Ingela Ulfves
executiveGood morning, everyone. Welcome once more to the joint webcast and news conference for Fortum's investor community and media, covering our half-year report for January-June 2025. I'm Ingela Ulfves, and I head Investor Relations at Fortum. As usual, this event is being recorded, and a replay will be up later today on our website. Joining me in the studio once again are our CEO, Markus Rauramo, and our CFO, Tiina Tuomela. Markus and Tiina will walk you through the group's financial and operational performance for the second quarter and the first half of this year. Once the presentations wrap up, we'll take your questions in the Q&A session. With that, I'll hand things over to Markus to begin.
Markus Rauramo
executiveI appreciate that, Ingela, and I'd also like to extend a warm welcome to everyone joining our Investor and Media Call. My plan is to first walk through the main points from the quarter along with our financial results. Following that, I'll comment briefly on where things stand with Hydro and on the most recent revision to the Power Demand forecasts looking out to 2030. Tiina will then take you through the financials in more depth and explain how operational performance fed through into our results. So let me begin with the highlights. As a reminder to start, in our kind of business, Q2 and Q3 tend to be modest quarters when it comes to results, and that holds true this year as well. Even with power prices coming down, the power price we achieved in Q2 was nearly level with the prior year — EUR 48.1/MWh against EUR 48.6/MWh — helped by a strong hedge ratio and solid physical optimization. Market prices we realized came in 23% below the figure for Q2 of last year. Tiina's presentation will go into the details of how the optimization premium and the hedge effect played out. This particular year stands out for its low volumes, which we view as a temporary matter stemming from hydrology and unavailabilities. Turning to Hydropower in Q2, output reached a record low, since inflow across the quarter was weak in the areas where we generate.
Markus Rauramo
executiveBeyond the reduced hydro output, we also noted alongside our Q1 results that unavailabilities existed — and persist — within our nuclear generation fleet. Consequently, total generation reached a record low of 8.8 TWh, a full 2.2 TWh below the figure for the second quarter of last year. During the quarter's final stretch, we completed the acquisition within our consumer solutions business, purchasing Orange Energia — an electricity retail operation in Poland. That deal doubled the number of our retail customers in Poland. Under the terms of the agreement, Fortum will keep selling electricity along with related digital services via Orange Polska's nationwide retail sales distribution network at minimum through the close of 2028. Our efficiency improvement program is advancing in line with the plan and schedule. Fortum aims to cut annual fixed costs by EUR 100 million, inflation excluded, step by step through the end of 2025. The full run rate takes effect starting at the beginning of 2026. We estimate the new fixed cost base for 2026 at roughly EUR 850 million. That figure excludes the Swedish property tax increase from 2025. On July 23, following the reporting period, we announced the purchase of a wind power project development portfolio in Finland from ABO Energy, the German renewables developer and constructor.
Markus Rauramo
executiveWith this acquisition, we're reinforcing the renewables development pipeline as we get ready for growth down the road. Our goal is to hold at least 800 MW of ready-to-build projects so we can serve customers once demand begins rising in the Nordics. Thanks to the 4.4 GW portfolio we've acquired, Fortum's onshore wind and solar pipeline in the permitting phase now stands at roughly 8 GW, and there are additional projects in earlier development stages. Any investment decisions on these projects will be taken case by case. Every project is to be tied to a customer PPA and must satisfy our investment criteria. At present, power supply in the Nordic area is sufficient, and we're able to sell PPAs from the outright portfolio we already hold. Our financial position is still solid, including after the EUR 1.3 billion dividend payment. As of the close of the second quarter, our financial net debt stood at EUR 1.3 billion. Uncertainty in the operating environment has persisted because of continuing geopolitical conflicts as well as U.S. tariff plans, and this may create challenges for major industrial investments in the Nordics. A stable and dependable regulatory framework is essential for supporting economic growth and long-term investment planning. That matters, for instance, when it comes to taxation of planned data centers.
Markus Rauramo
executiveFrom where we sit, public involvement ought to help industrial investments along, not hold them back. Now I'll move to our key figures and financial KPIs. These are the usual comparable headline KPIs we show for the group's second quarter and for the first half-year, 2025. As you can see, every KPI declined across all periods. The main reason was a combination of low generation volumes and weaker power prices. A large share of that negative impact is tied to the clearly lower volumes. In Q2, our comparable operating profit came to EUR 115 million, while EPS was EUR 0.09. Cumulatively, the group's comparable operating profit reached EUR 577 million. Our comparable EPS stood at EUR 0.51/share. Operative cash flow was at a good level, though it fell to EUR 656 million. On the balance sheet, our leverage — defined as financial net debt to comparable EBITDA — was 0.9x at the end of June. Tiina will cover the result analysis in greater detail in her section. Next, a few remarks on the market environment, particularly Hydro conditions. The picture on the left-hand side displays the Hydro Reservoir status for the entire Nordic market area, not just Fortum's reservoirs. As we communicated earlier this year, reservoirs were record full during the winter, meaning in the first quarter.
Markus Rauramo
executiveThat said, the water was mostly located in Norway and the northern areas of Sweden, where Fortum has no hydropower. Since the winter turned out mild and the snowpack stayed thin, spring floods ended up being very minor. As a result, reservoir levels dropped quickly during the spring, and as you can see, reservoirs now sit close to normal. As we've mentioned, generation volumes are going to be clearly lower this year. Our nuclear fleet has seen a fair amount of unplanned maintenance. On the basis of announced unplanned outages, we now estimate roughly 2.9 TWh lower nuclear volumes for the full year 2025. We also flagged the risk of lower hydro volumes for the full year. Unfortunately, that appears to be happening. You can see that over the last 12 months, hydro volumes came in at 18.3 TWh. Our normal year hydro output is somewhere between 20 TWh and 20.5 TWh. Giving any estimate for the full year isn't possible, since hydro conditions might change, but the assumption is that our annual hydro volume will be below that of a normal hydro year. Just to highlight how hydro volumes can fluctuate, our lowest hydro output year was with 18.1 TWh in 2013, and the highest output year was 25.2 TWh in 2012.
