operatorGood day, ladies and gentlemen, and welcome to the JSW Steel Q1 FY 2025 results conference call. Please be reminded that every participant line will be in listen-only mode, and once the presentation ends, there will be no chance for you to ask questions. If you require assistance at any point during this call, please signal an operator by pressing star to zero on your touch-tone phone. Kindly note that this conference is being recorded. I will now hand the conference over to Mr. Ashwin Bajaj, Group Head of Investor Relations. Thank you, and over to you, sir.
Ashwin Bajaj
executiveThank you, Operator, and good evening to everyone. It's a pleasure to have you join us for JSW Steel's earnings call covering the first quarter of FY 2025. Joining us today is our management team: Mr. Jayant Acharya, Joint Managing Director and CEO; Mr. Gajraj Rathore; and Mr. Swayam Saurabh, Chief Financial Officer. Mr. Acharya will begin with opening remarks, after which we'll open the floor for Q&A. With that, I'll hand things over to you, Mr. Acharya.
Jayant Acharya
executiveOkay, so good evening, everybody. On the macro picture, worldwide economic growth should stay steady. We had the IMF forecast come out yesterday, and the positive part is that they've added a modest upside for 2025. Inflation is easing bit by bit, and the first few rate cuts in the Eurozone and Canada have already happened. That gives us a likely possibility of monetary easing beginning sooner in the U.S. too. The global manufacturing PMI keeps improving, which is essentially pointing toward a softer landing. Still, geopolitical risks are a worry. In China, the property sector remains a challenge, but manufacturing exports and fixed asset investment outside of real estate have performed well. The government has announced some support for the real estate sector. We need to watch how that unfolds. Private consumption is still healthy. India's strong economic momentum carries on, powered by various sectoral pushes such as infrastructure CapEx from the government, private CapEx now picking up, manufacturing, energy transition, and improving positive consumer sentiment. We expect a rebound in government expenditure after they return, and we anticipate a favorable monsoon to bolster rural demand and consumption more broadly.
Jayant Acharya
executiveRobust foreign capital inflows, helped along by inclusion in global bond indices, are poised to give the strong macroeconomic picture an additional boost. Turning to steel, worldwide output from January through May held steady at roughly 793 million tons. Inside that total, China shrank by roughly 1.4%, while the remainder of the world expanded by 1.6%, which came to about 6 million tons on each side, and that was how the period balanced out. In India during quarter one, group steel production climbed about 4.6% year on year to 36.6 million tons, and consumption rose impressively, up 14.9% to 35.4 million tons. We see strong growth in steel demand carrying on. The budget will probably take a proactive stance on the spending the government has undertaken previously in areas such as infrastructure CapEx, manufacturing, and the energy transition, among others. We anticipate steel demand staying in the 10%+ range for FY 2025. By our expectations and estimates, steel demand could land somewhere between 148 million and 150 million tons this year. Once again, a strong outlook across the key consuming sectors throughout Indian industry will drive this.
Jayant Acharya
executiveDuring the first quarter, steel imports into India rose 27% YoY, though they came in lower QoQ — yet elevated exports out of China remain a worry. Chinese output is still running at higher levels. Domestic demand continues to be softer, so the surplus is flowing out into the world. A number of countries have erected barriers against such surplus steel entering their markets. India is a soft target, and we have no trade measures of any kind in place, and that is a concern for the Indian steel industry. Imports from other FTA countries have also climbed by 43%, heightening our concerns about trade diversions into India. At JSW Steel, we are mainstreaming sustainability across the businesses, and generating sustainable value has been one of our core priorities. We are committed to achieving net zero emissions by 2050. In May 2024, we recently published our first climate action report, in which we detailed our decarbonization roadmap, its levers, and alignment to TCFD. We continue to focus on reducing our fossil fuels and increasing the renewable energy. Last quarter, we mentioned to you that we have added 600 MW of renewable energy in Vijayanagar, in addition to the 1,000 MW which was in process across the plant.
Jayant Acharya
executiveWe've now made the decision to bring in a further 600 MW at Dolvi, split between wind and solar, and once that is fully commissioned it will lift our total renewable capacity to 2,200 MW. That is a positive not just when it comes to carbon emissions but also on the cost side. Over the last two decades, JSW has grown in a way that leads the industry and is aggressive on value. Going forward, with India's economic growth prospects and steel consumption continuing to rise, our focus stays on reaching a capacity of 50 million tons by the close of this decade, FY 2031. Work has already begun on a 42 million-ton capacity in India at Dolvi, and we expect that to be finished by September 2027. All of these are brownfield capacities within India, carrying low specific investment costs. Alongside this steel capacity growth, we are adding a number of strategic initiatives aimed at lifting our margins and profitability. Among them is the slurry pipeline in Odisha of roughly 30 million tons, which will cut our logistics costs for iron ore sharply. It will make the iron ore supply chain more efficient, and we will commission new captive iron ore and coking coal mines, which we have worked through options on over the last year or so.
Jayant Acharya
executiveWe're pushing full end-to-end digitization, generating efficiencies throughout operations, and enhancing customer service at every one of our facilities. We're also continuing to expand our downstream capabilities and product lines in step with market opportunity. Our attention on the VASP product is going to stay as we move ahead and add capacity. In quarter one 2025, we reported crude steel production of 6.35 million tons, down 1% YoY, largely because of plant shutdowns at Dolvi and BPSL. We reported sales of 6.1 million tons, a 7% growth YoY, powered by strong domestic demand in India. The India operations turned in the highest quarter one sales ever. At the Indian operation level, we saw an overall sale of 5.9 million tons, driven by 5.3 million tons of domestic sales, which grew 14% YoY. The export share dropped because of a weaker environment in international markets and came in at 10% versus 15% in the previous year. We also reported the highest ever share of value-added and special products during the quarter at 64%, growing 14% YoY. A number of segments were essentially the focus, and we achieved the highest ever sales in the renewable segment, the packaging segment through tinplates, and the corporate segments, which delivered very good domestic growth.
Jayant Acharya
executiveOn top of that, the electrical steel business is coming up nicely. It's also a sustainable product tied to energy savings, and it posted its strongest sales yet in the quarter just ended. Sales into the bearing segments likewise hit an all-time high in that quarter. So our push on value-added and special products, across sectors and segments, kept paying off. Consolidated revenues from operations came to INR 42,943 crores, a 7% decline quarter-on-quarter, while EBITDA was INR 5,510 crores, 10% lower quarter-over-quarter. The EBITDA margin held roughly flat at 13%, same as the prior quarter. Consolidated EBITDA per ton worked out to INR 9,007, and profit after tax was INR 867 crores. Results were hurt by softer volumes stemming from maintenance shutdowns at Dolvi and BPSL, as I noted, by inventory losses from inventory reevaluation, and by other one-offs that showed up in the last quarter. Overseas operations felt the effect of a weaker market in the United States, particularly on prices, while volumes stayed more or less steady. Italy operations were broadly stable in the quarter just passed compared with the one before. We managed to offset this through an improved product mix and reduced raw material costs on both the iron ore and coking coal side.
