Good afternoon, everyone, and thanks for joining Ferrovial's call on our 2019 financial results. As a quick reminder, the results report and the presentation can both be found on our website and should have reached you by e-mail. Should you have questions, you can submit them using the form in the webcast or by e-mailing ir@ferrovial.com at any point during this call. Your questions, along with who sent them, will be read out in the Q&A session at the end. With that, I'll pass things over to Mr. Rafael del Pino, Ferrovial's Chairman, who will be leading this call. Rafael, over to you.

Rafael del Pino y Calvo-Sotelo

executive
#2

Thanks. Good afternoon, and I appreciate all of you joining us for the conference call on our 2019 results. With me here today are Mr. Ignacio Madridejos, our CEO; Ernesto López Mozo, our CFO; and the CFOs from each of our business divisions. Near the end of this presentation, we'll take a closer look at the strategic update and the 2020 expectations. Turning to our results, though, 2019 was another strong year on the operational side, with particularly solid performance from our infrastructure assets. Our Texas Managed Lanes came in well above expectations, helped by growth in the Dallas-Fort Worth region, better connectivity along the corridor after several improvement construction works were completed during 2018, and the ramp-up of NTE 35 West, which is still in its second year of operation. 407ETR has kept up its robust results while at the same time staying in customers' good graces when it comes to customer satisfaction and value for money. After the tariff increases, customer satisfaction levels have stayed at close to 90%, while 80% of users agree that time savings offset toll road costs. That's why it is paramount that we keep focusing on delivering top-notch service levels on our toll road.

Rafael del Pino y Calvo-Sotelo

executive
#3

Heathrow keeps hitting fresh record highs for traffic, with nearly 81 million passengers passing through the airport — marking the ninth year in a row of traffic growth. That was accomplished while service standards stayed at top levels. And lastly, we received a new Managed Lane signed in late August: the NTE 35 West Segment 3C, a northbound extension of NTE 35 West that runs directly through the center of the Dallas-Fort Worth logistics hub and office parks area, making it our biggest Managed Lane in the region. There was also good news financially. We successfully finished refinancing the NTE Managed Lane's debt, which lowered financing costs and extended maturities. Dividends received from our infrastructure projects rose, hitting EUR 725 million (sic) 729 million for the year compared with EUR 623 million the prior year. 407ETR raised its dividends to shareholders by more than 14%, to CAD 1 billion. The NTE made its first dividend payment to shareholders, reaching USD 292 million, and Heathrow distributed GBP 500 million to its shareholders. Throughout 2019, we kept to our strategy of rotating mature assets, and we completed the sale of 65% of Ausol for EUR 451 million at evaluation — more than 60% above market consensus, which demonstrates the strong appetite for this kind of asset, the main focus of infrastructure money being pulled into the market.

Rafael del Pino y Calvo-Sotelo

executive
#4

We likewise made headway on divesting our services division via the deal to sell Broadspectrum, which was agreed last December, at an enterprise value of approximately EUR 327 million. That transaction is anticipated to complete at some point in 2020, at which time we ought to get the cash effect from it. Clearly, we stayed dedicated to divesting services entirely, and later we will describe how we intend to go about it. Last but not least, ESG continues to sit at the heart of Ferrovial strategy. And over the past year, we earned a globally leading standing within the construction and engineering sector from the Dow Jones Sustainability Index and were given an A List by CDP for our foremost work combating climate change. On the next slide, we can observe several of the key figures for 2019. Revenues rose 2.6% like-for-like to more than EUR 6 billion. EBITDA — affected by the EUR 345 million provision in construction from the first quarter of 2019 and encompassing the IFRS 16 impact applicable since 2019 — came to EUR 121 million. Net income came to EUR 268 million, affected, among other items, by equity-accounted results, capital gains from asset disposals and results from our discontinued operations, including the Broadspectrum sale agreement. Dividends from infrastructure projects, as I mentioned a moment ago, amounted to EUR 729 million, and our operating cash flow came to more than EUR 800 million, producing a net cash position at parent company level — excluding infrastructure projects — of EUR 1.6 billion, a solid and comfortable level given the attractive infrastructure pipeline that lies ahead of us.

Rafael del Pino y Calvo-Sotelo

executive
#5

With that, I'll pass things over to our CEO, Ignacio Madridejos, who'll walk you through how our business units performed operationally.

Ignacio Madridejos Fernández

executive
#6

Thank you, Rafael, and I'll now go into more detail on each of our businesses and main assets, beginning with Toll Roads. Revenue from Toll Roads rose 28.5% last year on a like-for-like basis, helped by a bigger contribution from Managed Lanes and traffic growth across most of our assets. EBITDA was up by more than 33%, with 67% of it coming from North America, which remains our primary geographical target to date. We keep collecting solid dividends from our Toll Roads, totaling EUR 494 million last year. As Rafael said earlier, rotating mature assets is a central element of our strategy. So in 2019, we completed the sale of Ausol. We divested 65% of the equity for EUR 451 million and entered a call and put option on the remaining 50% stake, to be exercised within the next 3 years. That sale generated implied net capital gains of EUR 474 million. We also divested 11.75% of Ruta Del Cacao in Colombia for EUR 28.6 million, producing a net capital gain of EUR 9 million. Our Texas Managed Lanes carried out their first debt refinancing and dividend following 5 years of operation. This past December, we finished refinancing the NTE debt, amounting to some $1.3 billion.

