COPT Defense Properties (CDP) Earnings Call Transcript & Summary
July 30, 2021
Earnings Call Speaker Segments
Stephanie Krewson
executiveThanks, Terry. Hello everyone, and thanks for joining COPT's call this afternoon, where we'll go over what we delivered in the second quarter of 2021 and our revised outlook for the entire year. Joining me on the line are Steve Budorick, our President and Chief Executive Officer; Todd Hartman, Executive Vice President and Chief Operating Officer; and Anthony Mifsud, EVP and CFO. You can find reconciliations between GAAP and non-GAAP figures that management references on our website — they're included in the earnings release and presentation, as well as in our supplemental information package. I'll also remind everyone that any forward-looking statements we make today carry risks and uncertainties, and those are described in detail in the filings we make with the SEC. What actually happens and what we actually report could end up differing significantly from those forward-looking statements, and we're not obligated to revise them later. Steve?
Steve Budorick
executiveGood afternoon, and thanks for being with us today. Our distinctive approach to investing — concentrating properties near U.S. military bases that support national security work — keeps delivering solid, premium-quality earnings. For the second quarter, FFO per share, adjusted for comparability, came in at $0.58, which beat the top end of our guidance by $0.01, mainly on same-property performance. On top of that, NOI from real estate operations rose 8% during the quarter, and AFFO climbed 17% versus the prior year. By the close of the second quarter, we had finished leasing totaling 1.7 million square feet — 815,000 square feet in renewals, 205,000 square feet of vacancy leasing, and 641,000 square feet of development leasing. In the third quarter so far, we've signed 53,000 square feet of development leasing, and we're deep in negotiations on an additional 250,000 square feet that we anticipate closing this quarter. Given all this activity, we have strong conviction that we'll hit our 1 million square foot target for the year. As for the big renewal at DC-6, the lease isn't finalized yet; we agreed on business terms back in June and figured the paperwork would move fast. The tenant is setting the tempo and pace of getting the actual lease documents ready, and that effort is still dragging. Considering their deployment, their power consumption, and the kinds of other work we're doing together, we're fully confident they'll stay in our building. This quarter, we brought 197,000 square feet of development projects into service, among them Project EL — a 107,000 square foot specialized facility constructed for a defense contractor in San Antonio. We finished that project an entire quarter ahead of what we'd forecasted, and we anticipate handing over 2 more projects sooner than planned later this year, which speeds up lease commencements. We now expect to deliver NoVA C and 610 Guardian Way ahead of the original timetable, and together with Project EL, those are contributing close to $0.03 to FFO per share this year. Better same-property operations plus faster development completions are pushing us to raise, once again, the midpoint of our full-year guidance for FFO per share as adjusted for comparability. The updated 2021 guidance midpoint of $2.26 sits $0.07 above where we originally set our midpoint, and it's 6.6% above 2020 results. With that, I'll hand the call to Todd.
Todd Hartman
executiveThanks, Steve. The metrics and trends we're seeing at our defense/IT sites are strong, and as our leasing results so far show, we keep capturing robust demand. During Q2, we signed leases for 1.4 million square feet, which included 661,000 square feet of renewals, giving us an excellent retention rate of 89%. Renewals and cash rents rose 0.1%, while annual escalations came in at an average of 2.6%. Over the 6-month span, we finished 815,000 square feet of renewal leasing, with a 78% retention rate, an average lease term of 4.3 years, and cash rents declining 0.2%. Near the end of the quarter, we found out that a tenant at Redstone Gateway lost the recompete for a large contract. And at the close of the year, they will leave RG 1200, which is a 121,000 square foot building. This marks our first chance in 10 years to show how strong demand is for second-generation space at the park. We're already seeing significant interest from several defense contractors who want to relocate to Redstone Gateway, among them 2 with 2022 occupancy requirements that are seeking control of the entire building. The demand strength we keep witnessing proves that Redstone Gateway's market position is the crucial spot for supporting government customers at Redstone Arsenal; when it comes to vacancy leasing, we signed 111,000 square feet during the quarter, which equals 10% of the space we had available when the period started. During the first half of the year, we signed 205,000 square feet of vacancy leasing. Our leasing activity ratio stands at 105%, the best it's been since long before the pandemic, which shows ongoing expansion and demand throughout our portfolio. Because of that, we anticipate completing solid amounts of vacancy leasing for the rest of this year. On development leasing, Q2 came in at a strong 630,000 square feet, made up of a 265,000 square foot data center shell in Northern Virginia for our cloud computing customer, plus 179,000 square feet at Redstone Gateway through 2 major pre-leases