Markus Rauramo
executiveTurning to something more encouraging, the persistent sharp swings we see in Nordic spot pricing underpin our ability to earn a premium via optimization. Back in June, the Nordic Transmission System Operators, or TSOs, revised upward their forecasts for electricity consumption across the Nordics. Per that revision, consumption should rise to 550 TWh per year by 2030. That figure came down a bit versus the prior one and indicates a delay in the anticipated need for hydrogen output, yet it simultaneously points to greater demand by 2030 coming from data centers as well as other sectors. Here at Fortum, we keep observing strong fundamental customer demand among our clients across a range of industrial segments, which in our view mirrors electricity consumption expansion over the longer horizon. Even so, we have not recently executed any meaningful fresh long-term power purchase agreements. Rather, our clients keep gravitating toward shorter and medium-term contracts spanning the coming three to five years. That wraps up what I wanted to cover, and I would now like to pass things to Tiina for more detail on business performance.
Tiina Tuomela
executiveThanks, Markus. Good morning, everyone, from me as well. Now I'll walk you through the financials in greater detail. Let's begin with the key financial figures. I'll kick things off with a few of the comparable KPIs. Comparable operating profit came in at EUR 115 million for the second quarter. During the second quarter, both comparable net profit and comparable EPS were lower. That reflects the weaker result in the generation segment. At the same time, we're very pleased that our consumer solutions business delivered a record-high second-quarter result. Comparable net profit for the quarter fell to EUR 87 million. As a result, comparable EPS for the second quarter came down to EUR0.09, versus EUR 0.20 a year earlier. Comparable EPS over the last 12 months now stands at EUR 0.83. Cash flow for the quarter was down by EUR 135 million and came to EUR 203 million in the second quarter. Cash flow was strong, even as leverage rose because of the dividend payment made in the second quarter. Let's turn to the income statement to examine a few items more closely. On the income statement, things are fairly straightforward. To begin with our efficiency improvement program: in 2024, our fixed costs edged down slightly, and that trend has carried on into the first half of 2025.
Tiina Tuomela
executiveDuring the second quarter, fixed costs came in at EUR 209 million. As we've said before, the fixed cost base for 2026 will be EUR 850 million. That figure leaves out the EUR 30 million rise in Swedish property tax. It's worth remembering that we have initiatives underway to grow our business and get ready for future expansion, and that pushes up our development cost, so fixed costs will continue rising this year. Turning to the associated company result and financial items, there were a few one-off type items, mostly tied to the nuclear cost updates and adjustments, and we've laid those out in detail in the notes to the report. The comparable effective income tax rate landed inside the guided range, at 19.2% for the first half year. Moving on to the segment result for comparable operating profit. Versus the prior year, the result in our generation segment fell, whereas both consumer solutions and other operation segments came in better. Within the generation segment, comparable operating profit declined by EUR 143 million-EUR 121 million, largely because of lower hydro and nuclear volumes, lower hedge power prices, and somewhat higher property taxes on nuclear and hydro in Sweden.
Tiina Tuomela
executiveDuring the comparison period, our renewable business got a positive boost from a EUR 16 million sales gain tied to the divestment of Fortum's remaining stake in the Indian Solar Power portfolio. The Pjelax wind farm's result contribution was slightly negative. District heating results declined, largely because power sales prices in Poland were lower. Our consumer solutions business put in a good showing in the second quarter. Comparable operating profit hit an all-time high for a second quarter at EUR 26 million. That's up EUR 14 million, driven mainly by better gas margins in the enterprise customers' business in Poland, stronger electricity margins in the Nordics, and roughly EUR 5 million in cost synergies from the brand mergers that have been completed, Telge Energi included. We're particularly pleased to now be seeing the cost synergy impact from the brand mergers arising from the bolt-on acquisitions we've carried out. For this year, total estimated cost synergies come to EUR 13 million. In the other operation segment, comparable operating profit was EUR 11 million better, with a negative result of EUR 32 million. The divestment completed in 2024 in the circular solution business was the key driver behind that improvement.
Tiina Tuomela
executiveNow, I'd like to point out a few aspects of how we create value in our Generation Fleet. Let's examine what makes up the power price we achieved. Please keep in mind this is an illustrative picture. If we split the achieved power price for the outright portfolio within our generation business into smaller pieces, there are essentially three components. The first pillar is our area-weighted realized market price, which we call our blended price. Within our generation fleet, the price area mix is 46% Finland, 37% Sweden Price Area 3, and 17% Price Area 2. That mix may shift with market conditions and availability. In the second quarter, the blended market price came in at EUR 26.4/MWh, versus EUR 34.3/MWh during the same quarter a year earlier. The second element is the optimization premium, added on top of the market price. One key thing to note is that the optimization premium covers 100% of the total volume of our generation, regardless of the hedge ratio. Another useful point is that the optimization premium relates to physical generation, whereas hedges are financial. During 2024, the premium stood at EUR 8.7 per MWh, and for this year we have guided it to a range of EUR 7-EUR 9/MWh.
Tiina Tuomela
executiveThe third element is the Hedge Effect. As I mentioned, hedging here means financial hedging—so hedges get settled in cash rather than through physical delivery. Open hedge positions aren't purchased or delivered physically. When necessary, we always have the option to open new positions or close ones that already exist. Since we monitor and manage our hedge position closely, the danger of significant financial losses is largely theoretical, including in scenarios involving high hedge ratios. As we disclosed in the interim report, the hedge ratio during the second quarter was elevated owing to low volumes of hydro and nuclear generation. At the close of Q1, we reported a hedge ratio of 75% at EUR 40/MWh covering the remainder of the year. That suggests the hedge price in Q2 stood clearly above the blended market price of EUR 26.4/MWh. As a result, the hedge effect proved positive for the quarter. Let's take a closer look at how we generate value through the hedging and optimization premium on top of market prices. This picture illustrates how much value we've created above the market price. The value created covers both the optimization premium and the effect from hedging. During the first quarter of 2024, the market price was EUR 63/MWh.
Tiina Tuomela
executiveDuring that quarter, we created just 1 year of additional value. If you examine the past five years, market prices averaged EUR 33/MWh, and on average we generated an extra EUR 18/MWh. In the same way, value creation during the third quarter of 2024 came to EUR 24/MWh. For the second quarter of 2025, that figure stood at EUR 22/MWh. It's worth bearing this in mind when you consider achieved power prices ahead. What this confirms is that value creation occurs particularly when market prices are low, and it also demonstrates that a higher hedge ratio need not be a negative. Let's now turn to the cumulative result waterfall for the segments. If you look at the waterfall covering comparable operating profit for our segments during the first half year, it reveals the same pattern as our second quarter. Versus the prior year, the result in our generation segment declined, whereas consumer solutions and other operation segments both improved. Within the generation segment, comparable operating profit fell clearly, from EUR 221 million to EUR 556 million, driven mainly by lower hydro and nuclear volumes, reduced spot and hedge power prices, and somewhat higher property taxes on nuclear and hydro in Sweden.
