Marissa Wong
executiveGood afternoon, everyone, and welcome to CLP's 2025 Interim Results Briefing. I'm Marissa Wong, Director of Investor Relations. With me today are Chief Executive Officer Mr. T.K. Chiang and Chief Financial Officer Mr. Alex Keisser. Our 2025 interim results announcement was lodged with the Hong Kong Exchange at midday today. That announcement, along with this presentation, is available right now on our IR website. This briefing is being recorded as well, and you'll be able to access that recording on our website later. Before we start, it's customary for me to remind you to read the disclaimer on Slide 2. For today's briefing, T.K. will begin with the business overview, then Alex will cover the financial results, and after that T.K. will give his strategic outlook, and we'll finish with a Q&A session. So with that, I'll hand things over to T.K. to get the briefing started. Thanks, T.K.
Tung Keung Chiang
executiveYes. Thanks, Marissa. Good afternoon, everyone, and thanks for being with us. As we move through an energy transition that is speeding up, with market dynamics shifting and geopolitics becoming more pronounced in the first half of 2025, the group has shown resilience, supported by the strength of our core Hong Kong business. That said, our performance was tempered by particular market headwinds, among them downward market tariff evolution in the Mainland and strong retail competition in Australia, and both of these affected this half's results. Even so, the fundamentals of the business remain strong. Our dedication to operational excellence keeps producing results. We sustained our record of excellent reliability in Hong Kong, brought new energy transition projects in the Mainland into commercial operation, and successfully finished a major maintenance overhaul at Mount Piper in Australia, improving its flexibility and reliability. We continue to build the energy infrastructure required to drive decarbonization and to lay the foundation for future recurring earnings. This growth is being funded from a position of strength, supported by our strong balance sheet and our recently affirmed A stable rating by S&P. That foundation makes possible our disciplined capital allocation framework, which puts priority on high-value investments and efficient use of capital, including strategic partnerships, so as to drive sustainable long-term returns.
Tung Keung Chiang
executiveAs we look toward the rest of 2025, we do so with a solid financial foundation and obvious routes for continuing to generate value for shareholders. Moving now to the highlights. As I noted, market difficulties in the Mainland and Australia shaped what we delivered in this half. Against that backdrop, group operating earnings before fair value movements fell 8% year-on-year, to HKD 5.2 billion. That result carried through to our bottom line, where total earnings dropped 5%, to HKD 5.6 billion. The Board has now recommended a second interim dividend of HKD 0.63 per share, which takes total interim dividends to HKD 1.26 per share — equivalent to a yield of 4.8%. On operations, we kept up solid performance across our safety and reliability measures, with reliability in Hong Kong rising to 99.999% and fewer injuries in Australia. On the customer side, accounts in Hong Kong grew, while tough competitive conditions in Australia led to a decline in customer numbers. Generation performance mirrored a reduction in coal output, and we brought more noncarbon capacity into the group portfolio. I'll now pass things to Alex, who will walk you through the financial results.
Alexandre Jean Keisser
executiveThanks, T.K., and good afternoon everyone. Here's a quick look at our financial results. EBITDAF—earnings before interest, tax, depreciation and fair value—came in at HKD 12.4 billion, down 5% versus the same period a year earlier. Operating earnings before fair value movement fell 8%, finishing at HKD 5.2 billion. Once you adjust for the fair value movement and items affecting comparability, total earnings stood at HKD 5.6 billion, which is a 5% decrease. Capital investments exceeded HKD 8 billion, lower than last year, because even though growth CapEx is higher in 2025, our headquarter acquisition was finalized in 2024. Total dividends per share declared for first half 2025 were HKD 1.26, unchanged from last year. Now let's get into the details. Our core Hong Kong business anchored the group's performance, contributing more. As T.K. highlighted, industry-wide challenges in the Mainland and Australia, plus one-offs in India, led to lower operating earnings. Fair value movements were small, reflecting accounting losses on EnergyAustralia's forward energy contracts as of end of June 2025. This half's results also include a one-off item tied to the realization of EnergyAustralia's Wooreen battery following the introduction of our 50% joint venture partner, Banpu. All in all, group total earnings were moderately down by 5%, to just over HKD 5.6 billion.
