Ferrovial N.V. (FER) Earnings Call Transcript & Summary

October 31, 2023

Bolsa de Madrid ES Industrials Construction and Engineering earnings 51 min

Earnings Call Speaker Segments

Silvia Ruiz

executive
#1

Good afternoon, everyone. Silvia Ruiz here, and I'd like to welcome all of you to the conference call where Ferrovial will discuss its financial results for the nine months of 2023. As a quick reminder, you can find both the results report and the presentation on our website. Joining me today are Ernesto López Mozo, our CFO, along with the CFOs from the various business divisions. Should you have any questions, you can submit them via the forum that's part of the webcast. During the Q&A session at the close of this call, we'll be reading out your questions along with who submitted them. With that, I'll turn things over to Ernesto. Ernesto, the floor is yours.

Ernesto López-Mozo

executive
#2

Thanks, Silvia. Hello everyone, and welcome to Ferrovial's results for the first nine months of 2023. Well, it really was another strong quarter. Our infrastructure assets did really well — beginning with the 407 ETR, distributions during the first nine months came in above last year's, and one more was announced after the quarter closed. That came on the back of better traffic performance. The Managed Lanes also delivered strong revenue growth, plus additional dividends from 35 West. On airports, with a strong summer and steady improvement through the year, Heathrow stood out, with September already surpassing pre-pandemic levels. Construction had a profitable quarter, though the full nine months are shaped by the first-half results, hit by the completion of large projects in the U.S. On net cash position, we ended the first nine months with €635 million of net cash at infrastructure level. That cash movement is driven by dividends from infrastructure projects of close to €400 million, and in particular the first one from NTE35 West. The main cash outflow was repayment of the — the buyback of the hybrid bond, which meant a €511 million outflow.

Ernesto López-Mozo

executive
#3

So we also put money into equity and into shareholder remuneration — €338 million. Naturally, these months have been busy on the corporate side, with the listing on Euronext Amsterdam. We're making headway as well on the U.S. listing, which naturally hinges on SEC approval. We also announced the second scrape dividend, which is expected to be paid at the end of this month. On the ESG side, I'd probably like to point to the issuance of a sustainability-linked bond — our first, at €500 million. Okay, let's go to the next slide. We begin with performance, the operating performance of toll roads. Here we see growth in both revenues and EBITDA. The U.S. assets really are feeding into these consolidated numbers — 83% of revenues and 93% of EBITDA. Segment 3C, opened to traffic at the end of June, means 66% additional length for the NTE35 West. It represented an €81 million investment on our part, and it carries a concession term ending in 2061. As for dividends from the Managed Lanes, the main one was this 35 West, where 100% of the shareholder base was US$435 million. But we also received regular dividends from NTE, LBJ — for 100 shareholder base it was US$123 million.

Ernesto López-Mozo

executive
#4

And within NTE as well, the strong performance means the ultimate configuration has been moved up. And here, we will be adding more lanes — a Managed Lane in Segment 2 and a General Purpose Lane in Segment 1. This extra capacity, which was part of the concession and, as I mentioned, got accelerated, is badly needed in a corridor experiencing more growth than anticipated. That matters for preserving the corridor's attractiveness over the long term. This ultimate configuration was entirely funded through debt. In August, we issued US$414 million in private activity bonds, and naturally, construction will get underway shortly, with traffic beginning to be impacted from the start of 2024 next year. Let's go to the next slide, please. Here you have the 407 ETR dividends, which, as I noted in the introduction, exceed the 2022 figures. And of course, you can see operational performance rising significantly versus 2022, with traffic in terms of VKTs growing close to 17%, while revenues and EBITDA show growth of close to 16%. Here, revenue per trip is fairly stable, with a slight increase on average triplet.

Ernesto López-Mozo

executive
#5

On dividends, the increase isn’t only what these figures show — 300 million against 200 million. That’s a C$100 million increase, plus there was an announced extra dividend of C$650 million. Looking at traffic performance, you can see we continue to improve. We ended the quarter near a 4% decline compared with 2019 and a 9.4% rise versus 2022. We’re clearly observing more mobility and commuting activity, and we’ve also seen construction work on Highway 401. I mean, that’s typically carried out as maintenance of the main alternative. Moving to the next slide, here we address the long-term drivers we like to examine. And well, the mobility you observe is largely shared in comparable terms in terms of how it evolves between the main alternatives, the 407 and urban transit as well. So you see mobility getting better across the board. Toronto really matters, and it keeps expanding in population at a high rate. It’s the first among Canada’s big three cities to reach a population growth rate of 3%. And well, Ontario’s population increased slightly above 3%. And you can see that, in general, Canada is growing well too, and it was the highest growth rate recorded for a 12 month period since 1957.

