Good afternoon—or good morning, depending on where you're joining from—everyone. My name is Silvia Ruiz, and I'd like to welcome you to Ferrovial's conference call, where we'll be discussing the financial results for 2024's third quarter. With me today are our CFO, Ernesto López Mozo, and our Corporate Finance Director, Ignacio del Pino. As a quick reminder, the results report and the presentation have both been available on our website since yesterday evening, after the U.S. market closed. There will be a Q&A session at the end of the presentation. Just like on previous calls, you'll have the chance to ask questions live. To do so, you'll need to join through the conference call channel and press *5 on your phone keypad. Alternatively, you can send them via the forum included in the webcast, and I'll read them out loud at the end of the Q&A session. With that, I'll hand things over to Ernesto. Ernesto, the floor is yours.

Ernesto López-Mozo

executive
#2

Thanks, Silvia, and hello everyone. So, we've delivered another strong set of results this quarter. Looking at the overview, you can see toll roads are still gaining from higher mobility in Canada on the 407. Revenue per transaction growth in the U.S. managed lanes was solid. Airports also saw record-breaking figures at Heathrow, plus strong growth at AGS and Dalaman. Construction delivered yet another quarter of improved profitability. Across the full nine months of 2024, our EBIT margin came in at 3.9%. On cash, this quarter — well, over the first nine months — we collected dividends from infrastructure assets totaling EUR 190 million, which includes the first dividend from the I-77. We also had proceeds from selling a 5% stake in IRB, amounting to EUR 211 million. In addition, there were proceeds from the divestment of the Amey vendor loan of EUR 176 million, and Serveo contributed EUR 40 million. This has also gone hand in hand with investments and shareholder distributions. Last year we were catching up on shareholder distributions, mainly buybacks of EUR 749 million. We also invested EUR 652 million in the IRB Infrastructure Trust.

Ernesto López-Mozo

executive
#3

And naturally, we're pressing ahead with NTO's development, with equity investment there amounting to EUR 319 million. I mean, there have been various announcements since the first half of the year. Among them is an extra buyback program capped at EUR 300 million. During the first nine months of the year, we've already put EUR 75 million into treasury shares. So that comes on top of the shareholder distribution figure I cited earlier. This is treasury stock. As for other deals, we reached an agreement to move the economic rights of concessions in Europe and Canada into a JV with Interogo Holding. Cash received came to EUR 100 million, though that was in October. So that figure isn't reflected in the net debt position for the first nine months. And finally, yesterday we announced the second scrip dividend, in line with what the shareholder meeting approved earlier in the year. Okay, moving to the next slide, we begin with toll roads performance, and we can see the entire division delivered strong double-digit growth in revenue and EBITDA, but I'd like to draw attention to the numbers in the bubbles tied to the North American assets.

Ernesto López-Mozo

executive
#4

I mean, revenues and EBITDA for US toll roads both grew by more than 20%. And regarding dividends from North American assets, we had a triple at EUR 444 million compared with just under EUR 403.93 during the first nine months of last year. Moving to the next slide, please, we go into the 407, and 407 has delivered a strong quarter. On traffic, I mean, we observed higher mobility and commuting. We should point out weather impacts here, and although there was heavy rain on a far larger, much greater number of days than last year, along with heavy downpour, and this did affect traffic. On revenues, I'd like to review the breakdown shown in the top right-hand corner. We see solid growth in toll revenues, ahead of other quarters. In addition, the fee revenues that were impacting the comparison in prior quarters now show slight growth, which helps. And contract revenue that was reflected in the early months of last year is now excluded from the comparison, and that produces a total revenue growth figure of 16.1% for this quarter.

