Freeport-McMoRan Inc. (FCX) Earnings Call Transcript & Summary

April 22, 2021

New York Stock Exchange US Materials Metals and Mining earnings 96 min

Earnings Call Speaker Segments

Kathleen Quirk

executive
#1

Thanks, everyone. Morning, and I appreciate you being here for the Freeport-McMoRan call. We released our results earlier today. A copy of the press release that went out this morning, plus the slides, is available on our site, fcx.com. There's a live webcast of this call. To listen, just visit our homepage and select the webcast link for the conference call. We've extended an invitation not only to analysts and investors but also to members of the financial press to join us today. Later today, a replay of the webcast will be made available on our site. Before we begin our remarks, a reminder: the press release issued today, as well as certain things we'll say during this call, include forward-looking statements. The outcomes we ultimately report might be materially different. Everyone should review the cautionary statements included in our press release and presentation materials, along with the risk factors outlined in our annual report on Form 10-K. With me today is our Chairman and CEO, Richard Adkerson. Also joining us are Mark Johnson, who oversees our Indonesian operations, Josh Olmsted, who oversees our Americas operations, Mike Kendrick, who oversees our Molybdenum business, Steve Higgins, who oversees our commercial activities and additionally serves as our Chief Administrative Officer, and Rick Coleman, who oversees our project development activities. I'll start with a brief summary of our financial results. We'll go through our slides and some prepared remarks, and afterward we'll take your questions. During today's discussion, we announced that for the first quarter of 2021, net income attributable to common stock came in at $718 million. On a per-share basis, that equals $0.48. When you factor out net charges that added up to $38 million, or $0.03 per share, adjusted net income reached $756 million, or $0.51 per share. The specifics of those net non-recurring charges are laid out on Roman numeral six in the press release. For the quarter, adjusted earnings before interest, taxes, depreciation, and amortization — adjusted EBITDA — totaled $2.04 billion. A reconciliation of how we calculate EBITDA can be found on page 36 of our slide deck. Copper sales during the first quarter of 2021 were 825 million pounds, which was close to what we had projected. During Q1 2021, the amount of gold we produced matched what we had projected back in January. Some shipments in Indonesia were pushed into the second quarter, which created a timing difference in our gold sales; meanwhile, better pricing worked in our favor during the first quarter. For copper, we realized an average price of $3.94 per pound in Q1, well above the same quarter last year. On gold, the $1,713 per ounce we realized also came in higher than the year-ago figure. Keeping our cost position low remains a priority for us. For our copper mines, the average unit net cost came to $1.39 per pound of copper across the first quarter. Operating cash flows were strong, reaching $1.1 billion, and that figure already accounts for $300 million in working capital uses. Capital spending during the quarter came to $370 million, so cash flows were above that level. As you've already picked up on, in February our board adopted a new financial policy that fits with our strategic aims — maintaining a strong balance sheet, returning additional cash to shareholders, and pursuing future growth opportunities. We closed out the quarter sitting in a solid financial spot, holding $4.6 billion in consolidated cash along with $9.8 billion of debt, and once you subtract cash from that debt, we were at $5.2 billion as of the end of March. Richard, I want to hand things over to you now, and then we'll begin walking through the slide materials posted on our website.

Richard Adkerson

executive
#2

Kathleen, thank you. I'm genuinely delighted to walk you through what we delivered in quarter one, and especially the remarkable strides made during a year in which every one of us confronted so much uncertainty; this is a distinctive, busy, energizing moment for Freeport. Safety remains the priority for our people. We stay alert regarding COVID while carrying out our operational blueprints successfully, and at this point we're advancing initiatives aimed at growth ahead. The underground ramp-up at Grasberg is moving forward as planned. That matters greatly to our approach. Output across the United States is climbing thanks to our Lone Star mine now commissioned, the restart of New Mexico's Chino mine during quarter one, and higher mining rates at Morenci — our U.S. flagship, the biggest operation in North America — where a year back we had the option to scale back output so we could preserve cash. Down in South America, efforts are underway to bring production back to where it stood before the pandemic, and within the coming 12 months we will get there. The Cerro Verde crew in Peru along with our El Abra colleagues in Chile deserve credit for superb work steering through these challenges. Sustainability efforts hold our attention, as they do for every company; for Freeport this has long been central to running our business under the new Copper Mark. Developed recently by the International Copper Association, this Copper Mark gives the industry a framework guaranteeing responsible output aligned with UN sustainable development goals. So far we set the pace in our sector, with 6 of our sites certified, and we're pushing to have every one certified. Turning to the slides, there are only a handful I want to go through with you. Slide 3: our yearly sustainability report is out and can be found on our website right now. This marks the 20th year of reporting on sustainability for us. We keep striving to improve it. I'd urge all of you to give it a read; the strong work we've done on sustainability makes us proud, and we stay dedicated to getting better continually. In prior years, this report came out at our annual shareholders meeting; we shifted the timing earlier. We've brought in additional people to our Freeport group handling sustainability matters, and I want to commend that team for their work in making this report ready sooner, which lets us support our growing interactions with the wide range of stakeholders now paying attention to how we perform and what we undertake on sustainability. A year ago, we put out our first climate report. The 2021 version is coming soon; not long ago we issued our annual shareholder report featuring what I consider a terrific theme — charging ahead responsibly, reliably and relentlessly; that theme captures exactly where Freeport stands today. As a top-tier global copper producer that keeps expanding, we're resolved to prevail and to act responsibly. Being relentless in carrying out our strategy is the Freeport way. Slide 4. Quarter one output matched what we had targeted. We raised our 2021 sales guidance to 3.85 billion pounds of copper, along with our 2022 volumes to 4.4 billion pounds. The Grasberg ramp-up I mentioned before is still moving forward in an absolutely remarkable way; at this point we've reached 75% of the annualized metal production run rate we're targeting for the long run. By the third quarter, we expect to hit 90%, and full rates should come by year-end. Being able to report this kind of progress, after so many years of effort, is honestly one of the proudest moments of my career. That said, the real credit belongs to the team we have on the ground in Indonesia, along with support from our worldwide group of technical specialists. Converting the Grasberg open pit into this enormous underground operation, which we are now finishing, amounts to a historic and major achievement. Things are also going well in our Americas businesses; we're meeting targets on both production and cost, and at this point we're actively zeroing in on and pursuing future growth opportunities, producing robust cash flows, and strengthening our balance sheet. Net debt came down by more than $3 billion across the last 12 months, landing at $5.2 billion as this first quarter ended. Copper prices averaged $3.13 during that stretch. Today it's above $4.25. A lot of people expect prices to climb further in the near term. Our near-term projection for copper and gold sales volumes is considerably higher. What we've done lately — this big debt reduction achieved despite weaker commodity prices and lower production volumes — shows just how strong our company currently is at generating cash flows. Thanks to our solid performance and the favorable outlook for our business and the commodities, our board was able to adopt a new financial policy that will deliver growing cash returns to shareholders while also preserving flexibility for growth and for building a very strong balance sheet. We've brought on two new directors as well. David Abney, who retired as Chairman and CEO of UPS, bringing his enormous experience in global supply chains, and Bob Dudley, the retired CEO of BP, a veteran leader in the worldwide extractive sector, have both joined our board. Both men bring deep knowledge and experience in global markets and in the issues we deal with in running our business. Bob and David had plenty of chances to join other boards. That they chose to join ours is personally gratifying and something I appreciate. They're genuinely excited to work alongside their fellow directors at Freeport and our management team to create value responsibly for our stakeholders. Turning to slide five. Nations everywhere are reacting to COVID with aggressive fiscal and monetary policies. That matters a great deal for near-term copper demand, extending past China. For the last two decades, China has driven growth in copper demand. Now the sources of new demand are broadening. Beyond continued strong copper consumption in China, we're seeing higher copper consumption in developed nations through COVID recovery initiatives, plus demand in emerging markets that keeps growing more important thanks to global growth. Copper has significant new demand sources now, coming from worldwide investments in carbon reduction, infrastructure, and expanded technology — 5G, artificial intelligence, and data analytics all broadly need more copper. Crucially, copper is vital to the shift toward a global, cleaner energy future. Delivering electricity accounts for roughly 70% of copper use. With the rollout of clean energy programs, the amount of copper used across the economy is rising dramatically. There has never been a stronger outlook for copper. Let's turn to slide six. A substantial increase in demand is unavoidable. Meeting that increased demand through supply faces major obstacles. Meaningfully higher prices will be needed for demand, and the shortage of new supplies points toward sizable structural deficits ahead, which support copper prices far above what had been expected previously. I'm certain you've seen this reflected in recent forecasts from an expanding set of industry analysts. Freeport stands out as especially well-positioned to gain from these fundamentals. We are a top responsible large-scale copper producer, with both near-term and longer-term growth built into our portfolio. The scarcity value of a portfolio such as ours is unmatched; it is enormously valuable today, and it will become still more valuable as major market deficits appear. Slide seven focuses on our near-term growth. In 2021, copper volumes are projected to be 20% above 2020, and gold volumes 55% above 2020. In 2020, volumes are anticipated to rise further, in the 15%-20% range for copper and gold alike. The capital needed to deliver these near-term higher volumes, along with the execution risk, is mostly behind us. Greater volumes combined with minimal incremental cost will produce wider margins.

