you can tell, we faced a greater amount of taxes, as I noted; the reason was the strong results, plus some payment scheduling that had been pending at the close of the fourth quarter and got settled early in 2025. Those bigger investing expenditures or actions are, once again, consistent with our guidance. Our net cash situation got better. At the bottom of the slide, you'll notice it was negative $4.6 million when the quarter ended. That compares with negative $14.2 million during the same period a year ago, which is an excellent outcome for these three months. Turning to the following slide and discussing what that implies for cash flow, we've felt very good about our performance and our capacity to take advantage of either the gold price or a solid production foundation, and with an emphasis on expenses, we anticipate this will keep going. This slide displays our cash held in the different jurisdictions and how it has changed across the quarters. The second chart underneath is the truly thrilling one, since it reveals the steady quarterly rise in cash, which is genuinely delightful; that reliable delivery of ounces, aided by the gold price, should persist well into 2025 and throughout the entire year to come. But what isn't visible on this chart is our present cash situation. After the solar plant sale wrapped up in April 2025, our pro forma net cash situation rose to $18.6 million, which genuinely gives us room for growth and our growth plans. We anticipate this cash balance will grow; we've placed that cash located in Jersey into deposit accounts, we set it aside, and we expect we'll keep building on that strong performance moving forward. All in all, a truly satisfying quarter. It sets 2025 off to an excellent beginning. With that, I'll pass it over to James Mufara, our COO, who will guide us through some of the operational results.

James Mufara

executive
#4

Thanks a lot, Ross — I appreciate that introduction. Hello, everyone. As Ross and Mark already mentioned earlier, Blanket delivered a record quantity of ounces in the first quarter. If you'd move to the following slide, you'll be able to see that illustrated. I'd like to begin with the chart down at the bottom, the one showing ounces. That record output came about because of deliberate choices we made in Caledonia's leadership. I want to highlight the crucial choices for you. The first involves sharper attention to health and safety, and at the close of my remarks I'll let Rusiano Tsoka speak about that and give a bit of detail on some of those programs. Our second choice involved separating the mine from the plant. Three efforts made that possible. One was establishing a dedicated leadership group handling only underground output, plus a separate dedicated leadership group handling plant operations. These constitute two distinct businesses. The other step we took toward separating output was building up a stockpile. During last year's fourth quarter, we saw the necessity of keeping a stockpile so operations could run smoothly through the quarter. What you don't want is a day when the mine produces nothing and we can't keep the plant running; late in the year — end of November into early December — we made a purposeful choice to accumulate a stockpile, allowing us to keep producing steadily even when the mine hits snags. That is what truly let us separate the mine from the plant. Our third choice was boosting employee engagement. We pursued that with a fair number of programs. One example is management by walkabout — getting out and interacting with staff. What do the employees tell us? What does management report back? The fourth step behind this record output — which was no accident and caught us by no surprise, since it was a delivered result — was beginning to tighten short interval controls, letting us oversee what goes on inside the mine across shorter windows. You can see the outcome: the record output now before us. Turning to the upper chart, the first one you see, you'll notice that while our tonnage has risen fairly consistently across time, the orange line — the gray one — has essentially flatlined across that same period. This is getting focus because of the ounces we're producing out of higher-grade zones, which lets us lift, you know, our grade over time. During the quarter — more significantly, in the quarter we've just closed — we truly did see grade get better, moving from 2.78 grams per ton in January to, you know, where we finished the quarter in March, which came in at 3.3 grams per ton. That approach is genuinely building momentum. We're pleased with the plan we have in place to raise the grade. If you could kindly move to the following graph. This graph illustrates how the real production, you know, came about during the quarter, across the quarter, which starting in January, is set against the budget we hold for that quarter. Looking at this graph, it will reveal to you that the orange line is the actual output we truly generated from the plant, as far as gold goes. The purple line stands for the budgeted ounces across that same stretch inside the quarter. This is a really lovely graph, the dream graph, where you observe that all the way through the quarter, the orange line stayed above the purple line, which is, you know, demonstrating both flawless and consistent delivery from the team. If you look at the, I mean, this graph likewise tells us there's a small hiccup, which I've already mentioned regarding the grade, which came in at 3.09 grams per ton versus a plan of 3.21. I've already mentioned the reality that we kicked off our breakthrough at a grade of 2.78. Even so, we closed out the quarter at a solid grade, comfortably ahead of the plan of 3.3 grams per ton, demonstrating that the initiatives introduced during the quarter had paid off. The stockpile helped us capitalize on the consistency as well when it comes to mill throughput, demonstrating that the calls we made, the deliberate calls we made in the fourth quarter, started to pay off in this particular quarter. If you could just flip to the following graph, the graphs display the various graphs, which is the three graphs you'll see in that spot, they display the measurements of the key performance areas of the mine and the various sections within the mine. I mean, what matters is noticing that every one of the areas, which is on the left-hand side, you know, the table on the left-hand side reveals that each of the key performance areas was in fact surpassed. I mean, this is broken down, and these are the key inputs into what we generate at the mine. This actually led to the surface stockpile, which we had already built during the fourth quarter, which stood at 7,000 tons, doubling to roughly 15,000 tons already on surface. The middle top, the top graph, reveals that there's achievement across the four mining areas. Four mining zones exist. The shallow area is one, and the far left is another shallow one, while section four sits on the far right and represents the mine's deepest part. Consistent output was in fact delivered by every section. What's additionally heartening is the quarterly graph — the one tracking reserve generation. It indicates that even though we went beyond our production figures, there was likewise a reduction in the reserves created. That positions the mine for more steady output down the road. Taken as a whole, this image reflects discipline and concentration when carrying out the plan, and we anticipate hitting our goals as we move forward too. Cost is among the main topics Ross mentioned, and that's what I'll address prior to turning things over to Rusiano. Please move to the following slide, then one more after that. Our attention to cost hasn't been abandoned as we chase greater production.