Ernesto López-Mozo

executive
#5

On dividends, I want to point out that the 407 paid dividends during the first half and the third quarter of CAD 175 million plus CAD 225 million Canadian dollars, and it has approved a dividend of CAD 700 million for the final quarter of the year. So that represents significant growth versus last year. Moving to the Dallas-Fort Worth managed lanes, here we see the solid revenue per transaction growth I mentioned at the outset. At NTE, traffic and revenue are affected by the capacity improvement construction works. What I mean is that it is performing much better than we expected, but clearly those works are having an impact. In LBJ, by contrast, we have solid traffic growth. Although it is affected by construction works, some of the connections have already been improved since the past year, so we are beginning to see part of the mobility return as well, and that is reflected in LBJ's growth. At NTE 35W, traffic growth is benefiting from last year's opening of segment 3C. Naturally, while this outperformance means we are also having some revenue share, and in the third quarter, EBITDA includes $3.4 million of revenue share.

Ernesto López-Mozo

executive
#6

This gets accrued each quarter starting from Q2 2024. So for the first nine months of 2024, the revenue share figure comes to $10.1 million. All right, at the bottom we also show dividend distributions across the assets on a 100% shareholder base, and you can see how strong the performance is. For reference, the soft cap update is 3.4%, and typically when you can exceed that growth, it ties to the mandatory modes we have in NTE, which is also the main factor behind the comparison against last year. We did have mandatory modes this quarter, but they occurred more often last year without the ultimate capacity, correct? So that impacts the comparison, yet it remains very healthy and strong. Moving to the next one, please — at I-77, we see solid revenue growth in terms of traffic, and the performance against the same quarter a year ago. We have to point to construction works that benefited 2023 traffic, and this quarter we also saw impacts from hurricanes Debby and Helene, and I should note that it affected things negatively, and we, I mean, don't discuss performance after the quarter closed, but I mean, the situation in North Carolina is that various roads are closed and traffic has been diverted onto the I-77, and of course that is helping performance considerably through October.

Ernesto López-Mozo

executive
#7

I'm not going to provide specific figures here—this is really just a caution so you don't take how September performed and project it onto your October results moving forward. Naturally, because of how the asset has performed, we're also receiving revenue share. For Q3, that came to $1.2 million, and looking at the entire nine months of 2024, revenue share totals $3.6 million. I want to call attention not just to growth in revenue per transaction, but also to the first dividend distribution. At 100%, that was $293 million. Looking at the I-66 on the right-hand side of this slide, we're seeing some traffic stabilization. Part of that ties to similar effects as well. What I mean is that in Q3 of 2023, completion works were still quite intense, and that was impacting traffic in the general purpose lanes while benefiting traffic on the I-66, and this year we also felt impact from hurricanes Debbie and Helene—so this has been affecting the comparison. Revenue per transaction continues to grow at a healthy pace. Okay, let's move on to the next slide. Here we get into the Airports division, and Heathrow—well, you've likely already seen the results, with passenger numbers that broke records.

Ernesto López-Mozo

executive
#8

Naturally, when you compare against 2023, the CAA-set glide path for aeronautical tariffs plays a role, so revenue on EBITDA comes down. EBITDA is also hit by increased costs needed essentially to handle the strong traffic demand. Moving on to the next slide, at the other airports we're seeing healthy expansion at AGS, where revenue is rising at a high single-digit rate and Adjusted EBITDA is even above 20%. That's robust growth, and among the various assets, the largest one, Glasgow, accounts for the bulk of it. Southampton is growing too. Aberdeen is steadier. Over on the right-hand side, Dalaman enjoyed its busiest nine months on record, and that growth also looks strong, with revenues up 7.4%. International traffic is increasing, and the area really is developing into an appealing tourism destination. Indeed, the region has been designated a tourism development area, so we'd anticipate additional hotels being constructed and greater capacity to draw passengers through the airport. As for New Terminal One, it remains on track. Construction on the project is genuinely going well. It's staying within budget and schedule, and we're also making progress in talks with airlines regarding the opening, roughly two years out or a bit longer.