Richard Adkerson

executive
#3

If copper is selling in the $4 to $5 range, our yearly EBITDA for both 2022 and 2023 would come in above $12 billion to $17 billion each year. Those are substantial figures. On page eight, you'll find details of the fresh financial approach our board put in place earlier in the year. Its primary goals are maintaining a robust balance sheet, boosting what shareholders receive back, and funding future investments. As I just described, today's copper market and its positive trajectory are generating considerable cash flow that allows us to pursue these aims. A base dividend of $0.30 per share on an annual basis got the board's approval. Come May, we'll issue our first quarterly dividend, marking the resumption of payouts. Once net debt hits the target zone of $3 billion to $4 billion—something we expect to reach by year's end at current pricing—the board's approach sets up a framework tied to performance for returning extra cash to shareholders via dividends and possibly share repurchases. The amount returned to shareholders will be set by directing as much as 50% of available cash flow toward shareholder returns, with the remainder going toward future growth and possibly additional debt paydown beneath our $3 billion to $4 billion target. The board will review any extra payout on at least a yearly basis. Given where copper prices stand now across our portfolio, we've restarted work that had been paused twelve months ago due to COVID in order to assess the schedule and launch of these possibilities. Within the United States, we're examining expansions at Lone Star and Bagdad, and we're also looking at ways to boost output using leach recovery technologies. That's genuinely thrilling. Lone Star is the most recently opened mine we have; it sits next to our current operations in Southeast Arizona, an area where the company has been active since the 1800s. There, community backing is solid, and our ties with Native American groups are excellent. We're assessing growth of Lone Star's oxide ore, which we currently produce and which is expanding in terms of ore availability. Equally important, we're doing longer-range planning for developing what appears to be a potentially world-class sulfide resource located right in the middle of this historic mining district. Over at Bagdad in Northwest Arizona, we have a chance to build a new concentrator that would double output; the reserve life there is extremely long; and community backing is strong there as well. I keep stressing this point since securing support is a hurdle for new supply projects globally. Our emphasis is on technology that lowers capital intensity for these projects. Leach technology efforts offer major chances in that respect to create value throughout the entire portfolio. We continue assessing an appealing and potentially sizable expansion of our El Abra mine in Chile, where CODELCO is our partner. Compared with our U.S. project, this one would need greater investment and longer lead times. The resource is appealing and quite large. This indicates that a significant future expansion at El Abra is probable. We're looking into developing a new deposit—an undeveloped one—at PTFI in Papua, Indonesia. It goes by the name Kucing Liar. This copper-gold endeavor would be a big block cave operation, drawing on the considerable infrastructure that Grasberg already has in place. Our know-how and lengthy history of succeeding with block caving would serve it well. And here's something quite enjoyable — we are assessing a set of intriguing investments in ventures that advance our goals for cutting carbon and other sustainability targets. That covers concepts for building new power generation that is clean and renewable to serve our operations and neighboring communities, plus we are moving forward with plans for a thrilling undertaking at Atlantic Copper in Spain aimed at retrieving valuable metals by recycling electronic devices, which once more is positive from a sustainability perspective. So, with these opportunities in hand, we will stay disciplined when making fresh investments, remaining choosy and prudent as we put capital to work, concentrating on investments that add value; we can manage this thanks to our reserves with such long lives, our established license to operate, and we will collaborate with communities impacted by new investments. Slide 10 highlights this reserve position. Beyond 30 years is how long our reserve life extends. That figure refers to proved and probable reserves that can be economically recovered. On top of that, we have pinpointed more than 100 billion pounds of copper in mineral resources outside of reserves, all within our current operations; we will be working to fold these into upcoming reserve additions and mine plans. Developing supplies to satisfy the dramatically rising demand for copper is growing ever more difficult and expensive for our industry. Our team genuinely adores where Freeport sits within this landscape. On Slide 11, we hold strong operating franchises across the U.S., South America, and Indonesia; in each of these places, we have gained the trust and respect of our partners, our customers, suppliers, financial markets, and above all, our workers, communities in the countries where we operate. We possess considerable development in large-scale operating expertise. We now have every capability needed to take on new projects anywhere on the planet, no matter the ore or the circumstances, in a responsible and efficient manner. To finish, I want to acknowledge Freeport's people across the globe. Their commitment, dedication, and remarkable achievements over the past year of COVID is really special; considering all the challenges our team has faced over the years and we've overcome, I'm just immensely proud of this team. Building on these accomplishments with an increasingly bright future, Freeport is charging ahead responsibly, reliably and relentlessly. Kathleen's going to review the financial results with you.

