executiveHello, everyone, and thanks for being with us on this call. The materials we’ve provided for earnings, which include the remarks prepared for today, feature forward-looking statements and estimates that carry a range of risks and uncertainties. For a look at the factors that could lead to outcomes differing from what management estimates and expects, please see our filings with the SEC, among them our latest annual reports on Form 10-K and our quarterly reports on Form 10-Q. Later this morning, we’ll cover certain ways we gauge our company’s performance that aren’t recognized under GAAP. You can find a reconciliation of our non-GAAP measures to the closest comparable GAAP financial measures, which we are able to calculate, in the earnings release kit. I’d urge you to go to our Investor Relations website, where you can review both the webcast slides and the earnings release kit. With us on today’s call are Bob Blue, who serves as Chair, President, and Chief Executive Officer; Steven Ridge, Executive Vice President and Chief Financial Officer; and Diane Leopold, Executive Vice President and Chief Operating Officer. I’ll hand the call over now to Steven.
Steven Ridge
executiveThank you, David, and good morning to all of you. With the last deal tied to the business review now finished, I want to begin by noting that Dominion Energy has been repositioned to deliver strong long-term value for shareholders, customers, and employees. From our investor meeting on March 1st onward, we've been consistent in communicating these three priorities: first, meeting our financial plan; second, bringing offshore wind in on schedule and within budget; and third, securing constructive regulatory outcomes. By accomplishing these objectives, we enable our employees to fulfill our essential mission of supplying reliable, affordable, and progressively cleaner energy that serves our customers daily; during today's call, we'll cover each of these focus areas. Alright, let's start with how we're tracking against our financial plan. On slide three, you'll see that operating earnings for Q3 landed at $0.98 per share, and during this period we had normal weather throughout the areas our utility serves. When it comes to GAAP, third quarter results were $1.12 per share. As always, you can find a breakdown of every factor that drove earnings relative to the same quarter last year in Schedule 4 of the earnings release kit, and Schedule 2 lays out all the adjustments made between operating and reported results. Now that we've reported nine months of 2024 financial results, we're narrowing our full-year guidance range to $2.68-$2.83 per share, while the midpoint stays at the original $2.75. During our last call, we mentioned that fourth-quarter results would take a hit from financing costs that exceeded our forecasts, plus the usual timing pattern where operating and maintenance expenses move out of the first half and into the second half of the year. On top of that, Q4 earnings will face additional pressure because the CVOW partnership closed ahead of schedule — the non-controlling interest gain tied to it, after accounting for debt reduction, is being recognized sooner than we'd expected. Honestly, I'm pleased that particular assumption proved overly cautious, since getting that deal done early represents a meaningful reduction of risk for our plan. Turning quickly to the 2025 through 2029 period, our prior guidance remains entirely unchanged. We're holding steady on every part of our guidance. That covers operating earnings per share for 2025 in the range of $3.25 to $3.54, and that figure includes roughly $0.10 tied to RNG 45Z credit income, with the midpoint sitting at $3.40. Our projection for annual operating earnings growth remains in the 5%-7% band through 2029, measured against a 2025 midpoint of $3.30, and that outlook leaves out the RNG 45Z credits because the legislation sunsets that credit once 2027 ends. One thing to keep in mind: we still anticipate some fluctuation inside that yearly 5%-7% growth range, and that's driven by the refueling schedule at Millstone, which calls for a second planned outage every third year. Finally, during our Q4 earnings call—which, as always, happens in early 2025—we'll provide a full update on our capital investment forecast through 2029. Now let's look at slide four. As I noted before, I'm very pleased to say we've now finalized every one of the debt reduction initiatives we told you about during the business review—all 100%. Beginning with developments since our last discussion, we have finished both the sale of Public Service Company of North Carolina to Enbridge and the CVOW partnership with Stonepeak. Taken together with earlier closings, that work amounted to roughly $21 billion of debt reduction, spread across six distinct transactions, each needing various federal and state regulatory sign-offs, and every one of them wrapped up on or before the schedule we'd shared publicly; in our view that's a major accomplishment, and it was only possible thanks to cooperation from our counterparties and the dedication of our workforce. We're grateful for the careful, thorough scrutiny our regulators gave everything. Let me wrap up my comments by discussing the financing plan, which you can see on slide five. Once the third-quarter financing moves were done, among them our $1.2 billion VEPCO debt issuance along with $200 million of ATM issuance, our 2024 financing plan stands fully accomplished. We'll keep looking at options to de-risk what the company needs to finance in 2025 by tapping the market at opportune moments for the rest of the year, whenever conditions justify it. As an example, you'll notice in the 10-Q filing that we've already made early progress on the 2025 guided ATM issuance, having sold approximately $200 million of shares through the traditional forward sale structure, which we anticipate settling at the end of 2025. To close, I want to restate my strong confidence that we can deliver on our financial plan. The guidance issued after the review was intentionally designed to be suitably conservative, yet not excessively so, so we can handle any unexpected difficulties that arise. With that, I'll hand things over to Bob.
