Ferrovial N.V. (FER) Earnings Call Transcript & Summary
May 6, 2021
Earnings Call Speaker Segments
Begoña Morenés
executiveGood afternoon, everyone, and welcome to the conference call where we'll be discussing Ferrovial's financial results for the first quarter of 2021. As a quick reminder, the results report and the presentation have both been sent to you by email and will soon be available on our website. As with earlier results, we'd like to point out that the financial information contained in our report has been affected by the COVID-19 outbreak, principally from the second half of March 2020 onward. Because of the uncertainty about how quickly and how far activity will resume, we cannot predict what effect the health crisis will have on Ferrovial Group's information and performance in 2021. Ferrovial will keep monitoring trading conditions closely, along with further signs of broader economic impacts. I'm joined today by Ernesto López-Mozo, our CFO, as well as the CFOs of our business units. Should you have any questions, you can submit them via the forum included in the webcast. During the Q&A session at the end of this call, we'll read out your questions along with who they are from. With that, I'll hand things over to Mr. López-Mozo. Ernesto, the floor is yours.
Ernesto López-Mozo
executiveThanks, Begoña. Hello, everyone. Appreciate you being on the call. Moving to the first slide, the key highlights for this first quarter: toll roads really demonstrate how progress in vaccination can support economic recovery and also bring mobility back. Texas fully reopened for business at the end of March, thanks to the rapid vaccination effort. As we'll show in the slides that follow, NTE and NTE 35 West are already surpassing 2019 levels and, naturally, are higher on revenues. As for 407 ETR, it's still affected by strict restrictions that may resemble those we saw in April 2020. Good to confirm there were no Schedule 22 payments in 2020. We'll also give more detail on the general understanding of the clause following our discussions with the MTO. On airports, we hold a resilient financial position despite all the challenges. Heathrow has managed to raise EUR 1.3 billion in additional funding in the capital markets and has a solid position and liquidity position, as does AGS. The CAA has issued its response to our petition — the Heathrow petition for a RAP adjustment. They granted a small adjustment, and they will address all the conditions of regulation at the end of the year for the H7 regulatory settlement.
Ernesto López-Mozo
executiveOn the contracting side, we've seen solid performance in construction and services. In construction, Budimex continues to improve, with 4.6% EBIT, just looking at the operations without the real estate business that's being sold, as all of you are aware. As I mentioned, services also delivered a solid operating performance. Naturally, at quarter-end, we hold a net cash position excluding infrastructure projects of roughly EUR 1.9 billion, and total liquidity stands at over EUR 7.5 billion. Moving on to review the businesses, starting with toll roads. We see revenues affected by lower traffic stemming from COVID-19. Truly, the beginning of the year brought more restrictions and cases, and we also saw severe winter storms in February in Texas. That's been partly offset by higher toll rates, and we'll show in the following slides that if you strip out the winter storms' effect, the impact on revenues and EBITDA would actually have been much smaller. Almost no impact versus last year, I would say. We have a strong presence in the U.S., and the highest profit from the U.S., as clearly 76% of toll revenues and 93% of toll roads EBITDA come from the U.S.
Ernesto López-Mozo
executiveGDP recovery in the U.S. is likely running ahead of what we had expected. Let me remind you of some projects we're developing that will matter materially over the next few years, including NTE 35 West Segment 3C. That one spans roughly 6.7 mi, is due to open at the end of 2023, and is moving along at a solid pace. As I mentioned, it continues the same profile as NTE 35 West 3A 3B, so prospects for this asset look very good. Turning to I-66 in Virginia, that project is likewise progressing on schedule and should reach completion at the end of 2022, beginning of 2023. Investment here is clearly picking up speed. We also saw healthy investment in the quarter, EUR 62 million. We still have above EUR 500 million of pending investment in this important asset. Others under development are referenced here in Colombia, Slovakia, and Australia. I'd also like to note — and we'll probably keep updating this information as we go — that a significant part of the strong revenue performance in the managed lanes in the U.S., and really the 407 in Canada as well, comes from commercial revenues, which are more than 30%, three zero.
Ernesto López-Mozo
executiveCommercial revenues mostly come from trucks, but they also include accounts paid for by companies rather than individual consumers. Okay. We move on to review the managed lanes. Probably the most important data on this slide are in the banner. Here we see a range of vaccination percentage in the different counties where our toll roads operate. It's between 45% and almost 60% of one dose of vaccination in the population over 16 years of age. This is data of April 29th. This performance that we see, and here we are talking about a graph where you can basically tell that NTE 35 West and NTE are above or at the pre-COVID level, I mean, the 2019 levels. This is happening even with around 25% work from home index. These indexes are numbers that you have different calculation from different sources. This is from the University of Maryland COVID-19 Impact Analysis Platform. We think this is quite telling that we get this kind of performance and performance in revenues with this level of work from home. One of the things that we've done, given this kind of tricky to analyze how these mobility patterns would work is do polls with users of the managed lanes and the corridors in Dallas-Fort Worth, what is the expected use in terms of, or the expected trips compared to the pre-COVID levels.
Ernesto López-Mozo
executiveWhat we're hearing back is that their usage will be very near what it was before COVID — 95%-97%. We're not discussing online commerce here; this is mostly about our individual users. Okay. It's good to see how this graph performs. What's probably more telling are the graphs on the next slide, which show quarterly traffic in more detail along with the early part of April. You can clearly see the trough on the three toll roads during the winter storms, when trapping was essentially halted because of the dramatic storms. On the other hand, once that's behind us, with the economy reopening, you see performance clearly above 2019 on 35 West. It's already above on NT — just 1%, but it's right there. LBJ is improving as well. When we look at LBJ lagging, it's probably also important to keep in mind that free lane capacity in this corridor, LBJ, is higher than the rest. Congestion, let's say, will show up later in time versus the others. Let's go on to the next slide, where we see some other interesting data. Here we really have the impact from restrictions, if we look at the right-hand side of the slide.
