Appreciate that, Regina, and good morning to everyone. We're glad you could join the Freeport-McMoRan conference call. We put out our operating and financial results for the first quarter of 2023 earlier today, and you can find a copy of the press release and the slides on our site, fcx.com. This call is streaming live over the Internet right now, and anybody can tune in by going to our homepage and selecting the webcast link for this conference call. Analysts and investors are on the line, and members of the financial press were also invited to listen in today, and a webcast replay will be posted on our site later on today. Before we get into our remarks, we want to remind everybody that forward-looking statements are contained in today's press release and in some of what we say on this call, and that actual results could differ materially. Please take a look at the cautionary language in our press release and presentation materials, along with the risk factors outlined in our SEC filings. Joining us on the call today are Richard Adkerson, Chairman of the Board and Chief Executive Officer. Maree Robertson, our CFO. Mark Johnson, our Chief Operating Officer for Indonesia. Josh Olmsted, our Chief Operating Officer for the Americas. Mike Kendrick, who heads up our molybdenum business. Cory Stevens, who oversees our engineering and project development activities. I'm going to hand things over to Richard for some opening remarks, and after that we'll return to walk through the prepared slide materials and then field your questions. Richard?

Richard Adkerson

executive
#2

I want to thank Kathleen, and I appreciate everyone taking the time to be with us today. Kathleen is going to walk through the quarter's results along with our guidance, and then our team and I will take your questions. The way our global team handled the difficulties we encountered in the first quarter makes me feel good. Everyone here is aware that mining is a demanding industry. The recent reports from across the sector make that clear. In our line of work, the way you handle difficulties is what determines who you are. At Freeport, I take real pride in who we are. In Indonesia, our people showed once more how resilient they are by getting through a significant flooding event. Dealing with rain at Grasberg is nothing new for us. It sits at a high elevation in the mountains of New Guinea, among the rainiest locations on Earth; we just marked 56 years of running operations at that site. Our infrastructure is built to cope with heavy rainfall. What we went through in January was exceptionally intense. Because of the systems we already had in place, we avoided serious damage. Our people recovered fast, acting right away to bring production back and reduce risk going forward, and operations there have gotten off to a strong start in the second quarter. Over the past few months, Kathleen and I have taken several trips to Indonesia. Speaking for myself, it feels rewarding to see attitudes toward Freeport there that are noticeably better than they were in earlier years. Everything stems from the partnership we formed with the government back in 2018, the progress we've made across the multi-year, large-scale buildout of our underground operations, and the favorable long-term picture for copper. Grasberg has now regained its standing as the number two copper mine in the world. At Grasberg, our net cash cost of production came in at negative $0.08 per pound during the first quarter. We're currently working constructively with the government on extending PTFI's operating rights past 2041 in a manner that serves every stakeholder. Over at Cerro Verde, our people worked their way through a turbulent stretch of political instability in Peru. Our team pulled together with the community and our workforce, managing the situation in an impressive way. In the United States, our team is rising to the occasion and dealing with the labor availability difficulties we face there. We're grateful for the dedication and motivation shown by the worldwide Freeport team as they pursue our objective under tough conditions. Low inventory levels, China's speeding up economic recovery, and the continuing favorable global demand factors for copper keep supporting copper markets. Our customers keep purchasing every pound of copper we're able to make and are asking for even more. Looking ahead, copper miners will need to increase output to satisfy demand. Here at Freeport, we're well positioned to bring on new sources of copper supply, to expand our business from our extensive brownfield resources, and to also expand our business through the fast-advancing leach technology along with the data analytics that back it up. At Freeport, we're fortunate to have strong franchises and backing from the communities in which we operate. Keeping our balance sheet strong is something we're dedicated to. Our history demonstrates an outstanding record when it comes to carrying out projects and running operations. At Freeport, disciplined implementation sits at the very core of who we are. Our strategy is sharply outlined, and we pursue lasting achievement with unwavering determination. Kathleen is going to walk everyone through our slides now.

