Grenergy Renovables, S.A. (GRE) Earnings Call Transcript & Summary

May 24, 2024

Bolsa de Madrid ES Utilities Independent Power and Renewable Electricity Producers earnings 57 min

Earnings Call Speaker Segments

Marta Castro

executive
#1

Good morning, everyone, and thank you for joining us for Grenergy's First Quarter 2024 Results Presentation. Marta Castro here, Investor Relations at Grenergy. With me today are David Ruiz, our Executive Chairman; Daniel Lozano, Chief of Strategy and Capital Markets Officer; and Rocio Fernandez, Head of Sustainability. Together they will walk you through our business, financial and sustainability review. Once their presentation wraps up, we'll open a Q&A session for sell-side analysts. Over to you, David Ruiz, our executive chairman.

David Ruiz de Andrés

executive
#2

Thank you. Thanks, Marta. And as you mentioned, this is my first quarterly presentation in the Chair role rather than as CEO. So I believe I'll — we will move straight to the highlights for the first quarter. Almost 15 gigawatts of solar pipeline. That represents, I think, modest growth versus the prior quarter, correct? We're somewhat more steady at 11 gigawatt hours. What we want to stress is that any time we add new projects into our pipeline, we genuinely mean it. And I think with storage, what you'll observe is that a very high percentage of those projects will be under construction and entering operation very soon. I'm referring to the storage projects, so we truly want to ensure that when we bring a new project into BESS, hybrid, it's something we can build over the short to medium term. Moving to the key projects advancing, where we right now have 1.7 gigawatts and 1 gigawatt hour already operating and under construction. There's a slide coming on Oasis Atacama, and it's truly on track. It's a highly transformational project for us, so we want to provide as much information as we can.

David Ruiz de Andrés

executive
#3

Two slides in the presentation will center on Oasis Atacama. Delivering successfully on both asset rotation and financing — that's a crucial element of the value we offer. It was already made public in the full year presentation, but it now shows up in the first quarter accounts. What I mean is the sale of nearly 175 megawatts of solar and PV and wind assets in Peru for USD 150 million. And the deal was finished — fully finished — in first quarter 2024. I think we should note that equity proceeds are already at roughly 55% of the EUR 0.6 billion — the EUR 600 million target of proceeds we set for 2023-2026 — so that has already been achieved. We are therefore genuinely well on track, given that we are reporting first quarter 2024. So we are not even halfway there. I think it's very important to note that EUR 175 million has been obtained — has been secured — for building 300 megawatts of solar PV assets in Spain. Turning to financial results. EBITDA is up 63%. That is driven by the asset rotation. We mentioned net income up 27% to EUR 6 million. I think we have a healthy balance sheet despite the continued CapEx efforts, and we'll also take into account the share buyback carried out.

David Ruiz de Andrés

executive
#4

Total leverage came in at 4.7x, with the corporate level at 2.3. The share buyback has ended, and to date we've put in EUR 36 million, repurchasing 4.3% of the share capital. Moving on -- sorry, I neglected to cover our sustainability highlights. On those highlights, I think Rocio will provide far more detail. I'm delighted to say that 100% of the objectives we committed to for the first quarter have been accomplished. I'd also like to call out in particular the publication of the TCFD. Rocio will walk you through more on the report, which lays out how Grenergy handles climate risks and opportunities, and a great deal of effort has gone into this area. And lastly, just to give one example of our commitment, we've generated a positive environmental impact in the communities where we operate. We'll share some interesting details on the most ambitious reforestation plan we've ever undertaken: 255 hectares of native forests at the Gran Teno PV plant in Chile. We were fortunate enough to explain this to the President of Chile at the plant's inauguration 1 month ago, and it ranks among the most ambitious reforestation projects in Chile this year.

David Ruiz de Andrés

executive
#5

We're really proud of what's been accomplished here. Now, turning to the platform overview — just quickly, 15.6. For this, we're counting the entire pipeline along with the plants that are operating, plus 11 gigawatt hours, correct? I believe assets in operation and under construction come to 1.7 gigawatts of solar and 1 gigawatt in BESS. This KPI is becoming increasingly important, I'd say. It's really something great that we can already demonstrate having 1 gigawatt hour of BESS under construction as part of Oasis Atacama. Those figures already leave out the wind and solar assets in Peru that were divested during the first quarter of 2024. And we'd also like to point out that the 3 platforms are well balanced, right? It stood — we're carrying out a lot more now in Chile and Spain, but we're putting in very hard work in the new markets that will be extremely important to us as early as the second semester of 2025 and of 2026, 2027. So everything remains on track. We'd like to provide all the information country by country, region by region, and whether it's solar or BESS. Our solar PV, I think, keeps growing.

