Silvia Ruiz
executiveGood afternoon, everyone. Silvia Ruiz here, and I'd like to welcome all of you to the conference call Ferrovial is holding to go over the financial results for the first quarter of 2023. Just as a reminder, you can find both the results report and the presentation on our website. With me today are Ernesto López Mozo, our CFO, along with the CFOs from the various business divisions. Should you have any questions, you're welcome to submit them via the forum that's part of the webcast. When we get to the Q&A session at the end of this call, we'll be reading your questions aloud along with who submitted them. So with that, I'll turn things over to Ernesto. Ernesto, the floor is yours.
Ernesto López-Mozo
executiveOkay, thanks, Silvia, and hello everybody for taking the time to join us on the first quarter results. If we go to the first slide, you'll see an overview of what we consider a really strong quarter. Looking at how the main assets performed, toll roads delivered a solid rise in traffic compared with the first quarter of last year, and managed lanes recorded strong revenue growth. Airports likewise demonstrated a robust traffic recovery. You've already seen Heathrow, and the rest as well. Construction profitability matches the same quarter of 2022. On the cash position, we had no meaningful cash consumption during the quarter even with the seasonality in construction. We made investments and remunerated shareholders. That, in essence, made up the main components of the EUR 142 million cash outflow recorded in the quarter. We'll give you more detail on the coming slides. Regarding the reverse merger and dual listing, over 93% of the quorum came back in the corporate organization. As for the separation rights period, we are nearly finished. It will conclude next week on May 18th. Once the transaction is done, once the reverse merger is completed, we expect to repurchase the hybrid bond, as we announced.
Ernesto López-Mozo
executiveI should note that the scrip dividend payments will occur following completion of this reverse merger. Turning to ESG, we also submitted the annual climate strategy report to the AGM for an advisory vote. Over 90% of the quorum approved it. That report covers the continuing steps and programs we're pursuing to cut emissions tied to our operations. At the same time, providing more sustainable mobility and infrastructure solutions supports profitable growth while we enhance life in the communities where we invest. On social initiatives tied to local community development, Ferrovial signed its yearly social aid program, which will better living conditions for over 52,000 people by 2023. In addition, in Q1 2023, Ferrovial was once again listed in the S&P Global Sustainability Yearbook of 2023. It honors companies achieving the strongest sustainability performance. Onto the toll roads slide, we observe robust growth from the U.S. assets. That is, revenues up 37% and EBITDA 41.1% on a like-for-like basis. Here, I mean, U.S. assets' revenue growth quarter-on-quarter, or this quarter compared with the same quarter a year earlier, exceeded 50%.
Ernesto López-Mozo
executiveEBITDA for this asset rose by over 47%. We'll take a look at the first quarter since the I-66 opened. Also, we need to remind everyone that we hold significant assets in development, particularly NTE 3C. That spans roughly 6.7 miles, which would add 66% to the current 35W. This concession runs right through 2061, with opening planned for September 2023. As you can imagine, we're making every effort to speed that up. Keep in mind there's a possible dividend distribution once opening occurs. What I mean is, all these roads have been running. I mean, the other certified roads have been in operation for a number of years, and the cash built up could be distributed following the opening of Segment 3C. So far we've put EUR 53 million of equity into this segment, and EUR 28 million is still outstanding. Also, as we said during the first quarter, we're examining the final configuration on the NT. That involves adding general purpose and managed lanes tied to revenue performance. Construction should run from 2023 to 2027. What I mean is, it's entirely financed with debt. Okay, let's go to the next slide.
Ernesto López-Mozo
executiveLet's turn to the 407. You've already seen the results for these assets. I mean, we'll go over them briefly, and we'll also discuss the region and its long-term prospects. On traffic, there's very important growth compared with last year, which was affected by Omicron. VKTs are up more than 28%, and revenues and EBITDA are each growing around 25%. Naturally, it maintains the high EBITDA margins typical of this kind of business — more than 82%. Okay. Average revenue per trip is comparable. It shows something like a decline versus the first quarter of 2022. That quarter was affected by the reversal on some loyalty schemes, and this is an effect that gets diluted as the year goes on. On dividends, even though no distribution took place in the first quarter of 2023 or in the first quarter of 2022, the board announced a CAD 150 million Canadian dividend in the second quarter, to be paid in the second quarter of 2023. When we examine the ETR performance and, I mean, we return to the... Yeah, to this slide. When we examine the traffic performance, we see gradual recovery through the quarter, and that's connected, of course, also to the weather getting better, seasonality, and also more enforcement of return-to-office or, let's say, the flexibility policies that were in place being enforced more and relaxed less than before.
