Ferrovial N.V. (FER) Earnings Call Transcript & Summary

October 27, 2022

Bolsa de Madrid ES Industrials Construction and Engineering earnings 67 min

Earnings Call Speaker Segments

Silvia Ruiz

executive
#1

Good afternoon, everyone. I'm Silvia Ruiz, and I'd like to welcome all of you to the Ferrovial Conference Call, where we'll be discussing the Financial Results for the Third Quarter of 2022. As a quick reminder, you can find both the results report and the presentation on our website. Just like in earlier results, our domain restrictions to mobility have been lifted, and we want to point out that the financial information in our report continues to be affected by the COVID-19 outbreak. Because of the uncertainty about how quickly and how fully activity will resume, there is no way to predict what impact the health crisis will have on Ferrovial's group information and performance in 2022. On top of that, the uncertainty brought about by the Ukraine-Russia crisis is weighing on global markets. Ferrovial will keep watching trading conditions closely, along with any further signs of a broader economic impact. Joining me today is Ernesto Lopez Mozo, our CFO, along with the CFOs of the various business divisions. Should you have any questions, you can submit them via the form included in the webcast. During the Q&A session at the end of this call, we will read out your questions and who they are from. With that, I'll hand things over to Ernesto.

Silvia Ruiz

executive
#2

Ernesto, you have the floor.

Ernesto López-Mozo

executive
#3

Yes, thank you, Silvia. Hello, everyone. Okay. So our review will cover the results through the EBIT line. The complete financial figures for the year, though, are going to be discussed in February. So, beginning with the first 9 months overview for toll roads, revenue growth has been very strong across every asset. Traffic did very well in the quarter, September put in a good showing, peaks are returning, and broadly that is carrying through into revenue and EBITDA growth. Naturally, the strong U.S. dollar currency has given an assist as well. At 407 ETR the patterns looked much the same, with traffic getting better as the quarter went on and improving in line with the broader recovery trend since Toronto reopened. A stronger Canadian dollar is helping those results too. On airports, we likewise saw very strong performance over the summer, along with better operational and quality service in the quarter. Construction has managed inflationary pressure while keeping margins stable. What matters is that construction is delivering infrastructure that will create a great deal of value. So recent developments such as the I-66 reopening come thanks to that excellent management and the acceleration of production.

Ernesto López-Mozo

executive
#4

A 9-mile stretch of the I-66 has opened ahead of schedule. The early figures we're seeing genuinely give us confidence. Naturally, we'll be releasing data over the course of 2023. Until the entire segments are open, we won't be putting out data. Additionally, <<inaudible>> Ferrovial has prequalified for the SR-400 in Georgia, and we're eager to see how that process unfolds. On strategy, we can report that the services divestment is now complete, following the agreement to sell Amey, and well, that should close within the coming weeks, months. Turning to new business opportunities, we also reached financial close in June on the new Terminal 1 at JFK — an accomplishment that demonstrates the quality of both the asset and the project, in a climate where financial closes are uncommon. We also finished acquiring Dalaman International Airport. Our cash position stands very solid at EUR 1.1 billion. We have been using up cash for some very sound reasons: investment in value-creating projects such as the I-66, the new Terminal 1 at JFK, and the Dalaman acquisition. And of course, that is driving working capital and cash out consumption, along with some construction involved in delivering these projects. And last but not least, we're continuing shareholder remuneration through dividends and buybacks.

Ernesto López-Mozo

executive
#5

On ESG, we're making progress on our decarbonization KPIs. We'll provide an update when we report year-end results. Okay. Let's go to the next slide. We'll begin with the toll roads overview. On a like-for-like basis, revenue and EBITDA grew 26.1% and close to 28%, with solid EBITDA margins. And once we factor in the American roads in the U.S. — I mean not like-for-like, but in translation terms — you'll see asset revenue growth of close to 56.5%. EBITDA is up 48.2%, and they distributed dividends at NTE and LBJ. The key new toll roads we're anticipating opening include the I-66 — as I mentioned, one segment is already open. We expect to close at year-end, finish construction, and open for full operations in 2023. We still have EUR 180 million left to invest there. Another very exciting project is the 35 well Segment 3C, which is close to 7 miles. It comes in addition to the 35 West, and we still need to invest EUR 70 million, with opening expected in September 2023. On to the next slide. We move to the 407 ETR. Here we see traffic rising strongly versus 2021, with 38% growth in VKT terms.