James Mufara

executive
#5

Here are the steps we've already implemented in order to lower expenses at the mine and, in turn, make an actual difference to our sole sustaining cost: we went out and found a business improvement manager, bringing them onto the team starting in the third quarter. This is the function that will examine the important cost-related projects, put them down on paper, and, even more crucially, make sure those projects actually get delivered so that we can bring down spending at the mine. As for Central shaft, it was completely handed over a number of years ago. Getting that Central shaft optimized and producing at a higher level is something we still need to accomplish. 60% of what we produce comes from Central shaft. Whatever steps we take there, we have to make certain we're able to run at an optimal level when it comes to cost. Second — and among our three largest costs — electricity ranks as the second priciest item we consume at the mine. We've brought in a firm named Vision to pinpoint and quantify how energy gets used across the various sections of the mine. That means we're now able to — right now we have solid visibility into all the energy being consumed at every energy center. On the mine we have in excess of 100 measuring units that let us actually take those measurements. We now have real-time capability to observe where energy is going, and that will serve us well down the road as we try to optimize these areas, since we know all the big spots and everywhere the energy is truly being drawn upon. Labor likewise represents a significant cost. As a matter of fact, it's our single largest cost, and we've made the decision to tackle this, the cost element within labor, so we can make better use of our workforce moving forward. We've begun — we've installed a time and attendance system known as Firefly on Blanket. That system now covers the entire mine and has been completely commissioned there. This time and attendance system will provide us with visibility into where our workforce is located. We'll be able to figure out the underground hours at work — that is, the hours put in by the people going below — and we'll be able to figure out where the overtime and all the hours we might need to work are actually coming from. On this point, we're quite pleased about bringing in this time and attendance system. Another thing we need to examine — the third largest, biggest area, the area of consumables we have to address — is that our planning around resources needs to improve. We've actually brought in an improved planning framework at this point, which lets us examine every section of our mine and determine what is being consumed where, so that we can find ourselves able to identify ways to establish structures allowing for enhanced resource usage and, you know, tighter resource oversight. I'll now pass things over to Rusiano Tsoka, who will discuss a few of the safety programs that we have implemented at the mine. But before I, you know, allow him the floor, I simply want to present Rusiano Tsoka. Rusiano came on board during the third quarter of last year, 2024. You see it, you see it, the safety and health strategy for the company. Rusiano has been employed by Anglo, Gold Fields, Rio Tinto; over the past 15 years, Rusiano Tsoka worked at Gold Fields as a group health and safety manager for the company. Harmony, just to provide some background, is a company with a $10.8 billion market cap, which generates 1.5 million ounces of gold and has a workforce of roughly 48,000 employees. Rusiano is a Zimbabwean, and he possesses over 35 years of experience in health and safety management. If you would allow, I might just pass things to Rusiano Tsoka to discuss the health and safety initiatives that he has rolled out. Thank you.