Ernesto López-Mozo

executive
#9

So we've got nine airlines signed up during the first nine — well, through the first nine months of 2024. The new carriers are listed on the slide: EVA Air, Air Serbia, SAS, and Neos. When it comes to equity contributions, they track the project's pace — $347 million was injected during the first nine months of 2024, and in the third quarter that figure was $116 million. Total investment as of September 30th this year stands at $641 million, that's cumulative since the start, and we still have a pending commitment of $501 million. I mean, during the first half of the year, we completed a successful issuance of $2.55 billion in long-term green PABs. Okay, let's move to the next slide. Construction — a really strong quarter. Basically, I mean, the comparison with last year is very strong because last year we were still feeling the impact from closing of big projects. Now we have a healthy backlog, and margins are up across the board, right? So we have a 7.8% EBIT margin in the first nine months of the year for Budimex, 3.0% in Webber, and Ferrovial Construction had a good recovery with 1.9% EBIT margin. As I said, the order book is at peak levels.

Ernesto López-Mozo

executive
#10

We consider that backlog to be a healthy one, and we are still not including $2.3 billion of contracts that are awaiting financial close or final signature. All right, so moving to the P&L, we have the P&L broken down into revenue, EBITDA, and EBIT for the first nine months of the year, and then for the third quarter. So we can see growth is very strong this quarter, and of course, across the first nine months, even more so. So very solid, strong operational results. Moving on to the net debt graph, here we see — I mean, the main captions were already covered in the introduction. I mean, we had a strong number of dividends from projects, close to $500 million. It's $490. Construction has some cash drain. I mean, better than last year at this point in time, but I mean, it has drained a little bit of cash, and then you have other cash flow from other operating activities. And taxes — in taxes, the main impacts come from Budimex and also from cash repatriated from Canada. It has a 5% withholding tax. And to the right of these cash flow operations, we have the investment activities, and here we have all the investments that I mentioned before, and you also have here the interest received on the cash in hand and divestment.

Ernesto López-Mozo

executive
#11

So it's clearly a year in which our emphasis is on investment as well as shareholder remuneration. Regarding financing activity, as I said, shareholder distributions have been the priority, catching up with last year. We also have the other Treasury Shares acquisition, and then there are cash flows used in financing activities, and here, well, you've got bond repayment or European commercial paper. You have, for example, the dividend in Budimex, leakage to minority holders — all these captions that are well described in the note published yesterday. Okay, so good cash performance across the different captions, with a strong emphasis on investment and shareholder remuneration. Just to wrap up the presentation before we get into the Q&A, I mean, really strong performance across the board in infrastructure assets, Construction profitability clearly improving, and I mean, we have to remember the 3.5% guidance that we provided for this year. We are there clearly. Then we have growth investments combined with shareholder distributions that I mentioned and a sizable pipeline ahead. So pipeline is accelerating. Okay, so thanks for bearing with us, and we open the floor for the Q&A session.

Silvia Ruiz

executive
#12

Thanks, Ernesto. We'll begin the Q&A sessions in just a moment. Operator, please go right ahead.

Operator

operator
#13

Thanks. Ladies and gentlemen, we’re starting the Q&A portion now. To ask a question, press star five on your phone’s keypad. If you decide not to ask, press star five once more. Before you proceed with your question, please make sure your device is unmuted locally. Our first question is from Graham Hunt at Jefferies. Please go ahead.

Graham Hunt

analyst
#14

Hi, yes, thank you so much. I have just two questions. So you mention the solid pipeline of opportunities and express lanes in the U.S. in your statement. I was just wondering, how do you position yourselves best to compete for these assets? Obviously, a disappointing result, I think, in Atlanta this quarter, but going forward, is it simply a matter of price, or are there other levers you can pull to give yourselves the best opportunity versus your competitors? And then my second question, if competition is increasing for these express lanes, how are you thinking about other investment opportunities? We're seeing more and more activity in European data centers, for example. Would that be an area Ferrovial would consider investing in? Thanks.