Ernesto López-Mozo

executive
#6

Revenue was up 35% and EBITDA rose 39.2%. Revenue per trip is climbing, and that's because the average trip is getting longer. The main driver here is trips originating in the eastern section of the 407 concession. That's a part of Toronto with room to grow in the future. On the financial side, the company has solid liquidity and nothing significant maturing in 2022 or 2023. And it paid out CAD 200 million for the full equity in the third quarter. At the October Board meeting, an extra dividend of CAD 350 million got approved. Of course, that isn't reflected in our accounts yet. Regarding Schedule 22 and the force majeure event, people have asked about the MTO agreement — specifically whether that agreement placed limits on 407 ETR's ability to raise tariffs. The answer is quite straightforward. No, nothing of the sort is in the agreement. So it becomes an economic decision: 407 ETR will raise tariffs when doing so makes economic sense. If you want to verify, the agreement is posted on 407 ETR's website. Another question we've been receiving is when the force majeure event comes to an end. There are 2 conditions.

Ernesto López-Mozo

executive
#7

If either condition is satisfied, the force majeure event comes to an end. The first is a tariff increase by the 407. The second is average peak hour traffic hitting the average peak hour traffic level seen during the period from 2017 through 2019. Peak hour traffic data is not provided by 407. As a good proxy for judging how long the force majeure event lasts, it has opted to report average traffic. Peak traffic will probably bounce back later than average traffic. Moving to the next slide, we can see how traffic patterns compare with 2019. Well, 407 published its results a few days earlier. So this is not news, though it is nice to see the trend. And I would particularly like us to look at the return-to-office graph as well. Well, it is low. Compared with the regions where we operate, it is very low, yet the trend is clearly visible. And September was roughly 32%. In the first days and weeks of October, it is roughly 34%. Okay. So compared with other regions where we operate, it is still low. Toronto reopened much later than other cities and has started more slowly, but the trend is getting better. Regarding the economy going forward, well, we have included here some forecasts from the Conference Board of Canada and Statistics Canada.

Ernesto López-Mozo

executive
#8

And so, despite a macro picture that's not fully certain, they — what I mean is these institutions anticipate that — well, real GDP is still expanding, CPI will moderate, household income should rise, and employment ought to hold up well. All right. So what I'm saying is the region appears more resilient than perhaps other areas elsewhere across the globe. All right. Turning to the following slide, we move into the Dallas Forward managed lanes. And at this point, I'd like to highlight a few different patterns. What I mean is the first one is, say, the pattern within the quarter. As is visible across every road, the traffic improvement was evident, with September coming in stronger. So NTE really stands apart and carries more mandatory modes because of congestion. When we examine LBJ, keep in mind that the comparison with 2019 — 2019 had flattering numbers during that latter stretch of summer and also in the fall, as we'll see, since — what I mean is one of the roads competing with LBJ began construction work, and another one that was a feeder opened. So that comparison probably doesn't properly reflect what the traffic evolution actually is. Still, we can see the quarter's improvement.

Ernesto López-Mozo

executive
#9

That's clear. Also, in the table underneath, we can see the growth compared with last year. Naturally, the LBJ still has works on the eastern connection, and there levels are high, with people avoiding the corridor. Much the same story applies when it comes to works on Segment 3 — concerning Segment 3C, it is affecting 35 West. We are verifying that useful drivers are steering clear of that corridor, and that is hitting traffic — traffic that, in any case, continues to perform very well, with a high share of heavies. We show there a picture of how 3C is impacted by works. Okay. So when we look into willingness to pay in the region, we see revenue per transaction growing on the different roads. So all of them are clearly above inflation. Inflation at the start of the year stood at 7%, and that was the upgrade, or the uplift, in the cap that was applied, okay? So still performing really well. If we move to the next slide, we can see that revenue outperformance versus pre-pandemic levels is huge, and it happens across all the roads. In particular, the last one, I-77, I will cover later, because it is also improving and showing excellent performance above our expectations.

Ernesto López-Mozo

executive
#10

Now on the next slide, you can see Dallas Forward being utilized, and the wave of new businesses keeps coming. I mean, Wells Fargo is putting up a new corporate campus, likely with 4,000 workers. Goldman Sachs is also expanding into Dallas, with office space for 5,000 workers. oneworld Alliance will move its headquarters from New York into Forward. So the region continues drawing companies from every part of the country. And if you look at what's driving future growth — something we have to keep emphasizing, since it speaks to substantially more value ahead — it's population growth and employment growth. Okay. So turning to the next slide to discuss the I-77, it's clearly expanding perhaps even more quickly in terms of revenues and EBITDA than the others, right? So on revenue per transaction, or per mile, it's catching up with the other roads. That area is growing nicely too. And well, the higher revenue per transaction just mentioned came in at 43.9% growth versus last year. On the regional update, once again, this one keeps expanding. Population is currently rising and is expected to grow 1.6%. And well, Charlotte's population is projected to jump by 47% between 2010 and 2030, okay, so that's another growth area where we're well-positioned.