Ernesto López-Mozo
executiveUp through March, restrictions were in place, as we observed. Even under those restrictions, heavy vehicles proved quite resilient. It's very encouraging to see that NTE recorded additional mandatory mode events in March 2021. What that means is when congestion reaches a point where we must run automatically above the cap, those events occur. March 2021 saw more of these events than February 2020, before COVID. The PM peaks are likely quite near pre-COVID levels. In the morning, as we mentioned, there's still some work from home, not everyone has returned to the office, and schools are still not fully reopened for in-person learning. The morning peak is being affected by all of this. The evening is clearly already there. As I said earlier, the winter storm's impact in February was quite severe. All three concessions shut down starting February 13th, and they reopened eight days afterward. The impact was so significant that, looking at the banner in yellow, if we set aside the winter storm effect, revenues for NTE have been up 7%. That's quite meaningful given that including the winter storm, it was down almost 2%. At LBJ, it declined only 16% versus 26%, and in NTE 35 West, growth would have been 23%.
Ernesto López-Mozo
executiveContributing as well, naturally, is how average revenue per transaction has performed, which is affected by a greater share of heavy vehicles. The toll multiplier ranges from two times to five times, along with higher toll rates. Okay, the region truly continues to be a draw for growth — you can see the population there keeps increasing. From 2010 to 2020, Texas ranked as the third fastest state when it comes to population growth. People are still moving into Texas. It's an appealing place for business, and folks are relocating there. This year, Dallas-Fort Worth is projected to be the number one industrial real estate market in the U.S. That comes from CommercialEdge. 28 million square feet of new industrial space is expected to be delivered in 2021. That equals 8% of all industrial space projected nationwide. Companies are also moving headquarters into Dallas-Fort Worth. There are several names — CBRE, Charles Schwab, a variety of them. We are glad to see this region really reopening, the response to polls from our customers, and that winter has ended. We are anticipating a rebound in GDP growth and activity in the region. Okay. We move on to the next slide. We also mentioned on the I-77, still small compared to the rest.
Ernesto López-Mozo
executiveThat's also trailing somewhat, though it's moving the right way. As we can see, Charlotte has stayed in phase three from early October 2020 onward. Restrictions eased a bit more late in the quarter, on March 26th, and at quarter's end businesses are now permitted to operate at 100% capacity. Fitness centers and restaurants may open at 75% capacity, while bars and entertainment venues can open at 50% capacity, subject to certain safety guidance rules that must be followed. The largest school district in Charlotte has increased the count of students in classrooms. Quite a lot of reopening happened in the final portion of the quarter. Vaccination efforts matter too. As of April 29th, 38% of Charlotte's population has now gotten at least one dose. Correct? Traffic growth is likewise speeding up in the quarter's latter part. Traffic rose 33.6% from February to March. Higher toll rates and an improved traffic mix have partly offset the traffic decline relative to 2020. What matters is watching restrictions come off and vaccination rates climb, which we view as essential for every mobility boost.
Ernesto López-Mozo
executiveMoving on to the next slide, we come to the 407, and once again I'll focus on the banner at the bottom. The Government of Canada has provided various estimates, and their goal is to have 64% of Canada's total population vaccinated by the second quarter of 2021. That, at least, is the plan. How quickly that happens will also depend on people's willingness to get vaccinated. As of the 29th of April, 40% of Toronto's population had already received at least one dose. Keep in mind as you look at this graph that it compares traffic against 2019, before the pandemic — and really, when we look at February and March in Toronto this year, mobility restrictions were quite similar to those in April of last year, 2020. Now you're seeing a 44% drop versus an 80% drop last year. Right? Things are reopening. Here's another one of the myths we encounter when people try to extrapolate traffic on alternative routes — the 401 and others — from various sources; they end up with very different numbers. We've brought in consultants to verify the different data points that could show how traffic is performing on the 401, and it is performing better than the 407, but still well below 2019 levels.
Ernesto López-Mozo
executiveLikely a decline nearer to 30% relative to 2019. As I mentioned, consultants were brought in to verify various data points. Moving on to the next slide, we can examine the quarter's performance in greater detail. As I noted, even under restrictions comparable to those of March last year — and, as I said earlier, similar to April's — results are improved. Toronto still needs to build momentum, the way it is happening in the U.S. Hopefully vaccination accelerates and reopening expands further. Let's go to the next one, where we dig deeper into several other elements of the 407. Right? Perhaps beginning in the bottom right-hand corner, with Schedule 22. An agreement was reached between the 407 ETR and the Ministry of Transportation concerning how Schedule 22 is interpreted and applied in relation to the COVID-19 pandemic. Both sides concur that under the concession and ground lease agreement a pandemic counts as a force majeure event, and the COVID-19 pandemic falls within that definition. It was also agreed by the parties that the traffic decline and the inability to satisfy the traffic schedules set out in Schedule 22 stem from that force majeure event, and as a result the concessionaire is not liable for congestion payments until the force majeure event concludes.
Ernesto López-Mozo
executiveThe parties agreed that force majeure covers 2020 and any year after that, until traffic volumes at 407 ETR and the main interchanges get back to pre-pandemic levels. Pre-pandemic levels, as defined here, mean the average from 2017 through 2019, or another condition, or until toll rates or user charges rise for any segment of the 407 ETR. Turning to the financial position, cash and cash equivalents remain near CAD 600 million. There really is an expectation that sufficient liquidity will be kept to meet all financial obligations in 2021. No meaningful bond maturities come due before 2022. For 2022, maturities are CAD 18 million. 2023 is CAD 318, and again, in 2023, it's only CAD 20 million — a comfortable maturity profile. On dividends, none were paid to shareholders in the first quarter. That's something all of you know. Last year, the 407 distributed CAD 312.5 million at 100% in that first quarter. The 407 ETR board will monitor the pandemic and review a potential dividend distribution in 2021. We'll have to see how the asset reopens, looking for vaccinations to ramp up. As for toll rates, there's been no change since the increase in February 2020.