Ernesto López-Mozo

executive
#15

Yeah, thanks, Graham. So, well, essentially those questions are great ones. I mean, we're going to compete using the tools that assist us, and design is one of those. For example, in the one we didn't win, the grantor scored our design higher on points. And then, naturally, we'll seek financial discipline from every angle, using all the information available to us. The fact that the pipeline has been augmented gives us a reasonable shot at winning new business. As for other investment alternatives, yes, we continue to examine opportunities throughout all our divisions. In Airports, we're looking more toward bespoke opportunities. Energy is pursuing things more in a developer role, so not really — I mean, we're not thinking about large investment tickets, but rather solid development activity. And the other things you mentioned, well, they could arise naturally given our capabilities, but it isn't something where we anticipate significant tickets at this point in time, right? So yes, if we're building data centers, an opportunity could exist to be part of a value chain, but that's all we can say at this point in time.

Graham Hunt

analyst
#16

I appreciate that.

Operator

operator
#17

Elodie Rall from JPMorgan is up next with a question. The floor is yours.

Elodie Rall

analyst
#18

Hello, and thanks for taking my questions. First, on the NTE, I'm wondering how long you expect traffic to keep being affected by the capacity improvement construction works. Second, on Schedule 22 of the 407 and specifically the provisions I believe you'll begin taking in 2025, could you give us a bit more color on when you'll actually start taking it and announce it, and whether you have any preliminary estimates? And third, on the U.S. line: regarding the U.S. equity line, do you have any plans to boost liquidity on the listing there so as to get into the U.S. indices? Thank you.

Ernesto López-Mozo

executive
#19

Thanks, Elodie. The first question, about NTE ultimate capacity, will go to Ignacio, and I'll handle Schedule 22 on the U.S. line.

Ignacio del Pino

executive
#20

Thanks, Elodie. Regarding NTE, the build-out is anticipated to run until early 2027. Through that period, that's when construction effects should be anticipated.

Ernesto López-Mozo

executive
#21

Now, on Schedule 22, we'll begin accruing for it starting with the first-quarter results of 2025. The pattern won't be an even one, so the provision will lean toward being more concentrated in Q2 and Q3. Those quarters carry heavier traffic tied to the busiest hours when it comes to business days. That's what defines Schedule 22. Yeah, we'll keep updating it as results come in. That's our intention right now. Then on your third question, the U.S. line, we're essentially doing the standard things that come with education, more presence in the U.S. alongside investors. So it's about building up awareness, and that's the plan at the moment. As you rightly said, indices demand a decent level of liquidity going forward, but you have to start the way we're starting now, right? So the plan is education and broader awareness with U.S. investors for the time being.

Elodie Rall

analyst
#22

All right, thanks.

Ernesto López-Mozo

executive
#23

I appreciate that.

Operator

operator
#24

Augustin Cendre from Stifel has the next question. Go right ahead.

Augustin Cendre

analyst
#25

Yes, hi there, and thanks for taking my questions. I have a couple, but the first concerns your formation of the JV with Interogo Holding. I was wondering what the strategic rationale was behind creating this JV. Is this part of your strategy to shift your focus toward North America, moving away from European assets? Any explanation would be appreciated. Regarding your traffic on the I-66 and I-77, I was wondering whether you could quantify the traffic impact of weather and how much is due to other effects. And finally, this is probably more of a technical question, but I noticed that Webber and Ferrovial Construction figures looked a bit different than before, as if some activities were transferred from Ferrovial Construction to Webber. So I was wondering what changed in terms of the reporting. Thank you.

Ernesto López-Mozo

executive
#26

Yeah, hi, thanks. Alright, so I'll handle the first question, Ignacio will take the second, and I'll likely field the third one. It just depends on how things flow. Okay, so essentially, when it comes to forming the JV with Interogo, we're rotating assets, and I mean, these assets are basically mature. The majority of them are availabilities, and we felt the timing was right to rotate them, and it also offers, let's say, a venue for more of this kind of rotation going forward, right, so basically it's the last of the availabilities we had in Europe, right? That was the rationale behind the asset rotation.

Ignacio del Pino

executive
#27

Regarding I-66 and I-77, you're correct to bring that up — in Q3, weather negatively affected both of those assets. Unfortunately, we're not able to give any indication of how large that impact was.