Bob Blue
executiveThanks, Steven, and good morning to everyone. To begin my comments, I want to draw attention to how we've done on safety. Slide six shows that our OSHA recordable injury rate among employees during the first nine months of this year came in at 0.44, which continues the favorable direction we've seen over the past two years. I want to recognize my coworkers for the steady dedication they show to keeping employees safe — that commitment sits at the heart of who we are. Near the end of September, Hurricane Helene brought historic destruction to numerous communities, some of them located in our South Carolina service territory. Because of that, our infrastructure suffered substantial damage, resulting in close to 450,000 service disruptions. When the storm was at its worst, roughly half of our electric customers in South Carolina had no power. Not since Hurricane Hugo, 35 years back, had a storm of this magnitude struck our South Carolina system. Many of our employees were themselves without water or power, yet they labored around the clock under difficult circumstances to bring power back to customers quickly and safely. More than 1,000 of our Virginia team members and partners headed south to help them. Restoring service required swapping out more than 1,000 transformers, 2,300 poles, and 7,000 spans of wire. Our final accounting isn't finished yet, but our preliminary figure for restoration costs, capital expenditures included, falls somewhere between $100-$200 million. Since those costs should exceed $100 million, our plan is to collaborate with the Office of Regulatory Staff and key stakeholders to consider whether to securitize the deferred costs; we recognize this storm touched so many lives, our employees among them, and our thoughts remain with the families and communities now rebuilding. I could not be prouder of our employees, and I applaud everyone involved for their dedication to our customers. To help with disaster recovery and response — things like meals, shelter, emergency services, and supplies — we've given direct financial support to more than 20 different local organizations in storm-affected communities, and we'll keep seeking ways to assist our customers, employees, and communities. Now let me share a few updates on how our plan is being executed. Starting with CVOW, the project remains on schedule and within budget, matching the timelines and estimates we gave before. We just wrapped up a highly successful first season of monopile installation. Slide seven shows that we've put in 78 monopiles along with four pin piles supporting the first of three planned offshore substations. On top of that, we've installed the first two of nine marine deepwater export cables, finishing ahead of schedule. Our progress this first season makes me very happy. Besides hitting our installation target, we picked up invaluable experience and process know-how that should make the coming installation season even more productive. I'd also like to express thanks to our partners at DEME for the excellent quality of their work. Slide eight has further CVOW updates, though here are several points worth calling out. Regarding materials and equipment, we have so far received 96 monopiles at the Portsmouth Marine Terminal, which works out to 55% of the project's total. EEW, our partner, keeps delivering solid progress, and steady deliveries should continue over the weeks ahead. The three offshore substations all stay on schedule, and the first one is in final commissioning, expected to wrap up and ship to Virginia for installation ahead of the next monopile season. Final assembly is finished on 82 transition pieces, and 33 of those have arrived at the Portsmouth Marine Terminal. On top of that, tower fabrication got underway last June, and turbine manufacturing remains on schedule. Nacelle and blade production should kick off in the first quarter of 2025. On the regulatory side, as you might have noticed, this morning we submitted our 2024 offshore wind rider filing, which represents $640 million in annual revenue. Moving to slide nine, the project's expected LCOE has come down to roughly $56 per megawatt hour, driven mainly by forecasted REC prices, which have risen substantially in value. Bear in mind that higher REC prices are credited against the levelized cost of energy as value delivered to customers. On a project-to-date basis, through September 30th, we've put in about $5.3 billion and still expect to spend roughly $6 billion by year-end 2024. Also, as today's quarterly filing update shows, unused contingency currently stands at $121 million, versus $143 million in the prior quarter. Measured as a percentage of total budgeted costs remaining, the present contingency level keeps benchmarking competitively against other large infrastructure projects we've studied and ones we've finished in the past. Our team, suppliers, and partners have heard us say it plainly: delivering this project on budget is the expectation. Finally, the project stands at 43% complete, and slide 10 lays out the remaining major milestones. Now, on slide 11, let me give a few Charybdis updates. Since August, engine load testing to support crane operations has been finished, and parallel engine testing is in progress. Over the coming weeks, the crane will set the legs' final sections, along with overall electrical work enabling commissioning activities. The vessel now stands at 93% complete, up from 89% at our last update. Charybdis should be finished in early 2025, in line with our prior guidance range of late 2024, early 2025. The vessel will finish sea trials, then come back to port for additional work so it can hold the turbine towers, blades, and nacelles. Nothing has changed regarding the vessel's expected availability for the current CVOW construction schedule, which we expect to begin in the third quarter next year. Nor is there any change to the vessel's cost of $715 million. Turning to slide 12, we're still seeing robust expansion of data centers in Virginia, and so far this year we've brought 14 new ones online. Our projection for 2024 is now 16 data center connections, which is an increase from the 15 we mentioned in our previous update. Going back to 2013, we've typically averaged about 15 connections annually. Now looking at data center demand on slide 13, these agreements fall into three categories: first, substation engineering letters of authorization; second, construction letters of authorization; and third, electrical service agreements. As a customer progresses from the first to the third, their financial commitment and obligation grow. Right now we are evaluating roughly 8 GW of data center demand that sits within the substation engineering letters of authorization phase, meaning those customers have asked us to start the engineering work needed for new distribution and substation infrastructure to serve them. In addition, there's approximately 6 GW of data center demand with executed construction letters of authorization — these are contracts that let construction begin on the distribution and substation electric infrastructure required. If a customer at this stage decides to abandon a project, they must repay Dominion for the investment we've made so far. Lastly, the 8 GW covered by electrical service agreements, or ESA, are contracts for electric service between Dominion Energy and a customer. Every contract is set up for an individual account.
