Freeport-McMoRan Inc. (FCX) Earnings Call Transcript & Summary

July 20, 2023

New York Stock Exchange US Materials Metals and Mining earnings 58 min

Earnings Call Speaker Segments

Kathleen Quirk

executive
#1

Thanks, and hello everyone on this fine morning. It's great to have you join our conference call. We shared our operating and financial results for the second quarter of 2023 earlier today, and you can find both the press release and the slides on our site, fcx.com. This call is streaming live over the Internet right now, and anybody can tune in by going to our homepage and selecting the webcast link for this conference call. Analysts and investors are on the line, and members of the financial press were also invited to listen in today, with a webcast replay set to be posted on our site later today. Prior to making our remarks, I want to point out to all of you that the press release issued today, along with some of what we say on this call, contains forward-looking statements, and actual outcomes could differ materially. Please take a look at the cautionary language in our press release and presentation materials, as well as the risk factors outlined in our SEC filings. Joining me on this call are Richard Adkerson, Chairman of the Board and CEO; Maree Robertson, Chief Financial Officer; Josh Olmsted, who leads our Americas operations; Mark Johnson, who leads our Indonesian operations; Cory Stevens, who heads up our Engineering & Construction and Technical Services Group; Mike Kendrick, who leads our Molybdenum business; and Steve Higgins, our Chief Administrative Officer. We'll get the call started now. Richard will offer some opening remarks, after which I'll walk through the prepared materials and our slide materials, and then we'll open things up for your questions. So let me hand it over to Richard.

Richard Adkerson

executive
#2

Appreciate that, Kathleen. Morning to everyone, and thanks for being here. The solid second-quarter numbers and the forecast we're sharing today show that the way we've been running the business lines up with both our plans and the guidance we gave previously. Across Freeport's worldwide operations, our people are carrying out their work with concentration, energy, and passion — every one of them a trademark of the Freeport way. Conditions in the worldwide copper market stayed favorable even with the worries people keep voicing about a slowdown across the world economy plus troubles in China. Electrification keeps widening as alternative energy, EVs, connectivity, and the infrastructure backing them up keep moving forward. Copper stockpiles around the globe are still strikingly thin, which stands out given all the anxiety over the world economy and China. Right now, copper demand is running far ahead of what the headline economic figures suggest. Although market analysts hold widely divergent opinions regarding the near-term picture for the economy and for copper prices, an increasingly upbeat agreement is forming about the medium- and longer-term view, rooted in demand that's projected to climb more quickly than supply gets developed. In these conditions, Freeport sits in an exceptionally strong position: we have large-scale assets already in production, which we're concentrating on operating; the continuing strong results; and a promising pipeline for growth ahead coming from the big undeveloped reserves and resources that already sit within our existing asset base. Kathleen is going to walk through the quarter and our outlook now, and after that I'll return together with our team to take whatever questions you have.