with KBRwyle; we also signed a 183,000 square foot build-to-suit at the National Business Park. That tenant is a Fortune 100 company and a key defense contractor delivering secure infrastructure, artificial intelligence, and cloud computing services to U.S. defense and intelligence agencies. By choosing the National Business Park for its local headquarters, they further cement how dominant our location is for serving missions at Fort Meade. Thus far in Q3, we've signed a 53,000 square foot lease at 8000 Rideout Road with i3, a defense contractor focused on software engineering, systems integration, and IT. Consequently, that project is now 73% leased, and we're in advanced talks on leases that will stabilize the building. Finally, we're in advanced negotiations with a defense contractor for a 2-building campus at Redstone Gateway totaling 250,000 square feet. Those leases would push our total development leasing for the year to 950,000 square feet. Given the 1.8 million square feet of opportunities sitting in our development leasing pipeline, our confidence is high that our 2021 development leasing goal will be achieved; having said that, I'll hand the call over to Anthony.
Anthony Mifsud
executiveThanks, Todd. For the second quarter, FFO per share as adjusted for comparability came in at $0.58, which beat the top end of our guidance by $0.01, mostly because same-property results were stronger. Thanks to effective expense management and the timing of R&M projects, operating costs were lower, and that lifted second quarter same-property cash NOI by almost $0.02 beyond what we had forecast for the second quarter. These R&M projects should be finished in the third and fourth quarters, and that will affect quarterly same-property cash NOI and FFO per share, as you can see on Page 18 of the results deck. Even so, better-than-anticipated operating savings and leasing results have lifted our same-property cash NOI projection for a second straight quarter. For the full year, we're now looking at same-property cash NOI that's either unchanged or up as much as 1%. At the midpoint, that's 150 basis points higher than what we originally guided. Our full year occupancy guidance stays at 90% to 92%, and that still factors in the drag from joint venturing fully occupied, wholly owned data center shells to raise equity, plus the surprise vacancy in December of the 121,000 square foot contractor building at Redstone Gateway. Earlier this month—June—we completed the sale of two data center shells into a freshly formed joint venture, split 90:10, alongside Blackstone Real Estate. That transaction brought in $107 million. Those assets had been valued at $119 million, so the deal delivered a 48% profit, showing the kind of worth our development efforts generate. Counting three properties still under development, we hold full ownership of ten data center shells, and we figure those are worth over $750 million in equity value—something we could turn into cash to cover the equity portion of upcoming development. And finally, for the reasons we've already gone over, we're raising our guidance for the full year: it moves up from the earlier, already-high range of $2.19 to $2.25, landing at a new range of $2.24 to $2.28. Based on the revised guidance we've provided, growth would land somewhere between 5.7% and 7.5% compared with 2020's results, putting the midpoint at 6.6%. One thing worth highlighting: the bulk of that upward revision to guidance comes from early development deliveries, while the NOI we expect from those developments in 2022 hasn't changed. For the third and fourth quarters, we're setting ranges for FFO per share guidance, adjusted for comparability, of $0.54 to $0.56 and $0.56 to $0.58, respectively. The $0.55 midpoint for the third quarter accounts for a full quarter of dilution tied to the 2 data center shells we brought into a joint venture in June, along with carrying out additional R&M projects. With that said, I'll hand the call back over to Steve.
Steve Budorick
executiveThanks. Halfway through the year, our FFO results have come in well ahead of what our business plan projected; this quarter marks the fifth occasion out of the last 6 quarters where we beat our plan, and the third instance in which we raised guidance for full year FFO. Metrics that matter most to us, including vacancy leasing and development leasing, are performing at or better than planned. It's evident that our approach — focusing investments near priority Department of Defense missions and generating value via low-risk developments at those sites — is producing FFO growth and bringing down our cost of capital. That approach keeps giving us more than 1 million square feet of fresh development opportunities each year, and consequently, high-value defense/IT assets that pay off for our shareholders over the long term. This year, our development capability excellence is not only delivering projects on budget and on time, in several instances, we're wrapping up projects ahead of schedule and pulling our bottom line results forward. Our property operations excellence is squeezing extra performance out of our portfolio and lifting our same-property results. Our highly durable operating portfolio, strong balance sheet and reliable low-risk development program, together produce the very visible growth we are delivering; we have a strong set of development and leasing opportunities in front of us and the balance sheet and access to capital to grab them. With that, operator, please open up the call for questions.