Ernesto López-Mozo

executive
#6

Turning to the return-to-office figures, what we observe is continued improvement. The 54% figure, naturally, represents a blend of peak days and slower days, correct? Still, the direction is unmistakably toward greater office attendance. Let's proceed to the following slide, if we may. This one covers the Managed Lanes in Dallas Fort Worth, where each of the three posted higher revenue per transaction — average revenue per transaction surpassing inflation. That's the way the Soft Cap adjusts annually, correct. So given 6.5% inflation, two of them delivered double-digit gains, while NTE rose 8.4%. As I mentioned, that has fueled revenue and EBITDA growth across the board, with very strong EBITDA margins. For NTE specifically, there's clearly robust performance continuing, supported by frequent mandatory modes. LBJ remains affected by construction activity nearby. At that road's east entry point — well, NTE 35 West is delivering positive traffic performance regardless of the extra segment we observe, correct. Absent that, it would have grown 5.6%. Once you factor in the added traffic from that segment, though, that amounts to a 14.4% increase, and NTE and LBJ both posted healthy traffic growth as well.

Ernesto López-Mozo

executive
#7

Let's please proceed to the following slide. First we turn to I-77, which continues to exceed even our most optimistic expectations—transactions are climbing by nearly 20%, revenues by over 56%, and EBITDA by 87%. So it is plainly growing beyond that; it's a fantastic asset, and you can see revenue per transaction rising at 31.8%. On the right side, we have I-66, which is also ramping up. I mean, quarterly revenue per transaction keeps increasing, and the third quarter of the year posted a 43.6% increase versus the first quarter of 2023. Traffic is also up by close to 30% in the third quarter versus the first quarter on a quarterly transaction basis, so, as we like to say, cautiously optimistic, but clearly a very strong ramp-up. Turning to Airports, we look at Heathrow. Well, Heathrow's results came out last week. So you're probably aware of all these numbers, but if we just pause on a few of them, I think they are remarkable. I mean, we entered September above 2019 levels, but really it has been trading at those 2019 levels pretty closely throughout the summer. Demand clearly is there, and Heathrow has upgraded its expected traffic for the end of the year to 79.3 million passengers.

Ernesto López-Mozo

executive
#8

Yet it isn’t just leisure — inbound leisure that these saw rise markedly. I believe every one of the segments is going up. And it’s encouraging to see business travel hitting 27% of total traffic, versus 32% before the pandemic. So, as I said, travelers of every sector and nationality are flying out of or through Heathrow. We examined the CMA appeal that at last reached its end. The final determination didn’t shift things greatly. What I mean is they fixed a few items such as the AK Factor, cost of debt and passenger forecast. So Heathrow’s expectation, I mean, is that it ought not to have a significant effect. And the message Heathrow conveyed is that the time has come to move forward. It’s disappointed, yet the time has come to move forward there with running the airport. If we go to the following slide, please. We observe the rest of the portfolio. Every bit of it is expanding. I mean, AGS is expanding. Not to the same degree as Heathrow versus 2019 levels, but it remains a really strong performance, and we’re looking for airlines to come back too or sign new flights in the region, I mean, compensating for a number of the airlines that exited operations.

Ernesto López-Mozo

executive
#9

Turning to Dalaman, the picture there compares far more favorably with both 2019 and 2022. Bids in each of those two years sit roughly 4% higher than the 2019 mark, alongside solid revenue and EBITDA performance. Finally, New Terminal One continues to move forward, with the project staying within budget and on schedule. Ratings were reaffirmed at the level set at financial close, and talks with international carriers are still under way. We signed an agreement with Korean Airlines, and overall the airline negotiation process is in good shape. We have contributed approximately €200 million in equity so far. Keep in mind that investment in this project is concentrated across 2023, 2024 and 2025, with 2024 representing the peak. Shifting to Construction, as noted, the third quarter was profitable. Budimex continues to perform strongly. Webber's EBIT margins remain stable. As for the real construction side, the opening six months were impacted by completion works on certain large projects. It is still wrapping up a few of them, though the contribution aligns more closely with what a comparable quarter showed a year earlier.