Ernesto López-Mozo

executive
#11

Turning now to airports, and I'll begin with Heathrow. Heathrow's results came out yesterday, so you've likely already seen how traffic performed. Heathrow has raised its full-year passenger forecast to a range of 60 million to 62 million passengers. Inbound leisure has, of course, been a key driver behind the recovery. Even so, inbound leisure and business travel are both displaying signs of recovery too. Business travel hit 21.5% in the third quarter, against 28% before the pandemic. That shows the appetite for travel remains. The temporary cap on the passenger side, brought in during July so that all parties around the airport could run smoother operations, will be removed starting October 30. Heathrow stood as the busiest European hub this summer, and consumer services quality got better over the quarter. Everyone in the sector is concentrated on rebuilding capacity and expanding resources. On financial performance, I'd like to point out that Heathrow continues to delever, with net debt to the regulated asset base at Heathrow Finance standing at 83.7% at quarter end.

Ernesto López-Mozo

executive
#12

All right, at this point we're awaiting the CAA's final proposals, and once they're released we'll share our comments. Okay. So turning to the other airports on the next slide. We're also seeing that AGS had a solid summer. Glasgow there is posting a 23% decline compared with 2019 in the third quarter, though it's clearly getting better relative to year-end and versus last year. And I'm glad to report that Dalaman, which we closed in the summer, is delivering good results, with traffic recovering strongly — specifically, only just about a 7% decrease against the third quarter of 2019. And at this point you can see the U.K. accounting for 46% of total passengers. So it's increasingly becoming a really appealing destination. Regarding what I flagged at the start, New Terminal One, it's very important to note that this project remains on schedule. And I mean, certain milestones such as the Green Garage demolition and the AirTran closure are presently in progress. On equity contribution, as of September 30, we've injected EUR 34 million. Okay. If we turn to construction. So we're still at flat margins. Here, obviously, we need to distinguish between the — I mean, 2 major projects that are pulling margins down, but which matter a great deal.

Ernesto López-Mozo

executive
#13

To start with the first one, I-66, which, as I said earlier, is assisting us in opening up infrastructure that's really exciting. And then there's I-285, which sits at the center of the new projects coming up in Georgia — SR-400 and others — and is genuinely helping us build a relationship with contractors in that area. So all of that experience ought to be valuable. As for how the other parts are performing? Well, on the — I mean, it's not on the slide, but the release that's been filed shows it: Webber, which operates in the U.S., is at 3% margins, and Budimex is well more than double that. Okay. So very good management in an intense environment, complicated projects with fixed price, delivery is taking place, and that should bring value from infrastructure. On the backlog side, it's also high, and there are some pending items to book, such as the subway line in Toronto, which should incorporate EUR 2.3 billion. I mean, we're looking forward to that project as well. As for cash consumption, yes, the U.S. is still expected to consume cash in the remainder of 2022. On services, on the next slide, we've pretty much completed the process with the sale of Amey; some small pieces remain, like mining services in Chile and waste treatment and energy from waste in the U.K., a long time that will go.

Ernesto López-Mozo

executive
#14

But I mean, the focus right now isn't on those sales processes. These operations are going to stay, and the aim is to make their results better, especially waste management — Chile is performing quite well. On the Amey sale, a few details: you saw the enterprise value of GBP 400 million. And regarding net debt-like items, the main item that got incorporated was GBP 148 million. That's really for pensions. It serves as a proxy for a pension scheme buyout. I mean, the scheme has a surplus in IAS 19 in technical provisions, and it's very well-funded. But clearly, the negotiation meant that we either had to keep that risk ourselves or take it as a kind of buyout solution. Okay. So as for final completion, it's subject to regulatory clearances that are expected in 2022. As for the capital gain, the estimate is around EUR 50 million. All of this was disclosed in our communication to the market at the time. If we turn to the cash evolution. We see the different components, I mean, the help from dividends from projects, and then we see the main cash drain that we have. The working capital evolution is tied to construction, a little bit in services, but I mean, construction — the delivery of these projects that I mentioned earlier is what's causing this drain.

