executiveLet's get started. All of these we're accepting. Good morning, and welcome to the 9 months 2026 results presentation for Grenergy. I'm Rubén Gómez, Head of Investor Relations, and as usual, this presentation will be led by our Chairman and CEO, David Ruiz; Daniel Lozano, our Chief of Strategy and Capital Markets; and María Rodríguez, our Director of Sustainability. They will walk you through our business, financial, and sustainability review. As always, once again, at the end of the presentation, there will be a Q&A session for sell-side analysts that covers the company. David, please go ahead.
David Ruiz
executiveI believe some folks are still coming in, right? Thanks so much, Rubén, and good morning to all of you. Thanks again for being here. Turning to our highlights slide, I'll begin with the key point for today, which is that I believe we continue to execute. We're moving at a very solid pace, and we think the figures demonstrate that. Revenue has grown by €845 million. EBITDA is up 28% to €141 million. Net income came in at €72 million. I think it matters a great deal that we are delivering what we laid out, what we committed to 6 months ago at the time we presented our 2026 to 2028 plan. Essentially, we sell energy, we provide financing, and we rotate some of these assets. In just the first 9 months of the plan's first year, we have contracted 3.4 terawatt-hours per year, along with 4.2 gigawatt-hours of capacity; we have signed $1.2 billion in project finance and a €170 million green bond. We completed the sale and transfer of Gabriela only 2 months ago, plus part of our distribution assets in Colombia. Two things I'd like to emphasize. First, backlog, the category that covers projects where we have already taken the final investment decision. In this quarter alone, we moved an unprecedented 1.1 gigawatts of PV and close to 7 gigawatt-hours into backlog. These are projects we intend to build, and we will be investing in them. Second is the unveiling of Pacífico Oasis, our new hybrid platform in Peru. Yesterday we announced the first PPA, nearly 1 terawatt. I believe it's the biggest PPA ever signed in renewables in Peru, and more significantly, it runs for a period of 15 years starting in 2029. CapEx was €476 million, mostly concentrated in Central Oasis, and well, we can anticipate it rising substantially in the fourth quarter to close to €900 million. On the next slide, I think we want to tackle right from the start the elephant in the room, the share price. The last few weeks have been rather tough for the stock, and we can't ignore that. Most of the pressure is macro. Higher interest rates, I think, are hurting valuations across the sector. We believe our financing costs are temporarily affected, and in some cases, this is impacting the expected price of our rotations. The 10-year rates peaked in both U.S. dollars and euros in early October. They have been improving over the last few weeks, and we expect them to ease in the months ahead. The sell-off in AI stocks has also weighed on sentiment, since AI is ultimately an energy business, as you know; however, some of the pushback might be more specific to us, and we have listened very carefully to feedback from investors and analysts. I think there are two areas where we can improve: the first is delays in energy revenues, and well, we are commissioning very large plants in Chile, especially Gabriela and Elena have taken longer than we expected. We're discussing only about 3 or 4 months more, but honestly, it's fairly remarkable. In the past year, we hooked up four of Chile's biggest, perhaps the four biggest and most systemic, power plants, and that is genuinely a real achievement. The testing demanded by the system operator and by us means those plants behave more like thermal plants. That process is far more extensive than we had planned, and reaching full commercial operation with the system operators takes longer; our view is that this doesn't diminish the worth of these assets across a 30-year life, yet it does hit this year's energy EBITDA versus our original estimates. We have roughly €25 million less in revenues during Q2 and Q3. We've taken lessons from these first projects. Our estimates are now becoming more accurate. Our commissioning processes are stronger, and we've increased operational oversight, so we are definitely continuing to improve. The second point is EBITDA visibility. 6 months ago, when we presented the 2026 to 2028 plan, no EBITDA figure was provided by us. Our focus was more on KPIs covering investment, fundraising, and asset turnover. Since then, investors and analysts have offered us very intelligent ideas; we agree more transparency on EBITDA is needed, and going forward, we will show the EBITDA of our assets in operation and under construction. We will also show the projected EBITDA of our backlog and our CapEx plan when we submit one. I think you'll find very useful information on slide 5. What hasn't changed, I think, is the strength of our fundamentals; in our view, they are stronger than 6 months ago. We have again secured 3.4 terawatts of contracted energy, 4.5 gigawatt-hours. That's just in 9 months. We have secured $1.2 billion in project finance; we have secured our corporate needs with a €170 million bond. More than €240 million has been generated from asset rotations. We've built a very impressive 1.3 gigawatts and 8 gigawatt-hours over the last year and a half, and we hold more than €300 million in cash. Moving to the next slide, just to give an idea of progress on the 2026 to 2028 plan, how we're doing against that plan. Before I continue, I'd like to take a moment to explain once more how our business lines are organized. First, there are the Oasis platforms, which are our hybrid PV and BESS. There are now four of them. We started in Northern Chile with Oasis Atacama, then replicated it in Central Chile with Central Oasis, and Central Oasis now accounts for a significant portion of our CapEx. That was followed in Spain with Iberia Oasis, and we have now announced, and I'm very happy to announce, our fourth hybrid platform in Peru. Different geographies and locations, but the same PV and BESS fundamentals. Then we have Greenbox, our standalone platform announced only 2 years ago, and it has already become a reality, probably the most promising pure BESS pan-European platform in Europe. The first of our plants are scheduled to come online during 2027, and we remain focused on bringing in revenue, with a meaningful share of our capital location going toward this platform. As you know, we currently operate in six European countries. Next there is GR Power, our flagship integrated utility business in Chile, along with our retail business in Chile. We have built it from scratch over the last 5 years, and today it ranks among the fastest growing retail businesses in the country, already producing positive EBITDA, €4 million through the end of September, with a very promising fourth quarter. Then we have GR Data. For now, both GR Data and GR Power operate only in Chile. Looking at how our plan has progressed after just 9 months of a 3-year period, on CapEx, when you combine projects in operation, projects under construction, and backlog, we already cover 80% of it, so there is plenty of visibility. Then comes financing, project finance, €8.8 billion in the plan, and we are 50% there in only 9 months. On corporate debt, the plan, as I mentioned, was €200 million, and we have already reached that point, so we are fine. Asset rotation, €800 million, and we are about 30% there, with several deals in different geographies being worked on right now.