Ernesto López-Mozo
executiveLooking at the financial results, this is already stale news. You saw that over seven days ago. Lower traffic took a toll on these revenues. Revenues are down 41.2%, and EBITDA is down 45.2%. Average revenue per trip rose 5% this quarter. Keep in mind that it's against the first quarter of 2020 as well, when a rate increase happened in February 2020. January is compared against a lower rate. Okay, moving on to airports, where we have Heathrow, whose results also came out last week. You saw on the right-hand side of the slide how Heathrow has responded to COVID-19, with plenty of cost mitigation and revenue protection initiatives. That's reflected in the number below, which is a 33.5% reduction in OPEX versus the first quarter of 2020. Organizational changes have taken place. I think the theme at Heathrow is also to lay a base for a more, let's say, leaner and dynamic structure going forward. It's digitizing. It's doing many different things. For current operations, terminals have been consolidated. There are two terminals and one runway, supplier contracts have been renegotiated, and the furlough scheme is being utilized. There was no benefit from business rates.
Ernesto López-Mozo
executiveIn this case, that option wasn't available, unlike at other airports around the country. On CapEx as well, it stays limited to safety and resilience, which means CapEx is down 77% compared with the first quarter of 2020. Keeping this strong liquidity position matters a great deal. The EUR 4.5 billion — if you factor in the issuances in April before Heathrow released its results, that comes to EUR 4.5 billion. Even leaving that aside, at the end of March it stood at EUR 4 billion. Very solid liquidity, and then lowering cash burn as we wait for travel restrictions to be lifted. There has been some news about reopening. It is gradual. We are hoping for further reopening and more vaccination to really give travel a boost. As we said, this liquidity position carries us for 15 months under a no-revenue scenario, which we see as quite unlikely, or into 2024 under the various traffic scenarios. S&P and Fitch reaffirmed the credit ratings as investment grade. That is good news. As I mentioned on traffic, looking at the left-hand side of the slide, we see 1.7 million passengers, quite reduced, almost 89% versus the same quarter last year. Please focus on the Global Travel Taskforce, which is very relevant.
Ernesto López-Mozo
executiveTaking a risk-based approach matters. Countries categorized as red, amber, and green. The greater the number of green countries, the better. Those in amber will have the ability to travel. That is the crucial element when it comes to reopening. Naturally, it will hinge on conditions in individual countries along with vaccination levels. Essential information is still needed. It isn't so straightforward. Various test types are required, costs are involved, and there's a procedure to complete. The earliest expected date for international travel to restart is 17 May, and something very critical — Heathrow has spoken out strongly on this — is having border force resilience in place to underpin the recovery and the growth in passenger numbers. Passengers are waiting too long, and this ought to improve. Moving to the next slide, we address regulation. A reopening statement was issued on 27 April. The CAA acknowledged that immediate action was necessary to fulfill its consumer duties and to support Heathrow's finance ability, confirming an immediate GBP 300 million RAP adjustment. In fact, this adjustment genuinely falls short. It is required to restore regulatory depreciation right away, consistent with regulatory principles. This is genuinely essential to preserve all the confidence behind investment in the regulated assets that are regulated, since it is key to delivering the key infrastructure, and those investments must be delivered with a degree of certainty.
Ernesto López-Mozo
executiveThe CAA has to fully tackle every adjustment-related issue in H7, which means this lands in the second half of the year, so that the investment required to maintain services, keep prices lower, and protect resilience through the recovery can be attracted. Risk and return also need rebalancing under the H7 framework. Heathrow submitted its revised business plan in December 2020. Initial proposals are due to be published by the CAA in the summer this year. January 2022 is when the H7 period begins. Okay. Turning to outlook as well, I spoke earlier about reopening and the lifting of restrictions. That creates uncertainty around the passenger forecast. A range of passengers, from EUR 36 million to EUR 13 million, has been revised and provided by Heathrow. The thinking here is that pent-up demand is substantial and international travel is really being counted on to restart. One of the queries—I'm not sure whether it's the top Google query in the U.K. right now—is, "Where can I go on vacation?" The chance to travel internationally is something people are genuinely excited about. Downside scenarios involve restrictions staying in place or additional restrictions arriving in the fall. At the lower end of the range, a covenant breach at Heathrow Finance is possible.
Ernesto López-Mozo
executiveWhen you look at interest coverage and interest leverage, the levels are more comfortable, though pressure on interest coverage ratios is possible. There will be a fuller update from Heathrow in the June 2021 investor report, and we'll also hear more about how the lifting of restrictions is playing out. Okay, on expansion — it's a topic that's on the back burner, but it's also among the top priorities. Heathrow remains committed to a long-term sustainable expansion. There was a positive outcome last year. This is old news, but it's worth remembering. The Supreme Court ruled unanimously that the ANPS was lawful and legal government policy. Heathrow will be consulting investors, government, airline customers, and regulators on the next steps. Last but not least, and I think Heathrow is leading here, is leading in sustainable aviation. The Jet Zero Council is an opportunity to accelerate the U.K. aviation net zero plans. There are two major work streams, sustainable aviation fuel and zero emissions aircraft. Heathrow 2.0 is aligned with the United Nations Sustainable Development Goals. Heathrow is clearly taking a leading role, this in the U.K. and internationally. We move on. Just closing on airports, we have AGS, of course, it's suffering from restrictions as well.
Ernesto López-Mozo
executiveIts liquidity standing is solid and strong. As we said, both shareholders pledged GBP 50 million — GBP 25 million apiece — to be put in to bolster liquidity. At present, the position shows GBP 47 million in cash and equivalents. On the overall accounts, you'll notice the effect of the GBP 25 million, roughly almost EUR 29 million, invested in that airport. That airport should bounce back as restrictions are lifted. In the interim, talks are underway about extending the existing financial maturity of 2022, seeking to push it out by at least three years. Right, those are the plans under discussion. As I noted, Glasgow is another airport with pent-up demand. Others are seeing more activity — Aberdeen, tied to oil and gas, for instance — while Southampton took a hit from Flybe's collapse previously. Right, again, plenty of management action. That matters a great deal. All those cost-cutting efforts. I won't go into detail on this. CapEx, too, is confined to safety priorities and compliance, yet it sits at a 27% cut compared with the first quarter in 2020. Okay. Let's turn to construction. Construction turned in a solid performance, beating last year's first quarter. Naturally, Budimex remains well out in front, with a 4.6 EBIT margin in the first quarter.