Alexandre Jean Keisser
executiveNow I’ll walk you through how each business unit performed in detail and what the outlook looks like. Every balance I cite leaves out foreign exchange so you’re seeing the organic performance underneath. Let’s begin with Hong Kong. Once again, Hong Kong produced a round of core earnings that was solid and dependable, thanks to our ongoing investment and dependable operations. We’ve moved forward well on CapEx, which stands at HKD 4.5 billion, mainly for key initiatives that support Hong Kong’s growth — the Northern Metropolis, new housing development, data centers and the decarbonization agenda. Overall electricity sales came in slightly lower, chiefly because last year’s warmer weather and an extra day created a high base for comparison, while data centers keep showing steady growth. Lower interest cost and positive refinancing outcomes on the USD 500 million perpetual capital securities contributed to Hong Kong’s strong results. Hong Kong keeps charging ahead, enabling a low carbon economy across all major sectors, including road transportation, shipping and building. As a demonstration of our decarbonization leadership, we partnered with CNOOC to deliver a Hong Kong first: simultaneous liquid financial gas fueling and handling of cargo. Looking forward, our focus has three parts: continuing to provide reliable electricity at a reasonable tariff; delivering the HKD 52.9 billion program of work in the development program; and advancing our decarbonization efforts toward the government’s 2035 climate target.
Alexandre Jean Keisser
executiveTurning to the Mainland now, where market difficulties weighed on financial results. A mix of weaker demand, faster expansion of new generation capacity, and wind resource viability drove a 15% decline in earnings, to HKD 870 million. On the operational side, our nuclear joint venture plans turned in a robust showing, with Yangjiang once again standing out. Still, reduced tariffs at Yangjiang ended up weighing on operating earnings from the nuclear portfolio. Renewable earnings came in lower as well, reflecting weaker wind resources, greater curtailment across the Northern and Eastern regions, and lower tariffs. A positive offset came from the successful commissioning of 3 new renewable projects during the first half, along with stronger hydro output — clear evidence of the tangible value our disciplined growth strategy delivers — while reduced dispatch amid softer demand hit our minority coal JVs. Our standing as a dependable foreign investor allowed us once more to land a GEC offtake agreement with one of the biggest green power purchasers globally, giving us earnings visibility and positioning CLP as a preferred provider of green solutions. Our development pipeline remains solid, spanning more than 1 gigawatt of renewable and battery projects at various stages of development, among them our largest wind project and our first independent battery energy storage system.
Alexandre Jean Keisser
executiveAs we look forward, in light of policy document 136 and the shift toward pricing determined by the market, we'll be assessing the renewable portfolio so that value is maximized. Our capital allocation will follow the value over volume principle and center on risk and return as we monitor how the policy is implemented along with supply and demand trends. We expect nuclear performance to stay dependable. In addition, for Yangjiang, we anticipate greater exposure to market tariffs and evolving taxation matters that are currently under review. Moving on to EnergyAustralia's results, which on the whole showed solid performance in the energy market but difficult retail conditions. The first half brought yet another stretch of fierce retail competition, together with cost of living pressure, which resulted in margin compression and a reduction in customer accounts. Importantly, notwithstanding the retail performance within the customer segment, our generation fleet, which is increasingly flexible, delivered solid results. Favorable wholesale prices combined with the ability to capture value amid volatility, plus the recoupment of development expense for Lake Lyell, more than offset higher loan depreciation and the absence of one-off benefits from last year — specifically Mount Piper's coal compensation and the strategic value book outcome. The net effect was a decrease to HKD 167 million in operating earnings. We keep actively shaping our energy transition through our expanding portfolio of flexible capacity assets, which include 6 battery storage and 1 pumped hydro into operation or construction.
Alexandre Jean Keisser
executiveOur goal is for EnergyAustralia to be self-funded and to carry a solid credit rating, and a key part of how we do business is financing our flexible capacity portfolio through a combination of contracted capacity and partnerships. In this first half, we signed 2 partnerships: one with Banpu Energy to develop Wooreen, a 350-megawatt, 4-hours battery, which is our single largest investment to date, and another with EDF Power Solutions to co-develop the potential 330-megawatt, 8-hours Pompadour energy system. Going forward, we will concentrate on laying a foundation for stability and earnings growth through 3 key actions: making sure our generation performs so it can respond to demand and price volatility in a favorable wholesale price environment; lifting our customer margin via pricing, recontracting activities and cost-saving initiatives, including the expected longer-term benefits from the multiyear platform replacement; and finally, moving forward our strong pipeline of flexible capacity projects, with new partnerships alongside EnergyAustralia's strong customer base. Apraava Energy's operating earnings came to almost HKD 80 million, helped by solid renewable performance and Jhajjar's continued reliability. The renewables result was driven by stronger wind resources and full commissioning of Apraava's largest renewable asset, the 250-megawatt Sidhpur Wind Farm, while Jhajjar kept up its reputation as one of India's best run thermal plant.