Bob Blue
executiveWhen a customer signs an ESA, they're making a commitment to use a set amount of power each year, and often there are ramp schedules involved, meaning the contracted usage rises as time goes on. Taken together, our data center demand stood at more than 21 GW as of July 2024, up from roughly 16 GW as of July 2023. Those contracted figures don't account for the numerous data center projects still in the development stage that haven't yet gotten far enough along in the service connection process for a contract to be signed. Moving to slide 14, I'd like to give you an update on how we're planning our transmission system. As I've mentioned before, the PJM DOM zone is seeing load growth on a scale never seen before. That's led to an equally unprecedented rise in both how many delivery point requests for transmission service on our system we're getting and how large they are; to put it in perspective, through September of this year we've gotten 63 construction delivery point requests, which amount to almost 13 GW of capacity. Going back to 2020, we've gotten 280 such requests, amounting to close to 40 GW of capacity. We've lately started putting process changes in place that will impact only new delivery point requests. This lets us group load requests into batches and handle them in the sequence they come in. Crucially, this means our customers can keep relying on strong system reliability even while demand grows significantly. Ever since we started telling people about these changes, demand from customers has remained strong. Moving to slide 15, I want to share some other business updates. To start, on transmission, back in September we put forward project proposals in PJM's most recent open window process, both for our own transmission portfolio and through a joint planning agreement with AEP and FirstEnergy; in our view, this kind of regional collaboration lets our companies provide customers with superior solutions compared to what any of us could deliver on our own. Final project selections from PJM aren't coming until early 2025, but the region genuinely needs substantial new transmission, and we anticipate this open window will show that. Keep in mind that a year ago, we won more than 150 transmission projects worth a total of $2.5 billion. On the generation side, we've made several announcements in recent weeks. To begin, on October 1st, we submitted our annual update along with the subsequent license renewal proceeding for the Surry and North Anna nuclear units, looking to recover costs from the North Anna extension as well as costs tied to phase two of the broader nuclear life extension program, which covers investments made during calendar years 2025 through 2027. Then on October 15th, we filed our next batch of utility-scale solar projects with the Virginia SCC, amounting to about $600 million of investment; additionally, on October 15th, we submitted our 2024 Virginia Integrated Resource Plan, which laid out multiple possible generation build portfolios adding resource capacity across both renewable and dispatchable generation technologies, responding to ongoing robust load growth and shifts in PJM's resource adequacy values. According to the IRP, we need to add more of everything—solar, storage, wind, gas, and nuclear as well. With that in mind, let's look at slide 16. We said on October 16th that we'd signed an MoU with Amazon to keep examining whether SMR technology could feasibly be built at North Anna. Let me be clear about our aim: we want to back customer power needs and push next-generation nuclear forward while shielding our customers, those who provide our capital, our business risk profile, and our balance sheet from the hazards that development brings, first-of-a-kind risk included. Since we're at an early point, there's a limit to what I can say about possible structures and similar matters, but I've laid out what we'll weigh when assessing any final agreement, and we'll share further information later when we're in a position to do so. I'll add that it's quite heartening when big power users, tech firms among them, show they're ready to put money in, join forces, and work together to make this promising baseload carbon-free technology a reality. One last thing: we're in active talks with other possible partners who have strong interest in arrangements of the same kind. On October 24th, we completed our purchase of an offshore wind lease of roughly 40,000 acres from Avangrid, which amounts to about 800 MW of extra possible regulated offshore wind generation. That comes on top of the lease area we obtained next to CVOW, which might allow for still more regulated offshore wind down the road. There are no timelines for how, when, or at what cost these options could be moved forward. The distinctive skills and proprietary know-how in offshore wind that we've built up via our CVOW project give our customers an edge over competitors. Taken together, these announcements show an all-of-the-above strategy for serving rising demand, and we're eager to engage productively with every stakeholder on these efforts. As we've previously stated, in looking at demand growth we consider the entire value chain—investment in transmission, distribution, and generation infrastructure that has driven, and will keep driving, utility rate-based growth. With those drivers in place, we anticipate chances for additional regulated capital investment late in our plan and afterward. As mentioned, we intend to refresh our capital guidance during our fourth quarter earnings call in early 2025. As ever, we'll assess incremental capital by considering customer affordability, system reliability, balance sheet conservatism, and our low-risk profile. On affordability for customers, as slide 17 shows, our present residential electric rates at DEV and DESC sit 14% and 11% under the U.S. average, respectively, and under the build plans put forward in each state's most recent IRP, both will keep customer bill growth rates across the forecast periods beneath today's electricity inflation levels. Now to regulatory updates in South Carolina and North Carolina on slide 18. During the previous quarter's call, we told you about a settlement we reached with the Office of Regulatory Staff along with other intervenors in South Carolina concerning our electric rate case. The South Carolina Public Service Commission gave that settlement its approval back in August, and the new rates took effect on September 1st. On top of that, those shaping policy keep weighing possible energy legislation, and they appreciated how much time the legislature has devoted to this important matter so far. We have said before that we remain dedicated to