Ernesto López-Mozo
executiveJust a quick note that the real estate business that's held for sale is moving toward a closing this quarter. Budimex, as you know, keeps the market pretty well informed on developments, and quite actively. As I said, we expect to hear about the closing during this quarter — that's our expectation. On revenues and EBIT margin, I'd just say that COVID-19 had no material effect on production, and really none on revenues, in Q1. Contracting activity has been solid. The order book has done well. We have more, let's say, pending backlog. As you know, we won a large contract in San Antonio, Texas, and it isn't included in the order book. Normally we have roughly 1 billion of contracts waiting to be added to the backlog. At the moment that figure is nearly twice as high. I mean, it's EUR 1.9 billion. That's partly because of that project and partly because of other contracting in Poland, mainly. Okay. Beyond that Budimex sale I mentioned — and you have the numbers there, a fairly substantial deal — there are other events. We also have other deals signed that await authorization from the relevant bodies. You have Figueres and Urbicsa, which come to more than EUR 57 million and are awaiting approval from the regional government.
Ernesto López-Mozo
executiveOnce more, we can’t speak to timing on their side, though a natural outcome would be to have those in the second or third quarter — approvals ought to land nearer the second quarter than the third. There was also the Nalanda sale agreement — not especially large, yet still EUR 17 million for our share — and that too awaits competition authority approval. No change to the outlook at this point. Keep in mind we still expect to move ahead at a good pace on the big works in the U.S., which will consume cash there. Naturally, all these divestments should bring cash into the division. In the U.S., we move on to services. In services during the first quarter of 2021, we saw an overall profitability problem. Okay, it seems the sound isn’t that great. I’ll try to speak a little louder. If not, I’ll try to come back. Hold on a second. I’m trying to improve the sound physically <<inaudible>>. Okay, it seems there was a lot of background noise. I don’t know if that’s better. It seems it’s better. Okay. I’m moving on. Hopefully it will be audible. I’ll try to speak a little more slowly.
Ernesto López-Mozo
executiveOkay. On services, like I mentioned, we're seeing solid gains in sales and EBITDA for both Spain and Amey. Spain sits behind both business lines — environmental, waste treatment, and collection, plus infrastructure maintenance. Amey is likewise putting up a strong showing compared with last year, helped by greater volumes in social infra and transport. Once again, on this front, COVID-19 has had no material effect on production. As for the sales process, it's moving along nicely. Naturally, the initial milestones — which you're aware of, and which are fairly dated by now — involve the Broadspectrum sale. Waste treatment and collection is progressing very well in Spain. Signing and closing are expected this year. I can't say anything more than that, but it's moving at a very healthy pace and with plenty of detail. Regarding the waste treatment business in the U.K., we've reclassified that portion as a continuing activity, even though we'll carry on with the divestment process going forward. Our view is that it could take longer than 12 months. The rationale behind this choice is that we truly have four plants there. One is nearing completion of construction, while the others are boosting availability over the coming months. These projects are in their early years.
Ernesto López-Mozo
executiveHaving some of our strong management from waste treatment involved here is beneficial. It safeguards value. Is it possible to speed things up and perhaps complete it sooner than the more than 12 months we've mentioned? Yes, that's possible, but we'd rather stay cautious on this, so we're keeping it as is. In terms of EBITDA, there's essentially no effect in this year's figures. It's roughly net zero, or close to about EUR 1 million on the account. Nothing material — it matters that these plans get developed before going to market. Naturally, we stay dedicated to the investment in the services division. Other areas are progressing too. All the processes are advancing, with staff and interested parties being prepared and various discussions taking place. As I mentioned, the furthest along is waste treatment in Spain. Alright. Let's shift from services to the consolidated P&L. Alright, at the consolidated level we see an EBITDA improvement. Beyond the various items I've covered at the operating level, keep in mind that last year we booked a provision for restructuring and streamlining overheads, along with part of the groundwork for greater digitization of the support functions. That is now finished.
Ernesto López-Mozo
executiveThat stacks up well. On the financial side, the outcome would have looked quite similar, yet we do have a gain of 20-odd, near EUR 30 million, stemming from an Autema mark-to-market effect. Bear in mind two points. The first: Autema got reclassified last year from a financial asset into an intangible asset after we lost the case at the Supreme Court, which means a portion of the derivatives is inefficient. Volatility in the P&L should be anticipated as a result. This is not a cash item. It sits outside the ex-infrastructure project perimeter. It is purely infrastructure project with no cash outflow whatsoever, but do anticipate volatility there. Worth noting as well that there is probably not a great deal of value in the equity for us, though a consolidated book value of EUR 117 exists. If we were to divest this asset, we would see an immediate positive P&L impact of that amount. I would strip this part out from, shall we say, the company's recurring performance, given what I have just described. On equity accounted results, there is the 407 ETR at Heathrow that I mentioned, with nothing major or extraordinary there. Once traffic recovers, a rebound should follow. At AGS, the impact is zero.
Ernesto López-Mozo
executiveSo basically, right now our equity accounting value stands at zero. And because it's equity consolidated, you don't consolidate any impact that could be negative there. Okay. On discontinued operations, we have a positive impact of EUR 11 million from Ferrovial Services Spain — that's essentially the results achieved, given the headroom in valuation that has been recorded. We also have the real estate activity from Budimex, currently held for sale, and that impacted us by EUR 5 million as well. That's a quick review of the entire P&L; we should move on to the final part of the presentation. That would be cash and the concluding remarks. Pardon me. I just hope the sound is better now. On the net cash position, not much movement. The working capital impact this quarter was smaller than in other first quarters, other years — quite contained. This is probably helped by the services division's better payment profile, thanks to the U.K. measures. Also helping the cash position is the Budimex real estate activity, which is part of these numbers. Another point I'd like to make is that investments have been higher than in other recent first quarters, and in the 129, the main numbers are investment on the I-66, investment in AGS — that's the GBP 25 million, EUR 29 million — and a EUR 9 million investment in electricity transmission lines.