Rusiano Tsoka

executive
#6

Hello everyone, and good morning. James, I appreciate you setting that up. Thanks. I'll be walking you through where things stand with safety — one of the core pillars supporting our operational excellence. If you could advance to the following slide, please? Ever since we went through the safety strategy back in May 2024, our efforts have centered on a number of safety initiatives, and every one of them appears on this slide. What I want to do today is focus on just a pair of the highest-impact ones: visible felt leadership, or VFL, and the structured management of our top 20 operational risks. Through visible felt leadership, we've made sure that our leaders, managers, and supervisors show up consistently in the places that matter the most — underground, in the plant, and out in the field — and that they engage personally with employees via two-way communication; that dialogue hands management valuable insights and information you wouldn't normally pick up through routine inspections and audits; during this quarter, just the last quarter, we carried out 47 VFL engagements, and those helped us spot and resolve unsafe acts and conditions right at the source, while at the same time building trust among employees, accountability among managers, and a platform for a proactive safety culture. When it comes to managing the top 20 operational risks, we've pinpointed and ranked the mine's most critical safety and health risks, among them falls off ground, heat stress, fire safety, and tailings storage integrity. Drawing on industry best practices and international standards like the ICMM guidelines and the ISO 45001 risk management principles, we've attached clear ownership deadlines and measurable outcomes. I'm happy to share that more than 85% of the high priority actions are already done and closed out. That proactive closeout has meaningfully reinforced our critical controls, brought down our overall risk exposure, and fed directly into the better safety performance we recorded this last quarter. When you combine the initiatives, including the two I just described, the result is obvious. Incidents dropped from five in January this year to one in March; that helped us reach 26 accident-free days in January and 30 accident-free days in March. Safety cannot be compromised, and we're dedicated both to protecting lives and to ensuring the long-term sustainability of our operation. What we're aiming for is to build and embed a proactive safety culture throughout the operations, one in which every employee feels responsible, empowered, and supported to stop incidents before they happen. Our journey to zero harm is still ongoing. Thank you. Next slide.

Mark Learmonth

executive
#7

All right. May I start by saying a few words about Bilboes? Before I pass things to Victor, could I offer a couple of opening remarks? Next slide, please. Okay. Before we dig into the specifics of where this stands, I'd like to touch on capital allocation. I've made this point previously, but let me restate it: when management thinks about how to move Bilboes forward, the goal is to get the biggest possible increase in Caledonia's net present value per share, since that's the nearest thing we have to a proxy for our share price. There are several routes to that. The first one, and Victor will cover it more thoroughly, involves the different work streams underway right now aimed at improving the project's economics, so that it stands on as solid a footing as we can manage. On the flip side, we have to keep equity dilution as small as possible. Our approach there is to examine ways of reshaping how we develop this so that the upfront capital cost — the money required right away to construct a project — comes down. We're likewise reviewing possibilities for raising Caledonia's internal equity contribution, meaning our own cash flow. Shortly, Craig will walk you through the background on the initiatives we're considering on that front. Last, to keep dilution down, we must also examine debt funding, though carefully. Plainly, we don't want to burden the company with an excessive debt load. Through Cutfield Freeman, our debt advisors, we've held very productive discussions with prospective funders; those talks are on hold right now while we complete the work Victor is about to describe. Let me be clear that capital allocation sits at the heart of how we're handling this project. I'll now pass it to Victor, who will explain what we're doing to hit these project-optimization goals. Victor, the floor is yours.