Kathleen Quirk

executive
#3

Thanks, Richard. I'll begin on slide three. You may have already noticed that our annual report and sustainability report came out today. Both documents can be found on our website. This year's annual report carries the theme "The Power of Copper," and it underscores the essential part that Freeport and copper, our main product, play in driving the global economy, along with copper's expanding applications as the world pursues decarbonization and rethinks modern infrastructure to serve a deeply connected planet. We take pride as well in releasing our annual sustainability report; this marks 22 years that we have reported on our wide-ranging sustainability efforts. Transparency keeps getting better. The report lays out our efforts, our accomplishments, and the difficulties we encounter in overseeing the safety, social, and environmental dimensions of our business, all of which matter greatly to our success over the long term. We rely on international standards, best practices, and outside organizations like The Copper Mark to gauge our performance and our accountability to stakeholders. We hope you'll take the opportunity to look through this material and share your thoughts with us on these subjects. Let's move to slide four, which captures our main operating and financial results for the first quarter. As we've said before, our Grasberg operations saw a temporary interruption in February after severe weather hit our mill area. Like Richard noted, the team did a fantastic job safely bringing production back to normal levels during March. Even though volumes came in below what we had projected entering the quarter, our consolidated unit net cash costs landed essentially in line with guidance. Consolidated costs per unit came to an average of $1.76 per pound for the quarter, since greater byproduct credits outweighed the effect of lower volumes. As Richard pointed out, it's worth noting that despite the disruption, Grasberg unit net cash costs averaged a net credit of $0.08 per pound, which means gold revenues exceeded the cash costs of production. With operations back to normal in March and a strong beginning to April, we anticipate solid volumes over the remainder of the year. Our margins during the quarter were robust. EBITDA came to $2.2 billion for the quarter. Operating cash flows, net of a $500 million working capital use of cash, reached $1.1 billion. We invested $1.1 billion during the quarter; that figure included roughly $400 million toward major mining projects and $300 million toward the Indonesian smelter, which is being paid for with proceeds from financing we raised last year. Setting aside net debt tied to the smelter, we closed the quarter with $1.3 billion in net debt. Our balance sheet, liquidity, and financial flexibility are in excellent condition. The outlook for free cash flow generation over the rest of the year is favorable. On the next slide, Richard discussed the difficulties we encountered in the first quarter. We dealt with these throughout our worldwide operations. Our teams performed admirably given the situation. On the left, you can see how the February weather event at Grasberg affected production and how strongly we recovered in March. Earlier this year in Peru, our company and others dealt with a tough set of conditions tied to broad protests that disrupted transportation routes and supply chains. The team at Cerro Verde handled things really well, both efficiently and safely. Conditions in Peru have gotten better over the past few weeks, and we're back to operating at normal rates. Here in the U.S., we ran into ongoing labor shortages, severe weather earlier in the quarter, and maintenance problems we hadn't planned for. We're focused on boosting productivity and reliability, on developing skills, and on technology and automation efforts, while we recruit aggressively given that the labor market in the U.S. remains tight. The leach recovery work — we'll get into more detail on that — genuinely helped offset part of the shortfall in mining rates, and we're going to keep building on it. Moving to the markets on slide six, Freeport holds a strong position as a leader in the worldwide copper industry. Going forward, copper demand should speed up, with forecasts calling for it to double by 2035. Copper plays an essential role in electrification. Low carbon investments in renewable power and electrification are fueling enormous demand growth; beyond that, major infrastructure programs from many countries, plus copper's use in connectivity, data, and artificial intelligence, are additional drivers of growing demand. Meanwhile, whether the industry can actually satisfy this increasing demand is a genuine problem. We can all recall this same point last year, when lots of people predicted the market would swing into a surplus during 2023, citing new projects that were starting up. Looking at where things stand now, most analysts expect the market to be balanced in 2023, even with those new projects. Over the longer term, forecasts point to extremely large deficits. Against that background, we think prices will have to climb to create incentives for new supply. At Freeport, we gain from a big reserve position, as shown on the slide, plus an even bigger resource position that lets us expand the business down the road. We're in a strong position to keep meeting rising demand, and we're advancing a number of these initiatives to raise production going forward. On slide seven, we cover the molybdenum markets. As we've noted, besides being a top copper producer, Freeport ranks as the biggest molybdenum producer in the world. During the last quarter, we discussed molybdenum's big jump from $18 per pound in late 2022 to a peak above $38 per pound in the first quarter of this year; for our first quarter molybdenum sales, we realized $30 per pound. Prices climbed sharply starting in late 2022 because of supply problems and favorable demand drivers in the energy and aerospace sectors. In recent weeks, prices started falling from those highs, due in part to better supply. Looking ahead, the factors driving moly demand are favorable, and because moly mostly comes out as a byproduct of copper mining, it faces some of the same supply constraints that affect copper. The present moly price is around slightly more than $21 per pound. We are genuinely thrilled, turning to slide eight, truly thrilled to speak with you today and provide an update on the leach programs Richard mentioned earlier. Our work to boost copper output by improving recoveries from our enormous leach stockpiles keeps building momentum. Given what we've seen in today's results, our confidence keeps growing that we will hit our initial goal of 200 million pounds each year, and we've started modeling how the following stage might take shape; on the chart's left portion, we lay out the different categories forming that initial 200 million pound objective, essentially across three groups. The first concerns heat, raising temperatures inside the stockpiles. The second is a program we refer to as Leach Everywhere, aimed at ensuring the whole stockpile gains the advantage of the liquid solution employed to leach copper.