backing South Carolina's expanding economy. That said, as our testimony made clear, the way DESC is regulated produces regulatory lag, which leaves us with virtually no practical path to earning the return we are permitted — particularly when measured against other regulated jurisdictions and the regulatory jurisdictions across the surrounding southeast as well. Turning to North Carolina, on October 1st we secured a settlement with the Public Staff and other intervenors in our base rate proceeding. It delivers a revenue requirement increase of roughly $37 million, built on a 9.95% ROE and a 52.5% equity layer. That agreement further provides that $9 million of yearly ongoing CCR costs be taken out of base rates and moved into a standalone rider that must be approved. Interim rates take effect today in North Carolina while we await the commission's final order. Taken as a whole, we keep securing constructive results across every one of our regulated service territories. Before wrapping up my remarks, allow me to offer a few thoughts on Millstone. We have expressed this before: Millstone, in our view, is an extremely valuable asset.
Bob Blue
executiveOver 90% of Connecticut's carbon-free electricity comes from it, and through late 2029, a fixed-price contract covers 55% of its output. Our hedging program substantially reduces risk on what's left. As a lot of you know, New England — and Massachusetts in particular — has seen legislative activity lately aimed at greenlighting additional nuclear power procurements down the road. We've kept talking with numerous parties in that region to secure the greatest value for Millstone. Beyond procurement backed by the state, we're also looking into the possibility of backing incremental data center activity; it's our strong belief that any data center option must be pursued collaboratively alongside Connecticut stakeholders. Right now, no timeline exists for potential announcements, but this stays top of mind for us; that said, let me wrap up our comments on slide 19. Safety results for this quarter remain solid, though additional effort is needed to bring injuries down to zero. Every piece of financial guidance from March 1 was reaffirmed, and we narrowed the 2024 earnings guidance range. Our offshore wind project is still on time and on budget. We keep making the investments required to supply the reliable, affordable, and progressively cleaner energy that serves our customers daily, and execution is our 100% focus. We recognize we have to keep delivering, and we will. With that, we're ready for your questions.
Shar Pourreza
executiveHey, guys. Good morning.
Bob Blue
executiveMorning, Shar.
Shar Pourreza
executiveBob, to revisit what you said regarding the Amazon arrangement and possible additional partners — could you share a little more detail about those other discussions? What kind of schedule are we looking at? Does it involve the same technology, or various SMR designs? Also, has any hyperscaler shown interest in the OSW? Thanks.
Bob Blue
executiveSure, Shar, that's a terrific question. What we've been discussing with Amazon and other parties has centered largely on this emerging SMR technology. Allow me to elaborate on that a bit. When you consider the reasons SMRs have moved into the national spotlight lately, there are really 3 factors. First, substantial demand growth, driven in significant measure by large consumers such as data centers. Second, an ongoing emphasis on round-the-clock carbon-free generation in order to satisfy reliability and carbon reduction objectives; and third, a belief that American leadership in nuclear technology matters for national security; and when you think about it, our Virginia utility sits precisely at the crossroads of all 3. There's no question that Virginia is still seeing a lot of load growth. By 2039, we expect our power demand to be twice what it is now. Virginia has a state law called the Virginia Clean Economy Act, which requires a carbon-free grid by 2045, and it includes off-ramps for reliability. On top of that, we serve some of the nation's most critical national security and defense installations, including the Pentagon, the CIA, Fort Belvoir, and the Norfolk Naval Base. I'd also note that Virginia may well be the most nuclear-friendly state in the country, with strong bipartisan backing for next-generation nuclear initiatives. Governor Youngkin, along with Senators Warner and Kaine, has endorsed these efforts. They were all with us at our Amazon announcement recently. Virginia's legislature approved a bill with strong support from both parties, letting businesses seek reimbursement for expenses tied to developing specific SMR projects. Consider also that our state hosts major nuclear players: Huntington Ingalls, Newport News, BWXT, Framatome and Lynchburg, plus the long-running reactors at North Anna and Surry. With that context, it makes sense our biggest customers, seeing us as a dependable nuclear operator, would want to work together on potentially advancing these technologies. Naturally, we've had discussions with Amazon and other parties. With that said, we need to approach this with real discipline. We have to protect both our customers and our investors from unnecessary cost exposure and development risk. So we'll take a careful, clear-eyed look at whether SMR technology is feasible for meeting what our customers need. Alongside offshore wind and battery storage, it could be one piece of a broader strategy. Down the road, it may prove to be a meaningful contributor to Virginia's expanding clean energy portfolio. To that end, we put out an RFP last summer to assess the available technologies. Yet technology alone isn't enough — we also have to be prudent when it comes to financing. As I said during my prepared remarks, I'm not able to get into the details of where we stand with Amazon or any of the other parties that have expressed interest. What I can share is that this is built around these customers, Amazon in particular. Our relationship with them goes back a long way. They've shown both a willingness and an interest to put funding in. A build-own transfer structure is one possibility we could pursue. Fundamentally, whichever framework we end up agreeing on with Amazon or with other interested parties needs to address first-of-a-kind risk, and it also needs to address cost overrun risk, so that the burden doesn't fall on our customers or on Dominion Energy. We have to protect our balance sheet and our business risk profile. We feel a great deal of excitement and optimism regarding our deal with Amazon and our talks with other parties about small modular reactors. On the principles I just laid out, we will not budge.