Victor Gapare

executive
#8

Thanks, Mark. So on the Bilboes project, over the past several months, working alongside DRA, the entire feasibility study has in fact shown that there are ways to optimize further, considering how big this project is — how much ore we'll be mining, how much waste we'll be moving, and the capital the project needs. When it comes to mining, the feasibility study we're reviewing assumes 240,000 tons per month. We see chances to revisit the pit and the mine shed line, especially as it ties into our McKays and Isabella operations, which sit within a 5 km radius of one another. That opens up ways to lower upfront capital cost as well as operating cost over life of mine. Regarding metallurgy, the bioprocessing route is the one we intend to take, as you know. Our current thinking is this: the first phase is going to focus on Isabella and McKays, after which the second phase — coming in roughly year six — will focus on ore processing from our Bubi operation, from our Bubi mine. To get the most out of the capital there, we've examined pulling out any upfront capital we'd be committing to the BIOX plant, pulling out the CapEx connected to Bubi, which means at the outset we'd only be dealing with CapEx connected to Isabella and McKays. Naturally, this affects things when it comes to possible capital down the road, though at the very least the money we need to commit right now upfront would be somewhat reduced. Exporting concentrates is another possibility we're looking into. Over recent months, we've determined that permission for concentrate exports can in fact be granted by the Zimbabwe government, and that means the Biox plant wouldn't need to be built right away. It could instead be installed perhaps two or three years later. That lowers the initial capital outlay. Among the optimization choices under consideration, this is one. When it comes to infrastructure, the emphasis has really been on what the project needs in terms of power. The largest expense involved is the direct supply power line, roughly 70 km in length. We're currently in talks with the power authorities so that they would cover the CapEx needed for that line, and we'd pay it back through credits applied to our monthly electricity bill. That shifts the project's economics. We're examining other areas too, such as the conveyors, which should let us lower the upfront capital cost once more, along with the office eventually. Contractor pricing is another matter. We believe sharper rates are achievable from contractors for the earth moving, civils and infrastructure work. That's something we're examining, and we believe cost reductions can be achieved in that area. At the moment, our attention is centered on the tailings storage facility, also known as the TSF. It accounts for the largest individual cost within this project. What we're really assessing is the waste material as such and the way it will impact the liner, ensuring we satisfy environmental compliance standards. Such work could involve using a limited sum of money and a limited period of time to establish the appropriate lining specifications for the TSF while lowering the expense. After that comes the question of moving it to another location. On the last call, we said there might be an opportunity to take another look at the TSF's location; as everyone knows, the Motapa property is directly adjacent to us. That ground is a bit more appropriate for a tailings storage facility, and while we're looking into it, it's more of a long-term item. If we chose to do that, it would take place while construction is underway. One more important thing we're reviewing, given that we're making the feasibility study better, is revisiting the smaller-scale options we looked at before — but truly on a conceptual basis, at a scoping study basis, to figure out if their economics could be viable and if they'd be alternatives worth considering. Regarding when we publish, or rather when we return to the market and say, "Here's what we've got," the preliminary results ought to be available before the year is out. We should be in a position to talk about the cap. We should have the same understanding of capital costs, aside from the matters tied to the TSF site, which could take somewhat longer — or rather, will take somewhat longer. Once all of this is complete, our expectation is to engage with the Zimbabwe authorities first regarding concentrates and other issues connected to the project overall. Mark has already indicated that after we wrap up this process, once we have the same CapEx figure, we will approach our prospective debt funders and push this project ahead. The smaller scale alternatives, as I mentioned, are being revisited at the later scoping study level, and they ought to indicate whether there's value in assessing them. These too will be ready at the same moment as the feasibility study itself. Mark, that's everything I'm able to share regarding the project.

Mark Learmonth

executive
#9

All right, I appreciate that. So at this point, could we turn to Craig, who serves as our Vice President of Technical Services, and have him give us a brief rundown of our exploration efforts, along with discussing a few of the opportunities currently taking shape that we have underway? Craig, the floor is yours.