Kathleen Quirk

executive
#3

Thanks, Richard. I'll begin on Slide 3, which lays out the main operating and financial highlights for Q2. Across the portfolio, production came in strong during the quarter, reaching close to 1.1 billion pounds of copper along with almost 500,000 ounces of gold. Copper sales landed roughly 3% under guidance because of administrative holdups in securing approval of PT-FI's export license. We anticipate PT-FI getting the green light to restart concentrate exports within the next several days. Unit net cash costs averaged $1.47 per pound for the quarter, slightly better than the $1.51 per pound we had guided. With realized copper prices averaging $3.84 per pound during the quarter, we delivered robust margins and EBITDA of $2.14 billion. Operating cash flows came to $1.7 billion, well above our mining capital expenditures of roughly $700 million, and that figure leaves out about $500 million of smelter capital in the quarter, which is being paid for with proceeds raised last year. The balance sheet, liquidity, and financial flexibility all remain in excellent condition. If you set aside net debt tied to the smelter, we closed the quarter with net debt below $1 billion. You'll note that during the quarter we finished some additional open market purchases of our public debt, buying at prices under par. Looking ahead, we're positioned well for solid results in the second half of the year, since second half copper volumes are projected to exceed the first half by more than 15%, while second half gold sales are projected to top what we sold in the first half of the year by more than 25%. Now I'll turn to Slide 4, which highlights a few operational achievements from the second quarter that make us especially proud. At Cerro Verde, where we run one of the world's largest concentrate sites, the mill averaged 425,000 tonnes of ore throughput per day in the quarter; this site was originally designed several years back for 360,000 tonnes per day. Over time, our team has discovered ways to boost efficiencies, and we'll keep doing so going forward. At Grasberg, mill rates averaged above 200,000 tonnes per day — 207,000 tonnes per day in the quarter — and that involved processing very high grades of both copper and gold ore, significantly above the first quarter level and in fact the highest average quarterly throughput in more than a decade. All of this ore now comes from our large-scale, modern, and efficient underground mines. Notably, the large-scale operation at Grasberg generated copper during the quarter at a net cash credit of $0.09 per pound — truly extraordinary performance. We're making steady headway on the smelter in Indonesia. This is a key initiative, and we're now at 75%, up from 60% progress 3 months ago. Things are moving along nicely on the execution side of our project, and over the coming months our team will stay sharply focused on wrapping it up efficiently. Construction should be finished in Q2 of 2024, in our view, with commissioning and ramp-up taking place across the remainder of that year. On top of that, we're pleased to share that our Leach initiative keeps making headway, and it's delivering particular benefits at our U.S. operations. This effort produced an extra 29 million pounds of copper during Q2 — more than double what we saw in the same quarter a year earlier. At that level, we've reached roughly 60% of the annual run rate we're aiming for, and we're firmly on track to hit our goal of about 200 million pounds of incremental copper each year from this initiative. There's more we'll say on that later in the presentation. Still, our confidence keeps building — both in reaching the initial target and in the substantial upside this highly valuable initiative offers. If you'll turn to Slide 5, you've likely come across plenty of press coverage in recent weeks regarding the regulatory picture in Indonesia, and we want to give you an update on the regulatory changes that country has recently made. As a lot of you are aware, Indonesia places great emphasis on downstream resource development — something that's been developing over many years — and that mirrors the nation's strategic priorities. The way this unfolded eventually brought us to our 2018 agreement to grow our domestic smelting and refining capacity there. Then in 2020, Indonesia enacted a law limiting exports of certain minerals — not all of them were spelled out — starting in June 2023. Thanks to our IUPK license and rights, along with the headway made on the smelter, we keep working with the government so that we get enough time to finish our projects, which the pandemic set back. As we noted, those projects are far along and close to being done, and it was truly an honor in June to welcome Indonesia's President, Joko Widodo, to our smelter site. Starting in June and July of this year, a number of ministries wrapped up the regulatory process that permits continued exports of copper concentrates through May 2024 for exporters whose smelter progress exceeds 50% — and ours is above 70%. Last week, the Trade Ministry brought in legislation allowing those exports. At this point it's just the administrative side, and we anticipate formal approval to restart exports within the next several days. We'll keep cooperating with the government so exports can go on in 2024 until the new smelter has fully ramped up and is running. Also last week, the Ministry of Finance adopted regulations raising duties on exports of assorted products, copper concentrates among them. For companies whose progress tops 70%, the new duty rate stands at 7.5% for the second half of this year. Our IUPK, which locks in stable terms for taxes, royalties and duties, provides that duties phase out once progress passes 50%. As such, we're reviewing the IUPK provisions with the Ministry right now and are in discussions about the matter. Up to now, the effect of shipping delays on what we do has been small, and really it comes down to timing between when we produce and when we sell. Right now, a substantial amount of copper concentrate sits at our port site, prepared for shipment, and over the coming months we anticipate drawing those inventories down. Turning to copper markets on Slide 6, which Richard mentioned in his remarks. When it comes to electrification, copper is the metal, and Freeport is extremely well positioned as a leader in the worldwide copper industry. Near-term market conditions feature, on one side, helpful demand drivers from rising intensity in autos, renewables and data centers, partly balanced by slower manufacturing growth. China is still the globe's biggest copper consumer, and despite the nation's present economic difficulties and softness in the property sector, copper consumption keeps rising, supported by major investments in copper-intensive electrical grid and robust growth in electric vehicle production. Richard brought up the inventories, which sit at very low levels compared with historical norms. They are now below where they stood when this year began, and we view that as proof of a market that is tightly balanced.