Alexandre Jean Keisser
executiveEarnings performance, though, got offset by a one-off item tied to the KMTL asset, and that included a noncash impairment charge of HKD 83 million, after we reassessed with a more conservative assumption on the discount rate. On top of that, during 2024 we benefited from a retrospective tariff gain from prior years that did not recur. Apraava achieved solid progress on the smart meter rollout, with roughly 7 million meters under installation, though near-term cost weighed on contribution. Lastly, corporate expenses went up because of mark-to-market losses on aluminum hedges taken for transmission projects. Growth momentum is still robust: 15 projects won in 2 years, equivalent to 2 gigawatt of capacity. As India, the world's third largest electricity producer, strives to reach 500 gigawatt of noncarbon capacity by 2030, our strategic joint venture will deliver its growth potential, funded from its own balance sheet. Then, turning to the Taiwan region and Thailand. Lower earnings from Ho-Ping in Taiwan were attributable to lower recovery of coal cost. Lopburi Solar's performance in Thailand stayed stable. Consistent with the group's strategy of exploring new opportunities in the region, higher corporate and development expenses were recorded in the first half for development in the Taiwan region and Vietnam. Altogether, earnings decreased to HKD 19 million.
Alexandre Jean Keisser
executiveAs we look forward, Ho-Ping, our attention will be on controlling fuel expenses, and on a wider level, we're assessing renewable energy possibilities that come with long-term contractual backing as part of the growth strategy for our Taiwan region and Southeast Asia. Finally, moving to cash flow. Free cash flow came in at HKD 7.1 billion, which is HKD 0.9 billion lower than the first half of 2024, explained by the reduction in underlying EBITDAF performance of HKD 0.6 billion and an unfavorable working capital movement of HKD 1.3 billion, mainly attributable to a one-off advanced receipt for EnergyAustralia during the first half of 2024 that was later rebated to customers in the second half. On the investment front, since our new headquarter is now complete, overall capital spending came in lower. The group put HKD 7 billion into investments during the first half, comprising HKD 5.1 billion for the Hong Kong SoC business and close to HKD 2 billion for renewable energy projects in the Mainland plus the Wooreen battery at EnergyAustralia. Cash payment for dividends was higher, reflecting the higher final dividends for financial year 2024. Our financial structure remains strong even with net debt rising to HKD 62 billion, and we hold a sound liquidity position of close to HKD 30 billion.
Alexandre Jean Keisser
executiveS&P has acknowledged our sound financial stewardship by reaffirming the strong investment-grade rating for CLP Holding, CLP Power and CAPCO, each with a stable outlook. For the Hong Kong SoC business, the team raised in excess of HKD 10 billion in competitive financing, and on top of that refinanced the USD 500 million perpetual capital securities, every one of these at favorable credit spread. Now I'll hand things to T.K. for an update on the group's strategic priorities.
Tung Keung Chiang
executiveThank you, Alex. So, during our previous results presentation, I laid out the approach we're taking to create lasting value in a world shifting quickly toward electrification and decarbonization. Our work centers on a set of clear pillars, and I'd like to bring you up to date on how far we've gotten with each one. The first is putting investment into foundational growth within our core regulated business in Hong Kong. Building on that base, we're methodically pursuing opportunities across several of the energy transition markets that are expanding most rapidly and where we already operate — the Mainland, India, the Taiwan region, Southeast Asia and Australia. And the enabler behind our execution is our people, together with our regional and operational know-how and our access to capital and partnerships — capabilities that all let us convert strategic ambition into results. Our integrated utility operation in Hong Kong sits at the heart of our ongoing investments and dependable earnings, backed by predictable returns under its asset-based regulatory framework. We're carrying out the HKD 52.9 billion 5-year development plan so as to provide safe, reliable power at a reasonable price along with decarbonization. Now that the gas infrastructure is fully commissioned, attention will turn to expanding and modernizing our power systems to serve new development areas, data centers, and to support the government's economic and infrastructure agenda.
Tung Keung Chiang
executiveWe're also speeding up Hong Kong's energy transition by electrifying the transport sector, which is the second biggest source of carbon emissions, and we're working alongside the government to bring in more zero carbon imports so the city can hit its 60% to 70% clean energy targets by 2035. Delivering a world-class electricity system that supports Hong Kong's long-term development creates a strong foundation for the rest of the organization to deliver returns and value to our customers and shareholders. Right now, almost 3/4 of all solar and wind power projects under construction globally are located in the Mainland, which underscores the country's rapid renewable energy expansion. In this first half alone, roughly 270 gigawatts of renewables have been added, and another 3,000 gigawatt is expected by 2030. Our initial target of less than 1 gigawatt a year is modest by comparison, but it's very much in line with the Mainland's build-out. We're making solid progress, with just over 0.5 gigawatts of solar, wind and batteries at various stages of execution in the first half and, importantly, new projects contributing to earnings. We're closely monitoring the recent introduction of policy document 136 market reform framework as provincial authorities develop implementation plans. During this transition, we'll assess our portfolio and pipeline and allocate capital based on 3 pillars: risk return; focusing on geographic selectivity; prioritizing expansion projects; and green power and green certificate contracts, maintaining our investment discipline with our value over volume approach.