David Ruiz de Andrés

executive
#6

Once more, we want to emphasize that our goal is producing high-quality products and a high-quality pipeline, so that whatever money we put into development goes toward projects we can genuinely build someday, and we can keep achieving a very high success rate here, as we have over the last 15 years — well, 16 years now. Pipeline growth in Mexico and Peru: keep watching Mexico, because I believe we'll receive good news from that market down the road. All the signs suggest it will be a significant market. Again, nothing has been accomplished over the past 5 years. It has — we have this near sharing effect with the U.S. Demand for energy there is extremely high. So I think it will be a very, very interesting market to examine. And, as you know, elections take place in just 2 weeks' time. And regardless of who wins, both candidates have demonstrated strong interest in developing renewals more quickly. Our first development in Romania: stable evolution versus the prior term in BESS, but I think we'll show some increases over the next few quarters, right? Chile, of course, remains our biggest platform for hybrid projects, supported by Oasis Atacama.

David Ruiz de Andrés

executive
#7

We're looking at every market, and we're putting a lot of effort into copying this model — the success we've achieved with Oasis Atacama — in other regions, correct? Turning to this slide, I think it's rather interesting. There's been plenty of chatter regarding the low merchant prices in Spain during the first quarter, right? My belief is that our exposure is much smaller than that of other players, especially when you factor in that a very high percentage of our IPP production comes from outside Spain, and also that a very high percentage of what we produce is contracted, right? Even so, this was caused by very early wet and windy conditions, right? I think that's worth pointing out. Having said that, our business model is very defensive. I think our earnings are predictable. We provide visibility. And I think our approach of contracting the majority of our energy production — which 3 years ago at one point appeared as though some players weren't contracting such a high percentage — we were contracting a minimum of 75%. And I think this strategy is the correct one, and it's paying off now. Merchant revenues accounted for just 8% of our energy revenues in the first quarter, and we expect them to be at most between 10% and 15% in — during 2024.

David Ruiz de Andrés

executive
#8

Just to remind everyone, at present we’re supplying roughly 1 terawatt hour each year, but we have PPAs contracted for no less than 3.3 terawatt hours, starting in 2026. That shows you the scale: our IPP division will become 3, 4 times larger than today, and with better price capture because of the PPAs we’re signing alongside BESS. So the picture will look entirely different as soon as the start of 2026. We’ve locked in EUR 3.3 billion of revenue across 15 years. And that includes, on the PPA side, most of the phases at Oasis Atacama. Turning to Oasis Atacama: the year began very busily in terms of moves. We signed the Phase 4 PPA with an investment-grade global utility. Also, in January, we announced that the first supply agreement for Phases 1 and 2 had been signed with BYD. We think it’s the right partner for this project, for these phases. We’re now working on the new phases, and we could be with BYD or another leader in BESS systems. We expect the coming months to be very busy too.

David Ruiz de Andrés

executive
#9

Regarding Phase 5's PPA, we're in advanced negotiations. With luck, it'll be wrapped up before September ends — possibly sooner — though securing a PPA and negotiating the contracts takes a very long time. Still, we're really well on track. Project finance for the first 2 phases should close very soon. That will be a very important milestone for the company. It's by far the largest PPA we've ever signed. We're bringing in 5 international banks, as a syndicate, and it will be a very important milestone for us. And I think for Chile as well — it's going to be a very unique project with very unique finance. Considering this, it's a very important project for us, and in this slide we want to give even more information in detail. This is where we stand — how we're advancing in Oasis Atacama. We provide more color on the next milestones to be achieved in the coming months. As I was saying, we expect to finalize the closing of the first 2 phases at the end of June or in July for Quillagua.