Emmanuel Korchman
analystYou all discussed the interest at Redstone Gateway, particularly regarding filling the space that will soon be emptied. Do you believe that this extra demand will result in additional construction there too? Or do you simply feel better about re-leasing that area you hadn't anticipated recovering but now have?
Steve Budorick
executiveSo, like Todd said, 2 contractors are competing to take over that tenant's spot in RG 1200, and just one of them will be a match. Consequently, yes, we figure we'll steer the other toward a new development.
Emmanuel Korchman
analystSo Steve, what I'm really asking is this — had you already been talking with them about development, and one of those discussions will now be resolved through filling this existing building? Or did those talks only begin after the tenant moved out?
Steve Budorick
executiveOpportunities like these come together quite quickly. So building something for them wasn't something we had lined up. It's possible it would have come about if this situation hadn't arisen. That said, given what's available, they view it as a compelling chance to act faster.
Emmanuel Korchman
analystSo, returning to DC-6, the subject we keep coming back to. You sound frustrated by how this is going. Investors definitely share that frustration. Is there anything else that could shift as — during your talks? Or is it purely a matter of waiting for someone to take up the pen and close the deal?
Steve Budorick
executiveIt's genuinely a matter of waiting for the point of contact to devote some time and effort to getting the documents finalized.
Emmanuel Korchman
analystIs there a fresh estimate you can give about the timing for that being finished? Or would you rather not go there?
Steve Budorick
executiveThat's not something I deal with anymore. My track record has been off repeatedly, one time after another. Back in June, Manny, we felt quite hopeful that we would get it closed out, and then across July absolutely nothing took place. So the waiting goes on.
Emmanuel Korchman
analystSteve, would you say they're actually responding? Or is it really just complete silence on their end?
Steve Budorick
executiveHow should I put this? They act as though they're answering us, yet when it comes down to it, nothing gets done.
Craig Mailman
analystI suppose we'll keep going on the DC-6 topic for a moment. You had mentioned a rent reduction of 10% to 15%. Is that still what you're expecting? And beyond that, are these tenants attempting to secure any sort of early termination from you? Or anything else that might affect how sellable the asset is if you eventually decide to take it to market?
Steve Budorick
executiveWe believe we arrived at business terms back in June. I'd rather not disclose every detail of their lease, but I'd say the structure looks nearly the same as the lease we originally had.
Craig Mailman
analystAll right, and does that mark-to-market figure still sit roughly where we thought it would?
Steve Budorick
executiveCorrect.
Craig Mailman
analystAll right. And there weren't any early termination options in that initial lease, correct?
Steve Budorick
executiveWell, they did hold a right to end it ahead of schedule, but doing so carried a substantial penalty.
Craig Mailman
analystAll right. Then, broadly speaking about development, you folks are executing quite a few lease agreements. With various building products in short supply these days, are you running into any difficulties obtaining materials? Or is it your sense that a comparable rate of deliveries to what you've traditionally achieved can be sustained?
Steve Budorick
executiveWell, our remarks indicated that a pair of these projects will wrap up ahead of our original expectations; securing both the materials and the labor required to deliver has presented zero difficulties for us. Just last year, two of those projects got signed. Thus, the majority of development moved forward across that stretch when shortages were being discussed extensively. No problems have arisen on our end.
Craig Mailman
analystAll right, and that's my final item. Any news regarding 310 NBP? I believe you mentioned a portion would be rented by 2Q, with the remainder by year-end. What does the schedule look like now?
Steve Budorick
executiveActually, I'd say your recollection isn't quite right; our statement was that 2 floors would be taken by the close of the government fiscal year, that being 9/30. As for the other 2, our expectation is they'll be leased by the close of the calendar year, or 12/31.
Craig Mailman
analystAll right, does that timeline still hold up?
Steve Budorick
executiveYes, it does.