Kathleen Quirk

executive
#4

Looking ahead across the coming years, we anticipate demand will pick up speed, with outside forecasts pointing to a doubling of demand by 2035. Spending on low carbon renewable power and electrification is going to drive enormous demand growth. Beyond that, programs many nations have launched for big infrastructure projects, plus copper's role in connectivity, data, and AI, are additional demand drivers that are expanding too. Meanwhile, the copper industry's capacity to satisfy this growing demand poses a significant challenge, and we're working extremely hard to boost our supply going forward. In our view, prices will have to climb in order to encourage fresh copper supply. Here at Freeport, we gain from a sizable reserve base and an even bigger resource base, which lets us expand our business down the road. As I noted, we're strongly focused on keeping up support for rising demand, producing in a responsible way, and we're carrying out a number of initiatives to lift our output in the future. Turning to Slide 7. We're giving you an update on our sales volumes outlook covering 3 years. It's mostly the same as what we forecast before. For 2023, we trimmed copper sales volumes by roughly 40 million pounds, around 1%, to reflect shipping schedules over the rest of the year. Guidance for 2024 and 2025 stands unchanged; and we do — we're concentrating on sustained progress in our leach programs, which we think could deliver some upside to those estimates. Now to the regional details on Slide 8; we present our projected 2023 volumes and unit net cash costs broken out by region. Our operations in the Americas, covering the U.S. and South America, make up roughly 2/3 of our 2023 copper sales along with all of our molybdenum sales; while Indonesia accounts for about 1/3 of copper sales and all of our gold sales. On a consolidated basis from a cost perspective, our unit net cash cost projection of $1.55 per pound for 2023 matches our earlier estimate. We've seen a few minor offsetting shifts among the regions. But overall, we continue to expect cash cost of $1.55 for the year. As the year progresses, we keep seeing better cost trends for a number of our commodity-based input costs, and labor, services and equipment component costs appear more stable. We stay committed to cost management and every one of our ongoing efforts to raise productivity so we can offset the cost increases we've dealt with in recent years. The estimates shown on Slide 8 presume that Indonesia's export duties stay the same as our current duties. As I said earlier, the new regulations brought in higher duties than the stabilized rates we have under the IUPK, and we're in discussions with the government to review this. On this page, we've laid out a few sensitivities related to what steeper duty rates could do. At the bottom, you'll notice that for the full year, this works out to a $0.07 per pound effect on consolidated unit net cash cost, and that figure accounts for Indonesia, where the impact comes to $0.19 per pound for the year, with the duty kicking in during the second half. Moving to Slide 9, we've refreshed our guidance on margins and cash flows. When we combine our expected volumes with our cost forecasts, we lay out modeled outcomes for EBITDA and cash flow across a range of copper prices, from $4 up to $5. The numbers shown on that slide are modeled using the midpoint of our 2024 and 2025 volume and cost estimates, and in these scenarios we keep gold steady at $1,950 per ounce and molybdenum steady at $20 per pound; right now, both of those commodities are trading a bit above those levels. Under these assumptions, annual EBITDA would land somewhere between roughly $11 billion per annum and $15 billion per annum when copper is at $5. The $11 billion figure corresponds to $4. As for operating cash flows before working capital, those would come in between just under $8 billion per year with copper at $4 and $11 billion per year with copper at $5. On the right side of the chart, we've included sensitivities for the different commodities — both the ones we sell and our input costs. Thanks to our long life reserves and large-scale production, we're in a strong position to capitalize on future trends of metals-intensive growth, and going forward we see opportunities to grow cash returns within our performance-based financial policy payout framework. Next, let's move to capital expenditures on Slide 10, where our current forecast for 2023 and 2024 is shown. This covers the capital we're putting into the Indonesian smelter project, and those amounts are being financed through a debt offering from last year, plus we have cash on the balance sheet and available capacity to back those investments — you can find the breakdown of those expenditures on Page 25 of the slide deck. Overall, though, when it comes to the investments not tied to the smelter, we've made some timing adjustments that shift certain spending from '23 into '24. Even so, the current forecast across the 2 years is fairly close to what we previously had. For that 2-year span, it's roughly 3% higher, which mirrors some revised estimates mainly tied to projects at Grasberg. On this slide, we've called out discretionary projects, which are the ones funded by 50% of available cash that isn't distributed. Across '23 and '24, those add up to $2 billion, and they're value-enhancing initiatives — Slide 24 in our reference material has more detail — but these are value-enhancing initiatives meant to strengthen our position going forward. On Slide 11, we'll discuss development options and our growth. As we've mentioned, our primary focus is on the demand growth outlook for copper and on our brownfield approach, in light of how risky and difficult greenfield projects can be. Our plan involves advancing the resources already in our portfolio; we're concentrating on expanding what we already operate and on the wide range of brownfield possibilities we hold. On Slide 11, we've broken the growth down into categories. These are near-term, medium-term, and longer-term development operation options, and as you can see, for the near term, the strongest growth options available to us involve hitting our initial leach targets and taking the steps we have in place, especially at our U.S. operations, to boost productivity and reliability. By raising our mining rates in the U.S. through adding workers, automation, and reaching higher goals for asset efficiency and reliability in our equipment and processing facilities, we think we can add 200 million pounds of copper a year with very limited capital investment. We're paying close attention to the specifics of the reliability and asset efficiency we're going after and see that potential going forward. We also laid out the potential of our leach opportunity beyond the initial target of 200 million pounds per annum. We discussed this at length on our last call. We have very large areas under leach; we have new approaches and operating practices that we are deploying on this effort. And the more we work on it, the more optimistic we are about this opportunity, is much larger than the initial 200 million pounds.