David Ruiz
executiveSo the targets we set out for each of our divisions — it's really worth highlighting that for Greenbox, the objective is 8 gigawatt-hours either running or being built by 2028, and we're already 60% of the way there, with 5 gigawatts at advanced stages, as we'll show you in Greenbox; for GR Power, we set guidance at 5 terawatt-hours annually by 2028. We're at 2.1 already, which is above 40%, and we also have several processes underway in Chile. Then GR Data, 1.6 gigawatts of power land — that sits outside the plan entirely; it's pure upside. Now for EBITDA guidance, which completes the picture of our plan. We're providing two figures. The first covers projects already operating or being built, and those will generate over €250 million of EBITDA on a run-rate basis. The second: when you include the remaining projects that are part of, or expected under, our €3.7 billion investment plan, the figure exceeds €535 million. To be clear, that's the total — it isn't added on top of the €250 million. A few points to keep in mind: the EBITDA we're referring to is generated by projects we own. We're excluding EBITDA from asset rotations. When we rotate an asset, that EBITDA is removed, correct? We also used a fixed currency rate of 1.10. Let me walk through the mix now, since I think that's where the story really shows. As of today, when you look at projects running and those being built, Oasis LatAm makes up about 65% of the €250 million. Under the full plan of €535 million, it's only about half. Iberia Oasis rises from 15% to 25%. Greenbox rises from 5% to 20%. So in 2028 we'll have a more balanced picture than what we see now. Turning to the platform overview, this slide shows the whole platform. In total, that comes to 10.5 gigawatts of solar and 60 gigawatt-hours of storage, across Latin America, Europe, and the U.S. The key figure sits at the very bottom of that table. Across projects already running, those being built, and our backlog — the advanced stages, as we term them — we presently have 3.9 gigawatts of solar along with 17.5 gigawatt-hours of storage. Now, regarding what the Oasis platforms can do, and I'll be brief here, we currently count four Oasis platforms, which I noted earlier. Each of these is a hybrid combining solar with batteries. Atacama stands as the biggest, at close to 3 gigawatts to date. Next comes Central at 1.6, with 1.2 already within Iberia Oasis, and Pacífico Oasis is now getting underway at 1 gigawatt. For Oasis Atacama, this marks the first time we've chosen not to present rotated assets one by one. During phases 5, 6, and 7, we have 759 megawatts of solar capacity plus nearly 7 gigawatt-hours of storage. Sitting behind that — and this matters a great deal — are three projects at an advanced stage of development: Antofagasta, Pampa del Desierto, and Bandurrias. These are sizable projects that remain uncontracted, but I'd say we've got the right stuff and the right projects, and we're pursuing opportunities with large mining, with utilities, and with distribution companies. The same applies to Central Oasis. We're showing that phases 1, 2, 3 are already connected and energized, in the process of obtaining COD, as we mentioned earlier. Monte Águila is in phase 4. It has reached mechanical completion, and all of the batteries are now in the project. Every one of the four phases is backed by a PPA, and things are moving along nicely. As I said before, the commissioning work has taught us a lot, and those lessons are now being put to use as we bring our new Central Oasis plants online. Similar to Oasis Atacama, we hold a project reserve — Parral, Sol de Cañete, Chanquilhué — totaling roughly 700 megawatts. The pace at which these proceed hinges on our PPA efforts in Chile, again, primarily involving mining companies, distribution companies, and data centers. Turning to Iberia Oasis, we're providing an update here. Escuderos and Ayora are operating plants, PV, legacy assets; we do have solar assets. We're already doing hybridization work — take Escuderos, which was already under contract, and right now we're contracting Ayora, specifically the BESS portion for Ayora. We've also added two new assets, Indalo and Andrea, which will form part of the new mandate and the fresh Iberia Oasis contracting. In my view, Spain holds strong potential for hybrid plants as well as standalone ones, with economics that are quite similar. On the next slide — this is significant news, I'd say; and we should note we're not newcomers to Peru. It's been 11 years for us. Back in the day, we successfully built, financed, and handed over some wind assets, and also a big 100 plant—I believe that was two years ago. We see strong momentum in Peru. Yesterday we announced our first PPA for Matarani-Algarrobal: 900 gigawatt-hours annually over 15 years. For now these are solar-only projects. Later on, we'll add storage. It's the same approach we took in Spain with Escuderos and with Tenorio-Tamango in Chile. Once capacity payment regulations are in place, a business case will exist, and we'll incorporate storage in a second phase. The platform overall currently stands at 1 gigawatt, with a potential of 3.1 gigawatt-hours. Additional projects are nearing ready-to-build status. Solar's prospects in the country are now very strong, and I want to point to a few tailwinds that we've highlighted near the bottom of the slide. In short, a mining project pipeline worth over $60 billion exists, largely for copper. Peru stands to be among the biggest beneficiaries of the copper supercycle driven by AI and electrification. A number of major mining firms are reaching final investment decisions — Anglo American, BHP, Fortescue, Mitsubishi among them. With so many new mining projects plus expansions of existing operations, power demand looks set for robust growth. At present, Peru's consumption is 60 terawatt-hours, whereas Chile's is under 90 terawatt-hours. Chile is expected to add roughly another 20 terawatt-hours of demand, at minimum across the next five to six years, and that is quite striking. An important detail: so far under 1 gigawatt of solar has been brought online, compared with over 10 in Chile. Right now, Camisea domestic gas keeps prices low throughout the day, and apparently its reserves will run out beginning in 2034. That creates upside, and we expect 24/7 PPA prices to be higher. Regarding capacity payments, a framework much like Chile's should arrive starting in the second half of 2027, which will allow us to hybridize and repeat what we accomplished in Chile. Moving on to Greenbox, the headline is that we've reached 11 gigawatt-hours with solid visibility. As a reminder, our plan had guided to 8 for 2028, whether running or being built. Nearly 5 gigawatt-hours of that total is in backlog and under construction; during this quarter we shifted 5 gigawatt-hours into backlog. Between 5.5 and 5.9 more sits in advanced development. Construction is underway in Spain, and we hold backlog in Poland and Romania. Germany, the UK, and Italy come next. In total, 4.3 gigawatt-hours are in advanced development, and we anticipate moving projects into backlog shortly.