Kathleen Quirk

executive
#4

Thanks, Richard. I'll keep my remarks short regarding our financial and operating matters, and after that we can move to your questions. Beginning on slide 14, we give some extra specifics about what we're doing operationally. In the U.S., as you can see, the Lone Star mine is running nicely. We see chances to keep raising our stacking rates there and to fill up the tank house, which has capacity in the range of 285 million pounds per annum. If we keep succeeding at boosting mining and stacking rates, we'll have a chance, through comparatively low incremental investments, to lift output from the Lone Star oxides well beyond the initial design. Chino came back into service during Q1, operating at half capacity. As we realize the efficiency gains we're targeting at that site, additional increases will likely become possible. Over at Morenci, our mining rates are going up by about 10%. That step-up had originally been slated for 2022, but we're pulling it forward, so 2022 output will exceed what the prior schedule called for and set us up for growing volumes down the road. Down in South America, the crew achieved rates that came in above what we'd budgeted. Due to Peru's operational constraints, we chose to be prudent and hold this year's plan at a milling rate of 360,000 tons per day; once COVID restrictions are lifted, we expect to increase that to the 400,000 ton per day level over the coming 12 months. At El Abra, we're achieving strong momentum in raising our operating rates, which will deliver additional copper in 2022. As Richard noted, we made outstanding headway at Grasberg during the first quarter, pressing ahead with the ramp-up plan so we hit our targeted metal run rates by year-end. We closed the first quarter carrying more inventory than we had initially anticipated, and those sales will be booked in the second quarter. As you'll see in the detailed schedules included in the reference material, we adjusted the sequencing at Grasberg Block Cave and Deep MLZ to a modest degree. Those adjustments had no material net impact on the metals we produce, and the outlook closely tracks what earlier plans called for. The sheer size of the ramp-up underway at both Grasberg Block Cave and Deep MLZ has us quite enthusiastic; a second crusher comes online at Grasberg Block Cave during this quarter, positioning us to keep raising throughput at that site. Moving to the following slide, we share an update on our efforts to build additional smelter capacity in Indonesia so that we fulfill what we have committed to the government. During the call, we mentioned that we're proceeding alongside our partners in Japan at PT Smelting to expand the existing smelter there. That route is relatively inexpensive, and it would reduce the amount of capacity required from the new smelter down to 1.7 million tons of concentrate each year. When it comes to PT Smelting, the cost is roughly $250 million, and PTFI would finance it via bank loans, which are already in progress. As you're aware, we've additionally been in talks with another company about the remaining requirements, and under that agreement, a brand-new smelter would be constructed by that company using a framework comparable to the one we set up for the present PT Smelting facility during the 1990s. So far, there have been thorough negotiations between the parties, yet we still haven't arrived at commercial terms we can accept. Meanwhile, our planning work continues on the greenfield project located in East Java. Looking at the chart to your right, it becomes clear that the long-term expense — the financing economics behind the smelter, which we intend to fund through debt — would be compensated for by eliminating, in stages, the 5% export duty that we pay at present. When it comes to PTFI, the economic effect is not material. Turning to slide 16, we lay out our three-year projection covering copper, gold, and molybdenum volumes. Looking at 2021, our copper sales volumes are now expected to hit 3.85 billion pounds. That's an increase over the prior estimate, which was a bit above 3.8 billion pounds. Then for 2022, we've pushed our guidance up by 100 million pounds, so it now sits at 4.4 billion pounds of copper, and that reflects the step-up we're seeing in the U.S. Aside from those changes, the other sales estimates are largely unchanged. Richard mentioned this earlier, and it's still true: we continue to look at additional opportunities for incremental growth over the long term as part of our longer-range development planning work. If you turn to Slide 17, you'll find a summary of where we anticipate our unit net cash costs will come in for the year. What you'll see there is that our revised estimate puts net unit cash costs at an average of 133 per pound of copper, compared with the 125 per pound we had previously. A big chunk of that rise is driven by increased royalties, duties, and profit-sharing payments, and those reflect revised price assumptions — our copper price assumption moved from $3.50 per pound up to $4.00 per pound. Similarly, we raised our cost estimates to account for pricier energy, mostly oil-related, and under our present forecast those are coming in about 25% higher. Our team is still doing an excellent job holding costs in check. We have seen some cost pressure, but nothing significant. Our team keeps searching for creative ways to preserve our standing as a low-cost operator. Slide 18 illustrates how much cash flow we can produce given our volume and cost estimates. We ran sensitivities with copper priced anywhere from four dollars a pound to five dollars a pound; for gold we kept the assumption unchanged at $1,750 per ounce, and molybdenum was set at $11 per pound. When you can add volume at a low incremental cost, the resulting EBITDA generation is extremely large. As you can see here, that figure averages more than $12.5 billion yearly across 2022 and 2023 when copper is at $4.00, and it climbs to $17 billion yearly when copper reaches $5.00. In those price scenarios, cash from operations would land between almost $9 billion and $12 billion; that level of cash flow comfortably exceeds the capital spending we have planned, which means we will produce considerable free cash flow down the road. Our forecast for capital projects appears on Slide 19. For 2021, projected capital comes to $2.3 billion. This covers possible outlays for the Indonesian smelter, which once more would be funded through debt. The guidance figures for 2021 look a great deal like those we presented in earlier reports. On a consolidated basis, our 2022 capital of $2.2 billion sits roughly $200 million above what we previously projected, and it factors in faster mining investments meant to pull volumes ahead and give us capacity assurance for our plans; our financial standing is strong, and we've now moved into a stretch of remarkable free cash flow generation. Slide 20 essentially illustrates that extraordinary cash flow generation within the business. Looking at this slide, you can see that our cash balance went up by over $2 billion during a six-month period. With our long-lived asset base, growing production profile, and strong markets, we have the capacity to continue strengthening our balance sheet, return cash to shareholders, and create additional value within our asset base. The financial policy Richard discussed earlier is designed to meet all of these goals. We're excited to put these plans into action. In closing, I'll just echo Richard's words: this is an exciting time at Freeport. We have the right assets at the right moment, and we're committed to maintaining our momentum. Operator, we'd now like to take questions from the call.

Emily Chieng

analyst
#5

Morning, Richard and Kathleen. I appreciate the update you provided today. I have one question regarding the capital allocation policy — we're glad you refreshed it 2 months back. If we take current copper prices as a given, it certainly appears there's meaningful potential for cash returns ahead. On the flip side, could you share your thinking on determining the appropriate moment to approve growth? Any insight would be helpful regarding the sort of long-term or sustainable copper prices you'd require, or that you'd need to use as a base case in your assumptions. I recall you noted being disciplined and selective. Looking ahead over the next 2 years, when would you begin contemplating pulling the trigger on growth?

Richard Adkerson

executive
#6

Emily, a year back we put every one of our growth-project studies on hold. We have now restarted those analyses, aiming to grasp what each project offers and what it costs us, and to build out an assessment of them. That foundational evaluation work should keep going at minimum until this year wraps up. Once the year closes, our hope is to have a clearer sense of the road ahead. Quite a while will pass before we commit to actually kicking off any major capital outlay. Meanwhile, we're counting on all the volume growth stemming from Grasberg, operations restarting after COVID, and so on. Volumes will be climbing alongside robust prices and hefty cash flows, while only a modest amount of capital gets deployed, simply because we won't yet be in position, as you put it, to greenlight projects; we hold no specific copper price target. Our longstanding approach has been to examine a range of price scenarios and ask how a fresh project would slot into our portfolio. We aim to make the most of the resources at our disposal while managing risk through how they match up against everything already in our portfolio; our lens isn't really one project at a time, but rather how a given project aligns with the rest. Freeport gains a real edge from running every project in which we hold an interest. That lets us view them through a single corporate strategy rather than one project at a time. At today's price levels, our projects certainly pencil out, and the outlook now points to prices climbing a great deal further. My expectation is that capital spending will come with time. It simply won't occur in the near term. This will characterize the whole industry, since even once we choose to spend, getting a project developed takes many years — 6 to 8 at the very least. As you're well aware, Emily, since you cover this constantly, all of that will give considerable support to copper prices. You cannot simply open the valve to bring new mine supply online quickly. When that's impossible and volumes plus demand keep climbing, the result is higher prices.

Emily Chieng

analyst
#7

Understood. That’s useful context. If I can fit in one brief item: regarding operations at the Grasberg Block Cave in Deep MLZ, it appears sales volumes may have slipped by about 1 quarter, but could you share anything about whether the copper grades we’re observing are sustainable, any remarks on the ramp profile, and the pace of drawbelling there? Thank you.

Richard Adkerson

executive
#8

Yeah, well.

Kathleen Quirk

executive
#9

We've got Mark Johnson on. Mark, you want to just give an update on?

Mark Johnson

executive
#10

Yes. Overall, we're where we expected to be. The grades we predicted are matching up nicely with what the mill is actually receiving — in fact, we've been lucky that the mill has encountered slightly higher grade than what the mine reports it has been delivering. On drawbell opening, the slides likely make clear that we made certain changes in Deep MLZ; we reduced how quickly the cave was advancing through some of our diorite rock types, which are the tougher rock, while speeding up cave advancement through some of the skarns extending westward in PB2. At GBC, we've picked up the pace on drawbell opening, and when you look across the 5 years, it stays about the same.

Emily Chieng

analyst
#11

Great. That's helpful. Thank you.

Richard Adkerson

executive
#12

Right. So when we mentioned a hold-up on shipments, operations played no part in that. The stock was already sitting at the location. There were issues with loading, with shipping, and some administrative matters involving the government. Every bit of that inventory got made on-site and is going to be sold now. As the inventory piled up, we could pull forward certain maintenance work from Q2 into Q1, and all of that helps us stay on track with our plans moving ahead.

Christopher LaFemina

analyst
#13

Hi there, I appreciate you taking the time for my question. Good morning.

Richard Adkerson

executive
#14

Morning, Chris.

Christopher LaFemina

analyst
#15

I've got some questions regarding how things are going in South America; it was encouraging to see that operations seem to be running smoothly there even as COVID cases have risen. There's also political risk that could be ramping up in that region, particularly in Peru given the presidential runoff that's coming. My first question concerns the contracts and licenses you hold in Peru. Is the situation comparable to Indonesia, where a stability agreement exists that includes international arbitration provisions, in case the government were to attempt a major tax hike or seek to nationalize a mine? Do you enjoy that kind of protection in Peru as well?