Jayant Acharya
executiveOn the domestic flat steel market side, prices increased in April and May, then fell in June due to the international environment—particularly cheaper imports arriving from China and FTA countries. For longs, prices jumped sharply during the quarter because of supply-side challenges; that increase eased in June, though. Export prices stayed soft. Even so, our realizations improved quarter on quarter thanks to a better product mix that we managed to optimize. NSR realizations rose by roughly INR 550 per ton. Despite those price headwinds, I believe we delivered good overall sales for the quarter. On costs, coking coal came in lower by around $23, similar to our guidance and consistent with what we had guided. Lower iron ore and other operational costs also helped us. But because steel prices dropped in June, we booked an inventory reevaluation loss, and that, along with our one-offs in Indian operations, offset the reduction in production costs for the quarter. Our U.S. operations—Ohio and Texas combined—posted an EBITDA loss of roughly $2.6 million, mainly from falling prices for both HRC and plates.
Jayant Acharya
executiveOn Italy, as I said earlier, things remained steady — in fact, quarter on quarter it was slightly better. For Italian operations we're looking for a stronger showing in quarter two, whereas how the U.S. business does will mostly hinge on where steel prices in the U.S. move. Net debt is at INR 80,199 crores, and the main reason it went up is an acceptance payout of roughly $300 million, which brought our acceptances down to $1.75 billion. Add to that higher CapEx as we finish projects. CapEx spending came to nearly INR 4,500 crores in the quarter. Beyond that, we laid out INR 228 crores as an upfront fee for our coking coal mine startup, which we want to fast-track, plus some additional working capital we needed given the new facilities being set up. To sum up, revenue acceptances stood at $1.75 billion as of 30th June, a drop of $300 million over the quarter, and capital acceptances were $124 million. JSW One Platform — a trusted one-step digital marketplace serving the manufacturing and construction ecosystem — keeps scaling, with over 58,000 registered customers at this point. Gross GMV for quarter one rose almost more than four times, reaching INR 2,500 crore plus, and it's still expanding quickly.
Jayant Acharya
executiveJSW Steel owns 69% of JSW One Platforms. Our board has given the go-ahead to move the assets tied to a 30 million ton slurry pipeline project still under construction in Odisha over to JSW Infrastructure Limited through a slump sale, and to sign a long-term take-or-pay agreement with JSW Infrastructure Limited covering iron ore slurry transportation across 20 years. That slurry pipeline project will change hands on an arm's length basis for a consideration of roughly INR 1,700 crore, which works out to the sum of the fair value of cost incurred up to 31st May 2024, as an independent valuer determined, plus cost incurred after 31st May 2024 through the actual date of transfer. Shareholders' approval and other regulatory approvals are conditions for this transaction. This transaction mirrors our capital allocation strategy at JSW Steel, under which steel capacity growth and raw material security stay our core Capex priorities for capital allocation. We have commissioned the hot strip mill of the 5 million-ton Brownfield expansion at Vijayanagar, and commercial production and sales began in March 2024. We expect the Blast Furnace to be commissioned by end of July and the SMS by end of August 2024.
Jayant Acharya
executiveWe're looking for the expansion project to ramp up in quarter three of FY 2025. Over at BPSL, the phase two expansions have had most of their equipment and facilities commissioned. Commissioning of the Oxygen Plant is set for July, and a gradual ramp-up across overall operations should come about by quarter three, 2025. That balanced capacity of 0.5 million ton is going to be reached via de-bottlenecking by FY 2027 — we're examining new technologies there — and we'll take a shutdown that lines up with the blast furnace shutdowns, so that no outage occurs. CapEx for the company in quarter one came to INR 4,466 crore, to be exact, as I said, plus INR 228 crore of upfront payment for mining. For FY 2025, we're expecting consolidated CapEx of roughly INR 30,000 crore. As guidance, let me sum things up: the new facilities at Vijayanagar and BPSL will ramp up during FY 2025. When it comes to shutting down blast furnace number three at Vijayanagar for capacity enhancement, we'd like that scheduled toward the end of FY 2025, once JVML's operation has stabilized. The BF3 shutdown should run between 140 to 150 days. Looking ahead to quarter two, we expect better volumes from our existing operations and from new facilities coming on stream.
Jayant Acharya
executiveWe're still on course with consolidated production guidance of 28.4 million tons and sales guidance of 27 million tons. As we head into Q2, we anticipate gains from raw material cost savings, including a coking coal price that's lower by $23-$28 per ton. Iron ore prices have softened as well, especially toward last month, and we'll receive the complete benefit from that during Q2 FY 2025. Although steel prices have stayed weak, we expect a decline in raw material cost to help us lift steel spreads above present levels, thanks to the raw material cost benefits over Q1. In closing, India remains a bright spot among the major global economies and offers a multi-decadal growth opportunity. We think strong steel demand growth will persist, driven by ongoing public infrastructure investments, higher private capital expenditure, and continued momentum across various sectors. Rural demand has shown a noticeable recovery, with a normal monsoon anticipated, and that should add further to India's consumption growth momentum. Thank you, and we look forward to your questions.
Operator
operatorThank you. Ladies and gentlemen, we'll now start the question-and-answer portion. If you'd like to pose a question, please press star and one on your touch-tone phone. Should you want to drop out of the question queue, press star and two. We ask participants to use handsets when asking a question. Ladies and gentlemen, we'll pause briefly while the question queue assembles. Participants, so that management can address questions from all participants in this conference, we request that you limit yourselves to two questions for participants only. The first question comes from the line of Amit Dixit from ICICI Securities. Please go ahead.
Amit Dixit
analystGood evening, everyone, and thank you for the chance to speak. Congratulations on delivering a strong performance under very challenging conditions. I have two questions. The first is more of a macro one. We've been observing that Chinese imports—and imports from other nations too—have been rising in the country, and Q2 imports also look quite high. As you correctly noted during your opening remarks, no barriers exist. So how should we factor in domestic consumption growth—that benefit would flow to the domestic steel companies? What sort of discussions are you having with the government to make sure some form of protectionism is in place? Because circumvention is occurring on a large scale. So how do we address that?