Ernesto López-Mozo

executive
#10

Okay, the order book is still holding up well, and you can see the geographic split on the slide. Moving to the net cash discussion — keep in mind that this quarterly report contains the operational update. The other result lines won't arrive until year-end. So in the net cash movement, we have the various blocks here, and I'd like to highlight the dividends from projects block once more. Naturally, there are equity investments and investments in other businesses, and this is essentially meant to support self-performance in construction, which helps within a stable environment. After that, we have €110 million of shareholder remuneration, and as I said in the introduction, the biggest cash outflow is repayment of the Hybrid Bond. Within other financing cash flow, the main piece is the positive carry from interest earned on cash exceeding the interest paid on debt. Okay. Moving to the final slide — clearly the portfolio is delivering strong performance. Rising dividends are supporting cash generation here, and pricing flexibility is proving extremely valuable across these assets. We continue to see a very attractive investment pipeline ahead, especially in the U.S.

Ernesto López-Mozo

executive
#11

We’re moving forward with the U.S. listing application and, naturally, making progress on the decarbonization roadmap. All right. So thank you for staying with us through the presentation. And at this point, we’ll open the floor for the Q&A session. Thank you.

Silvia Ruiz

executive
#12

Thanks a lot, Ernesto. We'll kick off the Q&A in just a moment, so please stay with us. All right. We'll begin with the first batch of questions from Nicolo Pessina at Mediobanca. The first one: for 407 ETR, is traffic robust enough to permit a toll increase in 2024?

Jose Velao

executive
#13

Thanks, Nicolo. Jose Velao here, CFO of Cintra. You're correct — traffic during peak hours is robust and has been rising across these 9 months. Still, right now we don't have any news regarding an increase in tolling rates. What we can say is that we're heading the right way.

Silvia Ruiz

executive
#14

Nicolo has the next question. Could you give us an update on where the SR400 project tender stands?

Jose Velao

executive
#15

The tender is moving along nicely. We’re putting in a lot of effort so that we can submit our proposal over the next few months. So everything is going according to expectation.

Silvia Ruiz

executive
#16

Nicolo has the final question. Considering the higher dividends coming in from the underlying assets, would it be fair to expect a sizable dividend increase for Ferrovial shareholders in 2024?

Ernesto López-Mozo

executive
#17

Thanks, Nicolo. Yeah, you're right to highlight how strongly all the infrastructure assets are performing on the dividend side. Of course, the Board will need to make a decision on this, especially considering that we have some quite interesting investments coming up. So now isn't the moment to get into that, but as you said, we're very pleased with how those assets have done.

Silvia Ruiz

executive
#18

We have the next batch of questions from Filipe Leite at CaixaBank. Starting with the dual listing process: has the process for listing on the U.S. stock market been delayed? If so, why, and when do you expect that process to be completed?

Ernesto López-Mozo

executive
#19

All right. Honestly, we're pushing the U.S. store market listing forward as quickly as we can. Naturally, that decision rests with the SEC, so we'll just have to watch how things develop. So I wouldn't call it delayed — it simply takes however long it takes. Okay, so the likeliest result at this point might be a listing in the first quarter, but as I mentioned, isn't that up to the SEC?

Silvia Ruiz

executive
#20

Filipe has the next question. Regarding 407 ETR, how long will construction on the expansion keep affecting the 401?

Jose Velao

executive
#21

Hey Filipe, this is Jose Velao from Cintra calling again. The 401 construction work is just normal course of business. It's included in the plans for the NTO that's published, and in the case of the current construction work, it affects the Cintra section of the 401. We expect that to continue until 2025.

Silvia Ruiz

executive
#22

Moving on to Robert Joynson from BNP with the next batch of questions. First up, 407 ETR workday traffic run rate sat roughly 8% to 10% under the 2019 baseline across May through September. How much would possible toll hikes in 2024 hinge on additional traffic recovery?