Kathleen Quirk

executive
#4

The third category is really significant. It involves data analytics that draw on new information from sensors applied in many different ways—among them, fine-tuning how much solution gets used and the rate at which we apply it, so we get the best possible outcomes. It has been demonstrated that raising the heat inside the stockpiles improves recoveries. We moved ahead more quickly with putting covers on the stockpiles to hold in heat, and we brought in mechanization for that work, which lets us carry it out with greater efficiency. At this point, more than 30% of our enormous stockpiles are covered, and these efforts account for 30% of the targeted increase. The Leach Everywhere initiative delivers 50% of the uplift and relies on targeted drilling to enhance the flow of solution that might otherwise fail to move through the stockpile. In addition, we are drilling injection wells so that liquid solution can be added to lower set-sections of the stockpile. Through the sensors we have put in place, plus access to other technology employed in oil and gas formations, we are gaining fresh information about where extra leach solution would stimulate the process and help drive higher production. The data analytics effort is generating new insights. We truly did not enjoy this advantage before, and now we can capture it in order to establish the optimal operating protocols across differing stockpile conditions. Early success from these initiatives boosts production at modest incremental costs and with a small carbon footprint. Alongside our initial activities, we have carried out considerable work on the drivers that stimulate leach production, and we have modeled what the next phase of initiatives might deliver. We see a chance to add another 600 million pounds per annum from these initiatives, bringing the total to 800 million pounds per year. That equals the scale of a major new mine, yet without the capital intensity and with a very low incremental operating cost. The three areas of focus appear in the middle of the slide, and each of these initiatives sits at a different stage of development. There is a great deal of work ahead to move these initiatives forward, and part of it calls for further innovation, but our path to success in this program is clear. We are assessing ways to raise the temperature even more by heating the liquid solution before it is applied to the stockpile. We are assessing possibilities for doing so with solar-generated power, geothermal, or other renewable sources at our mine sites in order to meet the added heat requirement. We are also testing a range of additives that we are developing in-house as well as through some third-party initiatives, and we are applying artificial intelligence in our journey and in our evaluations to help speed things up. We are also assessing ways to inject air into the stockpiles in zones that are not receiving sufficient oxygen. Once again, we understand far more about what takes place inside the stockpiles and are working to design solutions that re-stimulate copper production. With huge stockpiles sitting under leach right now, plus the mine-for-mine leach work we're running and the unused tankhouse capacity on hand, Freeport is positioned exceptionally well to take the industry lead here. Alongside the organic growth we'll pursue by developing new copper the traditional way, this will feed into our growth plans going forward. Our growth and development outlook is laid out on slide nine. Given rising copper demand together with the constraints and risks that make greenfield projects hard to actually execute, our strategy and development priorities center on extending what we already operate and on our portfolio of brownfield opportunities. Slide nine lays out our development options for the near, medium, and longer term. After the substantial growth delivered in recent years through the successful Grasberg development, our focus is on moving the next phases forward. Near term, the strongest growth options we see are meeting our initial leach targets and taking actions that lift productivity and reliability across our U.S. operations. Should we succeed in raising mining rates in the U.S., something we're actively working on, and meet our asset efficiency and reliability targets, then we have a chance to add another 200 million pounds per year for a modest amount of capital; over the medium term, we've set out a series of initiatives. The second phase of our leach project is the first of these. In addition, we intend to expand our Bagdad Mine in Arizona, with feasibility studies expected to wrap up this year. Chile offers a major opportunity at our El Abra project, where an operation already exists and we're seeking a significant expansion. In Indonesia, we're developing a new 90,000 ton per day block cave mine named Kucing Liar, which is underway and should begin initial production by the end of the decade. At Bagdad, we're putting some investments to work, included in our new capital expenditure guidance, on early works in the tailings area so we gain optionality to move faster on the mill expansion project once the feasibility study is done. Over the longer term — and we're already at work on these because they need long lead times — we expect an opportunity for another major expansion in the Safford Lone Star district, where we've identified a significant resource, and we have a series of U.S. brownfield projects that can be pursued. In Indonesia, Richard covered the extension discussions under way, and extending our operating rights past 2041 would open the door to continued large-scale mining and possible additional development options in one of the world's largest and highest grade copper and gold mining districts. We are ideally situated to keep playing a leading part in delivering copper to a planet whose needs keep rising. Our strategy will stay disciplined, and we will keep our attention on carrying out projects that let us generate shareholder value. Slide 10 gives you a refreshed look at our sales volume forecast covering 3 years. Our 2023 sales guidance now reflects the Q1 interruption together with the effect of reduced mining rates in the U.S. Even with what happened at Grasberg in February, our 2023 gold volumes sit roughly 3% above earlier projections. We have folded in assumptions of better gold recoveries than we had in our January forecast, and performance on that front is going very well. Guidance for 2024 and 2025 has not changed, though if our leaching work keeps succeeding, there is some upside beyond those figures. Slide 11 presents a bridge to cost, laying out how our earlier unit net cash cost guidance for 2023 compares with what we now expect. At present we project unit cash costs will average $1.55 per pound in 2023. That comes in a bit below our January figure of $1.60 per pound. Lower copper volumes are being offset by greater by-product credits plus a decrease in Indonesian export duties tied to progress on building our smelter. For the main commodity-based input costs, our assumptions closely match the January ones. In some areas we are beginning to see inflationary pressure ease relative to 2022, especially for energy, even as labor, services, and equipment components have gone up.

Kathleen Quirk

executive
#5

If you turn to page 23 of the reference slides, you'll see that site production and delivery costs at our U.S. mines are now estimated to be roughly 7% higher than before. The main driver here is lower volumes in the U.S. tied to the difficulties we went over earlier, and we have efforts underway to boost productivity at those operations. Now to cash flows, which is slide 12, where we present modeled outcomes for EBITDA and cash flow across a range of copper prices, from $4 to $5 per pound; these models cover 2024 and 2025 using our present volume and cost estimates, and in them we hold gold flat at $2,000 and molybdenum flat at $18 per pound. Under those scenarios, annual EBITDA would come in somewhere between over $10.5 billion at $4 copper and $15 billion at $5 copper. Operating cash flows would land between $7.5 billion annually at $4 copper and $11 billion annually at $5 copper. On the right side, we've laid out sensitivities to the different commodities; given our long-life reserves and the scale of our production, we are well positioned to capture metals-intensive growth trends going forward, along with the potential for higher cash flows and cash returns under our performance-based payout framework. Turning to slide 13, we've got an update on capital expenditures and current forecasts, and these leave out the Indonesian smelter project, which is being financed by cash from the bond offering we completed last year. For 2023, our current forecast comes to $3.5 billion. That's an increase over the earlier estimate of $3.4 billion, and for 2024 capital expenditures are presently expected to come in around $3.3 billion. The shift from our previous guidance mostly comes down to investments we plan at Bagdad to jump-start early works and preserve optionality for a potential future expansion. We classify the Bagdad investments as discretionary projects, and they don't lower the cash available for distribution under our payout policy, since they'll be funded by the remaining 50% of free cash flow that we retain for growth projects. Slide 14 has some excellent photos of construction at our new smelter in Indonesia; this is a significant undertaking for the company. It's an impressive sight, and it will operate at a world-class scale. Once complete, it will be the largest single-line flash copper smelting facility anywhere in the world, and work is moving ahead quickly; commissioning is expected in 2024. The project also involves a precious metals processing facility and an expansion of the existing smelter nearby, and it will be consistent with Indonesia's downstream policy and allow PTFI to process all of its concentrates inside the country. To wrap up on slide 15, here's a summary of our financial policy, built on three priorities, with a strong balance sheet as the cornerstone, and we've delivered on that. Both our balance sheet and our liquidity are strong, giving us considerable financial flexibility going forward. We are carrying out the performance-based payout policy, under which 50% of our free cash flow goes to shareholder returns through dividends and share purchases, with the remainder available for investment in our projects. A base dividend plus a variable dividend will keep being paid at a combined annual rate of $0.60 per share. Since we began the performance-based payout policy in 2021, roughly 60% of our free cash flow has been returned to shareholders, and along the way it further strengthened our balance sheet, giving us capacity to fund new projects over time. No shares were bought in the first quarter, but we do have availability under our share purchase authorization to make purchases under the policy; our outlook is positive for substantial free cash flow generation in the future, subject to prices and other factors. Balance sheet strength, allocating cash flow to a mix of shareholder returns, and organic growth — these three priorities, we believe, will enhance long-term value for the benefit of our shareholders. Our global team is energized. We're motivated to keep building value in our business, and we're executing our plans responsibly, safely, and efficiently. Thanks for your attention, we'll now take your questions.