Jayant Acharya
executiveYes, Amit, that's a very fair point, and you're absolutely right. At JSW, imports are a concern for us—particularly those coming from China and the FTA countries—because they've risen compared with a year earlier, and although they're marginally lower than in the prior quarter, the figure remains very high. We're raising this issue with the government, asking for various trade-limiting measures that need to be implemented with a quick response time. There are instances where trade measures permitted under world trade regulations are evident, and those could be fast-tracked. Beyond that, we're exploring and discussing additional trade measures that might be feasible. As you know, I think barriers have already been introduced by many other countries, which leaves us more exposed to this flow. Discussions are ongoing, and we would expect the government to take some steps on this front. That said, we keep working on the cost side. Through various strategic initiatives, we keep examining multiple avenues for reducing our costs. Besides the raw material flows of coal and iron ore coming in during these quarters—both quarter one and quarter two—we expect, again, that the sale price will now be range-bound.
Jayant Acharya
executiveGiven that it has eased, and based on what I hear from Chinese sources, Chinese exports are priced under variable cost, so that situation probably won't last very long. We aren't anticipating a decline, or much of one, in prices, nor anything beyond that. Prices ought to stay within a range. Demand in India will keep being strong, and as you saw in quarter one, our emphasis has been on the domestic market. Exports accounted for 10% of our share, and we'll stay within the 10%-15% range for exports, while otherwise concentrating on the domestic market.
Amit Dixit
analystAlright, sir. The second question is basically about raw materials. So could you tell us what your iron ore sourcing mix looked like this quarter, and break it down into your own mines, perhaps from OMC and NMDC, and imports. And also, the progress on the coking coal mine in Mozambique — we indicated that we would be able to do the box cut maybe in FY 2025. So what is going on over there? That's all from my side, sir.
Jayant Acharya
executiveUnderstood. So when you look at these two aspects of the iron ore sourcing strategy, as I said last time, our Karnataka ECs for the existing mines have mostly come through. A few are still in process. As a result, we're seeing higher volumes from our Karnataka mines going into Vijayanagar. Of the three new mines that were auctioned, we've already gotten recommendations for two. The remaining one is in process. We expect to bring these into operation over the course of this year. That will improve our iron ore mix for Vijayanagar, which means we'll need less iron ore from outside the state. On NMDC, I think our NMDC flow was affected by some strikes NMDC had recently. That appears to be behind us now, but we've managed to source pellets from alternate sources to make up for it. Our captive iron ore overall sits in the range of just a shade under 40%, roughly 38%-40%. That said, we keep in mind that we are structurally avoiding moving material from Odisha to Vijayanagar. As I mentioned, our Karnataka ramp-up is coming from our own mines.
Jayant Acharya
executiveIn a similar way at Dolvi, we're sourcing a blend—partly from Karnataka, partly from Maharashtra, with the remainder coming out of Odisha. That combination is what holds our captive mining around this level. Even so, we keep reviewing that blend, looking at whichever cost structure is most optimal and that we can secure for the site. Turning to the coal in Mozambique, the paperwork has been signed, and government approvals are underway. There are, however, certain land clearances still outstanding, and on that basis the government has raised some concerns, which we are taking up with them, since the earlier party did not finish some of the land requirements. Those were finished in June, albeit with a bit of delay. Talks with the government continue. We expect that condition to be eased, and that we should secure the approvals over the course of this year.
Amit Dixit
analystAlright, sir, that’s really useful. Yeah, that’s a big help. Thanks, and best of luck.
Operator
operatorThanks. Our next question comes from Sumangal Nevatia at Kotak Securities. Go ahead, please.
Sumangal Nevatia
analystGood evening, and thanks for the opportunity. I'd like to follow up on Amit's question about coking coal. Could you eventually share what the capacity might be at Mozambique's cost of production? In the annual report, we read that these are very high-grade mines with enormous reserves. So some kind of quantification of volumes and capacity, and the year in which production could begin. And then on domestic coal as well, we're thinking the mines would total around 3 million tons. So some guidance on what the cost would be versus the market cost.
Jayant Acharya
executiveMozambique is still at an early point in the approvals process. To figure out what sort of evacuation and what level of cost we can achieve, we'll need to get into mining operations. After those approvals come through, we'll be in a position to enter the mining operation and share some clarity with you. But as I said on the previous call, this is — as you correctly noted — a prime, low-volatile, hard coking coal asset, and that's the reason we took an interest. It holds roughly 800 million tons of reserves — 800 million ton plus. It ought to yield clean coal of around 280 million ore. And should we manage to retrieve all the assets, evacuation right now is feasible via Beira Port. As our volumes grow down the road, we'll examine the evacuation strategy. There's also a chance to expand port operations in that location. So as we gain more clarity and get approvals in place, we'll be able to provide you with additional color on this.
Sumangal Nevatia
analystGot it. Got it. On timing, is that—I mean, is it a few years off, at least 3 to 4 years away?
Jayant Acharya
executiveYes.
Sumangal Nevatia
analystAlright, my second question relates to the cost of iron ore. Could you share the gap between the delivered price of our captive iron ore and the market price? In other words, are we currently paying a meaningful premium over market price? And yeah.
Jayant Acharya
executiveGiving you that specific breakdown might not be possible, but consider how you're looking at it — you know the mine premiums we have across the different locations. At some places the premiums run lower, at others they run higher. Looking ahead, I think we've got a solid mix. We hold close to 23 or 24 mines that came to us through auctions. 13 of those are in operation. The rest still need to be operationalized. Their resources total roughly 1.6 billion tons, which is a really big positive as we expand capacity. As for the premium we carry — given how iron ore premiums have risen across the last few auctions, our sense is that the premiums we hold now look more moderate when we see the new premiums coming through. I think we'll be able to balance this better from a logistics standpoint. That's precisely why we're looking at the 30 million tons slurry pipeline, since from a dedicated mine it can move the material via slurry pipeline to the port, which is not only far better environmentally but also cuts the cost sharply. It will also let us build out pellet plant capacity at our new Paradip facility at the Jagatsinghpur.
Jayant Acharya
executiveThis agglomerated fuel — essentially agglomerated pellets — also brings down fuel costs. So those are things that will work in our favor. We keep examining ways to get the mines in Goa and Maharashtra up and running for Dolvi operations, and as we move along toward our expansion goals, that should give us additional downside on iron ore cost.
Sumangal Nevatia
analystGot it. If I could squeeze in one final question. On Ohio, once again, our losses there have begun to climb. So any guidance you can give on that would help. And really, from a strategy standpoint, is there a compelling argument for maintaining a presence in these geographies? I mean, profitability has been highly volatile, and historically, neither we nor our peers have generated any value in these markets. So what is our long-term thinking when it comes to these developed-country exposures?