Ernesto López-Mozo
executiveSo those are the three ideas that essentially make up the whole investment case there. Now we can go to the closing remarks I'd like to leave you with. The first is likely the lift we're seeing in the GDP rebound, particularly in Texas, in the U.S. That ought to help drive traffic, revenues, and activity overall. At airports, a reminder about the pent-up demand and how we're waiting for a broader reopening. Let's see how the summer plays out. In Spain, the services divestment is progressing nicely. I mentioned waste treatment in particular. Everything is moving forward. The board approved the first scrip dividend that was kind of set by the general shareholders meeting for the board to decide. Here we have the amount. End of May, beginning of June should wrap up this process. Very important, we are communicating — well, it has been communicated to the stock market regulator — two new independent board members who will add experience, knowledge, more depth, more breadth, more independence, more diversity. Welcome to all these new brilliant board members. I hope you can take a look at the information that has been posted in the CNMV. Thanks for bearing with me. Apologies for the noise, the sound has not been that great.
Ernesto López-Mozo
executiveNow let’s begin the question-and-answer portion.
Begoña Morenés
executiveThe first batch of questions is from Alejandro Vigil at Bestinver. He starts by asking for our views on Highway 413 compared with the existing capacity on the 407, and also on the idea of subsidizing trucks on the 407 ETR — what do we think?
Pedro Losada
executiveThank you, Begoña. And thank you, Alejandro, for your question. Pedro Losada here, Cintra's CFO. Regarding your first question about the proposal to subsidize trucks on the 407, we have had no conversations at all with the MTO on this matter, so there is nothing for us to comment on there. As for Highway 413, remember that during the full year, we shared some views from the company on this project. In recent months, opposition from municipalities and regions to the project has grown even further. On the environmental assessment, the key change is that, as of this past Monday, the federal government will now be involved and will also carry out an analysis and offer its opinion on that environmental assessment. From our perspective, that means, first, that after the analysis — which will certainly take some time — they could keep the scope as is, could alter the scope, or could even cancel the project. This comes from our own information, which is based on public information. In any case, we assume this will potentially delay the process significantly, because the federal government will probably need to start from scratch to conduct that assessment. Thank you very much.
Begoña Morenés
executiveThanks, Pedro. Our next question comes from Alejandro as well. Would you be able to share your thoughts on the investment opportunities tied to the economic recovery plans across Ferrovial's markets?
Ernesto López-Mozo
executiveHi there, and thanks for asking. That's a pretty comprehensive question. Over in European Spain, you've got the NextGen funds. Those NextGen funds tie into opportunities largely centered on energy efficiency, renewables, and other digital initiatives. Investment is coming in urban—let's call it—improvement aimed at the kind of energy efficiency I just mentioned. That's going to be part of the projects we're able to put forward. Then, naturally, there are mobility-related items tied to 5G, and these might not be only NextGen here—they could also involve things connected to the U.S. and other regions, correct? You can find chances to develop products that optimize traffic and also deliver services plus safety to your drivers. There are various items here that lean more toward software or IT, where we have the capabilities and where it can be done. All of these are more tied to recent flavors, and we're examining some things we can do here, and it's not a small amount. We see, in any case, a need for infrastructure across many countries. The U.S. being the primary one. Here it's a mixture. There are some public items where we'll compete. There are others sitting in what we call the development phase, and about those we can only comment once they reach the market.
Ernesto López-Mozo
executiveWe’re looking at opportunities that over the coming four years could amount to several billions in total equity—for example, in the U.S. I’m not going to be more specific at this point, since some are still in development while others will be bids. I don’t know whether later in the conference we might be able to say something about some of the public projects. Broadly, a number of them will become more public once they exit the development phase. That’s several billion of opportunities across these different markets. Naturally, these aren’t the only possibilities—we’ll also be examining opportunities that may arise in airports and could be attractive, and more generally other infrastructure. There are opportunities there. I’m not going into more detail. We’d rather speak about each project when it becomes more public.
Begoña Morenés
executiveThanks, Ernesto. Our next questions come from Jacopo Di Nardo at Latitude. When you look at congestion figures worldwide in places that have reopened, there doesn't appear to be a massive gap compared with 2019, except perhaps that the congestion curve across the day is flatter. Once the states of emergency are lifted in your North American markets, how are you thinking about overall tariffs?
Pedro Losada
executiveThanks, Jacopo, for that question. Pedro Losada here again. Well, as you said, you're asking about the point when restrictions get lifted, and in many of our regions, plus the impact on our assets, we're still in the midst of a lot of restrictions. It's true that improvements are showing up as restrictions ease a little, but sharing our views is probably too premature and likely not prudent. We ourselves need to wait a bit longer for more data points before making those decisions. Just to add a little more color, perhaps we can say that during the day we're seeing a small shift in traffic patterns, with fewer trips made during the AM peaks, and a full recovery at middays and PM peaks, driven by home-based, non-work-related trips and trucks. Again, we're monitoring how traffic profiles are evolving, and we'll adjust the toll rates policy accordingly. Thank you.
Begoña Morenés
executiveThanks, Pedro. Our next question comes from Jacopo as well. You divested the Polish house builder Budimex at roughly two times tangible book value. What are your plans for those proceeds? Will that money go back into Poland?
Iñaki García
executiveThanks, Jacopo. Iñaki Garcia here, CFO of Ferrovial Construction. Ernesto has already addressed part of that question, I believe. Back in March we got a conditional agreement in place. It hasn't closed yet, but the Securities and Exchange Commission has been notified that the deadline now runs to the 14th of May. There's a strong likelihood we get this deal done. Your figures are correct. Proceeds should come to roughly EUR 330 million, with a pre-tax and minority surplus of EUR 150 million. As for what we do with those proceeds, it's too early to discuss that right now, in my view. First, the deal isn't closed, and second, any decision rests with the supervisory board and the general shareholders meeting of Budimex. Naturally, we're looking at every opportunity, weighing what Ferrovial might do, balancing dividends against possible investments in Poland. There are certainly attractive opportunities in Poland, and we'll analyze them the way we always do. Thank you.
Begoña Morenés
executiveThanks, Iñaki. This final question comes from Jacopo. At this point your net cash position is quite high. Would you think about a buyback on a bigger scale in order to narrow the discount to your net asset value?