Christopher LaFemina

analyst
#6

Hello, and thanks to our operator. Kathleen and Richard, I appreciate you both fielding my question. In fact, I've got several queries, but I'll pose just this one for now and then rejoin the queue afterward. Clearly, there's a great deal of merger and acquisition activity taking place across the mining sector right now, and copper appears to be a primary area of interest. From what I recall, Richard has previously mentioned evaluating M&A possibilities, though plainly your company hasn't pursued much along those lines lately. So I'm curious about your broader approach to M&A. Are there particular jurisdictions you would target? Does having operational synergies matter to you? What kinds of essential criteria might you weigh, or is it simply a matter of waiting for the right opening? And then, second, given the broader wave of consolidation across the industry, is M&A becoming more and more something you're watching closely? Thanks very much.

Richard Adkerson

executive
#7

Appreciate that, Chris. As you're well aware, I've long predicted that consolidation was bound to reach our sector; it can't be avoided given how difficult it is to get projects off the ground; the problem isn't merely pricing, it's genuinely about whether companies can find actionable projects worth pursuing. Within our industry, diversified firms have placed copper at the very top of their strategic priorities for quite some time; what stands out is how broadly unsuccessful efforts to build new projects have been. Naturally, a handful have succeeded. When you put all of that together, it explains, you know, the M&A activity we're witnessing at present; as for us, growing via M&A isn't part of our strategy. Our attention stays on that extensive reserve and resource inventory Kathleen walked through. That said, it doesn't mean we'd pass up chances should they present themselves. We aren't carving out specific regions or setting any other parameters. The only scenario in which we'd act is if it were plainly value-enhancing for our shareholders; we aren't out hunting for deals to make, but given how much progress our company has achieved in bolstering the balance sheet, finishing the major underground conversion at Grasberg, and moving forward on every front, you know, we'd be ready should an opportunity come along; only under those circumstances.

Christopher LaFemina

analyst
#8

Thanks.

Emily Chieng

analyst
#9

Morning, Richard and Kathleen. I'd like to follow up on the leaching technology that came up earlier, and really focus on that figure of 600 million pounds — the step change in leaching volumes. As I understand it, the third-party catalytic leaching technology has already been put to use at El Abra and Bagdad. Of that 600 million pounds, how much is accounted for by those two? Could you also walk through the timeline for reaching that number, and does strong success there potentially mean the El Abra expansion — the mill expansion — gets deferred even further?

Kathleen Quirk

executive
#10

Emily, Kathleen here. I'll pass this to Cory Stevens, since he's the one heading up these efforts. On that extra 600 million pounds: some of it may be achieved via those additives, though we should keep in mind that the additives we're working on involve both in-house development and outside partners. At Bagdad, we're running a trial with Jetti using a fairly small stockpile, and at El Abra we've launched some new Jetti initiatives. Most of what we're describing consists of projects we can carry out ourselves. There's certainly plenty of innovation and technology in the mix, but it isn't rocket science. What we're seeing from our current sensing and data capabilities is essentially a map of where problems exist. So, for instance, at what point is the remedy failing to reach the stockpile? Or where is the stockpile failing to supply oxygen to it? These kinds of things can contribute. As soon as the issue has been pinpointed, we in this industry are able to devise a fix. Because our stockpiles at Freeport are so enormous, that's the reason such a significant chance exists for us here. The majority of what we're discussing—the chance we're discussing—is mostly located at Morenci. Morenci, you see, when you examine our 38 billion pounds and then examine what share Morenci represents, that's where most of the chance lies. Suppose this pans out — maybe at El Abra, though that's still uncertain — it could end up going head-to-head with conventional mill technology. Right now we're evaluating what third parties can currently offer, yet our own push and goal is to crack this ourselves, since that's how Freeport gets the biggest possible yields. Cory, anything you'd like to tack on there?

Cory Stevens

executive
#11

Well, Kathleen, you put that nicely. On the R&D side, we've been following certain in-house leads that appear quite promising. During Q1, we managed to pair our efforts with AI and machine learning — similar to what Big Pharma relies on when creating new products — and that's pushing us to broaden both the breadth and scope of the candidates we're seeking for implementation. At the same time, we're actually adding more capabilities for rapid testing, mid-scale testing, and field testing at scale. That's the part that excites us most: combining that with some of the temperature activities, we can see our confidence building there.