Jayant Acharya
executiveThe way we ought to view this is that, from a volume standpoint, Ohio operations have steadied. Each month we're running near 80,000 tons to 90,000 tons, and in certain months reaching 100,000 tons. So volume levels are in good shape. At Baytown as well, volumes and capacity utilization are fairly healthy and steady. The area where we've taken a hit is domestic pricing within the United States. Looking at the price points, hot rolled coil per metric ton stood at $900 on 1st of April and dropped to roughly $720 in recent days, as we speak. That has affected the overall viability of the Ohio operations. I'd say that with the new products we're seeing and fresh interest stemming from the Ohio expansions, which remain on track, we should be able to enhance our product mix, lower our commodity exposure, and supply Baytown for wind as well as monopiles and oil and gas, for which we're building both sets of assets. That's how we're approaching it. And I think we shouldn't view this quarter-on-quarter. The positive is that volumes are pretty much stable.
Sumangal Nevatia
analystThanks, and I wish you the very best.
Operator
operatorThanks. We’ll go to the following question. It comes from Satyadeep Jain at Ambit Capital. You have the floor.
Satyadeep Jain
analystHi, thanks. Jain, one additional point on this timing. Regarding the reasoning behind and the schedule for moving the slurry pipeline over to JSW Infra, we've already completed that work. Did you encounter any execution difficulties inside JSW Steel? What's the reasoning? Since the focus is on the core steel business, JSW is also invested in JSW Paints and JSW Neo. Might any purchase of rakes also arise down the road? Would that too sit within JSW Infra? I just wanted to grasp the reasoning for why the asset is being transferred to JSW Infra at this point. That's my first question.
Jayant Acharya
executiveWe're growing our steel capacity at a really fast clip. As you've observed, the goal is to reach 50 million tons in India by the close of this decade. We want to make sure capital allocation for growth in our steel assets is done prudently, since these are brownfield expansions. As I said previously, the Dolvi project, which we've just kicked off, comes in under $500 per ton of investment cost, and that's highly value-accretive. Our focus should be on product capital allocation. Next, this infrastructure pipeline is a physical asset. The infrastructure business already runs a port at that site in Paradip. They operate in logistics solutions and the infrastructure business. They can handle this more effectively, and it fundamentally won't demand too much bandwidth from the JSW Steel side. That lets us direct our bandwidth toward our expansions as well. We'll keep oversight on how this project is executed. Our rationale for handing this to JSW Infrastructure, subject to shareholder approval and other customary approvals, is essentially to achieve better capital allocation, which we'll carry out in steel, while leaving it to a solution provider with stronger experience on the infrastructure side.
Satyadeep Jain
analystWell, I just wanted to get a handle on that. I mean, that same reasoning would have applied before you spent Capex on the pipeline. So what makes it make sense now instead of at the very start? And then, looking at that take-or-pay contract, can you put a number on the price? On an annual basis, what would they charge for this?
Jayant Acharya
executiveLet me address your first question. Why didn't we do this sooner? The project actually began a while ago, and we've faced a range of challenges along the way — things like diverting lines, national highways, and water bodies. As you're aware, JSW Infrastructure recently got listed. Their overall capacities in the business have risen quite substantially over the last 2 to 3 years. They're now able to take on additional investments in this kind of infrastructure and logistics solution, which is a capability they now have. That's one reason it's happening now rather than before. Your second question concerned pricing, specifically take-or-pay. While this pipeline is 30 million tons, our take-or-pay is capped at 60% of that, at 18 million per ton. Our thinking is essentially that we can do better, because if you look at our 15 million ton Dolvi expansion, which sources part of its iron ore from Orissa, Dolvi alone will need roughly 25 million tons of iron ore. We'd use a blend and a mix, but that's why we've set a conservative target at the 60% level.
Jayant Acharya
executiveOur main concern here is essentially what gets transferred to them, namely the slurry tank side of things. Once the material comes in, the emphasis from our end will once again be on JSW Steel, and on their side they'll install the filtration units and the grinding equipment as well as the pellet plant. So our attention will be on those assets, which should let us finish the whole asset more quickly — the slurry pipeline, the pellet plant, and the development of the Paradip site.
Satyadeep Jain
analystAnd when it comes to price, aside from that minimum quantity price, has that been locked in as well, or not?
Swayam Saurabh
executiveThis is Swayam speaking. Regarding the price and the kind of IRR involved, those specific details aren't something I can share with you. What I can say, though, is that the capital freed up from this project would be directed toward constructing Dolvi Phase 3, which we announced during the previous quarter. The IRR on Dolvi Phase 3 is considerably greater than the IRR that has been negotiated with Infra on this particular project. This really comes back to the theme Jayant raised concerning prudent capital allocation.
Satyadeep Jain
analystAll right, thanks a lot.
Jayant Acharya
executiveI want to reassure everyone that once the take-or-pay arrangement is behind us, the operating cost will deliver meaningful benefits to JSW Steel.
Satyadeep Jain
analystAlright, thanks.
Operator
operatorThanks. We'll take the next question from Ashish Kejriwal at Nuvama Institutional Equities. Go ahead, please.
Ashish Kejriwal
analystHi, thanks for the chance to ask. So, carrying on from that same question — we've actually built out this project, and you also noted that we've put in a lot of effort on relocating lines, natural bodies, and so on. When we were halfway through it, we had already sunk INR 1,700 crore into it. And the payback period might be two or three years. So it's hard for us to grasp why, if JSW Infra gets listed and they're now able to take on extra capex, we're proceeding this way. Because this project might be far more advantageous to us, with a payback period of maybe three to four years. Or could you justify how much extra saving we would have achieved thanks to this, and what the likely saving would be now after doing it?
Swayam Saurabh
executiveSwayam here once more — let me put it a different way. It may look like this came out of nowhere, but I want to assure you that moving forward too, you'll find that our capital is mainly allocated, first, to expanding steel capacity, since we've already discussed reaching 50 million tons. And we want to reach that as fast as possible. You've observed the demand growth in the domestic market during quarter one. Our view is that this momentum will carry on. Which means capital will be required for constructing steel plants. Second, it will be directed toward securing raw materials, on the coking coal side as well as the iron ore side. Now, if we're going to devote that sort of capital to what we regard as our core priority, then whatever holds a lower priority must be dropped.
Jayant Acharya
executiveAnd although this choice may look like a one-time thing, you’ll notice this pattern in how we allocate capital going forward as well.
Ashish Kejriwal
analystSir, but that still doesn't get to what I'm actually asking about, what I'm really trying to look at here. To put it another way, when this project was being set up, we believed we could have saved a great deal on freight cost per ton. And clearly, that could amount to two or three years of your payback period. Now, if you do the same thing and the total CapEx comes to INR 60,000 crore-INR 65,000 crore, I don't think an extra INR 1,700 crore would be a burden on the company, nor would it change the course of the business. So again, the question stays the same. If this project was so beneficial at the start, when we could have paid over a period of 3 to 4 years, why are we shipping it to another party? And definitely, part of the profit will go to that other entity, which we could have earned ourselves.
