Good afternoon, and welcome to the 2024 Interim Results Briefing for CLP Holdings. I'm Marissa Wong, Director of Investor Relations, and with me today are Chief Executive Officer Mr. T.K. Chiang and Chief Financial Officer Mr. Alex Bernhardt. We released our 2024 results with the Hong Kong Exchange earlier today at about midday. You can find those results, along with this presentation, on our website right now. This briefing is being recorded as well and will be posted on our website later. Before we start, please take a moment to read the disclaimer on slide one. As for today's agenda, we'll stick with the usual format: T.K. will give the overview and the strategic outlook. Alex will then walk you through our financial results, and we'll wrap up with a Q&A session. With that, I'll hand things over to T.K. to begin the briefing. Thank you, T.K.

Tung Keung Chiang

executive
#2

Thank you, Marissa. And thanks to everyone for being with us at the 2024 Interim Results Briefing. I'm happy to say the year has begun strongly, with the group's earnings growing solidly and better results coming through from EnergyAustralia. What these results show is that CLP's fundamentals are still robust, even with volatile conditions around the world and new energy systems becoming more and more complex. Operational delivery stays central as we pursue the energy transition. During this half, we kept up our record of delivering major projects. In our home market, the final element of gas infrastructure — our 600-MW D2 units — entered operation, which allows coal-fired units to be retired gradually. In Australia, with price volatility on the rise, we reached first fire at Tallawarra B, the only peaking plant to join the New South Wales grid over the past decade. In every market where we operate, we've worked tirelessly to lift the availability and reliability of our 23-GW fleet as we responsibly shift to a low-carbon portfolio. Our growth momentum matches the energy transition opportunities across our markets. In Hong Kong, we keep making headway in executing the new development plan. In China and India, we delivered one of our strongest zero-carbon growth performances, driven by rising power demand and the push toward electrification and decarbonization in these markets.

Tung Keung Chiang

executive
#3

For EnergyAustralia, we moved forward on approvals to develop the 350-MW Wooreen battery in Victoria, plus a 50-MW battery system at Hallett Power Station in South Australia. Our financial position is still solid — S&P kept our investment-grade credit rating and a stable outlook for CLP Holdings, CLP Power, and CAPCO, and Moody's did the same for EA. With steady earnings, a sound capital structure, and a healthy development pipeline, the groundwork for future earnings and a lower-carbon future is in place and well underway. Now to the highlights. On the financial side, the group's operating earnings before fair value movements rose 22% year-on-year to nearly HK$5.7 billion. That came from solid contributions delivered across the group, together with better earnings contributions from EnergyAustralia. Operating earnings after fair value per share climbed to HK$2.32, and the board has recommended a second interim dividend of HK$0.63 per share, matching the first dividend. Total earnings also rose 18% to nearly HK$6 billion, or HK$2.36 per share. Based on our share price at the end of June, that gives investors a yield of 4.9%. On operations, our injury rates are stable, and safety stays a priority as we enter high-level fuel activities.

Tung Keung Chiang

executive
#4

When we look at reliability through the lens of unplanned customer minutes lost, extreme weather and power supply incidents in Hong Kong took a toll. Even so, by global standards Hong Kong's network reliability is still outstanding, and we'll keep working to maintain that. Turning to customers, our customer accounts in Hong Kong grew, whereas fierce competition in Australia brought about a modest decline. Output of electricity from our generation facilities held steady. The small drop in generation capacity is a reflection of three coal units in Hong Kong being retired. I'd now like to welcome Alex, for the first time in the role of Group CFO, to walk you through the financial results.