Tiina Tuomela
executiveThe hit from price and volume was partially balanced out by strong hedge ratios during Q2 and solid physical optimization. Pjelax wind farm contributed positively to the result, though it came in below the comparison period because power prices were weaker. During the comparison period, a gain of EUR 16 million on the sale of Fortum's remaining stake in the India Solar Power Portfolio gave the renewable business result a positive boost. For district heating, the result got better largely on the back of reduced fuel and CO2 cost, together with a higher heat price and volume, which was partly countered by a lower sales price for power. In consumer solutions, cumulative comparable operating profit for the business rose by EUR 19 million, reaching EUR 73 million for the first half of this year. That improvement stems chiefly from a better gas margin in the enterprise customer business in Poland and roughly EUR 11 million in cost synergies arising from the brand mergers that were completed, Telge Energi among them. Within the other operation segment, comparable operating profit was up by EUR 16 million, landing at -EUR 52 million, primarily as a result of the divestment in the Circular Solution Business that was finalized in 2024.
Tiina Tuomela
executiveNow turning to leverage and liquidity. Our financing position remains solid, mainly backing our goal of keeping a credit rating of at least BBB. It also gives us a sound financial base in this market environment, which is uncertain and turbulent. In our capital allocation principles, we strike a balance among leverage, investments, and dividends, always bearing the credit rating in mind. In June 2025, Fitch raised its long-term credit rating from the earlier BBB with a stable outlook. Both S&P Global Ratings and Fitch Ratings now assign Fortum a long-term credit rating of BBB+ with a stable outlook. I'd like to walk through the reconciliation of our financial net debt for the second quarter. Our financial net debt stood at EUR 13 million at the close of the first quarter. Operating cash flow in the second quarter came to EUR 203 million, and investments were EUR 162 million. As has been mentioned several times, the EUR 1,256 million dividend was paid during the second quarter. Interest-bearing receivables changed by EUR 8 million, while FX and other effects accounted for EUR 35 million. Our financial net debt at the end of the second quarter was EUR 1,270 million, and the leverage ratio of financial net debt to comparable EBITDA was 0.9x.
Tiina Tuomela
executiveTurning to our debt portfolio and the schedule of loan maturities, there are a few points I'd like to flag. Gross debt, excluding leases, came to EUR 4.6 billion at quarter-end. Bonds remain our main funding source, as they have been. The maturity schedule is well spread out, with no single year carrying a big concentration of maturities. The bond coming due next is EUR 750 million in 2026. Our liquidity is solid at the same time. We hold an ample liquidity reserve of EUR 7.1 billion, made up of EUR 3.2 billion in liquid funds plus EUR 3.9 billion in undrawn committed credit facilities and overdrafts. On our EUR 4.6 billion loan portfolio, the cost stands at 3.3%, whereas the interest income earned on our EUR 3.2 billion of liquid funds has declined further and now sits at 2.2%. Given this strong liquidity position, we'll keep optimizing our cash and credit lines. The overarching aim is to maintain sufficient liquidity while striking the best balance between debt and cash so that funding costs stay as low as possible. Moving to the final sections, the outlook. Four familiar elements make up the outlook section: guidance for outright Portfolio, Taxes, CapEx guidance, and our Fixed Cost Reduction program. First, a reminder: our normal annual outright volume is roughly 47 TWh, but given announced unavailabilities in nuclear and lower expected hydro output, this year we will fall clearly behind the normal historical output level.
Tiina Tuomela
executiveGiven the outages we've announced, we now project nuclear generation will be 2.9 TWh lower in 2025, with 1.3 TWh of that already realized during the first half of 2025. As for the impact we expect in the second half, the maturity is estimated to land in the third quarter. It's worth noting that our hydro output over the last 12 months stands at 18.3 TWh, versus a normal level of 20 TWh-20.5 TWh. On the hedges: at the close of the second quarter, the hedge price covering the remainder of 2025 was EUR 41, with a hedge ratio of 80%. For 2026, the hedge price is EUR 40 — EUR 1 below the figure we last disclosed — while the hedge ratio rose by 10% points, to 60%. We estimate our annual optimization premium for this year at between EUR 7/MWh-EUR 9/MWh. It's good to keep in mind, though, that quarterly variations are typical, as past experience shows. Guidance on our corporate tax rate stays the same for 2025 and 2026. We anticipate the comparable effective income tax rate will fall within 18%-20%. Finland's government intends to cut the corporate tax from 20% to 18% starting at the beginning of 2027.
Tiina Tuomela
executiveBut no official legislation exists as of yet. Based on our very early assessment, this would lead to a 1 percentage point reduction in the corporate tax rate starting in 2027. I'd like to reiterate as well that Swedish property taxes are being revised as of 2025. For Fortum, the property tax increase is currently projected at roughly EUR 30 million across the years 2025 to 2030. A substantial share of that added cost will land in our fixed cost. Our capital expenditure stays the same. Capex for 2025 to 2027 is anticipated at EUR 1.4 billion. That figure covers maintenance but leaves out possible acquisitions. Lastly, a brief note on our fixed cost reduction program. As you observed, fixed costs came in at EUR 200 million in the first quarter of 2025 and at EUR 209 million in the second quarter of 2025. Our goal is to lower the recurring annual fixed cost base by EUR 100 million, inflation excluded, step by step through the end of 2025, with a new run rate taking effect from the start of 2026. We currently estimate that the new run rate for our fixed cost base in 2026 will be about EUR 850 million, not counting the rise in Swedish property tax.
Tiina Tuomela
executiveAs I noted earlier, 2025 will bring some extra costs tied to growth. Those involve things like developing renewables, developing sites, building up the commercial organization, and the hydrogen pilot project. That wraps up what I had to present, and now we're glad to take your questions. So, Ingela, I'll hand things over to you.
Ingela Ulfves
executiveThanks to both Tiina and Markus, and I hope we've managed to shed a bit more light on the quarterly results. At this point we're ready for your questions. Let's get the Q&A session started, and if you'd like to ask in Finnish, that's fine too. Moderator, over to you.
Moderator
operatorShould you want to pose a question, press pound key five on your phone's keypad to join the queue. In case you'd like to take your question back, press pound key six on your phone's keypad. Our next question is from Harry Wyburd with BNP Paribas Exchange. You may proceed.
