CLP Holdings Limited (2) Earnings Call Transcript & Summary

August 2, 2021

Hong Kong Stock Exchange HK Utilities Electric Utilities earnings 52 min

Earnings Call Speaker Segments

Angus Guthrie

executive
#1

Good afternoon, everyone, and welcome to CLP's 2021 Interim Results Analyst Briefing and Webcast. Joining me for today's webcast are Mr. Richard Lancaster, CEO of CLP Holdings, seated on my right, and Mr. Nicolas Tissot, CFO of CLP Holdings, seated to Richard's right. Our results were announced and submitted to the Hong Kong Stock Exchange at approximately midday today. The announcement itself, along with the presentation materials we'll be discussing, is now available on our website too. As is our usual practice, Richard and Nicolas will first walk us through the presentation, and after that we'll move into a Q&A session. <<operator_script>> Priority will go to analysts posing live questions, though we'll do our best to get through every question submitted. One last note: Richard, Nicolas and I have all been vaccinated and are suitably spaced here, so we won't be wearing masks during today's presentation. With that format explained, I'll now hand over to Richard Lancaster to begin the presentation.

Richard Lancaster

executive
#2

Thanks, Angus, and good afternoon, ladies and gentlemen, and welcome to our presentation of the 2021 interim results. As we come out of one of the toughest stretches we've encountered in quite a while, I'm happy to report that we've made solid progress on our decarbonization goals, and we've delivered safe, reliable operations and customer services right across the business. In Hong Kong, we're continuing to invest in lowering the carbon intensity of electricity generation. In Mainland China, where noncarbon assets already account for the majority of our earnings, we're still pursuing new opportunities, with our main focus on noncarbon investments in the Greater Bay Area. In Australia, we've announced that the Yallourn Power Station will close early, and we've made several new commitments to flexible generation and storage projects that will help support the energy transition. And in India, we remain focused on investments in low-carbon assets along the electricity supply chain. In this first half of 2021, we recorded operating earnings of $5.7 billion, or $2.26 per share, which is 7% lower than the same period last year. Hong Kong's solid performance was not enough to offset the impact of high coal prices on our thermal assets in Mainland China and the challenging wholesale prices we've seen in Australia.

Richard Lancaster

executive
#3

The Board has maintained the second interim dividend at $0.63 per share, which matches the first interim dividend of 2021 and is identical to the first 2 interim dividends from last year. Given our recent share price, that gives investors a yield of roughly 4%. On the operational side, our generators produced 8.5% more output than last year, and we keep expanding our generation capacity. Our continued emphasis on operations is still delivering a highly reliable power supply to the people of Hong Kong. Customer accounts in Hong Kong continue to grow, while fierce competition in Australia has led to a slight decrease in accounts there. I will now pass things to Nicolas, who will walk you through the financial results in somewhat more detail.

Nicolas Alain Tissot

executive
#4

Thank you, Richard, and good afternoon, everyone. In the opening six months of 2021, amid conditions that remained difficult, revenue climbed to close to $41 billion while EBITDAF grew to almost $13 billion, supported by Hong Kong's strong showing. Greater depreciation and amortization in Hong Kong and Australia brought ACOI, or EBIT before fair value adjustments, down. Group-wide capital investments came in at nearly $6 billion, above the prior year, with a distinct emphasis on decarbonization. On the following slide, I'll cover operating earnings and total earnings. Looking at operating earnings, Hong Kong's contribution is stronger. That gain was more than outweighed by reduced contributions from thermal assets elsewhere, caused by elevated coal prices in Mainland China and Taiwan together with weaker wholesale prices in Australia. About $100 million after tax, or roughly 1/3 of the Australian decline, stems from noncash movements in the fair value of energy hedging contracts. Operating earnings fell 7%, and total earnings for the first 6 months dropped to $4.6 billion once items below the line are included — specifically the March this year settlement of litigation stemming from the 2015 disposal of the Iona Gas Plant, which covered both payment of a settlement sum and an extension of the existing long-term contracts for providing gas storage services.