Shar Pourreza
executiveDo any of the hyperscalers have interest in offshore wind?
Bob Blue
executiveWe have discussed those somewhat, though lately what our talks with them have centered on is SMRs. Keep in mind, we have the contracted — I mean the regulated CVOW that is under construction right now. Its cost recovery is already clearly established. And like we mentioned during the prepared remarks, Shar, we hold those two additional options, but at this stage we don't have any decisions or timelines. Our attention is firmly on delivering CVOW on schedule and within budget. So holding conversations with them regarding future offshore wind would truly be premature. And the offshore wind project is currently moving forward under a standard regulatory construct.
Shar Pourreza
executiveUnderstood. Then, as a final point, regarding the IRP that was submitted a few weeks back, the scenarios for the portfolio appear to suggest that, when it comes to capacity, you'd be in a somewhat short position in the state. Why not include additional generation in the plan right now? There's too much political sensitivity around gas in the state. Why does the plan rely so heavily on PJM? Thanks, guys.
Bob Blue
executiveShar, thank you for raising that — it's an excellent point. We're seeing significant demand expansion across our Virginia service territory, and that's genuinely thrilling. When you examine the integrated resource plan, you'll find we're constructing an enormous amount. Every segment of our generation mix is involved. We may potentially double our offshore wind capacity. We're incorporating far more natural gas compared to what appeared in the prior year's IRP. We're bringing in more solar than even the Clean Economy Act mandates, plus sizable quantities of battery storage. It seems reasonable to say that although we remain fully aware of PJM's operational limits, this blueprint involves us building an enormous amount. Whenever it's sensible—considering both dependability and what customers can afford—we'll seek out chances to do additional work. Still, our current plan strikes us as quite ambitious, given that it rests on a very large projected demand.
Shar Pourreza
executivePerfect. Congrats, guys, on the results. Really see you in a week.
Bob Blue
executiveThanks, Shar.
Nick Campanella
analystNick Campanella here with a couple of questions, thanks for having me.
Bob Blue
executiveGood morning, Nick. Hello there, Nick.
Nick Campanella
analystGood morning. I'd like to follow up on what was said about Millstone, staying with the nuclear topic. You seem to be describing a search for its highest value. Compared with what you might have been considering back at the analyst day, the range of possibilities appears to have grown. Could you perhaps explain whether a data center might go there? My understanding is that an upgrade has already been completed at that site, yet are there any additionality choices worth evaluating? In what way might all of this fit together? Thank you.
Bob Blue
executiveYes, Nick, we are examining whether upgrades could be made at Millstone, especially unit two, the smaller of those two units. That said, as our prepared remarks noted, New England may offer possible routes to contracted procurement. Should it be arranged in a manner that satisfies every stakeholder in Connecticut, a data center could potentially be sited there as well. Those discussions, however, remain at an early stage. As a result, beyond what we have already set out, there is nothing further we can share with you today.
Nick Campanella
analystAll right, thank you for that. Now, if I consider what has accumulated step by step since the analyst day you described — you submitted this IRP, you brought attention to that RTEP process, and I'm confident we'll have clarity on it during the fourth quarter call. Clearly, CapEx is climbing, but when you take into account the balance sheet together with the financing outlook, and when you also factor in that a portion of this capital may end up being more formulaic than was true previously, where do you believe you can realistically take rate-based growth relative to where it sits now? Is this going to extend the growth you're already getting from rate increases, or does it really function more as something added on top? That's everything I have.