Ignacio Madridejos Fernández

executive
#7

Under the new debt structure, the average cost of borrowing would come down and maturities would be pushed out. When we measure the deal against maturities, borrowing costs declined from 5.47% to 3.8%, a move of 167 basis points. On top of that, NTE made its inaugural shareholder dividend payment, which came in above what we had originally anticipated, reflecting how strongly the asset has performed. NTE distributed $292 million to its shareholders, and Ferrovial's share of that came to EUR 166 million. We anticipate that the refinancing of LBJ will take place later this year, and that the first dividends from these Managed Lane assets will be paid as well. The 407 results came out last week. Even so, I would like to call out how it performed last year: revenues rose 8.3% and EBITDA rose 8.1%, or 8.8% excluding the positive one-off from 2018, with an EBITDA margin of 87%, essentially unchanged from the prior year. Traffic was flat, down 0.2% for the year, hit by harsh weather in the first half and in the fourth quarter. Had the weather effect been excluded, traffic would have risen 0.7%. The 407 also announced a tariff increase that took effect on February 1, bringing in seasonal tariffs, with the goal of preserving excellent service standards on the toll roads and responding to the varying usage levels we have seen.

Ignacio Madridejos Fernández

executive
#8

In 2019, the 407 distributed 1,050 million U.S./Canadian dollars (sic) CAD 1,050 million as dividends — a 40% increase for the year, and 6% higher than the optimistic case we published in our December 2018 model. Beyond that, the 407 Board gave approval to a CAD 312.5 million dividend for the first quarter of 2020, which comes in 25% above the amount distributed during the first quarter of 2019. Dividends are going to grow above EBITDA provided we deliver strong performance and keep the 1.7x target senior indenture debt service coverage ratio. That performance will be underpinned by the robust macro drivers in the region, with growth in both population and personal income. Our focus stays on preserving service levels at the 407 while maximizing revenues. At our Managed Lanes in Texas, performance continues to be outstanding. NTE and LBJ have completed the ramp-up period, yet they are still posting very good traffic growth, whereas the 35 West remains in its ramp-up even though its traffic is close to the other 2 Managed Lanes. NTE EBITDA rose by 33%, with traffic up 14.7%, helped by the full opening of the 35 West in July 2018, which links to NTE Segment 1, and by the opening of the 183 TEXpress in October 2018, which connects directly to NTE Segment 2.

Ignacio Madridejos Fernández

executive
#9

In the NTE Managed Lanes, traffic patterns have pushed toll rates above the soft cap at multiple spots so that customer service is guaranteed. LBJ performed well, particularly during the year's second half, which drove EBITDA growth of 24% in 2019. Traffic rose 9.1%, with an impact from the October 2018 opening of the 183 TEXpress, a project that links straight into LBJ Segment 1. And there is construction at 100 -- the 75 US (sic) US-75 intersection with PGB Turnpike. At 35 West, traffic climbed 25.3% in the fourth quarter versus the same period a year earlier as LIBOR came back to the highway, surpassing prereconstruction levels, with a growing share of that traffic selecting the Managed Lanes. Fourth quarter 2019 EBITDA rose 85%, from $12 million to $22 million. A factor behind this very strong traffic performance has been the surge in commercial traffic. The presence of logistic facilities and office centers surrounding our 3 Managed Lanes in the region, along with the Fort Worth Alliance and the Dallas-Fort Worth Airports, has contributed to commercial traffic growth, and that traffic is less price-sensitive than light traffic.

Ignacio Madridejos Fernández

executive
#10

Also, it’s worth pointing out that e-commerce already makes up 13.3% of U.S. retail sales today, and that share is expected to keep rising. E-commerce, along with more same-day and next-day delivery, should drive growth in commercial traffic. As I said earlier, better connectivity between the NTE and LBJ via the 183 TEXpress helped push traffic higher in 2019. Looking ahead, more network improvements are coming — work that will help lift traffic beyond 2024, once construction is finished. East of LBJ, construction of new lanes on the 635 East begins this summer. In the NTE area, the 820 Loop will undergo reconfiguration and reconstruction through next year or 2022. The interchange between the NTE and 35 West will also be rebuilt, and direct connector flyovers will be added to 35 West as part of what’s called the Mark IV improvements. And north of 35 West, construction for the Segment 3C extension will get underway and run through 2023. So we may see some near-term traffic effects in the Managed Lanes segments closest to these improvement projects, but we should expect a fresh surge in traffic from 2024 onward, similar to what occurred in 2019.

Ignacio Madridejos Fernández

executive
#11

The NTE 3C extends our 35 West Managed Lanes by 60%, and with this addition it will become the biggest Managed Lanes facility we have in Dallas-Fort Worth, as well as the one carrying the highest share of commercial traffic. Northbound, the project runs 6.7 miles, with 2 Managed Lanes in each direction. We expect construction to wrap up in 2023. Maturity for the Managed Lanes comes in 2061. Investments will total more than $900 million. Cintra's stake is 53.7%, representing an equity investment of $86 million. In my view it will create substantial value by boosting traffic speeds north of Fort Worth. Let me turn now to North Carolina. The northern section of the I-77 opened on June 1 last year, and the southern section opened on November 16. We have been running those Managed Lanes with dynamic pricing since December 2019. As you know, this road links Charlotte uptown with the residential area of Mooresville, so commuter traffic accounts for much of the flow. Performance so far has matched expectations, though it is still very early days. That said, we have already observed better speeds along the whole corridor, which is lifting customer satisfaction and bringing volumes back to preconstruction levels.