Craig Harvey

executive
#10

Thank you. Appreciate it, Mark. I'll give everyone a quick rundown of exploration and what lies ahead for Caledonia. Next slide, please. Motapa ranks among our key priorities for this year. Late last year, we put out a press release covering the first phase of work we'd finished. Our exploration budget for Motapa this year sits just under $3 million. Three trends are there: north, central — that's Mpudzi — and south. Up at Motapa north, what we're targeting this year is defining a minimum of 250,000 ounces into a mineral resource — a mineral resource; we're planning approximately 19,500 m of drilling. That works out to about 170 drill holes. One thing to keep in mind: our goal covers a depth of just about 150 meters. That doesn't mean, you know, that everything stops once you hit that level. Think of it as just the opening stage. I have a lot of confidence that next year we'll be drilling in that spot to grow the sulfide resource. Over in the central zone, which I mentioned earlier, the Mpudzi block is a formation of iron that's been abandoned. On our outcrops and at surface, there's no shortage of, you know, lots of surface scratchings and things of that nature. We've put up fencing around the area on a large scale. The aim for this year is to establish an oxide mineral resource of more than about 30,000 ounces. One caution I'd like to attach: this carries with it every question around whether it's suitable for a heap leach. What kind of ore are we dealing with? How does the oxide-sulfide transition present itself, and questions along those lines? To investigate, roughly 6,000 m of drilling is on the schedule. Since Bilboes is located at Mpudzi, it sits somewhere between 400 and 500 m away from the heap leach pads at Bilboes, most likely. Obviously, should we get that work finished, we'd have ore feed available for those pads. Through everything we're undertaking, we keep digging trenches over the shear, the shear zones we come across. New details are coming to light — at Motapa south, a 600-m anomaly along strike has turned up, with trenches yielding anomalous values across a 20 to 25 m width. In the coming year, we plan to carry out additional infill trenching at that location. If the results turn out to be quite favorable, my aim is to obtain further funding later in the year so we can proceed with some drilling; that summarizes Motapa. Moving to the following slide, let's discuss Blanket—specifically underground exploration at Blanket. To give a quick recap, early in 2024 we put out drilling results from Blanket, and an update is in progress that ought to be released within two to three weeks concerning our long-haul drilling. Long-haul drilling continues to be extremely encouraging, extremely encouraging. Not only do the grades exceed what we had assumed, but in some zones the widths are considerably greater as well. At this point, we've drilled roughly 95% of what we intend to test down to 34 level, so it can all be classified as an indicated resource or better. We're aiming at extensions of the primary ore bodies beneath 34 level, since we must evaluate that to establish whether we ultimately go deeper. The first question is whether mineralization exists there. Another item that has stood out at Blanket is that, post-1970—or perhaps post-1980—not much work has been carried out on surface, correct? For context, directly to our south along our southern boundaries sits the Vumbachikwe Mine, which has now entered receivership and similar circumstances; it also lies on banded iron formation. The distance from the Blanket share zone is probably around 300 to 400 meters, offset and cross strike—or, to put it another way, yes, cross strike. Across the whole Blanket lease area, this banded iron formation stretches. Approximately 10 km is its strike length. We're going through some historical data that dates back to before 1970. And it's clear there are showings of strong grades. Showings of weak grades also exist; what can be obtained from surface, typically oxide-type material, is something we've now started pursuing a strategy around, so that we can add into the Caledonia stable some low-cost, dollar-per-ounce gold. Restricting it to surface alone isn't the case. The one at the bottom there is miner. In due course, we'll release some information. Once more, historically, mining there went down to approximately 150 m; it sits one and a half kilometers north of Lima, the northernmost shelf at Blanket. It has very strong grades, it has strong widths, and it's highly amenable to mining, so it fits your typical mining widths. Again, we'll begin examining that, and we'll bring it into the stable at Blanket. Moving to the next slide, something I'm fairly enthusiastic about is what we refer to as these near-term opportunities. At both Motapa and Bubi, as Victor mentioned, Bubi forms part of the Bilboes project. These old mines, or old areas, both contain what we refer to as spent heap leach pads; by that, we mean their last irrigation happened in the year 2000, or their last irrigation happened in the year 2020. The key point regarding these heap leach pads is that they were run-of-mine leach pads. By that, I mean the owners would mine, drill and blast, then take the blasted rock and load it straight onto a pad. It never passed through a crushing circuit whatsoever. If we look there, Motapa's spent heap leach pad recorded a historical recovery, based on the records we possess, of 53%. Bubi's historical recovery was just under 61%. For some background, Bilboes brought a crushing circuit into the ore stream they take straight from the mine. As for Bilboes recovery, it sits a bit above 82%, if I recall correctly. Essentially, and this happened very fast, that effort is already underway: crushing and screening, then placing material on a pad for leaching. We could likely contribute roughly 30,000 to 40,000 ounces of gold that can be recovered across the coming two- to three-year span, and at a cost even below what a typical open-pit operation would run at. It's clear we're pressing ahead with real intensity, and that's thrilling. All right. Thank you; that covers what I wanted to say regarding exploration.