Nicolas Alain Tissot

executive
#5

The provision made to guarantee secure operations at the Yallourn coal mine after extreme rainfall hit, plus a revaluation loss on investment property in Hong Kong. Combined, those two items produced a charge of $1.1 billion for the half year, and that pushed total earnings down 23.2%. Now I'll move on to how our business performed at the ACOI level. On this slide you can see the change in earnings at the ACOI level broken out by business unit. We got a benefit from favorable foreign exchange movements in this half year, mainly tied to the Australian dollar and the Chinese renminbi. So at the headline level, ACOI is 2.8% lower year-on-year, and once you strip out those foreign exchange movements it is down 6.7%. Every future variance shown in this presentation will exclude ForEx. Earnings in Hong Kong are up 4.7% as we keep making our decarbonization investments. At the same time, earnings in Mainland China and overseas have fallen, largely because of weaker earnings from our thermal assets. You'll also see a positive variance in other earnings, mostly from the net fair value gain on our innovation investments. Over the years we have assembled a portfolio of strategic investment so we can access and deploy the best energy technologies from around the globe into our business.

Nicolas Alain Tissot

executive
#6

That produces a net fair value gain exceeding $90 million in other earnings. Now I'll walk you through how each business performed and what we expect going forward. In Hong Kong, our operations remain robust and resilient. For the half year, ACOI rose 4.7% excluding ForEx, matching the expansion of our asset base. Capital expenditure came to $4.8 billion, reflecting our continued emphasis on investments that secure reliability, advance our decarbonization efforts, and deliver a smarter, greener power system in Hong Kong. Electricity sales grew 4.4%, supported by favorable seasonal weather patterns and the start of the post-COVID economic recovery. Over the months and years ahead, we will keep executing the current development plan and speed up our transformation toward a utility of the future. Looking further out, we are very encouraged by the government's plans for Hong Kong to become carbon neutral by 2050. We are deeply engaged with the government in discussing solutions and plans. Achieving this will require both decarbonizing the electricity sector and significant growth in clean electricity use across the transportation industry and in everyday household use. It will also require importing more 0 carbon energy into Hong Kong, drawing on our connections with the Greater Bay area.

Nicolas Alain Tissot

executive
#7

For Mainland China, our nuclear assets delivered dependable performance and contributed more. Renewables ran without issue, and earnings moved in step with how resources evolved. Wind came in stronger, solar held steady, and hydro resources were weaker. At the same time, coal prices that rose substantially have hurt the earnings from our thermal assets, and our expenses went up too as Shandong assets near the close of their economic life. These movements left us with ACOI of $1.25 billion for the first half, a drop of 24%, excluding ForEx. Over the year's second half, we expect dependable contribution from nuclear and renewable assets to persist while costs climb -- coal costs -- placing significant added pressure on thermal margins. We will keep pursuing payment of the HKD 2.2 billion in national subsidies that remained outstanding when the first half ended. Looking ahead, we will keep advancing carbon-neutral investments across renewables, energy infrastructure and energy as a service, with particular emphasis on the Greater Bay area. In Australia, wholesale electricity prices that were low across the last 2 years pushed earnings lower. That produced a 33.7% fall in ACOI, excluding ForEx.

Nicolas Alain Tissot

executive
#8

Even with fierce competition, our customer business has gained from cheaper electricity procurement and reduced bad-debt costs, along with better efficiency and cost effectiveness in our operations. In the Energy segment, as we expected, weaker wholesale power prices combined with higher gas supply costs have cut margins substantially, notwithstanding the cushioning effect of the hedging policies we have in place. Furthermore, specific items from Yallourn have weighed on the Energy segment contribution. In March, we announced that as part of our decarbonization strategy, we are bringing forward the closure of Yallourn by 4 years to 2028. That has led to accelerated depreciation for the remainder of its operational life, amounting to around HKD 250 million on an annualized basis. In addition, in mid-June, we responded proactively to extreme rainfall and limited operations at Yallourn as a precaution. This produced a lost opportunity impact on earnings of around HKD 190 million before normal operating conditions were safely restored after 2 weeks. No flooding occurred at the mine itself, and there was no damage to either mining or power generation facilities. Some damage was sustained, however, to the Morwell River diversion, which runs above the mine, and a provision has been made to address it, as noted earlier, under items affecting comparability.