Ernesto López-Mozo
executiveWe observe — and we'll go through this on the following slide — a greater presence in the office. I mean, to get ahead of the question, April demonstrates this better trend. I mean, the cause of the weakest performance at the start of the year comes from the usual seasonality, which the high workplace flexibility makes more pronounced. I mean, folks don't just remain at home when the weather is bad, but perhaps also a couple of days or three once the storm has gone through. Regarding Highway 401, I mean, there was also an effect from the widening of the 401 having been finished in December 2022. We have an impact that, by the way, we expected when we put out models some time back now in 2017. It matches the expectations we held. Okay, we go on to the next slide. Please, we see some interesting data regarding performance in the region. I mean, the first item in the top left-hand corner, we see that traffic performance between the 407 and the main alternatives is quite similar, right? I mean, there's no significant problem with capture rate. I mean, likely the people now using the 407 have the natural route, or route, whichever way you prefer, in the 407.
Ernesto López-Mozo
executiveThat's a positive signal for possible tariff hikes. On the question of working from home versus being in the office, we have that chart we keep presenting, and it continues to climb — we're seeing 47% office presence. Of course, an average conceals how different sectors perform, correct? Small and medium-sized businesses sit well above that — maybe, I'm not certain, they might reach levels beyond 70%, 80%. Our average is probably closer to what public institutions show, meaning government employment. Below that, we have sectors such as financial services. This sector deserves attention. Right above that chart, we have, I mean, some news from RBC, for example — the financial sector appears to be lending more, shall we say, weight to the message that employees need to come back to the office, right? I mean, messages of gradual improvement clearly follow that same direction. Regarding, as well, housing starts and development across the region, we continue to observe that housing starts mostly occur along areas near the 407 instead of downtown Toronto. That makes sense given capacity constraints. Alright, let's go to the following slide.
Ernesto López-Mozo
executiveNow we move into the Dallas Fort Worth area, where performance has been very strong and continues to beat what we expected. As you know, the soft cap gets adjusted upward with inflation each year. Revenue per transaction is rising beyond that level, which illustrates the interesting dynamics at play and how much pricing freedom this asset has. It also demonstrates, naturally, that certain traffic conditions require pricing above the soft cap. Everything is growing quite nicely. Keep in mind that 35W, which appears to be lagging, is impacted by construction activity. There is no reason to think that once the asset reopens, people will not return to the corridor. It is also worth noting how LBJ has performed — not only is it growing versus last year, but we also saw solid performance in March, at roughly a 2% decline versus March 2019. Activity in the region has picked up, and our network sits right in the middle of where that action is happening. Let's move to the next slide, please. We are seeing additional news regarding the long-term prospects for the area, correct? Beginning in the top right-hand corner, we see headquarters relocating to Texas and specifically to Dallas — Fort Worth, I mean. You know that many companies are moving into Texas, but more than 45% of that is going to Dallas — Fort Worth.
Ernesto López-Mozo
executiveThat pattern continues, and naturally it also supports population expansion into the area. When we examine the lower portion of the map—though the map may be somewhat dated, since it is 2018—we have the projected growth estimates, and one development zone sits directly above NTE 35W. Here you can see all the segments, including 3C, which is shown in yellow. Beyond that, the dense areas are not the whole story; a significant share of the growth is occurring north of there as well. On the broader economy, Texas ranks number one in the U.S. for job growth. It is expanding faster than the U.S. in every major industry. In fact, more jobs were added here than in all other states over the last year. The region continues to grow and is expected to sustain its trend of economic and population performance. Okay, let's move to the next slide, please. Okay, here we begin with the I-66, and here we'll have a mix of data that are typical of a ramp-up situation. I mean, if I may ask, how is this trading compared to our expectations?
Ernesto López-Mozo
executiveSo, January is projected to come in low — really low. February looks stronger than January. As for March, it's getting close to what we anticipated. April is performing above March's level, correct? I suppose a ramp-up like this is typical, and the key metrics underpinning the business plan remain just as valid, if not more so than the... We're genuinely cautiously optimistic about this asset. I mean, something that wasn't part of our business plan is the wealth in the region. You can see all those yellow bars enclosed by a dotted line. If you match them up on the map, you'll notice certain areas are also outlined with dotted lines. You'll see there's considerable wealth in the northwest portion of the asset, and also within the gateway, and all of this effectively supports how the asset performs. Also here, we're observing noteworthy headquarter relocations into the area, such as Boeing, Raytheon Technologies and Amentum. There's solid development happening in the area, and the long-term prospects remain very healthy. We'll continue to keep you updated. As I mentioned, this is typical ramp-up performance. We're genuinely excited about this asset. Let's move to the next slide, please.