Tung Keung Chiang
executiveIf the economics of a project fail to clear our return threshold, we simply won't proceed with building it. And finally, there's the matter of optimizing how we fund things. Our business in the Chinese Mainland remains on schedule to be self-funded by 2026, and we'll keep leaning on partnerships — an approach we've already carried out successfully in Australia and India — to reduce capital risk and boost returns. Turning now to India, the most populous nation on earth and among the biggest opportunities in the energy transition. To hit its climate targets, India must invest as much as 2% of GDP across the coming decade. Apraava Energy serves as our strategic joint venture for capturing these opportunities. This self-funded platform brings local expertise and solid governance, giving us exposure to that growth without adding debt to our balance sheet, and it's producing results through projects spanning the energy value chain. During the first half of 2025, we completed full commissioning of the Sidhpur Wind Farm and advanced key infrastructure, with 0.5 gigawatt equivalent of transmission currently under construction and roughly 7 million smart meters being rolled out across 6 states. Taken together, Apraava has an equivalent of 2 gigawatts of low-carbon projects in progress. Importantly, every one of them rests on long-term contracts backed by the government, which lock in predictable and attractive returns. The upshot is a capital-efficient, diversified growth engine that strengthens both our earnings and our growth profile.
Tung Keung Chiang
executiveTurning now to Australia, where coal plants retiring, along with supportive government measures such as the Capacity Investment Schemes, make for an attractive setting in which to put capital to work. Short energy and balanced capacity is our approach, matching contracted renewable energy PPAs with flexible capacity that is owned and contracted, all on a self-funded basis. On the renewables side, we are taking a capital-light approach, aiming for 3 gigawatts of renewable energy PPAs by 2030. When it comes to flexible capacity assets such as batteries and pumped hydro, we will build those out at our existing sites that have grid connection access and a skilled workforce. Where opportunities sit beyond our footprint, capacity will be secured via contracting. EnergyAustralia's balance sheet will fund the smaller flexible capacity assets, whereas larger projects will be project financed and draw on strategic partnerships. Momentum is strong, with almost 1 gigawatt of committed firming capacity, and we are actively looking into further battery developments at our Mount Piper and Hallett sites. Our partnership approach delivered results in the first half, as EnergyAustralia signed 2 important partnerships. The first is for the 350-megawatt Wooreen battery, under construction with Banpu; the second covers the 335-megawatt Lake Lyell pumped hydro project, under development with EDF. Together, this new dispatchable capacity and our existing gas and coal fleets, which are highly flexible, form a resilient and competitive portfolio that delivers reliable -- reliability and value in our evolving markets.
Tung Keung Chiang
executiveTurning now to the larger growth goals we have in Asia Pacific. We're actively looking at renewable energy possibilities in the Taiwan region and Vietnam — 2 markets offering considerable growth potential. Even though we see that potential, we stay disciplined. Capital will be committed only when an asset satisfies what we require for profitable growth and dependable earnings. That covers getting the right partners and the right financing structure in place. We're working to create opportunities for future earnings and dividends. Anchoring these efforts will be our ongoing work to uplift and enhance capability. This is guided by our cultural framework of care, excellence and responsibility, which we're embedding across the organization by accelerating 3 core areas. First, workforce transformation. We're building the teams of the future, making our people more adaptive, skilled and connected. This reflects how we care for our people and our commitments to their growth. Second, digital agility. We're modernizing our backbone. Our goal is to shift from doing digital to being digital. With Phase 1 of ERP go-live completed, we have the foundation to unlock efficiencies and drive more innovative, cost-effective solutions. Third, operational excellence. We're embedding a culture of excellence at every level. In Hong Kong, AI grid monitoring and drones enable early fault detection before they occur.
Tung Keung Chiang
executiveOn the Mainland, centralized control centers that link renewable energy assets raised efficiency. Throughout the group, better platforms strengthened customer engagement. These 3 pillars now interconnect and reinforce one another. They meet our duty to provide safe, reliable energy at a fair price, and they are the engine that will drive our disciplined growth for years ahead. I'll now give the floor to Marissa to run our Q&A session.
Marissa Wong
executive<<operator_script>> Pierre is now connected. Pierre.
Pierre Lau
analystIs my voice coming through?
Marissa Wong
executiveSure thing, Pierre.
Pierre Lau
analystI have three questions. First, on your Australian business: looking at Page 44 of your presentation material, you show forward prices trending downward over the next 3 years. So do you expect the margin of your energy business in Australia under EnergyAustralia in the second half, through this year, and in 2026 to be lower than in the first half of 2025? My second question concerns your China business. On Page 19 of your PPT, your target is to raise operational renewable capacity in China from 2.3 gigawatt right now to 6 gigawatt by 2029. We all understand that for new renewable capacity added from June this year onward, all their output will have to be sold on a market basis, and hence it's likely to be of lower return. So what kind of expected return do you think you can get for these new projects from June 2025? And how much lower compared to the existing one? The last question is for CLP overall. Obviously, we see that your overseas business performance in the first half seems to be weaker than expected. So I want to know what management has considered in your overseas business strategy and more about the performance in the first half?
