Century Aluminum Company (CENX) Earnings Call Transcript & Summary
August 9, 2023
Earnings Call Speaker Segments
Ryan Crawford
executiveThanks, operator, and good afternoon, everybody — glad you could join the call. With me today are Century's President and Chief Executive Officer, Jesse Gary; Gerald Bialek, our Executive Vice President and Chief Financial Officer; and Peter Trpkovski, Senior Vice President of Finance and Treasurer. Once we've finished our prepared remarks, we'll open things up for your questions. Just a reminder that today's presentation can be found on our website, www.centuryaluminum.com; the website serves as one channel we use to disclose material information regarding the company and to satisfy Regulation FD obligations. If you'd turn to Slide 1, please take a moment to look over the cautionary statements presented there regarding forward-looking statements and non-GAAP financial measures included in what we discuss today, and with that, I'll turn things over to Jesse.
Jesse Gary
executiveAppreciate that, Ryan. And thank you all for being here. To kick things off today, I'll walk through how we did in the second quarter on both the financial and operational fronts, and after that I'll talk about what we're seeing in the market right now. Jerry will follow with a rundown of the financial results, then I'll close things out before we open it up for your questions. If you go to Slide 3, you'll see that solid operational execution that kept up, combined with lower input costs at our smelters, produced adjusted EBITDA of $30 million for Q2 — roughly $6 million better than Q1. We — we've come a long way over the past several months, bringing our new Jamalco colleagues on board and starting the work of folding the Jamalco operations into the Century system. The caliber of the people at Jamalco gives us a lot of confidence, and their safety culture stands out in particular as truly excellent. Safety of the workforce and sustainability of operations have been priorities throughout Jamalco's long history, and they have strong systems in place so that everyone gets home safely every day. There are some good opportunities for us to bring certain Jamalco safety systems and procedures into the remaining Century operations. Back in early June, Jamalco was hit by a bad weather event when lightning strikes caused damage to the local grid; power to the refinery was completely knocked out for several days, and a number of key equipment pieces were damaged as a result. Lost production in June came from the outage, which led to stability issues and a staged restart of the plant. Over the course of June, the refinery gradually worked back toward targeted production levels, and by July it was back to full, stable operations. Jerry will walk through what this meant financially for Q2, and a little beyond. As we mentioned on the previous call, we're working through a set of operational upgrades and investments at Jamalco aimed at bringing the refinery back to its design capacity of 1.4 million tons over the next several years. Some of those volume gains should start showing up in Q3 and Q4 of this year, and that ought to let the refinery hit an annualized run rate of 1.2 million tonnes by year-end. We'll share more detail on 2024 and beyond during our Q4 call. Over on the smelter side, our teams have operated every one of our plants really well despite some extremely hot days during the past several months. Across the quarter, operations at each smelter held steady and met targeted levels. It's great to see the operational improvement programs we started putting in place 2 years ago really delivering, given how stable the smelters have been through the last several quarters; we expect those programs to keep paying off as we head into 2024. Now, looking at the market environment on Page 4, global supply and demand are still more or less in balance as we move into the third quarter. Okay, so Chinese supply increases, along with some softness in near-term demand, have shifted the market from a small deficit in the prior quarter to a modest surplus in this one. During Q2, the 3-month aluminum price came in at an average of $2,286 per tonne, roughly $150 lower than what we saw in Q1. Regional delivery premiums also came down during the quarter, though they are still high compared with historical norms. Broadly speaking, the aluminum market in Q2 mirrored the uncertainty present in the wider economy. Ongoing inflation and climbing interest rates have weighed on demand in the near term; that shows up most clearly in our value-added product sales, where billet demand stayed sluggish throughout Q2. The pressure is greatest among our building and construction customers, whereas automotive and renewable energy markets continued to stand out positively. Against that backdrop, we are keeping our attention on rigorous cost control and carrying out our improvement initiatives so we are best positioned when