Freeport-McMoRan Inc. (FCX) Earnings Call Transcript & Summary
July 23, 2024
Earnings Call Speaker Segments
David Joint
executiveAppreciate that, Regina, and hello everybody on this morning's call. It's great to have you join the Freeport earnings call. FCX released its operating and financial results for the second quarter of 2024 a bit earlier today. You can find the release from today, along with the supplemental schedules and slides, on our site, fcx.com. This call is streaming live over the Internet right now. To hear it, just go to our website's home page and select the webcast link. Besides analysts and investors, members of the financial press have also been asked to tune in today. A webcast replay will be posted to our site later on today. Prior to starting our remarks, we want to remind all of you that the press release issued today, as well as some of what we say on this call, contains non-GAAP measures and forward-looking statements, and that actual results could differ materially. Kindly look at the cautionary language included in our press release and slides, and at the risk factors outlined in our SEC filings, each of which can be found on our website. Joining me on the call today are Richard Adkerson, Chairman of the Board; Kathleen Quirk, President and Chief Executive Officer; Maree Robertson, Executive Vice President and CFO; plus other senior members of our management team. Richard is going to offer a few opening remarks. Kathleen will then walk through our slide materials, and after that we'll open the call up for questions. Richard?
Richard Adkerson
executiveThanks, David, and I appreciate everyone being here today. So, the past couple of months have brought a fair amount of turbulence to the markets. I happened to be on CNBC at the exact moment copper reached $5 for the very first time, and I had a big smile on my face. Well, the actual conditions in the copper markets have now become apparent. Let me offer a few remarks on that. A lot of you have heard me say this for quite a while: copper has shifted away from being the cyclical metal it once was in earlier years and has become something more influenced by episodic events. Demand in China has been rising as of late and has broken records even while certain sectors performed poorly, with the property segment standing out as the most notable example. More recently, demand has been weakening across other sectors. China's credit markets have been soft, and the elevated prices caused destocking. The concentrate market has stayed extremely tight. TCs and RCs sit at record low levels, and that has pushed a great deal of scrap into the marketplace. For a stretch of time, the government provided incentives for scrap. Consequently, with the destocking and the softening demand, global inventories have climbed, and that set off macro trading in commodities, especially following the letdown when the third plenum failed to deliver a clear signal of economic incentives in China. This won't continue indefinitely. Destocking has its limits, China is going to act on behalf of its economy, there's fundamental strength underneath, and we have a lot of confidence that things will get better over time. In fact, the recent interest rate cut marks their first move. Beneath all of this lies, really, what the global copper marketplace is built on. The world keeps becoming more electrified through connectivity, through addressing carbon emissions and the challenges involved, but that's the reality the world must contend with regarding A1, and Jeff Currie spoke not long ago about how greater defense spending matters and how that adds yet another source of demand. Supply shifts and supply difficulties carry on, and in some instances they're intensifying; so looking ahead, our approach rests on a fundamentally positive view regarding long-term copper demand and the practical need to bring new supply online to satisfy it; witnessing copper at $5 was truly something; and I can tell you, we will witness it once more. Let me add one brief note acknowledging our team for the excellent work done in getting our new smelter in Indonesia to commissioning. This was a significant undertaking, the largest single-line smelter anywhere in the world. Construction is basically finished; we put a new video up on our website yesterday evening. I'd really suggest everyone take a look at it, simply to grasp how big and how impressive this brand-new world-class complex is; visiting it and observing the full scope of the site is genuinely something. Back in 2018, we made this a central pledge to Indonesia's government, at the point when we decided to pursue an overall settlement of the matters that had been talked about across so many years. For our long-term commercial interests in Indonesia, it carries strategic importance, since we would become a completely integrated producer there through our mining operations, and PT-FI can now seek a long-term extension of its operations, which will genuinely boost what all stakeholders gain. That means the government, the people of Papua, our employees, Freeport along with every shareholder, and our partner MIND ID, a state-owned enterprise. This project has been underway for multiple years, during a period when the world faced challenges from COVID and from inflationary pressures that have shown up in so many projects throughout our copper sector, so bringing it in on schedule and with sensible budget spending is truly an accomplishment by our team. It's quite a complex. Watch the video; we look forward to securing our extension and then building out our plans to maximize the value of this resource across its life, with no 2041 time limit standing in the way. So we're truly encouraged by — and once more, our team simply did a tremendous job there. Kathleen, I'll hand it over to you.