Pierre Lau
analystSo what does that mean for your approach to investing overseas at this point, versus maybe 6 months or 12 months back? What's different now?
Tung Keung Chiang
executiveYes. Thank you, Pierre, for those questions. So regarding the first one, on the Australia forward price: in fact, you can see that the 2026 forward price is basically at a level similar to where we are now. Perhaps as we move ahead, into 2027 and 2028, we — at present, we are seeing a modest decrease. So in fact, when we examine the market, especially in the second half of this year, since the government has just announced the revised default offer — both the DMO and VDO in Australia — there are increases in those prices. So when we carry out the repricing, we will see that we can raise our price. At the same time, we are also doing recontracting when the existing contracts of our customers come to an end, and then we try to recontract. There is also an opportunity for us to renew the price at a higher level. So we do see an opportunity for improved margins in the second half. At the same time, if you look at our retail business, I think one of the issues concerns our costs. So we are in fact also embarking on a cost optimization exercise, hopefully to improve the efficiency of our operation and to improve efficiency further.
Tung Keung Chiang
executiveWhen you look at the medium term, we're also considering swapping out our customer platform for something more, you know, state-of-the-art, which would let us enhance our products and services along with efficiency and the customer experience — customer experience, sorry — to boost how our customers perform. Then, on your second question regarding China: at present, we're still holding to our goals of reaching roughly 6 gigawatts by 2029. That said, in light of the new policy that's being introduced and the reality that individual provinces will decide the implementation details laid out in the documents — and many of those details remain unavailable right now — there's a degree of uncertainty in the market. Given this, we'll keep the target in place while becoming more selective when it comes to identifying projects and making investment decisions. As I laid out in the presentation, we'll focus on geographic regions where demand looks considerably more promising, where tariffs are higher, and where grid curtailment risk is significantly lower. We'll also consider projects that involve expanding our existing assets, since that could bring overall costs down and lift our profitability.
Tung Keung Chiang
executiveAlso, finally, keep making sure we have longer-term green power contracts or green certificate contracts in place. One thing I want to emphasize now is that our discipline when making investment decisions will stay the same. In other words, if a project can't hit the return we're targeting, we won't put money into it. And so far, our threshold hurdle rate remains unchanged. So we'll keep growing our portfolio, with discipline. Turning to how the group performed overall, the first half is certainly weaker, given the headwinds in China and Australia. As I said, in Australia we do see the generation business performing well. That pays off through our ongoing investment in the reliability and stability of our generation fleet, and in flexible capacity too, which clearly gains from volatility in the wholesale market. The problem now sits in the retail segment. As I mentioned, we'll keep improving performance going forward. In China now, I think the reasons are mixed. A few of them are temporary. Take our renewable energy assets, for instance, the wind — the drop in wind resources, which we view as more of a cyclical matter.
Tung Keung Chiang
executiveWhen it comes to grid curtailment, I think softer demand growth plays a role there as well, along with faster capacity additions — and part of that, I believe, stems from document 136. Many developers rushed to finish projects ahead of what was called the deadline. That led to a larger surplus of capacity. So in the near term, we do see this kind of uncertainty and volatility. We'll keep watching the situation closely and remain disciplined in executing our strategy.
Marissa Wong
executiveEvan Li with HSBC is on the line with a question.
Ming-Hon Li
analystEvan Li from HSBC here. Really I only have 2 straightforward questions. As T.K. just noted regarding Australia, we aim to reach a set volume of renewable energy projects — namely 3 gigawatts of contracted renewables plus 1.6 gigawatts of flexible capacity by 2030. What I'd like to confirm is whether that goal can be met entirely through self-funding, even in the absence of any additional potential divestment of EnergyAustralia. Given EnergyAustralia's cash flow and — or its balance sheet position, would the company be in a position to hit that target under the present funding situation? That's my first question. My second question is this: if we look somewhat further out, at the next development plan covering the coming 5 years, and essentially take a longer-term view, is there any upside when it comes to CapEx spending in Hong Kong? And if there is, which areas would that be coming from? Yes.
Tung Keung Chiang
executiveThank you, Evan, for that question. Perhaps I'll have Alex handle the first one about funding. So let me try to take your second question first. Regarding the next development plan, we're at a very early stage at this point, so I don't believe I'd have much information to share. But looking at the bigger picture, as I mentioned during the presentation, here in Hong Kong, on decarbonization, we've just completed what I'd call the initial phase of investment in and construction of gas infrastructure in Hong Kong. That's now done. The next step is really to decarbonize further. We need to bring in additional zero carbon energy from the Mainland. So the early portion would perhaps be our clean energy transmission system, which is currently under construction. The amount won't be very significant, but it does help. Then over the medium-term future, I think, per the government's Climate Action Plan 2050, there's a goal of reaching 60% to 70% zero carbon in our generation fuel mix. At present, I think we've been importing nuclear power into Hong Kong from the Daya Bay nuclear power station.