Nicolas Alain Tissot

executive
#9

Now for the outlook. Over the near to medium term, margin pressure is likely to persist, in our view. We think competition will stay intense within the customer segment, and in the Energy segment, the effects of lower realized wholesale electricity prices will be felt more strongly, along with persistently high gas procurement costs. Further out, we will keep concentrating on excellence and cost reduction in customer service, on optimizing how our energy segment portfolio operates, and on advancing investments that will bring a cleaner, more flexible generation portfolio in the future. We will also be preparing for the closure of Yallourn. In India, the major planned outage at Jhajjar led to a lower contribution. That happened even though wind and solar contributed more, owing to higher wind generation, interest received on delayed payments from renewable debtors, and the commissioning of 2 new solar projects. The business delivered an ACOI of $476 million, down by 5.7% compared with last year. We are actively chasing overdue payments from the state-based distribution companies. We made good progress on securing long-dated payments during the first half of the year, with the outstanding amount at the end of the half being $0.8 billion. Our focus in India remains on new 0 carbon investments in renewable generation and transmission assets; construction of the Sidhpur wind farm in Gujarat and the anticipated completion of our acquisition of the KMTL transmission asset during the second half of the year are part of that.

Nicolas Alain Tissot

executive
#10

On the operational side, our Southeast Asia and Taiwan assets keep delivering solid results. Financially, though, ACOI fell 19.8%, since — as we had expected — Ho-Ping's contribution is smaller this year, consistent with the 1-year postponement of the coal cost adjustment mechanism. Higher coal costs have already affected our Ho-Ping earnings, and that effect should be considerably larger in the second half. We'd also remind investors that tariffs at our Lopburi solar project in Thailand will drop significantly at the end of this year. First-half cash flow generation has been healthy and tracks the usual annual pattern. For CLP, cash inflow tends to be lower in the first half, while dividend payments run higher because of the customary larger final dividend. Dividends paid in the half totaled $4.6 billion, and the group invested $5.4 billion. Of that amount, $4.9 billion went to investments aimed at improving networks and advancing cleaner generation in Hong Kong. We also spent $0.5 billion on projects across Australia, Mainland China and India. Our financial position is still strong. Debt levels are healthy. We hold substantial undrawn debt facilities and solid cash in hand, and our credit ratings are stable — both S&P and Moody's reaffirmed them in recent reviews.

Nicolas Alain Tissot

executive
#11

Net debt went up by $5.3 billion, reaching roughly $47.9 billion, apart from the litigation payment in Australia. That matches the typical seasonal pattern we see with dividends, CapEx and the generation of free cash flow. As a result, our ratio of net debt to total capital came in at a healthy 27.4%. Over this half, we announced financing arrangements, successfully issuing a number of loans and bonds aimed at supporting operations and growth. Among them were a USD 300 million energy transition bond for CAPCO in February, plus a USD 300 million conventional bond for CLP Power in July. These deals secured favorable terms, lengthened the debt maturity profile and broadened our funding sources. For the first 6 months, our blended average interest rate was roughly 0.5 percentage point below the first half of last year. As protection against possible rate hikes, 50% of our debt carries maturities beyond 5 years, versus around 40% 2 years ago. Also, nearly 2/3 of our debt sits on fixed rates, compared with around half 2 years ago. So we are well positioned to meet our commitments to shareholders and bondholders, while still retaining the ability to fund our investment plans. I'll now pass things to Richard, who will cover the strategic outlook for the business.