Bob Blue
executiveYeah, Nick, great question. We've put a lot of thought into this. Back at our analyst day on March 1, we stated plainly that what we're providing is a strong, sustainable operating and financial roadmap, featuring goals we anticipate meeting reliably. I really want to emphasize that term — reliably. The roadmap is built on suitably cautious presumptions. So, we serve premium markets across the Southeast, specifically Virginia and South Carolina. We do see further chances that could make our position even stronger and, like you mentioned, might even stretch out the long-term growth rate that comes during the later portion of the plan. Still, our focus is on an approach that sets us up to produce results you can count on year after year, along with solid performance over the long haul. So, as you pointed out, we'll give you an update on our CapEx plan during the fourth quarter call, which is only three months away. At that point, we'll emphasize how committed we are to discipline, growth, and operational excellence. That said, the feedback I've gotten from investors supports sticking with consistent execution against the targets we already shared on the first of March.
Steven Ridge
executiveAnd Nick, let me just jump in there. I believe we've mentioned this in a number of settings, and I'll say it once more on today's call: our view is that any skew in our capital plan is likely to the upside. Given the amount of time required to plan projects and to put capital to work, that chance would most likely emerge near the latter portion of the 2025 to 2029 window. You brought up the balance sheet as well. Throughout the review, we put in significant effort to build a balance sheet carrying a suitable level of cushion. As additional capital enters our plan, we'll be deliberate about the way we fund it. Capital projects aren't all the same. Internally, we devote considerable time to considering how quickly cash converts. Certain projects transform investment into cash flow faster than others do. A blend of those traits will be necessary as we construct our plan; even so, we'll stay highly attentive to financing it in a manner that maintains the cushion we've worked so hard to build and will keep in place.
Nick Campanella
analystAlright, we appreciate the comments today.
Bob Blue
executiveThank you, Nick.
Ross Fowler
analystGood morning. Perhaps we could spend a moment on South Carolina, since the electric settlement and the approval are already in place there. How are you viewing the timeline going forward, particularly with legislation that might advance next year? And is the thinking essentially that economic development sits on one side, while—as you mentioned, Bob, in your remarks—there also needs to be something addressing regulatory lag within the state? Then, as a follow-on, does a fresh nuclear possibility exist there, or an opportunity involving nuclear? In other words, how should we frame what happened with V.C. Summer that we all lived through against the fact that the site may have room for SMRs or some other option?
Bob Blue
executiveOkay, I'll take the second item first. As we've stated in public, we aren't looking to bring back V.C. Summer — specifically those new units at that location. More generally, regarding what you asked, the Senate Select Energy Committee, as you're aware and as you mentioned, keeps gathering on a routine basis to craft a companion bill matching the one the House delivered near the close of the 2024 session. Those talks, as you know, have stayed centered on giving us the go-ahead to work with Santee Cooper on a combined cycle plant at that site. Permitting reform is another focus. Plus, there's been a great deal of discussion lately about regulatory lag. The initial legislation brought up the utility's financial health. When we consider the utility's financial health, tackling regulatory lag matters a great deal. That discussion, I believe, has grown more sharply focused of late. So the effort they're putting in has our strong backing. South Carolina is an excellent state in which to operate. It's the quickest expanding state in the nation, or at minimum among the quickest. It's a wonderful state for business, and I believe we have terrific chances to put money to work there; we'll collaborate with policymakers to tackle this lag problem. It's foremost in our thoughts. It seems to be on lawmakers' minds down there too, which is encouraging, and a session is set to begin early next year, so we'll watch how everything works out.
Ross Fowler
analystAlright, Bob. I appreciate that. Turning now to storm restoration — clearly, in my view, your team did an outstanding job restoring service to everyone who was able to receive power following the hurricane, so kudos for that. That said, how should I think about the timeline ahead for finalizing cost estimates, for evaluating what portion falls under capital versus O&M, and then walk us through once more how the cost recovery mechanisms function?
Bob Blue
executiveRight. Prior to Steven responding to that, I managed to get some time in South Carolina immediately following the storm, especially around Aiken County, and that area took the heaviest hit; the destruction I saw was considerable. I felt enormous pride in our crew for the effort they were putting in, and still are, to restore electricity for people. When we consider all this, that piece is what matters most in what we're covering here. That said, I'll hand things over to Steven so he can address when restoration is expected.
Steven Ridge
executiveWhen it comes to South Carolina, those get pushed off onto the balance sheet. Because of what this storm was like, the estimated cost leans more heavily toward capital rather than O&M. For the big outage events we experience in South Carolina and Virginia, that's somewhat out of the ordinary. Under the latest settlement we reached regarding the electric, we came to an agreement with the staff to work in good faith toward possible securitization for storm costs above $100 million. So those conversations will happen with them; I can't give you a specific timeline, but our expectation is that this will end up being a constructive recovery outcome.
Ross Fowler
analystAll right, thanks, Steven. Perhaps one final question from my side, returning to that Amazon MOU. I understand you're not able to share much here. But could you just remind us that Virginia has rate structures, as we've seen with offshore wind, where entities other than utilities are able to invest capital. My understanding is it goes as high as 80% of a project's capital. And is that the sort of thing you're alluding to when you mention build-on transfer potential?