Kathleen Quirk
executiveAll right. Thanks, Richard. I'll begin on Slide 3, where the material shows how we performed in Q2 and the first six months of 2024. Our people remain intent on the things that create value for this business: carrying out our plans in a dependable and responsible way, finding better efficiencies, keeping a tight grip on costs, and creating choices and worth within our portfolio of organic growth. In Q2 we delivered robust margins along with cash flows, posting $2.7 billion of EBITDA and $2 billion from operations. Our output came in mostly where we had expected at the start of the period, though, as we told you in early July, copper and gold shipments took a hit during June because of the timing of our Indonesian export license, which we have since obtained. There are 2 things worth calling out that matter and carry momentum into the future. The first, which Richard mentioned, is the Indonesian smelter, now moving into commissioning. As Richard said, our people have handled this big, complicated effort in exemplary fashion, and our attention now is on removing further risk by getting it started up successfully over the coming months. Strong project delivery is something our Freeport team is known for, and they rose to the occasion yet again despite a tough backdrop for major capital projects. Finishing this strategic investment successfully carries real weight and puts us in position to lock in a long-term extension of our Indonesian operating rights. The second value driver I'd point to is the continuing progress on our novel leach initiative, which adds scale through low-cost incremental output. Growing this effort further is a big source of value and something that sets Freeport apart. As you will notice, incremental production from this initiative in Q2 and the first half doubled versus the same period in 2023. With our eyes on expanding this initiative even more, we foresee a chance to bring down our unit costs in the U.S. by a meaningful amount. We keep applying our shareholder return framework as established, with $0.5 billion returned via dividends and share repurchases so far this year. We closed the quarter on solid financial footing, with a good outlook ahead as we move into the back half of 2024. Moving to copper markets on Slide 4. Richard just covered this: copper prices moved within a wide band, from $3.67 per pound to $4.92 per pound on the LME exchange, and an even broader band on the U.S. COMEX exchange — that was during 2024; as we've noted on earlier calls, macro sentiment and investor positioning can produce big price swings. Richard pointed to China's domestic economic difficulties, the persistent softness in Chinese property, destocking and working capital management, rising copper exchange inventories, and postponed stimulus measures, all of which have pressured the market. In the U.S., we are — we continue to observe robust copper demand across a wide set of sectors. And across the world, we're seeing positive demand factors ahead tied to the growing significance of copper in the worldwide economy. On the subject of electrification, you simply can't talk about it without copper — it's an essential base metal. Worldwide, there's growing focus on energy uses that consume a lot of it. The plain truth is that copper's physical traits and outstanding ability to conduct electricity are what make it the go-to metal for electrification. Massive fresh investment in grid infrastructure, renewables, tech infrastructure, and transport is driving up demand for copper, and the forecasts suggest growth and demand will run above trend for as far out as we can see. When we look at the fundamentals and try to match demand with supply, we think about the limits on growing what's already being produced, the hurdles and long lead times involved in bringing new supply online, and what the projections say about mine supply peaking in the coming two years. When you put those elements alongside broader, long-term demand patterns, what you get is a picture of a market that will stay tight moving forward. Freeport occupies a leading spot in this industry, runs operations at a substantial scale today, and has a pipeline of growth ahead — all of which leaves us in a strong position to capture the upside from that underlying outlook down the road. Now let's move to Slide 5 and talk about our operations. We broke down the quarter's operating results by region; here in the U.S., our attention remains on softening the effects of the lower-grade phases we're currently mining. As the operational specifics in our press release show, ore grades running through our U.S. mill and leach facilities came in more than 10% below where they stood a year earlier. If nothing else changes, we end up paying more for each unit we produce. We're putting a lot of attention on reducing those effects. To do that, we're pursuing efforts around boosting productivity, making equipment more dependable, and capitalizing on automation along with new technologies. Another key piece is bringing in additional low-cost volume increases via our innovative leach initiative. Our sense is that this will make a difference down the road. Turning to South America, the team there and our large-scale Cerro Verde operation delivered a solid second quarter. As you can see, mill throughput came in above 425,000 tons of ore per day. That marks a strong bounce back from the first quarter, since better throughput and recoveries drove larger copper and molybdenum volumes. In South America, our net cash costs per unit got better compared with the first quarter, and that's true even though we absorbed a one-time charge of $0.22 per pound tied to the new labor agreement we struck during the quarter. Over in Indonesia, things came in strong even with shipping held up in June, and you'll notice net unit cash credits amounting to $0.21 per pound. Mill rates for the quarter came in below our first-quarter levels because we pulled maintenance forward into June so we could manage inventory while shipments were delayed. And as we said earlier, we've made a change to mine sequencing, which is going to have an impact on gold volumes this year. During the second quarter, we made changes to our 2024 mining plans in order to handle certain disruptions that arose from wet draw points within the Grasberg Block Cave. At present, we are keeping our mining rates at a constant level, yet we have transitioned into areas where gold grades are somewhat reduced as we implement operational remedies, allowing us to return to the higher-grade ore. This comes down to timing instead of being something significant to our longer-term goals. I want to take a little more time to discuss our innovative leach program, and you can find some relevant material on Slide 6. The momentum behind this program continues to grow. What makes this work is that the added spending is modest and the capital requirements are low, since we're essentially recovering more copper from rock that's already been mined. The financial returns and overall value here are significant, and for us it's a major catalyst. Across the last several quarters, you can see just how much extra volume these efforts have delivered. To sum up, we've reached the initial goal of a 200 million pound annual copper run rate, and over the next two years we intend to double that figure to 400 million pounds per year. Ultimately, our objective for this exciting program is 800 million pounds on an annual basis.