David Ruiz
executiveTurning to Spain, Oviedo stands out as a flagship, where we closed €100 million of financing. For 80% of capacity, we hold a 10-year tolling agreement. Construction is underway, batteries are already coming in, and we've picked up some projects through our buy-side division, the M&A team. In Spain, we're giving you considerably more visibility. Looking at our backlog, we already have 250, so that makes a fantastic package for the next project financing in Spain. Next, Poland and Romania: seven projects moved into backlog, which is very remarkable. The first two in Poland should be operational by Q4 2027. We already have government grants and some projects there. Then there are five large projects of 100 each, for which we've secured capacity payments. Then Romania: we have the Titu project, operational in Q3 2028; we've also applied for European Union funding, and the PPA is in advanced negotiations. We're very happy with the progress in Greenbox. On GR Power, just a few words: it's our in-house utility in Chile and a key tool for originating PPAs. It's growing — we now have close to 200 clients; we've contracted 2.1 terawatt-hours a year, which is 7 times what we had only in 2023; it's already profitable: €4 million of EBITDA, basically cash, basically net profit in the first 9 months, plus an estimated €3 million more for Q4. We're making progress toward an investment-grade credit profile, and basically we can offer 24/7 energy to practically any free client in Chile. Another 1.2 terawatt-hours a year is under negotiation. On GR Data, we already have 1.6 gigawatts of power land for AI and cloud in Chile. The big one is Quillayal — our dream that one day we can partner with a neocloud or a hyperscaler on a large gigawatt-scale project in Chile. We're working in that direction and already having several conversations; then we have two cloud campuses of 300 megawatts each, south and north of Santiago. We've mandated an international bank to help us find the best partners; this is a big upside for the company, but we want to be clear: it's not in our business plan, and today nothing is binding. When we sign initial agreements for any of these phases, we'll of course let the market know. Thank you very much. I now hand over to Daniel.
Daniel Lozano
executiveAppreciate that, David. I'll move through this fast. On slide 21, let's look at the main operating and financial figures. Overall output is up 8%, and it should keep climbing once the hybrid projects under construction in Latin America—and afterward in Spain—come online. Elena especially will add a positive boost in Q4. Of the total, 73% came from contracted production. This sits at the heart of our strategy. Our goal is a portfolio that's largely contracted, nearly like a regulated one, giving us clear sight of our returns. Prices we actually received are up 19%, and that should keep rising, since we've moved away from the solar PV platform of a few years back toward a hybrid model that lets us sell at night at much higher prices. The key financial figures are on the upcoming slides; for now, the main point is that net income has risen 58%, helped considerably by favorable exchange rate differences stemming from the dollar's appreciation. On slide 22, you'll find the revenue and EBITDA breakdown. Development and Construction contributed the most to revenue and to EBITDA alike, with asset rotation—chiefly Gabriela—adding a strong boost, at €116.4 million of EBITDA. The Energy division continued its growth, hitting €43.3 million of EBITDA, up 24%. Elena, as I said earlier, our BESS project — the biggest one in the Americas — will add positively to both revenue and EBITDA in Q4. On the retail side, note that accounting has shifted somewhat, which explains the -14% revenue figure. The system coordinator bills us for certain system costs, and we hand those through to the customer without any margin. Starting this year, they're recorded on a net basis. Had we compared like for like, retail revenue would be up 62%. Last, EBITDA is now at +28%, or €141 million. Turning to CapEx, we hit €476.4 million, largely on the back of our hybrid projects in LatAm, with Central Oasis contributing the most. Spain is now responsible for roughly 10% of overall CapEx, and Europe's portion is set to rise further over the next few quarters. For 2026, we previously guided to CapEx of about €850 to €900 million in H1. That guidance stands, and we anticipate a substantial step-up in CapEx during Q4. Turning to cash flow: we closed the first nine months with a cash position modestly above where we started the year — €318.6 million versus €305.4 million — despite having invested heavily, to the tune of €476 million, with more of the same planned for Q4. As explained earlier, asset rotation has delivered a meaningful positive impact on EBITDA. Within the net working capital movement, deconsolidating Gabriela has a significant impact, amounting to €250 million; project finance remains our method for funding projects, and during this year we also issued a €170 million green bond. Through September, I should note, the share buyback totaled €10 million, and we have invested €28.5 million under the program to date. Turning to the following slide on leverage and liquidity: total leverage stands at 5.1 times. As a reminder, our business plan specified an average leverage of 6 to 7 times, although certain periods will see it above or below that range, depending on asset rotation and EBITDA generated by the platforms. One thing to point out: the debt we utilize is project finance debt, and about 85% of it is either fixed or hedged, so increasing interest rates don't affect us meaningfully. Covenant leverage stands at 1.8 times, below the 3.5 times threshold that we aim not to exceed. That leverage mirrors a peak construction period, with our asset both operating and under construction, along with delivering an EBITDA run rate above 250 million, as David mentioned. That covers all I have. María will now take you through the key messages regarding sustainability progress. Thank you.