David Ruiz de Andrés

executive
#10

So when we refer to FAT, that means the factory asset and tax — I mean, every battery for Phases 1 and 2 is already in production at this point. Inspections for the first units are scheduled for the end of July. That puts initial shipments in September, correct? So with luck, the batteries will be installed by the end of October or in November, right? As for the PPA we're referring to here, it could be finalized in September for Phase 5 — again, ideally sooner, since we have something in the middle, but with luck we can make an announcement about that PPA too. That way, all of Oasis Atacama will be under contract. Our attention in Peru is on the deals we closed during the first quarter. It's a very strong deal on our side. We made them public in late January. We sold a plant — a solar plant, a newly built facility, the 97-megawatt Matarani project — to Yinson, a utility based in Malaysia, right, for USD 90 million. In addition, we agreed to rotate out the sale of 77 megawatts of wind assets to Engie for USD 60 million, right? Total proceeds will come to USD 150 million, and we're discussing a valuation increase of 1.3x enterprise value over invested capital.

David Ruiz de Andrés

executive
#11

As I mentioned during the highlights, we've already rotated 643 megawatts, with equity proceeds of EUR 340 million. That covers 2023 and the first quarter of 2024, and it already represents 55% of our targets for the 2023 to 2026 period — we are really on track. All right, that's all from me. I think I'll hand things over to Daniel. Thank you.

Daniel Herrera

executive
#12

Thanks, David. Now we’ll turn to the financial review, starting on Slide #10. Total output fell 4%. That drop came mainly from selling our Peruvian wind assets, specifically Duna Huambos. Contracted volumes rose 14% in the first quarter of 2024. That volume totaled 194,000 gigawatt hours and made up 77% of our total electricity production. Realized prices, though, were up 4%. This favorable trend reflects beneficial PPA prices in that period and showed our defensive profile, especially amid the difficult market conditions we faced in Q1 2024. Also, on the right-hand side, there’s a summary of the key financial KPIs we’ll examine later. Looking at Slide 11, you’ll see that total revenue in the first quarter of 2024 came to EUR 110 million, up 15%, while EBITDA climbed to EUR 23.3 million, an impressive 63% increase. By division, the development and construction division—the Duna Huambos wind project and the Matarani solar PV project, both in Peru, as already noted—drove this division. Combined, they brought in almost EUR 70 million of revenue.

Daniel Herrera

executive
#13

Energy division. Despite those disposals, revenue for the energy division stayed fairly flat. Better realized prices offset the effect of reduced output. Also, during this quarter, our retail supply business in Chile posted positive EBITDA again, at EUR 0.3 million. We expect that trend to carry on through the remainder of the year. Moving to Slide 12. In the first quarter of 2024, total CapEx came to EUR 73.8 million, in line with the prior-year figure. But it's worth noting that this amount will ramp up over the next quarters as we build the Oasis Atacama project. A large share of CapEx went toward constructing various projects — specifically 66% of the investment here in Spain, with the other 34% in Latin America. Notably, that figure includes CapEx tied to rotated projects such as Matarani in Peru and Tabernas and Jose Cabrera in Spain. A further EUR 13.5 million went to development initiatives. And the cost per megawatt has hit an all-time low. Panels, as you probably know, now cost just $0.10 per dollar — including the interconnection line, current CapEx is roughly EUR 2.4 million per megawatt.

Daniel Herrera

executive
#14

The drop here comes from growth in worldwide industry and capacity, along with more polysilicon output. Even with interest rates running higher, CapEx deflation and the solid PPAs we're signing more than make up for that impact. So IRR stays steady and appealing, sitting at double-digit levels. Now on Slide 13, we get a look at cash flow for the period. One important point is that, well, working capital saw an outflow of EUR 17.5 million. CapEx has mostly been funded by ourselves via asset rotation and, naturally, project financing. As David mentioned, we've already ended our share buyback program, which totaled EUR 36 million — that's 4.3% of company shares. And, well, as we wrap up this period, our cash position is at EUR 164 million; the net proceeds from asset rotation in Peru didn't just help — they lifted our treasury balance by close to EUR 116 million. Now, if you turn to Slide 14, net debt rose to EUR 335 million, mainly because of CapEx investment. Even so, our total leverage ratio held steady at 5.7, a similar level to the prior year. Selling the Peruvian assets helped our corporate leverage.