Emily Chieng

analyst
#12

Wonderful. That is really useful. Thanks.

Carlos de Alba

analyst
#13

Yes. Thanks a lot. Morning, everybody. Turning to Indonesia. Could you possibly provide an update regarding the discussions around securing the export license, the renewal of that license in June? And as well, any talks you might have held with the government and your local partner about extending the contract past 2041 in advance? Thanks.

Richard Adkerson

executive
#14

Yes, thank you, Carlos; it's, every one of these matters is occurring simultaneously. To have the contract extension approved, and there is broad backing for it inside the government, calls for certain procedural steps to handle current government regulations and then to modify the IUPK that was granted to us in December of 2018; that would be a relatively straightforward process. So we're genuinely encouraged by it. It's the June date, it relates to this wider matter the country is pursuing with downstreaming for minerals generally. That's the reason it was there. We don't expect that to be something that would restrict our capacity to keep operating past June. Anything else, Carlos, to be specific about it? It, you know.

Kathleen Quirk

executive
#15

Right, let me just clarify something. Our IUPK, the one Richard mentioned that we signed in 2018, permits us to keep exporting until December 2023, which was the date envisioned at the time. It includes force majeure clauses, and the holdups we've had tied to COVID and supply chains clearly fall under force majeure. So under our IUPK we're allowed to do it, but we still need approval from the government, which introduced a regulation after the IUPK was signed to limit exports across a broad range; it isn't specified which minerals they're targeting, but we're engaging with the government. We're keeping them updated, and they're touring our copper smelter site. They're quite impressed by how much progress we've made. Sadly, it won't be done. Construction will be substantially complete by the end of this year, yet it won't be fully finished, so we'll require the ability to keep exporting. Crucially, given the alignment we now have with government ownership, continued exports matter greatly for government revenues too; we're going to keep pushing on it. We don't have the extension past June yet, but we do expect to secure it.

Richard Adkerson

executive
#16

Correct, Kathleen is right about those legal rights we have on record. What I want to stress is that our approach with the government is a cooperative one, and we aren't merely asserting our legal rights — the response we're receiving has been good.

Carlos de Alba

analyst
#17

Right. Okay. Only one thing I want to clear up. When it comes to extending past 2041, or the agreement running beyond 2041, does that need lawmakers to sign off, or can it be handled purely as an executive call, obviously alongside the ministries and so on?

Richard Adkerson

executive
#18

How to put it in writing is really up to the government. It's possible to move ahead with this without going through the formal route of passing new legislation. Right now we gain from having solid backing inside Indonesia's Parliament, and its members come see our operations. The parliamentary committee that keeps an eye on mining traveled to the US and paid us a visit here. I'd like to stress that the entire mood has shifted. The president, as you know, came to our operations in late August, early September, and it was extremely positive. His visits rank among the high points of my time working in Indonesia, and we're using that as a foundation to figure out the proper path ahead and do it in a manner where everyone comes out ahead. The government would come out ahead, the nearby community, the employees, the companies that supply us. That's the spirit in which we're cooperating to determine how to move forward; no one gains anything if we end up with some sort of hard cutoff for operations there. It's genuinely difficult to picture. That 2041 date came from our original 1991 contract of work, and it was preserved in the 2018 IUPK. To date, we haven't carried out major delineation drilling to determine how far the resource reaches past what's needed to fill out the production profile through 2041. While doing so, we've already identified a very sizable resource past that point. I'm genuinely thrilled about the chance to get in there and drill to find out — you know, across the 30-plus year history of Grasberg, it has always grown larger as time passed. I'm certain that with additional drilling, it will keep expanding and get bigger, simply due to the character of the ore system there and the grades we can access. It's truly thrilling. Getting the extension approved is what we aim to accomplish with the government, and after that, launch an active delineation program. Our reserves are only reported through 2041, and this would let us build reserves past that point and to develop and to devise plans for bringing those reserves into production for future growth; as a foundation for our company's future, you know, it's simply a fantastic long-term asset.

Carlos de Alba

analyst
#19

Alright, thanks a lot, Richard and Kathleen.

Richard Adkerson

executive
#20

Fine. Appreciate your question.

Brian MacArthur

analyst
#21

Morning, everyone. I’d like to dig a bit deeper into what’s happening with leaching, and I appreciate the thorough explanation. Let me make sure I have this right. I believe you mentioned that the majority of this was internal, meaning Jetti isn’t involved. You noted that most of it relates to Morenci. Morenci accounts for roughly 50% of the stockpiles, but there’s plenty of other North American material as well. Is there a tankhouse problem, or is that $800 million limited going forward by something else, or could it end up larger if you’re able to do work at Bagdad and Sierrita and other locations?

Kathleen Quirk

executive
#22

Brian, throughout our operations we have roughly 1 billion pounds per year of untapped tankhouse capability, and it's located in various spots. What makes this so appealing is that these projects genuinely don't require much additional capital. If you look back decades at historical leach output, it has fallen off gradually; we're simply seeing a revival of what it used to be. Fresh information we now have, which reveals what's happening inside the stockpiles, is giving us a guide to, you know, bring about a rebirth of the leach production from before. Should it become necessary, we could put money into building new tankhouse capacity, but the easy wins come from the untapped tankhouse capability we already have at a number of these sites. We're genuinely tackling this throughout the whole footprint, but the biggest effect so far has been at Morenci. That's probably going to be the majority of where we, where we gain extra pounds. We've got, you know, we've got chances all over the footprint; we also have inactive operations and active leach stockpiles to consider down the road. The first, simplest wins and the greatest value lie in locations where leaching is already underway.