Richard Adkerson

executive
#16

Yes. That's an absolute yes. Stability agreements have been part of how Cerro Verde has operated since long before Freeport came in, but when we grew the business we managed to secure a fresh stability agreement. You always see a link between what governments and workers hope to gain and rising copper prices.

Christopher LaFemina

analyst
#17

Thanks.

Richard Adkerson

executive
#18

For Peru, copper matters enormously — that's a nation still dealing with poverty and other difficulties. We simply observe what happens in political environments. Whatever governments a country chooses, anywhere on the globe, we recognize we must collaborate with them, though our rights to do so are strong. In contrast to certain operations in Peru, we enjoy good ties with the nearby community, thanks to social investments we've directed toward water and wastewater projects. Regarding our team there — words can't capture how outstanding their performance has been. Twelve months back, Peru had us quite concerned. The city of Arequipa was where our workers resided. Community spread was a genuine problem, yet we've collaborated with the community, created temporary housing, and pushed our rates up to close to the original run rate targets, and going forward we can grow even more. The team there has simply performed remarkably well.

Christopher LaFemina

analyst
#19

That's really encouraging to hear. I appreciate it.

Kathleen Quirk

executive
#20

Chris, under that stability agreement alone, our taxes are locked in, and in fact they sit above Peru's present statutory rate. We accepted paying more in exchange for that stability. On top of that, we contribute heavily to the communities and we're a major employer; there's a profit-sharing arrangement in place, which explains part of the cost increases you noticed, but as the mine turns more profitable with prices rising, a significant profit share goes partly to workers and partly to the nation. Sharing the economics with local communities, the country, the workforce, and investors — that's a solid model.

Christopher LaFemina

analyst
#21

Thanks, that's helpful. Regarding a possible buildout at El Abra, we keep hearing from other miners in Chile about how hard it is to secure permits — in certain instances, it sounds almost unattainable, which, I'd imagine, is quite bullish for the copper market if businesses simply can't get capacity up and running in Chile. I'm curious, specifically for El Abra, what kinds of permitting obstacles you'd need to clear to truly grow that asset. Thank you.

Kathleen Quirk

executive
#22

An environmental impact statement is something we'll submit as part of this project; that's an extremely thorough approvals process. We've been through that process previously, and it requires substantial baseline work, and so on. A great deal of effort goes into it prior to when you finally hand it in. For that project, permitting is one reason Richard describes it as being six to eight years away.

Christopher LaFemina

analyst
#23

All right, that's great, thanks.

Richard Adkerson

executive
#24

Chris, even under the most favorable conditions, securing that permit is going to be a lengthy process. The reason is the location of this mine, plus the reality that it has been an operation running for many years already. It sits close to the CODELCO mine. Some of the permitting problems that affect other operations simply aren't present here. If we were to undertake a major mill expansion, we would need a desalination plant, along with the expense of moving that water up to the high altitudes where our work takes place. This is a setting in which we don't confront certain difficulties that others do. In the best case, it's a big project and it takes a long time.

Christopher LaFemina

analyst
#25

Great. Thanks.

Richard Adkerson

executive
#26

Hey, Alex.

Alex Hacking

analyst
#27

Morning, and hello, Richard — how are you doing? Morning as well. I want to pick up where Chris left off regarding Peru. Has the mining sector had any dialogue so far with the candidates, especially the one currently ahead in the polls? And then on your production base, now that Chino is back and Cerro Verde is returning to full rates, does that mean Freeport's output is back to the normalized level we saw before COVID, or could there be more upside ahead given these prices? Thanks.

Kathleen Quirk

executive
#28

Let me handle the second one first. As far as bringing things back up, we've decided to begin ramping El Abra up again. That work is underway, and we anticipate reaching pre-COVID levels at that site during 2022. Our guidance captures that. The same holds for Cerro Verde; here in the U.S., we had reduced mining rates quite a lot. Those are now starting to come back up, and at Morenci we still have certain opportunities that haven't yet been factored into our forecast. There are also opportunities at Chino, since our current plan runs Chino at 50%; on top of that, as we noted, we may have some additional opportunities at Lone Star. In the U.S., I'd say we have opportunities outside our near-term plans that we'll be evaluating, along with certain leach technology applications Richard mentioned earlier; we do have some near-term opportunities that aren't in our plans.

Richard Adkerson

executive
#29

Okay, Kathleen — before we go further, I want Josh to say a few words about this. Josh Olmsted was appointed during the last year as our Chief Operating Officer of Americas. For a long stretch of years, he served as the number two person here. Though he's still early in his career age-wise, he has spent a great deal of his professional life at Freeport, and the energy and leadership he brings to our team have been truly remarkable. Josh, go ahead and share a couple of thoughts.

Josh Olmsted

executive
#30

Appreciate that, Richard. Like Kathleen mentioned, we've got a few short-term possibilities at Morenci and Lone Star — additional items, really. What I find most thrilling, though, is the effort we're putting into leach technology, which both Richard and Kathleen brought up. Should we manage to validate certain ideas we've pinpointed and started developing, that might dramatically improve our capacity to capitalize on the long-term stockpiles sitting out there, which hold copper right now that we've never managed to recover. As we seek ways to obtain some inexpensive added copper going forward, this leaching technology genuinely might prove important. Our intention is to pursue that during this year, aiming — much like Richard's remarks regarding the larger-scale projects — to achieve far greater clarity by year's end concerning how this shapes up and what kind of potential worth it holds for us. What we've witnessed so far has us incredibly enthusiastic.

Richard Adkerson

executive
#31

Looking at restarts, tech advances, and leaching — every one of those signals rising output from the mines we've run for years, Chris. Alex — correct? We've got Alex on the line now. Alex, turning to Peru, honestly, how messy does politics get across the globe? In Peru, with that runoff getting close, there were six or so additional contenders, and every one of them sat at roughly 10% ± in the polling. Extremely messy. Freeport doesn't get involved in politics. Like I mentioned, our job is simply to operate the business, back the communities, and be ready to collaborate with whoever comes out of the political contest. When it comes to mining in Peru, there's a busy industry association run by Peruvians, and they talk with candidates in order to grasp, engage, and share views regarding policies that touch mining. I'm confident they'll be dealing with these two candidates moving ahead. You'll see that the contender who previously took a very combative stance on mining is these days speaking about how vital mining is for Peru. Every bit of that will factor in, and we'll simply need to wait and watch how it unfolds.

Alex Hacking

analyst
#32

Thanks a lot.

Timna Tanners

analyst
#33

Hi there. Morning to you. I appreciate you letting me ask.

Richard Adkerson

executive
#34

Hello, Timna.

Timna Tanners

analyst
#35

Hi, everyone. I'd like to dig a bit deeper into the cost picture. You clearly walked us through, in good detail, what drove the incremental cost this quarter and what's baked into guidance. Costs are climbing, and inflation is on everyone's mind. Do you feel this captures all the future costs you might face, or is more pressure coming? If so, where would it come from, and can you give us more specifics on what you're seeing?

Richard Adkerson

executive
#36

Let me start with something Kathleen mentioned earlier. A number of key pieces of our cost structure move with copper prices. They're linked. Royalties, for example, profit-sharing plans, labor cost broadly — there's a connection. Other input costs are tied in too. Energy is a significant part of our costs, and energy prices have gone up lately. Copper prices have climbed even more, fortunately, but energy is factored into that. Some other costs are experiencing inflation; to date, apart from the profit-sharing royalty cost, energy is what's hitting us hardest. Down the road, as copper prices climb, we'll need to manage inflation; our margins are so strong. We have an excellent team that negotiates with suppliers to mitigate costs wherever possible. We're pushing hard on that. Timna, I'm sure you know this since you cover it, but inflation benefits copper. Inflation benefits copper. Given what the world is doing now, with all the COVID recovery spending, with global spending aimed at addressing economic inequalities, that's putting money in the hands of consumers, who generate economic velocity, which drives copper demand; more broadly, all these forces will ultimately help our company.