Tung Keung Chiang
executiveLooking at it across all of Hong Kong, that comes to roughly 25% for the entire territory. Which means that to reach that 60% to 70% target, besides bringing in renewables, we clearly anticipate needing to import considerably more nuclear power from China. And for that, additional transmission infrastructure — cross-border infrastructure — will be required so we can import the electricity. So my expectation is that this could well be among the new requirements laid out in the next big plan. Naturally, though, the specifics have not been settled yet. More study is still needed on our side, along with further discussion with the development parties.
Ming-Hon Li
analystApologies, T.K. — could I just come back on that point with a follow-up? Just how significant would the government's Northern Metropolis plan be when it comes to CLP's CapEx down the road?
Tung Keung Chiang
executiveYeah. So with Northern Metropolis, the spending on development would stretch over a fairly lengthy stretch of time. From what I can see in the government's plan, I'd say at least 10 years. So under the development plan as it stands, it actually covers a portion of the CapEx needs for that development. And my expectation is that it'll probably look more like a steadier CapEx profile spread across a long period, rather than all at once — suddenly there's a surge in CapEx.
Alexandre Jean Keisser
executiveOn your question about EnergyAustralia, the first thing to note is that EnergyAustralia generates strong cash flow, and the plan is to keep running our generating assets at a performance level following the upgrade completed at Yallourn and the multi-contracting work done at Mount Piper, along with output from our gas plant, and there is also a turnaround plan on the retail side, as T.K. mentioned. So funds from operations are on a good path. Now, on debt capacity, we made the decision to do 2 things. First, on EA's balance sheet we chose to finance, I would say, the relatively small CapEx — those tied to generation for maintenance, to retail, and to the new small flexible capacity — whereas we decided on 2 structures for renewable and large-scale flexible capacity. For renewables, we chose to sign PPAs. For large-scale flexible capacity, we chose to contract its output with EA while arranging project finance and seeking partners. We succeeded with our Banpu project partnership, as you have seen, and we believe we will be equally successful with future battery development.
Alexandre Jean Keisser
executiveAnd we'll also secure the appropriate partner for our Pompadour project alongside EDF. So the real question now is whether we can hit our targets. We think we can, when it comes to flexible capacity, because as you've seen, we currently have 1.1 gigawatts underway, with a feasibility portfolio of 0.8 gigawatts. That's well above our 0.6 gigawatts, and we're on a good track. The harder part is locating the right renewable projects, and that's an Australian challenge. Right now, Australia isn't developing enough renewable projects. So we don't view that as a flexible — we don't view that as a funding challenge, but rather as a market challenge.
Marissa Wong
executiveThanks, Alex. Evan, those specifics are on Slide 21 if you'd like to look at how the flexible capacity additions have been progressing. All right. Our next question comes from Stephen Tsui at JPMorgan.
T. Tsui
analystI have 3 quick questions. First, on finance costs: since HIBOR has been falling during the second quarter, what is our outlook for the average interest rate in the second half, and what do we expect for interest expense for the full year? Second, on dividends: we raised dividends per share last year, but with the earnings headwinds in Australia, should we expect dividend per share to stay stable on a full year basis? Third, on growth CapEx: looking at the cash flow, there is a gap of around HKD 4 billion between cash inflow and outflow. Given that we may raise CapEx for the next SoC plan, will growth CapEx be more prudent, particularly for renewable projects in Mainland China, given the uncertainty over project returns?
Tung Keung Chiang
executiveYes. Thank you, Stephen. So perhaps I'll have Alex take the first question about finance—financing costs—and the CapEx question as well. On the dividend: our policy has been to provide a dependable and steady dividend, aiming for consistent growth, as long as the underlying business can grow sustainably. So in the past, you've seen that we have never cut our dividend. We'll therefore be very careful whenever we adjust it. And it's also, I'd say, our practice to try to keep the dividend in place for the first 3 quarters. The last quarter will then depend on the Board's decision regarding the overall dividend level, taking the underlying business performance into account. So I think we'll obviously have more information when we announce the year-end results.