María Rodríguez
executiveThanks, Daniel. I’ll give you a really brief sustainability update. In this quarter, I want to call out three important assessments that have been finished; they reinforce the base of our sustainability strategy and, more importantly, help us do a better job of embedding sustainability risks and opportunities into the business. The first one, shown on the slide, is our climate risk assessment, which we have updated, and this time we widened the analysis considerably: it covers 51 projects in 10 countries and includes 19 physical climate hazards. We examined how those risks might develop under various climate scenarios and time horizons out to 2050. The aim is to bring climate risk considerations into our business processes so decision-making becomes more resilient over time. The second assessment, on the next slide, was an update of our double materiality analysis, which helps us pinpoint the sustainability topics that matter most from both angles: how they may affect our business, and how our activities may affect people and the environment. The process was thorough. We involved 34 internal and external stakeholders, among them clients, offtakers, investors, local communities, NGOs, suppliers, and others. As a result, as you can see, we identified 11 material topics and 27 material impacts, risks, and opportunities. That gives us a shared basis for prioritizing decisions and setting the focus of our next sustainability strategy as we go forward. Last, we keep strengthening human rights due diligence. There we are taking a proactive approach and staying ahead of regulatory requirements that are coming, and our work has covered enhanced risk assessment, on-site audits, and employee training to build the internal capabilities effective due diligence needs. Overall, the main message is that as we move toward a sustainability strategy that is more impact-driven, our approach extends beyond reporting. It is about understanding our risks and opportunities better, getting ahead of future challenges, and in the end strengthening the resilience and long-term value of our business.
Rubén Gómez
executiveThanks a lot, María; we’ll now move into the Q&A session. If you have one question, please raise your hand, as some of you already have, and as usual, we remind everyone to ask just one question per participant. Our first question comes from Fernando García at RBC. Please go ahead. You need to accept now. We’ve enabled your mic, so, Fernando, you need to accept. There should be a pop-up where you have to accept that you want to ask.
Fernando García
executiveCan you hear me now?
Rubén Gómez
executivePerfect. Now, perfect.
Fernando García
executiveApologies, I was slightly delayed in accepting. Thank you, Rubén. David, Daniel, many thanks for the presentation. In my view, this tackles a solid number of the key worries the market has held regarding Grenergy. My question concerns asset rotation. You clearly have been quite successful. They come with very high valuation. Of course, the flip side is that you wind up with a smaller base for recurring EBITDA, and the market usually assigns a lower multiple to that. Could you share a few thoughts on how you determine which assets to retain over the long term and which ones you are content to keep rotating? For instance, are there specific geographies, technologies, or kinds of projects, like storage or hybrid assets, that you regard as core to the portfolio you wish to own? Many thanks.
David Ruiz
executiveThanks so much, Fernando, for that question. We've gotten the same question a number of times, and it's quite clear we're shifting from a company where most of the EBITDA came from asset rotations to one — and you can see that path very plainly over the last quarters, right? — that will become even more pronounced next year, where a majority of EBITDA may come from generating earnings off the existing portfolio. That direction is clear, but rotating assets as a business is part of our DNA. I think we have one of the best M&A teams in the industry. The menu for asset rotation is very large, and obviously, if you ask me now, we're looking at a more diversified portfolio, bringing in more projects in Europe and eventually in the U.S. relative to what we currently have in Chile, and we try to reflect that on the EBITDA slide. Again, it's opportunistic. We have many projects, sometimes unsolicited processes, and well, obviously, we do what we believe is best to recycle the capital, yeah? We look at returns. We look at a more diversified picture. If you'd asked me 2 years ago, we basically only had possibilities in Latin America. Now we have a large portfolio of options, and again, we'll look at rotations on an opportunistic view; we have total guidance, but we can choose from one jurisdiction or another.