Harry Wyburd
analystMorning, everyone — hello and hi. I have two questions, please. First, could you help me nail down what full-year volumes will be for hydro and nuclear? On nuclear, if I recall correctly, you typically run around 26 TWh per year. When you mention 2.9 lower for the year, should we be thinking roughly 23 TWh for nuclear across the full year? On hydro, you've noted it's very hard to forecast the full year. I believe you were 2 TWh below the last 12 months, within the usual range of 20 to 20.5. If you had P50 volumes, or given the outlook for the remainder of the year, would 18 be a reasonable estimate? That's the first one. The second concerns Russia. I think we've become somewhat immune to Russia and Ukraine and so on, but obviously the Alaska Summit is imminent. Where do we stand on the legal claims regarding the Russian business? And do you think there might be some kind of improvement in the outlook there if we get a good result from the Alaska Summit? Thank you.
Markus Rauramo
executiveThank you. Perhaps I'll begin with Russia and say a few words about the Hydro Reservoirs, and Tiina, if you could handle the question on nuclear volume. Sure. There's no significant legal development to report regarding the Russian claims. We have the arbitration proceeding against the Russian Federation over our equity ownership, and separately there is the legal process involving our own company related to the unpaid loans. Both of these are moving forward. If it were possible, we would sell the business as well. Essentially, we are hoping for some easing of currency controls, so that the company would be permitted to transfer money to us and thereby repay the loans. That would let us recover the funds along with the ownership, and potentially sell it. We will pursue all of these avenues. As we have stated before, should we regain control of the business, we will not carry on our operations in Russia. We will exit it in one way or another. On the volumes, Tiina can provide more of the precise details, but what I personally am focused on, naturally, is that availability has to be there. A level of unavailability such as this is not what we are aiming for, as you can see from our strategic targets.
Markus Rauramo
executiveThe same applies to nuclear. On hydro, as I mentioned in my section, if you examine the reservoir levels closely, they were quite high at the start of the year, which weighed on prices. At this point we're basically at a neutral level. For the remainder of the year, anything is possible. Measured against historical results, the distribution is now neutral in either direction. Tiina, anything on nuclear?
Tiina Tuomela
executiveYes, thank you so much. Perhaps to begin with, it's really important to emphasize that this quarter has been highly unusual. Hydro volumes were the lowest we've ever seen. And in nuclear, unfortunately, we experienced a great many outages. Naturally, we're also signaling that this will affect the full-year level for this year. I'm not speaking about future years, but this year will feel the impact. Nuclear volumes typically average roughly 26 TWh. What we've stated is that, currently, based on the UMMs available in the market, the reduction comes to 2.9 TWh, of which 1.3 TWh has already occurred. The 1.6 TWh will mostly hit the third quarter. There will be some reduction, as indicated. Turning to hydro volumes, the second quarter was a record low. Given our present estimates, fully closing that gap during the year is very hard. Our usual 20 to 25 is difficult to reach because of the lower volumes. Of course, as Markus indicated, hydrology can change. We have to live with that.
Markus Rauramo
executiveIs it 20 to 20.5?
Tiina Tuomela
executiveYes, 20 to 20.5.
Harry Wyburd
analystThanks. It seems you dropped a few TWh during the first half. If the second half is typical — I’m not sure, maybe around 10 TWh or so — I’ll figure roughly 18, perhaps 18 or 19, in my head. I mean, call out if you believe that misses the mark.
Markus Rauramo
executiveOne thing I'll point out here is that, naturally, you have to make an estimate for what you expect over the remainder of the year. Forecasting hydrology is hard, but the unavailabilities and the record low figures—those are exceptional and temporary as we see it. Nothing suggests we wouldn't have a normal year, naturally, if we make normal hydrological assumptions for next year.
Harry Wyburd
analystUnderstood completely. Yeah, no impact in 2026. All right, thanks a lot.
Moderator
operatorWanda Serwinowska has the next question. Please go ahead.
Wierzbicka Serwinowska
analystHello, this is Wierzbicka Serwinowska calling from UBS. I have two questions for you. My first one concerns the data center tax in Finland. At what point do you anticipate a decision or some clarification on that matter? I have to admit, Markus, that I missed what you said at the start. Should it be implemented, what impact would you anticipate on data center growth in Finland? Since you also develop sites, does this issue come up in your discussions regarding the PPA or the site? That is my first question. My second question concerns your onshore wind. I was quite surprised that it came in negative in Q2. Could you please explain the reason for that? Could you please remind us of the support price you have? What mechanism do you have in place for this onshore wind farm? Perhaps just a very quick follow-up to Harry's question. I do understand that hydro is difficult to model, but what have you observed in July and August so far regarding volume generation? Thanks a lot.
Markus Rauramo
executiveAlright, perhaps I’ll hand the onshore wind and hydro question over to Tiina. I’ll say something about the data center tax. The proposal that came from the Minister of Finance was a normal part of her work — asking where tax revenues could be collected. From what we understand at this point, it’s now going through the full government review of all the proposals currently on the table. The government also established a working group led by Veli-Matti Mattila, who headed Elisa Corporation for a very long time, specifically to evaluate the benefits and impacts of the data center economy for Finland. I’d say that the tax is more of a detail in the big picture. Having any kind of uncertainty is not a positive. If you look at what data center operators are seeking when we talk with them very closely, it’s that they need sites, they need grid, they need infrastructure, good competencies, and clean energy. This is a little detail. If you look at the total cost of investing in a data center, electricity and the tax is a small fraction. Is it a positive thing? No. That’s a detail that, of course, the data center hyperscalers are also asking us about — what’s going to come out of this.
Markus Rauramo
executiveHonestly, the biggest piece is that whenever we carry out site development, we’re able to hand over sites that are ready to go, and we can deliver grid access immediately, up to 1.3 GW. We’re able to supply substantial volumes of both existing power and new power. Those are truly the major items, and the tax is a minor point. We would hope for certainty and for no changes to taxes. That is something we also communicated in the report. Tiina?