the market eventually recovers. Now on the supply side, production in Yunnan that had previously been curtailed started coming back online during the quarter as the province's power situation improved. Those restarts were more than enough to counterbalance curtailments in Sichuan, pushing the overall Chinese market closer to balance. Although non-hydropower production did get a boost from recent rainfall, reservoir levels in that province are still under normal, which means there is a risk of a third consecutive season of output cuts when the dry season comes back this fall. On the whole, even though worldwide supply and demand are now close to balanced, global days of inventory are still around 50 days. Inventories have stayed at these fairly low levels even as a rising number of global consumers stop accepting Russian metal after the Russian invasion of Ukraine; what that means is that while total global inventories remain low, an increasing share is metal of Russian origin. In fact, Russian metal accounts for roughly 80% of LME inventories now, compared with only 10% before the war in Ukraine. Given inventories at these historically low levels, LME prices and regional premiums ought to react quickly once demand conditions get better. As the energy chart on Page 5 shows, EU energy prices are still significantly elevated, which leaves margins under pressure for the remaining European smelters; since forward energy prices are still above $150 per megawatt hour, we do not expect any meaningful European smelter restarts in the near term. If we turn to Page 6, we can see smelting costs have declined across the board, with the biggest drop on the energy side, where Q2 in North America and... both reflect a reduction of over 50% from year-ago levels. Energy supply and demand fundamentals are still constructive, with U.S. natural gas reserves 22% higher than a year ago and 12% above the 5-year average. Utility coal stockpiles are also full, nearly 60% above a year ago. These high levels of U.S. gas and coal reserves should help ensure power prices stay constructive over the next 6 months. Moving to raw materials, coke and pitch prices have finally started to decline, with coke prices averaging $582 in the quarter, down almost 25% from year-ago levels. Pitch prices also eased. When it comes to refining in our company, the main external raw materials Jamalco relies on are caustic soda, LNG — whose price is tied to Henry Hub references — and HFO. Through the first half, most of those input costs came down, with U.S. natural gas in Q2 averaging $2.15 per MMBtu, a drop of more than 70% versus the same period a year earlier, while HFO averaged $63 a barrel, roughly a 1/3 decline from Q2 2022. Caustic prices similarly have been tumbling sharply, falling more than 50% compared with last year. Given all that, I'll hand things to Jerry so he can take you through the financial results and what we expect in Q3. Jerry?
Jerry Bialek
executiveThanks, Jesse. Moving on to Slide 7, I'll take you through what we saw in the second quarter. Our consolidated global shipments for Q2 came in at 174,000 tons, a slight sequential decline tied to the usual fluctuations in shipment cutoffs at quarter-end. Realized metal prices matched what we had anticipated, which helped us achieve net sales of $576 million for the quarter, up 4% from the previous quarter. Now, for Q2 operating results, adjusted net income reached $16 million, or $0.16 per share. That's a $27 million gain over the prior quarter. The adjusting items in Q2 included add-backs of $6.6 million for lower of cost or net realizable value on inventory, $3.6 million for the final capacity charge tied to the Hawesville curtailment, $1.6 million for share-based compensation, and $700,000 for Jamalco acquisition costs. These were partly offset by a $4.3 million deduction in unrealized gains on forward contracts. Adjusted EBITDA attributable to Century totaled $30 million, which is a $6 million sequential improvement. Keep in mind, this reflects our 55% stake in the Jamalco JV in Jamaica. Our liquidity stayed solid at $231 million by quarter's end, made up of $51 million in cash and $181 million available under our credit facilities. Also, we now anticipate the Mount Holly land sale will wrap up in the third quarter, with a final sale price expected around $25 million. Now, on Slide 8, to break down the $6 million sequential rise in adjusted EBITDA for Q2, overall, realized lagged LME prices and delivery premiums aligned with the guidance we gave on our previous call. Realized LME for the second quarter was $2,371 per tonne, an increase of $21 from the prior quarter, while the realized U.S. Midwest premium came to $563 per ton, down $10, and the realized European delivery premium was $299 per tonne, up $9. These figures reflect our 1- to 3-month lags in realized metal prices. All together, these factors gave us a $3 million boost in the quarter. Power costs fell from the