Richard Lancaster

executive
#12

Thank you, Nicolas. Here at CLP, every part of our operations is being geared toward the energy transition. We are decarbonizing and digitalizing the business as we move toward our vision of the utility of the future. In Hong Kong, we are working toward a carbon neutrality target by 2050. Our portfolio has been getting decarbonized through building highly efficient gas-fired generation units, diversifying our gas supply, upgrading our clean energy transmission system and studying the potential to develop the first offshore wind farm in Hong Kong Waters. Looking ahead, we know the best solution is to adopt a range of technologies which will include more renewable energy from solar and offshore wind projects in Hong Kong, more important clean energy from the mainland and ultimately, the use of green hydrogen as a fuel for local electricity generation. As we pursue these decarbonization goals, we're increasingly integrating our efforts in Hong Kong with the broader Greater Bay Area. Our clean energy transmission system already links us to imports. It's being upgraded as part of the current development plan, and we anticipate it will become part of a network of connections to bring clean energy from the Greater Bay Area to Hong Kong in the future.

Richard Lancaster

executive
#13

We have an offshore wind project under consideration in Hong Kong Waters, and beyond that, we'll examine whether additional developments throughout the Greater Bay Area are feasible. On top of that, we are putting money in and forming partnerships aimed at drawing on our Hong Kong know-how throughout the Greater Bay Area. As an illustration, energy management is something we see as a service we're able to offer. A lot of Hong Kong businesses operate factories or property developments in the Greater Bay Area. Those customers of ours based in Hong Kong turn to CLP for assistance in managing both their energy costs and their carbon footprint. If governments, communities and businesses are to reach carbon neutrality, energy consumers need ways to cut their carbon emissions. A large number of our customers are setting out on decarbonization journeys of their own. With our emerging energy infrastructure and energy as a service approach, we're able to offer end-to-end products that help make a difference. That covers supplying low-carbon electricity, broadening the use of electricity in transport and industry, boosting energy efficiency, and helping offset emissions that can't otherwise be avoided. We're also working with innovation -- with innovators so that we can get hold of and deploy the finest energy technologies.

Richard Lancaster

executive
#14

That also covers a set of strategic investments across top global innovation centers in China, the U.S., and Israel, spanning technologies such as demand response management, smart buildings, cybersecurity, and hydrogen storage. Such investments do more than reinforce our business — they also deliver financial returns, as Nicolas noted before. Taking a wider view of the business, we keep investing and innovating as we decarbonize our operations. The Qian'an III project in Jilin province is set to become our first grid parity wind farm in Mainland China, and it will be built together with another company in battery storage. In India, we anticipate closing the acquisition of our first interstate transmission project, and construction has begun on our largest wind farm so far, located in Gujarat. At the same time, in Australia we've notched 3 significant firsts this half. We moved up the closure of the Yallourn power station by 4 years, to 2028, giving our people and the community 7 years' notice of closure and announcing workforce support packages to help with the transition. Alongside that, we announced construction of a 350-megawatt battery facility to be built near our Jeeralang power station. Were it built today, this would be the largest battery facility in the world, and it will help smooth the power market transition in Victoria as Yallourn closes.

Richard Lancaster

executive
#15

For New South Wales, we've announced that the Tallawarra B gas-fired power station is being expanded. From the moment it begins operating, it's going to be designed and built to run on 5% green hydrogen, and it will be Australia's first net 0 emissions gas peaking plant. Then in Queensland, construction has started on the 250-megawatt Kidston Pumped hydro storage facility. This asset won't be owned by Energy Australia, but once it's completed in 2024, the company has secured the operational dispatch rights for this important facility. We keep seeing opportunities to invest in accelerating Australia's energy transition. That's going to be capital intensive, and we will proactively look at ways to optimize our capital structure, including forming partnerships with others where appropriate. Taken together, these projects show our commitment to working with governments and communities to accelerate the energy transition. At CLP, our aim is to be the leading responsible energy provider in the Asia Pacific region from one generation to the next. We seek to give our customers sustainable energy solutions. So beyond our investments in low-carbon technologies, we'll put increasing focus on energy infrastructure and energy as a service. Hong Kong remains the core of our business. And as it increasingly integrates with the Greater Bay Area, we'll build on our experience in innovation and new business models with our business in Hong Kong.