Jose Velao

executive
#23

Hi Robert, as I mentioned earlier, we're heading the right way when it comes to traffic performance. The traffic numbers we're seeing in this state month are better than we expected, but we can't — there's no update on this toll increase. So we'll see down the road when it makes economic sense.

Silvia Ruiz

executive
#24

We have a question from Robert next. Ontario's COVID restrictions came to an end nearly 18 months back — does the 407 ETR face any pressure from the NTO to bring the 2021 first Mayor Agreement to a close?

Jose Velao

executive
#25

Hi Robert. Once again, there is smooth communication between the concession and NTO, but this isn’t one of the subjects they’re addressing. They have plenty of matters to discuss; this one isn’t on the table.

Silvia Ruiz

executive
#26

Robert has the final question. Once the U.S. listing is done, is for real committed to keeping a listing in Madrid?

Ernesto López-Mozo

executive
#27

Hi, Robert — Ernesto here. Well, rather than just saying the word commitment, I think it makes sense to keep the listing in Madrid for European funds and retail investors alike, right? So yes, keeping the listing in Madrid would make sense.

Silvia Ruiz

executive
#28

Now we'll take questions from Fernando Lafuente at Alantra. First one: a strong quarter in construction, with an EBITDA margin of 3.7% against 1.1% in the second quarter and 2.9% in the first quarter. What's driving that improvement? And is it sustainable going forward and beyond?

Iñaki García-Bilbao

unknown
#29

Thanks, Fernando, for that question. Iñaki Garcia here, from Construction. Yeah, essentially Budimex and Webber are maintaining the same profitability pattern we witnessed in earlier quarters. As for the remaining Ferrovial Construction business, it was heavily affected by provisions for losses on the U.S. projects wrapping up this year, and those were mostly booked in the second quarter, or in the first half of the year. Regarding sustainability for the fourth quarter, we anticipate the same trend at Webber and Budimex, and we believe we have now accounted for every loss on these U.S. projects that are ending. Thank you.

Silvia Ruiz

executive
#30

Fernando has the next question. What should we expect in terms of dividends from concessions in 2023?

Ernesto López-Mozo

executive
#31

Hello, Fernando — Ernesto speaking. That type of information isn't something we provide. I mean, performance has been very strong. We don't give short-term guidance of this kind. Sorry about that, and thank you.

Silvia Ruiz

executive
#32

Our next question comes from Luis Prieto at Kepler Cheuvreux. Could you give us any hints that might help us better understand the potential flow of Schedule 22 payments we should expect over the short or medium term?

Ernesto López-Mozo

executive
#33

Apologies, Luis — my computer gave me some trouble there. I can offer you a few pointers on how things are going. As you're aware, I believe this falls under the contract. It varies — it hinges on peak-hour traffic and the threshold, purely for working out how much gets paid under Schedule 22. But as you know, we don't have to get there, because we've said on earlier calls that reaching 2019 traffic levels isn't necessary for toll rates to go up. What that means is we're able to make a sizable Schedule 22 payment down the road, yet once the revenue from crystals compounds, we'll make up for it — we'll offset that payment amount.

Silvia Ruiz

executive
#34

Now we'll take the next batch of questions from Sathish Sivakumar at Citi. For the first one, could you say what share of the contracts in the construction segment is still priced at 2019 to 2022 levels?

Iñaki García-Bilbao

unknown
#35

Yes, thanks for asking. Every one of our contracts reflects present pricing. What I mean is that contract values get revised in line with current costs. As for sales, where contracts involve a price intersection, that has been revised as well, so it's fair to say that all the contracts carry carbon prices. Thank you.

Silvia Ruiz

executive
#36

Sathish also has a follow-up question: why has revenue per transaction on I-66 gone up? And do you expect that figure to keep rising down the road?

Jose Velao

executive
#37

Hey, Sathish. Jose Velao here again, calling from Cintra. The key point is that this asset is ramping up, and customers are getting solid value for money during peak hours, which benefits our revenue too.

Silvia Ruiz

executive
#38

Now we'll take the next batch of questions from Marcin Wojtal at Bank of America. Here's the first one. Are you expecting 407 ETR to pay out another dividend before calendar year 2023 comes to an end?

Jose Velao

executive
#39

Once the board signed off on that extra distribution in October, we got to a level of CAD950 million. For this year, I'd say that's a solid dividend level. Thanks go to the asset's strong performance. An extra dividend later in this year isn't probable.