Ernesto López-Mozo
executiveAll right, so here we have the I-77. The I-77, which a lot of investors tend to overlook, keeps outperforming even our strongest forecasts by a wide margin, correct? Transactions are up substantially, 24%. I mean, revenue per transaction comes in around 38% higher than the same quarter last year. Naturally, that translates into even stronger EBITDA growth. The asset and the region continue to expand, and we're looking forward to further developments here. Let's move on to the next one, please. All right, now we go to the Heathrow conference call. Here, it's clear that Heathrow is beating other airports when it comes to traffic growth. It's very near pre-pandemic levels. Probably, I mean, the constraint going forward has more to do with airlines' operational capacity than with underlying demand. This is something important that needs to be addressed for the summer. In any case, Heathrow has lifted its traffic expectations, and the range is now 70 million-78 million passengers. Clearly the outlook is strong. Demand — leisure was clearly there, and it's even rising. It's also being supplemented again by that solid recovery in business travel. Also, as I mentioned, leisure was more outbound leisure from the U.K. into other destinations. Now we're also seeing good performance in inbound traffic, and some regions that had travel restrictions are returning to travel.
Ernesto López-Mozo
executiveWe've raised the forecast, and we're looking forward to how the asset performs over the course of the year. The rating agencies have reflected this as well. And last but not least, as you know, Heathrow has requested the right to appeal the CAA's decision. We should hear from the CMA next week on whether that appeal is permitted. There are several grounds on which Heathrow claims to be correcting errors in the CAA settlement. Those are the COVID-related rapid adjustment; the weighted average cost of capital, which of course has components in both equity and debt; and then the K factor incurred during the pandemic, plus the CAPEX incentives model that the CAA has proposed. We're looking forward to this, and let's see whether these factual errors get corrected. Some airlines have appealed as well, so we'll be keeping an eye on that. We're already on the next slide, and here we can review AGS, Dalaman, and New Terminal One. AGS is also showing strong growth — it's still not at the 2019 level, so on that front it lags Heathrow, but performance is clearly improving. Okay, we look forward to this market recovering and to airlines renewing flights to this airport. On Dalaman, I mean, it's quite encouraging that we saw performance better than 2019.
Ernesto López-Mozo
executiveNaturally, this is an asset that generates profit from spring through mainly the summer months. A negative -1 on its own carries no real significance. This asset is performing better than expected and should keep exceeding our acquisition business plan. We're also eager to watch how this asset develops over the next few months. On NTO, the project is still on schedule, and so is the negotiation with the airlines over slots for the 2026 opening. On investment, EUR 83 million has gone in so far. Alright, we're now in construction, and with this fast-moving presentation, profitability matches the first quarter of 2022. Revenues are climbing across the different divisions. On margin, Budimex is clearly delivering a strong performance and continues to do so, while Webber's margins are stable. Then there's the rest of Ferrovial Construction, which right now finds itself still wrapping up works on I-25, I-66, all those big projects. Overheads stay in place until those are finalized, and that weighs on profitability. There are also new works that have grown the backlog a great deal. We don't recognize margin at early stages. And naturally, we have extra expenses tied to preparing bids such as SR 400, correct?
Ernesto López-Mozo
executiveThis is somewhat a matter of having a mix of mature contracts and new ones, and that mix doesn't mirror what you'd anticipate for that division over the medium to long term. On the order book side, it remains at very high levels, and there are EUR 1.5 billion of contracts not yet included in it. Regarding performance — and we'll go through the cash performance later — it has done well, helped by some advanced payments on the Ontario Line. That large project, won at the end of last year, also received some advanced payments, but you shouldn't count on any major signings with large advanced payments for the rest of the year. We still expect cash consumption here. Well, we've confirmed the 3.5% EBIT margin on a cumulative basis for next year, correct? That's consistent with what we expected, and we're still working on wrapping up some significant projects in the U.S. Okay, yes, turning to cash, we ended with a net cash position of EUR 1.3 billion versus roughly EUR 1.4 billion at the close of last year. I mean, dividends from projects played no part in this first quarter. As anticipated on working capital, it came through well thanks to those advanced payments.