Ignacio Madridejos Fernández

executive
#12

We don't discuss them frequently, yet it's worth recalling that other toll roads sit within our portfolio. These are mostly availability-based projects located in Spain, Portugal and Ireland — countries where government bond yields are low. They are likewise long-duration toll roads, with an average maturity across the portfolio of 16 years. Broadly speaking, these toll roads performed well over the year. Turning now to Airports. Heathrow has also reported these results, with passengers reaching a record high of close to 81 million and 1% growth — marking the ninth consecutive year of traffic growth. Financial performance was good too, with revenues rising 3.4%, supported by a 4.9% increase in aeronautical revenues, aided by a favorable long-haul passenger mix and recovery of the prior year's yield dilution, and also affected by the introduction of the commercial deal with the airlines. Adjusted EBITDA rose 4.6%, helped by IFRS 16. Excluding that effect, it would be up 1.7%. As for AGS, traffic dropped 7.8%, with declines at all 3 airports, mainly due to the Thomas Cook and Ryanair closures in October 2018 in Glasgow, the cancellation of easyJet's route to Gatwick and London city from Aberdeen, and fewer rotations to Manchester and Belfast by Flybe, along with the cancellation of the route to Amsterdam from Southampton.

Ignacio Madridejos Fernández

executive
#13

But EBITDA did fall 2.6%, and that was helped by stronger other revenues. Dividends we got from our Airports division came to EUR 183 million in 2019. That's EUR 7 million lower than in previous years. Heathrow's solid performance came about even as it kept service quality extremely high, with an overall score of 4.17 out of 5 and 82% of passengers calling their experience excellent or very good. Heathrow's Terminal 5 was also named Best Airport Terminal for the first time. On top of that, Heathrow has been recognized as best airport in Western Europe for the fifth time and best airport in the world for shopping. Departure punctuality and baggage connection have improved year-on-year as well. And all of this took place while we operated the asset at 99.1% capacity in terms of aircraft movement. Today, though there's little room for additional aircraft, 1 in every 5 seat is still empty within those carriers, which means there's an important opportunity to grow. Heathrow stays committed to its net-net 0 carbon objectives through its plan Heathrow 2.0. That plan, which has been discussed before, sets as objectives carbon neutral airport operations by 2020, a 0 carbon airport by 2050 and carbon neutral growth from the new runway.

Ignacio Madridejos Fernández

executive
#14

The plan is also tied to the expansion, since Heathrow has committed to making it sustainable over the long term. In its consultation on airport expansion, it has put forward this proposal for an environmentally managed growth framework, setting out how its growth will be handled in line with environmental limits on air quality, surface access, noise and carbon, and it supports growth in flights at the airport while making sure Heathrow's environmental performance stays within maximum limits. Moving now to Construction. The division has performed operationally in line with the guidance we have given the market since the first half of last year, and has a 0 EBIT margin excluding the impact of the $345 million provision registered in the first quarter of the year for estimated future costs in U.S. projects. We are comfortable with the current level of provisions. As we explained in the Horizon 24 strategic presentation last month, we are taking certain measures such as having a local presence in our target geographies, which includes U.S., U.K., Canada, Poland, Spain, Chile, Colombia and Peru; increasing the amount of sale performance in our projects; undertaking organizational changes with clear accountability; implementing measures in place to increase risk controls so we can respond faster to any potential issue that may arise from our projects; redesigning key main processes like bidding; and finally, improving our technical capabilities.

Ignacio Madridejos Fernández

executive
#15

So this is going to make our EBIT margin begin improving as early as 2020, and at that point we expect it to come in above 1%, then keep getting better from there until we hit the 3.5% EBIT margin we're targeting by 2024. In construction, the order book came to EUR 11.4 billion — that's a 2.8% like-for-like increase — with 88% international, and civil works is the biggest segment at 79%, and we're also aiming for 25% to 30% of revenues to come from internal concessional projects. Cintra's share of the construction order book, leaving out Webber and Budimex, came to 47%. The December 2019 order book number doesn't include preawarded contracts or contracts still pending commercial or financial agreement, and those add up to more than EUR 600 million. On cash flow generation, 2019 gave us higher operating cash flow than we'd originally anticipated. In fact, back at midyear 2019, we were expecting a cash drainage of roughly EUR 300 million, but in the end the division generated positive operating cash flow of EUR 132 million. That was achievable thanks to a positive impact at Budimex with more activity toward the end of the year; advanced payment on U.S. projects, which came in higher than expected; a real estate sale in Spain — Valdebebas went for EUR 69 million; and lastly, the fact that only part of the EUR 345 million provision has been cashed out, with the amount at EUR 143 million.

Ignacio Madridejos Fernández

executive
#16

Looking ahead to 2020, we anticipate cash drainage that didn't occur last year — specifically, minus EUR 300 million. That's the same figure we gave around mid-last year, driven by the cash outflow from the provision and lower advance payments. Turning now to Services — and keep in mind that this division has been classified as a discontinued activity since the close of 2018. Services delivered a positive performance, particularly in Spain and internationally. In Spain, revenues rose 3.8% and EBITDA climbed 5.3%, both on a like-for-like basis, with margins expanding 30 basis points to reach 10.7%. Internationally, revenue growth came in at close to 20% like-for-like, helped by increased oil and gas activity in the U.S. and Chile. EBITDA there increased 26.3% like-for-like. In the U.K., EBITDA — excluding utilities, collection and environment, which are treated as discontinued activities — came to GBP 56 million. As a reminder, last year we signed an agreement to terminate the Birmingham contract, and it will have no impact on Ferrovial's profit and loss. Under that agreement, Amey paid GBP 160 million in 2019, with GBP 55 million still to be paid over the next 6 years.