Silvia Ruiz

executive
#40

Marcin, here's another one for you: could you say whether I-66 so far is coming in at, above, or right on your internal forecast?

Ernesto López-Mozo

executive
#41

Hey, Marcin. I-66 is doing pretty well and matching what we expected, and as I mentioned, it keeps ramping up. Traffic levels along the corridor are already back to where they were before construction, and a few segments are even higher than those preconstruction levels. And as I said, customers are getting appealing time savings during peak hours, and we're seeing strong performance from heavy vehicles too. So the outlook looks quite good.

Silvia Ruiz

executive
#42

Martin has the next question. Are you anticipating that Heathrow will pay out dividends to its ultimate shareholders during 2024?

Laura López

executive
#43

Hello, Martin. This is Laura López, CFO of Ferrovial Airports. In last week's call, Heathrow said they aren't expecting dividends in 2023. So I have nothing further to add on that. The key point to stress is that this asset carries more leverage than anticipated. Ultimately, operational performance will be decisive when it comes to dividends. As Ernesto said earlier, their performance has been remarkable. Thank you.

Silvia Ruiz

executive
#44

Our next questions come from Elodie Rall at JPMorgan. For the first one, could you explain that negative CAD18 million shown against others on the EBITDA line?

Ernesto López-Mozo

executive
#45

Hi Elodie. That's probably not minus CAD18 million — it's a different number — but what I mean is that in the other items we've got the expenses from the restructuring transaction and the U.S. listing. So you have all those kinds of fees, ranging from the advisors and the auditing of PCAOB accounts to the lawyers for the 20-F. So the main impact of all that sits over there.

Silvia Ruiz

executive
#46

Elodie has the next question. Could you give us an update on when the U.S. listing might happen? What are the key things you're weighing there? And likewise, what's the timing looking like for your Capital Markets Day coming up?

Ernesto López-Mozo

executive
#47

Hello. As we mentioned earlier, the timing most likely points to a U.S. listing during the first quarter, though we can't be any more specific since that decision rests with the SEC. As for the Capital Markets Day, we'll announce the one we have visibility on. We're looking forward to it.

Silvia Ruiz

executive
#48

And one final question from Elodie. If you keep a listing in Madrid, do you expect the U.S. line to have enough liquidity that you'd move the primary listing to the U.S.? Or do you think the U.S. will most likely be a secondary listing?

Ernesto López-Mozo

executive
#49

Thanks, Elodie. Well, at first the U.S. is going to be — it's expected to serve as a secondary listing, but the thinking behind this is that since our operations are American, we don't have American investors, and there's so much expansion in front of us, it will grow increasingly relevant. So I mean, over the long term it would make sense for the U.S. to carry more weight. But at the start, we shouldn't count on that taking place.

Silvia Ruiz

executive
#50

Moving on to the next batch of questions, which come from Jose Manuel Arroyas at Santander. The first one concerns 407 ETR. Could you lay out the key elements that come into play when determining the dividends for 407 ETR Campaign 2024, and especially how debt maturities, liquidity, and the capacity to issue new bonds interact with one another?

Jose Velao

executive
#51

Hi, Jose Manuel. Of course, the biggest driver is how the asset performs — its traffic performance and revenue are the key factors for 407 ETR. Naturally, we also have to engage other stakeholders such as rating agencies, which means we need to resolve things with them. How strong is the asset's performance? Yes, that determines whether we seek additional debt or negotiate liquidity with them at year-end. But that's just part of the ordinary course of business. Still, these are the primary factors. These are the primary factors.

Silvia Ruiz

executive
#52

Jose Manuel has another question. Regarding construction, could you give us an update on the cash outflows related to construction for full year 2023? Have your expectations shifted compared with the first half, when you suggested that outflows between CAD120 million and CAD150 million might be possible?

Iñaki García-Bilbao

unknown
#53

Yeah. Thanks, Jose Manuel. Well, as you saw in September, working capital in construction came in at minus CAD193 million. As you know, the year's final quarter is typically when we receive advance payments from certain clients, especially at Budimex and on specific contracts. So, yeah, we're able to maintain that forecast of cash consumption in working capital of between CAD120 million and CAD150 million.