Richard Lancaster

executive
#16

In every region where we operate, we've made substantial headway in the effort to decarbonize how we supply energy. We have taken on the difficult task posed by newer, cleaner energy technologies, along with handling the growing complexity that comes with our energy systems. So we're eager to publish fresh science-based targets covering the decarbonization of our business ahead of COP26 in Glasgow later this year. Regardless of what we do, though, our customers will remain central to every choice we make, and we'll make sure our workforce is skilled and agile enough to keep pace with their evolving needs. These are exciting times. And here at CLP, we're confident we can make a genuine difference as the world carries out the energy transition and as we work to build the utility of the future. So thank you, ladies and gentlemen — we'll now gladly take your questions.

Angus Guthrie

executive
#17

Thank you, Richard, and thanks to you, Nicolas, for handling the presentation. <<operator_script>> So if I turn to the queues now, I believe there aren't any analysts on the lines currently, though a question has come in through the webcast. I'll go ahead and read it. It comes from Simon Lee at Morgan Stanley. He asks: last week, Origin Energy cut its energy markets divisional earnings by roughly AUD 100 million, citing the higher cost of New South Wales coal, with prices having risen $50 a tonne half-on-half. And his question is whether Mount Piper coal carries the same exposure to market-linked mechanisms. Richard?

Richard Lancaster

executive
#18

To start, I’m not in a position to speak to another company’s results. Still, just to note, our portfolio at Energy Australia includes 2 coal-fired power plants. Yallourn has its own mine, so there’s essentially no market exposure there. At Mount Piper, we hold long-term agreements for coal supply. Mount Piper isn’t linked to the international market, and we essentially secure our coal under long-term contracts.

Angus Guthrie

executive
#19

Thanks, Richard. I think Evan Li from HSBC has a question on the line right now.

Ming-Hon Li

analyst
#20

This is Evan calling from HSBC, and I have a couple of questions. To start, I'd appreciate some clarification regarding what you said about the provision already taken for the mine in Australia. What was the size of that provision? Also, was it captured within ACOI on one of the slides where you referenced the red-to-green and red bar — I'm not sure whether that provision sits inside it? My second question concerns the point raised that Energy Australia, the retail business, will be expanding into broadband, mobile and insurance. Could you perhaps provide a bit more detail on that? Are we talking about things such as owning mobile spectrums and similar assets?

Richard Lancaster

executive
#21

I’ll take a moment to discuss the Yallourn mine, and I’ll have Nicolas clarify things and ensure the figures are clear to you. Basically, early in June the Latrobe Valley area received extremely heavy rainfall. At the peak, water was flowing at roughly 30x the usual rate. We made a significant investment in river diversion specifically to handle floodwaters, and it held up. However, after the water went down, we found that cracks had formed in the ground across some parts of the local area. As a precaution, we halted mining activity briefly, and now we need to investigate and carry out some temporary repairs. That is the context for the repair costs we are providing for. Nicolas, perhaps you can clarify where that accounting treatment sits.

Nicolas Alain Tissot

executive
#22

Basically, those extreme weather events in Australia hit the area where Yallourn runs. We have a couple of kinds of impact. One sits above the line, and that's a lost opportunity from curtailing Yallourn's operations for a couple of weeks — an AUD 40 million impact, HKD 190 million, above the line. Then, as we said in items affecting comparability, we've booked an additional provision so the industrial site, and the mine in particular, can be run safely, and that's a below-the-line impact of AUD 65 million. It's meant to resolve the elevated risk that was flagged, as Richard described, around the Morwell River diversion, which passes above the mine.

Richard Lancaster

executive
#23

And Evan, turning to your second question: as a business in Australia, our focus is on energy — electricity as well as gas. And if opportunities come up that let us deliver additional value to customers, we're definitely open to them. So energy management services are part of that, but also, where we have a retail business, we're open to exploring areas where we can give customers extra value. So this isn't a strategic move into another sector. It's about optimizing and enhancing the customer relationship we already have, to see how we can deliver extra value to customers.

Angus Guthrie

executive
#24

All right, thanks for those responses. We have another question coming in on the phone lines, this one from Cissy Guan at Bank of America Merrill Lynch.