Tiina Tuomela
executiveYeah. Turning back to onshore wind, those are our big power plants, the Pjerlax. For the second quarter, the figure came out slightly negative, though it's worth highlighting that on a cumulative basis it remains positive. In my view, low spot prices in the second quarter weighed on that result. Most of the project is hedged through the PPA, but on the portion that isn't hedged, the price came in lower. What we've taken away is that when it's extremely windy, the capture rate — meaning the average spot price — the wind actually receives a lower price. That lower price on the unhedged portion is what pushed the result negative. I believe there was a question about what July and August have shown us regarding hydro reservoirs and the hydro situation. Reservoir levels stood near normal at the close of the second quarter, 5 TWh above normal at the Nordic level in August, and they fell to 2 TWh. I'd describe it as fairly normal, a normal sort of profile, and that's where things stand as of the end of the second quarter.
Wierzbicka Serwinowska
analystThanks, Tiina. If I could just come back on that, since I’m still unclear how an onshore wind park can be negative when you’ve locked in part of the majority of your output through a PPA and only the merchant piece — I mean, the capture rate, it’s low, but we’re still above EUR 1, I mean, EUR 0/MWh. Why is this asset EBIT negative?
Tiina Tuomela
executiveMy sense is that during June, the capture rate dropped to under 50%. That was an extreme situation. It’s possible that June had a lot of wind, and that pushes wind prices down even further. This is temporary.
Markus Rauramo
executiveSo we come to overtime costs and similar items. And yes, capture rates are very low, and prices for those capture rates are very low as well.
Wierzbicka Serwinowska
analystAll right, that's great. Many thanks.
Moderator
operatorOur next question is from Bernstein's Deepa Venkateswaran. Please go ahead.
Deepa Venkateswaran
analystThank you. There were two things I wanted to ask about. On second-quarter spot prices, hydro was clearly lower, but you also had a lot of outages. Even so, why were spot prices so soft, even looking regionally inside Finland? Historically, when volumes have been low, spot prices have tended to be higher and they offer a hedge. Could you flag anything unusual? You mentioned wind, but was demand also especially weak? How do we reconcile low volumes with low prices? My second question: in Finngrid's first-half reporting, they discussed nearly 35 GW of data centers having applied for grid connections in Finland. In your view, how realistic is that, and what share of it could realistically become actual data centers? Based on your experience, when do you expect the power demand from these to start showing up? Thank you.
Markus Rauramo
executiveI'll take the Finngrid question about data centers, and Tiina, you can handle spot price realization. What we do is triangulate using information from the TSOs — Finngrid, SvK, Statnett — and their updated forecast points to 400 TWh rising to 550 TWh. Working back from that, it's clear there won't be 35 GW of data centers. What they're really referring to is a gross figure of the applications they receive. As for their methodology, once they have that gross number, they apply a haircut — in fact a very large haircut — before it goes into their forecast. That gross figure comes from the connection inquiries they're receiving. We examine the TSO forecast alongside our own customer pipelines, or customer by customer, looking at when they signal they'd make investment decisions and when those investments would begin consuming energy. That lines up well. I'm not claiming it matches their 550 exactly, but it lines up well with what we observe across the different customer segments. On the data side, returning to data centers, when we speak with them, what they require — as I mentioned earlier — is sites, meaning land availability, grids, and clean power.
Markus Rauramo
executiveWhat’s great about Fortum, Finland, and the Nordics is that we’ve already been developing and permitting sites you can actually locate right away. Grid connection exists all the way up to 1.3 GW. If you look, say, five years ahead, we have a portfolio that is largely unhedged. We can sell massive amounts of energy to the data centers. From that point of view, we are very attractive. It’s normal sales work, which we are doing. I’m positive — very positive — about the characteristics of Finland and the Nordics as a place to locate data centers. We have the cleanest and cheapest energy in Europe, land availability, and grid availability. Really fantastic platform. Tiina?
Tiina Tuomela
executiveYes, turning to the spot price for the second quarter. When we look at the spot price across our areas, the blended figure came in at EUR 26.4/MWh. Looking across the different areas, pricing really differed quite a lot. It ranged anywhere from EUR 10/MWh up to more than EUR 30/MWh. The cheapest prices showed up in Sweden, in price area two. There they were EUR 10.5/MWh, which is really low. That still mirrors the hydro situation. Reservoir levels were high. They came down over the quarter, but remained very, very high. And of course, the wind. Meanwhile, in Sweden price area three, the price stood at EUR 31.6, considerably higher than in the northern part. I think that's where the Oskarshamn 3 outages will reveal the tightness in that price area. In Finland, EUR 28, so below Price Area 3. Outages, plus the hydro and wind insulation. Also, of course, summer, summer, when it's usually a bit warmer.
Markus Rauramo
executiveI keep returning to the fact that I didn’t address the question of when demand would arrive. These are, naturally, long projects. We began site development in the capital region for the sites that later became Microsoft sites in Espoo, Kirkkonummi, and Vihti. From the start of our work through to the data centers beginning operation, it takes many years. Microsoft has held the groundbreaking on these sites. We expect that we will then get these, and that we’ll begin operating in 2027. We will also start to receive the heat, the excess heat, from these plants. Our own electric boilers, air-to-water heat pumps, water-to-water heat pumps — those will be operational already for the next heating season. We are ready then to connect these plants to our district heating system. The data center excess heat will arrive later. As we see now, such as the recent announcements of a new data center in Lahti, it will be several years before that is up and running. Google announced massive land acquisitions, a few thousand hectares in Kajaani and Muhos, also several years of lead time before reaching production. The potential, as you referred to, is very big.
Deepa Venkateswaran
analystSo, would five years be a fair timeline to expect? Broadly speaking, given where you sit, there’s clearly a great deal of urgency among technology companies to move ahead in the AI race. Should we assume five years is reasonable, or is it more likely longer—or shorter?
Markus Rauramo
executiveIt really comes down to how much land and grid capacity are available. What works in our favor is our ability to shorten the lead time involved in site development and getting grid access. Either way, it takes years. Starting from zero, it might run beyond 5 years. Our aim is precisely to accelerate that process so it amounts to just a few years.
Deepa Venkateswaran
analystThanks.
Moderator
operatorOur following question is from Ajay Patel at Fortum. You have the floor.
Ajay Patel
analystGood morning, this is Ajay Patel calling from Goldman Sachs. I have a couple of questions, if I may. First, I'd like to return to slide six, where you discuss power demand and the potential for strong growth, as you highlighted in the TSO report. Could you speak to the scale of grid investment that will be required to meet that demand, and to what extent that might become a bottleneck? My second question concerns the renewable pipeline you're developing. I believe you mentioned 8 GW. Over what kind of timeframe could you begin to see fruit from this pipeline, and therefore the CapEx attached to it?