Richard Adkerson

executive
#23

Right. Today Morenci stands as the biggest leaching site anywhere in the world, and decades back, a great deal of the leaching methods we use now were first created there. I only wish there were a solid way for me to share how thrilled our people are to be doing this work; watching it is genuinely enjoyable. Leaching is happening at every one of our sites, at every one of our sites, and we will keep leaching until nothing is left. The advantages include, well, you know, no permits are required for this type of activity. There is, you know, extremely minimal capital involved. Should tankhouse capital be needed, it does not amount to much within the larger scheme. The weather, the carbon, the emissions are... In every way this is a winner, which explains why we are collaborating with other businesses and with Jetti while also concentrating on whatever we can accomplish independently. Since doing it independently means our shareholders get all of the financial upside. This is a deal with many sides to it. As I mentioned, it is genuinely a great deal of fun. It has brought a degree of excitement into our entire company that is truly wonderful to witness.

Brian MacArthur

analyst
#24

I realize I may be going too far with this, but on a similar note, you also mention asset efficiency for North American staffing at 200 million pounds. None of that connects to any of the above. It stands on its own. What exactly does that piece of the equation represent?

Richard Adkerson

executive
#25

Okay, so this isn't something that only affects mining. For sure, it's not holding us back when it comes to pushing forward with leaching. When I speak with other chief executives in the Business Roundtable, it's a problem that people are dealing with everywhere. Part of it came from COVID, along with how folks are thinking about their lives and the way they work going forward. It's a genuine problem for us, and we're going after it by hiring people hard, but it's also pushing us to explore what technology can do to reduce how labor-intensive our operations are. It's a genuine problem in the U.S., not in Peru, Chile, or Indonesia, but it's a big deal in the U.S.

Kathleen Quirk

executive
#26

Brian, it's basically getting our mining rates up.

Brian MacArthur

analyst
#27

Okay.

Kathleen Quirk

executive
#28

Plus, bringing our plant and processing operations up to the reliability levels we've seen before. Certain experience levels have affected us, for the reasons Richard just mentioned. These are self-help items, and we already have efforts in motion to address them, along with a game plan for how we're tackling it. It's an opportunity we don't need a major project to capture. Once again, the leach initiative — the initial leach initiative — and this self-help work we're doing rank among the highest value opportunities we have near term.

Brian MacArthur

analyst
#29

Okay. That 1 billion pounds, I suppose, puts it on par with ranking among the largest, among the top five copper mines globally.

Kathleen Quirk

executive
#30

Yep.

Brian MacArthur

analyst
#31

Great. Thank you very much.

Timna Tanners

analyst
#32

Yeah. Hey, good morning.

Kathleen Quirk

executive
#33

Good morning, Timna.

Timna Tanners

analyst
#34

Thanks. I’d like to go to slide five and, in a way, the rhythm you outlined, and sort of get a sense of where the path goes from here. From what we hear, it seems the situation in Peru has gotten much better. Is that completely in the past, and should we count on this run rate from now on? I realize you mentioned labor problems will persist, but my assumption is that with weather, well, we won’t be projecting any disruptions there. I just hoped to hear a bit more regarding the cadence you would anticipate across the regions, plus any cost effects that could still be hanging around. Thanks.

Richard Adkerson

executive
#35

Okay, Kathleen, let me begin with a few words on Peru. Different regions across that nation face separate problems. Our facility sits right near the edge of Arequipa city, within the Arequipa region. Protests did occur in that place, yet they were smaller in scale than demonstrations elsewhere; for a stretch of time we experienced certain interruptions to worker travel and to supplies, and conditions in our area have gotten better. Nationwide, those underlying matters stay unresolved and continue to pose a risk. When examining this trajectory question, I believe one ought to review each region separately and consider its particular situation, rather than concluding that the gains we achieved automatically extend to a comparable degree elsewhere. This is a complex matter; the entire business is complex.

Kathleen Quirk

executive
#36

It-

Richard Adkerson

executive
#37

Peru is very complicated.

Kathleen Quirk

executive
#38

Timna, if you turn to slide 26, you'll find the sales volumes we expect by quarter for the rest of the year.

Richard Adkerson

executive
#39

Mm-hmm.

Kathleen Quirk

executive
#40

During Q1, those interruptions took a toll. Beyond that, Indonesia's shift to tolling played a part, something we had, you know, anticipated as we entered the quarter. You're able to see the run rate we're aiming for across the rest of this year. And you're able to see, you know, an extremely powerful bounce back from Q1 through the remainder of 2023.

Timna Tanners

analyst
#41

Appreciate it. Regarding what I asked about costs as the second half of my question — is that also largely behind most of the group, apart from the labor problems?

Kathleen Quirk

executive
#42

During Q1, we recorded $1.76, while our forecast for the full year averages out to $1.55. Unit costs over the remaining quarters are going to come in below what we saw during Q1. We mentioned how certain inflationary pressures would cool off compared with last year — mostly that's energy. As you recall, energy jumped sharply beginning roughly a year ago at this point. Certain other input expenses got worse because of the Russia-Ukraine conflict. A number of those have come down and softened, which helps. Labor remains a factor, along with the services we've got under contract, plus certain components and equipment parts — all of that is still with us in 2023. So we've got a mix of relief on some fronts and elevated costs on others; none of those costs run above what we projected at the start of this year, though they're still up compared with last year.

Timna Tanners

analyst
#43

Understood, thanks.

John Tumazos

analyst
#44

I appreciate you fielding my question. Might you shed some light on why spot moly climbed to $38 during February — was there a particular supply crunch? Likely certain high purity buyers needed to secure quality moly. I saw that the Spence concentrator started reporting moly production to Cochilco for January, and presumably Quebrada Blanca will kick off in April and May. Your company wasn't behind that added supply, yet perhaps you can offer perspective on where else output may have come back once the price had doubled. Thank you.