Ernesto López-Mozo

executive
#28

Okay, on that piece about Construction moving over to Webber — I mean, we'll provide some specifics. It isn't material. It's probably tied to the energy efficiency business, but we'll follow up with you and give you more detail. It's not material.

Operator

operator
#29

The following question is from Gregor Kuglitsch at UBS. You have the floor.

Gregor Kuglitsch

analyst
#30

Oh, hello, and thanks for taking my questions. Could I dig a bit deeper into the I-66 and I-77, please? What I'd like to understand is, if you were to strip out, say, September, how would traffic have appeared across just July and August, so we could get a feel for the underlying picture — maybe you'd rather not put a number on it, but just give us a sense — and then on the I-66, where transaction growth slowed quite noticeably, would you say this largely shows that the asset has now more or less finished ramping, or do you still see additional ramp-up ahead? Then, turning to capital return, you've accomplished a great deal this year and, of course, announced a buyback during the summer. So could you remind us by pulling together all the various pieces? I believe part of it is catch-up from last year. Part of it, clearly, is this year's dividend, which you're paying partly in scrip and partly in cash. And then the extra buyback — could you just summarize for us what is essentially carryover and what is, I suppose, incremental?

Gregor Kuglitsch

analyst
#31

Maybe one last question about the new tenders—I know it's still quite early, but could you give us some kind of envelope, whether CapEx or equity, around those projects taken together, so you don't have to reveal your hand on each individual asset? I understand that, but just to give us a sense of how large these are. Thank you.

Ernesto López-Mozo

executive
#32

Alright, thank you. Well, those are quite a few questions. I’m not sure I managed to jot down every one of them, so we’ll probably need you to repeat some of the ones we didn’t catch. Okay, so the first one, I-66, Ignacio will handle. I’ll look into the second one. Yeah, you were asking whether we can break out performance within Q3 for both I-66 and I-77, excluding September—so just July and August—and unfortunately, that’s not a data point we will provide.

Gregor Kuglitsch

analyst
#33

Alright.

Ignacio del Pino

executive
#34

Regarding your second question — the one about traffic growth slowing on I-66 and whether that should be taken as ramp-up coming to an end — as we've noted, the Q3 standalone number is affected by an unfavorable comparison against construction works in the prior year, along with adverse weather, so it would be premature to draw the conclusion that ramp-up has ended.

Gregor Kuglitsch

analyst
#35

Alright, thanks.

Ernesto López-Mozo

executive
#36

So there are two more left, correct? And one of those relates to what we can treat as remuneration from last year that we were catching up on? Then, as for the others, right? So the catch-up this year comes to EUR 270 million, if you prefer to see it that way. The remainder is this year's remuneration, right? And then on the question of how large the pending projects are, well, I won't go into that for commercial reasons. I mean, grantors will likely disclose some CapEx figures down the road, but at this point in time, we won't be commenting. Thanks for bearing with us.

Operator

operator
#37

Marcin Wojtal from Bank of America has our next question. The line is yours.

Marcin Wojtal

analyst
#38

Yes, hi there. Thanks for taking my questions. I'd like to revisit the topic of capital allocation. Back at your capital markets day in early 2024, you said that a possible special dividend, backed by money from disposals, was among the scenarios you could consider. What's your current view on that scenario, and when do you expect to reach a decision?

Ernesto López-Mozo

executive
#39

Thanks, Martin. So yeah, I mean, essentially we're viewing it the way we discussed at the capital markets day. Most likely there would be some mix of investment, remuneration, and buybacks. I mean, the conference call covering the full year results in February 2025 is probably the right moment to bring this to the market, right? So I mean, please bear with us.

Marcin Wojtal

analyst
#40

Alright, thanks.

Operator

operator
#41

The next person to ask a question is Sathish Sivakumar with Citi. You have the floor.

Sathish Sivakumar

analyst
#42

Thank you. There are a couple of things I'd like to ask about. The first concerns the NTO, and the second has to do with the Construction segment. On the NTO, you said that long-term agreements have been signed with nine airlines. Could you comment on how the arrangement works regarding volume versus price, and what the current agreements with the airlines mean for how much capacity you have contracted out at this point? Then, on the Construction segment, you do mention that you're focusing more on local markets and that large designs carry lower weight. So does that basically imply that your average contract size and the time period of the projects you undertake have somewhat decreased compared with what they were before? If that's the case, what are the average contract size and duration at present? Thank you.