Alexandre Jean Keisser

executive
#5

Thanks, T.K., and good afternoon. I'm pleased to share that we delivered a strong set of results for this half. Our snapshot of key financial metrics demonstrates that we grew earnings while continuing to invest for the future and give back to shareholders. EBITDAF — that's earnings before interest, tax, depreciation, and fair value — rose 17% to nearly HK$13 billion. That came from sustained capital expenditure in Hong Kong and a turnaround at EnergyAustralia. This EBITDAF increase underpinned operating earnings growth of 22%, reaching almost HK$5.7 billion. Higher interest costs in Hong Kong and higher tax expenses had a slight impact. After adjusting for fair value movements and items affecting comparability, total earnings for the period came in slightly above operating earnings before fair value. Capital investment exceeded HK$10 billion, up from last year, which reflects our focus on decarbonization and on supporting infrastructure growth. Total interim dividends per share declared in the first half stayed at HK$1.26, unchanged from last year. On the whole, the EBITDAF evolution reflects solid earnings growth. Currency movements against the HK$ had a small impact. Beyond that, the EBITDAF waterfall shows EnergyAustralia as the biggest driver of the period-on-period increase, with dependable performance from Hong Kong and profitable growth in India following behind.

Alexandre Jean Keisser

executive
#6

The lower contribution from mainland China lined up with the big scheduled maintenance at the Daya Bay and Yangjiang nuclear plants. On the slides that follow, I'll go through each region in detail. At the operating earnings level, every region except mainland China, the Taiwan region, and Thailand gave us a higher contribution. Hong Kong put in a very strong underlying performance, with earnings of almost HK$4.3 billion. Earnings in mainland China came to almost HK$1 billion, hit by the scheduled 30-year outage at Daya Bay and the 10-year outage at Yangjiang, and both of those were completed on time. EnergyAustralia turned things around, moving from a loss position to positive earnings, which reflects better performance in the energy and customer segments in a market that keeps evolving. In India, Apraava Energy kept growing, with increased contributions from a diversified portfolio of renewable, transmission, smart meters, and thermal. Our asset in Taiwan was affected by more plant outages and an earthquake, while Lopburi Solar in Thailand contributed less because of lower tariffs. Ongoing digitalization and corporate center optimization produced a 7% improvement in cost, as we focus on driving further efficiency in our business. So we reported operating earnings before fair value of nearly HK$5.7 billion, 22% higher than the first six months of 2023.

Alexandre Jean Keisser

executive
#7

Fair value came in positive, which mirrors an accounting gain on EnergyAustralia's forward energy contracts measured against prices prevailing as of the end of June 2024. Strip out one-off elements, and total earnings for the group across the period rose 18% to almost HK$6 billion. Next I'll walk you through how each business unit performed and what we see ahead. Every variance I cite excludes foreign exchange effects and scope, so it reflects the organic, actual underlying performance of the business. Beginning in Hong Kong, we posted another financially dependable half-year result amid an environment of higher global interest rates. Operating earnings climbed 3%, mirroring higher average net fixed assets stemming from continued capital investment, which came to roughly HK$4.1 billion this half on an actual basis. Higher interest costs slightly offset those earnings. Operational performance was sound: local electricity sales rose 2.6%, driven by higher temperatures and economic recovery. Average net tariff sat at a lower level than at this point last year, since the fuel cost adjustment fell by more than 5% from the start of the year, mirroring softening international fuel prices. As T.K. noted, the D2 CCGT generation unit entered service in April. Going forward, we will focus on delivering the new development plan, investing in low-carbon energy systems and drawing in additional zero-carbon energy, while continuing to support communities in need and serving as the energy partner to customers, delivering reliable electricity at a reasonable tariff.

Alexandre Jean Keisser

executive
#8

Turning now to mainland China, the underlying performance of our business there continued to be solid. This half-result was affected by low output from our nuclear portfolio, because of scheduled maintenance required on the anniversary years of operation. Earnings from renewable stayed solid, with somewhat higher output from the portfolio and a contribution from new grid parity projects. Earnings from our coal plants in which we hold a minority stake declined as a result of lower tariffs. In addition, this was partly offset by fuel prices stabilizing. Taken together, our earnings for mainland China fell by HK$384 million to just under HK$1 billion. Going forward, nuclear should return to normal operations in the second half. On renewable development, we are well placed to capture structural growth in power demand in mainland China, with a healthy pipeline and new capacity additions that are expected to contribute to earnings. And we will keep leveraging our international presence to foster green contracts and energy solutions for corporate clients and local governments. In Australia, the business swung from a loss position to positive operating earnings of HK$611 million, the net result of much stronger performance from the energy and customer segments. In the energy segment, the combination of measures we undertook to improve thermal plants' reliability and availability, together with the rolling off of lower-price forward contracts, produced higher realized prices for both Yallourn and Mount Piper.