Ernesto López-Mozo
executiveThere are certain tax payments, primarily tied to Budimex, along with some cash that we brought back from Canada. And naturally, the biggest factors behind the cash usage are investments and remuneration to shareholders. What I mean is, within other financing costs, you're beginning to notice the elevated return on the cash we're holding, which helps offset the shareholder remuneration. Let's please go to the following slide. Well, as we look forward, it's really important to keep in mind that growth in the toll road portfolio is going to boost dividends. That portfolio is a very strong set of assets. Consider the value creation we've delivered via pricing flexibility and take a look at the… especially at the long-term prospects for the area. Regarding the pipeline that lies ahead, we're looking toward a merge lane pipeline that's more visible. The corporate organization remains on track following the backing from shareholders at the general shareholder meeting. Once that's done, we'd be seeking to apply for the U.S. listing that we referenced. And of course, last but not least, we keep moving forward on decarbonizing our business. Okay. Thank you for your patience, and we'll now begin the Q&A session.
Silvia Ruiz
executiveThanks, Ernesto. We'll be starting the Q&A portion in just a moment. All right. Our first batch of questions comes from Fernando Lafuente at Alantra. Question one: why did the airports division post a negative EBITDA of EUR 11 million?
Laura López
executiveHi, this is Laura López, Ferrovial Airports' CFO. Thank you, Silvia and Fernando. The negative EBITDA at airports comes from Dalaman and overheads. Dalaman is in negative territory because of seasonality. Q1 falls outside peak season, with summer getting underway in March. Operating expenses run more evenly across the year, and across the quarter, whereas revenues cluster in the peak season, from March onward. This downward pattern in Dalaman's EBITDA will reverse over the months ahead.
Silvia Ruiz
executiveMoving on to the next question. 407 hasn't paid any dividends during the first quarter, which mirrors 2022. Should we anticipate that the same payment pattern from 2022 will apply in 2023 as well — for instance, with payments clustered in Q3 and particularly in Q4?
José María Velao
executiveThank you, Fernando. Chema Velao here, Cintra's CFO. There isn't any particular pattern for paying dividends in 2023 or even in 2022. When the board feels sufficiently at ease with how the asset is performing, that's when it chooses to pay dividends. We hold the liquidity that we judge to be necessary enough both for the asset and for the rating agencies. As you know, dividends can be paid by us each quarter. As soon as all the ratios and our contracts are complied with, dividends will be paid by us. We have to wait and see how the asset performs. It matters to see when debt can be issued by us this year and to monitor the asset's liquidity as well, and to comply with our ratios and the various aspects of our contracts.
Silvia Ruiz
executiveMoving to the next question, which is also about the 407 ETR. EBITDA has risen 25% compared with a year earlier on a constant-currency basis. Dividends were anticipated to move in step with operating results. Given such a robust showing in the first quarter, why has a dividend not been approved?
José María Velao
executiveEBITDA has risen 25%. You're correct. That's genuinely positive news for the asset. The asset's performance is developing nicely. We chose not to approve a dividend during the first quarter. We preferred waiting until April for this CAD 150 million, mainly since we wanted to observe how seasonality would affect the first quarter, because we lacked any comparison, given that 2022 was affected by Omicron. As you know, January was the initial month showing the impact of the 401 widening. Given that we had these two items to monitor during the first quarter, we believed it was more prudent to hold off until April to pay CAD 150 million, which is highly favorable for the shareholders.
Silvia Ruiz
executiveFernando has the final question. How should we think about the dividend outlook for the managed lanes in the current year?
José María Velao
executiveAt this point, we've had a strong first quarter, as Ernesto mentioned. The trend looks quite positive. We expect to keep going that way through the year. The dividend will move in line with traffic and revenue performance, certainly, along with operating cash flows. One important point to note here is that, as Ernesto said in his remarks, we're trying to speed up construction work in the 3C Segment. I'm referring to the 35 West. If we hit our target and get that construction accelerated, chances are we'll be in a position to pay a dividend — a meaningful dividend — in June. I think that's what we need to keep an eye on. You know. That dividend represents money accumulated, cash flows accumulated from the end of construction up to now.
Silvia Ruiz
executiveNow we'll take the next round of questions from Elodie Rall at JP Morgan. First off, on the 407 ETR, you still expect the trends to get better going forward as people come back to the office. In the end, would you say this asset will probably see a structural effect from COVID, and that congestion is going to stay below where it was before COVID? What does that mean for how you see tariff increases down the road?
José María Velao
executiveThanks, Elodie, for that question. Yeah, well, if you look at the presentation, on the graph showing the % of office occupancy in downtown Toronto, the trend is positive. We're seeing employees come back to the office. We're seeing different institutions enforcing some kind of requirement on their employees just to go into the office at least 3 days a week, you know, under this hybrid scheme that they implemented a year ago. That definitely has an impact on general mobility in the corridor, which increases congestion and therefore increases our traffic on our toll road. How could this affect the tariff increase? The tariff increase, as we always say, is a decision, an economic decision. We will raise the tariff when it makes economic sense. Internally, we are analyzing and monitoring all the patterns, and the traffic and user patterns, and how this return to the office evolves. Based on this internal analysis, when we see economic sense, we will raise it. The tariff is the only information that I can provide you.