Ernesto López-Mozo
executiveHi, thanks for the question. You're right that we have an investment priority, and many of you have pointed that out. Our net cash position is quite substantial. That's liquidity, and to create value we need to put it to work. We're focused on industrial investments. That's the preference, since we believe we're at a moment when a great deal of infrastructure will be built. I know there's been plenty of commentary that a big chunk could have been Maryland, but others are coming too. That's a priority for us. Of course, we can't deliver that. Maybe that could be entertained. Narrowing the discount to net asset value matters a great deal to us. In our view, the best route to that is investing wisely, though we don't rule it out in case we don't consider it. The house's priority is to invest profitably and then to develop and clinch whatever opportunities may come.
Begoña Morenés
executiveOur next question is from Nicolo Pessina at Mediobanca. On the 407 ETR, what kind of traffic recovery are you expecting?
Pedro Losada
executiveThanks, Nicolo. Once again, given the restrictions and the fact that we're under a shutdown and a stay-at-home order right now, it's too premature for us to share our own views. We need to wait a bit longer until restrictions are lifted, and also watch quite closely how vaccination is evolving these days — it's better than it was a few weeks ago. It's speeding up, and that will probably give us the chance to have more views over the coming months. Today is too soon to answer that question.
Begoña Morenés
executiveThanks, Pedro. And here's another one from Nicolo: "How are the highways close to the 407 doing?"
Pedro Losada
executiveSharing details like this isn't something we normally do. At times such information isn't public, and our hands are tied by our commitments to the public authority that might be in a position to disclose it. What we are able to say is that we engage technical services providers, and they offered us some perspectives on how congested our corridors might be throughout all of our assets. From one of those firms, StreetLight Data, here's what we can pass along: that company reached the conclusion that 401 in particular — though it probably could be extrapolated to the remainder of the corridor — shows a 30% decline in traffic performance compared with 2019. That should give you a bit of flavor and partly answer your question. Thank you.
Begoña Morenés
executiveThanks, Pedro. Now for Nicolo’s third question: “Given that the Ministry of Transportation of Ontario appears set to raise Highway 407 tolls in June, would you anticipate 407 ETR following suit at some point during this year?”
Pedro Losada
executiveThanks again, Nicolo. I want to make clear that the 407 ETR contract is entirely separate from the 407 extension contracts. Even though there is likely a scheduled tariff increase this coming July on certain of the extensions, that once more is unrelated to the 407. In addition, as Ernesto explained in the presentation, given the agreement with the MTO and the fact that a force majeure event remains in effect, there is no foreseeable way we can change the tariffs at all during 2021. Thank you.
Begoña Morenés
executiveThanks, Pedro. Nicolo’s final question was this: given the traffic outlook as it stands now, would NTE and LBJ be expected to pay a dividend in 2021, and what might the dividend policy look like going forward?
Pedro Losada
executiveThanks, Begoña. As we said in the presentation, following this quarter and with restrictions lifted in the Dallas area, we have greater confidence that performance will improve considerably over the remainder of the year. Under the financing contract, dividend payments are permitted in June and December. We have to wait until those months, meet the covenants and ratios in the financing contracts, and then, we hope, if the board so decides, we will pay dividends. Yes. Thank you.
Begoña Morenés
executiveThanks, Pedro. Our next question is from Felipe Ley at CaixaBank BPI. He asks why EBITDA from other activities is EUR 15 million in Q1 2021, compared with minus EUR 38 million in Q1 2020.
Ernesto López-Mozo
executiveAll right, so thank you for that question. Two factors stand out above everything else. To start with, during Q1 we set aside a provision aimed at simplifying overhead structures and digitizing support roles. That hit the first quarter of 2020. When it comes to Q1 2021, there is an effect that is pretty tough for management — we received considerably fewer shares and less bonus, since COVID-19 weighed on how the share performed and on the results, and that came out this year. Smaller pieces include, as I said earlier, waste treatment out of the U.K.
Begoña Morenés
executiveThanks, Ernesto. Our following questions come from Elodie Rall at JPMorgan. You said no Schedule 22 will be owed until toll rates or user charges rise for any segment of the 407. Could you clarify what level of tariff increase that is based on? Is it the 2019 level or the 2020 level? Thank you.
Pedro Losada
executiveThanks, Elodie. Pedro Losada here. Those tariffs mean the ones in place right now. Under the concession, we're limited in what we can do about adjusting tariffs relative to the ones we're currently dealing with. That would happen once we've assessed the impact.
Begoña Morenés
executiveThanks, Pedro. Our next question is also from Elodie. You said previously that you expected dividends from 407 ETR to start up again by the end of 2021. Does that still hold, or has anything changed? Did the Schedule 22 outcome influence how you think about dividends?
Pedro Losada
executiveThanks, Elodie, once more. If I take the second half of your question first, I'd actually flip it around. From our perspective, Schedule 22 shifted how we view dividends, and that shift has been favourable. As for the first part, yes, we still hold to that view, and it rests once more on the way traffic develops — which is to say, on how the financial restriction ratios and the redundancies played out across the year. Taking all of that into account, we assume the board could decide to push it back, as we mentioned with the full year results, so that any potential dividend distribution lands at the end of 2021.
Begoña Morenés
executiveThanks, Pedro. Our next questions come from Luis Prieto at Kepler Cheuvreux. Once the Maryland DOT has made its initial ruling on the protest of the I-270 result, should we expect Cintra's consortium to appeal that decision further?
Pedro Losada
executiveThanks, Luis, for asking. Regrettably, we remain bound by our NDA with the administration, just as we were in February when these questions first started coming in. We've been reading the press the same way you have. The confidentiality agreement limits us, which means we're unable to say anything at all about this process. Thank you.
Begoña Morenés
executiveThanks, Pedro. Our next question also comes from Luis. Can you give us any update on the managed lanes pipeline in the U.S.? Are you seeing more competition? And has there been any shift in your views on the country because of the president's infrastructure plan proposal, especially given the potential tax changes?