Steve Sakwa
analystAnthony, I'd like your help walking through that 90% to 92% same-store occupancy goal. I understand the RG 1200 project added some vacancy to the portfolio. I can sort of see how the midpoint or the high end might happen, but could you help us understand how the low end could occur right now, since we're basically in August or almost August?
Anthony Mifsud
executiveSure — the low end assumes the effect of 1 to 2 deals, or extra data center shell sales, that appear in our 6/30 results as transactions that are 100% leased. If each one of those deals moves year-end same office occupancy by roughly 20 basis points, that happens only if we complete both. We're handling each according to when our development capital is needed, so the real issue is whether we close the second data center shell sale.
Steve Sakwa
analystI understand that you don't give us a broad picture of occupancy patterns. Still, if you just considered your current total occupancy, do you have any idea where it might stop falling? Once Transamerica has left, when do you expect we'll hit that low point? Or how are you approaching total occupancy more generally?
Anthony Mifsud
executiveRight. On a whole-portfolio occupancy basis, the trough will likely arrive at the close of Q1 of the coming year, at which point Transamerica will have departed and the effect of the Redstone nonrenewal will be felt. Regarding the aggregate — the overall occupancy figure, just so you know, Q2 compared with Q1 was affected by our bringing the remainder of 2100 L online; previously it wasn't included in the denominator; therefore, since it had been 12 months since its in-service date, those 81,000 square feet came online in the quarter — Q2.
Steve Sakwa
analystUnderstood. Then perhaps only one more item. Given that you brought up 2100 L, could you provide an update on the leasing front, and share your thinking regarding how you might monetize that property, perhaps after it's fully leased?
Steve Budorick
executiveAlright, Todd, how about you take the leasing question?
Todd Hartman
executiveAbsolutely. DC took a severe blow from the pandemic, and recovery there is gradual. Even so, tour activity has picked up, and for the 80,000 square feet of vacant space, we've got roughly 100,000 square feet worth of active prospects. A number of them have reached the proposal stage, while drafts are being prepared for others. So activity is rising, and it's encouraging to see more traffic — we anticipate some leasing will come out of it.
Steve Budorick
executiveAs for our perspective, once we've achieved the worth we anticipated, our clear plan is to bring that asset to market and recycle it.
Jamie Feldman
analystI'm just wondering, do you have any feel for how price discovery is shaking out regarding where cap rates sit across your various products — and across different markets — for those products in those different markets?
Steve Budorick
executiveWell, we've got an entire research piece covering exactly that. And instead of me attempting to recall on this call precisely what that piece contains, I'd prefer to wrap up by having us follow up with you — together with Stephanie, who leads IR — and provide you with some backing on those cap rates.
Jamie Feldman
analystAll right, that sounds fine. Then could you discuss the market in Baltimore? What are your views on refilling the space that you'll receive back at the start of next year, and how does that pipeline appear?
Steve Budorick
executiveOf course. Todd, would you like to take this one?
Todd Hartman
executiveOkay. Well, ever since word got out about the upcoming empty space at 100 Light, the reaction has been quite positive; roughly 120,000 feet of active interest exists for that vacancy, and approximately 80,000 of that requires occupancy in 2020. So the market's response to that space has left us fairly encouraged. Given that it's the tallest in the market, it's a rather distinctive space. So the activity we've seen to this point makes us feel encouraged.
Anthony Paolone
analystPossibly this is one for Anthony. There's guidance you've put out, and at the midpoint it appears to be a run rate for the year ending around $0.57, plus you mentioned <<inaudible>>
Steve Budorick
executiveHi, is anyone on the line?
Anthony Paolone
analystAnthony Paolone here — Tony Paolone. I'm on the line, assuming you can hear me.
Steve Budorick
executiveTony, you dropped off just as you began. So go ahead and start over from the beginning.
Anthony Paolone
analystOkay, absolutely. This next one's for Anthony, and it's really about the run rate as we head into '22, since your fourth quarter appears to land around a midpoint of $0.57 for the year, yet you now have greater visibility into certain leases that are either happening or not, plus the roll outs coming next year. Is there any way to pin down, at the bottom line, what that step down might look like beginning Jan 1, based on what you currently know relative to that run rate?