Alexandre Jean Keisser
executiveOn your other 2 questions, if you'll let me, I'll begin with question #3, which concerns our funding strategy and our capacity to fund our incremental CapEx. That strategy is fairly straightforward and rests on 4 principles. First, we want our business units to produce strong cash flow so that we can determine the debt level we are able to target. Second, maintaining a strong credit rating matters greatly to us, since it gives us not only financial flexibility but also a low cost of debt. As a reminder, a few weeks ago S&P reaffirmed the rating level for CLP Group, for CLP Power and for CAPCO, with a stable outcome. Third, as T.K. mentioned, we intend to carry on with our dividend policy of growing dividends alongside earnings growth. And 4, now I come to your question, we want the ability to fund our CapEx, giving first priority to the CapEx commitments we have in Hong Kong and then weighing the various alternatives available to us across the different regions. In H1 there was indeed a gap, as you point out, but we are also shifting our strategy by seeking partners in the places where we have growth.
Alexandre Jean Keisser
executiveWe carried out something similar with Apraava a few years back. As we've just demonstrated, we can do the same at EnergyAustralia through a partnership focused on sizable flexible capacity. Right now we're in the process of executing our clean energy fund — essentially establishing a fund alongside limited partners for the grid parity project, with the fund sized at HKD 4 billion against total CapEx of HKD 20 billion. That lets us do two things: first, those funds no longer sit on our balance sheet; and beyond that, it allows us to market our development, construction and O&M capabilities so we can earn a higher return. So that's the strategy we've adopted. Turning to your first question, it's a fair point that our debt has risen by more than 10%, yet our funding cost — our interest — came down in the first half. There are 2 reasons behind this. First, we trimmed our debt in the high-cost environment, namely Australia, while raising our debt level in China, where interest costs are low. And second, we achieved a substantial interest cost reduction at CLP Power and CAPCO, which now lets us bring our interest costs comfortably beneath our 4% threshold.
Alexandre Jean Keisser
executiveI won't share what the outlook looks like for H2. What I can say, though, is that HKD 24 billion of refinancing is coming up within the group, and given where interest rates are heading and our ability to take advantage of, as you said, right, the interest environment, as happened 2 months ago in Hong Kong, we hope we can bring our interest cost down further.
Marissa Wong
executiveRob Koh from Morgan Stanley in Australia is joining us on the line.
Robert Koh
analystIs my voice coming through clearly?
Marissa Wong
executiveYeah, we can do that.
Robert Koh
analystAlright, I have 3 questions, and they all relate to Australia, so I apologize for that. My first one is just to confirm I've got the minor risk segmentation, or the restatement of earnings, within EnergyAustralia right. It says the customer earnings there — you took out a hedge book so the comparison is cleaner. Should I now read those customer earnings as your actual customer results rather than the default tariffs? Is that how I should think about it? That's question #1. Question #2 is a bit more high level. You said the strategy at EnergyAustralia is to be short energy and balanced capacity, and that isn't new. But with capacity prices rising, if you're balanced on capacity, does that mean your net earnings leverage across the integrated business would actually be neutral? Or is that the right way to look at it? My third question concerns the Wooreen battery transaction. Congratulations on getting that done. Very simply, is that a deal template — a 50-50 JV with EnergyAustralia as operator and offtaker? And should we think about it that way, given that your pipeline has another 0.5 gigawatt in execution and another 0.8 gigawatt in feasibility.
Robert Koh
analystIs that roughly the kind of template we ought to have in mind for that pipeline?
Tung Keung Chiang
executiveAlright, thank you. Rob, perhaps — could I ask Alex, since you handled that last question about the JV partnership. Turning to the first one, I think — in a sense, actually, the customer business in — as you said, the reason we're looking to, so to speak, take the hedge book out of the customer business is so that we can genuinely see how the customer business is performing, both in terms of how efficiently we operate and whether the products and services we've been delivering to our customers are truly competitive. So really, the customer business in Australia is more of a margin business. Under the government's default price, a margin is assumed. So I'd say competition really comes in two forms. The first is efficiency. If our operations are more efficient, then actually we can achieve a higher margin. And at the same time, if we can bundle our products and services, especially those behind-the-meter products, then we might be able to earn an even higher return. So I wouldn't describe it as being entirely price-based. And I think it also hinges on what you might call the value we add for our customer.
Tung Keung Chiang
executiveTake solar paired with a battery, for instance—that's a product that could deliver real value to our customer. Turning to your second question, on the short energy and balance capacity, I apologize, but I may not have entirely grasped what you were asking. Would you mind repeating it?
Robert Koh
analystRight, T.K., absolutely. You've mentioned, I think, that this company is positioned to benefit from greater volatility and can seize more of it thanks to the flexible plant. That said, when you look at EnergyAustralia's integrated operation being balanced on capacity, does that produce an equal offset against the gain? Or does the process turning more volatile leave things net positive?
Tung Keung Chiang
executiveSo when we talk about balanced capacity, the point there is really to make sure we won't be long even in the peak demand stretch. But at other times, the reason we run short on energy is that we're able to use that capacity for arbitrage when wholesale price volatility is elevated. That's where we can earn extra profit from our capacity without taking on added risk, provided we have length in capacity. So that's the thinking behind it.