prior quarter thanks to a 33% drop in Nord pool market prices, plus favorable cost of service rate for our Mt. Holly operations. The rest of the benefit came from the year-over-year decrease in the MISO capacity charge for CBRE. As a reminder, MISO runs an annual capacity auction each spring that determines the capacity price for the following 12-month period. This year's auction brought capacity prices back toward more normal levels, which will cut our capacity cost by roughly $20 million year-over-year; this took effect June 1 and stays in place through May 31, 2024. Realized alumina cost in Q2 was $400 per tonne, $11 higher sequentially. We note there's a 3- to 4-month lag for alumina costs to flow through our income statement. Realized coke prices dropped 10%, and realized pitch prices fell 1%. Combined, alumina and other raw material costs led to a $1 million improvement in EBITDA. Operating expenses, mix, and other items came in a bit under what we had anticipated, mostly because of somewhat softer billet premiums and a sales mix that worked against us; at Jamalco we took a $6 million loss stemming from downtime and output we couldn't produce as a result of the weather event Jesse referenced during his opening remarks. Going forward, Jamalco's results are going to be consolidated within our overall Century numbers and forecast, just like our smelters plus carbon and facility. You'll be able to run sensitivities against the right raw materials, which are laid out in the appendix of the presentation today. On the whole, adjusted EBITDA in the second quarter was up $6 million quarter over quarter, coming in at $30 million. Let's go to Slide 9 to examine cash flow. We entered the quarter with $30 million of cash and generated an additional $30 million in adjusted EBITDA. Borrowings rose during the quarter largely to cover our semiannual interest payments along with ongoing CapEx projects, chiefly the build-out of our new cast house in Iceland. As a result of these movements, cash at the end of Q2 stood at $51 million. Moving now to Slide 10, which gives insight into what we expect for the third quarter; for Q3, the lagged LME price of $2,240 per ton should come in roughly $131 lower than Q2 realized prices. The Q3 lagged U.S. Midwest premium is projected at $505 per tonne, a drop of $58 per tonne, while the European delivery premium should land at $320 per tonne, roughly $21 per tonne higher than in the second quarter. When you combine the LME and the delivery premiums, the expectation is that Q3 EBITDA will fall by somewhere around $20 million to $25 million relative to Q2 levels. Energy costs should be comparable to Q2, with seasonal Indy Hub prices a touch higher, offset by lower or pool market prices. We also anticipate that the benefit from a reduction in Sabre's capacity charge will be canceled out by a somewhat higher cost of service-based rate at Mount Holley. On the refinery side, note that we've added more reference prices tied to Jamalco's energy mix. We've now added sensitivities for those prices in the appendix as well, so you can sensitize our results to these additional markets going forward. Turning to our other key raw materials, lagged realized alumina cost should come to $390 per tonne, a slight decline. Jamalco is set to supply roughly 40% of aluminum mix through the rest of this year. We likewise expect favorable effects from lower coke and pitch prices. Caustic soda prices have fallen about 50% from year ago levels, with current spot prices in the mid-$300s. In the appendix, we've also added the sensitivity for caustic soda, and it now takes 5 to 6 months for spot prices to work their way through our P&L. Taking everything together, we expect lower raw material costs to add between $5 million to $10 million to EBITDA versus the second quarter. We expect volume gains and operating cost improvements to offset continued headwinds for value-added premium sales mix. When you take everything into account, for the third quarter we're looking at adjusted EBITDA somewhere in the $10 million to $20 million range. There are a couple of additional items I want to mention regarding hedges: we anticipate a realized gain somewhere between $0 and $5 million during Q3, and tax expense should come in at roughly 0. Keep in mind that these two things sit beneath EBITDA and therefore affect adjusted net income. One final note on the Jamalco acquisition, which we covered in Note 2 of the 10-Q for this quarter: right now we're in the middle of purchase accounting, and that process calls for the assets and liabilities we acquired to be recorded at fair value as of the date of acquisition. We have as long as 12 months from that acquisition date to complete the work needed to lock in the fair value, and according to our preliminary estimates of fair value, a deferred gain has been recorded as a current liability on the balance sheet as of June 30, and with that, I'll hand the call back to Jesse.