Ernesto López-Mozo

executive
#43

All right, so I'll address the NTO question, and really, the sole detail we're able to share on that is that we've now surpassed 30% of revenues for traffic for 2027, and that's really all I'm able to say at this point. What I mean is, we don't give out volume and price references. As for the Construction segment, fine, Ignacio can handle that one.

Ignacio del Pino

executive
#44

Yeah, regarding the Construction segment, as you mentioned, design and build contracts carry less weight there. It's true those contracts tend to run longer and involve bigger volumes, but sadly, we're not able to offer any insight into how the average contract size has changed.

Sathish Sivakumar

analyst
#45

Looking ahead, would you actually aim by design for contracts with lower size value and shorter duration, or just to get a sense, what upside does this offer on margin?

Ernesto López-Mozo

executive
#46

Alright, so as we said, going forward the emphasis is on projects where we can help secure infrastructure that generates value, correct? Those tend to be larger in size, though the pipeline will likely need some time before it materializes, right? Near term, sure, there may be some sizable projects that we find appealing and solid given our capabilities. And in that case, unless it's for an infrastructure sister company, we'll apply every caveat when it comes to risk management and margin, correct? So there's no particular target when it comes to size. Naturally, on average we should be shifting more toward the sizes we're talking about now, which are smaller. But like I said, we're open to larger projects when it makes sense, and especially when it's for our infrastructure companies.

Sathish Sivakumar

analyst
#47

Understood — thanks.

Operator

operator
#48

Just a reminder, everyone: if you'd like to ask a question, you can press star five on your phone's keypad. We now have our next question from Nicolò Pessina at Mediobanca. Please go ahead.

Nicolò Pessina

analyst
#49

Good afternoon, everyone. I had a few questions about the 407 ETR. It seems as though the emphasis in the third quarter was more on pricing than on traffic, which is different from the second quarter. I'm wondering whether my reading of that is correct. Even so, the change in average revenue per transaction appears to be smaller than the toll increase that took effect in February. As I understand it, the toll increase applied for just 8 months. That applies only to total revenues and not to total revenues. But even so, there seems to be a gap of 200 to 300 basis points. So I'm wondering whether you could explain what accounts for that gap. And finally, still on 407 ETR pricing, do you have a strategy for next year, when the Schedule 22 calculations will become relevant, as to whether you plan to introduce aggressive promotional discounts to stimulate traffic and minimize Schedule 22 payments? Thank you.

Ernesto López-Mozo

executive
#50

All right, thank you. So on pricing — as we've said before, and I believe the revenue breakdown slide illustrates this, the comparison is impacted not just by that single month we referenced, but also when you consider the contract revenues that were essentially there a year ago and influence the growth figure. More significantly, though, certain fees — transponder fees and trip toll charges, for instance — saw zero increase in the current year, correct? That effectively waters down the impact. Still, this doesn't imply we're unable to raise it at any point, right? So keep that in mind. In other words, a portion of revenues experienced no price increase, while toll per kilometer did, correct? That's how you can see the effect. Yet performance remains very strong. As I mentioned, there's no cause to believe that can't shift in the future, and you could raise the various parameters that feed into revenues. On next year's strategy — we won't disclose that at this point, but naturally, the various loyalty activities and schemes trialed during this year would be significant next year. Client response has been favorable, and we anticipate that will be even more prominent, correct?

Ernesto López-Mozo

executive
#51

Regarding next year, there's nothing we can share at this point, but yes—logically speaking, it will take on a more significant role. And I'm not sure whether I missed part of the questions.

Nicolò Pessina

analyst
#52

Nope, everything's clear on my end. Thanks very much.