Ignacio Madridejos Fernández

executive
#17

Beyond what the divisions delivered, we're still focused on getting the Services divestment finished. Last December we reached a deal to sell Broadspectrum — that's our Australia/New Zealand business — to Ventia. Closing is anticipated within the first 9 months of 2020. Under that agreement, enterprise value came to EUR 327 million, with equity value at EUR 303 million. As previously explained, this process began as a possible sale of the business as an international platform, but it will now proceed on the basis of subsets of the original parameter, with transactions occurring on specific euro fees. At this point I'll turn the call over to Ernesto, who will walk through the year's main financial results.

Ernesto López-Mozo

executive
#18

Thanks, Ignacio. Good afternoon, good morning. All right, so I'll handle the lines below operating performance, beginning with disposals and impairments. And in this section, the primary item is the capital gain we booked on the Ausol sale, which came to EUR 475 million. As Ignacio noted earlier, it's important to recognize how strong investor appetite has been for this type of infrastructure asset, and if anything, we've seen further yield compression in these assets as the year has begun. Other items in there include an impairment on Autema's net worth. As you know, we run this exercise annually, simply because the dispute remains pending over the unilateral changes made to the concessions in the past, and we are seeking compensation. Among the other items, we also have the Ruta del Cacao disposal in there. Moving on to financial results, beginning with the infrastructure projects and financial expenses, we show a figure of — an expense of EUR 263 million, and essentially the rise compared with EUR 218 million reflects having a full year of NTE 35 West in operation, along with the start of operations on I-77 and the NTE refinancing, which carried the expense of the initial fees from the original financing.

Ernesto López-Mozo

executive
#19

Alright. This was achieved using highly competitive rates. When we examine the ex-infrastructure project level, we observe income of EUR 69 million. So that's an improved result compared with last year, and it's essentially driven by hedges and equity swaps tied to performance-year plans for employees and management. Okay. Moving on to equity-accounted results, here we see growth, along with the positive contribution from 407ETR as well as Heathrow and AGS. At Heathrow, you'll note EUR 106 million, and this benefits from the better operational performance as well as from lower inflation expectations, which have supported a positive P&L on the inflation hedges. Okay. You've likely noticed that today the judicial review on the Airport National Policy Statement came out. And Heathrow's position is that management will seek permission to appeal that ruling. Also, the ANPS is, let's say, under suspension owing to noncompliance with the Paris Agreement on climate change, and Heathrow's management holds a strong view that this can be resolved. And naturally, the government must take the final action regarding this Airport National Policy Statement.

Ernesto López-Mozo

executive
#20

When it comes to impact, if this weren't likely to proceed — that is, if the expansion weren't likely to go ahead — then we'd retain the existing investment in design and expenses of EUR 450 million, keep that in the regulatory asset base, and receive a regulated return. That falls under the regulatory framework, correct? So if this doesn't move forward, there shouldn't be an economic impact. From an accounting standpoint, though, yes, there would be an impact — we would likely need to write that amount down. And the effect on our P&L, on the bottom line in the equity accounted line, would be a negative of EUR 100 million. There's more explanation in the full note, so I won't spend more time on this. Okay. Next, you have the corporate income tax expense of EUR 47 million. Here too I'll point you to the note in the financial statements, but the primary reason for this is that the capital gain on the Ausol sale is tax-exempt, right, which means you get a lower accounting tax rate. Then you have net profit from discontinued operations. And here, remember that at the end of the first 9 months we had a result of EUR 28 million, but then the Broadspectrum sale, which we mentioned during the quarter — in the last quarter — would have a negative impact of EUR 270 million.

Ernesto López-Mozo

executive
#21

Thus, the EUR 198 million represents a mix of the first 2 and afterward the outcomes from the remaining discontinued operations during the last quarter. All right. So next I’ll go to the following slide to go over cash flow generation, and as you can see, we had a very strong finish to the year and a strong year overall. I think the last quarter — if we look at the first column, where dividends from projects appear — delivered a very strong performance. What I mean is that dividends came in above what we expected at the 407, NTE and Heathrow Airport holdings, right? Then, moving to the right, we see how Construction evolved. What I mean is that, of course, we have the EBITDA and then the effect of the noncash construction provision in the first quarter. Moving further right, we have the cash out related to that provision. And then, further to the right, we have a EUR 129 million additional provision. Here, we finish with construction in line with what Ignacio described earlier and with the guidance we gave the market. And what matters is that the main caption here stems from risks provided for in Budimex tied to industrial construction, and the remainder is really spread across quite different projects just covering additional costs.