Jayant Acharya
executiveSo the question is about the CapEx for the slurry pipeline, which we had earmarked at roughly INR 3,400 crore. Of that INR 3,400 crore, some money has already been spent, and that will be evaluated at fair value and then transferred. On the operational cost side, as we said, those costs are being worked out in such a way that the operational cost will be at arm's length with respect to the actual variable cost they are getting plus returns on the equity they are investing. We should be able to get more value when we take this INR 3,400 crore out and put it into our expansion at Dolvi, because the returns on those projects are higher. So from a capital allocation standpoint, since we are trying to spend almost INR 20,000 crore every year, it is more prudent for us to make this change at this point in time. That is the thought process. From a savings standpoint, I think we will be very similar to what we targeted our savings to be at when we started the project.
Ashish Kejriwal
analystOkay, so sir, is there likely to be any plan on our side to move some of the assets we already have in operation in Karnataka over to JSW Infra as well, or will that apply only to new projects going forward?
Jayant Acharya
executiveNo, there isn't any other plan like that. As I mentioned, with this particular asset, the reason we're doing this is that it's a portion of the asset where we've already spent some money and still have to keep spending two-thirds more. So this is one area where we saw a chance to redirect the capital, and that's the reason we've done it. In Karnataka, there are no plans to transfer anything to JSW Infrastructure.
Ashish Kejriwal
analystThanks. On the second question: during your opening remarks, you said that for quarter two we should see spread improvement versus quarter one, driven by reduced iron ore and coking coal costs, which would counterbalance steel prices. So within that, did you assume prices stay stable over the next two months, or are you expecting any additional decline from this point?
Jayant Acharya
executiveHonestly, pricing is really hard to call right now with the way international steel markets look. That said, my expectation is that prices will stay rangebound. As I said earlier, the Chinese export cost is already sitting in negative territory as we see it today. So we don't see much likelihood of any price decline. That means margins should stay protected via raw materials, even in the absence of any meaningful price increase. Still, we're working to improve our mix toward value-added products. Our volumes will come through, and those two things together will lift our absolute capital. From the standpoint of existing operations, we hit 6.35 million, mainly due to the shutdowns at Dolvi and BPSL. We anticipate a substantial volume addition from existing operations in quarter two. On top of that, the new capacities will come online at the end of quarter two. So on an absolute number basis, these volumes will deliver an absolute increase in capital. On a per ton basis, as I mentioned, raw material prices along with some other initiatives we've undertaken will lend support to margins.
Ashish Kejriwal
analystSure. Thank you, sir, and best wishes.
Operator
operatorThanks. Our next question comes from Indrajit Agarwal at CLSA. Your line is open.
Indrajit Agarwal
analystSir, hi. Back to costs for my first question. So regarding coking coal, once that $23-$28 decrease in Q2 is in, will it capture spot prices in full, or might we see, purely on the basis of spot prices, further reduction in Q3?
Jayant Acharya
executiveLook, essentially what we have is visibility from the PLV figures that came out over the last month. So with coking coal, as things stand right now, you'd have noticed prices sitting probably under $240 — $240 at Aus PLV Australia. Given the pressure we're observing around the steel environment across the broader global steel industry, we therefore anticipate these prices might decline a bit further. There's a case for the price to fall somewhat more. Still, offering any sort of estimate at this moment is hard. So what I can tell you is that in quarter two we're expecting $23-$28, on top of a $23 sort of impact already seen in quarter one. So taken together across both quarters, you'll see close to probably $48 odd of decline. JLV is $232 today. JLV sits at about 232 today. I was just informed it's roughly $232 at Aus PLV Australia.
Indrajit Agarwal
analystSure. Thanks. My second question actually returns to the slurry pipeline. So did I hear it right that INR 1,700 crore is a consideration you'll be receiving, right, versus a CapEx turn-off of roughly INR 850 crore-900 crore? Is that accurate?
Jayant Acharya
executiveYes. At fair value, on a cost basis, through May 31. Yeah. Okay. No — what you're asking about is the cost we've incurred. The amount we had incurred as of May 31 came to roughly INR 1,200 crore.
Indrajit Agarwal
analystAnd the price tag on that is 1,700 crore rupees?
Jayant Acharya
executiveRight. It’s ultimately going to be decided on the transfer date. So we’re still spending on the asset. And when the transfer happens, we’ll take the cost based on a fair value assessment.
Indrajit Agarwal
analystSure. Actually, to follow up on that point — since both are listed entities — did we look at any other potential buyers, or was it just a group company and we've settled on JSW Infrastructure?
Jayant Acharya
executiveWe did explore other options in this sector. You may also be aware that one of the public sector entities attempted to build a slurry pipeline running from its iron ore facilities to the port; they issued a tender, yet four years have passed and they have not managed to secure any takers. We made inquiries with a couple of larger contractors, but this fell outside their focus area. The country's two other operating pipelines were mainly constructed by the entities themselves or through their group companies. That is the reason we reached out to JSW Infrastructure to see whether they might have an interest. And that is why we examined a model — essentially this model — together with JSW Infrastructure.
Indrajit Agarwal
analystThanks. And do you have any plans like that for JSW One, or will you keep it within our entity for at least the foreseeable future?
Jayant Acharya
executiveLook, JSW One is a digital platform. The basic concept is to provide a transparent product across our companies — steel, cement, paint — to MSMEs and to home builders. Then we widen that basket over time. We've already begun building homes via JSW One. A few have already been completed. We have decent order books right now. Delivering that to home builders is a good achievement on our part. On the MSME side, we're gaining more and more benefit. Volumes are rising. We can now reach the smaller MSMEs that we can't access directly, since some of them need five tons, some need two tons, three tons. That's where the JSW One platform, together with their franchisees and service centers, can reach them. And that's the direction we're going. Divestment is hard to predict, because valuations for entities of this type will keep shifting. Previously we had Mitsui as an investor who showed interest in this asset. We'll watch how the business develops and then take a view.
Indrajit Agarwal
analystAlright, that covers everything from me. Thanks.
Operator
operatorThanks. So, everyone, so that management can take questions from everybody on this call, we’d ask each participant to keep it to just two questions. Our next question comes from Ritesh Shah at Investec. Please go ahead.
Ritesh Shah
analystHello, and thanks for taking my questions. I have a couple. First, on the quality control order: there have been 2 orders. With the second one, the net was widened nicely, but so far we haven't seen any impact. Is the industry proposing something, or is the government considering doing something to make this work? That's my first question.