Ernesto López-Mozo

executive
#15

Taxes mostly concern Poland. Then, naturally, there are investments, shareholder remuneration, and the main costs here. Within other financing cash flows, we have the dividends paid to minorities at Budimex. We also have the deconsolidation of the net cash position of businesses sold and divested, and then FX, meaning the exchange rate impact. Moving to closing remarks, we are genuinely seeing very good traffic this quarter, with favorable trends and a solid recovery. Our infrastructure assets are truly long term and sit in regions that continue growing, in countries stronger than others. And well, we observe that infrastructure assets gain from inflation. Construction is delivering, which matters greatly in this environment. And we look forward to attractive investment opportunities. Our focus, naturally, is on complex infra projects in the U.S. On ESG, as I said at the start, we are making progress on the raw mat to decarbonize the business, and we will update the KPIs at year-end, and it is also important to pursue business opportunities arising from this effort. Regarding remuneration to shareholders, the Board approved the second scrip dividend, which will take place during November.

Ernesto López-Mozo

executive
#16

Alright, thank you very much for your patience during the presentation, and now we'll move on to the Q&A portion.

Silvia Ruiz

executive
#17

Thanks a lot, Ernesto. We'll be taking questions in just a moment, so please stay with us. All right, then — let's get the Q&A started. Our first batch of questions is from Luis Prieto at Kepler Cheuvreux. Here's the first one: what's the right way to view the cost inflation trend on the construction side for 2023? And is it reasonable to expect margins to fully normalize by 2024, assuming no recession?

Iñaki García-Bilbao

executive
#18

This is Inaki Garcia, CFO of Ferrovial Construction. Yes. I mean, most of the massive inflation rise is already reflected in our backlog, and a large share of that will be recovered in 2022. Keep in mind that this applies not just to contracts that are profitable, but also to those that are loss-making. And that inflation cost has already been accounted for. So for 2023, of course, I mean, inflation does appear in the contract's final result. So given the percentage of completion, a portion of this is much smaller, I mean, that will be considered in 2022. And for 2024, we don't see an impact unless, I mean, a very massive inflation impact that has also been covered in some of the latest contracts signed now. So my question will be -- my answer will be 2023 small inflation impact. 2024, we don't see inflation impact in this moment. So we can keep the guidance of 3.5% EBIT at the end of the year.

Silvia Ruiz

executive
#19

Luis has the next question. Can you explain how you'll factor cost inflation and/or volatility into your bids for feeder management work such as SR-400 in Georgia? And in a potentially far more adverse economic and financial climate, how would that approach differ?

Iñaki García-Bilbao

executive
#20

Inaki here again. With every new contract we sign, we're taking a cautious approach. I mean, when it comes to identifying ways to secure that protection — whether through index formulas, or by factoring into our cost structure whatever price escalation we can go with.

Silvia Ruiz

executive
#21

We have the next batch of questions from Sathish Sivakumar at Citi. For the first one, could you share your thoughts on how traffic has been trending into October on ETR and the other managed lanes?

Executive

executive
#22

Thanks for the question. This is Timo with Cintra. October’s traffic patterns look similar, with nothing meaningful having changed. The direction of the traffic trend is favorable. So we’ll share additional details when we report next quarter.

Silvia Ruiz

executive
#23

We have a follow-up from Citi as well. Could you tell us what portion of the order book consists of inflation-protected business?

Iñaki García-Bilbao

executive
#24

Inaki Garcia here once more. Roughly 80% to 90% of inflation is covered within our order book. Keep in mind that this protection isn't limited to the indexation clauses you find in Spain or Poland — it also comes through the kinds of contracts involved, with price ceilings on certain ones and materials built into others. And on still others, well, there are practices that, at the moment they're being reviewed, tell you precisely which bases are able to be closed.

Silvia Ruiz

executive
#25

Our next question comes from Anna Aarko at BBVA. In light of the recent <<inaudible>> decision to call and not replace its non-call 2022 hybrid, could you give us any color on what options you might be weighing right now with respect to your own EUR 500 million, EUR 3.124 per hybrid bond?

Ernesto López-Mozo

executive
#26

Thanks, Anna. So, the reason for having a hybrid bond is that it fits well within the capital structure, correct? I mean, it is a hybrid. This is a subordinated — deeply subordinated issue, right? So, I mean, we would be examining the various alternatives. If calling the bond proves too costly at that point, we would extend it and we would look toward other opportunities. I mean, after 2023, you can call it recurrently. So we would be examining other opportunities. But as I said, it fits very nicely within the capital structure, okay? So we will be considering all the various opportunities that exist, issuing a new one, calling it with cash, or most likely, probably, in this current environment of uncertainty, keeping it because it has value from its cost equity characteristics.

Silvia Ruiz

executive
#27

Robert Joynson from BNP has the next batch of questions. The first one concerns the 407 force majeure agreement: Slide 5 of the presentation said average traffic serves as good an indicator as peak hours traffic for when the '22 waiver scale expires. But then Ernesto said average traffic will probably bounce back before peak traffic does. Those 2 statements look inconsistent. Could you clarify which one is correct?