Mark Learmonth

executive
#11

Appreciate it. Thanks, Craig. We've had a fairly lengthy stretch together, roughly 50 minutes. Could we move straight into the outlook and wrap up as fast as possible? What we're aiming for really comes down to strategic focus along with disciplined growth; the goals here are to keep Blanket's production at its current level — we've gotten off to a great start this year. We'll keep advancing our cost production initiatives. With any luck, by year-end we'll see some movement there. As you've heard, we're growing the exploration work at Blanket, intending to extend Blanket's life of mine and additionally to look into new opportunities across the lease area. <<inaudible>> walked through assessing beneficial development options via Bilboes, aiming to optimize economics and bring down the upfront capital costs. Like Craig also laid out, we're quite enthusiastic about what Motapa could hold; we've covered a lot of ground there. Apologies for that. I hope you found it helpful. Shall we open this up for questions?

Executive

executive
#12

I have no questions.

Mark Learmonth

executive
#13

No questions. Okay.

Executive

executive
#14

That's my quarter. My quarter time.

Mark Learmonth

executive
#15

Thank you for your help. Very good; we'll do a few several questions.

Executive

executive
#16

Thanks a lot. Hey, everyone. Thanks. That was a genuinely impressive presentation. Appreciate it. I have a few questions. James, you've shared significantly more information than we typically get regarding the mine itself, and you've provided some reassurance that you're matching the reserves with the production. What about the more long-term elements of developing the mine — you know, the progress on the declines and the additional work you're doing? Is that where it ought to be right now? That's my first question.

Mark Learmonth

executive
#17

Thanks, James. Thank you.

James Mufara

executive
#18

Appreciate that, Nick. Yeah. Regarding the decline development right now, as you're able to see, a choice has been made by us. At the point we assumed control, we came to understand there were some shallow reserves available for mining. What I mean is, Craig and I, the two of us went in and figured out that nearer the surface, ventilation isn't required, and you don't need much energy. We're slowing this down since it will be expensive, all of the; actually our production is improving, nearer the surface. Of course, over the medium to longer term, those declines will need to be restarted by us so we can go deeper.

Executive

executive
#19

Thank you. So, the following question basically concerns Blanket dividends and the role they might play going forward over the next 2 or 3 years. Clearly, your mine is generating quite a lot of money. In 2024, what dividends were paid out by Blanket? That's a tough one for you, but looking ahead across the year, how much money do you figure you could pull out of Blanket to fund your business? Under the present gold price scenario, what is the probable close-out horizon for the facilitation loans? What is the most significant or influential crisis in.

Mark Learmonth

executive
#20

Okay, we’ll begin with the facilitation loans. First, there’s Blanket—specifically Blanket’s dividend distribution, without all of the Blanket shareholder interest, so that you can effectively pull as much cash as possible out of Blanket. That’s what we want, and the other shareholders want that as well, all right? The balance you have to strike is that you don’t distribute too much, and we’ve already done that. At this pace, I’d anticipate the facilitation loans being repaid in roughly 12 months at this level of distribution relative to cash generation. I’ll let Ross discuss how much cash he believes he may be able to extract from Blanket across the year.