Alexandre Jean Keisser

executive
#9

The rise in the customer segment came from better recovery of energy procurement costs versus last year. That said, it occurred against more intense retail competition, weaker customer demand, and cost-of-living pressures. The depreciation uplift reflects greater investment for Yallourn 2023 outages as well as capitalization of additional decommissioning costs. Reduced finance costs stemmed from lower average drawn debt, and consistent with stronger financial performance, tax expenses rose. Going forward, we remain focused on strengthening Yallourn and Mount Piper's operational and financial performance in the face of viable wholesale prices and higher fuel costs at Mount Piper as coal price caps expire. Competition stays intense, putting pressure on earnings contribution from the customer segment. We keep our attention on serving customers and on advocacy regarding energy affordability. EnergyAustralia will develop flexible capacity projects under the Climate Transition Action Plan, among them the Wooreen Utility-scales battery in Victoria and the Hallett battery situated beside Hallett Power Station. Last, to India, where Apraava Energy, our joint venture platform, maintained strong momentum and posted a 61% rise in operating earnings to more than HKD 200 million. Underlying earnings contributions were positive across a balanced and diversified portfolio.

Alexandre Jean Keisser

executive
#10

Earnings growth was driven by solid operational results at transmission and the Jhajjar coal-fired power station. Operating expenses got better, largely because we recognized deferred tax assets tied to prior tax losses. Apraava Energy currently has roughly 2 GW-equivalent of non-carbon projects under execution, which includes 2 renewable, 1 transmission, and 2 advanced metering projects that were won in the first half of this year. Going forward, the joint venture will keep expanding its zero-carbon project pipeline in order to meet growing energy demand and back the country's decarbonization. We're engaging with government authorities to renew the approvals needed so we can take part in government greenfield auctions. Turning to group cash flow, free cash flow generation came in strong at HKD 8 billion, supported by underlying EBITDAF performance. Cash outflow was larger, at HKD 14 billion in total, consisting of HKD 9.3 billion in capital investment. The bulk of that CAPEX went to our Hong Kong SOC business, which accounted for HKD 6.1 billion. The remainder consisted of renewable projects in mainland China plus a partial payment for our new headquarters in Kai Tak. Dividend payment amounts to HK$4.6 billion. Keep in mind that our cash flow is seasonal — cash inflow tends to be lower in the first half, and that combines with a higher dividend payment because of the practice of a higher final dividend.

Alexandre Jean Keisser

executive
#11

The group's financial structure stayed in a strong position, with debt growing modestly and liquidity sound. Confirming that strength, S&P reaffirmed in May the credit rating and stable outlook for CLP Holdings, CLP Power, and CAPCO at A, A+, and AA-, respectively. In a similar vein, Moody's has maintained EA's rating. You can also see this in our capacity as a group to raise competitive financing so as to keep a balance sheet, debt maturity profile, and fixed floating composition. In this half, the Scheme of Control business arranged bank facilities and bonds totaling HK$11.4 billion, with low spread from a diversified base of international and local lenders and investors. Our mainland China and Australia business also executed bank facilities of HK$3.3 billion and HK$3.9 billion, respectively, to support energy transition. With a solid investment-grade balance sheet and healthy liquidity, we are very well positioned to back our business growth and stay true to our long history of dividend payment. I'll pass it over to T.K. to take you through the group's strategic priorities. Thanks, Alex. So I'll now briefly recap and update on CLP's long-term strategy as we orient ourselves to capture the tailwinds of the energy transition. Our purpose remains the same: to power brighter tomorrows in the era of net zero transformation.