Ernesto López-Mozo

executive
#28

Yes, Robert, thanks for asking. So, in essence, 407 ETR doesn’t publish peak-hour traffic figures. That’s highly sensitive for commercial reasons, correct? So if you won’t release it for commercial reasons, then for the public the first step is to give the most readily available traffic measure, which is the average one. The reason I call it as good a proxy is that weekend traffic has recovered more than the other measure. Of course, it’s true that all the growth right now is coming from weekday traffic accelerating, correct? But I’d say it’s prudent to say that because it could point to an earlier date. So that’s why we consider it a good proxy and prudent. Okay? So that may be a little inconsistent, as you say, but this is probably the right way to proceed if you don’t want to provide peak-hour traffic.

Silvia Ruiz

executive
#29

BNP has a follow-up question. During September, how far under the 2017 and 2019 average level did average peak hour traffic run?

Ernesto López-Mozo

executive
#30

As I said, we aren't disclosing that, since it's commercially sensitive.

Silvia Ruiz

executive
#31

The final question comes from BNP. Regarding how long that force majeure agreement lasts, does any time limit apply? And could it be feasible that the force majeure event would still be considered valid if peak traffic hasn't recovered to the 2017, 2019 average level by, let's say, 2030?

Ernesto López-Mozo

executive
#32

You can, I mean, grab the agreement — like I said, it's up on the website. There are 2 conditions, and neither one is tied to time, so no deadline applies. That said, I mean, things will likely progress a lot quicker than the number of days you're putting forward.

Silvia Ruiz

executive
#33

Now we have the next batch of questions from Jose Manuel Arroyas at Santander. The first one is about 407 ETR: when you examine the daily traffic patterns on 407 ETR, how far off is traffic from the 2019 level at various times throughout the day — and specifically, given the growth in e-commerce, could there be upside for raising tariffs during the midday hours?

Executive

executive
#34

Thanks for the question, Jose Manuel. This is Timo from Cintra. Like Ernesto mentioned, we’re not able to share anything regarding peak hours on the commercial side, since that information is commercially sensitive. Ultimately, though, what we can observe—as you can see in the presentation—is that performance during this quarter has been quite strong, largely driven by the war days and, once again, in peak. So we’re heading in the right direction. When it comes to e-commerce, the key point here is how right traffic is evolving. E-commerce matters, but traffic is essential for the war days and for peak hours.

Silvia Ruiz

executive
#35

We'll take the next question from Jose Manuel Arroyas <<inaudible>>. Could you bring us up to date on where liquidity stands at these 2 entities? And how much cash is there that could be paid out as dividends in the second half of 2022?

Ernesto López-Mozo

executive
#36

All right. Both of these 2 entities are doing quite well. How much cash we hold at year-end is going to hinge on how traffic performs during the last quarter. That said, liquidity tracks the asset's performance. Should all go according to plan, we expect dividends from the 2 entities totaling more than $100 million by the end of the year.

Silvia Ruiz

executive
#37

Moving on to the next batch of questions, which come from Marcin Wojtal at Bank of America. His first one: at what point will the soft cap for U.S. managed lanes be updated for 2023, and what kind of revision are you expecting?

Ernesto López-Mozo

executive
#38

In January 2023, the soft cap is going to be escalated by CPI, and that uses the CPI at the end of the year — December versus December of the prior year. So it's going to hinge on how CPI evolves, but based on the consensus, it will come in above 6%.

Silvia Ruiz

executive
#39

Moving on to Marcin’s next question. You’re confident Ferrovial is in a strong spot to land the SR-400 project in Atlanta — what’s behind that, given that 2 other consortia are in the running as well?

Executive

executive
#40

Back to you, Timo. There are 2 competitors out there. This project is going to feature some genuinely strong competition. That said, as you're aware, Ferrovial's model is integrated, with a construction company that works alongside us, and we'll be in a position to assign the rigs individually and stay as competitive as we can on this project. Should those competitors come in very aggressively, well, that's something we'll have to watch. Even so, we possess every capability and everything required to compete in this grid. Our confidence is high.

Silvia Ruiz

executive
#41

Now we'll take the next batch of questions from Filipe Leite at BPI CaixaBank. To start with: why is LBJ traffic recovery still trailing so substantially relative to the other managed lanes?