Ernesto López-Mozo

executive
#22

So we're pleased with how the year closed out, and we can see that the change in working capital — which came in at a positive EUR 165 million — also got a boost from how Construction performed. And here we had works that were built in advance in the U.S. as well as a favorable working capital movement at Budimex. Those figures also include cash coming from the Services division. And, as Ignacio said, Spain showed very strong gearing when it came to generating cash in Services. All right. Then moving to the right, we've got investments of close to EUR 300 million plus divestments, which we already covered, and shareholder remuneration, and we finished the year with a net cash position ex infrastructure projects of EUR 1.631 billion. That number factors in a net cash position for the Services discontinued operations, excluding infrastructure projects, naturally, of EUR 158 million. So, as I mentioned, cash performance was very strong both at year-end and across the whole year. And with that, I'll pass things back to Rafael.

Rafael del Pino y Calvo-Sotelo

executive
#23

Returning now to what we touched on at the start, I'll walk through a few of the key numbers that illustrate how we performed over the last year. Dividends on 407 grew 14%, driven by the asset's robust performance. Thanks to NTE's strong results, Ferrovial took in EUR 166 million from the Managed Lane. Given how keen the market is on mature, high-quality assets, the valuation of Ausol in the sale carried out in 2019 came in 60% higher than the market consensus. NTE 35 West keeps beating expectations, posting traffic growth of 25.3% in the fourth quarter of 2019. Heathrow achieved its ninth consecutive year of growth while upholding excellent service standards. And last, our net cash position excluding infrastructure assets improved to EUR 1.6 billion, which doesn't include proceeds from the agreed Broadspectrum sale. Now, a brief look ahead. Last month, Ignacio laid out what the group's strategy will be over the next 5 years when we presented our Horizon 24 strategy. Results from putting this strategy into practice will begin to appear in 2020. We anticipate that the robust performance of our infrastructure assets, together with the first dividend from LBJ Managed Lane, will drive strong growth in dividends received from infrastructure projects.

Rafael del Pino y Calvo-Sotelo

executive
#24

Our emphasis is going to stay on infrastructure work that carries significant concessional value. A pipeline worth EUR 12 billion has already been pinpointed by us, and EUR 10 billion of that sits in toll roads, largely in U.S. Managed Lanes, which stays our central target. So this month we received the first RFQ tied to Maryland's inaugural project entering the market. Throughout 2020 we will be engaged in that process, and we anticipate an award for the project early in 2021. Construction continues to be central to our strategy, since it is how we capture these highly complex greenfield Toll Roads projects — the ones where returns are highest for us, where our competitive edge is greater, and where we are better equipped to handle the risks already present. That said, we recognize the division requires changes to lift both performance and profitability, and we have set a target of 3.5% for 2024. Over 2020, we expected — we do expect an improvement already against 2019, and for the Construction business overall our goal is an EBIT margin above 1%. Completing the divestment of Services remains something we are committed to. And every bit of this will be carried out under a new operating model designed to make the organization more agile, innovative and efficient.

Rafael del Pino y Calvo-Sotelo

executive
#25

Altogether, this plan ought to deliver yearly savings amounting to EUR 50 million, and during 2020 we should get EUR 20 million of that. Everything I've just described for 2020 comes from a single aim: continuing to build shareholder value. A vital part of that is shareholder remuneration, and what we propose for 2020 is a 5.8% rise in shareholder remuneration, bringing it to EUR 550 million in total, with a first scrip dividend of EUR 0.32 per share and a second scrip dividend of EUR 0.43 per share. A share buyback of up to EUR 360 million, or 25 million shares, has been approved as well. Many thanks for listening, and we're now happy to take whatever questions you might have.

Operator

operator
#26

The opening question is from Elodie Rall at JPMorgan. It's about Heathrow. How likely do you think it is that the new runway gets approved? And if it isn't, what consequence would that have for Ferrovial?

Ernesto López-Mozo

executive
#27

Thanks, Begonia. Well, we went over that in my speech already, correct? So I've just been thinking about what Heathrow's management said. Heathrow will seek permission to appeal. And regarding the ANPS ruling — I mean the failure to comply with the Paris Agreement on climate change — Heathrow's management holds a firm view that this can be resolved. Naturally, as I mentioned, ultimately the government will need to make a decision on the ANPS. And on impacts, I covered that earlier from an economic standpoint: all the amounts ought to be included in the RAB. From an accounting perspective, writing them down will hit us by EUR 100 million at the end of 2019.

Operator

operator
#28

Elodie has another question as well. What's your take on how the coronavirus might affect things?

Ignacio Madridejos Fernández

executive
#29

Thank you, and thanks for the question. Naturally, the main worry with the coronavirus is the health of our employees and of everyone connected to us. Well, up to now, there has been no impact on the supply chain, and no effect on the toll roads either, so far as traffic goes, of course. The only area where there will be an issue is something tied to the airports. That said, as was mentioned yesterday at Heathrow's results presentation, the benchmark they are using comes from the SARS outbreak in 2003. Back then, traffic fell 2.8%. Naturally, we are complying with every protocol set out by the Health Department in the U.K., and we are monitoring the situation very closely. So it is something where -- we will see how things develop, but the sole benchmark we have at this point is the one linked to the 2003 SARS outbreak, and as I said, the impact on traffic, though nothing beyond that at this stage, and we will update you next time with the first quarter results.

Operator

operator
#30

And finally, another question from Elodie, a follow-up regarding Heathrow. Is there a risk, in your view, that dividends could be lower?

Ernesto López-Mozo

executive
#31

Alright. Heathrow also addressed that point during the management presentation. With the base case, they really don’t see any risk. In fact, the first quarter dividend came in as expected based on what their investor report at the end of 2019 had indicated, and Heathrow still has very ample headroom across all of its financial parameters. So, at this point in time, we don’t see that.