Alexandre Jean Keisser

executive
#12

Those four pillars—decarbonization, putting money into growth, building up capability, and allocating capital with discipline—are what will drive us to successfully build energy systems and serve our customers, along with our decades of experience and more than 8,000 hardworking colleagues who are dedicated to turning a low-carbon future into reality. Now, on to the progress we've achieved. Delivering the new HKD 52.9 billion five-year development plan remains our ongoing priority. This plan is one of a series of five-year plans under the Scheme of Control regulatory framework, which supports our world-class electricity system, founded on decades of planning and long-term investments. In fact, 2024 marks the Scheme of Control's 60th anniversary. That framework is remarkable—it has stood the test of time and still gives us the stability needed to deliver power that is reliable, cost-effective, and cleaner. This year under the SOC, we reached a few milestones. Our 600-MW D2 combined cycle gas turbine generator began operating in April. That CCGT, together with our recently commissioned offshore LNG terminal and enhanced interconnector capacity, are essential pieces for retiring coal generation. We also mark an achievement in nuclear energy development. Daya Bay, this region's first commercial nuclear plant, celebrates 30 years of supplying Hong Kong with electricity that is clean, reliable, and reasonably priced.

Alexandre Jean Keisser

executive
#13

Careful planning of this sort, along with prudent investment and effective cooperation across regions, is exactly what’s needed to execute the demanding work program under the newest development plan. That is essential for delivering the Hong Kong government’s economic and infrastructure agenda. The way we pursue growth and investment aligns with the requirements created by electrification and decarbonization. The markets where we operate contain some of the richest opportunities. Based on current estimates, China alone will add 250 GW of new wind and solar power capacity this year. India aims for 500 GW by 2030, equivalent to 80 GW per year. Australia has set an 82% renewable target for 2030. Set against those figures, our own targets are modest, yet it does reinforce our value-over-volume approach and our focus on investing in assets that satisfy our return criteria over the long term. Our financing philosophy stays responsive to market developments as they unfold. Turning to China, subsidy-free RE projects will be funded mainly through non-recourse project financing, with the remainder coming from equity. Our businesses in India and Australia are structured as self-funding operations and will draw on a mix of cash generation, non-recourse project financing, and partnership arrangements where that makes sense, to help speed up the developments.

Alexandre Jean Keisser

executive
#14

We've been making solid headway. Our development work has been robust, the opportunities in our pipeline look healthy, and we're tracking well toward hitting our targets. Our focus is going to be on keeping a disciplined capital program so we can deliver this growth platform, which — along with the strong foundations we already have — will feed into earnings growth down the road. The strategic backbones of our success are going to be digital transformation and a workforce that's future-ready. We've been rolling out programs of work to bring both of those into the organization. Our dedication to digital is changing how we manage resources, how we engage with customers, and it's helping us unlock value that's embedded in years of industrial know-how and experience. This isn't merely about keeping pace with industry trends. It's about positioning ourselves strategically so we can sharpen our efficiency, reliability, and customer experience to meet the energy demands of tomorrow. And the energy that delivers all this comes from our people. By investing in our workforce, we're also securing our sustainability in the new energy order. We've taken steps to close talent gaps and scaled up the capabilities we need to match the pace and scale of the net zero transformation. To sum up, our business performance is strong, and we're making good progress on our strategic objectives. Along with embracing our core values of care, excellence, and responsibility, and building a new way of working culture, we're well positioned to keep delivering value and returns to our shareholders, customers, and communities.

Alexandre Jean Keisser

executive
#15

With that said, I'll pass things over to Marissa for the Q&A.

Marissa Wong

executive
#16

Thanks, T.K., and thanks, Alex. Now we'll begin the Q&A portion. There are two ways to take part: one channel is for those on Zoom, who can raise a hand and ask a question live, and the other is for webcast attendees, who can type a question into the chat box located at the bottom right of the screen. So the line is open, and I can see Pierre from Citi has joined. Pierre, please unmute yourself and go ahead with your question.