Executive

executive
#42

Appreciate that, Filipe. It's accurate that LBJ traffic is trailing 2019 by a significant margin, okay, and versus NTE you might get that impression, but the primary cause here is that, as Ernesto said earlier, we've got construction activity on the 65 — that is pulling traffic volume out, mostly light traffic, from this area. There's — and, you know, this 65 is a solid figure for LBJ. Part of it also ties to working from home, since the area where LBJ sits has greater exposure to people able to work from home. But our main view is that construction work is the biggest impact, it's temporary, and it will wrap up in 2024. Once that construction is complete, we expect to watch how traffic performance at this asset develops.

Silvia Ruiz

executive
#43

Filipe has the next question. Is selling your Heathrow stake something you'd consider, or is that airport investment core for you?

David Kenny

executive
#44

This is David Kenny with Ferrovial Airports. Airports sit at the heart of Ferrovial's operations, and we are dedicated to expanding that portfolio. As for Heathrow, our big emphasis right now is helping the Heathrow team produce a major airport that ranks best-in-class for both quality and service. We are also assisting the airport as it works toward finalizing a fair and sensible result regarding 87 user charges. Over the near term, we are not weighing any shift in how we approach our Heathrow investment. The same holds true for the rest of our airport holdings.

Silvia Ruiz

executive
#45

Filipe has the next question. Could you provide any visibility on what the pipeline looks like for 6 and 12 months?

Executive

executive
#46

Timo from Cintra here once more, and I'll take that question from Cintra's perspective. We're quite upbeat about what's coming through the pipeline over the next 12 months, especially the high-complexity projects that lie ahead of us in the U.S. The SR-400 is one of them, and it falls under the yield Georgia realty program; the other is the I-10 in Louisiana. As you're aware, we hold prequalification for these 2 projects. We also have — or rather, we expect — to submit a bid outside the U.S. on a couple of contracts in Chile and Colombia. Then there's India. As you know, we've made an investment — we hold a stake — in an Indian company named IRB, and India is booming when it comes to pipeline, with plenty of projects ahead of us in the next 12 months. So, as I said, this pipeline leaves us optimistic.

Silvia Ruiz

executive
#47

Filipe has the final question. For U.S. construction projects in 2022, what total cash consumption do you expect? And should we also anticipate cash consumption in 2023?

Iñaki García-Bilbao

executive
#48

Thanks, Filipe. This is Inaki Garcia. So by the close of 2022, cash consumption is going to land somewhere around EUR 300 million to EUR 350 million. That is, roughly speaking, these are the figures. When it comes to 2023, I-66, our main contract, will probably be nearly finished, while I-285 will see some consumption. But keep in mind how our business works. That is, on the other side, we have contracts, our new contracts. Typically, these contracts come with advanced payments. So that is part of our everyday reality. So in 2023, there will likely be additional compensation. Thank you.

Silvia Ruiz

executive
#49

Stephanie D'Ath from RBC has the next question. Congratulations on getting the Services division sale across the finish line. Are there any other areas of the business that you might look at divesting — construction, in particular?

Ernesto López-Mozo

executive
#50

No, at the moment we aren't worried, and we don't have any process underway to sell any other business. Construction has really been central to delivering the fantastic infrastructure that we can provide on a greenfield or yellowfield basis, if I may put it that way. So no, nothing of that kind is under consideration. Of course, it's true that we do rotate assets, and from time to time we get interest from buyers, which we have to weigh case by case. But I mean, right now we are not divesting anything.

Silvia Ruiz

executive
#51

Now we'll take the next set of questions from Graham Hunt at Jefferies. First, could you give us some detail on what you're doing to offset cost pressures on construction projects in the U.S.? Are you at all seeing headwinds on materials and labor?

Iñaki García-Bilbao

executive
#52

Thanks, Graham. Inaki Garcia here again. Well, I believe we’ve laid out the key steps we’re taking, and those range from hedging certain materials to improving sales performance and also finalizing long-term agreements — I mean, with subcontractors. So those are the things within our control. As one example in San Antonio — I mean, we’re still in the design stage — but we’ve already locked in most of the concrete beams that will go in. And on the material and labor side, yes, of course, I mean, we’re seeing labor costs rise. On materials, in some states — I mean, Texas, for instance — there’s a cement shortage, but we’re managing through it. Thank you.

Silvia Ruiz

executive
#53

Moving on to the question from Jefferies. Regarding the work referenced in connection with the FDA, when do you expect it to be finished?

José María Velao

executive
#54

Timo from Cintra here. TxDOT is assuming substantial completion in late 2024, so the expectation is that it opens in 2025.

Silvia Ruiz

executive
#55

And our final question comes from Jefferies. Could you walk us through how the equity contributions for the GFK are phased across 2022, '23 and '24?