Silvia Ruiz
executiveElodie has the next question. Given that Schedule 22's computation would be pushed to 2025, is it fair to say that at this stage it would make more sense to wait until January 2024 before raising tariffs?
José María Velao
executiveAppreciate the follow-up question. That's correct. As you know, if we increase the toll rate in January 2024, we shift the schedule — Schedule 22 — to 2025. As you're aware, we have the ability to raise the toll whenever we choose, and it could happen at any point. The only thing is that we need to evaluate internally whether it makes economic sense. We're open to doing it at any time. We're open to raising the toll rate at any time.
Silvia Ruiz
executiveLuis Prieto from Kepler Cheuvreux has the next batch of questions. For I-66 in 2023, what trend would you anticipate in the monthly transaction count? What I'm really after is a sense of whether we should expect continued, meaningful growth from the 1.8, 1.8, and 2.2 recorded in January, February, and March, or whether 2.2 is roughly a steady monthly run rate for now.
José María Velao
executiveThanks, Luis. Chema here once more. The pattern we observed during the first quarter is carrying on into April, from what we can tell. That is the sole piece of information I am able to share with you. Specifically, April is coming in stronger than we had anticipated, with weather that has also beaten our expectations. It is also worth pointing out that the construction work season — the rehab construction work season on Highway 401 — got underway just in April. Thank you.
Silvia Ruiz
executiveLuis has the next question. LBJ traffic is still below where it was before the pandemic, but March showed a pretty meaningful improvement at minus 2.1%. Can that level hold, or is some of it seasonal?
José María Velao
executiveThanks again for that question, Luis. Yeah, this is genuinely good news — with LBJ Express traffic at -2.1% versus 2019. What's driving that improvement is that we're seeing more employees come back to the office. So mobility in the area is going up, along with congestion, and that's why we're seeing this type of improvement at this asset.
Silvia Ruiz
executiveNow we have the next batch of questions, and they're from Nicolás Mora at Morgan Stanley. For the first one, how does the I-66 asset stack up against what the 2016 bond prospectus projected for its first year of operations — revenues of $129 million and a 76% EBITDA margin? And would you say it's outperforming on tariffs or underperforming on traffic?
José María Velao
executiveThanks, Nicolás. As for the bond prospectus, for the sake of comparison, I’m not sure it’s the right one. First, since it isn’t an internal forecast — it comes from an external source. Second, it’s grounded in a forecast made before the pandemic, you know. To compare it with how things are performing now using that information, you’d have to adjust that forecast for a COVID impact at a minimum.
Silvia Ruiz
executiveNicolás has the next question. Could you give us some color on how LBJ performed during the first quarter? That asset struggled for three years, and all at once traffic appears to be jumping off the charts.
José María Velao
executiveThat asset has had a tough time for 3 years. Still, as I mentioned earlier, we're noticing return-to-office trends getting better, and that is driving more movement around the area, with congestion returning to this property and a favorable effect on traffic.
Silvia Ruiz
executiveNicolás has the next question. Net working capital looks really solid. How large was that prepayment tied to the Ontario Line? And do you expect additional cash usage on U.S. legacy projects in Q2 and the second half of 2023?
Iñaki García
unknownHi, Nicolás. It's Iñaki García calling from Ferrovial Construction. Sure, so working capital came in pretty strong within construction at EUR 90 million, and roughly EUR 65 million of that relates to Ontario Line. As you're aware, that project sits at an early stage and remains in the design phase, and everything there consists of prepayments tied to hitting the various milestones. On the legacy projects, as was noted at the end of December and as Ernesto has now said, we do anticipate cash consumption, though both of those projects will wrap up during this year. Keep in mind that for I-66, the managed lanes are open while the purpose lanes are still being completed, and naturally the lease on these projects will be paid off, right? Then on the other side, net-net, likely by year-end, assuming no major contracts carrying large advance payments come through, overall, I mean, construction will see a cash consumption. Thank you.
Silvia Ruiz
executiveNow we'll take the next round of questions from Marcin Wojtal at Bank of America. To start with, what steps will you take next in order to secure a U.S. listing, and do you anticipate that process wrapping up before the end of 2023?