Bob Blue
executiveRight. I don't precisely know what you're referring to regarding that 80%. And the money put into our offshore wind project was explicitly approved through legislation back in 2023. That said, there are definitely chances for bespoke contract pricing with customers, or bespoke tariffs; so that could be an option in this case. But honestly, past that and past the principles I mentioned before, there isn't much else I'm able to say at this point.
Ross Fowler
analystOkay. Understood. Thank you.
Steven Ridge
executiveThanks, Ross.
Steven Ridge
executiveHi. Good morning.
Bob Blue
executiveMorning, Jeremy.
Jeremy Tonet
analystJeremy Tonet here, from J.P. Morgan. I'll keep it brief, if that works. There's a lot of useful information in what you've shared; regarding the most recent REC figure within CVOW's LCOE, could you explain what's behind that change and how much that assumption could shift depending on modest growth and added renewables down the road? I'd just like to understand what we ought to be considering.
Steven Ridge
executiveYes, Jeremy, great question. Clearly, we witnessed a pretty big shift in CVOW's LCOE. We called out what caused it, and that's REC pricing coming in higher than expected. In terms of how the LCOE gets calculated, we built that metric so it could be compared against the legislative reference cap, a combustion turbine, which comes to $125 per megawatt hour in 2017. Let me take you through the three pieces of that calculation, so you can consider how the figure might change. First comes what is essentially a fairly simple revenue requirement tied to the cost of service build-up. That includes depreciation, maintenance, and property taxes where they apply. It also covers return on capital, the book financing for debt, plus return on equity. That part is quite simple. We've provided sensitivities indicating, "Hey, if interest rates or financing costs rise or fall, this is what would happen to the LCOE." We've also provided sensitivities for capital moving up or down. Each of those would affect it. All of that is quite simple. Next come PTCs or ITCs. PTCs are used since they're best for customers. Against that cost of service, we apply a credit for the PTC value, which strikes me as sensible; we don't expect major movement there. There is a sensitivity we have for capacity factor, which would impact the denominator and the PTC amount too; that sensitivity has been shared as well. The final piece is the REC value. Virginia's renewable portfolio standard, which comes from the Virginia Clean Economy Act, works similarly to RPS rules in other states: the legislation basically gives a renewable generation resource a credit, which moves it closer to competing on equal terms with a non-renewable resource. Therefore, if we didn't have this project — CVOW — our customers would need to buy that REC value themselves. It happens in stages, so a share of our overall load, adjusted for nuclear megawatt hours, climbs in increments all the way to 2045. It therefore goes up bit by bit, and part of that load has to be met using RECs. So we can go to customers and say: look, when you stack CVOW up against a benchmark like a combustion turbine, the RECs it creates deserve real credit. And if REC prices in the market climb, then the value CVOW delivers to customers goes up as well, because of the RECs coming out of it. That's another item that gets netted in. Where market REC prices will go, we can't fully see. We do know a few things have been pushing them higher. One is that the share of demand we're required to procure keeps ratcheting upward. In that sense, it works a lot like capacity, plus we have to hit an ever-larger share of that demand. It ratchets up beginning in 2023. Also, starting in 2025, the legislation requires that three-quarters of those RECs come from sources located in Virginia. That's a shift — previously, you could source them from anywhere within PJM. Now it has to be 75%. So when you take all of that into account, what we're seeing in the market is a supply-demand balance that's pushing REC prices upward. Where does that lead? Nobody knows. We've given you the table showing figures both with and without RECs, so you can get a sense of the effect with and without them. That's the way we laid it out for our regulators. My guess is those numbers will remain. Given the dynamics I just walked through, they'll stay robust. But we'll keep an eye on it. We're going to be upfront with everyone. The key takeaway, though, is that in our view the framework regulators established for offshore wind has produced a strong result for the people we serve. And we are intensely committed to honoring that commitment. Understood.
Jeremy Tonet
analystThat's quite useful, thanks. Perhaps we could return to transmission for a bit more, if that's alright. Regarding PJM's open window, could you elaborate further on what's possible through the joint projects you have with AEP and FirstEnergy? Specifically, how do these fit into PJM's transmission system as it exists now and as load keeps growing? Also thinking further ahead, you brought up opportunities in the back half of the plan. Any further insight into the timing of when that might actually happen?
Bob Blue
executiveYeah, Jeremy. Like we said in our remarks, we filed these proposals in early October as part of PJM's most recent open window process, and growth is occurring across PJM, and the chance to do something innovative such as this alongside AEP and FirstEnergy, we think, really we're drawing on the know-how of our amazing transmission team, AEP's amazing transmission team, and FE's amazing transmission team to achieve the most cost-effective options as demand rises, and we've discussed this for some time, more transmission is needed so that reliability can be maintained. Being able to collaborate with those companies on something somewhat different, we believe, is very logical. It might mean extra CapEx beyond the March 1 plan should PJM ultimately award the projects, but right now those projects are being reviewed. They're at an early point in development. We don't expect PJM to make a selection before the first quarter of next year. So at this point it's difficult for us to say what the pace of CapEx or the size of CapEx might be since we're awaiting more from PJM. But I'd simply say that we think this open window might be as large, or perhaps even larger, than last year's, which was, as I noted, 150 transmission projects for us totaling $2.5 billion.