Kathleen Quirk

executive
#45

John, I’ll make a few remarks, and then Mike Kendrick can chime in. In part, what took place during the first quarter involved a number of the same moly supply problems that affected copper. Conditions in South America—especially Peru—certainly had an effect on availability. Meanwhile, we were observing fairly robust expansion and demand. The first quarter was extremely tight, and a portion of that pressure eased in Peru once operations began moving back toward a more typical footing; looking ahead, we, you know, keep seeing positive demand drivers for moly, while the supply side, which will behave much like copper, faces the simple difficulty of adding new supply. Often, as you’re aware, at a copper mine with byproduct moly, when operating constraints create trouble, you know, copper becomes what everyone strives to maximize, and in those situations moly may not be maximized; I think that was the primary development on the moly supply side. Mike, I don’t know whether you want to add. There are additional points we ought to include.

Mike Kendrick

executive
#46

No, I think you did a great job describing it, Kathleen. What I'd say is that this really brings home just how constrained the physical marketplace for Moly happens to be. Because of that, you don't get any cushioning at all when a need for demand shows up in a particular week and there isn't any supply on hand. You're able to observe sharp climbs along with sharp drops throughout the whole system. Regarding what you asked about quality, we happen to be a sizable participant in that segment, and that business of ours is carried out under contract. The bulk of our higher-grade material gets allocated, 100% of the time, to those products.

John Tumazos

analyst
#47

Thank you.

Kathleen Quirk

executive
#48

Thanks, John.

Michael Dudas

analyst
#49

Good morning, Richard and Kathleen.

Kathleen Quirk

executive
#50

Good morning.

Michael Dudas

analyst
#51

Like you mentioned during your prepared comments, you noted that CRU saw the market dealing with surpluses, more balanced than it might appear. What else are you seeing discussed? The reality that this consolidation could pull attention away from, you know, growth capital toward positive capital. Given those dynamics as you navigate them across the coming 12, 18 months, how much risk do you see a year out that the market faces upside or downside risk on supply?

Richard Adkerson

executive
#52

You were cutting out somewhat, but your question concerned the supply side risk assessment, correct?

Michael Dudas

analyst
#53

Yes. Yes.

Richard Adkerson

executive
#54

When you look back a number of years, at the time the projects that are currently starting up were initially made public, people expected huge oversupplies during this calendar year and calendar year 2024, 2025. Those projects, as you're aware, were pushed back for a variety of reasons. COVID came along, and this year the market is essentially balanced, so we aren't seeing that big surplus condition. If you look ahead to 2024, possible surpluses exist. Beyond that, no meaningful new projects are beginning operations. My view is that supply-side risk leans much more toward the downside. As you know, we've observed that troubles with hitting production targets have grown for a range of reasons. The situation in Peru and operational problems such as the ones we experienced in Indonesia happened elsewhere too. I believe that when you examine the long-term record, supply projections, those projections typically come in above what actually occurs once real-world experience plays out. That, I think, is the point we've reached now: we have this leaking project, which provides us with some upside. On the whole, I believe the risk leans more toward the downside.

Michael Dudas

analyst
#55

Thank you, Richard.

Richard Adkerson

executive
#56

Thank you, Michael. Appreciate it.

Matthew Murphy

analyst
#57

Hi. I've got a question regarding the cash flow statement. Distributions for non-controlling interest came in at zero for this quarter, which I suppose has occurred a handful of times before, but what's behind that? In this instance, should we be thinking there will be some amount made up afterward during the year?

Kathleen Quirk

executive
#58

During Q1, we incurred, as you're aware, a fair amount of taxes. That had been anticipated. We paid sizable taxes in Q1 tied to the earlier year's period. No distributions occurred in Q1 since that money went toward covering those costs; we anticipate seeing that line item rise over the course of the year; we're producing substantial free cash flow at PT-FI along with Cerro Verde, and those monies are going to be paid out. When you think about it, as you know, we give some guidance regarding how non-controlling interest affects our net income. The projections for cash flow resemble that, perhaps somewhat below the earnings effect, yet roughly in that vicinity.

Matthew Murphy

analyst
#59

Okay; that's great. Thanks.

Kathleen Quirk

executive
#60

Morning, Orest.

Lawson Winder

analyst
#61

Thanks, operator. Morning, Kathleen and Richard. Great to hear your voices. I appreciate you making room for my question. I wanted to ask about Chile, since there have been a few encouraging signs there. Has the situation now shifted in a better direction, to the point where El Abra could become a more attractive candidate for an expansion? And could you also give us your thoughts on what the regulatory landscape for mining there might look like going forward? Many thanks.

Richard Adkerson

executive
#62

Well, Lawson, things remain unclear. Although certain encouraging signs, from where we sit, have emerged since this process got underway, we still don't know how it will conclude. Yes, there are fiscal matters tied to royalties and taxes. Regulatory matters also exist around water usage and other environmental impacts. On a broader view, you know, conditions are improved compared with before, but meaningful uncertainties persist that we, along with other miners, will, you know, have to watch and see how they resolve.

Kathleen Quirk

executive
#63

At this point, we're taking certain steps to preserve flexibility. We have plans for some desalination investments, and those will help us not just with the chance to lengthen the life of current operations, but additionally provide us with some capability for the possible mill project. As was mentioned before, we're doing work related to leaching, and that might keep shifting what we expect regarding how the new expansion project gets designed. We're leaving choices on the table. We're pursuing certain improvements to boost that flexibility. El Abra is a really robust project. Right now we're updating our capital cost figures so they match the present conditions, yet El Abra holds an enormous resource. We're discussing, you know, the possibility of raising output at that site. You saw those figures in the press release, I mean, in the slide presentation we gave. That project is probably one that will be completed. The issue isn't whether, it's when, and we're, you know, trying to keep the analysis current so that, and push ahead with a few of these initiatives to get ourselves ready to act faster once we reach the decision.