Silvia Ruiz

executive
#54

Now, we have the next round of questions from Pierre Rousseau at Barclays. Regarding Heathrow, how do you intend to adjust to the new pricing landscape?

Laura López

executive
#55

Hello, it's Laura once more. At the moment, Heathrow is in the process of updating its business plans. As they announced on last week's call, they'll present more detailed updates in the Investor Report in December. Thanks.

Silvia Ruiz

executive
#56

Pierre has the next question. You announced US$1 billion in U.S. orders during September. How risky are those projects? What should we expect on margins? And does that business play a key part in reaching your construction margin target?

Iñaki García-Bilbao

unknown
#57

Thanks. Thanks, Pierre. So, as we said earlier, the backlog right now — once we wrap up — the present U.S. price is pretty solid. What I mean is, given possible cash inflation, and the bid stood in a stronger spot knowing how inflation, COVID and so on, plus material prices, would hit. So we anticipate profitability on those. But keep in mind they're at earlier phases, such as Ontario and a few others, and the margin will likely become more visible as those projects move forward.

Silvia Ruiz

executive
#58

Pierre has the final question. You said that results on I-66 and I-77 matched up nicely against the most ambitious targets you had set. Would you be able to tell us what those were?

Jose Velao

executive
#59

Hey, Pierre. Unfortunately, we aren't able to share future projections with you, so I apologize for that. That said, I do agree with you — the I-66 and the I-77 are both performing really well.

Silvia Ruiz

executive
#60

Now we have a couple of questions from Augustin Cendre at Stifel. Starting with LBJ: can you give us more detail on how LBJ traffic is bouncing back, taking into account work-from-home patterns and the construction that's still underway? And do you have any clarity on when a recovery might occur?

Jose Velao

executive
#61

Hi <<inaudible>>. Yeah, I can give you — sorry about that, Augustine, and thanks for the question. Yes, I can go into more detail. LBJ is doing quite well. Mobility in general, along with congestion, has been getting better in that area. Thank you for — partly because of this recovery in office presence, plus the economic growth of the area and the corridor. I think what LBJ is doing is heading in the right direction. And the only problem we can see with traffic mobility in the area is the 635 East construction works. That is expected to wrap up at the beginning of 2025. But as a conclusion on LBJ, I can say it is doing quite well.

Silvia Ruiz

executive
#62

Moving on to Augustin's next question. From Ferrovial Construction, my understanding is that completion of the I-285 project has slipped to Q1 2024, versus Q3 2023 previously, and talks about the I-66 contract remain underway. So should we anticipate additional losses from the Ferrovial Construction division, or are those largely behind us now?

Ernesto López-Mozo

executive
#63

Thanks, Augustin. So the I-285 project should reach substantial completion this year. I mean, there will likely be some additional work, but it's minor — punch-list items and other small things. Substantial completion, though, will land in Q3 — sorry, in Q4 2023. On losses, as of September, we've accounted for every potential loss we could face on this contract. So for this particular province, yes, I believe the worst is behind us, and now it's time for the — we're in mediation processes with the clients on both. So we expect there should be recovery on claims. Thank you.

Silvia Ruiz

executive
#64

Graham Hunt from Jefferies is up with the next batch of questions. For the first one, on I-77, could you describe the activity you're seeing along that corridor — the activity that's driving volume and price growth there so strongly?

Jose Velao

executive
#65

Hello, Graham, and thanks for asking. Jose Velao here, from Cintra. What we're observing in that region is that it's highly appealing and is drawing in plenty of new jobs, and the population is increasing too. We believe that this pattern is going to keep going going forward. We need to keep in mind that there isn't a genuine alternative, and that's partly why it has this volume — a strong volume. Thank you.

Silvia Ruiz

executive
#66

Jefferies has a follow-up question, also about the A-66. Can you give us any additional color on how consumers are responding as pricing ramps up? And in the third quarter versus the second one, did heavy vehicle contribution change in a meaningful way?

Jose Velao

executive
#67

Yeah, what I can tell you is that travel times during peak hours are good and safe, and that value is drawing users onto our highway. And at the same time, the traffic — heavy traffic vehicles have been behaving well this quarter. So both of those factors are boosting our revenue.