David Kenny

executive
#56

Absolutely. This is David Kenny from Airports once more. I'd like to point you to Page 46 in the investor presentation we released in June, and also simply to share those figures that showed up in the earlier disclosure: for 2023, it comes to roughly 230 million; for 2024, approximately 500 million; 2025, 260 million; and for 2026, about 70 million. Ferrovial's overall commitment stands at approximately USD 1.14 billion.

Silvia Ruiz

executive
#57

Now, the next set of questions comes from Antonio Rodriguez at ODDO. First question: during the presentation of the first half results, you gave an upbeat message about what to expect for working capital for the full year 2022. Do you remain upbeat on that front? What should we be expecting?

Ernesto López-Mozo

executive
#58

Well, instead of a positive message, we discussed seasonality, correct? And typically, the fourth quarter tends to see more inflows when it comes to working capital. So we'll have to wait and see. As we said in the presentation, we have contract spending to be added into the backlog at a fairly substantial amount relative to what is customary. And while that does materialize, we'll get some inflows from it. But at the same time, we also noted that in the U.S., we will continue consuming cost from delivering these projects, right? So we'll have to see how that balances out, but definitely some seasonal inflows will occur as they normally do. But I mean, I basically won't give any specific guidance on the final sign of the quarter.

Silvia Ruiz

executive
#59

Antonio Rodriguez has the next question. Regarding LBJ traffic in your estimates, did the impact from the feeder motorway works come in higher during the third quarter than it did in earlier quarters?

José María Velao

executive
#60

Appreciate the question, Antonio. We aren't observing any additional impact. We needed to factor in what Ernesto noted during his presentation — namely that our comparison is against 2019. And certain construction works concluded during that year. As a result, the comparison carries some distortion. So when we discuss how this 3 quarter stacks up against earlier ones, you have to account for that impact, and not solely the construction works.

Silvia Ruiz

executive
#61

Next question comes from Carolyn Bruger at Allianz. Why keep the hybrid bond outstanding when S&P gives you no equity content for it? Considering what the reset costs, wouldn't senior debt be the cheaper option?

Ernesto López-Mozo

executive
#62

Okay, so S&P isn't giving us equity content at the moment, since our position is really strong with plenty of cash, correct? That said, if investment opportunities were to come up, we could deploy that cash, and then it would make sense. The hybrid's purpose, you see, serves as a layer within the capital structure that optimizes it, right? So we'll be watching that closely to find the best outcome. Senior debt might be the best outcome, but the fact that it's cheaper doesn't mean it's the best solution, because like I said, it fits well within the capital structure.

Silvia Ruiz

executive
#63

Next question comes from Nicolas Mora at Morgan Stanley. At NTE35 West, traffic <<inaudible>> in June and July, recovering slowly in August and more strongly in September. Does the phasing of construction work on Segment 3C explain this? And how long do you expect those works to weigh on traffic?

Executive

executive
#64

This is Timo calling from Cintra. The stronger traffic you're seeing in September, I believe, fits the pattern we're observing in the region — mobility is improving, which we can attribute to people going back to school and back to work in September. We're making every effort alongside our contractor to lessen the traffic effects while this construction is underway at Segment 3C, but it's important to recognize that getting this project developed and completed on schedule is our top priority, and that matters a great deal to us. Thank you.

Silvia Ruiz

executive
#65

Elodie Rall from JPMorgan is up next with her questions. First, on the contracting side, what sort of inflation protection is built into your contracts? How much of it is fixed cost? And do you use cost-plus-fee mechanisms?

Iñaki García-Bilbao

executive
#66

Yeah, I believe I said that 80%, 90% of the backlog has inflation protection. That protection takes several forms. In countries such as Poland or Spain, there are indexation formulas, and also certain contract types where, as I noted, part of the materials can be covered. You can build indexation formulas into agreements with your client. So that's the protection you get. Of course, we also have cost-plus contracts — as your question brings up, an example being target costs in the U.K. — but in other countries that isn't the situation. And when it comes to new contracting, as I said, escalation gets taken into account, and among the major contracts we're signing, some of them — all of them — sorry, some of them include protection of one kind or another.

Silvia Ruiz

executive
#67

Elodie has the next question. Regarding the Forward 7, would you say traffic recovery is nearing a point where you'd feel at ease raising tariffs?

José María Velao

executive
#68

So, in September, we did see Vortex traffic and AMP getting better, which is a good sign, but we still have to keep an eye on that traffic, because we need to see some -- we have to get more visibility into the usage patterns tied to working from home, and there are some construction works and alternatives we need to factor in as well. So right now, we're on the right track, but we need -- it's too early to call it, we need time.