Lawson Winder

analyst
#64

I appreciate it, both of you.

Bendik Folden Nyttingnes

analyst
#65

If we see demand possibly doubling over a span of 12 to 15 years, how do you feel about picking up one of those big-scale assets in certain parts of the globe that haven't been explored as much, and advancing it as a greenfield development? Is that on your radar in any way, or would you prefer to direct your capabilities and financial capacity toward the organic growth pipeline along with possible industry consolidation?

Kathleen Quirk

executive
#66

Richard, I'll handle that question. Our attention is squarely on the opportunities we can develop ourselves. Looking at the assets we hold, we're quite lucky to have internal growth potential that not everyone in this sector enjoys. Through the years, as we've examined greenfield prospects, you haven't witnessed many big greenfield wins. That kind of success is uncommon. We're not claiming it's impossible. We continue watching closely what greenfield availability looks like, but our priority sits with brownfield possibilities, including the leach opportunities we discussed. As someone pointed out earlier, this could become a major top mine if that leach opportunity becomes a reality. We lean toward the lower-risk, higher-certainty brownfield projects, while we keep monitoring what greenfield options exist. A modest amount goes toward greenfield exploration, yet given our pipeline and asset profile, brownfield remains where our attention lies.

Christopher LaFemina

analyst
#67

Hello, and thanks to the operator. Kathleen, you brought up once more that the higher CapEx guidance is mostly tied to initial spending at Bagdad for upcoming expansions.

Kathleen Quirk

executive
#68

Correct.

Christopher LaFemina

analyst
#69

I recall that during October, Richard mentioned growth spending had been paused, given that the macroeconomic conditions clearly weren't great. So I'd like to know whether Freeport's perspective on things has shifted at all across the past 6 months. Does it come down simply to China reopening? Is it tied to supply problems deteriorating, or is there really no shift at all, and this was simply the expected trajectory for these projects? Thanks.

Kathleen Quirk

executive
#70

There hasn't been any meaningful shift. This truly comes down to optionality. Much of the early works effort we're engaged in concerns tailings infrastructure that we'd need to undertake regardless a number of years down the road, yet we'd need to undertake it regardless to back Bagdad's life of mine plans. What this does is pull some of that work ahead, so should we choose to proceed with Bagdad, we'll be positioned better to deliver it faster. Nothing changes there. We continue to face Bagdad's difficulties, not merely economic uncertainty, but also the difficulties around housing and staffing for the project. With this project, speeding up the tailings infrastructure will provide us with choices going forward. That's genuinely the whole point of this for us — preserving optionality inside our portfolio so we can. None of this occurs overnight, but potentially proceed at a quicker pace. When I say quicker pace.

Christopher LaFemina

analyst
#71

Has there been a shift in how you think about copper?

Richard Adkerson

executive
#72

That said, and while not discounting the volatility present in the world right now, my take is that for our sector, conditions in the economy have gotten better compared with, you know, the middle of last year. You know, through all of this, copper demand from China during the year's second half remained robust. My understanding is that it was the most powerful second half they have ever seen. You know, we take encouragement from 2023's GDP expansion; we hear the remarks that consumers are powering it and that problems persist. Inflation has gotten better. So in my view, the broader landscape has gotten better over the last few months. As Kathleen mentioned, that isn't genuinely what shapes our choices. You know, the Bagdad project is up against labor problems, housing problems. Chile is held back by ongoing political uncertainties. We think the world will require every one of these projects. They will deliver strong profits for our shareholders, and so we are putting money into them and making plans for them and expecting that a time will arrive when we carry them out.

Christopher LaFemina

analyst
#73

Great. Thank you. That's very helpful.

John Tumazos

analyst
#74

Thank you. Turning to slide 14, which features the desalination facility, might you provide some context regarding it? Clearly, rainfall is abundant in Indonesia. What was the reason fresh water sources proved insufficient? Would it have been possible to rely on salt water for cooling purposes? My assumption is that the majority of the water serves cooling needs at the large smelter. Alternatively, is this somewhat of a community relations matter, aimed at avoiding the use of local water resources?

Kathleen Quirk

executive
#75

John, we went through quite a few alternatives; water isn't the issue here, and when you consider what the project needs in capital, it's a small piece. Our conclusion was that this route gives the project dependable water. Cory, if there's anything you'd like to add, go ahead, but that's how we reasoned it through. Still, we examined several possibilities for water and worked out the whole configuration.

Cory Stevens

executive
#76

Right. So we really dug into the possibilities around fresh water. Any choice we make regarding water involves gazing 20, 30 years ahead — weighing what social consequences might arise, what tomorrow's needs will look like, and how replenishable those supplies truly are — and after all that, we determined desalination represented the optimal path. After that, once you weigh the differences in capital expense between, say, using salt water and going the desal route, this turned out to be the wisest option available to us.

John Tumazos

analyst
#77

Thanks.

Richard Adkerson

executive
#78

We're grateful that you joined us and for the attention you've shown. Should any additional questions come up, reach out to David Joint, and it would be our pleasure to answer them. We're eager to share updates down the road about how we're advancing.

Operator

operator
#79

Everyone, that brings today's session to a close. We appreciate your joining us. You're free to hang up at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Freeport-McMoRan Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Freeport-McMoRan Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Freeport-McMoRan Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.