Daniel Herrera

executive
#15

It's worth noting that neither project carried non-recourse debt, and that helped strengthen our corporate leverage position. Keep in mind as well that the recent announcement about closing financing for Tabernas and Jose Cabrera means moving corporate debt into non-recourse debt for all the CapEx already incurred. That has helped push our corporate leverage ratio even lower. With both of those factors taken together, our total corporate leverage ratio comes in at 2.3x. And as we said at our Capital Markets Day in November, the investment plan for 2023-2026 will be self-funded. We're getting there through our asset rotation strategy, which, as David mentioned, is already 55% complete. Thank you — that's everything from me. I'll now pass it over to Rocio, who will walk you through the key sustainability actions.

Rocio Fernandez

executive
#16

Thanks, Daniel, and good morning to all of you. I'd like to invite everyone to go through the specifics of how our ESG progress unfolded in Q1 2024. It's a pleasure to report that both objectives we committed to for this quarter have been met successfully. The first of these was a report on climate change risks and opportunities prepared in line with the TCFD recommendations, which was approved and published. The second was the Sustainability Report 2023, which was verified by an independent third party for a second year running and was likewise approved and published. Now let's turn to the next slide. I'll walk you through some additional detail on the TCFD report. This document was put together so that climate change risks and opportunities are properly disclosed, demonstrating to our stakeholders the way Grenergy tackles and reduces them via a robust governance framework and strategy, along with meaningful metrics and targets. Grenergy assesses and mitigates physical climate risks using the most conservative climate scenario, which puts them among the highest-impact ones, as you can see on the right side -- on the right hand, thermal stress, temperature variability and floodings. Beyond those physical risks, Grenergy also manages and reduces transition risks that carry a significant impact and a high likelihood of occurring, including technology, market, resilience and product risks.

Rocio Fernandez

executive
#17

Moving to the next slide, I'd like to tell you about an environmental project at our Gran Teno facility in Chile — further evidence of how firmly we are committed to making a positive environmental and social impact. The photo shows members of our local teams taking part in replanting over 250 hectares of native forest with native species, drawing on an innovative technology that achieves high efficiency rates and requires no irrigation water — only rainwater. This effort makes us genuinely proud, and we hope to carry it out again at other plants. That covers everything from my end. Thank you all very much for listening.

Marta Castro

executive
#18

Thanks a lot, Rocio. At this point we'll shift into the question-and-answer portion. <<operator_script>>. We'll kick off the Q&A now with Fernando from RBC.

Fernando García

analyst
#19

Apologies — I have 2. The first concerns the Atacama project. So you're keeping your CapEx for batteries and solar there. But since then — since you announced that battery CapEx impact — those fell significantly <<inaudible>> gross as well. So let me ask: do you see any upside in terms of returns? And as a follow-up to these questions, taking into account that you potentially see lower CapEx, what will the company's strategic decision be — simply to have less CapEx, or to move to additional projects and do the same CapEx that you announced at your CMD in November? And then the second question is a follow-up about the divestment of Ayora.

David Ruiz de Andrés

executive
#20

<<inaudible>>.

Daniel Herrera

executive
#21

David, are you able to hear us? You can’t hear us. All right, apologies, Fernando. David was unable to listen to your question.

David Ruiz de Andrés

executive
#22

There was an issue with my...

Daniel Herrera

executive
#23

Alright.

Fernando García

analyst
#24

Should I say that again, or...

David Ruiz de Andrés

executive
#25

No, that's fine. Daniel, if you were going to respond, please go ahead.

Daniel Herrera

executive
#26

Actually, hold on—no, no. Fernando, if you’re able to say that again, that might work better.

Fernando García

analyst
#27

Yes. So for my first question, it concerned the CapEx for batteries and solar—you kept those numbers the same as a few months back, even though battery packs have dropped quite a bit lately, and the same holds for volume cost. So what I'm asking there is whether you see any upside on returns given this possible decline in CapEx? And then what are you—what are your strategic decisions going to be you get for doing the projects—the same projects with lower CapEx? Will you move on to additional projects, or will you simply bring down your net debt? And then a follow-up question on Ayora: is the divestment process for Ayora underway at the moment?