Kathleen Quirk

executive
#37

Yeah. What's really notable is that when you consider the present situation, copper's sitting at $4.25. The previous occasion copper hit $4.25, oil wasn't sitting at $60. It could have been $107 per barrel. Lower energy prices are working in our favor, despite the fact that they've risen somewhat. The way things used to correlate historically simply doesn't hold to the same degree anymore. Every quarter we conduct a review of our supply chain status, and each quarter we update our forecasts so they capture current pricing and things of that nature. All of that is incorporated into these plans. As Richard mentioned, when it comes to whether tightening freight markets or other supplies will create extra cost pressures, we'll need to observe how that develops. At this moment, the forecast we've put together reflects what our pricing contracts say right now.

Timna Tanners

analyst
#38

This is the sort of challenge you're glad to have, yet when we take, say, a somewhat stronger copper price as our premise, it seems we ought likewise to build in certain inflation-related assumptions too.

Richard Adkerson

executive
#39

Indeed, just like I mentioned.

Kathleen Quirk

executive
#40

Right.

Richard Adkerson

executive
#41

Just like I mentioned, indeed. Yes, that's correct — correlations do exist. When royalties go up, profit-sharing goes up too, and after that you decide how to factor in things like energy and steel costs, and so on. Timna, I realize I sound like a skipping record, and I realize you get this already, but the key point is that margins go up.

Timna Tanners

analyst
#42

Sure.

Richard Adkerson

executive
#43

Across a lot of operations, these inflationary trends end up eroding margins. Over time, when copper prices climb and other expenses climb, our margins have remained quite robust.

Timna Tanners

analyst
#44

No, absolutely. That makes sense. Thanks.

Richard Adkerson

executive
#45

Thanks.

Matthew Murphy

analyst
#46

Hello. Hello. Regarding the Indonesian smelter, I'd like to ask whether you could assist me in grasping the dangers linked to how quickly this project is moving. Your 10-K included a disclosure concerning the fine, and there have been a few remarks in the media. I'm simply curious about what you anticipate. Through this conversation and by examining the alternatives, might it be that additional fines emerge, or that the Indonesian government expresses greater irritation, or do you believe matters are heading the opposite way and it will be settled?

Richard Adkerson

executive
#47

Kathleen is the one I'll ask to address this. She has been working closely with the parties over there on hammering out the terms; our intention is to collaborate with the government. Back in December 2018 we pledged to construct a smelter, and let me state plainly that we acknowledge that pledge, and we stand ready to fulfill it. Opinions differ among those in power in Indonesia. Referring to the government as a single entity risks misrepresenting it. Inside the government itself, opinions diverge on whether to back this project at Weda Bay or proceed along the path we originally embarked upon. current shareholder MIND ID, as well as with the Ministry of State-Owned Enterprises and the Ministry of Energy and Mines, to determine what choice the government ends up making. We are ready to move ahead, so long as we have — should we take the Weda Bay route — acceptable terms and a sensible regulatory setting. Kathleen, would you like to speak on this?

Kathleen Quirk

executive
#48

Yeah.

Richard Adkerson

executive
#49

The Mines Ministry is eager to move us along. My belief is that we'll get this matter settled and that all will turn out fine. Kathleen, could you fill in the specifics?

Kathleen Quirk

executive
#50

All right. So according to the rules, export permits get issued by the government each year, and after that a review happens at the 6-month mark to measure how far you've come relative to the smelter build-out timeline the government holds and has signed off on. Because of COVID, like we mentioned, back in 2020 we informed the government that the pandemic had thrown off our timeline, and force majeure circumstances existed that stopped us from hitting that timeline. The regulations allow for penalties when the timeline isn't met. That's the step the government took. This fine was imposed by them. We came in and laid out for them why the project fell behind and that this constituted force majeure, which the rules permit as grounds to have any penalty waived. Those talks with the government are ongoing. They want some extra backing for our argument along with specifics; it's clear that COVID disrupted project timelines everywhere in the world, yet they want further details. Our expectation is that it gets settled in a way that works for both sides. Like Richard mentioned, we're also strongly committed to honoring what we promised the government. In the end, we told them COVID had pushed us 12 months behind on hitting the December 2023 deadline for building the new smelter. At this point we anticipate that it won't be finished before 2024; the option Richard brought up at Weda Bay might be able to put us back on track. We simply have to confirm it works from a commercial angle and from the angle of overall business risk. We're coordinating closely with the government. I can tell you that our interests, given that MIND ID is our partner, line up very well, and all of us share the same understanding of what has to be done, and we're simply navigating the government's rules to get this matter settled, and I'm confident that we will.

Matthew Murphy

analyst
#51

Thank you, Kathleen. As far as what came out of those talks with the government goes, is that going to amount to finalizing a fresh timeline for the smelter's advancement?

Kathleen Quirk

executive
#52

Yes.

Matthew Murphy

analyst
#53

Would that put you back on schedule?

Kathleen Quirk

executive
#54

Correct. A revised timeline for the project is among the things we're talking about, and it connects to the talks we're having with them regarding this administrative fine.

Matthew Murphy

analyst
#55

All right. Thanks.

Carlos de Alba

analyst
#56

Many thanks, Richard and Kathleen. Good morning. I just want to follow up regarding the smelter. Could you please give us a bit more detail about where things stand in the talks among the commercial parties, perhaps concerning a third party carrying out the investment in the major smelter? Are those talks still going on, or have they come to a halt, meaning we should now return to the idea of PTFI building the smelter by itself? On CapEx, and this is not a large increase, but the CapEx outlook for 2022 went up by roughly $200 million tied to all the projects. Is there any specific item you would point to, or does it simply reflect the set of projects you described earlier in the call?

Kathleen Quirk

executive
#57

Yeah.

Richard Adkerson

executive
#58

Well.

Kathleen Quirk

executive
#59

Well, on the last question.

Richard Adkerson

executive
#60

Regarding that final question, Carlos, I'd call this a positive development. When copper prices rise, that creates motivation to allocate capital toward boosting values. These are mostly projects that had been sitting in our long-range plans, and now we're pulling them forward in order to generate value. Isn't that right, Kathleen?

Kathleen Quirk

executive
#61

Correct. We moved some capital up. Production has gone up too. That accounts for it. Mostly, it's spending on mining equipment. Regarding the first piece, about talks — while negotiations are ongoing, we don't share specifics publicly. All of us had agreed on a goal: finish the commercial deal with that third party by March's close. During Q1, there were lots of negotiations going back and forth. When March ended, no acceptable agreement had been reached; we've been advancing this separate project simultaneously. Eventually, a choice has to be made; that choice isn't final yet, though we're pushing our own greenfield project ahead, enabling us to fulfill what we owe the governments and avoid depending entirely on a third party. Right now, discussions continue with that third party, while we also advance the other one at the same time. The moment a final call is made — and trust me, everyone wants it fast — we'll let you know.

Carlos de Alba

analyst
#62

That's great, very straightforward, and I value the detail. Thanks a lot. Richard and Kathleen.

Richard Adkerson

executive
#63

Carlos, whenever we chat there, we put it this way — I was hearing Kathleen speak, and a portion of those are choices made by the government. When we say "we" in Indonesia, that means PTFI, a partnership involving MIND ID and FCX. FCX runs the operations. Our "we" in Indonesia refers to that partnership together with the Ministry of State-Owned Enterprises; it's an entirely different situation compared with those among you who tracked us throughout all those years when we were negotiating with the government, back when FCX needed to be out front and, honestly, I myself was on the ground during those talks. These days, we're present very much as one team.

Analyst

analyst
#64

Morning, hello. Once more, I'd like to revisit the smelter topic. Eventually, I'd imagine a choice has to be made about constructing one ourselves versus partnering with an outside company. Right now, is there a hard deadline for deciding which way to go? Obviously, this can't be allowed to continue indefinitely.

Richard Adkerson

executive
#65

No, that's up to the government. The government holds that call. Should the government back it, and should we secure acceptable terms for selling concentrate plus a regulatory framework that addresses our IUPK obligations, PTFI stands ready to work with Weda Bay. If that fails to materialize, we stand ready to move ahead with the alternative project; that's something we're actively pursuing. We aren't simply waiting around doing nothing; we stand ready to move ahead. I believe it's worth remembering that although this represents a major project and a management concern, for FCX it isn't a massive financial concern; we were paying a 5% export duty that the smelter would remove. The financial effects aren't all that large, and over 70% of those financial effects flow to the government via taxes and equity share ownership.