Operator

operator
#32

Our next question is from Daniel Gandoy at JB Capital. Is it fair to take the first quarter 2020 dividend for the 407ETR and annualize it in order to work out the full year dividend? Or should we factor in that the first quarter of 2020 contained some extraordinary item?

Ignacio Madridejos Fernández

executive
#33

Naturally, the Board makes the call on the 407 dividend, and it isn't something decided each quarter. That decision rests on how the 407 performs, chiefly in terms of EBITDA and operating cash flow. Naturally, if we extrapolate the first-quarter EBITDA — the first-quarter dividend — across the full year, that works out to a 19% increase. And as you're aware, EBITDA has risen over the last years, but the choice gets made quarter by quarter, and we must wait for how the following quarters perform to confirm that the dividend for the year will be the same.

Operator

operator
#34

Our next batch of questions comes from Stephanie D'Ath at RBC. Could you give us an update on the potential increase in the 407ETR stake?

Ignacio Madridejos Fernández

executive
#35

Well, there's nothing new to report. And the hearing, I believe, is set for April — April 19th — no, April 16th, that's right. So once that's done, a decision will likely take a few months. That puts it around midyear, most likely.

Operator

operator
#36

Could you give us an update on when the Services or disposal is expected to happen?

Ignacio Madridejos Fernández

executive
#37

As has been mentioned multiple times, we are fully committed to divesting the Services division. And as also stated, we're shifting away from a global platform approach and basically selling it country by country. So we're moving forward with that — selling on a geographic basis, and the Services division process is underway. We're not able to commit to any specific date, and we'll make an announcement as soon as we have news of any specific agreement to sell any of the parts.

Operator

operator
#38

Could you share your thoughts on what we should expect for dividends from U.S. Managed Lanes in 2020?

Ignacio Madridejos Fernández

executive
#39

We aren't providing any dividend forecast. The sole item we provided under the Horizon 24 plan was a EUR 3.3 billion dividend stemming from the Toll Roads. That's, I believe, the only guidance we've issued.

Ernesto López-Mozo

executive
#40

Right. Also, a while back — either 2 or 3 years ago — a business plan was released, and it's gotten somewhat dated. That's the sole guidance available publicly, and operations have been performing better. So our hope is to exceed it.

Operator

operator
#41

Could you share the timeline for the Maryland project tender?

Ignacio Madridejos Fernández

executive
#42

Yes, I believe the tender — the RFQ — gets underway in April. Then, from what I recall, the basis for launching the project points to July. My understanding is that bidding happens in February, with closing set for mid next year. In addition, I think we'll have greater clarity on precisely how the process will be defined by summer, and the bidding will likely be selected around February or March next year, then close in mid next year. So this project is still more than a year away.

Operator

operator
#43

Our next question is from Guillermo Fernández-Gao at Kepler Cheuvreux. Can you give any color on how traffic has started in January and February on the 407ETR?

Ignacio Madridejos Fernández

executive
#44

Well, I think it's too early to provide any guidance on what traffic will look like in the 407 this year. Of course, many factors are at play. The economy in the area is performing well. Of course, there may be some price elasticity. It's too early to say whether there will be any, because the increase happened in February and another increase is coming during the summer. Of course, there are some weather effects — no, last year those were negative. We'll see how it looks this year. We also have 1 more day in the — during the year on the calendar. So I think several effects are at work. It's still too early to give any guidance, and we have to wait at least until the first quarter to get more information about that.

Operator

operator
#45

Guillermo also had a question — is there any specific asset you'd view as mature and a possible candidate for rotation in 2020?

Ignacio Madridejos Fernández

executive
#46

On that point, as I mentioned earlier, naturally, we're looking at every chance we might have to rotate assets that have matured. However, no decision has been made on that.

Operator

operator
#47

And finally, one from Guillermo: will Heathrow be seeking the government's permission for the expansion?

Rafael del Pino y Calvo-Sotelo

executive
#48

So what I said earlier is that Heathrow has indicated they'll seek leave to appeal, and also that the condition stemming from the initial review might be able to be resolved, and they're open to having the government resolve this.

Operator

operator
#49

Our next question is from Nicolas Mora with Morgan Stanley. Could we talk about the soft traffic on 407ETR in 2019, particularly the weaker mix — lower weekday traffic against stronger weekend? What's behind that? And beyond that, could you lay out your view on schedule 22 payments?

Ignacio Madridejos Fernández

executive
#50

Yes. Regarding last year's traffic, I mentioned in my presentation that weather had a negative impact. As I said, that effect was negative. Absent it, the figure would have been positive at 0.7%. As always, we see both positives and negatives over the course of the year. Economic growth, of course, is a positive, while elasticity was a negative. I believe the area is growing well. Construction on the 401 may also produce positive effects at certain points in time. Once it is sold, things flip the other way, with a negative effect arising from the finalization of that kind of job. Generally speaking, we don't disclose information on traffic type or segment. We regard this as commercially relevant information. But as noted, we typically make as much use as possible of all this information, first, to deliver the best service to our customers, so they get the traffic flow — adequate speed in the 407 corridor — and also to maximize revenues. That is the basis on which we make decisions. And on that same basis, we set the price increase for the years ahead.