David Ruiz de Andrés

executive
#28

Alright, thank you, thank you. Sorry about that issue. I wasn't paying attention to you at all. Regarding the project — well, on your question about lower CapEx, we really — we would prefer to keep the figures we presented at our Capital Markets Day, which happened just 5 months ago, correct? So — but the trend does point downward. And that could — as you mentioned, it might present a chance either to cut debt and achieve better profitability on — I mean the projects we haven't yet committed to, right? Because the Phase 1 purchase was already fully secured back in January. But for the remaining phases, we still have various options. We could shrink CapEx and debt and boost project profitability, or we could scale everything up, staying at the same CapEx but adding more batteries. That would give us a bigger project with greater profitability — given that we have debt committed from 5 banks, I believe up to USD 200 million for Oasis. That could also be an opportunity for the company, but we're looking at both possibilities.

David Ruiz de Andrés

executive
#29

And I think in the upcoming update we'll provide some detail on this, yes. Regarding Ayora, well, the long story is that it has been under construction. We continue to believe that mechanical completion might be achieved by the end of this year. As you know, the government extended the interconnection and provided additional flexibility. Originally, our projects — most of our projects in Spain — were meant to be connected in June, I believe it was June, July 2025. Now those dates have been pushed out. That could be somewhat good news for others. But for us, we are truly on track, though we are sort of reorganizing the interconnection date together with the remaining partners in the nodes. But — anyway, this part, as you know, it's — we are looking at a build-to-sell. And also, we have been in very advanced negotiations for quite some time already. We still believe that this deal will be announced before the end of the year, perhaps sooner, right? And I think the — given that we have a fantastic PPA, right, with Amazon, we don't expect that capture prices will be lower given that we have a very high percentage contracted. So I think the figures will be slightly similar to the last deal we announced.

David Ruiz de Andrés

executive
#30

That covers Ayora. In any case, as soon as we have any news, we'll let you know.

Marta Castro

executive
#31

And our next question comes from Paul at Kempen.

Paul Chabran

analyst
#32

David, just one question for you. Over the last month, you sold a big stake in the company and stepped down from your CEO role. Could you explain why you made these 2 moves, and are you planning to further reduce your involvement with the company?

David Ruiz de Andrés

executive
#33

Yes, well, thanks for asking. On that first item — as you're aware, an extremely large share of my personal wealth sits in this company, perhaps above 80%. Because of that, I occasionally need to reduce holdings in other ventures I'm involved in. This is, I believe, the second occasion I've done so, but in any case, I didn't sell — in fact, what I sold came to under 3%. I believe it was 1 — 2.8%, 2.9%, to an investor who was already a shareholder in the company, correct? And I view it as a logical step given that we ran a share buyback program. I'm also climbing back up to roughly the same percentage, right? So I'll be — I dropped to 51%. At present I'm very near 40% — 54% following the share buyback period. So I'll end up in the same position, right? This is purely a financial transaction. And I don't anticipate carrying out further deals, at least not this year, that's certain. As for the other item, it's something we'd been planning for quite a long while. I think it makes complete sense from a corporate governance standpoint. Operationally speaking, right, I think splitting the CEO and Chair — and Chairman, right, Executive Chairman, roles — and we're very pleased to have Pablo with us now, since he'd right been at the company for some time.

David Ruiz de Andrés

executive
#34

He'll take on more responsibility for the operational divisions, correct — development, construction, and running the plant. I'll be more — I'll focus more on corporate strategic decisions and wealth. That's how we're set up. And I believe it's a good move for the company, given that the company is growing, and we already number more than 500, and we have to deal with many markets. So it's — I think this is great — it's going to be a big help to me and great news for the company to split the roles, yes.

Marta Castro

executive
#35

Next up, we have a question from Jorge at <<inaudible>> Capital.

Jorge Guimarães

analyst
#36

Could you update us on where things stand with the sale of the final asset in the Valkyria program in Spain? That's the first one. And second, with the experience you're picking up in Chile, has your view on batteries in Spain shifted, or do you still think some form of capacity payment, CFD, or similar mechanism is needed for batteries to be profitable, whether stand-alone or by hybridizing existing assets?