Ernesto López-Mozo
executiveThanks, Marcin. Well, you know, the first thing we need to do is complete the reverse merger along with the listing in the Netherlands and Spain. After that, a prospectus would be filed for a U.S. listing with the SEC. I mean, we're on schedule, so that ought to be finished before the year is out. I mean, the timing around prospectuses isn't solely up to us. Yeah, we should be done in the late fall.
Silvia Ruiz
executiveMarcin has the next question. Could you verify whether the construction work at JFK Terminal One is staying within budget? And please remind us how much of the cost-overrun risk has been shifted to third-party contractors?
Laura López
executiveThanks, Marcin. Laura López here. Construction is moving along well. We're on schedule and within budget for the project. Let me walk you through a few key construction milestones. Steel erection got underway on May 1, and for the entrance enclosure we're planning to wrap it up by the end of the year. The T2 closure and demolition that began in January are slated to finish by Q3 of 2023. The comprehensive final designs have received conditional approval, and the team is pushing toward completing 100% design later this year. We're confident. Most of the cost is already locked in through the Guaranteed Maximum Price, the GMP, with AECOM Tishman. AECOM Tishman, the contractor, brings extensive experience on projects for the Port Authority of New York and New Jersey, and particularly in New York City. On top of that, Ferrovial Construction is handling the PMO services, meaning oversight of the construction. We're confident that construction is on budget. I hope that answered your question.
Silvia Ruiz
executiveMarcin has the next question. In your view, what accounts for the fact that 407 ETR working day traffic showed no improvement in Q1 23 compared with Q4 22, even though office occupancy in Toronto has been rising?
José María Velao
executiveThanks for the question, Marcin. There are a couple of things you need to keep in mind for this quarter. First, seasonality has turned out deeper than we anticipated, which comes from the flexibility in Upwork, and second, there's the 401 widening. My sense is that rising office occupancy in Toronto is producing a favorable effect. We'll likely see better performance going forward as a result.
Silvia Ruiz
executiveMarcin has the final question. Should we expect Heathrow to begin paying dividends again to its ultimate shareholders within the next two years?
Laura López
executiveThanks, Marcin. This is Laura López once more. No decision has been made in the current discussion about when the next dividend distribution will occur. That timing will hinge on how PAC evolves over the summer, along with airline resources and airport capacity, handled jointly with the outcome of the CMA appeal. We've had positive news on the rating agencies, which have affirmed their rating for Heathrow and moved their outlook to stable from negative. There's also a positive effect from inflation on the regulatory asset base, which brings gearing ratios down at year-end, and Heathrow remains comfortable with its covenant. We'll need to wait until we're further along in the year before addressing your question.
Silvia Ruiz
executiveMoving on to Bosco Ojeda from UBS and his questions. The first one: traffic in Toronto City in May is now higher than it was in 2019. Is that simply down to favorable weather, in your view? And if traffic holds up only through spring and summer, would that put a cap on your price expectations over the long term?
José María Velao
executiveThanks for the question, Bosco. What we're observing is a link between weather and mobility that runs both directions — positive and negative. Weather that beats expectations could produce a favorable effect. Also, as I said earlier, in April we began the rehabilitation construction work on the 401. That's going to have an effect too. Thank you.
Silvia Ruiz
executiveBosco has the next question. Could you provide some detail on the I-77, which posted very strong revenue transactions during the first quarter?
José María Velao
executiveThanks for asking that again. The I-77 has turned in a strong showing this quarter, setting a new record for ADT. We have a really positive outlook on this asset, and that holds even as we raise tolls by a substantial amount. This quarter, you know, traffic is holding up quite well. Thank you.
Silvia Ruiz
executiveÁlvaro Navarro from Berenberg has the next question. Can you give us an update on the main bids for this year — the SR 400 in Georgia?
José María Velao
executiveThanks, Chema, for that question. Once more, we feel generally optimistic regarding the US pipeline, with our attention on managed lanes, and we're concentrating on managed lanes along with traffic revenue risk in the US. As you're aware, we hold pre-qualification for SR 400 and I-10, and we anticipate submitting our bid over the coming months. We're likewise active in additional initiatives across other states, including I-77 South and the 495 in Virginia, which are anticipated to reach the market during the coming months. Thank you.
Silvia Ruiz
executiveNow we'll take the next batch of questions from Augustin Cendre at Stifel. First up: even though Polish construction indicators look soft, Budimex is turning in a solid showing on revenue margin. Could you walk us through what the market environment in the country looks like right now?