Cissy Guan

analyst
#25

To start, once Energy Australia has recontracted its gas supply contract, what effect does that have on unit fuel cost, and what total profit impact does it have on generation profitability? Next, how much of a tariff cut was there for the default market offer from July? And what margin impact do you expect on the retail business? Third, I'd like to ask — we've seen a significant outage scheduled for Mount Piper and Yallourn generation capacity from both 2020 and 2021. So what does the schedule look like for 2022 and the years ahead?

Richard Lancaster

executive
#26

Okay, let me address the third question first, and then I'll ask Nicolas to weigh in on how profitable the gas supply contracts are and on what effect the tariff adjustments have. Essentially, though, when it comes to our outage program, 2020 and 2021 are quite heavy years for us. We've got 2 units at Mount Piper and 4 units at Yallourn, and the Yallourn units are of differing vintages. So once we get through 2021, we'll find that we're past the worst of it, and maintenance outages will return to more typical levels.

Nicolas Alain Tissot

executive
#27

Regarding your question about gas contracts, we already announced when we published our full year results in February that we were recontracting our gas contracts under less favorable terms. We aren't disclosing the specific impact. But clearly, that's one of the factors that has weighed on Energy Australia's profitability starting in this first half and is expected to continue through the second half. On the tariff cut, I'm not sure exactly what you're referring to, but speaking about the first half, I think the highlight is the repricing we've seen in Victoria, which has helped the profitability of our customer business holding up during the first half, along with other factors — specifically, our efforts to reduce and master the level of costs and the efficiency, and also a specific effort to streamline our operation in the customer business and the lower cost of bad debt in that business, and that has protected our performance during the first half.

Cissy Guan

analyst
#28

Let me just clarify what I was asking. Earlier, we said the Victoria deferred offer was reset starting in January, and the other DMO gets reset starting in July. So my question was: how much margin impact do you expect from the DMO rate in the second half of the year?

Richard Lancaster

executive
#29

Cissy, if that works, I’ll take that one briefly. In a general sense those figures are out there, since the tariff cut itself gets published. New South Wales, South Australia and Queensland see a reduction of a few percentage points, while Victoria’s effect across our areas is more modest in any case. Still, we don’t give specific guidance on it. What we are saying — and stating plainly — is that we expect retail competition to stay very intense, and that covers this sort of pressure on our retail margins.

Angus Guthrie

executive
#30

I think — well, I don't think — I hope that's fine. Right now there isn't another question coming through on the phone lines, but a web question has come in, so perhaps I'll turn to that one. Daniel Fitzgerald of Martin Currie submitted it. He asks: how serious are the cracks found at the Yallourn mine? And is there a possibility it won't operate through 2028? Might you provide additional detail regarding the provision. Richard or Nicolas?

Richard Lancaster

executive
#31

I'll take that question. Coal mining has been going on in this area for over a hundred years. And the flood we experienced was a 1 in 75-year event. So it stands to reason that after flooding occurs and once those waters pull back, you have to evaluate what took place beneath the surface. In areas where coal has been mined, some degree of subsidence is always occurring, and flooding across the nearby region can speed that up. So that's basically the situation we're examining. As a highly responsible operator, we've examined the entire area very carefully. Our plan is to keep the plant operating through 2028 and to ensure it gets responsibly rehabilitated consistent with our agreements with the Victorian government, and they've also been cooperating closely with us to ensure the mine is left safe, with dependable operations, and that we're able to bring the water level down, so we can properly determine what work is required to repair it.

Angus Guthrie

executive
#32

And just to touch on the mine and the power station — while they had restricted operations for 2 weeks, they've been back at full operational capacity since early July. So there's no immediate long-term halt to operations there, and those repairs will be carried out at the same time. There's actually a follow-up question from Daniel, and I might just read it out. What are your return thresholds for new investments in generation capacity, such as batteries and gas in Australia? And given the group is investing more in the country, presumably the group holds a more positive view of long-term power prices.