Ernesto López-Mozo

executive
#53

Thanks. I’ll also use this chance to finish answering Augustin Sander’s question about the business transfer between Webber and Ferrovial Construction. It was really Ferrovial Construction—specifically the U.S. portion that’s embedded, of course, in Ferrovial Construction CapEx, correct? So the water business at Webber that was previously 50% Webber and 50% Ferrovial Construction, the U.S. part, has been moved over, and basically this has no effect on EBIT margins at all. I mean, it isn’t really changing anything materially there, and basically it’s consistent with the margins at Webber.

Operator

operator
#54

The next person to ask something is Augustin Sander of Stifel — go right ahead.

Augustin Cendre

analyst
#55

Yes, hi there. One last question I have concerns your Ferrovial Construction business. I'm curious how you see your activity developing from here, given that your order book is lower? It's down 10% year on year, as I see it, and I'd like you to comment, perhaps, on when this present order book plays out relative to the projects you're seeing in your pipeline. Thank you.

Ernesto López-Mozo

executive
#56

So, well, you really have to consider the Construction segment in its entirety. What you're referring to there is Ferrovial Construction — I mean, the reason the backlog has fallen is essentially that the large U.S. projects we talked about over the last several years have wrapped up, correct? And that, basically, is what pulled the backlog down. And on this, yes, I mean, opportunities may arise through sister companies, as I said earlier. I mean, we shouldn't read anything into any particular plans for this area, because it also spans other countries, right? So no, I mean, overall the order book is still high, and there isn't any specific plan to turn this one around. I mean, we ought to view it in its entirety.

Augustin Cendre

analyst
#57

Thank you.

Operator

operator
#58

That brings us to the end of the question-and-answer portion of today's call. I'll now return the conference to you. Thank you.

Silvia Ruiz

executive
#59

Thanks for that. So I’ll begin reading. A few questions came in through the webcast, so I’ll read them first. The first group is from Patrick Creuset at Goldman Sachs. His first question: how would you evaluate 407 ETR’s pricing power for 2025 to 2026 compared with the price increase in 2024?

Ignacio del Pino

executive
#60

Thanks. As we've said on several occasions before now, the value 407 ETR delivers to users is still very strong, and price elasticity to this year's increase has come in below what we expected. So we're still optimistic about the asset's medium and long-term potential. That said, we're not in a position to give any guidance on toll rate increases in the future.

Silvia Ruiz

executive
#61

Patrick has the next question. He's asking for our perspective on two things: first, the risk tied to plans for tunneling a highway beneath Highway 401 in Toronto, and second, the possibility that the grantor buys back the 407 ETR.

Ernesto López-Mozo

executive
#62

On that final point—a possible repurchase of the 407 by the grantor—we've received no contact and no indication whatsoever. From our side, there's simply nothing to comment on. As for the tunnel, the situation is the same: it's early days, there are comments in the news, but it's too soon to say anything about any of these initiatives. We'll have to wait and see whether anything has any prospect.

Silvia Ruiz

executive
#63

And the final question comes from Patrick. If you were to boost distributions to shareholders this year, do you think there's room for a more formalized distribution policy down the road — tied, say, to yearly distributions from the underlying infra assets?

Ernesto López-Mozo

executive
#64

Thanks, Patrick. I'll likely point you back once more in the same manner I redirected on the full-year conference call, so you can get additional detail on distribution policy. So, please be patient with us.

Silvia Ruiz

executive
#65

Álvaro Navarro from Bestinver has the final webcast question, concerning dividends received from managed lanes. Is it possible to forecast that total dividends in 2024 will surpass EUR 500 million? Should you be unable to answer that, please provide some guidance for this year and 2025.

Ernesto López-Mozo

executive
#66

Unfortunately, Álvaro, we aren’t offering any guidance on that subject.

Silvia Ruiz

executive
#67

All right, it looks like we don’t have any more questions. Thanks so much.

Ernesto López-Mozo

executive
#68

Yeah, many thanks, and I appreciate you joining the conference call. We’ll be seeing you before long. Thanks. Bye-bye.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Ferrovial N.V. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Ferrovial N.V. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Ferrovial N.V. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.