Markus Rauramo
executiveSure, I can handle the TSO portion if you'd like to cover the renewable pipeline. When we talk with Finngrid about their approach to planning grid expansion, they start from that gross figure—which is far, far larger than what appears on page six. It's several times larger. In planning their grid investments, they take that entire gross pipeline, assign certain probabilities to it, and then build their own investment plans from there. If you began looking, without any planning, at where land happens to be available and gave no thought to the grid, then I'd say grids would be a serious bottleneck. On our side, when we develop sites, we genuinely listen to our customers—whether steel, chemicals, data centers, or battery factories—and examine what kind of sites they require. Is it grid infrastructure, fiber, ports, railroads, and so forth? We go to locations where the grid already exists, or where the connection line you must build for distribution or for transmission scale is something you can handle very quickly. In the Finnish case, for this 550 expansion, I don't see that grids as such would have been flagged as the bottleneck.
Markus Rauramo
executiveWhen it comes to customers, we're able to determine which ones will continue moving forward, and Finngrid can then align its grid investment with that. To me, it hasn't shown up as a bottleneck.
Tiina Tuomela
executiveYes. Regarding the roughly 8 gigawatts of renewable projects we have in the pipeline, as I said, that covers a lot of projects sitting at various stages. Naturally, not every one of them will make it to construction or even reach the ready-to-build stage. I believe it matters a great deal that out of this portfolio we are able to select and focus on the sites that are most competitive, and also have that conversation with customers. Customers do have their own operations to think about. One of the targets we hold internally is that we would have 800 MW of renewable projects at ready-to-build by the end of 2026. That gives an indication of the volume and the potential that would begin to build up, assuming customer demand is there. Naturally, this depends on how demand and the PPA pipeline develop as well.
Ajay Patel
analystAlright, thanks a lot.
Moderator
operatorArtem Beletski from SEB has the next question. Go ahead, please.
Artem Beletski
analystYes, hello, and thanks for taking my questions. First, I'd like to begin with a few more operational matters and topics tied to this year. Turning to the district heating business in generation, you said earnings declined compared with a year earlier, and I believe we saw a fairly substantial improvement on that front last year. What's the outlook for the full year? What about district heating? I do recognize that Vaasan plays a part in how Q4 will turn out. Second, on consumer solutions, you posted a record Q2, and H1 has been quite strong for this business. LTM EBITDA stands at EUR 96 million. In your view, what is the type of normal earnings potential for this segment these days? The final question just follows on the power demand outlook topic, and indeed, the upbeat estimates from TSO point to high single-digit demand growth by the end of this decade. Could you perhaps discuss the outlook for the next, let's say, two to three years? In this case, we have projects that would contribute to power consumption, should be basically ongoing and so on. How does the picture look for the next two to three years?
Artem Beletski
analystShould we expect that kind of, say, mid-single-digit expansion when it comes to power consumption across the Nordics? Thank you.
Markus Rauramo
executiveThanks. Perhaps I’ll take the last two questions — cost and demand growth — and if you’d like to comment on district heating.
Tiina Tuomela
executiveYes.
Markus Rauramo
executiveRegarding consumer solutions, the business and division have truly performed well — achieving internal synergies, refining processes, merging brands, removing costs, consolidating customer systems, and securing synergies from the acquisitions we've completed. That's now showing up in the results. We previously stated that under normal circumstances this business would deliver a EUR 80 million-EUR 100 million result. At this point, naturally, the figures indicate the upper end of that range. Q2 and Q3 are usually the weaker quarters, so that naturally applies to the outlook too. We don't provide precise guidance, but the picture looks favorable and the business is performing extremely well right now. On the demand growth outlook, this does indeed tie in somewhat with the earlier questions and the TSO forecasts. As I mentioned, we examine every incoming customer inquiry and attempt to calibrate it — okay, when are they, when do we expect them to reach investment decisions, and when will the energy consumption arrive? Consider, say, a practical illustration with Microsoft: 3 sites with substantial consumption, set to begin midway through this period, 2025 to 2030.
Markus Rauramo
executiveThis is going to be back-end loaded. When we announce investments today, the typical timeline runs two to three years. So we're looking at 2027, 2028, 2029, when demand is picking up. The pipeline is so large that it gives us the comfort to invest in the optionality of growth. That's why we acquired the ABO Energy wind and solar pipeline, and why we acquired Enersense. We built that optionality so that when customers run their tenders for new energy, we can respond. We have calibrated this very carefully. Tiina referred to the question about the eight gigawatt pipeline. When do we invest, and when does the cash flow start going out? We try to match exactly, so that we have ready-to-build projects. Let's say, for argument's sake, if we had a 300 MW project, that's roughly EUR 300 million of spend. For wind, that is distributed over 2.5 years. For solar, the CapEx would be lower than that, distributed over about one and a half years. That ties together customer demand, which is a little bit loaded toward the back part of the 2025 to 2030 period, and then matches that with new supply.
Markus Rauramo
executiveTiina.
Tiina Tuomela
executiveThanks. On district heating, Q2 came in somewhat softer, largely because power prices in Poland were quite weak as well. On a cumulative basis, the trend we began last year is still going. Results are better, with the main drivers being lower fuel and CO2 prices, plus improved heat price and volume this year. We don't provide guidance for the full year, but it may be worth keeping in mind that Q2 and Q3 aren't the major quarters for the heating business — the final quarter typically is, when winter sets in. Naturally, that's when our products and services are in demand.
Artem Beletski
analystOkay, that's clear. Thanks.
Moderator
operatorOur following question is from Deutsche Bank's James Brand. Go right ahead.
James Brand
analystGood morning, and thanks for the presentation and for taking my questions. I have a couple of questions. The first one concerns nuclear. You said there were many outages during the second quarter, and you expect quite a few in the third quarter. Could you share any further details about what is causing this? Are these just random issues, or is there something more common across the plants? I believe you have had securities at Oskarshamn 3, so perhaps you could tell us more about what has been happening there. Do you expect any of these problems to drag into 2026, or do you expect all of them to be resolved in the second half of this year? That is the first question. I suppose it is a two-parter. My other question was about demand growth. The forward curve for the Nordics extends quite far, to 2031. I am not sure how liquid it is that far out, but it is basically flat. Yet if you get anywhere near the demand growth forecasted by TSOs, I would imagine the power price would rise quite meaningfully. I was wondering whether you could perhaps help us rationalize what you think the power market is thinking.