Richard Lancaster

executive
#33

I'll take a moment to discuss our investments and how we see Australia. Nicolas might want to add some thoughts regarding our thresholds. But basically, we seek out investments capable of earning our cost of capital. Australia, in our view, has quite sound fundamentals, and we take a long-term perspective in our business. So we do think Australia is a good market to operate in. It is undergoing an energy transition, as is every market worldwide. And we hold a strong and significant position in that market. And we are making investments that we believe will be profitable, enabling us to keep running our business over the long term.

Nicolas Alain Tissot

executive
#34

So essentially, we use investment criteria built on our weighted average cost of capital in the different geographies where we do business, and we seek out projects that cover that cost of capital. For competitive reasons, you'll appreciate that we'd rather not reveal those thresholds specifically, but that's the framework we operate under.

Angus Guthrie

executive
#35

All right. We’ve got another question coming in on the phone lines, and it’s from Peter Shaw of...

Analyst

analyst
#36

So here's my question — I believe Richard said earlier that hydrogen is, ultimately, one of the ultimate answers for decarbonizing Hong Kong. So I'm wondering: if hydrogen does take off, how compatible would it be with the infrastructure CLP has right now? And if it does happen, will CLP still need to make a lot of investments for hydrogen?

Richard Lancaster

executive
#37

Thanks for that question, Peter. In Hong Kong, we burn natural gas at our combined cycle power station located at Black Point. We have 2 generations of machines there. The first 8 machines date from the 1990s. At the moment, we're constructing the second generation. With no modification at all, the older units are able to run on as much as 15% hydrogen blended into the natural gas, while our new units can handle as much as 30% hydrogen blended with natural gas. So it's clear that, for a period of time, we can begin using hydrogen as it gets blended into our natural gas supply with no modification at all. Once you go beyond the 15% or the 30% level, then we'll need to begin modifying our machines. These are essentially very large jet engines, though the combustion system represents a relatively small cost in the overall scheme of things. So by swapping out the combustion system, you can convert the machines to run on different fuels at relatively low expense. So the question becomes, where will the hydrogen come from? Our gas supplies come from a diverse mix. Some arrives via pipeline gas supplies, and some travels over long distances, such as through our West to East gas pipeline.

Richard Lancaster

executive
#38

We think green hydrogen made using renewable energy is going to form a component of China's energy mix. And provided we can keep pace with the shift from natural gas toward green hydrogen — sitting at the terminus of that pipeline — we'll be in a position to benefit from it. We're also constructing an LNG terminal offshore. And a rather appealing feature of such an offshore LNG facility is that your fuel gets stored aboard a ship. And should you wish to switch the fuel, the only step needed is to remove one vessel and bring in a different one that fits that fuel. So every bit of what we're building is designed with the future in view and with the capacity to convert whenever green hydrogen turns up.

Angus Guthrie

executive
#39

Thanks, Richard. There's another question waiting from Simon Lee at Morgan Stanley, so I'll go ahead and read it. The Chief Executive, Carrie Lam, said not long ago that she had met with the 2 power companies about decarbonizing Hong Kong by 2050. Beyond offshore wind, the clean energy transmission system, and green hydrogen — which Richard touched on a moment ago — what contribution can CLP make toward Hong Kong's decarbonization road map?

Richard Lancaster

executive
#40

Thank you, Simon, for that question. When you take into account that roughly 65% of Hong Kong's carbon emissions come from the electricity sector, that figure might seem high at first glance, but the reason is simply that Hong Kong has very little other industry. And when you factor in that transport is the next largest source, at about 18%, then if you can decarbonize the electricity supply and switch the transport sector over to using decarbonized electricity, you've essentially addressed 83% of Hong Kong's carbon emissions. So with those initiatives you mentioned — combining offshore wind with additional imported energy, clean energy brought in from the Mainland, and also using hydrogen in place of natural gas at our gas facilities — we have all the tools required to manage and generate decarbonized electricity. We may well need a few batteries scattered here and there just to keep supply and demand in balance. But that, essentially, is how we will decarbonize the electricity supply. We believe it can be achieved by 2050, which is 30 years from now, and we have all the technology required. We have all the expertise required. And by working with our regional partners, we believe all of this can be put in place within 30 years.