Rubén Gómez
executiveThanks a lot. Our next question comes from Gonzalo at UBS. Please go ahead. Gonzalo, you'll need to turn on your microphone.
Gonzalo
analystHi, apologies. I believe it's working now. Are you able to hear me?
Rubén Gómez
executiveYes, that's perfect.
David Ruiz
executiveYes, we can hear you.
Gonzalo
analystSeems like this microphone is giving all of us trouble.
David Ruiz
executiveApologies for that, everyone. We had been on Zoom for many years, I believe, and then switched over to Teams, and so, yeah. Sorry about that.
Gonzalo
analystNo, that's fine. It just needs a moment to come up. Thanks for the presentation. As Fernando mentioned, I believe it tackles a number of the main concerns the market has had lately. My question concerns the Peruvian assets, and you've explained quite well that you've already been there, and I recall when you had these wind assets that were successfully rotated out. I suppose my question is whether you could give a bit more visibility on the returns expected on the first PPA signed, on the BESS, and how do you view them relative to other markets and obviously more specifically on the Chilean projects? How alike or unlike are they — what shifts in contracting, interest, and possible asset rotation might emerge later on? Could you set them against Spain? In short, what relative returns should we anticipate, and how do you view them strategically compared with your other platforms? Thanks.
David Ruiz
executiveThanks, Gonzalo. To repeat, Peru is not a new market for us. We have built, operated, rotated and financed successfully there, so our experience in that market is substantial. A local team is in place, yet it works in a fully integrated way with our Santiago team. Construction and asset management, along with operation and maintenance, are all handled jointly. Remember that the bulk of these projects sit in Southern Peru, fairly close to our Oasis Atacama facilities. From a logistics standpoint and across the board, the two platforms share quite a few synergies, correct? As for the returns in Peru, I believe they're certainly in the double digits. Our target is roughly a 12% IRR — project IRR, right? That's rather impressive given the offtaker is an investment-grade utility, 15 years, the biggest one. We're discussing two PPAs, but combined, 900 gigawatt-hours, nearly 1 terawatt in Peru. Peru’s fundamentals look quite strong to me. That same supercycle in copper is also occurring in Chile, but I believe it is moving faster in Peru, with a great deal of investment coming from major international mining companies. They mention 20 terawatt-hours, which implies—according to our estimate—that 10,000 megawatts of solar will be needed over the next seven years. We genuinely aim to secure a share of that. At first it will be solar only, since we are awaiting the regulation; in a second phase—the regulation has already been drafted—everyone assumes it will take effect from some point in Q3 or Q4 of next year. At this point, that means capacity payments will come to us for storage, and storage is going to be highly competitive, which creates room to move toward 24/7 PPAs, right, since what we're announcing now are the old-school pay-as-produced solar PPAs. That's it. There's a lot of interest from the lender community regarding Peru, and once more, I consider it a great location. In other markets like Colombia and, I believe, Mexico, we aren't truly gaining traction, but I think — and Peru's situation is completely different — there are many synergies with Chile.
Rubén Gómez
executiveNext question from Santander. Please, Eduardo, go ahead.
Eduardo
analystYes, hello, and good morning. I really appreciate you taking my question. Regarding Iberian Oasis, could you walk me through the reason Ayora is now part of the platform? And is there anything new you can share about the projects still under negotiation? Since the CODs haven't changed, how confident are you about hitting those timelines for the capacity that hasn't been announced yet?
David Ruiz
executiveAntonio, sorry, by the way, I missed the second part of what you asked. The first one concerns Ayora, why it was included. What was the second one again, sorry?
Eduardo
analystYes. The first one concerned Ayora, which you are now adding to the platform. The second is whether you can give any update on the projects currently under negotiation, and whether, since the CODs for all of these projects remain unchanged and still fall in Q4 2028, you foresee any possible delays to the COD of those projects.
David Ruiz
executiveOkay. Thank you. The reason Ayora has always been there is that our plan for the Iberian Oasis platforms is to include plants that are either PV-BESS, hybrid plants from the very beginning, or plants that potentially can get the hybridization, right? Previously that was not the case for Ayora, because the offtaker was not really willing to do it. This, well, we are talking about — I'm not sure if it's public, but it's an IT, large IT U.S. U.S. company. Now it's very open, and they're encouraging the hybridization of the plant; that will take some time for the hybridization and permitting, but we will definitely be a hybrid plant, maybe 2 years or 3 years latest from now; that's the reason. Before, there was no potential for hybridization, it was more of an exit for us, but now there is this potential, it can be included in the platform. For the rest of the projects, well, we think we are fine. Most of them are in areas where we have already worked. In Dalo, it's even in the node where we have already connected some plants, and trafos have been reserved. I think we are good. I think we're good. I think we — well, some people might say, okay, 24 months, but for us it is definitely more than enough. We are now looking at the best offtake possibility. We have several options, and we're also talking with lenders for approaching this financing that we will do in Dalo and Andrea together as a batch, and we might include some other projects that are under negotiation. Most of these assets need to be connected by the end of 2028, some first semester of 2029. If this remains, I think the new government, if there's a new government, might get rid of this semester system, yeah, but anyway, we are working with this scenario right now.
Rubén Gómez
executiveThank you. Next question from Beatrice, Mediobanca. Please, go ahead, Beatrice.