Pierre Lau

analyst
#17

Hi there. Management, I appreciate your time, and congratulations on the strong result you posted for the first half. I've got three questions about the company. The first concerns your Australian business and the margin expansion your energy business typically delivers in the first half. Should we expect your energy business in Australia to see additional margin expansion in the second half? If so, what would drive it? My second question is also about your Australian business. I believe you've discussed this part of your Australian business for some time now, yet nothing has been concluded so far. So I'd like to know whether there's any update on that matter, or whether your strategies in this area have changed. And my final question: you show that you've paid HK$2.7 billion for a new headquarters in Kai Tak in Hong Kong. So I presume you'll move your people into that headquarters at a later point, and perhaps you can then save some rental expense at the current headquarters. So how much rental expense saving can we expect each year beginning in 2025? Thank you.

Tung Keung Chiang

executive
#18

Alright. Thanks, Pierre, for that question. So for the first part, during the first half of the year, in the DA — in the customer business — we managed to recover those high procurement energy costs, but at the same time, some of that was actually offset by margin reduction stemming from intense competition. Now, as we move into the second half, we do see that intense competition continuing, and energy prices staying high. Of course, the Australian market has always been volatile, but our ultimate goal is to ensure we deliver value-for-money service to our customers. Now, on the partnership arrangement, this isn't something so-called for EnergyAustralia. Across the entire group, we anticipate very significant capital requirements for the energy transition in all of our markets. Of course, we want to focus on our core markets in Hong Kong and China. And for diversification purposes, we wish to maintain our business in Australia as well as in India. But given those capital requirements, we're open-minded about bringing in partners to help fund the investment required. So a good example — in India, we've successfully brought in CDPQ as a partner.

Tung Keung Chiang

executive
#19

At this point, we're in a 50/50 joint venture. And in Australia, we're actually open-minded regarding various forms of that kind of partnership, whether it takes shape at the project level or at the enterprise level. So our minds are open, and we'll keep exploring various options. Now, on your third question, about the new office we have in Kai Tak, our plan right now is to finish the renovation toward the end of the year, and we plan to move in probably in December. Now, as for the current Laguna office, our short-term plan is to use it as a temporary office, since we may need to do some renovation in other offices in Hong Kong. So, for instance, temporarily, we may move our colleagues to the Laguna office in Hong Kong so renovation can be carried out in other offices, and then people can move back. Now, over the longer term, we're still reviewing how the office in Hong Kong here is used. Thank you.

Alexandre Jean Keisser

executive
#20

I believe Pierre also brought up the margins for the energy segment. Perhaps we should cover that. Maybe I'll ask Alex to handle it. But Pierre, if you look at slide 42 in the presentation pack, the wholesale prices are listed there for your review. That should give you a sense of where market prices stand in any case. Alex, would you like to take the energy segment? I can cover that. There are two key points: first, how much generation we will have, and second, what prices will be seen in the market. On generation, we will have a major overhaul, which will be the fourth one for Yallourn. So we should expect a reduction in generation from Yallourn during this major overhaul. On prices, the key difference is that the subsidy that was provided to keep the coal price under control and lower electricity costs for customers was finalized at the end of June. So it will not continue in the next half.

Operator

operator
#21

Thanks, Alex. Appreciate the question, Pierre. Moving on, we have Evan Li from HSBC on the line. Hi, Evan. Please go ahead with your question. Evan, can you hear me? Hi there. Great. Go ahead.

Evan Li

analyst
#22

Good. Thank you. Thank you, Management. Three questions from me. The first concerns Yallourn. Now that the maintenance program wraps up by the end of this year, does Yallourn still look like it will retire by 2028, or does energy represent an earnings extension? That's my first question. My second question is about cash flows. As I see it — correct me if I'm wrong — during the first half of this year, cash inflow, or what you term free cash flow, appears to be coming in below CapEx and dividends. Australia has improved, and I think that's perhaps a major contributor to the improvement. Yet in 2023, last year, we observed that on a full-year basis our free cash flow exceeded CapEx and dividends. But in the first half of last year, we also saw that cash flow on the inflow side was fairly weak. So I'm just wondering how large a seasonality factor applies for CLP overall, or perhaps specifically for the non-Australian businesses, given the month-end shift from June to December? That's my second question. And the third one is for T.K.: I'm just wondering whether there's any upside to the current development plan in Hong Kong across the current five years.