Richard Lancaster

executive
#41

So for that to help Hong Kong reach full decarbonization, it's going to mean using more electricity in the places where fossil fuels are burned today. Transport is only 1 sector — in any industry, if electricity can be used, that industry can decarbonize simply by switching away from the fuels it currently relies on to electricity.

Angus Guthrie

executive
#42

We have another webcast question from Adrian Nang, and actually this person has 3 questions. First, what's the current status of the Argyle Street redevelopment project? Second, at what point will the property sales go ahead, and when are those expected to be booked? And the third part of that question is whether a special dividend would be considered.

Richard Lancaster

executive
#43

I can take those questions. Right now the Argyle Street redevelopment is being built. The residential portion is genuinely coming together at this point. We got an initial payment from the developer, and there could be additional sale proceeds as the flats get sold. But basically, the initial payment covered the bulk of it. And since we've vacated the Argyle Street office and relocated to temporary office space, we still need to sort out an office for ourselves — at present we're in temporary accommodation. So in essence, those sale proceeds can't be paid out as dividends, because we'll have to set aside at least a portion of them to cover the cost of our new office.

Angus Guthrie

executive
#44

We have 1 additional question coming in from the web. This one is from Carol Hung. Part of it has already been covered. Essentially, though, it comes from Australia, and I believe it refers to the hydrogen element being built into our Tallawarra B power station over there. Would you think about using hydrogen applications in Hong Kong? So once more, Richard, perhaps you could expand on that.

Richard Lancaster

executive
#45

Sure. Yeah, the answer is yes. We're really eager to get a handle on how natural gas gets converted into hydrogen. We've got natural gas plants over in Australia. We've also got natural gas plants in Hong Kong, and we'll be drawing on every one of these opportunities to build up our expertise and to grasp what it means to switch from natural gas over to hydrogen.

Angus Guthrie

executive
#46

I appreciate that once more. At this point, it seems there aren’t any additional questions coming through. Still, let me make one final appeal for any questions, whether people are joining by phone or via the webcast. We have a few minutes left, and we would gladly take 1 or 2 more. If none come in, though, I’ll simply note that my team will be reachable for the rest of the afternoon and into the early evening to handle anything people want to ask afterward. As it happens, another question has just come in. Once again, it’s Cissy from BAML.

Cissy Guan

analyst
#47

I recall that earlier we said we're taking a very careful approach to renewable energy investments in China. But now it looks like we've put new money into a grid parity project, so what does the project IRR look like? And has anything shifted in how we approach renewable energy investment in China?

Richard Lancaster

executive
#48

Thank you, Cissy. I'll turn it over to Nicolas to speak about the well — clearly it does meet our IRR hurdle, but this was our first grid parity project, with no subsidies provided for this project. And we believe that — with the cost — the EPC cost along with our financing costs, we can still make this a profitable project that still meets our IRR hurdle. So it is consistent with all of our other investments in China or wherever they be made; they do need to earn their cost of capital. This is the — this is the first. And what does make this an interesting project for us is that it's being combined with battery storage. So that does improve the economics. So we're using new technology to make these projects a little bit more profitable, and that's how we get them over the hurdle.

Nicolas Alain Tissot

executive
#49

There isn’t really much more for me to add. We use the same framework I referenced regarding Australia: our aim is always to cover our cost of capital as calculated for each individual region or country. And in China specifically, we’re in a region where we anticipate a double-digit type of IRR. It may also be worth noting that we always seek to finance those projects on a nonrecourse basis. Those IRR targets should also be viewed in light of this approach to our investments overseas.

Angus Guthrie

executive
#50

Well, ladies and gentlemen, once again, I believe we've reached the point where no further questions are available. That said, if anyone has something at the last moment, we still have a few minutes left. Still, I don't believe there's another question waiting on the telephone lines, and nothing more is coming in through the webcast. So, ladies and gentlemen, we appreciate your attendance. As I said earlier, my team and I will be around to take additional questions over the course of the evening. We do have some investor meetings on the schedule for tomorrow. But many thanks for your attendance. And at this point I'll declare the webcast closed. Thank you.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete CLP Holdings Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to CLP Holdings Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research