Beatrice
analystYes, thanks. Sorry about how my voice sounds. Actually, my question concerns the EBITDA guidance. Could you help us grasp the key drivers behind that run-rate EBITDA guidance of €250 million, at above €250 million? Which main projects do you expect to drive that growth? What's the assumption for '28, I suppose? If you could just go a bit deeper into the number, in terms of projects and their contribution. Thanks very much.
David Ruiz
executiveThank you, Beatrice, and especially for the effort you're making with your voice. Daniel, I think I'll leave this one to you.
Daniel Lozano
analystThanks. What you're seeing is the organic EBITDA run rate coming from every asset we have in operation plus those that will come out of the €3.7 billion investment CapEx plan. That reflects the complete EBITDA potential these projects should deliver once they're fully up and running, regardless of any asset rotation down the road. The EBITDA tied to the divested project ought to be left out. On timing, '27, '28, naturally we want to get these projects operating as soon as we can, but as you're aware, it's really hard to see with full certainty exactly when those projects will be hooked up. That could shift the EBITDA contribution in the Energy division a bit. Since we don't want to hand out incorrect guidance, that's how a lot of the analysts we work with and some investors have advised us to do it, the way we can give what will be, right, the run-rate EBITDA, the cash flow generation of the assets in a sense; if the EBITDA arrives a little sooner or a little later, that has basically no effect; so we're giving plenty of detail, since the presentation is really built for investors and analysts, and you can construct the connection timeline yourselves. You can factor in some commissioning phase much like the Elena project if you'd rather be conservative, and you can build the energy EBITDA arriving in '27 and '28; on top of that, we have a great IR team that should be speaking with you folks and letting you know precisely whether there's any timeline deviation as soon as we have visibility on it. That's the answer we can offer you. We can speak with you afterward about your numbers if that makes sense, and that's how we'll keep delivering EBITDA run rate going forward.
Rubén Gómez
executiveThanks. Our next question comes from Flora at CaixaBank. Please go ahead.
Flora
analystHi, can you hear me?
Rubén Gómez
executiveYes.
David Ruiz
executiveYes, that is extremely, extremely clear.
Flora
analystThank you. Thanks for the presentation. Might I politely request that you share your thoughts on the returns you are observing for standalone BESS across Europe? A competitor of yours delivered what I'd describe as a cautious message regarding tolling, permitting, and how visible this return is. Is there anything you can tell us about how you see the returns you anticipate on standalone in Europe, and whether the growth you projected at the start of this year remains intact, which I presume it does? If you could offer us some detail to set against this more cautious view we're hearing from the sector. Thank you.
David Ruiz
executiveThank you. Appreciate that, Flora. I can't say for certain. When you consider how much interest standalone projects in Spain draw — meaning those built there purely as standalone — it isn't all that large. Interest is strong. We're reviewing projects. Right now there's a lot of appetite among many developers, considerably more than for hybrid projects, since in a way the PV price, the capture price, is fairly depressed. Should someone hold a big portfolio of merchant projects, or ones that are somewhat distressed, there could be an argument for simply deciding, fine, better to put batteries into those projects instead. If you're beginning from nothing, then I'd say both strategies are sensible. I think that at present, in a nation such as Spain, standalone projects deliver better returns during their initial years than an equivalent hybrid plant would, since owning a PV component doesn't really add much value. Down the road, those returns become fairly comparable. I'm referring to Spain here. Every market has its own situation, and the evidence lies in the enormous momentum behind standalone. With standalone you can move faster, seize certain markets ahead of cannibalization, and in my view it's a more adaptable strategy. You're able to target various markets. As for returns, we target a minimum of 9% project return. Across certain markets — Germany comes to mind, along with Italy and Spain — our project portfolio keeps delivering double-digit returns year after year. Evidence of that: not long ago we closed financing with Santander and SMBC on a bundle of projects, and now we're pursuing a second such portfolio. The numbers, I'd say, hold up; we feel good about the standalone proposition, and we're working hard to build what we think could become one of Europe's most appealing and strongest pure BESS platforms.
Rubén Gómez
executiveNext question from Nacho Doménech, JB Capital. Please, go ahead.
Nacho Doménech
analystHi, can you hear me?
Rubén Gómez
executiveYes.
Nacho Doménech
analystHello, and thanks. Yes, thank you, David, Daniel, and Rubén, for the presentation. A quick question about asset rotation, right? Previously, you've done quite well rotating assets at an invested capital of roughly 1.6 times. You said you're working on various opportunities, correct? I was wondering whether you could say more, perhaps about how large these opportunities are and the target multiple, right, that you'd be aiming for on some of these rotations, or maybe a multiple below which you wouldn't want to go, right, that would imply it's under the 1.6 times. Perhaps you could say more about that. Perhaps one last question about those tolling agreements in Romania and Spain, which as I understand are reasonably far along. Is it fair to think we could see those tolling agreements signed before the year is out? Thank you.