Daniel Herrera

executive
#37

Thanks, Jorge. I believe your first question was more or less addressed earlier, correct? You're referring to Ayora. We hold additional assets in Spain, though those weren't part of Valkyria. So to this point, the final piece of Valkyria — I mean, up to now, to put it briefly, it came to roughly 1 gigawatt. We ultimately — one of the early options involved farming down 49% of the entire platform, of the whole gigawatt, but in the end we retained the 200 Escuderos plant, right? And that stands as a very solid candidate for our inaugural hybrid project. That ties into your second question, correct? After that we farmed down 100% of Belinchon to a solar pipe to equity. We farmed down 300, which remains under construction and finance, to Allianz, right, Tabernas, Jose Cabrera. Then, to wrap up Valkyria, Ayora is still there and the original decision has been to farm that plant down as well, right? That's the full picture of Valkyria, correct? As for replicating Oasis Atacama in — or this scheme across other countries, that is definitely going to happen, right? And we're working extremely hard analyzing — the great thing about BESS storage is that everything is moving so quickly, right?

Daniel Herrera

executive
#38

I mean, take a look at the 11 gigawatts in our pipeline — 1 gigawatt is already under construction, and we — the remainder of Oasis Atacama is going to enter construction very soon. So 40% of that 11 is already being built. It will be under construction very soon. And things are progressing very quickly, right? Why is it happening first in places like Chile, Australia and some parts of the U.S. first? Well, because regulation exists, because there's a gap between day and night prices and, well, perhaps other factors, right? But we're quite confident that eventually we can replicate this in other — especially other sunny regions like Spain and Texas, and we're analyzing the markets very well. They have very high potential for introduction of BESS. But it takes time. Yes, in Spain we are obviously missing some inputs and — but everybody thinks that it's going to happen, right? So we're missing the regulation for capacity payments. And we're also kind of educating the large offtakers like — the hyperscalers like Amazon and Microsoft. Look at the announcement that Amazon made in Aragon yesterday — the day before yesterday, it's unbelievable.

Daniel Herrera

executive
#39

Energy will be required around the clock — 24x7, correct? That creates an excellent opening for BESS paired with other <<inaudible>> as well. What Spain truly lacks is regulation, correct? And hopefully that will be put in place before the year ends, right? Once regulation exists, and we have demand, and we have regulation, and we have the gap, then all the pieces — everything will function. So my sense is perhaps if not in 2025, then in 2026, definitely, Spain will see a storage boom, covering both stand-alone and hybridization. Of that we are very certain, and possibly sooner in Texas.

Marta Castro

executive
#40

And our next question comes from Eduardo from <<inaudible>>.

Eduardo Imedio

analyst
#41

I have 2 questions, though one of them has already been addressed. I'd like to follow up on what Jorge asked regarding Ayora. Given that you've now locked in the financing needed to build Tabernas and Jose Cabrera, how do you plan to approach construction of Ayora? Do you intend to arrange bridge financing while waiting for that asset to be sold, or will you be going with full equity?

David Ruiz de Andrés

executive
#42

Thanks, Edward — that's a really pertinent question. As a rule, we keep a number of tracks open, right, for — one point we're currently talking over with the prospective buyer at Ayora is whether this will be structured as a ready-to-build transaction, which is what we — or instead as a COD deal. Should it be ready-to-build, an approach we've already carried out, that typically means we hand over the shares, receive a very large portion of the price, and afterward stay on in the role of an EPC contractor. That's the route we took for this — to give you one illustration, at Matarani in Peru, right. A different strategy is the one we followed alongside Allianz and — okay, we arranged the financing, we — this is precisely what we've now completed with MUFG, Santander and Natixis for Tabernas and Jose Cabrera, and after COD we then transfer the plan, right? That's the other — the alternative route. Both possibilities remain available to us at present. In fact, those same banks that provided financing for Tabernas and Jose Cabrera are more than willing. It's all covered within the term mandate, within the same mandate. They are certainly able to go and finance Ayora, right?

David Ruiz de Andrés

executive
#43

So it's the identical PPA, identical project, identical sponsor — nothing changes at all. But that only works in the case of a COD deal, correct? With a ready-to-build deal, that simply wouldn't make sense. As you mentioned, we might in every case request a bridge; typically, bridges are corporate facilities. Closing happens more quickly with them — they close faster — yet it remains corporate — at the end of the day it's a corporate loan, right? So that's another option we can — we're considering it, right? Still, I believe we'll provide more detail during the September presentation. By then we'll know which route we're taking. And — but the natural approach will be, fine, simply taking — shifting the deal to COD and afterward employing the identical project finance facilities that we used for Jose Cabrera and Tabernas.