Kathleen Quirk
executiveThis represents what a brand-new major mine would look like, needing only modest capital outlay and with minimal added operating expenses, and it stands to substantially lift both the worth and the competitive standing of what we produce in the Americas. Let me walk you through our approach. What we've accomplished so far comes from improving how heat is retained inside the leach stockpiles, from leveraging sensor data alongside analytics that pinpoint where the opportunities sit inside those enormous stockpiles, and from putting new operating methods to work so our catalyst solution reaches zones that used to be out of reach. We are now extending these wins and feel very confident about raising the run rate to 300 million to 400 million pounds across 2026. Among the fresh initiatives are enlarging the surface area under leach through drone technology and helicopters to set up irrigation where conventional techniques could not reach before, plus growing the number of our solution injection wells. Drawing on what we've learned, our drilling is more efficient, we're getting additional injection wells in place, and we're trialing methods to stretch the effect of injection wells across wider zones. At the same time, we're pursuing innovation-driven efforts that would truly shift the needle toward our end goal of 800 million pounds per annum. Those take in adding direct heat to the stockpiles from renewable or other sources, capitalizing on pyrite-hosted ore to create extra heat, and testing new additives we've been developing. At Freeport, our position for capturing this value is strong, thanks to a vast inventory of substantial residual copper in material already mined, technical know-how and leaching technology that leads the industry, and a robust, multi-disciplined, focused innovation team committed to this initiative. Now to our other growth areas in the project pipeline on Slide 7. We went through earlier the lengthy time frames the industry needs to bring on new supplies. At Freeport, we benefit from using existing infrastructure to develop new supplies, and we have a set of projects moving forward. Our leach initiative offers the best near-term growth opportunity, and as we discussed, we're going after it aggressively. Past that, within the U.S., we have a brownfield expansion at our Bagdad mine in Arizona, where our reserve position is extensive; we've already reported on it. Our studies are finished. We're now pushing forward investments in automation, tailings and energy infrastructure, along with expanded employee housing at this remote site, so we're positioned to carry out the project more efficiently once timing is right. This project, in contrast to other things you see across the industry, carries no major permitting hurdles and amounts to a straightforward option; we're watching conditions and progress on our derisking initiatives and expect to be ready to decide on our investment next year. We've also kicked off pre-feasibility studies aimed at defining a brownfield expansion in the Lone Star Safford District. As most of you are aware, that's our newest U.S. operation, and we're truly only beginning there. Our ambition goes beyond simply doubling what we produce today, which sits in the range of 300 million pounds each year. This is a massive resource, and we anticipate that over the coming decade this district will turn into a cornerstone asset for generations for Freeport in Arizona. Over at El Abra in Chile, where CODELCO is our partner, the pre-feasibility studies are finished, and at this point we're putting together an environmental impact statement that should be done by the close of next year. What the project entails — what we're looking at entails putting money into a new concentrator on a scale comparable to the Cerro Verde concentrator that we built close to 10 years back. Funding for desalinization plus a pipeline network to meet our water needs. The early figure for the added capital costs tied to the new concentrator project and the associated infrastructure, which are still under review, comes to roughly $7.5 billion, and it would deliver 750 million pounds of copper output each year along with 9 million pounds of molybdenum per annum across a very lengthy lifespan; roughly 7 to 8 years of lead time would be needed for this project owing to permitting demands, yet we're pushing ahead so that we have optionality, and we'll keep examining the economics against market conditions, while believing this project will be necessary down the road to serve long-term copper demand trends. Over in Indonesia, excellent progress is being made on our large-scale Kucing Liar development, which is set to start producing before 2030. In addition, we're doing further exploration beneath our Deep MLZ ore body and anticipate that an extension of our operating rights past 2041 will pave the way for more long-term exploration and development possibilities in this highly-attractive district. All of these initiatives are being moved forward to create growth optionality, and we'll stay disciplined in how we go about it, going after opportunities that can be carried out efficiently, profitably and in a value-enhancing way. Richard brought up the PT-FI extension past 2041, and the crucial part the smelter plays in that, and we've gone back over our prior talks with the Indonesian government about extending our rights, so as to ensure the significant benefits of this operation keep flowing to the people of Papua and the Republic of Indonesia. In the second quarter, the government put in place a regulation that applies to a wide array of license holders in Indonesia; we've pointed out the relevant provisions for IUPK license holders like PT-FI, and these cover the conditions that must be satisfied to — for approval of an extension. Such conditions match what we expected, and we're working through an application so that we're able to file it at some point during 2024. Under the old rule, extensions could only be sought 5 years prior to expiry. So with these new regulations we can apply right now, which shows the government acknowledges the lengthy lead times that investment requires. That's a genuinely positive step for PT-FI and everyone with a stake in it. We can't wait to file our application and get into a position where we're able to extend our rights, allowing us to keep up our long-range planning and get the most value out of this fantastic resource. On Slide 9, you'll see our 3-year outlook regarding sales volumes for copper, gold and molybdenum. We've made a few modest adjustments to 2024 copper sales, which reflect minor revisions in the U.S. and Indonesia; and as was talked about before, our gold volumes for 2024 will now reflect the change in mine sequencing, which we went over earlier, and this is really a matter of timing. The remaining guidance is quite similar to the outlook we gave previously. For 2024, we currently estimate consolidated unit cash costs to come in at approximately $1.63 per pound, a bit higher than the April estimate of $1.57 and comparable to our guidance of $1.60 per pound at the beginning of the year. You can find the specifics of this in the back, on Slide 20, within the reference materials. Slide 10 displays the cash flow generating capacity of this business, combining our projected volumes and cost projections; we present a modeled result for our EBITDA and cash flow at a range of copper prices, from $4 a pound to $5 per pound copper.