Iñaki García
unknownThanks. It's Iñak speaking once more. Budimex, you know, has an excellent backlog. Keep in mind that it hit a record level last year and then went on to exceed that record. And as we've said on a number of occasions, it's a really robust, really robust backlog — roads and rail in particular. On the... So what we think is that profitability stems from these projects. Bear in mind as well that last year the cap went up for indexation on public contracts, on roads. And then, following a number of months of talks, in rail too — the ceiling was lifted from 5% to 10%. That's another helpful lever for profitability. As for the weak indicators, our view is that funding exists for every piece of infrastructure Poland requires. Right now, we're seeing bridge financing come from the national government, I mean, for this project. We aren't seeing any major halt in bidding. We're also diversifying the business. That is, we're doing more in the energy business. We're doing more in building. We still see enormous potential for the country in the construction business.
Iñaki García
unknownThanks.
Silvia Ruiz
executiveAugustine has the next question. Regarding energy and mobility, you said earlier that you're looking to explore new opportunities. Could you give us a sense of what opportunities you're seeing in the market?
Alejandro Veramendi
executiveHi, everyone. Alejandro Veramendi here, CFO of the Energy Infrastructure and Mobility division. The division, as you're aware, came into being in 2021. From that point on, we've had a 50-megawatt photovoltaic project in Spain, plus two transmission lines in Chile — one currently being built and one already running. We recently signed an agreement for an additional 100-megawatt photovoltaic plant in southern Spain. Our strategy is going to center on generation — perhaps PV plants, onshore wind, and storage. In the key countries for Ferrovial, which would chiefly be the U.S., Spain, and Poland, where we've signed a JV with Budimex. As for transmission lines, our focus would mainly be Chile and the U.S.
Silvia Ruiz
executiveNow we'll take the next set of questions from Filipe Leite at CaixaBank BPI. His first question: is a tariff increase at 407 ETR still viewed as possible during this year, or is it more likely to happen only next year?
Iñaki García
unknownThanks, Philip, for asking. Like I said earlier, the choice to increase tolls comes down purely to economics. We're watching how the asset performs and doing our own internal review, and once we identify economic value, that's when we'll raise a toll. Thank you.
Silvia Ruiz
executivePhilip has the next question. Which significant projects in your pipeline ought to be awarded over the next 6 to 9 months?
Iñaki García
unknownYeah. Thanks again for the question. Like I said earlier, we're pre-qualified for the SR 400 in Georgia and the I-10 in Louisiana, and we expect to submit our bid over the next few months. Thank you.
Silvia Ruiz
executivePhilip has the final question. He's asking why the EBITDA margin for energy, infrastructure and mobility came in under last year — below 4% in Q1 2023 compared with 5% in Q1 2022. He also wants to know whether we should treat that as a normalized margin from here on, or whether we expect improved margins in the quarters ahead.
Alejandro Veramendi
executiveHi everyone. This is Alejandro Veramendi once more. Right, so EBITDA for the division is extremely small — very, very small — which makes it highly sensitive to just about anything. Essentially, the reason would be that, as we expand, or through bidding, this would mostly stem from increased bidding costs. What we anticipate going forward is, clearly, to succeed and to deliver a larger EBITDA.
Silvia Ruiz
executiveMoving on to the next round of questions, which come from Patrick Rousset at Goldman Sachs. First one: regarding I-66, you said that so far you're seeing what you'd call typical ramp-up performance. To what extent would you regard the Dallas Forward maintenance history as a reliable guide for how I-66 traffic will progress from here? And is the ATR per pax so far matching what you expected, or will that end up creating a difference relative to Dallas?
José María Velao
executiveThanks for the question, Patrick. So when Ernesto said we're in a typical ramp-up, I think what he means is that we're seeing users become accustomed to when we set things up on the highway, and everything is progressing in an adequate way. Compared with Dallas, you know, I think there's one advantage here in Washington relative to Dallas, which is that users, you know, they don't have to get used to paying tolls, because they have several tolls, you know, in the area. That, I think, is quite an advantage for D.C. compared to ACTC, compared to managed lanes. That's the only information I can give you on this.
Silvia Ruiz
executivePatrick has the next question, from 407. In your opening remarks, I believe you said that traffic trends on the 407 ETR kept improving sequentially in April. How much time would you need to watch that better performance before a favorable trade-off emerges between Schedule 22 payments and toll increases?
José María Velao
executiveThanks for asking. So I think we’ll keep watching the trends, along with how traffic performs and how users behave, at the point when it’s needed in order to make the right call. Like I said earlier, we’ll make the right call to increase the toll when doing so makes economic sense.