Ignacio Madridejos Fernández

executive
#51

Regarding the schedule 22 payments, that item also belongs to the same equation. First, this isn't a long-term effect, since traffic has an initial theoretical evolution and at some point reaches the cap that was expected for the 407. So I believe that after a few years we won't see any effect from schedule 22 payments, because we'll be above that threshold, and then there will be no effect. In the short term, over the next few years, it may happen that we fall below this theoretical evolution of traffic. But of course, we treat that as part of the equation — first, looking at the customers and making sure we have an adequate traffic flow on the 407, but also looking at revenues and at additional increasing costs that these schedule 22 payments could bring. So I think it's part of the equation. The month has been very small. During the last year, it's also, at the same time, very difficult to calculate, because it's based on specific days. And I think it's not very easy — it's calculated at the end of the year.

Ignacio Madridejos Fernández

executive
#52

There could be some impact in the years ahead. Still, my view is that it won't influence or bear on revenue growth, since, as we said before, price elasticity along with the price increase and the customer will all be taken into account anytime we aim to maximize revenues.

Operator

operator
#53

Regarding the Texas Managed Lanes, could we discuss truck traffic? Also, can you help us grasp what the penetration levels are between NTE 35 West and LBJ? And how much did the count of days rise when traffic exceeded the maximum threshold for switching to free pricing at NTE compared with 2019?

Ignacio Madridejos Fernández

executive
#54

As you're aware, we don't provide details on trucks within our Managed Lanes. I believe this matters a great deal owing to commercial traffic, for the reasons covered earlier. Still, I'd say it's price-sensitive information that carries importance for upcoming Managed Lanes, and we intend to keep it confidential. We're not disclosing anything on that front. On hitting the cap, we did so on the NTE over the past year at multiple locations, and on 35 West, in one of the segments, we hit the cap in December, and we could anticipate that happening this year as well, particularly as we get closer to the summer months, when traffic is heavier.

Operator

operator
#55

Stanislas Coquebert from Lazard has the next question. How much room do you believe you have to raise prices again at U.S. Managed Lanes and at the 407 ETR?

Ignacio Madridejos Fernández

executive
#56

Well, I think that, of course, I mean you have to take your own assumptions, but you know what are the variables that we are taking in order to increase prices. We look to make sure that, first, there is a traffic flow at a certain speed in our Managed Lanes and the 407. We can have a more dynamic pricing in the Managed Lanes in order to make sure that there is not congestion at a time. And as you know, also the 35 West is lagging behind because of its ramping up still compared to the LBJ and NTE. Also as you know, 77 is starting dynamic prices just in December. So I think it's ramping up. Of course, it will be based on the traffic, its pricing dynamics in the information that we have. And based on that, we will take the decisions. So it's very difficult to anticipate how this will evolve because it will depend on the traffic. But as commented, we see a very strong economy. We see Dallas-Fort Worth that is growing very strongly. So I think that we feel comfortable with our pricing dynamics and how we'll apply that in the future.

Ignacio Madridejos Fernández

executive
#57

Next quarter, you'll see how that pricing develops. With the 407, as you're aware, I believe there are 2 increases announced and one decrease over the year — once again, to capitalize on the seasonal pattern and the heavier traffic volumes during the summer months. And once more, we aim to maximize customer service while also bringing in more revenues. That's the reason our first increase happened in February, which has already taken place, with a second one coming during the summer months and then a reduction later in the winter. That has already been announced, and you have that information.

Operator

operator
#58

Our following question is from Marcin Wojtal with Bank of America. If the capacity expansion were definitively not to proceed, would you think about divesting your Heathrow stake?

Ignacio Madridejos Fernández

executive
#59

I believe Heathrow is appealing no matter what the circumstances — it's a highly appealing asset. As has been noted, it's a really solid infrastructure asset with outstanding customer service, ranked among the finest globally. And as has been mentioned a number of times, we anticipate having some CapEx in the year ahead in any case, so that will be appealing. Regarding the third runway, I think that — we still believe they will appeal, and we have solid options that it will go ahead. In my view, it is greatly needed for a global U.K. I think it will also satisfy all these environmental concerns and carbon-neutrality. So I think there's no reason for it not to happen, because it meets every requirement needed for growth, for economic growth in the U.K., and also to be a global hub, taking the present that has been — taken today, that exists today. So for us, we still consider it a strategically relevant asset that could generate value no matter what the circumstances.

Operator

operator
#60

Marcin also had another question: would you think about selling other mature assets, like the AGS airports?

Ignacio Madridejos Fernández

executive
#61

So no, that's not something we're looking at. In our view, it isn't a mature asset at this point. Even with traffic not growing last year, we still believe there's potential there going forward, and selling the AGS airports is not under consideration.

Operator

operator
#62

And finally, Marcin asks whether you anticipate any significant restructuring charges during 2020 tied to carrying out the cost savings plan?

Ernesto López-Mozo

executive
#63

Yeah, some costs are possible. I mean, we're still finalizing the assessment. We're looking at roughly EUR 30 million, or something in that neighborhood. But that number is preliminary. Once the assessment is final, we'll update the market.

Operator

operator
#64

Robert Crimes from Insight has the next question. Could you speak to the year-on-year slowdown in average tolls per transaction in the Managed Lanes during the fourth quarter, particularly the 3% in LBJ?