Kathleen Quirk
executiveTaking those projected results for 2025 and 2026, combined with our current assumptions on volume and cost — assuming gold stays flat at $2,300 an ounce and molybdenum remains flat at $20 a pound — yearly EBITDA would land in a range from roughly $11 billion a year when copper is $4 to $15 billion a year when copper is $5. And given those price scenarios, cash flow from operations would come in between $7.5 billion annually and $11 billion at $5 copper. We've also put some sensitivities on the right-hand side of this chart for your reference. Our reserves have long lives, and our production is large-scale. Looking ahead, the stronger underlying conditions put us in a great spot to gain; on Slide 11, you'll see our latest projection for capex across 2024 and 2025, just as we've shared before — roughly $3.7 billion slated for 2024, then $4.1 billion for 2025. Over those two years the rise isn't very large, and it's tied mostly to updated figures and assumptions for the sustaining capital program plus long-term work in the Grasberg District; our approach to spending will stay disciplined, making certain every dollar put to work delivers returns, while we pursue initiatives that create added value. When you look at that 2-year window, discretionary projects came to $2.5 billion. That bucket captures the capital we're putting into new projects, and under our financial policy, those get funded using half of the available cash that isn't distributed. If you want more background, Slide 23 in the back of our reference materials lays out additional detail on these efforts, which enhance value and will support us as we work to create value going forward. Turning to Slide 12, to wrap up, we restate our financial policy priorities: a strong balance sheet, returning cash to shareholders, and putting money into growth projects that enhance value. Our balance sheet is solid. Our credit metrics are solid, and we have room within our debt targets to carry out our strategy. S&P raised our credit rating this quarter, which means all 3 major rating agencies now rate us Investment Grade. The slide shows that so far this year, we've returned $4.3 billion to shareholders through dividends and share purchases. Our long-term portfolio going forward is attractive, letting us keep building value as we stick to a policy of putting money into projects that create long-term value while also giving cash back to shareholders. We keep a close watch on market conditions and carefully time our projects so that our financial flexibility stays strong. Our team around the world is driven by value. Our strategy is clear, and we're sticking to it: carry out our plans, put money into what's ahead for us, and give cash back to shareholders. Appreciate everyone tuning in — now let's open it up for your questions.
Alan Spence
analystRegarding North America, your grades came in below last year's levels. And leaching volumes in Q2, when annualized, sit above the '24 target, but copper sales guidance got cut — only by 1%, I realize — yet should we connect those dots and infer that North American optimization goals might be turning out somewhat tougher this year?
Kathleen Quirk
executiveAlan, productivity in North America has our full attention. Our management team treats this as a major priority. We made solid strides in the second quarter. A set of metrics is being tracked by us that should push output upward. One spot we're addressing involves unplanned maintenance that keeps cropping up and the disruptions it brings. Plus the asset health and reliability initiatives we're implementing and steadily expanding — long a signature of our U.S. operations — matter greatly for hitting our production targets. So my sense is we're turning the corner. These matters have our very, very sharp focus. Leach production is assisting us in counterbalancing the effects of low ore grades, and as I said earlier, scaling that up further will genuinely help lower the average cost of our U.S. production. Still, those productivity objectives must be achieved. Progress is happening; during the quarter we hit some trouble with downtime at our mill plus at certain crush and convey facilities, yet we're moving forward to ensure our equipment stays reliable and unplanned outages don't occur. That's a key focus for us going ahead.
Alan Spence
analystAnd one more quick thing regarding the leaching. You gave us some useful extra detail there. You said there's a strong likelihood we reach the $300 million to $400 million range by '26; but I just want to confirm, none of that is included in the current '26 sales volume guidance?
Kathleen Quirk
executiveCorrect. The — what we've essentially done is take the rate we're currently maintaining at 200 million pounds per annum and put that into our forecast. So if we expand beyond that scale, and we have high confidence that we will, that gives our numbers some upside. What also gives upside are those productivity initiatives I brought up that are kicking in. So we understand where to direct our attention. We have teams dedicated to it, and we will reach that point; but this leach matter is really going to assist with the unit costs.
Carlos de Alba
analystKathleen, let's pick back up on what we were saying about the leaching projects and initiatives across North America. Could you remind us, or give us a sense, of just how much lower the cash cost is for those initiatives, or those volumes, compared with the current overall North American cash cost?
Kathleen Quirk
executiveSure. For the leach initiatives, the incremental cost works out to less than $1 per pound on an incremental basis. They come in lower because, basically, the mining cost has already been spent. This is ore sitting in stockpiles, and we're essentially recovering more metal than our earlier plans indicated was possible; so we're finding spots inside the stockpile where the rock never received the benefit of this catalyst solution. Through our sensoring and data analytics, we've managed to identify these areas; and now we're working on operational tactics to pursue it; and so, basically, the mining cost isn't there because you've already spent it. So all of this is purely incremental. And that — if it scales, it carries the benefit of pulling down the average unit cost in the U.S. So it's something we're extremely focused on, because it will shift the competitive position of these U.S. operations, mainly our Morenci mine, which holds most of this potential. So we're genuinely excited about it. The — we have new technologies, we're pulling in some expertise from other industries, adjacent industries; it's helping us; we've got the agricultural industry that we've been learning from. We've got oil and gas industry, services industry helping us with some of these drilling techniques, where we're drilling, basically placing the solution. Typically, it's irrigated through, but over time, blockages appear, so we can now directly drill and put solution down into areas that aren't receiving the benefit of the solution. And that's giving us a boost; we also call this other initiative, Leach Everywhere, and that's what I was mentioning, where we're reaching areas that we couldn't access before, and we can now reach them using drone technology and helicopters, going places where humans couldn't go to lay these irrigation lines. So there's a lot happening here, a lot of excitement. We've got really a major new mine potential here without big capital intensity and low incremental operating costs. So we're all over this one, Carlos; and — but it does help us when it comes to the incremental operating cost position of the U.S. operations, the more we scale it.