Anthony Mifsud
executiveRight. I'd say — well, regarding the effect of the 2 big nonrenewals during the first quarter, together they bring in yearly revenue of roughly $8 million. That works out to approximately $0.02 per share each quarter, provided there's no — since those take place at the start of the year, we aren't factoring in any backfill for those spaces; however, we do also capture the advantage of full quarters of development placed in service out of the fourth quarter. As a result, it could come in $0.01 or $0.02 beneath the run rate at the close of — the figure at the close of the fourth quarter.
Anthony Paolone
analystAll right, understood. Then could you give us some color on the data center shell pipeline as we look ahead about 18 months or so?
Steve Budorick
executiveCertainly; we hold land positions that could support approximately another 1 million square feet; leasing is something we anticipate next year. What has truly dictated when that leasing happens is critical power being available, since the market's availability was absorbed across the past couple of years amid strong development; overall, what we own today accounts for about 1 million, with possibly more beyond that.
Anthony Paolone
analystAll right. Given the direction cap rates appear to have taken, plus what's happening with materials costs and similar factors, do you see any yield sensitivity on projects of that kind?
Steve Budorick
executiveHonestly, cap rate matters more here than material cost does. These deals are built around a yield on cost, so as costs rise, rents rise alongside them. The real squeeze lands on the negotiated yield, since cap rates keep getting tighter.
Anthony Paolone
analystAll right, and that's my final question. You folks have managed to lift your outlook and you've delivered growth. Do you have any thoughts regarding the dividend? And when might we possibly witness a shift on that front at some stage?
Steve Budorick
executiveYou take it.
Anthony Mifsud
executiveAbsolutely; the way we look at the dividend is still through the lens of capital allocation. And because the opportunities we have for development are still quite strong, and at present there's no tax structure reason for us to raise the dividend. That extra net operating cash flow is being used by us simply to control how much equity we must bring in annually to fund the development pipeline. So right now, when it comes to our dividend — our payout ratio is extremely solid, and there's capacity for us to increase it whenever we either have to for tax purposes or we conclude that — yes, we lack development opportunities to put money into.
David Rodgers
analystYou've already covered quite a bit. But Steve, perhaps you could address the newer JEDI announcement, plus how the defense community reacted or what impact it had, and whether that creates or removes any near-term opportunities that you had previously intended to pursue?
Steve Budorick
executiveWell, I'd say visibility in that area remains limited. Yet from the start, we never really thought JEDI would deliver a significant lift to our business, since our data center shell customer hadn't truly discussed what effect it would have. Our view is that if multiple vendors are involved, the set of possibilities open to us would be larger, given some of the excellent sites we hold. Still, it's quite early to identify a definite path.
David Rodgers
analystThat's useful, Steve, I appreciate it. Then perhaps a question for Anthony. If you already covered this and I didn't catch it, please tell me. Regarding the Baltimore lease, where you'll recover that space during Q3 of '22, but it appears the gap rent gets reset in Q3 of '21 — is there any significant effect from that which we ought to consider?
Anthony Mifsud
executiveThat rent is coming down roughly 10% compared with what we pay now. It would begin the month following our execution of the renewal with the tenant; so at present, our forecast — the guidance we currently have — puts that into effect as of September 1.
Bill Crow
analystSteve, perhaps this is only how I heard it, but I came away thinking you considered 1 million square feet of development leasing easily within reach — possibly even a modest target. So I keep asking myself whether — though once more, it could simply be my own misunderstanding. What is your level of confidence about potentially exceeding 1 million square feet by a wide margin during this year?
Steve Budorick
executiveBill, it comes down to timing. A number of projects we anticipate winning might land before the year ends, and that would take us materially higher. The problem is timing — my confidence in when that happens isn't strong enough for me to include it in a forward-looking statement.
Bill Crow
analystOkay, got it. Thanks for that. And sorry, just a quick thing about DC-6 — how have market rents moved during the last 12 months at competing projects?
Steve Budorick
executiveOur renewal rate matches what other big deployment renewals have seen over roughly the past 6 to 12 months. On new leasing, those rates are much lower — possibly up to $15 per kilowatt per month — but as far as renewals go, we're squarely within the market range.
Bill Crow
analystSo regarding that fresh lease agreement, the decreases we're seeing in rates stem from an oversupply of square footage, insufficient tenant interest, lower construction costs, and rivals in the market. So what exactly is pushing those rental prices lower?