Marta Castro

executive
#44

We’ll take one more question now, and it comes from Fernando at RBC.

Fernando García

analyst
#45

With the rise in U.S. electricity demand factored in, how do you rank your projects there, and how do you weigh the chance of advancing any of your U.S. projects to the construction phase against other geographies?

David Ruiz de Andrés

executive
#46

Thank you, Fernando. Our expectation is that the U.S. — what I mean is — and that is the reason we made the decision to — for the first time, acquire a developer that already exists, right, an existing platform rather than building from zero the way we have done in other geographies across the U.S. So we were looking to speed up what took place 2 years ago, a bit — in fact more than 2 years, right? We — a learning curve is always there. We want to be certain we don't make any mistakes, particularly in a country — sorry, in a market such as the U.S., where — the figures are huge. It's — it ought to be, if — our biggest market in, naturally, our biggest country 2, 3 years from now, right? But we want to be sure about the timing, and we want to proceed step by step, right? In any event, I think we may begin with construction. We want to build up construction capabilities. I think a great team is being assembled by us in the U.S. I think we're already close to 30 people. A very good pipeline is being developed by us. Great opportunities are there. As in every other place, the huge driver at present is data — it is the convergence of data and power, right?

David Ruiz de Andrés

executive
#47

It's generating an incredible new source of demand, right? Everyone anticipated tailwinds such as electric vehicles and hydrogen vehicles. Fine, that's going to happen. But over the very, very near term, right — in the short and medium term — the really strong demand for new PPAs is coming from AI and data centers, and it's genuinely coming from these companies, right, like the ones we've mentioned, that are the major drivers and the major — so that's taking place in the U.S. It's taking place in Europe too. And we're tracking that trend, and many of the new PPAs we'll announce will certainly be aimed at meeting this need, the needs of this fresh demand. I believe the U.S. will play a very significant role. There are elections under 6 months away. I think it's in the first week of November. We also prefer to wait and see, right? Because some — if you know that the question now is what happens if Trump wins. Well, nobody truly knows. We all think that even the IRA, the — IRA, the entire concept behind the IRA is very Republican, is really helping build local industry, I think, rather successfully, right? It's really helping many <<inaudible>> states such as Texas, such as the southeast.

David Ruiz de Andrés

executive
#48

And I don't believe there would be anything more than small adjustments. But naturally, before we lock ourselves into PPAs, we'd really like greater clarity on whether the IRA ends up being modified, since that modification could have some effect. So it's a very intriguing market. Developments are happening at quite a pace. And I think we're positioned to ramp up quickly once we judge the moment is right.

Marta Castro

executive
#49

Alright, we’ve got 2 more questions, and one of those comes from Eduardo at Santander.

Eduardo Martin

analyst
#50

Yes, that's meant for David. If I recall correctly, you mentioned that with Ayora, you'll be the one running the Valkyria project. So then, what's the situation with Clara Campoamor? Should we expect a sale of that asset? And on top of that, could you give us some update on where things stand regarding development and regarding the permits for Clara Campoamor?

David Ruiz de Andrés

executive
#51

Okay, thanks. Alright, you're Eduardo — not Edward, correct? Fine. So, Clara Campoamor — that has been contracted, yes? We're aware of that. And I believe the major development — or at least part of it — is that, if I'm not mistaken, we've secured the environmental permit for 250-odd, and Daniel, correct me if I've got that wrong, but my understanding is it was scaled down. You'll recall that at the outset it stood at over 400, right? What's different now, I think, is that this project is going to have considerably more time available. We have, I believe, an excellent PPA. That PPA has also bought us additional time, since the offtaker here is Lyondellbasell — this isn't the Amazon PPA. We could potentially begin as late as the close of 2026. So we're able to take somewhat more time. There's also the possibility of incorporating storage into that project, right, and turning it into something rather different. And we're actively pursuing that. But I'm not suggesting we've become relaxed. We are never relaxed when it comes to that project — yet not really — at first, our thinking was, okay, this needs to be hooked up by mid-2026. Now we'll have, I believe, until 2028 — which isn't to say we'll connect that plan in 2028, but we do have far more time.