Alexandre Jean Keisser
executivePerhaps the response to the third question—which also helps you grasp the second one—is that our initial strategy is to contract capacity when we lack a cost-competitive edge. We accomplish that, naturally, by contracting this capacity alongside our retail portfolio. When we judge that a cost advantage exists—that is, being at one of our sites where land, transmission, water and people are available—we can capture it, as we demonstrated last year with the CIS tender. Once that happens, what we have settled on as a model—and this is our base model—is to contract the capacity with EA, obtain the O&M from EA, seek project finance (Wooreen was 50% oversubscribed by banks) and find the right partner for this. We intend to do the same for Mount Piper, should this project be developed. And we intend to do the same for Hallett. We haven't done it so far because it was too small. It was only 50 megawatt. But if we extend it by another 150 megawatts, which would give a total of 200 megawatts, then the cost required in order to put the structure in place is outweighed a lot by the benefits of it.
Alexandre Jean Keisser
executiveSo we intend to move forward with that. Turning now to the hydro plant we're developing alongside EDF: our share here is just 25%, and theirs is 75%. What matters here, I think, is that this shouldn't be viewed purely as a financial structuring arrangement — there isn't a great deal of Pompadour being developed. So finding a partner with substantial operational and construction expertise was also key for us, so that we could put together a partnership that brings, beyond capital, the capabilities of both sides to bear on developing these projects.
Marissa Wong
executiveCissy Guan, Bank of America — go ahead.
Cissy Guan
analystI have 2 questions. To start with, in the first-half results, you said CLP has been progressing with upgrades to the clean energy transmission system that connects Hong Kong with Daya Bay. Could you tell us more about that? For instance, how much has the capacity of that power transmission system gone up? And if we were to import more clean energy from the Mainland to hit the clean energy targets, how much additional CapEx would be required — for example, how much more CapEx do you expect for the transmission system? That's the first question. Second, on EnergyAustralia, we've done a few partnerships at the project level. I'd like to ask, going forward, will CLP keep pursuing project-level partnerships, or will EnergyAustralia be actively seeking a corporate-level partnership? And third, I understand our shareholders value the dividend payout. Can we commit to a final DPS increase? Or what considerations go into deciding whether we'll have a DPS? And if we were to have a DPS in the final dividend, would that be a HKD 0.05 increment just like before? Or are we flexible on the magnitude?
Tung Keung Chiang
executiveAlright. Thanks, Cissy. Turning to the first question on nuclear imports: at this point we're, I'd say, in the last stage of finishing the CTS, and it should wrap up early next year. So we're looking at how that can be used to bring more zero carbon energy into Hong Kong, though the volume won't be significant. And as you correctly said, to bring in more from the Mainland and meet the 2035 target set out by the Hong Kong government in the Climate Action Plan 2050, the quantity would be far larger. Naturally, that would include both renewable and nuclear. But given that, in the nearby region, importing nuclear would, I think, make up the bulk of that zero carbon energy. That said, since it's 2035, there's still time on our side. And at present, I'd say no concrete sources have been identified. We also need to carry out system planning and design to work out how the power would be imported into Hong Kong. So as things stand, it's still a very early stage for any estimate of the CapEx required.
Tung Keung Chiang
executiveBut I think since it’s going to be a cross-border type of infrastructure, it should be fairly significant. Still, the reality is that completing it will take a considerable amount of time. So once we have additional information, we may share more at a later point. Now regarding the EA partnership, as I may have said earlier, we’re open to partnering at either the project level or the enterprise level. That said, what matters more is that EA can genuinely optimize its performance. At present, with the generation assets, we’re performing quite well. All the major investment in maintaining reliability and safety has been finished. And the next area for improvement will likely be our customer business, as I just noted, so that we can lower our costs and enhance the platform to offer more products and services that add value for our customers. As for our dividend payout, I also just explained that our dividend policy is to provide a reliable and consistent dividend. And based on history, we have never cut our dividend.
Tung Keung Chiang
executiveWe’ll therefore be quite careful about any upward change to our dividend. We’ll examine how our underlying business is performing. Should that performance be backed by growth that is more sustainable going forward, we would then think about raising the dividend. Ultimately, naturally, our Board will approve the dividend.
Marissa Wong
executiveThanks, T.K. That's all the time we have. So I'll need to wrap up the briefing at this point. T.K. and Alex, thank you for fielding the questions and giving the briefing. If anything else comes up, my team and I will be around, and we'll gladly take those questions once this briefing ends. And many thanks for all the excellent questions you brought today. With that, I'll bring the briefing to a close now.
Tung Keung Chiang
executiveThank you.
Marissa Wong
executiveOkay, thanks everyone. Bye.
Alexandre Jean Keisser
executiveAppreciate it.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete CLP Holdings Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to CLP Holdings Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in CLP Holdings Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.