Pedro Losada
executiveThanks, Luis. Regarding the growing competition and pipeline in the U.S., we're watching various options. We brought up a few of them during the last results presentation. We're pursuing a number of opportunities across different states like Georgia, Florida, and Texas, several of which came up previously. A few others remain somewhat confidential, but we're still seeking managed lanes opportunities that carry high concession value. As you know, that's one of the company's main objectives. On the competition side, as we saw in the recent process we were involved in here in Maryland, we haven't observed much of an increase when it comes to competitors. We continue to see the usual suspects here. As for your comment on tax, I think it's a bit early to gauge the scope of Biden's tax reform. While a potential tax hike could affect our tax position, since we hold a significant amount of tax credit, we don't anticipate a severe cash tax impact. Again, it's a little early to analyze how far the tax reform will go. Thank you.
Begoña Morenés
executiveThanks, Pedro. We now have questions from Marcin Wojtal at Bank of America. With the agreement on Schedule 22 in place, do you plan to hold toll prices on the 407 steady until traffic volumes get back to pre-pandemic levels? Would you think about raising prices earlier than that?
Pedro Losada
executiveThanks, Marcin. Yeah. Again, apologies — I keep saying the same thing too often, that it's still too early to respond to questions like these. We have to watch how things develop. Sorry. We really do need to see when and how we'll get back to that pre-pandemic level, and after that, figure out what the trade-off is between raising prices and holding them steady for the benefit of the concessionaire's users. Again, it's too early to respond to these questions. Thanks.
Begoña Morenés
executiveThanks, Pedro. Our next question also comes from Marcin. Are you expecting to submit bids for new U.S. managed lanes projects prior to the end of 2021?
Pedro Losada
executiveThanks, Marcin. Before the end of 2021, we don't have a pipeline for managed lanes. It's true that we're working on several initiatives that could create that pipeline over the coming 12 to 18 months. The answer is no, we don't have any specific managed lanes projects this year.
Begoña Morenés
executiveThanks, Pedro. The next question — and the final one from Marcin — is whether you expect Heathrow to need an equity injection during the next 12 months, and would Ferrovial be willing to take part?
Ignacio Castejón
executiveThanks, Begoña. Hi, Marcin. At Heathrow we’re sitting on a solid cash position of GBP 4.5 billion. Under an exceptionally severe no-revenue scenario, that money covers our projected requirements for the next 15 months. Beyond that, the balance sheet is in a very robust place thanks to the recent GBP 600 million capital increase in the SP vehicle, plus the GBP 300 million reopener. Strong liquidity and a strong balance sheet. That said, downside scenarios could arise that lead to a possible breach of covenants at Heathrow Finance. We would regard any such covenant breach as technical and temporary. For these reasons, we don’t anticipate an equity injection at the Heathrow level. Thank you, Marcin.
Begoña Morenés
executiveThanks, Ignacio. Our next question is from Kenton Moorhead at DWS. How much of Spain services, as a percentage, is the waste business? Is that all of the business in Spain, or only part of it?
Ernesto López-Mozo
executiveYeah. Hi, Kenton. So it's a portion, though a substantial one — somewhere in the 70% to 80% range of what the Spanish business is worth.
Begoña Morenés
executiveThanks, Ernesto. Our next question, or group of questions, is from Patrick Creuset at Goldman Sachs. How are light truck or e-commerce-related traffic volumes on the managed lanes and the 407 trending at present, as a percentage of pre-COVID levels?
Pedro Losada
executiveThanks, Patrick. We’ve brought up this trend a few times now. Performance in heavies looks stronger than it did before COVID, and e-commerce is driving most of that improvement. Thank you.
Begoña Morenés
executiveThanks, Pedro. We have one final question from Patrick. I-66 has now passed the 60% completion mark. What are your views on the possibility of opening it early in the middle of next year, the way we managed with the Dallas managed lanes?
Pedro Losada
executiveThanks, Patrick. As of today, we're running according to schedule. We can't say there's a real chance for early opening mid-next year. We maintain by the end of 2022 as the goal for ending the construction.
Begoña Morenés
executiveThanks, Pedro. Our next question is from José Manuel Arroyas at Santander, on how the new Schedule 22 rules actually work. You mentioned that the suspension of Schedule 22 holds until toll rates go up for any segment. I just want to confirm: if the ETR increases tolls on only one segment of the road, does that mean Schedule 22 applies in full again, as usual, across all 24 segments of the 407 ETR?
Pedro Losada
executiveThanks, José Manuel. Yes, that's right. If you raise tariffs in only one segment, you pay the full amount for 2022.
Begoña Morenés
executiveThanks a lot. Our next questions come from Nabil Ahmed at Barclays. Could you give us some sense of Texas Managed Lanes pricing during the first quarter, excluding the mix — that is, heavy vehicles?
Pedro Losada
executiveThanks, Nabil. Unfortunately, we don’t break that out. What we do give is the average and the tariff per transaction, and that reflects a combination of the effect from heavy vehicles on the weight used in calculating that average, along with tariffs. As noted in the presentation, those tariffs rose across all 3 Texas Managed Lanes. Thank you.
Begoña Morenés
executiveThanks, Pedro. Our next question also comes from Nabil. What does the motorway traffic trend look like for April? Has there been any improvement at the 407 ETR?
Pedro Losada
executiveThanks, Nabil. So, our view of April is pretty much consistent with March, which is a good trajectory. Just remember that during April, mobility restrictions were at a higher level, though consistent with March.
Begoña Morenés
executiveThanks, Pedro. Moving on to the next question, which also comes from Nabil. Has the LBJ begun to bounce back, and did the March trend carry on for the NTE and for 35 West?
Pedro Losada
executiveYes, thanks, Nabil. Yeah, as we showed in the presentation, the three Dallas tollways did considerably better in March than they did in 2020, and we're continuing to see that same kind of trend in April. So the answer to your questions is yes. Thank you.
Begoña Morenés
executiveThanks, Pedro. Our next question comes from Nabil as well. Would you mind giving us an update on the savings plan at the group level?
Ernesto López-Mozo
executiveHello, and thank you, Nabil, for raising that. As you're aware, our target is EUR 50 million in savings each year. We're quite near that figure—around EUR 40 million in savings. The reason we haven't reached 50 yet is partly tied to digitization, which requires system implementations and so forth. Right now we're past 30 and getting close to 40, and the 50 ought to be hit once the IT implementations are complete. For that, we should be targeting the second half of 2022.