Evan Li

analyst
#23

Is there any possibility that the CapEx figure could be raised given what is going on in Hong Kong, with infrastructure and so on? Yeah, those will be the three questions. Thank you.

Tung Keung Chiang

executive
#24

Thanks a lot for that question. Perhaps I’ll have Alex handle the second one, and I’ll take your first and third questions. So, on Yallourn, the maintenance program is underway right now, and the final outage for the last unit should wrap up by Q4 of this year. As things stand today, we remain committed to retiring the plant by 2028. And in fact, we’ve set aside provision for the decommissioning.

Alexandre Jean Keisser

executive
#25

Meanwhile, for the coal mine, we're getting the rehabilitation plan ready too — it'll go to the government and likely get approved in 2025, 2026. On the Hong Kong side, we're currently carrying out the development plan on the basis of the approved HKD 52.9 billion. When you mention upside, I'm not sure if you mean extra CapEx or the incentives. Under the SOC, there are incentive payments tied to our performance. So essentially, we'll assess that under the SOC. As for CapEx, it hinges on whether anything comes up down the road. As of right now, we have no additional CapEx as such. Previously, in the earlier D plan, if extra requirements came up while executing, we'd go into discussions with the government to see about a supplementary development plan or a separate development plan. It all hinges on whether additional requirements arise. On your second question, to start with, our cash inflow for this semester was strong at HKD 8 billion, driven mainly by two factors. The first is very strong EBITDA, as you can see.

Alexandre Jean Keisser

executive
#26

The second factor relates to timing. We got some money upfront from the state of Queensland in Australia. Certain taxes remain unpaid on our side, and those will be settled in Hong Kong next year. So both of these are one-off items that won't repeat. As a result, our cash inflow looks quite strong, helped by those two exceptional items. Turning to cash outflow, the biggest change compared with last year comes from an increase — as mentioned — in SOC CapEx and growth CapEx, plus the purchase of the Kai Tak headquarters. On the seasonality of our results, we won't provide any forward-looking commentary for EA, but this will certainly be the primary factor behind the gap between this half and the next one, tied to what I referenced earlier regarding energy generation and profit, along with intense competition.

Operator

operator
#27

Thanks, Alex. This is Stephen Tsui at J.P. Morgan. Stephen, if you're able to hear me, please unmute yourself and go ahead with your question.

Stephen Tsui

analyst
#28

Hello, and thanks to Management for the time. I have three questions. My first concerns the Australia business. What is our view on long-term power prices in the Australian wholesale market? Gas and coal prices appear to remain elevated, and renewable connections in Australia are below expectations. So should we expect wholesale prices to hold up? And regarding the significant improvements in the Australia wholesale business, how much did the gas-fired plant contribute? My second question is on capital expenditure. How should we project CapEx for Australia and mainland China going forward? Over the past 3 years, we spent roughly HK$2-HK$3 billion in Australia and under HK$1 billion in mainland China. Should we expect CapEx to be similar? My final question is about dividends, since we have held dividends flat for the past 3 years because of the volatile Australia business. Now the Australia business is turning around, and power prices appear to remain elevated. Should we expect dividends to grow in line with the Australia turnaround? After all, we kept dividends flat for the interim period. Thank you.

Tung Keung Chiang

executive
#29

Alright, thanks Stephen. I might begin with the dividend, which was the fourth question, and then I'll address the first one, on the outlook. I'll also pass things to Alex to cover the price trend, plus questions two and three regarding earnings contribution and CapEx. Turning to the dividend: our policy has always been to keep it reliable and consistent. We aim for growth in the dividend, as long as business growth can support it and the company's financial position stays sustainable. In the first half of this year, I'd say we're performing well. Should we keep generating enough growth for the company, then naturally we'll examine whether an adjustment to the dividend is possible. Ultimately, though, the board will decide on the dividend according to the financial conditions. Now, on Australia, I'd say the longer-term outlook for power prices really hinges on supply and demand, and especially on renewable energy investment there. Recently, we have indeed observed somewhat slow progress when it comes to adding renewable energy projects in Australia.