Kathleen Quirk

executive
#66

Orest, our preference is to reach a conclusion faster. No hard deadline exists as such, yet we are eager to settle this matter very soon.

Analyst

analyst
#67

Yes. All right, thanks.

Richard Adkerson

executive
#68

I was just about to add something as a follow-up.

Analyst

analyst
#69

Please proceed, Richard.

Richard Adkerson

executive
#70

No, what I'm getting at is that we can't simply announce that we'll take this action; the choice has to be made jointly by the government and PTFI.

Analyst

analyst
#71

Got it. All right. Considering how low copper benchmark or spot TCs happen to be at the moment, would it be reasonable to think that before any third party would commit to constructing the smelter, they would want to see a certain degree of steadiness in those TCs, maybe?

Kathleen Quirk

executive
#72

Yes.

Analyst

analyst
#73

At higher levels?

Richard Adkerson

executive
#74

Yes.

Kathleen Quirk

executive
#75

Yes.

Analyst

analyst
#76

Okay.

Richard Adkerson

executive
#77

Yes.

Analyst

analyst
#78

All right, one quick clarification. Earlier, did you say that you're aiming to be able to give the market some direction regarding certain brownfield expansion possibilities in the U.S. before the year is out? Is that right?

Richard Adkerson

executive
#79

That is what we're hoping for. That is our aspiration. As you're aware, transparency is something we value highly as a company, and our hope is that by the end of the year, we'll have some clarity. Josh brought it up. Kathleen brought it up. In keeping with how we operate, we'll make sure all of you stay informed.

Analyst

analyst
#80

Great. Thank you so much.

Richard Adkerson

executive
#81

Hey, John.

John Tumazos

analyst
#82

Thanks so much. Morning to everyone. I appreciate you taking my question, and congratulations on all that cash pouring in your direction. I just want to pick up where Emily left off with her opening question. When it comes to the Bagdad Mill project, the El Abra Mill project, and the Kucing Liar underground project — and we realize you'll be carefully engineering and studying each one as you handle planning, permitting, construction, and financing — would it be fair to say all three probably won't start until 2025 at the earliest?

Richard Adkerson

executive
#83

Yes.

John Tumazos

analyst
#84

Is it safe to say 2026?

Kathleen Quirk

executive
#85

Right, Bagdad might be able to move ahead faster than the remaining two. As you're aware, investments for KL involve lengthy lead times. Kucing Liar sits within our long-term plans, and at this point we're simply optimizing it. That capital will be deployed across an extended stretch of time. Looking at El Abra purely from a sequencing perspective, it would trail Bagdad in terms of when it might begin operating. If you kicked off everything immediately, you'd be looking at roughly 7 years out, accounting for the entire permitting process — 7, possibly 8 years, once permitting is factored in. Bagdad, by contrast, could likely be finished around a 2025-type timeline, depending on when we get started.

John Tumazos

analyst
#86

If I might squeeze in one final question. I remember drill results from Kucing Liar being quite strong back in the '90s. When was the most recent drilling and update on that?

Richard Adkerson

executive
#87

On an ongoing basis.

John Tumazos

analyst
#88

You've got the ability to do so, and with those studies brought up to date, you now possess additional data.

Kathleen Quirk

executive
#89

Yeah, Mark, why don't you talk about.

Richard Adkerson

executive
#90

John, you likely recall as well that Kucing Liar contains pyrite. Mark, could you discuss what we've been doing on that front? This has been an ongoing effort; it stands apart from Grasberg Block Cave, Deep MLZ, and the rest of our operations. Mark, perhaps you could speak to how our analysis of KL has been refreshed.

Mark Johnson

executive
#91

Right. Over roughly the past 36 months, things shifted quite a bit. New drilling wasn't really the main driver. We did carry out a bit of drilling during the last 24 months or so, and we took another look at portions of the metallurgical test work. The major shift was this — and Richard touched on it — the initial KL mine plan leaned toward a higher copper equivalent grade, yet it also carried far more pyrite and called for a substantial overhaul of how we process. The revised mine plan targets a somewhat lower copper equivalent section of the resource, which has since been converted into the reserve; with this portion of the ore body, basically we keep the mill unchanged. The pyrite issue is mostly reduced and nearly done away with. Capital tied to processing, power needs, and environmental management has come down considerably overall; on top of that, in this new section of the revised mine plan — the zones we work — gold recoveries climb a great deal. In our earliest reserves, from a number of years back, gold recoveries sat under 50%. Under the updated plan, gold recoveries exceed 60%, and we believe further gains are possible there; it's a far less capital hungry, far sturdier plan, with considerably fewer environmental management expenses tied to this updated KL plan.

Richard Adkerson

executive
#92

Yeah.

Mark Johnson

executive
#93

There’s one item, which Richard referred to, that stands on its own, though in certain respects it is connected. Portions of the GBC ore flow system are shared by us. As KL increases output, and in alignment with the GBC plan, certain conveyors are used in common. What mattered most was this: under the revised plan, the mill stays more or less the same.

Richard Adkerson

executive
#94

Yep.

Kathleen Quirk

executive
#95

Thanks, Mark.

Richard Adkerson

executive
#96

Mark, thanks. And John, this isn't some rival initiative to the Americas growth plan we have; as Kathleen mentioned, it belongs to our long-term plan. Everything we're doing out there aligns with it. When it comes to deciding where our investment dollars go in the Americas, that's a matter of weighing the pluses and minuses of every project. Because we hold the land in fee within the U.S., we pay no royalties. Thanks to our tax laws carried forward across a very long stretch of time, we pay no taxes, and U.S. tax rates are extremely low. This whole analysis is done on an after-tax, after-royalty economic basis, and our decision will come down to where we can deliver the most economical value addition for shareholders.

John Tumazos

analyst
#97

We're just so happy to see it raining money and good opportunities on you.

Kathleen Quirk

executive
#98

John, thank you.

Richard Adkerson

executive
#99

Appreciate it; the journey has stretched out and twisted quite a bit, yet this moment is wonderful.

Michael Dudas

analyst
#100

Yes, hello. Morning to you as well, Richard and Kathleen. I'd like to ask a follow-up regarding what you're thinking about investing in Freeport. For sure, when you consider after-tax returns, the price of copper, taxes, and so on, how much more will ESG factor into certain parts of the analysis that both you and the rest of the industry will need to address in order to get there? Will that generally create meaningful obstacles? Naturally, a social license to operate is something you must have, and we get that, but given its growing significance, will it prove beneficial, and will it introduce barriers to some of that long-term investment the industry will need in order to satisfy the demand requirements down the road?

Richard Adkerson

executive
#101

This is happening right now. When it comes to ESG, you can't apply a one-size-fits-all approach — every single project has its own unique circumstances. I want to highlight something, and I believe you noticed it, when we discussed how our expansion efforts in Arizona have backing from local residents and Native American tribes; the reason is our long-standing presence there, and we've committed significant effort and funding toward those populations, creating chances that go well beyond what our individual sites offer. Even in other parts of Arizona, where the state takes a positive stance on mining growth, there remain massive ESG-related obstacles for new developments. Consider Rosemont and Resolution, along with other ventures. Each individual project requires its own examination of how the companies behind it handle things, yet the hurdle is tremendous, and it will only expand. The sheer count of organizations now paying attention to ESG keeps rising — you witness it among institutional investors, whom all of you are part of, but consumer advocacy groups are deeply engaged as well. Car makers care deeply about the origin of their minerals, about where their copper is sourced. That's exactly why the Copper Mark initiative I mentioned carries such weight; it's a massive concern at this moment. It will have a significant effect on the growth of supply.