David Ruiz
executiveAll right. Let me start with the tolling agreements. I'm not sure — we're already at the end of November. There are a number of discussions taking place, and some are quite far advanced. My guess is that we may be able to announce our first tolling agreement for the project in Romania that is furthest along. It's shown on this slide. That market has its own characteristics. Lending works differently there, but we are in talks with a few European banks. We're seeing quite a bit of interest. First, we'll announce the tolling agreement for Titu, and right after that we'll launch the project finance mandate. Then there's Spain—internally we refer to it as Greenbox 2, the second package, which will be at least double the first one, perhaps 2.5 times. In Spain, the first package was 150, and the second is already 250 in backlog, essentially ready to kick off in 3 to 4 months; we may add more projects to aim for a larger project financing, at least twice the size of Oviedo. The strategy is very similar. I believe we'll use a day-ahead swap for that market alone, and operations will continue. In addition, our Spanish control center and energy management team are already established, and we'd be glad to have you visit our office. Watching how we intend to optimize the batteries across the various markets we're in is, I think, quite fascinating, and we'll handle that in-house. It's really something worth seeing; we may see new tolling agreements within the coming two months in Spain, Poland, and Romania. Poland too—we're taking our time there, since the vast majority of their projects reach COD in 2029. The combination of this COD and the TSO might be able to move forward, though at this point we need something to pair with the 17-year capacity market arrangement we secured — specifically a tolling agreement, and we're seeing abundant liquidity there. When you combine those two elements, I believe we end up with a project IRR that holds steady at 12% to 13%. That's the overall picture, yes, and beyond that we're putting in a lot of effort in Germany, Italy, and the UK to bring it to fruition; it's excellent news that Spain is no longer the only market. For Greenbox storage, we're now providing visibility across two additional countries. On the topic of asset rotations, I'd say a 1.6 return is genuinely remarkable. We did hit that figure in the most recent rotation in Chile, and it's worth remembering that we also pulled it off in Spain. During the early stages of our Valkyria projects, we rotated certain Spanish solar assets at 1.6, and in some cases even 1.7. When it comes to our plan, we're working with 1.3 as the average, right? That doesn't rule out rotating a single non-strategic, non-core asset at a lower ratio should we feel the timing is right, but 1.3 is the number we have in mind. You're right that returns go up for buyers when interest rates rise and WACC climbs, so at the moment getting very high valuations isn't easy. Still, there's no rush on our side, and we're focused on making the right rotation at the right time; our menu of jurisdictions and geographies is very large. I can't share more details, but we're working on both large rotations and smaller ones. As always, we'll share news once we have something binding.
Rubén Gómez
executiveThank you very much. Next question from Anis from Oddo. Please, Anis, go ahead.
Anis
analystYes. Yes, thanks. Good morning, and thank you for the presentation and for taking my question. I actually have two, if I may. The first is about regulation. Given the Spanish election coming up and the royal decree on data centers that was recently approved, how do you expect the political and regulatory landscape to develop for the group, and especially for Iberian Oasis and Greenbox? My second question concerns the BESS commissioning and testing phase. Could you elaborate on what is behind the longer testing and commissioning periods for large BESS projects in Chile, and should we assume up to 6 months for every project, or was Elena a specific case? Thank you.
David Ruiz
executiveThanks — I appreciate it. Let me start with the regulation question. One big reason we feel so confident about data centers in Chile is that the government backs them completely, and they see them as beneficial for the country. Their support has been strong, and my expectation is that time-to-market there will be much quicker than in Spain. Our initial 18-megawatt phase is just about set to begin construction, and we kicked off that development a bit over a year ago, correct? That’s genuinely accelerated, and the government backs it strongly, and I’d say the fundamentals are excellent, and no regulation comparable to the one just approved by the government exists; we’ll find out if Spain’s new government will issue a fresh royal decree or alter the present regulation, which we consider among the most convoluted data center rules internationally. Regarding how this affects our storage, whether standalone or hybrid, the possible Ministry of Energy, and also the Partido Popular’s program, backing is robust, and support for storage is stated explicitly, correct? And pumped hydro—clearly pumped hydro—along with storage and lifetime extensions for nuclear facilities, though that's explicitly written into the program, correct? I'm confident it will roll out the red carpet for hybridizing existing solar farms, whether solar-plus-wind or standalone setups; should a new government ultimately take that path, we foresee no issues, though one never really knows. On your other question—to be more specific—we've already interconnected four sizable projects in Chile, and those represent our first big PV-BESS interconnections, and in a sense they're the biggest storage-equipped assets ever hooked up to Chile's grid, right? This is a new situation for us and for the TSO as well. During testing, in certain cases — let me give you an example. Last week we made connections at Central Oasis Tamango and Planchón. Gran Teno had already been hooked up back in September. What that means is the project begins producing, continues producing solar power, and is already cycling energy through your battery. You're able to cycle the battery, though not on a daily basis, since you aren't yet part of the TSO's official program. At this stage you have to carry out numerous tests, much the way a thermal plant would. When all is said and done, you operate 24/7, so it calls for a different approach; that approach wasn't very clear, and I believe it is much clearer today. From roughly the instant the plant is fully connected and mechanical completion has ended, we regard the plant as operational, up to the point where we receive the COD from the TSO, which is when capacity payments begin and you can start cycling every day without disruption. In Elena we required 5, 6 months, whereas our initial estimate was 2 months, 3 months, correct? We are trying to shorten that period, but at a minimum we will need 4 months. That does not mean we receive no early revenues. You do get some early revenue, but it's harder to predict, and capacity payments aren't included in that, correct? I think we're learning, and I think the TSO is learning too, so we're working on it. That's really all I can say. As Daniel said, my view is this doesn't really change what the plants are worth, but if you look at our estimates for a year like 2026, then yes, we're short €25 to €30 million in energy EBITDA due to that misestimation. So that's why we said, okay, folks, we got this wrong, we're fixing it now, we're making our estimates more accurate now, and that's it. I think it was fair for us to recognize that issue and to explain what is behind it.