Kathleen Quirk

executive
#5

We still see a clear chance to grow that initial 200 million pounds of copper a year up to 800 million pounds a year across the coming 3 to 5 years. Our efforts go on to bring more heat to the stockpiles. Our efforts go on to sharpen how we spot and apply solution to parts of the stockpiles that are not receiving enough solution, and our efforts go on regarding additives via in-house testing along with examining technology other parties hold when it comes to additives. This is a huge value chance, a huge catalyst for us, and among the industry Freeport stands as one of the best-positioned firms to seize value from it. That comes from our sizable stockpiles already in place, holding billions of pounds of copper, our technical expertise, and how fast our team can spread what it learns throughout the portfolio thanks to operational control over every mine where we hold an interest. Beyond the leach chance, we have more conventional growth sources that we are chasing. We keep assessing an expansion at our Bagdad mine in Arizona. Feasibility studies for that expansion are being finished. We have the sizable El Abra chance in Chile, where an operation already exists plus very large reserves and resources that back expansion later on. And naturally, we are developing and advancing the 90,000 tonne per day Kucing Liar Block Cave in Indonesia, which should start producing by the close of the decade. At Bagdad, we are putting in some investments to move tailings and other infrastructure forward so our optionality for the project improves. The same is happening at El Abra, where we are examining certain investments in water infrastructure that would not only serve the present operation but also give optionality for the big mill project down the road. Past those 2 projects, we hold a big chance in our Safford Lone Star District in Eastern Arizona; production is underway there and we have pinpointed a substantial resource that could turn that district into yet another cornerstone asset for Freeport as we head toward the 2030 timeframe. We also have a set of U.S. brownfield projects under review. A major chance for us sits in Indonesia, where extending our operating rights past 2041, which we keep pushing forward, would unlock the door to long-term, large-scale mining past 2041 plus possible reserve growth and further development options in one of the globe's biggest and highest grade copper and gold mining districts. With these projects, we can keep up our leadership role, supplying copper to a world whose needs keep rising. We will stay disciplined in how we go about it while concentrating on executing projects where shareholder value can be created. On the final slide, Slide 12, we restate the financial policy priorities; those really focus on our strong balance sheet, which we possess, our cash returns to shareholders and investments in our value-enhancing growth projects. The balance sheet is solid. Our credit metrics are extremely solid, and we have room to maneuver within our debt targets when it comes to carrying out projects. Meanwhile, since we launched this performance-based policy, we've returned more than $3 billion to shareholders via dividends and share buybacks, and we have an appealing long-term portfolio ahead that will let us direct a share of our cash flow toward creating long-term value for shareholders. Richard noted that the team is energized and motivated, and our focus remains on continuing to drive value in our business by executing these plans responsibly, safely and efficiently. Thank you for your attention and your participation, and operator, we'll now open the call for questions.

Alex Hacking

analyst
#6

So I suppose there's just one thing I want to ask. A press release came out this morning regarding a 72-hour strike at Cerro Verde. Could you give us some background on that, perhaps?

Richard Adkerson

executive
#7

Of course. Josh, you're on the call, why don't you take that one? I had just been at Cerro Verde, and honestly, I have to say the pride I felt in what that team has accomplished there was tremendous.

Josh Olmsted

executive
#8

We take real pride in having candid, continuous talks with every one of our team members and with the union. At Cerro Verde we have 2 unions, and this is among the original ones, making up about 28% of the people who work for us. There's simply been a continuing discussion, and we've kept that dialogue going. Tomorrow we have a meeting with the Labor Department, aiming to keep encouraging that conversation and head off a possible strike there. Still, we will keep holding those discussions, and we're pushing ahead, staying as open and transparent as possible with the union, to work through and resolve whatever issues come up.