Carlos de Alba
analystAnd perhaps one more thing — I realize giving an exact answer here could be tough. But now that Indonesia's new IUPK regulation is in effect, and as you said, PT-FI has essentially satisfied the conditions needed to request an extension, what lies ahead for securing that extension's approval? I'm not sure whether there are timing details or milestones you could identify, and do we need to hold off until the new President takes the oath of office?
Kathleen Quirk
executiveSo, the regulation came out. For some time we'd been anticipating its finalization. It was issued at the close of May — that's genuinely encouraging progress. The smelter was really the trigger that puts us in position to qualify as an integrated producer, a status the regulation requires in order to seek a life of mine extension. Therefore, as we bring the smelter through commissioning and into the operational phase over the coming months, that truly puts us in position to apply. Nothing among the conditions set out in the regulation caught us off guard. It matched what we've discussed with the government for quite a while. We need to actually assemble the application package, which is underway, and we're able to apply at any point now. So we anticipate applying for the license; there aren't any guidelines governing how long the government must take to reply to such an application. That said, based on our prior conversations, the government intends to proceed swiftly, since they recognize the lengthy lead times, and they genuinely want to see us begin defining new resources and mine plans that let us maintain continuity past 2041. Thus, our aim is to complete this in the course of 2024. In my view, that's quite achievable. And regardless of whether it happens under this administration — the current one remains in office through October — I believe there's been a broadly favorable response to the smelter, to PT-FI operating as an integrated producer, and to extending the long-term benefits. So, under this administration or the following one, I sense positive momentum exists for PT-FI to accomplish this within 2024.
Richard Adkerson
executiveKathleen, one more point from me — the situation now isn't the same as the challenges we dealt with before. There's no argument happening here. Having broad buy-in serves everybody's interests. And people now clearly get that every shareholder — every stakeholder — gains when we examine ways to get the most out of this resource. So for anyone who has tracked us previously, this process looks unlike the old one, and that's a really encouraging thing.
Liam Fitzpatrick
analystMy question concerns the new Indonesian smelter and how its ramp-up will unfold. At first glance, reaching full capacity by the end of the year seems like a rather ambitious goal, considering how big and complicated this facility is. Could you therefore provide some detail on the main ramp-up milestones that must be met during the second half in order to reach that goal? And as a separate matter, going forward, are you intending to offer any distinct disclosure on the smelter, allowing us to evaluate its operating performance, profitability, and similar metrics?
Kathleen Quirk
executiveLiam, regarding what you asked first, this is an extremely large and intricate project, and smelter startups of this magnitude in the Western world have been scarce in recent years. We have therefore understood that for quite a while and have spent a long stretch of time preparing accordingly. We have assembled the know-how Freeport possesses globally when it comes to running smelters; we run one in the United States, in Arizona. There is an efficient smelter we have operated for a considerable period in Huelva, Spain. We additionally have a smelter already in Indonesia through a partnership with a Japanese counterpart, and that venture has performed very well. So we have applied the full range of that expertise, not just regarding construction — and we have had a team, a devoted team on the construction side, that has performed excellently. Yet on the operational front, we have spent quite a while building up this team so it can operate the smelter, training personnel, and we have — the workers are already hired. We have drawn in know-how from across the globe to head the startup. Thus, we have prepared for this. And the company fully appreciates the point you raise. We believe we are thoroughly ready; issues will arise with any startup; we accept that. Yet whenever we have presented this team with problems and difficulties throughout construction and then commissioning, they have managed to resolve them. Should you not have done so yet, I hope you get the opportunity to view the video demonstrating really where this — where the smelter stands regarding operational readiness, and we show all the different facilities involved. So we have prepared for this. We realize it will mean a different method of selling our product. Previously, in Indonesia, we put concentrate onto a vessel, paid the TC/RC, and gathered our revenue, which was quite straightforward; today there is a more complicated logistics picture and a more — we have multiple products that we will be selling. Still, the team has been addressing this, and we possess expertise in running smelters and selling various products. Consequently, we are favorably positioned. As for reporting, it will be included; it is folded into PT-FI. This is going to show up within PT-FI's numbers. You can track its operating costs via the TC and RC line in our unit cost. However, on the revenue side above that line, we will naturally be able to bring in greater revenues since we're doing the marketing ourselves. Essentially, we get the free metal, which benefits us. There's no smelter payment, no payable factors, and so on. So it'll be both a revenue component and an operating cost component, but we'll give disclosures to guide you through it. The duties will no longer apply to us. That's a considerable plus for our results too. Now, regarding operations and readiness, I'll turn it over to Cory Stevens for a few remarks. Cory leads our engineering group, our project construction group, and our group focused on operational efficiencies. He has a large portfolio, overseeing not just the smelter project but also the leach innovation initiative. Cory just returned from Indonesia, so perhaps, Cory, you could add to what I said about operational readiness.