Jayant Acharya
executiveRight. So we're examining the quality standards along with the quality control orders that have come out, and those have been under continuous review, and whatever isn't covered, we're raising with them. That said, I think there are still substandard products, or products that deviate from the BIS, still entering under the guise of a different BIS. That's what we're highlighting and then figuring out how to tackle. So that's what we're pursuing with the BIS and the consumer affairs ministry.
Ritesh Shah
analystSo there's no immediate hope on this?
Jayant Acharya
executiveSo fundamentally, take coated products as an example: there are certain ones where the zinc substrate ought to be at a particular level, and it may sit at a lower level, and once the color goes on, that isn't visible on the substrate. You get instances of circumvention occurring from one country to another, and then if that carries BIS, it gets circumvented and arrives in India. Those are challenges we face today, which have been taken up, and I think discussions are underway. I can't state with certainty what steps will follow, but we are talking with the government about tightening the quality control laws.
Ritesh Shah
analystSure. Sir, regarding your second question, do you have any views on the two assets, RINL and NMDC Steel? We had said we would be open to everything. Is this something that is currently in progress? How should we view it?
Jayant Acharya
executiveWe aren’t open to just anything. I believe we mentioned previously as well that we do examine assets that make strategic sense for us. As for NMDC, we have submitted an expression of interest, but as you’re aware, it stalled because of the code of conduct and other establishment matters related to getting the factory operational, and so on. So when NMDC comes up again, we’ll take a look at it. RINL is in a different state. We’ll need to observe and monitor how that develops and whether the asset comes down the divestment route or not. If it does come at that point, we’ll review it based on the document and determine whether it makes strategic sense for us.
Ritesh Shah
analystSir, just two quick things to finish. Sir, I notice JSW One now has an NBFC. Does that carry any meaning for the distribution sales network at JSW Steel? Is there any way in which it helps? How are we meant to interpret that? And finally, BPSL's profitability has improved sharply quarter over quarter. How are we to read that — how should one interpret it? Thank you.
Jayant Acharya
executiveRight. Previously, we had mentioned that BPSL's profitability was on the lower side, so we made efforts to enhance it. That said, I believe numerous initiatives have been undertaken at BPSL aimed at upgrading various operational parameters, and those are now becoming visible. From the standpoint of specific consumption, from the standpoint of coil cost, from the standpoint of streamlining logistics costs tied to raw material movement, I think work has been carried out, and that is how the improvement in profitability is showing. Another thing we have managed at BPSL is that we have been able to utilize our downstream assets fairly effectively. Downstream assets are now operating at almost full capacity. Capacities are being loaded. We have also begun pipe manufacturing via our pipe asset at BPSL, which is the former Kalinga brand, which existed and which carries a good reputation. So the downstream facilities in coil rolling, galvanizing, color coated, and Galvalume have been ramped up. That too is contributing to your value, as you can see. The other question you raised prior to BPSL concerned JSW One and NBFC. JSW One is attempting to provide a complete solution to the customer.
Jayant Acharya
executiveThey’re not just considering a financing option for anyone who requires it — they’re also considering a logistics answer for getting the material delivered, and service-center answers that let them supply it in cut form. So what they’re doing is building a supply ecosystem along the lines of what you’d get from the Amazons of the world. The aim, then, is to set up a commercial marketplace — an e-commerce venue — where they can offer the product to the customer at the door. If financing is needed, it will be there.
Ritesh Shah
analystAbsolutely, sir. Thanks very much.
Operator
operatorThanks. Our following question comes from Amit Murarka at Axis Capital. You have the floor.
Amit Murarka
analystHello there, and good evening. I appreciate the chance to ask something. Honestly, my question once again concerns the slurry pipeline. So, at the point when the... Thank you,
Operator
operatorMr. Murarka, we’re having trouble hearing you clearly. Could you switch to handset mode when you speak?
Amit Murarka
analystHas it improved at this point?
Operator
operatorSir, that's a bit better. Go ahead, please. Thanks.
Amit Murarka
analystAlright, so my first question is about the slurry pipeline again. If I'm not mistaken, at the time those auctions took place, you had placed bids involving a high premium and so on. The thinking back then was that this would deliver savings on logistics costs via the slurry pipeline and so forth. So on one hand, we bid aggressively for iron ore and absorbed that cost into our P&L, but it now appears the benefit from the slurry pipeline won't materialize, since you'll be paying whatever transport charges and so on to JSW Infra. So could you help us understand once more why you described it as take or pay? And could you also quantify it somewhat — does it still offset the negative impact of the iron ore premiums on your P&L?
Jayant Acharya
executiveNo. I think the way we see it is that JSW Steel will still get the operational benefit. It's essentially handing over the asset on a build-and-operate basis, similar to leasing, where an entity handles the financing and our capital allocation is freed up for our steel expansions. The savings from iron ore transportation will still come to us. We'll pay them certain charges for operational costs, which will be set mutually, and as I mentioned in the last question, I think we're at a better plan — clarified, at a much better IRR, which we've been able to achieve from JSW Infrastructure versus the IRR we see in our greenfield project at Dolvi. So from a capital allocation and return standpoint, it's actually positive.
Amit Murarka
analystAnd honestly, having some figures would really be useful. For instance, compared with what you currently spend on transportation through the slurry pipeline payments, what kind of savings would that be, or something along those lines?
Jayant Acharya
executiveWe’re therefore expecting savings of roughly INR 900 to INR 1,000 per ton on iron ore. If you look at steel, you can multiply that by nearly 2x.
Amit Murarka
analystSo that's after deducting what we pay for using the pipeline, is that what you're saying?
Jayant Acharya
executiveAll of it. All of it. All right. Of course.
Amit Murarka
analystAnd then second, as you said, imports are generally going up, and we’ll see how consumption turns out this year—but suppose it’s a more subdued year for steel consumption in India. And there’s so much capacity addition. So could you, I mean, push back the ramp-up of your capacity in that case, simply because exports look unviable right now?
Jayant Acharya
executiveOkay, Amit, so actually the situation with capacity is that migrant labor has pushed ours back by a month—a month and a half—since some of those workers who returned home didn't come back over the election period, and the heat wave contributed too. Across India generally, we're observing constraints on labor capacity. Honestly, the way I look at it, in the last quarter we got a positive surprise: 14.9% YoY growth in Indian demand. Looking ahead, I expect demand growth of roughly 12 million-14 million tons this year. If you examine the capacity additions, ours included, they're weighted toward the back end, and most other capacity additions this year are back-ended as well—those additions will unfold across perhaps two years or slightly longer. Over a two-year horizon, the way to view it is that the country's demand is going to rise by 25 million tons.
Amit Murarka
analystThat isn't HRC — sorry to cut in — but that is not an HRC increase. Every bit of that capacity is HRC.