Jesse Gary
executiveAppreciate that, Jerry. Even with a complicated macro backdrop, Century's emphasis on cost control and operational execution has positioned us well to keep producing results through this stretch of the cycle and past it. The operational improvement programs, <<inaudible>> and started putting in place when we assumed control of our global operations 2 years ago, keep generating solid performance at our smelters. Our big capital investment program at the Grundartangi casthouse project is almost finished and on schedule to make our first sales of low-carbon natural billet to European customers during the first quarter of next year. Combined with the U.S. casthouse debottlenecking programs we have underway, the Gruden casthouse is going to give us the capability to sell 80% of Century's total production as value-added product, whether billet, slab, foundry alloys or natural, low carbon aluminum, and our new Jamalco operations have taken the risk out of the supply chain for our most critical raw material, and offer a significant opportunity for value creation as we carry out our planned capital and operational improvement programs to bring this asset back to its full potential. Taking everything into account, we're staying focused on what's right in front of us and enthusiastic about our future. Thank you. I'll hand the call over to the operator now for questions.
Lucas Pipes
analystThanks a lot, operator. I'd like to start with Jamalco. During the prior quarter, I believe you said that, with spot prices as they stood then, Jamalco was expected to add to the financial results beginning — if I recall correctly — in this quarter, Q3. So I was hoping you might address whether that remains your expectation. And if you're able to put a figure on the effect, that would be helpful.
Jesse Gary
executiveThank you, Lucas; this is Jesse. Appreciate you being here. Appreciate the question. Yes. So to revisit the previous call, I believe you framed the question accurately — with spot prices as they were at that point, our expectation was that Jamalco would contribute positively to the financial results in Q3, and I believe if that had stayed the situation, the statement would still hold; however, as Jerry said, moving forward, our approach will simply be to put the Jamalco results into the guide, so you have that across the 4 to 90 days, it falls inside that $10 million to $20 million shown before you. But just to give context, yes, that statement would still have held if spot prices for maintenance.
Lucas Pipes
analystAll right. Now let's shift to a different subject. You brought up the MISO auction during — my understanding is that it was scheduled for Q2. Could you walk us through again what that auction involved and what it means for your company? Also, any signal regarding a possible restart at the hospital? I appreciate your thoughts on this.
Jesse Gary
executiveOf course, Lucas. Thanks once more. That's a good question. Right, so regarding the MISO capacity auction, as you may recall, we purchase power, and essentially there are 3 components across our Kentucky facilities, both plants in Kentucky. One component is capacity, naturally, another is energy, and another is delivery. The capacity auction happens each April and May, and in this instance, the capacity auction came back to more typical levels. You might recall that 12 months ago, capacity prices in MISO delivered a major upside surprise. Capacity prices rose very substantially. — this time around, capacity prices have gone back to those more typical levels, so the effect you'll see now — this is specific to CBRE — will be roughly a $20 million gain for the new 12-month period compared with the prior-year period. So roughly a month's worth of that showed up in the Q2 results, and you should expect around a $5 million gain in the Q3 results. Naturally, that will affect Pasi too, but — and you'd observe a comparable gain if you were buying energy at the same levels at Hawesville; but on the whole, as far as a hassle restart goes, we remain exactly where we were when we last spoke a quarter ago. We keep watching market conditions, on both the revenue side and the cost side, and we'll get back to you once that decision has been reached.
Lucas Pipes
analystOne more quick question — regarding that capacity price, my understanding is it's listed as megawatts per day of capacity. Could you tell us roughly what rates you secured in that auction?
Jesse Gary
executiveSure. In fact, I believe settlement happens each month, though we're able to express it on a megawatt day basis — so for the next 12 months, it comes in under $10 per megawatt day.
Lucas Pipes
analystAll right, that's helpful. I'll pass the floor along. Thanks a lot, and good luck.
Jesse Gary
executiveAll right. Thanks a lot to all of you for being on this call, and we're eager to speak with you again in Q3.
Operator
operatorThe call has now wrapped up, and we appreciate everyone joining us. At this point, you're free to hang up.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Century Aluminum Company transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Century Aluminum Company earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Century Aluminum Company or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.