Richard Adkerson

executive
#9

Our company and Cerro Verde have dealt with matters in Peru for many years. At times, strikes that have nothing to do with what we run affect us, among other things, yet our people are ready for that. We hope this situation reaches a resolution. Based on what I see, it isn't truly a big kind of problem. And if we do end up having to handle it, our team will find a way to get through.

Josh Olmsted

executive
#10

Yes.

Richard Adkerson

executive
#11

Okay. Thanks, Josh.

Christopher LaFemina

analyst
#12

Regarding what's happening in Indonesia, I've got a good number of things I'd like to ask, though for the moment I'll keep it to only 2. So, first off, as we understood it when July started, the areas used for storing concentrate were just about full, and without an export license coming soon, you'd probably be forced to halt operations. My question, initially, is whether operations at Grasberg have kept going, or whether the mines have been halted for the time being? Then my second question concerns the export — oh, you'd prefer to take that one first?

Richard Adkerson

executive
#13

Let's take your first question. Yes, we may as well handle that. A complication we faced here was that the domestic smelter located at Gresik, which PT Smelting owns and which no export matters touch, was in the middle of maintenance — a scheduled maintenance turnaround. As a result, the concentrate volume we could send within the country was limited; that work is now finished, and shipping back to Gresik has started; no shutdown has happened on our side. What our team did was adapt to circumstances by pulling forward certain maintenance work already planned for the year's second half. And even though the storage facilities were nearing their capacity, reaching their capacity, the effect on operations, while present, hasn't been major. We expect to restart exports in the very near future; and a substantial amount of concentrate has been generated at its own site, is sitting ready for sale, and we will be taking it to market.

Christopher LaFemina

analyst
#14

Alright, that's useful. Now for my second question — I believe Kathleen mentioned the export license is only days away. And clearly, according to the IUPK, once smelter construction goes beyond 50%, you no longer owe export duties; however, with this new regulation, an export duty would apply. So I'm curious whether the export license would still be issued to you even while you're contesting the obligation to pay that new, higher export duty, given that you may be shielded under the IUPK?

Kathleen Quirk

executive
#15

Well, so that we can...

Richard Adkerson

executive
#16

Every sign and every forecast points to this: we'll be in a position to export. At this moment we're still in talks to lay out our argument. Should we manage to settle the matter, that would be the ideal result. Should we fail to do so, we start shipping and then separately go after what we're owed legally. Kathleen, did you want to say something?

Kathleen Quirk

executive
#17

No, that's excellent. Thanks, Richard.

Carlos de Alba

analyst
#18

My initial inquiry concerns Cerro Verde. Operations are going quite smoothly over there, and as far as I can tell, the business no longer carries any meaningful debt. Given that cash flow being produced, what do you intend to do? Should we anticipate that dividend payments will keep happening? I believe you've already declared two disbursements during Q2, with additional ones coming in Q3. Historically, you usually made payments in Q2 and Q4 — ought we to look for one more payout in Q4, meaning 3 total for 2023? Broadly speaking, what could you share regarding Cerro Verde? Then I'll follow up with my next inquiry.

Kathleen Quirk

executive
#19

Carlos, I'd say your description is accurate — essentially, we're sending cash flow out from Cerro Verde. Our performance regarding debt has been strong, and occasionally we set aside funds for known matters, obligations requiring payment, or things we're aware of. Still, we anticipate continuing to produce cash flow at Cerro Verde, and insofar as we lack obligations, distributing that to shareholders. Regarding exactly what cash flow and dividends will look like quarter-by-quarter right now, we haven't reached a decision — no decision exists at this moment. We will — however, we do anticipate continuing to distribute cash from Cerro Verde.

Carlos de Alba

analyst
#20

Then moving on to my second question, which concerns capital expenditures. As you noted, total CapEx remains fairly flat. However, in reviewing the various projects individually, I saw that both the PMR in Indonesia and the Grasberg mill recovery project came in with CapEx that was 10% to 20% above what was shown in the prior update. So I'm curious whether you could offer some explanation for what's behind that?