Ernesto López-Mozo

executive
#65

Okay, so the LBJ during the most recent quarter, at its highest point, came quite near to the makeup, and traffic conditions meant the soft cap wasn't lifted, correct? So it was near that level. And as a result, we didn't see that kind of uplift. But naturally, as traffic conditions shift and the cap continues to evolve, that could be different going forward.

Operator

operator
#66

Our next question is also from Nicolas Mora at Morgan Stanley. When do you expect the provisions on U.S. contracts, along with the other contracts, to be paid out across 2020 and 2021?

Ignacio Madridejos Fernández

executive
#67

Right. The majority of those provisions will be cashed out. These come primarily from three construction projects, as you're aware: I-77, the Atlanta project, and I-66. The I-77 construction, as you know, is nearly complete already. I-66, though, will take place over the coming 2 years, the same as Atlanta. So we'll see that provision — particularly in this year 2020, and we'll also see a portion of it in 2021.

Operator

operator
#68

And also, a question for Nicolas: when do you expect to begin putting equity into I-66, and how much will that be?

Ernesto López-Mozo

executive
#69

All right, those contributions are going to be made. Essentially, 2022 and 2023 are the primary years, and 2024 as well. What I mean is that the total comes to roughly $700 million.

Operator

operator
#70

José Manuel Arroyas from Santander has the next question. How often do the schedule 22 payments recur on the 407ETR? We understand that in the fourth quarter of 2019, 407ETR was subject to the second congestion payment, which we assume came to roughly CAD 2 million. Is there any guidance for 2020?

Ignacio Madridejos Fernández

executive
#71

So, José, as we said, this schedule 22 payments — that's our term for it — gets calculated once the year ends and is paid out in April. Working out the amount is really tough, since it hinges on particular days and on what traffic looks like on those days relative to a target set quite a while back. That makes it genuinely hard to project how it will play out over the course of the year. What we expect is that, yes, some payments will come in the next few years. We can't put a figure on it, because we simply don't know — it will come down to traffic on those particular days and how much that adds up to. So I'd say we still need — we will need some time before we know exactly what those payments will amount to. But as was said earlier, once these few years have passed, going forward we don't anticipate any additional payments, since we will hit the threshold that was set. That figure hasn't been fully pinned down yet. And as you're aware, it's a payment owed to the state that will be made, I believe, in April.

Ernesto López-Mozo

executive
#72

On that earlier question — my apologies, I put up the slide showing the 1 year for all the shareholders. So rather than '21 through '23, the I-66 injection runs from 2020 through 2022. And when we convert those dollars into euros, it comes to roughly EUR 625 million.

Operator

operator
#73

Also coming from José Manuel: given what was announced today, what are your views on shareholder returns — both the share buyback and an increase in the yearly dividend?

Ernesto López-Mozo

executive
#74

So, as you've seen, we wrapped up the year with a solid cash position. Infrastructure is doing well. And we figured — as you know, we make this decision every year — we figured it was worth proposing a raise for this year's remuneration.

Operator

operator
#75

Our next question is from Nabil Ahmed at Barclays. Could you quantify what traffic impact you expect from the network improvement and construction works in the Managed Lanes across 2020 and 2024?

Ignacio Madridejos Fernández

executive
#76

No, I don't think we can provide those. But that type of information hasn't been disclosed by us. It's hard — it's really hard to estimate at the same time as well, since a number of these improvements, I mean, will impact only particular segments. The work is sometimes only at night and not during the day. So in some places it might begin later and will end earlier. So I think anticipating how it will affect the traffic is very difficult. And of course, it also depends on other factors as well. But it's clear that after 2024, we'll see an improvement the same way we saw during 2019 in the traffic, because we are increasingly improving the connection between the different Managed Lanes, and I think that traffic will flow much better after all these improvements.

Operator

operator
#77

Would ADP in France be of any interest to you if that privatization process were to get going again?

Ignacio Madridejos Fernández

executive
#78

We can't say at this point whether it will take place or on what timeline it would take place. And naturally, we'll still require some details at whatever point an announcement comes that they're divesting any stake, should they choose to go that route, so that we can assess whether it makes sense for us.

Operator

operator
#79

Our next question is from Bruno Silva at BPI. Regarding how working capital moved in the fourth quarter, what portion came from prepayment? And within that, if there was any, how much was tied to own group concessions?

Ernesto López-Mozo

executive
#80

All right. For the full year, the figure came to EUR 130 million in total. And the bulk of it landed in Q4. I'm not going to split things out between group companies and external parties, since every bit of this is handled at arm's length. So drawing a distinction there wouldn't serve any purpose. To put it simply, EUR 130 million is what we recorded for the year.

Operator

operator
#81

Also from Bruno: does the NTE EBITDA figure of USD 146 million that appeared in the concession zone budget for 2020 line up with Ferrovial's own budget?

Ignacio Madridejos Fernández

executive
#82

That's not something we disclose.

Operator

operator
#83

We have one more question that should be coming in, so please hold. The final question is from Charles Maynadier at Kempen. Could you provide additional detail on what you expect for the 2020 construction EBIT margin by division — specifically Budimex, Webber, and Agroman?

Ignacio Madridejos Fernández

executive
#84

That's not something we make public. The only figure we have is the 1% EBIT margin for the Construction division as a whole, and that's all we're providing.

Operator

operator
#85

Thanks. That brings us to the end of the Q&A.

Rafael del Pino y Calvo-Sotelo

executive
#86

Well, thank you so much for joining the conference. And that's everything for today.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial N.V. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.