Silvia Ruiz

executive
#68

Graham has the final question, and it's about NTO. He's asking what share of NTO capacity airline agreements now account for, and whether any conversations have taken place with retail partners regarding the commercial operation.

Laura López

executive
#69

Hey Graham, appreciate the question. So with regard to the 2027 traffic, roughly 25% is committed under existing contracts with international carriers — Air France, LOT, KLM, Etihad and Korean. As for the retail NTO commercial program, that's run by URW under a master concession agreement. URW is moving forward together with NTO on defining the program, and the procurement process will launch during next year. Thank you.

Silvia Ruiz

executive
#70

We'll take the next questions from Nicolas Mora at Morgan Stanley. To start, could you walk us through how traffic has been performing on NTE 35 West? The underlying figure is up just 5% even though the construction disruption has ended. Why isn't traffic recovering when compared with a third quarter 2022 basis that was heavily disrupted? And on segment 3C, are you charging the same price per mile as on the rest of the segments, A and B?

Ernesto López-Mozo

executive
#71

Nicolas, thanks for asking. To start with, I wouldn’t characterize that as underperforming. You need to keep in mind that following a lengthy stretch of construction disruption along the corridor, there is some ramp-up taking place here and there, and some construction work is still ongoing on the U.S. 175 connector, which is also affecting general mobility in the corridor. So in my view, things are progressing well when it comes to traffic performance across the three segments A, B, and segment C. In segment C, we are observing a strong ramp-up. As for tariff, toll rates, segment 3C aligns with the toll rates of A, B.

Silvia Ruiz

executive
#72

Our next question comes from Nicolas Mora, and it's again about U.S. Managed Lanes in general: are you beginning to observe any signs of fatigue among the U.S. consumer?

Ernesto López-Mozo

executive
#73

No, Nicolas, the answer is no. I believe users see a great deal of value here, and we observe that through various polls we send out to our customers, and we aren't seeing any fatigue from our U.S. consumer.

Silvia Ruiz

executive
#74

Alright, we have another round of questions coming from Stifel, from Tobias Woerner. The first one: repurchasing the hybrid bond has brought your NCP down fairly sharply. Does that cash level sit comfortably with you? And if it doesn't, what steps will you take about it?

Ernesto López-Mozo

executive
#75

Yeah. Hey Tobias. Yeah, we feel good about where our cash sits. Really, cash ought to be put to work earning double digit returns, or else given back to shareholders, right. So, I mean, we've kept cash on hand while hunting for opportunities. We're sitting in a very comfortable spot. So there's no reason to bring in more hybrid capital or go searching for fresh cash.

Silvia Ruiz

executive
#76

Tobias has a follow-up as well. With the CMA ruling in mind, has your stance on the Heathrow stake shifted at all? And if it has, would you be open to a sale?

Ernesto López-Mozo

executive
#77

Thanks. Regarding Heathrow, I suppose the response is similar to what we'd say about any other asset in the portfolio. In other words, we're open to various options, just as we are with anything else in the portfolio. So if an opportunity keeps presenting itself to us, we'll evaluate it based on financial merits. Thank you.

Silvia Ruiz

executive
#78

And for the final question, Tobias has one. Could you provide some detail on how things are going at NTO, and explain what that implies regarding when this asset will be developed, please?

Laura López

executive
#79

Hello, Tobias. I was glad to be able to report how things are going with NTO. That project is moving along nicely and showed genuinely clear headway during the third quarter. Even so, the front section of the terminal has now been built up, with the first steel <<inaudible>> the demolition work is nearly finished, and the air train enclosure is far along, with the aim of opening very soon, by Thanksgiving. Design work stands at 97% complete. That's solid progress when you consider the complicated situation we're in, with JFK being entirely redeveloped and service effectors interfering from all the simultaneous work going on at other terminals. Still, there is an effective mitigation plan, developed together with the Port Authority <<inaudible>>, and we feel confident the project will be delivered satisfactorily. Thank you.

Silvia Ruiz

executive
#80

All right, then. It looks like we don't have any more questions.

Ernesto López-Mozo

executive
#81

Thanks, Silvia, and thanks to all of you. I mean, we're excited about what lies ahead — the potential U.S. listing and the Capital Markets Day. So we hope to see you soon, everyone. Thank you. Bye now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial N.V. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.