Jayant Acharya
executiveI completely agree with you on that point. We've also run the numbers using HRC. When it comes to capacity versus the growth and demand from flats, we don't have concerns about consumption over the next two years. Taking into account the capacities that are coming online and the ramp-up we expect, we believe most of this will be absorbed within the domestic market. As we've mentioned, exports will likely stay in the 10%-15% range for us.
Amit Murarka
analystAlright, thank you very much.
Operator
operatorThanks. Our next question comes from Bhavin Chheda at Enam Holdings. You have the floor.
Bhavin Chheda
analystYes. Good evening, sir. Could you give us some guidance on where peak debt or net debt stands?
Operator
operatorGood afternoon, sir. Mr. Chheda. Sir, could you switch to handset mode while you're speaking? The audio isn't coming through clearly.
Bhavin Chheda
analystHi there. Is my audio coming through okay?
Operator
operatorYes, sir. That’s much better. Thanks.
Bhavin Chheda
analystYeah, could you walk us through what peak net debt is likely to be this fiscal year? And if you're able to give some guidance on ratios — whether it's net debt to EBITDA, net debt to gearing, or whatever metric you track — what peak levels would you be comfortable with?
Swayam Saurabh
executiveSwayam speaking here. We've said repeatedly that our preference is to stay under three on net debt to EBITDA. That said, during a quarter or across one or two quarters it may tick up a bit, though ultimately our aim is to move nearer to 2.5. So as broad guidance, we don't anticipate going much above the three we've just reported. By the close of this year, we do expect to be back nearer to 2.5.
Bhavin Chheda
analystAlso, could you help us out with the actual net debt figures, or would that be tough to do?
Jayant Acharya
executiveIt’s hard to give you a precise figure for that, but as we said, we’ve repaid acceptances totaling INR 300 million. We’ve tried to inject some working capital into the business. We’ve spent a bit upfront on CapEx, since we’re completing the ramp-up at JVML and BPSL and also beginning phase III at Dolvi. So as that working capital is released, you’ll see part of it coming back to bring down the debt. Still, putting an exact number on it would be difficult.
Bhavin Chheda
analystYeah, of course — I mean, that's something you can hand over to me.
Swayam Saurabh
executiveOn your second question, we remain within the CapEx cycle. Once you reach the end of that cycle, it becomes simpler to provide an absolute figure and offer guidance. The ratios, though, matter more.
Bhavin Chheda
analystOkay, regarding the second point about captive iron ore mines obtained through auction — as you mentioned, there are 124 such mines, and 13 of them are operating at present. So what is the mining run rate for those 13 mines? And if you could split that between Karnataka and Orissa, plus what the status is for the remaining ones and when they'll commence, and what sort of volumes you anticipate coming from them?
Jayant Acharya
executiveRight. So in Karnataka, the mines we already have — the 9 mines — represent roughly 11 million tons of capacity. The 3 new mines in Karnataka will bring another 4.5 million tons, and as I mentioned, those will begin operating over the course of the year. That puts Karnataka captive at around 15.5 million tons. Turning to Orissa, we have 4 mines running at present, and there output is near 20 million tons. The reason is that in Karnataka we are maximizing anyway — apart from the 4 million that has yet to arrive, we are trying to run our 11 million of capacity at full. In Orissa, we are currently running at 20 million. We could go higher, but we will do so according to what our ramp-up requires, and that ramp-up is coming in August.
Bhavin Chheda
analystYou mentioned Karnataka hitting 15.5 this year, and Odisha staying at 20. Does that account for all 24 of your mines, or will a few more still be waiting to come online afterward?
Jayant Acharya
executiveYes. A few additional mines are coming. We have 2 mines in Goa — that’s 1, 2, correct? We also have 2 in Maharashtra, where we have 1, and these need to be officialized. The Maharashtra mines are more P&L, developmental mines. So those will take somewhat more time. But in Goa, we ought to be able to reach operations sooner. Beyond that, we have one additional mine close to BPSL — Netrabandha, roughly under 100 km from the BPSL site. That mine, which should deliver about 2 million tons per annum, ought to be operationalized in the next year, as we see it today. So those are the mines.
Bhavin Chheda
analystAnd how much would Goa add, sir?
Jayant Acharya
executivePardon me?
Bhavin Chheda
analystHow much would the Goa mines contribute, sir? The two mines in Goa?
Jayant Acharya
executiveRegarding the two mines in Goa, what we're expecting from those two mines is currently about 1.5 to 2 million tons.
Bhavin Chheda
analystSure, and then my final question is about coking coal in Mozambique?
Operator
operatorAlright. Mr. Chheda, would you like to take that one?
Bhavin Chheda
analystSure, sure. One last thing on Mozambique coking coal — what do you figure you'll spend across 3 years? Yeah, sure. Yeah, thanks. Just regarding the Mozambique CapEx, I wasn't.
Jayant Acharya
executiveLike I mentioned, it’s hard to provide a CapEx figure until the approvals are in hand, we’re on site, and mining operations have begun. Once those approvals come through and we shift into mining mode, we’ll be in a position to share more feedback with you.
Bhavin Chheda
analystThanks. Thanks.
Operator
operatorThanks. Our next question comes from Raashi Chopra at Citigroup. Please go ahead.
Raashi Chopra
analystI just have a single question about realization. You mentioned that prices had corrected in June. So what's the gap between spot prices and the previous quarter's average, for both flats and longs?
Jayant Acharya
executiveI'd say flat prices moved up a bit in April and May. On the international side, they rose roughly $15 to $20. We saw that reflected in India — partly, I think, around $15 to $17 there. We did see an increase within that range. But in June, with pressure from imports out of China, Vietnam, and the other FTA countries coming in at lower prices, that price began to come down. I can't give you an exact figure for how much it will be on a spot basis quarter on quarter. What I can tell you is that in quarter one, even with a softer pricing environment, we managed to raise realization by roughly INR 540 to 550 per ton, thanks to better product mix allocation and more emphasis on domestic sales. So on price, it's hard to say how the market will move, but my sense is that in June and with whatever has happened on the July price announcement, prices now look more or less bottomed out, and they should stay around these levels unless imports create some further pressure.
Raashi Chopra
analystSo would it be fair to describe that 15 to 20 increase you saw in April and May as having mostly reversed, or did the correction go beyond that?
Jayant Acharya
executiveWe did observe a bit of an uptick from April to May. From June through July, I believe the bulk of that movement landed in the flat segment, largely on account of the lower import volume. You made that point correctly. That is accurate. So the positive effect from April and May has pretty much been undone. On the longs side, we saw a considerably bigger price rise over the quarter, driven by supply disruption across many regions, particularly among the secondary re-rollers and similar players. At this point, though, I think supply has come back as well, and on top of that the monsoon seasons have arrived. As a result, the longs side looks somewhat softer. So in that segment too, prices have come off, most notably in the secondary market. There, I think although it remains range bound, with monsoons you typically do witness seasonal effects. So that is not really unusual.