Ross Jerrard

executive
#21

Appreciate that, Mark. Hello there, Nick. Sure, that's pretty straightforward — by the time the year wraps up, we could find ourselves sitting on a cash balance somewhere in the range of $50 million to $60 million, and that hinges on a number of different elements we're watching; so from a cash flow standpoint, it's a really thrilling path we're on. As part of that cost program, we're evaluating a range of initiatives tied to saving over the longer term and getting costs lower. Some extra capital could get put toward those projects, meaning money spent now to capture a benefit further out. That spending would come out of our cash, but realistically, we see a closing balance of roughly $50 million to $60 million, anywhere in there.

Executive

executive
#22

Thank you.

Mark Learmonth

executive
#23

Anything else, Nick?

Executive

executive
#24

Right, I simply wanted to ask — you still hold a few modest exploration assets, and with the scale of what you've committed to Bilboes, now just wouldn't be the moment to cut those loose.

Mark Learmonth

executive
#25

Which, which one, which one's in particular?

Executive

executive
#26

What else is that? That would be your Maligreen. The wrong Maligreen is not what Maligreen is.

Mark Learmonth

executive
#27

Right now it’s in the incubation stage. No, selling that isn’t something we would do. As for a company, what else do we have?

Executive

executive
#28

All right. Last thing — I believe you brought that up. Regarding what you might be tempted to do with the cash right now: the strategic situation this company occupies today is substantially unlike the one from 12 months back, and maybe even unlike conditions when your budgets got put together. Opportunities could exist, and I think you've mentioned before putting money into electricity. Are there other things that draw your interest, such as additional spending on exploration in the surrounding area?

Mark Learmonth

executive
#29

In my view, there's a great deal for us to share at this point. There are some promising possible investment opportunities on our radar. We have more than enough. All right.

Executive

executive
#30

Thanks very much, Mark.

Executive

executive
#31

Hi, can you hear me?

Mark Learmonth

executive
#32

Yep, we can hear you.

Executive

executive
#33

Okay, thanks. Earlier, you earmarked $41 million in CapEx for 2025 to upgrade operations, improve mining efficiency, and put money into exploration work. From what I recall, you mentioned $3.4 million allocated for Blanket, plus $6.9 million for Bilboes and Motapa. Of that total, what portion has actually been used so far?

Mark Learmonth

executive
#34

That's a slow; so roughly

Ross Jerrard

executive
#35

$10 million across both.

Mark Learmonth

executive
#36

Yes. We're at roughly $10 million so far. The sole thing holding back that outlay is simply how quickly we can carry it out.

Ross Jerrard

executive
#37

I mean, the situation is that acquiring certain items can take a really extended period, and at times you have to wait on vendors to actually deliver them. What's holding us back isn't whether we have the funds on hand; it's simply the practical challenge of deploying such a large sum in such a short window. Is that useful?

Executive

executive
#38

Thank you.

Mark Learmonth

executive
#39

Okay; we are good to have further questions.

Executive

executive
#40

My apologies. My apologies. Right. Right. One additional question from me. Given that your cash generation and potential rose during the quarter, and given the signals that you aim to grow your cash balance sheet by year-end to a range of $50 million to $60 million, when it comes to where the funding for your CapEx for the remainder of the year will come from, would it be reasonable to conclude that the bulk of it will originate from this? Could you give some detail on that?

Mark Learmonth

executive
#41

Every bit of our capital expenditure comes out of the cash we generate ourselves. That $50 million to $60 million Ross mentioned is what remains once CapEx has been accounted for. Out of the $100 million the mine is going to produce, $40 million goes toward CapEx, and whatever is left after that is the remainder. Cash flows are the source we use to pay for CapEx.

Executive

executive
#42

Right. Thank you.

Mark Learmonth

executive
#43

Thanks. I appreciate everyone being here; we had a solid quarter, and ideally, if this gold price keeps up and given how strongly we've begun production this year, we should hopefully witness better results in quarter two and beyond. We'll bring you an update when the next quarter comes. Thanks so much for joining.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Caledonia Mining Corporation Plc transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

For developers and AI pipelines

Programmatic access to Caledonia Mining Corporation Plc earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Caledonia Mining Corporation Plc or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.