Cory Stevens
executiveAbsolutely. Thank you, Kathleen. Alright, so the commissioning effort is moving along nicely. There are many massive unit processes involved, and our teams are working together across operations — Kathleen touched on this — but we've brought in a sizable group of operators from various parts of the world, which we refer to as boots on the ground, and they're all there working shoulder to shoulder to get this big project commissioned. I mean, it's quite — it's enormous. And to put it in perspective, there are 45,000 pieces of instrumentation and computer connections that we're checking and verifying and running the equipment across its operating ranges so we can start up. As for the ramp-up plan, when we begin startup, the plant wasn't built to operate at a very slow rate. So essentially you have to run it at 50% capacity or slightly above that from the very beginning. That means there are plenty of checks and safety verifications happening right now so we can run at that level, then re-verify the procedures and so on, and after that we'll be able to ramp up further. So — the teams are energized, it's well coordinated and has been planned for years, and we're ready to make it happen.
Kathleen Quirk
executiveYeah, and there's one point I'd like to stress: at Freeport, having a centralized group backing the operating teams is a real advantage on a major project. So while certain other firms lack that type of support structure — one that genuinely assists with overseeing the build phase and the handover into operations — we're able to assemble the very finest talent available for carrying out a start-up. And I won't pretend otherwise: issues will arise; that's a given, but the proper individuals are truly — in position to deliver a safe and efficient start-up. Come August, we anticipate achieving first processing of concentrate through the facility. And per Cory's remarks, the ramp-up should advance rather swiftly through the close of 2025 — sorry, 2024, and we've also — a precious metal refinery is set to come online within that same window. So this project has involved a great deal, extensive planning. And it's been carried out well, and we anticipate carrying it out well all the way through ramp-up.
Liam Fitzpatrick
analystThat was a really thorough response. Might I just pose one brief follow-up? Over the coming few months, is there a single item on the critical path that you would call out, such that once it's behind you, you'll rest a little easier at night?
Kathleen Quirk
executiveCory, is there one that comes to mind for you?
Cory Stevens
executiveRight. So additional safeguards are being applied by us at the second stage of the smelting furnace — the flash converting furnace — and just 6 of those are in operation globally. It's quite specialized, and we're putting extra precautions in place there. That sits at the core of what will allow the smelter to run at the levels we're aiming for.
Bob Brackett
analystMy question concerns the revision to gold sales. My understanding is that wet conditions at the Block Cave shifted your mining sequence toward an area with lower gold grade, but why won't those ounces return within the plan period? So if 0.2 million ounces were lost this year, shouldn't they show up again in '25 or '26?
Kathleen Quirk
executiveYes, Bob, it's 150,000 ounces, and over the coming few years it does come back into our plan. And so it simply didn't — it wasn't large enough to raise our numbers, but this is entirely a timing matter. And when we consider our overall 5-year plan, there really wasn't much change. Mark Johnson is on the call, the problem we experienced in the second quarter, and we expect will persist for a period in 2024, is that we had some wet draw points with spillage that we couldn't get back in to clean up; it took — it takes a while to clean it up; we have a robust remote mining, underground mining system, and that's performing really well. And what the team is working on is a remote pumping system that lets us clean up these spills more quickly, and so we don't have as much disruption in these areas. But it truly is just a timing thing. And Mark, I don't know if there's anything you'd like to add to those comments?
Mark Johnson
executiveNo, Kathleen, I believe you hit on that point. We have been dealing with wet muck since the IOZ days, so that's about 20 years or more. A few of those items, like you said, involved spills that moved somewhat farther; therefore within the GBC, certain material properties are unusual, and we are working to mitigate them. The main one, which Kathleen brought up, is being able to position pumping equipment remotely and remove the water that collects while some of our time entry criteria are in effect; so we have a stretch of time that we wait through to get back in safely, and what we observe is that water accumulates while we are waiting. Through remote pumping, we can have it operating before the — during the period this time is being spent, and then our cleanup can begin far sooner. One thing we did at GBC is — it was somewhat unusual, we — since it is the foundation of our operation and the primary source of value, we added extra operational flexibility by creating more draw points than would theoretically be needed to achieve the production rate. That is what let us move into this different area, which had copper grades very close to the same, though gold grades were incrementally lower. And as Kathleen said, across the 5 years, that goal you brought up is back in the plan. We intend to have this mitigation measure strongly in place, firmly in place during the fourth quarter, and I am confident we can accomplish that.
Bob Brackett
analystGot it, that's crystal clear. Let me ask one more thing about the third requirement tied to the IUPK filing — the one involving a pledge to do more exploration and boost refining capacity. Does that involve a specific figure in dollars that must be included in the paperwork? Or have you already negotiated that? Or does it function more as a loose objective?
Kathleen Quirk
executiveThe Minister of Energy & Minerals would be the one to sign off on that. Conversations with the government have been ongoing. Exploration is something we intend to carry out, and some is already underway. Going forward, we'll undertake further exploration work, which should help us pinpoint additional resources. That fits within our expansion strategy, essentially. Regarding further refining capability, talks have taken place with the government. There's a desire to build extra capacity in Papua. Our existing smelter sits in Gresik, and the hope is to add more capacity in Papua, which remains under discussion with the government. However, no specific figure or investment threshold appears in the regulation. It's genuinely about assessing what the country requires, and the preference is for it to be situated in Papua, and we'll be assessing that together with the government.