Jeremy Tonet
analystUnderstood. That's reasonable. I shouldn't be getting too far ahead of myself. Just quickly, one final item, if I may, regarding what was said about generation today — with all this low growth, could you share any fresh perspective on whether this might affect, or perhaps might not affect, when coal plants get retired overall. And also, the EPA regulations concerning CCS for natural gas facilities. I'm just curious what your thinking is on how that plays in?
Bob Blue
executiveYes. Jeremy, to start, I'm impressed you've managed to ask this many questions when you aren't the only person in the queue. Well done. But let me say, regarding the EPA regulations and fossil retirements, to begin with, both of those topics are really covered in the IRP we just filed; so it's a 15-year look. And you can see there's no fossil retirements in the IRP planning horizon precisely because of the low growth we've been talking about and the low growth that's identified in the IRP; so no expectation as that document exists today, as everything that we see today, that we would be retiring any fossil units in the next decade and a half; and then as to the new EPA regulations, we actually ran scenarios in the IRP with and without those EPA regulations. And it did not swing that much what we're building. So we're going to sort of keep working through the regulations; they're obviously being litigated. But when we ran the models for the IRP, not a huge change between with and without those new EPA regs. Got it. Thank you for that. I'll have to think of more questions for next time. Thank you. Thanks, Jeremy.
Anthony Crowdell
analystMorning, everyone. Different from Jeremy, I've only got a single item to raise. It builds somewhat on what Nick asked, so truthfully, if the response is that Nick's question already covered it, that works for me. My sense is Nick cared more about the rate-based expansion narrative and possibly refreshing it. Clearly, there was news yesterday about utilities adjusting their earnings growth rates. What I want to know is what sort of calculation, or what factors do you consider while assessing your financial plan for whether a thing can be sustained, regarding whether rate-based growth gets revised. And honestly, my interest tilts more toward an earnings growth figure. Once more, don't hesitate to tell me Nick's question already handled this.
Bob Blue
executiveNick's question got mostly addressed by us, though we'll have Steven add a few additional details.
Steven Ridge
executiveAnthony, that's a really solid question. It's quite timely, given the calls happening this season. The way I'd frame it is this: like Bob said, we released a financial plan on March 1st, and we have a lot of confidence in our capacity to hit it consistently. If we keep seeing tailwinds across the different drivers we've discussed — which means extremely strong load growth plus additional chances to invest capital within solid regulatory regimes — then each year when we publish an update, we'll be asking ourselves what the ideal plan should look like. From our standpoint, delivering earnings that are reliably high-quality, predictable, and low-risk is the top priority of our financial plan. And if we find ourselves able to do something better — whether that's on the rate-based growth side or the earnings growth side — we'll weigh that very carefully, making certain we aren't doing anything that could undermine our capacity to deliver on that steady, predictable, high-quality, low-risk earnings trajectory. We'll also ensure we fund it in a manner that upholds that framework too. So it's somewhat of a non-answer, in the sense that we'll assess it annually when we roll out our updated plan or refreshed capital outlook. We clearly have some tailwinds, just like many others in the industry, but we feel genuinely good about the plan we issued on March 1st.
Anthony Crowdell
analystExcellent. Appreciate you answering my question — that's everything from me.
Carly Davenport
analystHi there, morning. Really appreciate the chance to ask. I was hoping to follow up on what Jeremy raised regarding the IRP and those EPA rules. From what I can see, a sizeable amount of gas remains in that plan, combined cycle units included. So let me just verify — going by what you said, is the expense of possibly equipping those assets with CCS technology factored in there?
Bob Blue
executiveNo, the expense of equipping them with CCS isn't factored in, though it does factor in the capacity factor limits contained in those regulations. So, as we've stated, our view is that CCS hasn't been adequately demonstrated. That's clearly going to be something litigated with EPA. However, the plan we released factors in the regulations simply by making adjustments for the capacity factor. Understood. All right.
Carly Davenport
analystThanks for clearing that up. That really helps. Maybe just one brief additional question — something at a high level — when you consider the possibilities around SMRs. Looking at when that technology might reach commercialization, I'm aware the IRP includes something like a 2034 start date. Does that roughly signal your thinking on when scaled commercialization of SMRs could occur? Or any general perspective on the timeline from that angle would be useful.
Bob Blue
executiveYes. Our view on timing is reflected in the IRP. So once more, we'll stay with the principles I described. But if we do achieve those, what we believe is achievable would fall within the timelines included in the IRP.
Carly Davenport
analystWonderful. I really appreciate the additional detail.
Bob Blue
executiveThank you all for making time to be with us on this call today. Everyone, take care for the remainder of your day, have a good weekend, and we will see you at EEI. Many thanks.
Operator
operatorAppreciate it. That brings our call to a close. Thanks for joining us for today's presentation. You're free to hang up at this point.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Dominion Energy, Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Dominion Energy, Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Dominion Energy, Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.