Silvia Ruiz
executiveElodie Rall from JP Morgan has the next question. On the listing process, do you see three listings being in place over the mid-term — Spain, the Netherlands, and the US, for instance? Is that a realistic expectation?
Ernesto López-Mozo
executiveYeah. Thanks, Elodie. So, midterm, yes. I mean, the point is that whenever you dig into any solid model and you examine the results and the cash generation that our U.S. assets and Canadian assets are going to deliver, the expectation that in 10 years the U.S. will absolutely dominate, right? That's going to dictate what we, what we do, right? Midterm, yes, it's natural to have the 3, but I mean, over the long term, the U.S. should dominate.
Silvia Ruiz
executiveRobert Price from Insight has the next question. Is there any danger that the Spanish government might pursue legal action to prevent the listing from being moved out of Spain?
Ernesto López-Mozo
executiveThanks, Robert. Based on what our outside legal counsel tells us, the answer is no — there’s no risk.
Silvia Ruiz
executiveJosé M. Arroyas from Santander has the next group of questions. Starting with question I-66: could you tell us how traffic for heavy vehicles is doing, and what pricing approach Ferrovial is using for those heavy vehicles?
José María Velao
executiveThanks for the question, José Manuel. The nice thing about this asset — I-66 — is that we can decide the heavy truck multipliers ourselves. Beyond being able to set that multiplier freely, we can also assign rates for different vehicle classes. That gives us a degree of flexibility to maximize revenue by adjusting the toll rate.
Silvia Ruiz
executiveJosé Manuel has the next question. Could you bring us up to date on how you’re thinking about the I-77 managed lane extension project that Ferrovial put forward to the grantor, and also give us your view on the chance that Ferrovial wins the I-270 managed lane in Maryland, which Transurban has walked away from?
José María Velao
executiveThanks again for the question. Let's turn to I-77 South. It's currently under study, and simply determining whether it will reach the market or not will take at least 12 months. There's nothing I can add here. As for Maryland and the process with Transurban, we've had no news from the DOT since this decision, so we need to wait until we receive any information about that just to give our opinion.
Silvia Ruiz
executiveMoving on to Graham Hunt from Jefferies and his questions. First, how has feedback from customers looked during the first few months the I-66 has been running? Has tolling run into any technical problems? And when it comes to the dynamic tariffs, how are commuters reacting compared with what you expected?
José María Velao
executiveRight. Like Nestor mentioned, we're in the ramp-up phase. And by ramp-up, I mean everyone is learning — we're learning how to run the highway, and the users are also adjusting to the new setup on it. I haven't come across any major issue here. Things are progressing as smoothly as we anticipated, and drivers are taking to the dynamic tariffs pretty well, since they've already encountered that kind of thing on other toll roads nearby.
Silvia Ruiz
executiveGraham has the next question. Should Heathrow's appeal not succeed, what other avenues exist for Heathrow to tackle the problems it perceives in the regulatory framework? And if that appeal does fail, does Ferrovial still stand as an attractive long-term investment, as you put it?
Ernesto López-Mozo
executiveThanks, Graham. So, essentially, should the CMA appeal fail, it would fall to the CAA to put right any of the errors we've raised. We don't see any other route right now. Right. I'll have to hold off on answering the other question until the CMA appeal has concluded. No comments until that CMA appeal is finished.
Silvia Ruiz
executiveVictor Acitores from Societe Generale has the next question. How does traffic in the first quarter of 2023 compare with the first quarter of 2019 for Texas Managed Lanes?
José María Velao
executiveThanks, Victor, for asking. That information is included in every packet we distribute to the market. All right, I can read it out for you. So, on NTE versus 2019, we're above 13.1%. NTE 35W sits at 12.9% over 2019 levels, while LBJ Express is trailing 2019 by minus 9.8%. Thank you.
Silvia Ruiz
executiveApologies — we were holding for the final questions. This is Nicolás Mora once more, from Morgan Stanley. On NTE 35W, you’ve mentioned the chance of Segment 3C opening early, ahead of the end of June. Given that we’re already in mid-May, what’s the likelihood of that? And how much work still has to be done to reach that point?
José María Velao
executiveThanks for the question, Nicolás. Yeah, you're right that we're in mid-May, but in construction work, one month does matter. We can't give you any probability of success. What I can assure you is that we're making a great effort with our construction company to accelerate and try to open earlier than we expected.
Silvia Ruiz
executiveAll right, that's all the questions we have. Thanks for joining us.
Ernesto López-Mozo
executiveWell, thanks a lot, guys, for being with us. I mean, we think this has been a great set of results with very positive traffic trends. We look forward to seeing you in a short time. Thank you. Bye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial N.V. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.