Kathleen Quirk

executive
#102

Right. That consideration has consistently factored into how we assess projects. It matters even more now, yet evaluating with reduced power consumption, broadening where our energy comes from toward renewable options has always been included. Managing water represents a significant concern. At Cerro Verde in Peru, our work produced an excellent answer: we constructed a wastewater treatment facility to secure supply, which meant we weren't rivaling other national water needs and genuinely assisted local residents. As we examine each undertaking, we continually ask how it benefits the surrounding population. ESG has long played a role, and per Richard, its importance just keeps expanding. You likely already know this, yet copper presents a remarkable opportunity. Unlike other firms, we aren't burdened by Scope 3 emissions. The purposes copper serves are genuinely tied to decarbonization. Scope 1 and 2 remain areas we diligently address daily, fully embedded within our project development strategies and capital investment strategies.

Michael Dudas

analyst
#103

Yeah, I appreciate those thoughtful answers. Thank you.

Andreas Bokkenheuser

analyst
#104

Alright, I appreciate it a lot. I'm grateful that you're answering my question. This is really just a short operational query, and it actually has two parts. Clearly, production came in somewhat above sales during Q1. Could you elaborate a bit more on the restocking? I believe you also mentioned that certain gold sales at Grasberg might be pushed back, landing in Q2 sales instead. What was behind that?

Richard Adkerson

executive
#105

Fine. I'll take that on; at Grasberg, copper and gold aren't what we sell. Copper concentrate is our product. Copper and gold are both contained within it. Payment comes to us for each component separately, based on LME pricing. As I said before, the situation at Grasberg was that our production goals were achieved. That copper concentrate was moved by us down to the port location, where it would be ready for shipment. A number of shipments were held up for a range of reasons. Production is finished, and sales get recognized by us once the concentrate is put on vessels. What we're really looking at is simply that a portion of those sales will land in the second quarter instead of the first quarter, and that's really all there is to it. Across all our operations, timing problems of this kind do occur. If you're someone who tracks Grasberg, you're aware that weather at the port is a factor. The sea there is shallow, and weather can hold up shipments. In the end, this is purely about timing — whether it falls at the very end of the first quarter or the beginning of the second quarter doesn't matter.

Andreas Bokkenheuser

analyst
#106

Got it, that clears things up.

Kathleen Quirk

executive
#107

Right — typically what we make matches what we sell, and there were cases both in the U.S. and Indonesia. There were variations between what we produced and what we sold, but as Richard mentioned, it comes down to timing.

Richard Adkerson

executive
#108

As you can imagine, we can sell everything we produce; that's not an issue.

Andreas Bokkenheuser

analyst
#109

Got it, that's crystal clear. One more thing I wanted to ask about. You've clearly been saying that output at Peru and Cerro Verde should get back to normal in the coming year. Is there anywhere else in your worldwide operations that's currently under strain from COVID restrictions or similar issues, where you'd anticipate some volume pickup as we head into next year?

Richard Adkerson

executive
#110

Right, as we noted, we had halted activity at the Chino mine in New Mexico — a fairly small operation — but we are restarting it now. At Morenci, we cut back on mining rates and stripping rates as a way to save on cost, and getting those back up will take a while, with production climbing gradually from there; none of this is especially material. What's incredible is that the folks — Mark and his group at Grasberg — have simply been outstanding in hitting our goals despite COVID making that location extremely difficult; we've handled all of that impressively and are still doing so.

Kathleen Quirk

executive
#111

Sure. I'd say that at the moment, our tightest logistical limits are in South America; we're still handling the situation everywhere when it comes to things like protocols and so on. We aren't easing off our vigilance, and we keep being extremely cautious in the way we run things so that people stay safe. As far as logistics go, South America is the region that's mostly been affected.

Andreas Bokkenheuser

analyst
#112

All right.

Richard Adkerson

executive
#113

Our internal medical director is excellent. For years we've partnered with International SOS, and they've done a wonderful job assisting us in setting up testing facilities as well as facilities for handling those who are infected. We can treat them and return them to work; that process continues.

Andreas Bokkenheuser

analyst
#114

All right, that makes sense. Regarding South America, the assumption is that the ramp-up takes place during the latter half of the year, and then you return to a full run rate by early 2022. Is that how we should view it?

Kathleen Quirk

executive
#115

In Peru, to be specific, we intend to operate at this lower level throughout the entire year, and we will keep evaluating that as things develop. At this point, the initial assumption is that this situation will persist for the rest of 2021, followed by a return to the plan in 2022; that is what we are assuming; Chile represents a smaller operation for us, but we have started raising our mining and stacking rates there. The effect on metal will occur in 2022, though we are beginning that process now. At Cerro Verde, our biggest operation in South America, the intention is to stay at this somewhat reduced rate for the remainder of the year. The team performed very well and managed to exceed expectations during the first quarter, yet we do not consider it prudent to count on that, since the restrictions remain quite substantial.

Andreas Bokkenheuser

analyst
#116

All right, that makes perfect sense. Thanks a lot.

Richard Adkerson

executive
#117

Appreciate it.

Kathleen Quirk

executive
#118

Morning.

Lucas Pipes

analyst
#119

Richard, and Kathleen, I appreciate you both fielding my question too. I've already had most of what I wanted to ask covered, but Richard, I did want to revisit a few of those points you raised earlier about this ranking among the strongest copper market outlooks you've witnessed. Given that backdrop, as we consider how to balance keeping capital against giving it back, how much room is there for that to be reevaluated? We've devoted considerable time on today's call to discussing organic growth, for instance. Might there be a reason to shift that ratio further in favor of growth? In a similar vein, has your thinking on M&A changed at all? And if it has, which regions might be logical? Would you consider producers, or would you instead focus on pre-production assets? I'd welcome any fresh perspective on that too. Thanks so much.

Richard Adkerson

executive
#120

That is a really solid, multi-part question, and I'll try to give you a precise answer. Having spent many years in this industry, I observe that copper demand has gone through what you could call three distinct periods. Before the early 2000s, developed nations' GDP was the sole engine. Of all commodities, copper tracks GDP most closely, and it moved up and down with business cycles. Then China came onto the scene, and for close to 20 years it has been the dominant source of new demand growth. When you examine it, China accounts for essentially all of it. The remainder of the globe has been roughly stagnant. The exciting new period we're in right now centers on the fact that China's growth rate — which observers have flagged for quite a while — is unavoidably declining and must decline. COVID muddled everything somewhat. Because its economy has expanded, its absolute copper volume demand is extremely robust, and that will persist even as it reorients toward consumers and exports. Even with a lower growth rate, the absolute quantity of copper it adds will remain powerful. What makes the present moment so exciting to me is that the developed world has now recovered from COVID, and on top of that there's this worldwide push — you can see it plainly in the United States — to direct money toward a wider group of people so consumption expands. This whole effort regarding income inequality, which everyone agrees we must address, will generate fresh copper demand. Beyond that, my longstanding thesis has always rested on the developing world and global growth. Huge numbers of people across the planet who endure substandard living conditions want something better; achieving that calls for more energy, more transportation, more communication, more copper. That's why I describe the demand side as entering a new era, and it's genuinely encouraging. On the supply side, I honestly have no idea how it will possibly keep pace. I truly don't. Consider all the projects we have at Freeport. Copper's price could double in a single day. Some observers already predict a doubling regardless, but even if it happened overnight, we still couldn't bring meaningful new production online for several years. Watching how this unfolds will be fascinating. Absent some worldwide catastrophe, prices, it appears obvious to me, simply must climb dramatically. Substitution will be necessary. Scrap will have to increase. How will that demand be satisfied? That's precisely why I feel such enthusiasm about our position after all these years spent building this company. John Tumazos brought it up; we've endured a great deal, yet I remember Kathleen and I crafting a strategy during 2003 and 2004, the period when I took over as CEO, to concentrate on copper. And now, all these years later, it's wonderful to watch that finally pay off.

Lucas Pipes

analyst
#121

That's quite useful.

Kathleen Quirk

executive
#122

As far as the question about M&A goes, our attention is squarely on.

Richard Adkerson

executive
#123

Oh, yes.

Kathleen Quirk

executive
#124

The assets we already hold. Development possibilities exist inside our portfolio. We constantly keep an eye on what might be obtainable outside, and weigh that against our own holdings.