Raashi Chopra
analystThanks.
Operator
operatorThank you. The next question comes from Prateek Singh at DAM Capital. Please go ahead.
Prateek Singh
analystHello, sir. My first question mostly concerned the value of the slurry pipeline transaction. From what I can read, the yearly transaction volume we're discussing is roughly 30 million tons. So would that figure apply to 18 million tons, or to 30 million tons?
Jayant Acharya
executiveThat comes to 30 million tons.
Prateek Singh
analystOn 30 million tons. Okay, got it. So that would sort of suggest a transaction cost of INR 400 per ton for roughly 300 km. That's how to view it, correct? Nothing extra will need to be paid on top of that. This is a recurring cost they have to bear. Got it.
Jayant Acharya
executiveThat's right. You've got the math headed in the right direction.
Prateek Singh
analystSure. And we're saying that on top of that, we'll save roughly INR 900. So that sort of suggests that even if we were handling it on our own — I mean, without the slurry pipeline in place, our cost would come to about INR 1,500 to INR 1,600 per ton over a distance like this. So that kind of tells me — sorry?
Jayant Acharya
executiveThat really hinges on how much rail versus road you're using. The main problem in the Odisha sector is that railway wagons and rakes are in very short supply. So we operate our own rakes. We do use Indian Railways, but only a small amount of Indian Railways capacity is actually available. So if you're forced to move more by road, your costs rise. So it shifts based on what share of road transport you're compelled to take, and on top of that it's less efficient. So that's the cost you'd be looking at.
Prateek Singh
analystRight. Thanks. Yeah, yeah, that's exactly where I was heading with this. It does sort of suggest the emphasis leans quite a bit more toward road. So my follow-up question, then, is how does that figure shift? As you mentioned, at a minimum we were looking at roughly 18 million tons from that point. So would it move on a flow data basis if we take 18 million tons, or do different mechanics come into the picture here?
Jayant Acharya
executiveSo we have a table according to which, from 18 million to 30 million tons, a price exists because it steadily declines. If we hit 18 million tons, then obviously the figure is higher, but apart from that it falls. Our aim will be to keep the pipeline full. So our intention is, as you know, ultimately — we have stated our intention that we would set up a steel manufacturing site in Jagatsinghpur in Odisha. We are already in this budget. The slurry pipeline and the pellet plant are already included. Development of the pellet plant we will begin. Following that, we will examine the next phase of CapEx. Perhaps we will examine another pellet plant, which is not included at present in this CapEx. And with that, we will be able to utilize the full slurry pipeline. That is where our plan is headed. So what 60% is, is essentially a calculation done at the end. But the facility, once it is used at 30 million or 27 million or 25 million, there is a chart of reducing cost.
Prateek Singh
analystGot it. My next question is about autos. We've been seeing reports that you're currently holding a fairly sizable inventory. Could you remind us when the most recent half-yearly settlement took place, what size price increase we saw on a semi-annual basis at that time, and what it might be now?
Jayant Acharya
executiveHonestly, I can't call to mind the exact pricing figures and how they moved right now, but market conditions are what drive prices, and there are essentially set guidelines that govern how automotive pricing gets determined. Those terms get worked out with them according to specific guideline criteria — specifically how pricing shifted during earlier quarters. What I can say is this: on the demand side, I genuinely don't observe a significant deceleration. In quarter one, we're operating at a rate of roughly 692,000 tons, or 693,000 tons, of automotive. So at present our run rate comes to nearly 2.8 million tons annually. That will likely rise as time goes on. Demand coming from automotive, in my view, looks fairly steady. Regarding inventory — yes, you're referring to the dealer level, but looking at the FADA data, the registration numbers, that data has displayed considerably healthier expansion. What that means is inventory dilution is occurring and probably will continue to occur. I believe we should be fine. The base is elevated. That's naturally understood, since across the last two years they grew quite strongly.
Jayant Acharya
executiveBecause of that, the base is higher. The growth rate in percentage terms might come in a bit lower, but from what we can see, they will still post very positive growth.
Prateek Singh
analystGot it, sir. I appreciate you taking my question. Wishing you all the best. Thank you.
Operator
operatorThank you. Ladies and gentlemen, we'll treat that as the final question. At this point, I'll pass the conference back to management for their closing remarks.
Jayant Acharya
executiveThank you very much. I'd like to wrap things up by noting, as we've said, that economic momentum in India remains strong, and the country's steel demand reflects that. The government has sufficient fiscal room to increase spending — whether on infrastructure programs, manufacturing, or any other consumption-linked outlay. At JSW Steel, first-quarter volumes came in somewhat lower due to shutdowns. That situation is now behind us. So we'll see volumes improve from our existing operations as we move into Q2. Both of our new facilities, at Vijayanagar and BPSL, are at various stages of commissioning, and they should begin contributing volume near the end of Q2, with a ramp-up in Q3. As we've observed, we've managed a considerably better product mix, which has delivered value-attractive growth in realization. Costs in quarter two will likely be softer, as we noted, for coking coal and iron ore, both of which have eased. That will therefore feed through into Q2. These factors will support margins going forward. India remains a bright spot and a multi-decadal opportunity, and we expect the overall growth momentum to keep both consumer demand and overall demand in the country moving.
Jayant Acharya
executiveSo because of that, we view it as a strong opportunity for us within the steel industry to put capital to work, and we feel lucky to be part of this investment cycle here in the country. Thank you, and best wishes. Thanks to everyone.
Operator
operatorThank you, members of the management team. Ladies and gentlemen, that brings this conference call to a close on behalf of JSW Steel. We appreciate your participation, and you are welcome to disconnect your lines at this time. Thank you.
Read the full transcript via the API
You're viewing the first half of this call. Get the complete JSW Steel Limited transcript — plus 132,000+ transcripts from 7,000+ companies, speaker segments, AI summaries and full-text search — through the EarningsCalls.dev API.
Get the API View API docs →This call discussed
For developers and AI pipelines
Programmatic access to JSW Steel Limited earnings transcripts and 132,000+ others is available through the
EarningsCalls.dev REST API. Plans from $39.99/month — full transcripts, speaker segments,
full-text search, and the recently-added /api/v1/transcripts/recent polling endpoint for ETL pipelines.
More tools for stock research
OptionsBell: an unusual options activity scanner that tracks options flow across all US stocks and emails you when large trades appear in JSW Steel Limited or any ticker on your watchlist.
StockMarketScan: a stock screener with alerts: 24 pre-built screens refreshed every 5 minutes, watchlists and email notifications. Both offer API and MCP access and fair monthly pricing.