Rubén Gómez
executiveThanks a lot. I believe Fernando has one more follow-up question for us. Fernando, please go ahead.
Fernando García
executiveThanks very much, Rubén, for having me on again. What I'd like to know is where things currently stand with this data center opportunity. Could you say a bit more about the timeline? David, you mentioned that progress is happening more quickly, likely in Chile compared with Spain. Then, regarding your remark about the bank-mandated process for the 1.6 gigawatts, what is your plan there? Are you approaching it one asset at a time, or would you rather discuss the entire portfolio? Thank you.
David Ruiz
executiveAppreciate that, Fernando. So we have a process in motion right now, and interest has been quite robust. It's being handled by a major U.S. bank, and we actually kicked things off 2, 2 months back when the formal announcement went out. Things look like they're moving along nicely. I can't say exactly how many NDAs have been signed, though it's certainly north of 15. There are different public, yeah? On one hand, there's the possibility of a big AI training buildout. It doesn't have to start at 1 gigawatt right out of the gate. It could obviously come in phases, right? That's for AI training. You either strike a partnership directly with a hyperscaler, or you go through a neocloud, right? Ultimately, with AI training, everyone understands the location requirements, correct? Ours is a strategy without capital expenditure or borrowing. Our goal is to create value from where we stand in the market, what we've developed, our permits, the accelerated path, and how quickly we can deliver to market. Should the chance materialize, we'll raise some capital through it, yet above all, we'll be providing power over a 20- to 25-year span to that purchaser; we're the ones bringing the buyer in, correct? Prior to having the facilities, we must sell power to the mining operations wherever those firms, or whoever they may be, or customers are, and through this you're delivering your buyer to the facility. That's the guiding principle. When you look at the campuses in and around Santiago, it's closer to the situation in Spain. Again, as I said, the market there has less liquidity. You've got four or five of the usual suspects, hyperscalers that are expanding. Santiago in this case is competing with Brazil, São Paulo, and Querétaro in Mexico as regional hubs, and there's a lot of interest, but here too we can either partner with a hyperscaler or work through a sponsor — those are private equity-backed — and that's a different type of partnership. Our aim, once more, is to create value from our developments and to be in a position — this is essential for us — to sell the energy for 20, 25. That's it. We aren't considering more intricate joint ventures in which we'd take equity positions in the sponsors. That's not something we're examining, correct? That's our stance. Once more, the key point regarding Chile is that developments can happen remarkably quickly relative to what we observe in Spain.
Rubén Gómez
executiveGonzalo at UBS has one more follow-up, and after this we’ll wrap up the Q&A, all right? Gonzalo, you’re the final one, please go ahead.
Gonzalo
analystThank you. I appreciate that, Rubén. I actually had a follow-up question about something you said regarding asset rotation. Clearly, the increase in yields hasn't been helpful, I suppose, for pushing valuations higher, and I think that's quite a reasonable point. What I'm asking is more about how quickly you're seeing offtakers, big clients, being ready to factor a higher price into PPA prices so that it also mirrors the increased cost of funding, and whether this shift in the yields and rates environment is causing any kind of changes to your strategy that you laid out for '25 and then refreshed earlier this year? I suppose the real question is: apart from asset rotation, what does a higher yield environment mean for your strategy? Thank you.
David Ruiz
executiveThank you, Gonzalo, and for new investment that's a good point. We have Peru as an example, and I hope the offtaker isn't on the call, but we had a price, and in the end we were able to raise that price thanks to tougher bidding conditions. This is a market driven by supply and demand, in my view. Looking at Spain, we're seeing strong interest in hybrid PPAs and in 24/7 PPAs; someone was saying just now that there's no case for standalone in Spain. I'm quite bullish on standalone in Spain, and a few hyperscalers are issuing RFQs with a heavy emphasis on storage, correct? Those batteries might be placed in a hybrid plant or they might be standalone. The economics don't differ much, right? I think the case for hybrid or standalone is fantastic. Obviously, the situation is more complicated if you have a PV plant with no demand. The price you might secure for a PPA today is perhaps in the mid-€20s, versus high-€30s previously, right? That's completely different. In any case, we're seeing strong demand for energy in every market, and some offtakers, IT among them, aren't chasing the last dollar or euro. They genuinely need the energy, and time-to-market matters a great deal.
Daniel Lozano
analystAnd if I could, David, just to build on that answer, the PPAs we have in LatAm are indexed to inflation. Rates are climbing due to inflation, and in fact that offsets the negative impact through higher prices over the long term on a 15-year contract, all right, and at the same time on the interest rate side we are hedging, and for those projects the project finance already in place has been hedged, which is producing a favorable effect on returns.
Rubén Gómez
executiveThat brings our 9-months results presentation to a close. Many thanks for joining us, and we will see you all when we report our full-year numbers at the end of February. Thank you very much.
David Ruiz
executiveThanks. Have a good day.
Daniel Lozano
analystThanks. Bye.
María Rodríguez
executiveThanks. Bye-bye.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete Grenergy Renovables, S.A. transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to Grenergy Renovables, S.A. earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in Grenergy Renovables, S.A. or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.