Begoña Morenés
executiveThanks. Nabil has another question. What amount of cash consumption do you anticipate for construction across all of 2021?
Iñaki García
executiveHi, Nabil. Thanks for asking. Iñaki here. It's too early to provide any guidance regarding cash consumption. Just to offer a bit of context, I'd say three levers will come into play. The first, naturally, is that we have this loss provision in the U.S. — no effect on the P&L, but naturally, those losses have to be paid. On the other hand, we're contracting and we still hold high hopes for a high level of awards. That could bring, sorry, some advance payments, provided all the contracts get awarded on time within the year. The third item is the investments that Rafael already mentioned will probably be collected during this year. Thank you.
Begoña Morenés
executiveThanks, Iñaki. Now for the next question — and this will be the last one from Nabil — how much CapEx should we expect for the group across full year 2021?
Ernesto López-Mozo
executiveHi, Nabil. What's really behind the CapEx figure is spending on I-66, which is ramping up on Cintra's side and could approach EUR 400 million. You've already seen what airports are putting into the AGS, and while other group investments would be smaller, it's quite possible we land in the high EUR 500s — near EUR 600 million for the year.
Begoña Morenés
executiveThanks, Ernesto. Tobias Woerner from Stifel has the next batch of questions. Your services divisions have improved quite a lot. Could you shed some light on the reasons behind that, please?
Ernesto López-Mozo
executiveA few different factors are at play here. First, there's Amey. Amey saw increased activity in social infrastructure, defense contracts and maintenance, along with more highway maintenance work. That higher activity showed up in higher EBITDA. Turning to Spain, there was also an improvement in industrial waste as well as in waste from hospitals and similar sources. Waste treatment compared with last year was a clear improvement too. On top of that, some contracts that the pandemic hit harder last year, tied to maintenance services for infrastructure—such as the trip attendant in rail in Spain—did better. The Renfe contract, which had seen reduced activity because of the pandemic, also performed better than last year. All in all, there was more activity in the areas that could carry a higher margin.
Begoña Morenés
executiveThanks, Ernesto. Tobias has the next question. The AGS at equity result came in significantly less bad than last year. Can you explain the reason for that?
Ignacio Castejón
executiveHi, Tobias. Ignacio Castejón here, calling from Ferrovial Airports. The explanation lies in accounting — specifically International Accounting Standard 28. Put simply, AGS's share of losses has now gone beyond Ferrovial's interest in that company. As a result, Ferrovial has stopped recognizing any additional losses arising from AGS. Thanks, Tobias. Thanks to all of you.
Begoña Morenés
executiveThanks, Ignacio. This will be the final question, and it comes from Tobias. With the EU's Next Generation Recovery Plan in place, are you beginning to see additional projects coming through in Spain and Poland?
Iñaki García
executiveThanks. It's Iñaki once more. Let me speak to construction. It remains premature. More clarity is needed regarding the plans. We anticipate that clarity arriving during the second half of the year. What's certain is that Ferrovial Construction has already submitted expressions of interest, roughly EUR 3.4 billion. Largely green real estate plus energy-related work. Urban rehabilitation, industrial real estate. There are projects where we anticipate, as noted, greater clarity on these projects. We anticipate some form of pipeline that our capabilities allow us to reach. Thank you.
Begoña Morenés
executiveThanks, Iñaki. Our final questions come from Nicolas Mora at Morgan Stanley. If we look at NTE and NTE 35 West, which are the furthest along in the recovery, westbound traffic on NTE commands premium pricing. At what point might eastbound traffic also join in on dynamic pricing? And what about 35 West?
Pedro Losada
executiveThanks, Nicolas. Yes, eastbound is doing better, though westbound is also closing in on those same levels. We likely need a bit more time, but we're confident we'll reach that point, and it will apply not just to the NTE but to the NTE 35 West as well.
Begoña Morenés
executiveThanks, Pedro. We have a final question from Nicolas. What would you say is required for LBJ traffic to get back to 2019 performance? Dallas Fort Worth International Airport stepping up further as the eastern stretch's works wrap up, which are expected by late 2024, economic growth, and a smaller effect from working from home. Thank you.
Pedro Losada
executiveYeah. Thanks, Nicolas. I'd probably put that down more to folks returning to the office. Bear in mind that LBJ is an urban corridor where commuters make up a higher percentage. Of the three, it likely sees less traffic even within the corridor, which is why it's hit harder on overall traffic, but that's probably tied more to commuters than to the other factors you're bringing up. Thank you.
Begoña Morenés
executiveThanks, Pedro. There's a final batch of questions that's just arriving now, and we'll read them out soon. This next group comes from Charles Maynadier at Kempen. Might we see additional sales of certain mature toll road assets on your side within the near term?
Ernesto López-Mozo
executiveHello. Appreciate it. No, not truly during this year. Our expectation is to complete and finalize the pending items, which are simply awaiting authorization. No, not at this moment. Thank you.
Begoña Morenés
executiveCharles Maynadier has the final question. Considering the revisions to your original projections for the managed lanes and traffic mix dividends, among other things, plus the addition of new assets, do you anticipate providing the market with visibility at some point following the pandemic — through either an updated or a simplified version of that toll roads valuation file you shared in 2019?
Ernesto López-Mozo
executiveThanks. Yeah, we should. We genuinely need to examine additional information patterns and how things stand. We’ve got to decide based just on how patterns, let’s say, grow clearer, along with our investment activity. Those two things together mean that not in the short term, but it’s something that helps the investor, has done so previously, and it’s something we ought to carefully review. Now, with all the activity increasing and more investment, I don’t think it’s the time, but we keep watching for the right occasion to give more information.
Begoña Morenés
executiveThanks, Ernesto. That’s all the questions we have.
Ernesto López-Mozo
executiveWell, thanks to everyone for joining the call and for being here with us. I'd say the news is encouraging. Hopefully the health situation will recover more quickly and all the vaccinations will work. Thank you. Bye-bye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial N.V. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.