Steve Budorick
executiveYeah, my take is it comes down to projects built on speculation that require generating some revenue for those properties.
William Catherwood
analystTodd, during the remarks you'd prepared, you brought up a leasing activity ratio of 105%, which as I recall you described as a company high. How does that stack up against earlier periods — perhaps the prior quarter or 12 months back? And do you likewise monitor how long leases take to move from the initial activity and interest through documentation and on to execution? Because that stretch seems to have grown longer and longer across recent years.
Todd Hartman
executiveWell, obviously the pandemic had an effect on that ratio. Right now we're sitting at levels close to what we saw before the pandemic. But it fell throughout the pandemic, and since late last year it has been climbing steadily, and now post-pandemic, it's — whether it's an all-time high, I'm not sure, but it's at a high we haven't seen in at least 18 months, I'll say. As for the time involved in leasing, we don't officially track that, but from talking with our leasing teams and our asset managers, it's clear the deal cycles have stretched out, something that might have been a 4-month cycle before is now 5 or 6 and 6 months might be 8. It comes down to tenants having a lot of opportunity, where they're looking at a lot of different spaces and taking their time to make their decisions. So the good news is people are moving through the pipeline, just seems to be taking a little bit longer than it used to.
William Catherwood
analystGot it. Then it was encouraging to see leasing rise, clearly, in every area this quarter, yet Northern Virginia also saw an increase, and that region has — appears to have been somewhat slower during recent years. Could you share your thoughts on what's been happening there lately? And do you expect to secure additional vacancy leasing in that location soon?
Todd Hartman
executiveYes, it's among the regions where activity has recently picked up. The ratio for activity there is quite robust, and it has been gaining momentum through the past 3 months. Once more, we'd expect to finalize a portion of that activity, though I'm unable to say precisely when that might occur.
William Catherwood
analystUnderstood. Then here's my final question, and it may be directed at Steve. You brought up completing that San Antonio project ahead of schedule. You hold several properties in that area near Lackland. Clearly, every one of those has been entirely leased out for quite some time. What sort of chance exists for possibly growing your holdings in that market? Is there anything further coming up soon?
Steve Budorick
executiveNothing soon is what I'd anticipate; the land we had on our balance sheet has all been used up at this point. Still, in the end, we anticipate that mission will keep expanding. We also possess capacity within defense to serve the government, and when chances arise with contractors, we'll need to find some additional land, though I wouldn't anticipate anything within the coming 12 to 18 months.
Chris Lucas
analystSteve, I just wanted to ask a bit more about what you said regarding possible development leasing transactions at Redstone. I'm wondering if those transactions would fall within the exterior — meaning land outside defense — or within defense, or possibly some mix of both?
Steve Budorick
executiveThe items we're trying to finalize at present, plus a start we're considering we may include, are entirely outside defense. Opportunity exists over a longer horizon inside defense.
Chris Lucas
analystOkay. Now Anthony, I'd like to ask about those capital raises tied to the data shell. My recollection is that earlier this year you mentioned a set of transactions that would get done across Q2, Q3, and Q4. From what you're saying now, it seems your confidence has dropped, or maybe not all of the deals you originally pointed to actually need to be finished within this year. Can you walk us through where things stand right now with the data shell JV process?
Anthony Mifsud
executiveAbsolutely. Under the forecast we're working with today, we expect to close one more joint venture before the third quarter wraps up. Based on how we're looking at things right now — and this really comes down to having some extra EBITDA coming in from running the portfolio, which keeps our leverage where we want it — we don't see a need for another deal in Q4. So as things stand, we'd be looking at a joint venture involving as many as two data center shells, possibly wrapping up before Q3 ends, and once that's done, we'd be finished with transactions for the rest of the year.
Steve Budorick
executiveThanks, everyone, for being on the call today. This afternoon we'll be at our offices, so if you'd like a follow-up call, please get in touch through Stephanie to set it up.
Operator
operatorWe appreciate everyone joining us for Corporate Office Properties Trust's conference call covering the results of the second quarter of 2021. That wraps up our presentation. You are free to disconnect at this point. Have a good day.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete COPT Defense Properties transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to COPT Defense Properties earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in COPT Defense Properties or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.