Orest Wowkodaw
analystI just want to clarify something about the possible IUPK extension. From what it sounds like, you're heading toward handing over an additional 10% stake in the asset after 2041 — would you get any money for that, or is it basically just what the extension costs you?
Kathleen Quirk
executiveThat 10% — giving a 10% interest to a state-owned enterprise, and we're in talks with MIND ID regarding their goal of picking up another 10%. In our conversations with the government so far, that 10% has been on the table, and it comes out of FCX's shares, with that 10% offered alongside reimbursement of the capital costs we've incurred for the current period through 2041, to the degree that it benefits the period past 2041. So really, it's a book value idea. And the thinking behind putting that 10% forward, plus how it gets valued, has been that the government is giving PT-FI the extension, and it amounts to a cost of the deal. And as we see it, being able to go past 2041 holds a great deal of value that we simply couldn't capture if we don't proceed and put in investments; so in the spirit of our partnership with the government, where it's a one-off alignment and a win-win, we felt this was suitable to give us the optionality for value — significant value past 2041.
Orest Wowkodaw
analystOkay. And as a fast follow-up, it's good to see the repurchase program back in July. I believe it has been 2 years since any buyback occurred. With the smelter commissioning and ramp-up, should we anticipate that it will now accelerate during the second half of the year?
Kathleen Quirk
executiveOur financial policy essentially involves distributing 50% of available cash through dividends and share purchases. The smelter investments weren't included in that calculation. Thus, we are funding the smelter on a separate basis. So the definition of available cash is truly just cash flow minus the CapEx needed for ongoing operations. It excludes the smelter. It excludes our future growth through the discretionary projects we're investing in that we identified earlier. Therefore, that will depend on what our cash flows turn out to be. We definitely intend to keep repurchasing shares, but it will hinge on eventual cash flows, and we'll keep adhering to that policy. As a quick note, we're past the hour now, and I know folks have been asking multiple questions, so please keep it to one, and we'll follow up with you afterward.
Michael Dudas
analystDavid and Richard.
Kathleen Quirk
executiveMike, I think your line is cutting out.
Michael Dudas
analystIs this coming through for you at this point?
Kathleen Quirk
executiveYes, you're coming through clearly now.
Michael Dudas
analystThe way you've described your dealings and talks with Indonesia's government today and on earlier calls, those have been going pretty smoothly. Perhaps you could bring us up to speed on the situation in Peru and Chile, and possibly North America too — when you weigh the scale of investments you'll be considering, along with what others and your rivals are doing, how has that unfolded amid the swings and the gains we've seen in copper prices, and is there any inclination among those governments and ministers to speed things up on the supply the market appears to be demanding?
Kathleen Quirk
executiveIn South America, I'd say there's a real appetite for additional investment — Peru and Chile alike, both of them want to see mining draw more capital, since it's such a major component of their economies. So their interest is very, very strong. Of course, you have to ensure community and social issues are handled properly, yet the desire for that investment to happen is definitely there. Right now Chile is engaged in a process of reviewing how it grants permits and attempting to make that permitting more efficient. We've discussed the El Abra project and the lengthy permitting process it's been through, and our hope is that this effort the government has now started will bring about streamlined permits. Still, I believe both nations are eager for more mining investment. The same goes for the U.S. — you've witnessed lately how America is giving priority to metals deemed critical to the supply chain; therefore, I'd say the climate in these countries for putting money into projects is better than it used to be. Yet once more, I want to stress the social dimension and the community dimension here. That doesn't mean the bar gets lowered regarding what we owe on sustainability, to communities, on environmental stewardship, and on social benefit. So every box has to be checked, but awareness keeps growing that these metals are needed, and copper stands among the frontrunners in that regard. So our position is solid; in the U.S. especially, we're sitting in a strong spot thanks to our existing operations, where what we're proposing amounts to expanding upon what's already there. Consequently, the permitting demands aren't as broad for the kinds of projects we're chasing as they'd be for a greenfield endeavor or something in Chile, say; and the U.S. is likewise discussing making permitting and regulation more efficient. So we're well placed, and the Lone Star Safford opportunity I mentioned before is one where, even though our studies lag somewhat behind where we stand in Chile with El Abra, that project is going to close the gap quite fast, since we don't face the sweeping permitting obligations for it that we do in Chile. Thus, our attention is squarely on nailing down what that project entails, which lets us evaluate them side by side and determine the one that — delivers the greatest worth to both our company and those holding shares; and therefore we hold a genuine edge within the United States thanks to the operations already running and by capitalizing on where we currently stand. Naturally, leaching calls for no additional permits. That leaves us well placed to launch projects at a faster pace than perhaps competitors might manage.