Kathleen Quirk

executive
#21

Yes. Our precious metals refinery did see an increase, a revised estimate for that precious metals refinery. Relative to the total capital, this is a fairly small operation. But as more engineering has been completed, the cost estimates have gone up. It's a bit unlike the large project, the Manyar project, where numerous items were ordered and numerous things were put in place before inflation rose sharply. And so up to now, on that project, we've done a pretty solid job of holding the cost estimates; on the larger project we secured better terms on components, and so forth, yet we are absorbing some increases tied to the precious metals refinery. With the copper cleaner, given all the work underway at Grasberg, the mill project, the power project we're building, the filter plant at port site, the availability of experts and contractors has been slower than initially projected, and the project has run a little longer, which is affecting the cost. But nothing materially different is happening in what we're doing there. It's just that in this environment, things take somewhat longer and that adds to the cost. Still, I want to give a shout out to our team managing the bigger smelter, the bigger spend, they're doing a great job managing that project.

Richard Adkerson

executive
#22

Carlos, you're familiar enough with this sector to recognize what has been happening worldwide with the expenses tied to projects. I'll add my praise alongside Kathleen's for the folks at our smelter, yet also for the wider operations group and the people handling supply chain management — you can observe how we're performing on cost in a world where inflation still has an impact. What I mean is, costs linked to commodities have come down, but even so, we're taking that situation and pushing it across the board with every one of our suppliers. So when you examine our operating costs along with what projects cost us, I feel genuine pride in the operating and supply management teams for the quality of their efforts.

Timna Tanners

analyst
#23

If you can handle a couple — 2. But even just 1 would be quite high level; and I realize we've discussed Indonesia extensively in the near term, yet there's also the wider matter of that extra 10% stake they're requesting plus the IUPK renegotiation looking further ahead; but my impression is that versus 5, 6 years back when you appeared somewhat more worried regarding the Indonesian relationship, this time around you don't seem as worried. So I was hoping you might give us a bit more detail on that? Is that actually true? And possibly the reason why? And how much runway do we have, I suppose, before we genuinely must consider a settlement or reach a decision on this in the near — does that fall in the near term or the medium term?

Richard Adkerson

executive
#24

Timna, allow me to fix something in what you just said. The IUPK is not being renegotiated. Our existing IUPK extends through 2041 and beyond that we hold no rights, and that came about following a long negotiation and was concluded during 2018. And what was agreed in 2018 has turned out to be remarkably favorable for every stakeholder. Indonesia's government, which picked up Rio Tinto's stake along the way, met its objective of securing a 51% equity ownership position and, when you combine taxes, royalties and other fees, effectively holds a 70% economic interest in this project. Because of that structure, FCX kept its stake since it had already been encumbered by the Rio Tinto joint venture interest. And from then on, we've managed to finish the transition from open pit mining into this underground operation, and the performance record our team is delivering speaks for itself. During that stretch, copper prices have performed well. Every stakeholder has come out ahead. Now, regarding relationships — when the President, and this ties into your question, a crucial element was President Joko Widodo's visit to our Papua job site around late August into early September, the first Indonesian President to make such a trip since Suharto back in the early '70s, and he spoke positively about everything he observed — the progress underway, how far we've come in expanding Indonesian management, Indonesian workers, and the Papuans employed across our operations. That visit mattered greatly in strengthening what came out of the 2018 agreement and turning the relationship far more constructive; now both sides — we share a common understanding that this operation has to be conducted in a manner that gets the most out of the resources present there, and having a hard cutoff of 2041 for an operation of this kind benefits nobody, since exploration, delineation and long-range capital planning all have to be weighed against the resources that exist there. So we possessed no rights that could serve as grounds for continuing past 2041. There were topics we needed to work through, among them an extra ownership stake for the Indonesian government to address, and we've committed to backing Papuan companies in pursuing efforts along those lines. That makes it quite unlike what the talks looked like as we headed into 2018, when sharply divided and conflicting positions existed around a range of issues, all of which got resolved. At this point, we're operating in a way where everyone involved recognizes the shared upside for all stakeholders in our mapping out of this operation past 2041, and I feel strongly that we'll get there. Does that — Timna, do you want to ask anything further on that?

Kathleen Quirk

executive
#25

Timna, I just wanted to jump in and mention something that's a major shift from how things may have looked in the past: the alignment — the improved alignment — that now exists between us and the government, specifically the state-owned enterprise, which holds 51% of the shares. On top of that, naturally, we pay taxes along with royalties. That means the government's economic stake in what happens here is far bigger today than it used to be. As a result, that alignment looks really favorable as we move toward generating the value Richard mentioned, extending past 2041. And when we discuss what lies past 2041 and the possibilities, it genuinely lets us reconsider the asset and unlocks potential for growth well beyond what had previously been our plan, since, as Richard pointed out, the reserves continue past 2041. We're seeing substantial opportunity to leverage the infrastructure already in place for additional development. As for that 10% — the share arrangement you've come across — what we're working on involves protecting what exists through 2041 while providing some form of compensation to the government for going beyond 2041. So once more, similar to what happened in 2018, we'd only move ahead on this if a genuine win-win could be reached for both Freeport and the government, and we believe that's achievable.