Tung Keung Chiang

executive
#30

So that could mean energy prices remain at a fairly high level, as you mentioned. Looking ahead, I think it comes down to supply and demand, and also things like weather conditions can shift demand when you get extreme weather, and so on. Another question is whether the plant condition will actually hold up in terms of performance. You can see there are cases where, for instance, in 2022, our plant in fact underperformed. And this year, in May as well, there were incidents that led to plant outages. Over the longer term, though, I would say wholesale price appears fairly stable. So perhaps I'll pass it to Alex.

Alexandre Jean Keisser

executive
#31

Let's begin with the CapEx question, and I'll tie that question to the funding approach we use. To start, in China, CapEx should go up because of the success we're having with our development strategy and our wish to double capacity. As T.K. mentioned, the plan is for this to be funded through project finance, and the rest of the equity will come from the CLP balance sheet. In Australia, funding will be self-funded. Everything we develop in Australia will be self-funded, as in India. Development growth there is structured differently. We aren't building the renewable plants ourselves; instead, they are contracted. So at the EA level, we don't draw on our balance sheet for that, whereas flexible capacity is developed on EA's balance sheet through a mix of corporate finance for the small project and project finance with partners, certainly for the large one. That addresses the CapEx question. On the earnings contribution from the gas plant, the gas plant is an important part of our flexible capacity portfolio, with 1.6 GW across the three main markets of New South Wales, Victoria, and to a lesser degree South Australia.

Alexandre Jean Keisser

executive
#32

As more renewables come into Australia, volatility is bound to rise, and over the long term we expect this portfolio to contribute more.

Operator

operator
#33

Thanks, Alex. And Stephen, on slide 19 in our pack we’ve included some disclosures specifically about targets and the growth pipeline, so for more information you can look at that slide. Okay, Rob Koh from Morgan Stanley is on the line from Australia. Hi, Rob. Please go ahead with your question.

Robert Koh

analyst
#34

Hello there. Good evening, and thank you for taking my question. I apologize for joining somewhat late — one of my other companies had an announcement. So if this has already been covered, just move on. I suppose the first question is this: from your disclosures, I take it you're carrying on the long-standing practice of giving no earnings guidance, and I'm just wondering whether that's something the new and refreshed management team has thought about. My second question, I guess, inevitably concerns Australia. I think there are two parts to it. In May, in Australia, there was a very volatile New South Wales pool price event. I'm just wondering whether EnergyAustralia was lucky enough to benefit from that. And then second, in the second half, in Southeast Queensland, the government there is providing a very generous AUD 1,000 per household subsidy. If you could perhaps comment on how that might affect your business, please.

Tung Keung Chiang

executive
#35

Alright, thanks Rob, for that question. And I really appreciate your remark about how we don't provide earnings guidance — right now, that's a practice we intend to keep. Still, I'll take your feedback on board. On your second question: during that event, I'd say our generation plant performed strongly and kept producing power. To some degree, we actually came out ahead because of that event. Now, on the Queensland subsidy — we've already committed that we will essentially pass that subsidy through to our customers. And I think, to some extent, that's good for the business, since it will help relieve the pressure, the cost-of-living pressure. Because in Australia, frankly, we're also, I'd say, dealing with rising cost-of-living pressure, which has put pressure on our margin and on the cost of supporting underprivileged families. So I'd say it's actually a positive impact for our business.

Operator

operator
#36

Thanks, T.K. I believe no further questions are coming in, so I’ll wait a couple of seconds. All right. We’re coming up on time now. Thanks to all of you for your questions. And thanks, T.K. and Alex, for the briefing and for taking the questions. A recording of this briefing will be posted on our website later today. My team and I will be around to handle any additional questions you might have. Beyond that, thank you all for joining. I’ll close the briefing now. Thank you and goodbye.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete CLP Holdings Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to CLP Holdings Limited earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in CLP Holdings Limited or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.