Richard Adkerson

executive
#125

I'd like to throw in one personal thought about this. There was a mistake on our side. When other mining firms pushed into M&A for strategic reasons, they stumbled too. You simply keep looking at case after case. Phelps Dodge showed up as an opportunity for us; doing it was never part of a strategic plan. We had held conversations with them about acquiring us. The situation today is that we hold no strategy of participating in M&A markets, yet we will now, for the first time in quite a while, be positioned so that if an opportunity presents itself, we can seize it. Looking ahead, our strategy is to execute and to invest with discipline in our resources that deliver growth and generate value. Should something come our way, we'll be able to evaluate it, though it isn't our strategic objective. You brought up startup operations, and those get pitched to us constantly; getting their economics to work has been a major obstacle, since entering means paying for the value already built. Meanwhile, we hold all these tons of resources in our portfolio that receive no value in our share price. In our view, that has been a genuine barrier to making even projects that might be, on some level, appealing work economically for our company. At Freeport we've long said that big mines get bigger and small mines get smaller. That's another difficult matter.

Lucas Pipes

analyst
#126

Richard, Kathleen, thank you very much for the color and continued best of luck.

Richard Adkerson

executive
#127

Thanks.

Jatinder Goel

analyst
#128

Hello there. Morning to you, and afternoon as well. Appreciate you fielding this. I've got a single question about the smelter. For a clearer picture: when it comes to possibly contracting out the smelter, is there just a sole counterparty you're in talks with, or do several exist? The motive behind my asking is that a press release or news piece may have crossed your path in the last week, reporting Indonesia put pen to paper on an MoU with ENFI — located in West Papua — and Freeport was described as having pledged 800,000 tons of raw material there too, something that appears inconsistent with the smelters' complete scale. I'm unsure whether you're contemplating a single smelter and a single counterparty, or whether more are involved. Thanks.

Kathleen Quirk

executive
#129

Yes. Talks so far have gone the furthest regarding the Weda Bay project. That potential project you mention sits in Papua — we know the developer involved there, and we've said that should spare capacity exist, we might be in a position to provide supply. At present our alternatives center on the base supply, centering on either the Weda Bay choice or the Grasberg project of ours.

Richard Adkerson

executive
#130

Yeah, regarding what you said, we haven't pledged anything when it comes to supply for the Papua project. For a number of years, it would have been nice to see a smelter get built in Papua, since that would be a good thing for the community in that area, but the expense of infrastructure, the lack of infrastructure, the timing, and the investment that infrastructure would need have meant it wasn't feasible before now.

Jatinder Goel

analyst
#131

Got it, that makes a lot of sense. Thanks a lot.

Brian MacArthur

analyst
#132

Morning. Hello, how's it going?

Richard Adkerson

executive
#133

Hello, Brian.

Brian MacArthur

analyst
#134

I want to circle back and spend a moment on KL, since at long last, after a number of years, it's drawing nearer, yet it does appear that, per John's remark, the project has been altered. I'm simply attempting to get a bit of clarity, because if you examine the grade here, the reserve grade stands at 0.9 copper and 0.9 grams per ton gold. That's somewhat more gold than certain other ones. Under this revised plan, my initial question, I suppose, is this: you mentioned specific zones of the ore body. Is there a zone with a higher grade where you begin, which assists the economics? My next question, it appears that the updated plan clearly reduces CapEx, which is positive. From a technical standpoint, it's likely simpler, which is also positive, but afterward you mention reduced copper equivalency, so I'm attempting to determine precisely how much lower that copper equivalency actually is. As a follow-on to that, clearly, that hinges on price assumptions as well.

Kathleen Quirk

executive
#135

Yeah.

Brian MacArthur

analyst
#136

Because I'm trying.

Kathleen Quirk

executive
#137

We'll let Mark.

Brian MacArthur

analyst
#138

This sounds pretty good.

Kathleen Quirk

executive
#139

Sure. Mark's going to cover that, but there's a portion of the mine where — and we took the same approach with the Grasberg Block Cave development.

Brian MacArthur

analyst
#140

Correct.

Kathleen Quirk

executive
#141

Over time, we adjusted it so we'd target the sections with the least pyrite. As Mark will explain, at KL we reworked the mining plan to lower how much capital is needed, since recovering pyrite demands additional mill capital, greater environmental management, and recovery begins to fall. You brought up the 0.9, though for certain ore the recovery is extremely poor. What we've come up with here is a better-optimized plan that cuts upfront CapEx and modestly alters the overall ore. On a metal basis, you wind up with comparable metal since your recoveries are higher. Mark, I'm not sure whether you'd like to chime in.

Richard Adkerson

executive
#142

Okay, let's hand things over to Mark — this really isn't all that complex. What we've done is put together a fresh mining blueprint so that the pyrite zone gets steered around and kept to a minimum.

Mark Johnson

executive
#143

Right.

Richard Adkerson

executive
#144

Taking that approach, we cut back on what we'd spend at the mill, and on top of that, a pipeline would have been required. You've seen the site yourself — a pipeline running from the mill down to the lowlands, along with pyrite storage down there. Mark, this comes down more to an engineering design decision, one that delivers all of these economic advantages, rather than something else. Mark?

Mark Johnson

executive
#145

Right. I believe the key ones were — perhaps not the best grade — but they had the greatest worth once you factored in the capital spent inside the ore body. Were it not for carrying debt, our agreement with the government runs through 2041. Without that, the material we pushed out would still sit in reserves. What this new plan does is pull things forward; roughly 50% of the prior reserve overlaps with that earlier reserve. The other half is where we postponed some lower-value ore and managed to swap in ore of greater value. The ore we're extracting now would be sediment hosted, quite close to what we've processed for years at the DOZ, Deep MLZ. That earlier reserve was largely focused on this fault holding the best grades, yet it had — as Richard and Kathleen noted — a few of the larger difficulties being a new mill. We needed to grind it far finer. That brought extra power needs. We also had to handle the pyrite, which for us means separating it from the ModADA and keeping it in its own storage. Once we accounted for every cost tied to those elevated copper equivalent grades — which blend the value of copper and gold — and replaced that approach by focusing more on value instead of just copper equivalency, we arrived at a far better mine sequence, with the chance to pursue this other material down the road should we get the chance to mine past 2041.

Kathleen Quirk

executive
#146

Like Mark mentioned, we want to lower risk and have a plan that's sturdier. At this moment, we're taking certain steps to keep working toward improving those gold recovery rates.

Brian MacArthur

analyst
#147

With this new plan, I can't recall the initial rate you estimated KL would process. Is it actually possible to offset that and achieve a greater mining rate? My understanding is you'd still have 240,000 tons of mill capacity as well, correct? Does that provide the offset, or does the rate remain roughly unchanged?

Mark Johnson

executive
#148

The mining rates are pretty much in line with what we saw previously. We're looking at comparable tonnage. It comes in slightly lower since our start date is a bit further out. That 240,000 tons of mill capacity we'll have once SAG 3 is in place does get filled by this. Naturally, there's a district-wide plan where we sequence every ore body so that the mill gets filled in the most optimal way possible. Peak throughput here would hit 90,000 tons a day, which is only slightly above the Deep MLZ plan we have. As GBC begins to decline, this ramps up, so essentially it's about balancing things out so the highest value material gets first dibs on mill space.

Brian MacArthur

analyst
#149

Alright, thanks a lot. It definitely seems as though this project's capital intensity is far better on a risk-adjusted profit basis than what people might have assumed 15 years back, when we initially took a look at it, I suppose.

Mark Johnson

executive
#150

Yes, correct. Exactly right.

Brian MacArthur

analyst
#151

Thank you very much.

Kathleen Quirk

executive
#152

Thank you, Brian.

Richard Adkerson

executive
#153

Out of the underground mine, we're getting 240,000 tons each day. That's all I'll say about it. We really appreciate your joining this call, and we're eager to keep sharing updates on how things develop throughout this year and in the years ahead. Thanks.

Operator

operator
#154

Everyone, that brings today’s call to an end. We appreciate your joining us. You’re welcome to hang up now.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Freeport-McMoRan Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Freeport-McMoRan Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Freeport-McMoRan Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.