Richard Adkerson

executive
#26

That 10% wouldn't kick in until after 2041. And here's a major point: under the deal from 2018, Freeport-McMoRan handles — has control over — how the operations are managed, and everyone's pleased with that setup. People throughout the government widely acknowledge how complex this business really is, and they've been very praising and satisfied with our — with how we're operating things; so honestly, it's a solid partnership.

Michael Dudas

analyst
#27

Kathleen, you said during the quarter you repurchased a portion of debt at a reduced price, I believe, and obviously the dividend program is set up. Yet when you consider the back half of the year along with CapEx and what anticipated cash flows could look like, how does the Board view buybacks of stock, given that it seems you held off on those in the first six months? Is it a matter of taking advantage of valuation? simply keeping things even? Perhaps you can give us a bit more detail on this as we head toward the latter part of the year, particularly should copper prices start climbing sharply?

Kathleen Quirk

executive
#28

Yes. Well, should copper prices rise sharply, we will produce substantial free cash flow. Per the policy, we return 50%; and looking back on a cumulative basis to when we launched it in the latter half of 2021, we have returned more than 50% through dividends plus share repurchases; better market conditions will hand us considerable leverage over free cash flow and let us weigh how to put that to work, be it buybacks of shares, dividends, and so on. So the policy is what we're adhering to. Our debt is being kept extremely low. Of the cash flow produced since the policy began, more than 50% has been returned to shareholders, while the remaining portion is — part of it remains on our balance sheet, since we have projects designated for funding. So the policy is what we're adhering to. In our view it's an excellent equilibrium among the balance sheet, returning capital to shareholders and putting money into our long-term growth, and that's what we will keep doing.

Richard Adkerson

executive
#29

Mike, let me just add that at the prices we're seeing right now, we think the stock is attractively priced.

Brian MacArthur

analyst
#30

I'd like to add something to what Timna asked. When a mine shifts from underground operations, or from open pit to underground, we began construction on that, if I recall correctly, back in 2005, and it required 15 years to complete. So with this long-range plan extending to 2041, at what point do you truly need to develop the ore body efficiently after KL is done? Does that mean everything must be settled 15 years ahead of time, just like the last case, meaning work has to begin in 2026? So what kind of timeline are you considering in order to be efficient from here on out?

Kathleen Quirk

executive
#31

Brian, that is precisely what we are trying to convey; and as we mentioned before, since the government holds a substantial stake in PT-FI now and takes part in our business and our operating committee, they grasp that planning for this must happen across long-term horizons. And so no firm deadline exists, yet the earlier the better, because as 2041 draws nearer, altering the result becomes increasingly hard. So that is a point — an extremely significant point, and the government has come to see this more clearly now than at any prior time, and that provides us with the chance to hold this conversation regarding advancing the extension. The smelter plays a major role in this. Once the smelter is finished, Indonesian regulations currently permit companies that have refined processing facilities to seek longer-term horizons. And so the regulatory framework is acknowledging that, and all of this forms part of what we are working to accomplish. There is no particular date, yet the sooner the better when it comes to long-term planning.

Richard Adkerson

executive
#32

Brian, one thing I should mention: given the IUPK term, our reserves are reported only through 2041. Even so, in the course of preparing our mine plans out to 2041, we have already pinpointed production — meaningful production — that would carry us past that point. Mark Johnson and the PT-FI team have already begun the work of delineating those orebodies to determine what opportunities exist there. So, just as we did in the early 2000s for the underground conversion you mentioned, we will waste no time getting started on long-term plans for extending production to Kucing Liar, which we know reaches much further out, and we have not yet established the boundaries of the Grasberg Block Cave or the other orebody, Kathleen...?

Kathleen Quirk

executive
#33

This is about the deep MLZ.

Richard Adkerson

executive
#34

The deep MLZ is part of that very same ore body Freeport started extracting back at the beginning of the 1980s, and it simply kept extending deeper and deeper. That makes it something we're genuinely thrilled about. I've had a connection to this deposit for a great many years, and one pattern that never changes is that it has consistently turned out larger than anyone expected it to be. So for our company and for the government, this represents a truly thrilling prospect.