James Brand
analystI realize you'd rather not spend much time on power prices, but is the sentiment in the power market simply very doubtful that demand growth will actually materialize, and is that the reason forward curve power prices aren't rising? Or is there another explanation? Thanks so much.
Markus Rauramo
executiveAppreciate the questions. Perhaps I'll start us off, and if anyone wants to jump in, great question regarding the forward market. To give some context, at present a large majority of our hedging is handled bilaterally with customers. When we consider, alright, what's our actual view on price, it's the hedge pricing we communicate that mirrors short-term pricing. Exchange liquidity is so thin that, alright, you can handle a few megawatts, perhaps some 10s of MWs. Should you want larger PPAs, those must be done bilaterally. We'd have appetite for longer PPAs — five years, even beyond. In our view there will be demand growth alongside scarcity of supply, unless new supply arrives. Our price indications slope upward. That's also why we observe very little activity at the long end of the curve, roughly between five and ten years. The sweet spot where we and customers find common ground sits at about the three to five years mark. We do believe demand will increase, and new supply won't come online at today's prices. That's clear from our perspective as well.
Markus Rauramo
executiveThat's the basic principle. If you're looking for additional new energy, it's going to come at a higher price than today's forwards indicate. On the nuclear unavailability, I'd stress that these situations are temporary. There's no trend here and no pattern. Naturally, the unavailabilities are not something we accept. We'll work to ensure they don't happen again. These are one-off cases, not a pattern. Take Oskarshamn 3 — a long outage, and actually a fairly simple problem. We're dealing with a pipe connection. The thing about nuclear plants is that when something unexpected and unplanned occurs, you have to certify the working methods. First you certify the equipment and the way of working, then do the repair, and after that have the radiation authorities verify it. At another type of power plant, this wouldn't take so long. The problem was something that shouldn't have happened under normal conditions, but a pipe defect had developed more quickly than we had anticipated. We have hundreds and thousands of these kinds of points. This was unusual. As I said earlier, we don't want this to repeat itself. When we reach 2026, by and large, it should be a normal nuclear year.
Markus Rauramo
executiveIs there anything unusual heading into 2026 at this point?
Tiina Tuomela
executiveI'd say that, looking at it, some of the outages are normal, just a bit longer. For instance, at Loviisa, one of the units is going to have somewhat longer outages, but that follows a normal pattern. And Oskarshamn 3 also has slightly longer outages, though there's nothing out of the ordinary there. It's more the usual maintenance cycle.
James Brand
analystThanks a lot — that’s really useful and quite interesting.
Markus Rauramo
executiveThanks.
Moderator
operatorOur following question is from Louis Boujard at ODDO BHF. You have the floor.
Louis Boujard
analystYes, hello, and good morning. Thanks for taking my question. I'd like to explore the option and the new capacity — the new flexible capacity mechanism that's presently being discussed in Finland. From what I understand, there's 800 MW that could ultimately materialize. There's been some debate around this topic. It looks to us like it could genuinely be needed. I'd like to know, given your current portfolio and future developments, what type of project and where do you see that you could ultimately gain from this potential development down the road? If you could also give a bit more detail on the actual framework that might be established for this flexible capacity mechanism in the country. Perhaps my second question concerns more a possible shift in your thinking about the market. Up until the past few years, we've seen a lot of disposals, and you have refocused into your regions. You have also put in place a reduction program plan in terms of efficiency measures, etc., that is coming to an end in 2025. Now we see some development, notably in Poland, in the customer business. We see also new development into a pipeline, acquiring a pipeline into the renewables over the past few months.
Louis Boujard
analystSo we're nearing the finish line on that efficiency initiative. Looking ahead to next year, do you feel you might be in a position to lean a bit more toward growth when it comes to your investment and your potential development, given that you see future demand growth as now clearly coming into view and you're now set to begin stepping up that development as you move forward? Thank you very much.
Markus Rauramo
executiveThank you, and that's a good question. To start with, we believe the market is going to require that non-fossil flexibility reserve. Given the growing share of renewables and the intermittency that comes with them, from a market adequacy standpoint, a resource at this kind of scale is necessary. We're in favor of the concept. The terms and conditions haven't been settled, and we don't know them at this point. We're getting several alternatives ready, but the characteristics are such that we expect it will need to be something capable of ramping up fast while also offering duration. Those are the sorts of features we're applying in our planning. Our aim is to be able to take part in a possible auction. We're developing toward that, though we can't yet truly state what exactly it would be. We're working on different alternatives, both for new investments and potentially examining whether we could then modify something so that it fits. The concept is sound. For market development, we'll keep up the cost focus. We're aiming at the EUR 100 million cost reduction on a comparable basis. Run rate reached by the end of this year, and that is going really well. We'll continue our cost scrutiny. That goes hand in hand with the possibility, in the future, of being able to supply new capacity for our customers if and when they need it.
Markus Rauramo
executiveIt's going to be backed by PPAs, but the optionality is something we provide. That portion of our development cost is already being allocated there today. As you rightly pointed out, we've been busy on the M&A side within consumer solutions, in wind and solar development. Electrified heating, heating and cooling — those are areas that interest us. Consumer solutions, the heating business, the entire shift to electricity, and renewables. Owning renewable assets is also something we could pursue through M&A. Usually, those come with a high price tag. That explains why we see only a handful of deals taking place in that space. Truly, we're pursuing growth no matter what is going on with growth in the underlying market.
Louis Boujard
analystThanks a lot.
Moderator
operatorOur next question is from Piotr Dzieciolowski at Citi. Please go ahead.
Piotr Dzieciolowski
analystGood morning, everyone. Two questions from me. My first one concerns the PPA you signed with data center customers and how you expect the future to develop. When you sign such a PPA and you have a demand rate, how much of a premium do you actually observe on that three to five year view compared with the market? When Google or Microsoft, or whichever other hyperscaler approaches you wanting to close a deal like this, what magnitude of premium could you obtain, and should we expect volumes to pick up? I recall that in the past you attempted to hedge your portfolio on a long-term basis, and in terms of volume it was not that successful. My second question concerns the supply side's effect on pricing. What levelized costs of energy do you see for your 8 GW Wind Pipeline development in the Northeast? Is my understanding correct that this is basically a long-term price equilibrium for Finland and for the region, since you have an indefinite — it is not only you with a large pipeline, but plenty of supply could be mobilized on the three-year forward basis that would come at.
Piotr Dzieciolowski
analystI'd like to ask you this: on this development, what price would you genuinely be happy with? Thank you.