Silvia Ruiz

executive
#69

Elodie has the final question. Regarding I-66, could you share a rough sense of what you expect for revenue and EBITDA in 2023?

José María Velao

executive
#70

As you're aware, there's no way for us to give out any details for 2023. That said, as Ernesto mentioned, we're getting data from the first segment we launched a few months back, and what we're seeing coming in is encouraging. Thank you.

Silvia Ruiz

executive
#71

Now, a fresh round of questions from Augustin Cendre at Stifel. To begin: will the losses tied to the <<inaudible>> construction business Agroman keep occurring in early 2023, given that the I-285 project is nearing completion?

Iñaki García

executive
#72

The I-285 won't be done by the close of this year; we'll wrap it up in the middle of next year. But as you're aware, that contract carries losses. So those losses were provisioned in earlier years. The only piece left is internal fees that you can't provision for, and a modest amount of losses will come out of this contract.

Silvia Ruiz

executive
#73

Apologies — we have another question coming from Stifel as well. What's behind the EBIT margin at Budimex in Q3 2022 being so strong, at 7.4% against 5.8% year-on-year? And what caused the division's revenues to fall during that quarter?

Iñaki García-Bilbao

executive
#74

Yes, sure. So Budimex is essentially — a few contracts are wrapping up. Certain contingencies tied to the work performed that had been built into those contracts got released when those contracts ended. And that's essentially the main driver. The second one is that third-quarter weather came in better than we had anticipated. So that gives you an improved margin, right. And as for the revenue decline, this quarter versus the prior one looks quite comparable. I mean, so I'm not sure whether you mean the prior year, when, you know, I mean, there were other businesses such as SEC or the real estate business that also contributed some sales for us. But there isn't — there is no genuine revenue decline. And given the backlog we hold, no decline is going to occur going forward, right.

Silvia Ruiz

executive
#75

Moving on to Stifel's next question. The top-line performance at the airports looks strong. How much of that can be attributed to Dalaman?

Ernesto López-Mozo

executive
#76

Great question. Out of all the airports in our portfolio, Dalaman is the sole one we consolidate. Because of that, it makes up roughly 80% of the top line revenue figure that's visible to you.

Silvia Ruiz

executive
#77

Our final question comes from Stifel. Once Schedule 22 is back in effect, is your plan to make up for the tariff growth that was lost while COVID-19 was going on? Or would it be more reasonable for us to anticipate a smaller rate of increase, one that tracks inflation?

José María Velao

executive
#78

Right. As soon as raising everything becomes economically sensible and we've made that call, the likeliest scenario is a rapid catch-up with inflation. Thanks.

Silvia Ruiz

executive
#79

Sathish Sivakumar from Citi has the next question. Given the strength of the U.S. dollar, could you put a number on how currency is affecting earnings?

Ernesto López-Mozo

executive
#80

All right. So — I mean, because we report down to the EBIT level, I'll speak to the EBIT level as well, right? So there are 2 impacts: a positive one on concessions of EUR 32 million, equivalent to improvements coming from the strength of the dollar. And then there's a negative of EUR 10 million in construction. The reason I split those out is that we view construction as temporary, and completing these important assets isn't something that ought to recur. So my suggestion would be to stick with the positive concessions impact of EUR 32 million. As I said, that's to the EBIT, up to the level we're reporting today.

Silvia Ruiz

executive
#81

Now, moving on to questions from Marcin at Bank of America. For the first one: are you expecting 407 ETR to pay out any additional dividends during calendar 2022?

Executive

executive
#82

Right, additional dividends are likely, though the asset's performance will determine that. The direction is favorable. We'll see what happens at year-end and what the Board decides, but we're optimistic about it. Thank you.

Silvia Ruiz

executive
#83

Marcin has another question as well. Could you remind us how peak hours for 407 ETR are defined when it comes to calculating Schedule 22 penalties?

Executive

executive
#84

To sum up how things are functioning for the '22 scale, it accounts for 60% of the year's business days, and within that — and bearing in mind that this represents 60% of this stage, the 2 business hours. And this — you're setting a record with that traffic during the days I just specified. And when your traffic falls below this threshold, that's when the penalty applies. But I think it's better if you — one more detail so you understand fiscal '22 better, you have the provision in the 407 West and you can check it out. Thank you.

Silvia Ruiz

executive
#85

All right, it looks like we don't have any further questions.

Ernesto López-Mozo

executive
#86

Well, thanks so much, everyone, for your patience with us, and I hope you enjoyed the results as much as we did. Thank you. Take care.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial N.V. or any ticker on your watchlist.