Brian MacArthur

analyst
#35

So could I just follow up on that? That’s the thing I’ve been trying to work out. Is that extra ore beyond 2041 at depth — you mentioned DMLZ, KL is larger? Or is it a completely separate zone where you’d need to build another entire, let’s say, shared infrastructure project or something else in that location? Because at first, all the initial drilling in that area was completely blocked off and so on. Is this depth, or is it simply additional underground development? Or is there another whole, as I’d put it, entire original shared infrastructure that would need to be installed?

Kathleen Quirk

executive
#36

Well, at first...

Richard Adkerson

executive
#37

No, building out an entire shared infrastructure wouldn't be necessary. What I'm describing is more along the lines of something that takes advantage of what's already in place and then goes further. That said, we do have quite a few indications of what's there, but honestly, we need to move into more active delineation drilling to figure out exactly what exists, and then shape our plans accordingly.

Kathleen Quirk

executive
#38

And Brian, when you check the resource statement included in the 10-K, you'll notice a substantial amount of resource that hasn't been classified as reserves. A portion of that material sitting past 2041 would need some extra processing-type handling, since part of it carries high pyrite content, and that could pose a challenge as well as an opportunity for us; but at first, the real opportunity sits at the Deep MLZ; we're already beginning to carry out some exploration beneath Deep MLZ. So based on what we understand, we believe there's plenty of opportunity. And then, with the life-of-mine extension, we'll be motivated to go conduct additional exploration, because we haven't explored for, I don't know, 20-plus years, given that we already had sufficient reserves to carry us through 2041. So it's a wonderful opportunity for, as Richard said, both the government and for Freeport. And this is an asset that the global copper industry genuinely needs, truly, truly important.

Richard Adkerson

executive
#39

Brian, you were there for this, so you'll recall it — back when we began building out those underground operations, our target 20 years ago was 120,000 tonnes per day through the mill. Now look at what we achieved this quarter: 240,000 tonnes per day. That's simply what this remarkable orebody is capable of.

Brian MacArthur

analyst
#40

I'm completely with you there — like you mentioned, it requires a great deal of advance planning as well.

Richard Adkerson

executive
#41

That's just how our business works.

Cleve Rueckert

analyst
#42

I've got a single quick follow-up, and it leans a bit more toward the short term than what we've been discussing; regarding Indonesia, could you frame the coming 18 months for us — the approval you anticipate within the next several days, what length of extension does it grant for your concentrate export capability? Then, given the smelter build schedule and the ramp, at what point do you anticipate concentrate shipments leaving Indonesia so that this export license stops being a concern?

Kathleen Quirk

executive
#43

The rule that was just modified runs through May 2024. Export quotas are something the government signs off on alongside its evaluation of our yearly work plans, so the quota we're presently shipping against runs through the end of this year, 2023. An update to that work plan will be needed, which is — for us it's simply routine, something we handle each fall, and that lets us raise the — as we call it — the quota so it carries us to May; tied to that, and we've already had conversations about this with the government, although we anticipate the smelter reaching mechanical completion during next year's second quarter, there's still a stretch of several months across 2024, shrinking as time passes, during which ramp-up of the smelter must occur. That portion is something we'll keep reviewing alongside the government. Getting mechanical completion finished is the key item, and our belief is the government will keep cooperating with us so some exports can continue past that point, though we'll need to sort that out with them. Still, by the close of next year, our expectation is that — put simply, capacity will be sufficient to handle what PT-FI produces, and that's where our attention is directed. This came up earlier. The project team is performing very well; our EPC contractor has us quite satisfied; thousands of workers are on site; and looking at the photos, it's genuinely, genuinely taking shape; we understand and acknowledge that running a smelter can be complicated, and we're investing heavily in work and planning tied to operational readiness. Even so, our aim is to finish the entire ramp-up as we — before next year ends.

Kathleen Quirk

executive
#44

Okay, I appreciate all of you joining in. Should anything else come up that you want to ask about, don't hesitate to reach out to David, and we're eager to keep updating you about how we're doing.

Richard Adkerson

executive
#45

Thank you all.

Operator

operator
#46

That brings us to the end of today's call, everyone. We appreciate your joining us, and you're free to disconnect at this point.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Freeport-McMoRan Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Freeport-McMoRan Inc. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Freeport-McMoRan Inc. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.