Markus Rauramo
executiveNow regarding demand from data centers, what we’ve seen is that once hyperscalers sign PPAs, those deals serve their own clean-energy or additionality obligations. There doesn’t have to be matching within the same price area at all. A hyperscaler might purchase a PPA somewhere in Europe and then state that this created additional supply. As for data centers, like I mentioned earlier today, most of the investment goes into infrastructure and chips, while only a very small portion is directed to energy. If we consider the U.S., the reason PPAs get done is to help ensure power availability. Availability isn’t the constraint in this case. When demand arrives, data centers still appear to be fairly comfortable with it; they are willing to accept the risk of staying exposed for a considerable time. On the specific question of premium, when we examine the forward curve and consider what premiums we’ve seen in PPAs or PPA indications, it ranges from low single digit to high single digit euros above the implied forward price, depending on the profile, characteristics, additionality, RFNBO character, and similar factors the customer desires. It depends heavily on what the customer is looking for.
Markus Rauramo
executiveI'll go back to what I said earlier: the forward curve does suggest that some MW is being traded. When we're talking about 100 or 200 MW, the pricing is highly tailor-made. It hinges on what we're able to do. That brings me to my second point, which is the LCOE for wind and solar. The Nordics are extremely competitive. We've completed projects where the LCOEs sit far below where the market is today. These days equipment prices are elevated, rates are elevated, and so forth. LCOEs have risen as well. We aren't seeing much demand at all for pay-as-produced wind and solar. As for the price that would be required to build hybrid products combining renewables, flexibility and storage, the figure we discuss is considerably higher than what's on the market today, even with a highly competitive LCOE for wind and solar. Looking across Europe, the strong projects in the Nordics and Finland are the absolute best available on the continent when you look at it from an LCOE standpoint.
Piotr Dzieciolowski
analystAll right, thank you so much.
Moderator
operatorHarrison Williams from Morgan Stanley has the next question. Go right ahead.
Harrison Williams
analystHello there, and thanks for taking my questions. Most of them have been answered now, but perhaps one point of clarification concerns your response to an earlier question about the PPA discussions. You mention in the report that you have a lot in that attractive range of two to five years. Looking past that horizon, is the situation that demand simply isn't there, or is it a mismatch between your pricing and what you would secure or aim to secure, I suppose? That's my first question. For the second, referring to your slide 11 and the favorable hedge impact you've been reporting, is this purely because historically you've had higher prices at which to hedge? Should that normalize going forward and land around zero, or is it more structural in nature? Perhaps you could clarify why it's considerably higher during the summer months, which would be helpful, please. Thanks.
Markus Rauramo
executiveIf you go for the hedge effect, that also ties back to the first question. You could say there are two kinds of customers. One group essentially works with a rolling order book, repricing their product each three months, six months, or yearly — as many heavy industries do now, steel, chemicals, pulp and paper in the Nordics. Their order books are short and prices reset. Even with a long-term view that a price is good to lock in, you usually don't, since that creates basis risk. For many industries this simply isn't feasible. Long-term contracts don't make sense for them because they must watch, or must consider, their margin. Long-term hedges matter in cases where you take big new steel, new aluminum, or other businesses built on the fact that our customer signs long-term contracts with their own customers. You do five or ten-year contracts for steel supply or clean steel and so on. They have a strong interest in long-term hedges too. That's one segment. The other is the sectors that indeed want to secure their access to power.
Markus Rauramo
executiveTake data centers, for instance — that's a pertinent question there. We've witnessed that in a big way across the U.S., where availability is the problem. Those are the kinds of characteristics we observe. The demand for data is present, and it will increase. Availability is the crucial factor. Under no circumstances do you want your data center to halt.
Tiina Tuomela
executiveOkay, yes. On that positive hedge effect, I believe we said our realized power price came in at EUR 48.1/MWh versus the blended market spot price of EUR 26.4. Two key factors drove that high realized power price. The first is the hedge effect. The hedge price we guided to last quarter, for the remainder of the year, stood at EUR 40/MWh. We aren't disclosing the precise profile within that quarter, but we did give the indication of the level. That hedge price was high, but even more significant, during the second quarter, when volumes were low, the hedge ratio was high. Essentially that means we capture this hedge price on the bulk of our volumes, and only a very small portion went to the spot market. That lifted our price. The second very important element was the optimization premium. Although prices were low, volatility was present, and as we can see, that volatility has stayed quite elevated. We managed to optimize our portfolio and capture the value creation there.
Harrison Williams
analystAll right, that’s useful. Thank you.
Moderator
operatorElias Huuhtanen from Montel News has the next question. Go right ahead.
Elias Huuhtanen
unknownHi there, this is Elias Huuhtanen calling from Montel News. I'd like to ask something regarding the Swedish government's fresh approach to financing new nuclear. A plan was approved by them not long ago under which as much as 5 GW of new nuclear would be funded via contracts for difference. My question is whether Fortum intends to seek this subsidy, and if the answer is no, what the reason would be? Thanks.
Markus Rauramo
executiveThank you. We believe that in carrying out the feasibility study for nuclear, we found that you need clear visibility into cash flows, construction timelines, financing, and then risk mitigation — for instance, through loans. The Swedish government is checking every one of those boxes. At this point we haven't submitted an application. Nor do we have a site in Sweden where a project of that kind could get underway. We hold partial ownership in Oskarshamn and in Forsmark. On the technical side, we're conducting the feasibility study, examining over the long term whether customer interest exists and whether there's a need for the new supply that would come. Right now this isn't urgent. As we said when we announced the findings of our feasibility study: given today's market prices, today's conditions, and the technology, there is not, at this moment, a case for new nuclear. All parties need to do more work to make this happen. Naturally, there has to be demand for the product. I think the Swedish direction is the right one. They have identified the right things.
Elias Huuhtanen
unknownAlright, thanks.
Moderator
operatorThat brings us to the end of the question queue. I'll now return the floor to the speakers for any closing remarks.
Ingela Ulfves
executiveThanks a lot. Thanks, moderator. And thank you everyone for those really excellent questions. I think this has been a very good discussion. On Fortum's behalf, we hope the remainder of your day goes really well. We appreciate you joining us here today.
Markus Rauramo
executiveAppreciate it a lot, everyone. Take care.
Tiina Tuomela
executiveThanks. Goodbye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Fortum Oyj transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Fortum Oyj earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Fortum Oyj or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.