Richard Adkerson
executiveFor many years now, we've stayed dedicated to the course Kathleen described — acting properly and cultivating ties. That has brought us, here in America, consistent backing from local populations, from Indigenous communities, from state authorities and those who regulate us. The situation is similar down in Peru at our Cerro Verde operation, located in the Arequipa area, a place where doing business can prove quite difficult. Politics there are extremely tough at the moment, yet the effort we've put into assisting that community works to our advantage, and that counts for a great deal. Turning to Chile, CODELCO holds a 49% stake alongside us at El Abra, and they're eager for progress and give us strong backing. We've built a connection with Boris. Come this autumn, I'll join a panel alongside him at APEC, held in Peru. Compared with the period right after his election, the mood has shifted considerably, now that he's confronted what Chile actually requires in terms of aiding its mining industry. As you can observe globally, this sector remains an enormously vital component of what we do. Through developing Grasberg, we picked up numerous early insights about the importance of maintaining solid ties with the Indigenous population in that location, plus with the national government. So I take pride in our team's efforts, and we remain devoted to locating shared ground and proceeding correctly.
Lawson Winder
analystI'll keep this short. I'd like to ask about Kucing Liar, which is a very high-return project for all of you. Really one subject, 3 questions. I just wanted an update on the timing you expect for first production, and then I want to ask about how fast the spending goes. So I mean this is a $4 billion project, and you're saying roughly $400 million has been spent so far across a period of about 2 years. When do you expect that to begin accelerating somewhat more?
Kathleen Quirk
executiveLawson, that's correct. Like our other projects, our long-term development, Grasberg underground blockade, the capital gets spent across a multiyear period; and yes, in our projections we show that spending on Kucing Liar will begin ramping up as we move forward. The average of $400 million a year over a 10-year period was — we're spending somewhat less than that, and that will start to ramp up and we'll have certain years when it's above $400 million; and there could be further development within that $4 billion that happens after we start. So — but we expect a start-up of KL near the end of this decade, ahead of 2030; and it's very large scale, 90,000 tons a day of ore, meaningful copper and gold output from that deposit, a genuine advantage of this extension past 2041, is the resource is far bigger than what we'll mine between the late 20s, late 2020s and in 2041. So we'll have — we ran the economics and the economics paid at only the life that finishes in 2041. But there's plenty of resource past that, which will come into the fold with an extension. So it's a wonderful extension of Grasberg. It sits in that district. We're taking advantage of everything we've learned from developing the Grasberg Block Cave and Deep MLZ, and before that, our other ore bodies, but it's essentially the same type of development that we've had previously, and we're applying all of the new learnings and technologies that have helped us in the development of Grasberg Block Cave; so we're in a good position there and feel good about our execution of this project over the coming several years, leading into 2030, when we'll have strong production coming from this operation.
Brian MacArthur
analystLet me return to that 10% figure regarding the IUPK. First, I'd like verification that through 2041, your stake stays at 48.76%. My understanding is that it becomes 10% after that point. Second, regarding capital, do you invest everything up to 2041 and then recover it? Or will this resemble the Rio situation for some time, where ownership rises as reserves get developed and your share of capital comes in varying proportions, similar to what happened historically with Rio Tinto? I'm simply attempting to determine precisely how cash flows will operate here.
Kathleen Quirk
executiveYes. As part of what we file with the government seeking the extension, an agreement to carry out the transaction will be submitted; discussions on that agreement are ongoing with MIND ID. What has been talked about across the past couple of years on this, or more than the past year, is that the mechanism will be a 10% share transfer occurring in 2041; the amount paid then will reimburse capital spent from now through 2041 that serves the period past 2021. To that degree, this bears no resemblance to the Rio Tinto deal. It is simply a reimbursement at book value for what exists to serve the period past 2041; so in essence, take the book value at the close of 2041, and that pro rata percentage — 10% of our shares — will be handed over, with the purchase price being that capital reimbursement; consequently, cash flows from now until 2041 are unaffected by this.
Richard Adkerson
executiveSo Brian, that deal takes place once we’re past 2041. It isn’t comparable to Rio, where the deal went through back in the mid-90s and the only issue was the way it got applied. So should it fail to happen for any reason at all, our stake would remain unchanged. The expectation is that the government would step in to buy that 10%, and the arrangement covering reimbursement of costs would be set off at the point that deal happens.
Bill Peterson
analystIt's great to see leaching double in the first half of '24 compared with the same period a year earlier. As we look forward, what's the right way to frame the path ahead? Should we expect output around the level of the most recent quarter, 55 million pounds, or could some of those productivity efforts you called out, like applying technology, deliver additional gains in the back half of the year and into 2025 as you move toward the 300 million to 400 million pounds per year target in 2026?
Kathleen Quirk
executiveWhat's reflected in our figures is the run rate we have today; through the initiatives we're working on to reach that 300 million to 400 million pound per annum range, we do see chances to grow beyond it; so it will happen gradually. It won't arrive all at once. So over the course of this year and next year, we'll likely have more than what our plans currently contain. But we haven't presented that. These tactics are still being deployed, we have a lot of confidence in them, but at this point we haven't included them in our numbers, and that's something we'll keep updating as we move ahead.
Kathleen Quirk
executiveRegina, thanks — and thanks to all of you for joining in and showing interest. Should anything else come up that you'd like to ask about, don't hesitate to reach out to David.
Richard Adkerson
executiveThanks, everyone.
Operator
operatorEveryone, that brings today’s call to a close. We appreciate your joining us, and you’re free to hang up now.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Freeport-McMoRan Inc. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Freeport-McMoRan Inc. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Freeport-McMoRan Inc. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.