David Ruiz de Andrés

executive
#52

We're pursuing various strategies even alongside the offtaker, since this could be the first project we're able to announce as something like a hybrid PPA in Spain. So we're exploring several different alternatives, right?

Marta Castro

executive
#53

And our final question comes from Anis at ODDO.

Anis Zgaya

analyst
#54

Since my first question has already been addressed, I'd like to ask about cash flow. Could you walk through how the EUR 50 million of divestments in the cash flow statement is calculated? I had thought the Peruvian projects carried a lower level of debt, so I was expecting those sales to contribute more to cash flow.

David Ruiz de Andrés

executive
#55

Thanks. Daniel, I think I’ll hand this one over to you, okay?

Daniel Herrera

executive
#56

Yes. Well, we’ll have to verify that figure. The EBITDA contribution from the Duna Huambos project hasn’t really been significant. The main contribution has come from the Matarani Solar PV asset, both from selling the asset, of course, and also from the construction. And you’re right, the Peruvian — the wind asset was financed with corporate debt. So — but it didn’t make much of an EBITDA contribution; the net effect and net debt have not — and cash flow has not been really significant, but the equity. And then the Matarani asset contributed around USD 20 million in EBITDA; there was some earn-out. And that project, since we had also begun construction and there was some CapEx invested previously, has contributed more cash flow beyond the margin generation. However, there will be more — pending revenue coming from this Matarani asset as the project is being built. If you have more doubt, we’ll need to check it with the finance team and I’ll let you know.

Anis Zgaya

analyst
#57

Okay, I’ll ask one more question if that’s all right — yes, it concerns the European elections. We discussed the U.S., and there are elections in Europe coming up soon in June as well. So how do you view those elections, given that the previous 5-year term was favorable to renewables? Are you worried about shifts at the European level regarding the direction of the energy transition?

Daniel Herrera

executive
#58

Well, it's the big election year, isn't it? Mexico's vote is coming up in 2 weeks, I believe—that's next on the calendar. We brought this up earlier, right. In the U.S. it's November, and the U.K. announcement came, I think for July. So elections are happening everywhere. What we're seeing—and Europe has us somewhat worried, right? On that front, I'd say things are progressing much more quickly in the U.S. and in Chile as well, certainly, right? And it also comes down to the biggest constraints. As <<inaudible>> mentioned, it's permitting. You can't sit around waiting 5, 6 years to get a PV plant developed, as happens in Spain or Italy in a lot of cases, right? That's one issue. Then there's over-regulation, and on the flip side, in many areas such as storage, regulation is what we lack. In other areas the market is overregulated. So I genuinely think Europe needs to take action. We're pleased with how things are progressing in certain markets. Germany comes to mind. In Germany's case, we're happy with the direction—we were somewhat surprised, since we'd anticipated longer development timelines, and now it's becoming simplified.

Daniel Herrera

executive
#59

However, Spain and Italy are still quite difficult. Those markets have proven very tough. As for whether something similar to an IRA could be implemented at the European level — well, we'll see, we'll see. But I'm not sure. I think it's rather challenging, right — whether that actually makes a difference in our industry, and what unfolds in the European elections, I think that has more to do with — still with each individual country.

Marta Castro

executive
#60

All right. With no further questions, that brings the first quarter 2024 Grenergy results presentation to a close. I hope we've addressed all of your inquiries. If anything comes up, please don't hesitate to reach out — we'll be glad to get back to you. Thank you very much for your time and availability, and see you next time.

David Ruiz de Andrés

executive
#61

Thanks. I really appreciate it.

Rocio Fernandez

executive
#62

Thanks, everyone. That's all from us.

Daniel Herrera

executive
#63

Thanks, goodbye.

Read the full transcript via the API

You're viewing the first half of this call. Get the complete Grenergy Renovables, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.

Get the API View API docs →

This call discussed

For developers and AI pipelines

Programmatic access to Grenergy Renovables, S.A. earnings transcripts and 132,000+ others is available through the EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments, full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.

More tools for stock research

OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Grenergy Renovables, S.A. or any ticker on your watchlist.

StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.